II PKERJAAN PONDASI
1 Galian pondasi batu kali m3 30,510.00 6.63 6.06 6.34 202,281.30 184,890.60 193,433.40
2 Urungan & Penimbuman tanah kembali bekas galian & bawah lantai m3 14,785.20 4.34 4.04 4.19 64,167.77 59,732.21 61,949.99
3 Urungan pasir dibawah pondasi & di bawah lantai t : 5 cm m3 156,254.21 1.59 1.54 1.56 248,444.19 240,631.48 243,756.57
4 Pas. Pondasi batu kali 1: 5 menerus m3 508,400.28 3.66 3.45 3.55 1,860,745.02 1,753,980.97 1,804,820.99
5 Pas. Ulang batu bata (teras) m' 31,257.96 3.60 3.60 3.60 112,528.67 112,528.66 112,528.66
Sub Total 2,488,166.95 2,351,763.92 2,416,489.61
III PEKERJAAN DINDING
1 Sloof balk Uk. 10/15 m3 3,418,982.48 0.37 0.37 0.37 1,265,023.52 1,265,023.52 1,265,023.52
2 Ring balk & balk sofi Uk 10/10 m3 4,205,503.34 0.41 0.41 0.41 1,724,256.37 1,724,256.37 1,724,256.37
3 kolom beton + tiang sopi uk. 10/10 m3 4,205,503.34 0.33 0.33 0.33 1,387,816.10 1,387,816.10 1,387,816.10
4 pas. Dinidng batu bata
Spesie 1 Pc : 5 ps m2 89,308.47 70.94 70.94 70.94 6,335,542.52 6,335,542.52 6,335,542.52
5 plesteran dinding + Acian m2 38,570.76 105.71 91.00 104.90 4,077,314.85 3,509,939.00 4,046,072.54
6 Plesteran dinding KM/WC AD 1: 3 T 160 cm m2 38,051.72 7.48 7.48 7.48 284,626.87 284,626.87 284,626.87
7 kantileuvel teras P 140 cm, t 8 cm, lebar 50 cm & balok uk. 10/10 cm m3 2,850,074.20 0.07 0.07 0.07 199,505.19 199,505.19 199,505.19
8 Kantileuvel di atas jendela depan P 75 cm t : 7 cm lebar 30 cm & balok Uk 10/10 cm m3 2,850,074.20 0.02 0.02 0.02 66,264.23 66,264.23 66,264.23
9 pasang rooster Uk. 10X25 cm bh 10,000.00 6.00 6.00 6.00 60,000.00 60,000.00 60,000.00
10 Pas. Kusen kayu kls II uk. 5/10 cm
- kusen type P 1 bh 305,927.12 2.00 2.00 2.00 611,854.24 611,854.24 611,854.24
- kusen type PJ 1 bh 409,756.62 1.00 1.00 1.00 409,756.62 409,756.62 409,756.62
- kusen type J 1 bh 265,788.61 1.00 1.00 1.00 265,788.61 265,788.61 265,788.61
- kusen BV 1 + kaca es bh 95,028.91 1.00 1.00 1.00 95,028.91 95,028.91 95,028.91
11 Pas. Locis kusen ad 1Pc : 2 Ps : 3 Cipping (Kerilkil) bh 2,500.00 6.00 6.00 6.00 15,000.00 15,000.00 15,000.00
Sub Total 16,797,778.03 16,230,402.18 16,766,535.71
IV PEK. RANGKAP ATAP KAYU KLS II
1 Pas. Rangka atap gording uk. 5/10 kayu Kls II m' 18,207.91 56.00 56.00 56.00 1,019,642.81 1,019,642.81 1,019,642.81
2 Pas. Angkur O 8 mm pengikat gording bh 18,207.91 20.00 20.00 20.00 364,158.15 364,158.15 364,158.15
3 pas. Listplank 2X2/25 m' 34,771.49 16.88 16.88 16.88 586,942.68 586,942.68 586,942.68
Sub Total 1,970,743.64 1,970,743.64 1,970,743.64
V Pek. Penutup Atap
1 pas. Seng gelombang BJLS20 m2 58,784.16 32.95 32.95 32.95 1,936,938.07 1,936,938.07 1,936,938.07
2 Pas. Nok seng gelombang BJLS20 m' 48,750.38 6.35 6.35 6.35 309,564.91 309,564.91 309,564.91
3 Pas. Talang beton Uk. 35/30 m3 2,850,074.20 0.13 0.13 0.13 370,509.65 370,509.65 370,509.65
sub Total
VI PEKERJAAN PLAFOND
1 Pas. Rangka plafond kayu bagian dalam m2 50,714.96 17.82 17.82 17.82 903,740.59 903,740.59 903,740.59
2 pas. Rangka plafond kayu bagian luar m2 50,714.96 6.94 6.94 6.94 351,961.82 351,961.82 351,961.82
3 pas. Penutup plafond kalsiboard bagian dalam m' 34,837.40 17.82 17.82 17.82 620,802.47 620,802.47 620,802.47
4 pas. Penutup plafond kalsiboard luar m2 34,837.40 6.94 6.94 6.94 241,771.56 241,771.56 241,771.56
sub Total
VII PEKERJAAN INSTALASI LISTRIK & JILDAK + KONSUIL
1 Pas. Titik lampu ttk 40,000.00 5.00 5.00 5.00 200,000.00 200,000.00 200,000.00
2 pas. Stop kontak ttk 40,000.00 2.00 2.00 2.00 80,000.00 80,000.00 80,000.00
3 saklar tunggal ttk 40,000.00 1.00 1.00 1.00 40,000.00 40,000.00 40,000.00
4 saklar ganda ttk 40,000.00 2.00 2.00 2.00 80,000.00 80,000.00 80,000.00
5 Ps. Sekering kast lengkap arde ttk 70,000.00 1.00 1.00 1.00 70,000.00 70,000.00 70,000.00
Sub total 470,000.00
VIII PEKERJAAN SANITAIR
1 Ps. Inst air bersih pipa PVC AW dia 1/2' + acc m' 13,442.32 8.60 8.60 8.60 115,603.95 115,603.95 115,603.95
2 Ps. Saluran Tinjak m' 16,612.92 4.20 4.20 4.20 69,774.26 69,774.26 69,774.26
3 Saluran air kotor pipa PVC dia O 3' m' 16,612.92 13.00 13.00 13.00 215,967.96 215,967.96 215,967.96
4 Saluran air hujan dari talang beton pipa PVC dia O 3 m' 16,612.92 0.50 0.50 0.50 8,306.46 8,306.46 8,306.46
5 Pasang Bak kontrol uk 30X30 cm bh 47,985.45 1.00 1.00 1.00 47,985.45 47,985.45 47,985.45
6 Pas. Closet jongkok porselin bh 294,869.14 1.00 1.00 1.00 294,869.14 294,869.14 294,869.14
7 Pasang Kran ledeng Q 1/2' kuningan bh 10,281.32 1.00 1.00 1.00 10,281.32 10,281.32 10,281.32
8 pasang saringan air mangkok bh 15,000.00 1.00 1.00 1.00 15,000.00 15,000.00 15,000.00
9 pasang beerput lengkap bh 870,191.20 1.00 1.00 1.00 870,191.20 870,191.20 870,191.20
Sub Total
IX PEKERJAAN LANTAI
1 Pas. Lantai keramik 30x30 ruangan & teras m2 131,542.43 18.02 18.02 18.02 2,370,394.59 2,370,394.59 2,370,394.59
2 pas. Lantai keramik 20x20 KM/WC m2 151,690.50 1.80 1.80 1.80 273,042.90 273,042.90 273,042.90
Sub Total
X PEKERJAAN DAUN PINTU DAN JENDELA
1 Pas. Daun jendela J1 + kaca polos 3 mm bh 264,843.64 1.00 1.00 1.00 264,843.64 264,843.64 264,843.64
2 Pas. Daun pintu panel kayu P1 engsel & kunci tanam bh 659,903.83 2.00 2.00 2.00 1,319,807.66 1,319,807.66 1,319,807.66
3 Pas. Daun pintu panil kayu PJ 1 + engsel & kunci tanam bh 659,903.83 1.00 1.00 1.00 659,903.83 659,903.83 659,903.83
4 Pas. Daun jendela PJ 1 + engsel & Grandel bh 264,843.64 1.00 1.00 1.00 264,843.64 264,843.64 264,843.64
5 pas. Daun pintu P2 dan kusen PVC super lengkap bh 300,000.00 1.00 1.00 1.00 300,000.00 300,000.00 300,000.00
Sub Total
XI PEKERJAAN PENGECETAN
1 Pengecetan plafon luar & dalam m2 17,332.69 24.76 24.76 24.76 429,157.40 429,157.40 429,157.40
2 pengecetan tembok bagian dalam setara metrolite m2 17,332.69 60.07 59.17 60.07 1,041,174.69 1,025,575.27 1,041,174.69
3 pengecetan tembok bagian luar setara mowilex m2 32,431.85 53.12 39.31 52.31 1,722,779.87 1,274,896.02 1,696,510.07
4 Pengecetan bidang kusen, daun pintu dan jendela m2 22,064.15 8.64 8.64 8.64 190,634.26 190,634.26 190,634.26
5 pengecetan listplank m2 22,064.15 1.13 1.13 1.13 24,932.49 24,932.49 24,932.49
Sub Total
XII PEKERJAAN LAIN - LAIN
1 Perapihan dinding pembatas unit 50,000.00 1.00 1.00 1.00 50,000.00 50,000.00 50,000.00
Sub Total
1JUMLAH FISIK
2 PPN 10%=(1)X10%
3 JUMLAH TOTAL=(1+2)
4 PEMBULATAN
AJUAN PEKERJAAN
BOBOT %
Tepi Ket
Tepi K.
TENGAH
Tidur 47
KM/WC
100
Perhitungan Volume Konstruksi Desa Tiara
I PEKERJAAN PERSIAPAN
3 Mobilisasi Bahan 1.00 ls
Dibuat oleh :
Kontraktor Pelaksana
CV. Telaga Arum
Nor Fitria
Direktur
Halaman : 01
CV TELAGA ARUM
Kabupaten Tabalong
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
PENINJAUAN LOKASI
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Mobil 2 1 Parang
2 Sepeda Motor 1 2 Meteran
3 GPS
4 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Pickup 2 1 Parang
2 Sepeda Motor 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
LAPORAN HARIAN
TANGGAL :
PEKERJAAN : PERBAIKAN JEMBATAN PIPA DI DESA TIARA RT 03
LOKASI : DESA TIARA RT 03 KECAMATAN MUARA UYA, KABUPATEN TABALONG
C. PEMAKAIAN PERALATAN
Jumlah Jumlah
No. Jenis Peralatan No. Jenis Peralatan Ket.
/Aktif /Aktif
1 Sepeda Motor 3 1 Parang
2 Alat Bantu 3 2 Meteran
3 Camera
E. USUL/SARAN/INSTRUKSI/PELAPORAN/……………………………………………………………………
URAIAN Nama Tanda Tangan
KONTRAKTOR
PENGAWAS PROYEK
KONSULTAN
I #REF!
1 #REF! #REF! #REF! #REF! #REF! 100
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
II #REF!
1 #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF!
9 #REF! #REF! #REF! #REF! #REF!
10 #REF! #REF! #REF! #REF! #REF!
11 #REF! #REF! #REF! #REF! #REF!
12 #REF! #REF! #REF! #REF! #REF!
13 #REF! #REF! #REF! #REF! #REF!
14 #REF! #REF! #REF! #REF! #REF!
15 #REF! #REF! #REF! #REF! #REF!
16 #REF! #REF! #REF! #REF! #REF!
17 #REF! #REF! #REF! #REF! #REF!
18 #REF! #REF! #REF! #REF! #REF!
19 #REF! #REF! #REF! #REF! #REF! #REF!
20 #REF! #REF! #REF! #REF! #REF! 0
Proyek
Pekerjaan
Lokasi
Departemen/Instansi
Harga satuan VOLUME JUMLAH BOBOT % UPAH BORONGAN Rp. 8.750.000 UPAH BORONGAN TERTIMBANG TERHADAP VOLUME VOLUME S/D MINGGU LALU VOLUME MINGG
Tepi
SAT Tepi
No. Jenis Pekerjaan Tepi Tepi Tepi K. Tepi K. Tepi Tepi Tepi Tepi
(Rp) TENGAH TENGAH TENGAH TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur
K. Tidur KM/WC Tidur Tidur KM/WC KM/WC KM/WC KM/WC
KM/WC
I PEKERJAAN PENDAHULUAN KM/WC
1 Pengukuran dan pematokan LS 1,000.00 90.00 60.00 90.00 90,000.00 60,000.00 90,000.00 0.24 0.17 0.24 21,036.57 14,487.74 21,109.42 233.74 241.46 234.55 0.00 0.00 0.00
2 air kerja LS 100,000.00 1.00 1.00 1.00 100,000.00 100,000.00 100,000.00 0.27 0.28 0.27 23,373.97 24,146.23 23,454.91 23,373.97 24,146.23 23,454.91 0.00 0.00 0.00
3 pemasangan bouwplank m' 11,166.59 20.00 20.00 20.00 223,331.70 223,331.70 223,331.70 0.60 0.62 0.60 52,201.49 53,926.18 52,382.26 2,610.07 2,696.31 2,619.11 0.00 0.00 0.00
II PKERJAAN PONDASI
1 Galian pondasi batu kali m3 30,510.00 6.63 6.06 6.34 202,281.30 184,890.60 193,433.40 0.54 0.51 0.52 47,281.17 44,644.11 45,369.64 7,131.40 7,367.01 7,156.09 0.00 0.00 0.00
2 Urungan & Penimbuman tanah kembali bekas galian & bawah lantai m3 14,785.20 4.34 4.04 4.19 64,167.77 59,732.21 61,949.99 0.17 0.16 0.17 14,998.56 14,423.08 14,530.32 3,455.89 3,570.07 3,467.86 0.00 0.00 0.00
3 Urungan pasir dibawah pondasi & di bawah lantai t : 5 cm m3 156,254.21 1.59 1.54 1.56 248,444.19 240,631.48 243,756.57 0.66 0.66 0.65 58,071.27 58,103.43 57,172.89 36,522.81 37,729.50 36,649.29 0.00 0.00 0.00
4 Pas. Pondasi batu kali 1: 5 menerus m3 508,400.28 3.66 3.45 3.55 1,860,745.02 1,753,980.97 1,804,820.99 4.97 4.84 4.84 434,929.99 423,520.27 423,319.22 118,833.33 122,759.50 119,244.85 0.00 0.00 0.00
5 Pas. Ulang batu bata (teras) m' 31,257.96 3.60 3.60 3.60 112,528.67 112,528.66 112,528.66 0.30 0.31 0.30 26,302.42 27,171.43 26,393.50 7,306.23 7,547.62 7,331.53 0.00 0.00 0.00
Sub Total 2,488,166.95 2,351,763.92 2,416,489.61
III PEKERJAAN DINDING
1 Sloof balk Uk. 10/15 m3 3,418,982.48 0.37 0.37 0.37 1,265,023.52 1,265,023.52 1,265,023.52 3.38 3.49 3.39 295,686.22 305,455.48 296,710.18 799,151.95 825,555.35 801,919.42 0.00 0.00 0.00
2 Ring balk & balk sofi Uk 10/10 m3 4,205,503.34 0.41 0.41 0.41 1,724,256.37 1,724,256.37 1,724,256.37 4.61 4.76 4.62 403,027.17 416,342.90 404,422.86 982,993.10 1,015,470.48 986,397.21 0.00 0.00 0.00
3 kolom beton + tiang sopi uk. 10/10 m3 4,205,503.34 0.33 0.33 0.33 1,387,816.10 1,387,816.10 1,387,816.10 3.71 3.83 3.72 324,387.72 335,105.26 325,511.08 982,993.10 1,015,470.48 986,397.21 0.00 0.00 0.00
4 pas. Dinidng batu bata
Spesie 1 Pc : 5 ps m2 89,308.47 70.94 70.94 70.94 6,335,542.52 6,335,542.52 6,335,542.52 16.92 17.48 16.98 1,480,867.83 1,529,794.63 1,485,996.08 20,874.93 21,564.63 20,947.22 0.00 0.00 0.00 37.66
5 plesteran dinding + Acian m2 38,570.76 105.71 91.00 104.90 4,077,314.85 3,509,939.00 4,046,072.54 10.89 9.69 10.85 953,030.36 847,517.92 949,002.85 9,015.52 9,313.38 9,046.74 0.00 0.00 0.00
6 Plesteran dinding KM/WC AD 1: 3 T 160 cm m2 38,051.72 7.48 7.48 7.48 284,626.87 284,626.87 284,626.87 0.76 0.79 0.76 66,528.60 68,726.66 66,758.99 8,894.20 9,188.06 8,925.00 0.00 0.00 0.00
7 kantileuvel teras P 140 cm, t 8 cm, lebar 50 cm & balok uk. 10/10 cm m3 2,850,074.20 0.07 0.07 0.07 199,505.19 199,505.19 199,505.19 0.53 0.55 0.53 46,632.28 48,172.98 46,793.77 666,175.50 688,185.45 668,482.47 0.00 0.00 0.00
8 Kantileuvel di atas jendela depan P 75 cm t : 7 cm lebar 30 cm & balok Uk 10/10 cm m3 2,850,074.20 0.02 0.02 0.02 66,264.23 66,264.23 66,264.23 0.18 0.18 0.18 15,488.58 16,000.31 15,542.22 774,429.07 800,015.65 777,110.92 0.00 0.00 0.00
9 pasang rooster Uk. 10X25 cm bh 10,000.00 6.00 6.00 6.00 60,000.00 60,000.00 60,000.00 0.16 0.17 0.16 14,024.38 14,487.74 14,072.95 2,337.40 2,414.62 2,345.49 0.00 0.00 0.00
10 Pas. Kusen kayu kls II uk. 5/10 cm
- kusen type P 1 bh 305,927.12 2.00 2.00 2.00 611,854.24 611,854.24 611,854.24 1.63 1.69 1.64 143,014.63 147,739.73 143,509.89 71,507.31 73,869.86 71,754.94 0.00 0.00 0.00
- kusen type PJ 1 bh 409,756.62 1.00 1.00 1.00 409,756.62 409,756.62 409,756.62 1.09 1.13 1.10 95,776.39 98,940.77 96,108.06 95,776.39 98,940.77 96,108.06 0.00 0.00 0.00
- kusen type J 1 bh 265,788.61 1.00 1.00 1.00 265,788.61 265,788.61 265,788.61 0.71 0.73 0.71 62,125.35 64,177.93 62,340.49 62,125.35 64,177.93 62,340.49 0.00 0.00 0.00
- kusen BV 1 + kaca es bh 95,028.91 1.00 1.00 1.00 95,028.91 95,028.91 95,028.91 0.25 0.26 0.25 22,212.03 22,945.90 22,288.95 22,212.03 22,945.90 22,288.95 0.00 0.00 0.00
11 Pas. Locis kusen ad 1Pc : 2 Ps : 3 Cipping (Kerilkil) bh 2,500.00 6.00 6.00 6.00 15,000.00 15,000.00 15,000.00 0.04 0.04 0.04 3,506.10 3,621.93 3,518.24 584.35 603.66 586.37 0.00 0.00 0.00
Sub Total 16,797,778.03 16,230,402.18 16,766,535.71
IV PEK. RANGKAP ATAP KAYU KLS II
1 Pas. Rangka atap gording uk. 5/10 kayu Kls II m' 18,207.91 56.00 56.00 56.00 1,019,642.81 1,019,642.81 1,019,642.81 2.72 2.81 2.73 238,331.01 246,205.29 239,156.35 4,255.91 4,396.52 4,270.65 0.00 0.00 0.00
2 Pas. Angkur O 8 mm pengikat gording bh 18,207.91 20.00 20.00 20.00 364,158.15 364,158.15 364,158.15 0.97 1.00 0.98 85,118.22 87,930.46 85,412.98 4,255.91 4,396.52 4,270.65 0.00 0.00 0.00
3 pas. Listplank 2X2/25 m' 34,771.49 16.88 16.88 16.88 586,942.68 586,942.68 586,942.68 1.57 1.62 1.57 137,191.81 141,724.53 137,666.90 8,127.48 8,396.00 8,155.62 0.00 0.00 0.00
Sub Total 1,970,743.64 1,970,743.64 1,970,743.64
V Pek. Penutup Atap
1 pas. Seng gelombang BJLS20 m2 58,784.16 32.95 32.95 32.95 1,936,938.07 1,936,938.07 1,936,938.07 5.17 5.35 5.19 452,739.33 467,697.51 454,307.17 13,740.19 14,194.16 13,787.77 0.00 0.00 0.00
2 Pas. Nok seng gelombang BJLS20 m' 48,750.38 6.35 6.35 6.35 309,564.91 309,564.91 309,564.91 0.83 0.85 0.83 72,357.61 74,748.25 72,608.19 11,394.90 11,771.38 11,434.36 0.00 0.00 0.00
3 Pas. Talang beton Uk. 35/30 m3 2,850,074.20 0.13 0.13 0.13 370,509.65 370,509.65 370,509.65 0.99 1.02 0.99 86,602.81 89,464.11 86,902.72 666,175.50 688,185.45 668,482.47 0.00 0.00 0.00
sub Total 2,617,012.63 2,617,012.63 2,617,012.63
VI PEKERJAAN PLAFOND
1 Pas. Rangka plafond kayu bagian dalam m2 50,714.96 17.82 17.82 17.82 903,740.59 903,740.59 903,740.59 2.41 2.49 2.42 211,240.06 218,219.28 211,971.58 11,854.10 12,245.75 11,895.15 0.00 0.00 0.00
2 pas. Rangka plafond kayu bagian luar m2 50,714.96 6.94 6.94 6.94 351,961.82 351,961.82 351,961.82 0.94 0.97 0.94 82,267.45 84,985.51 82,552.34 11,854.10 12,245.75 11,895.15 0.00 0.00 0.00
3 pas. Penutup plafond kalsiboard bagian dalam m' 34,837.40 17.82 17.82 17.82 620,802.47 620,802.47 620,802.47 1.66 1.71 1.66 145,106.18 149,900.39 145,608.69 8,142.88 8,411.92 8,171.08 0.00 0.00 0.00
4 pas. Penutup plafond kalsiboard luar m2 34,837.40 6.94 6.94 6.94 241,771.56 241,771.56 241,771.56 0.65 0.67 0.65 56,511.61 58,378.71 56,707.31 8,142.88 8,411.92 8,171.08 0.00 0.00 0.00
sub Total 2,118,276.43 2,118,276.43 2,118,276.43
VII PEKERJAAN INSTALASI LISTRIK & JILDAK + KONSUIL
1 Pas. Titik lampu ttk 40,000.00 5.00 5.00 5.00 200,000.00 200,000.00 200,000.00 0.53 0.55 0.54 46,747.94 48,292.46 46,909.83 9,349.59 9,658.49 9,381.97 0.00 0.00 0.00
2 pas. Stop kontak ttk 40,000.00 2.00 2.00 2.00 80,000.00 80,000.00 80,000.00 0.21 0.22 0.21 18,699.18 19,316.98 18,763.93 9,349.59 9,658.49 9,381.97 0.00 0.00 0.00
3 saklar tunggal ttk 40,000.00 1.00 1.00 1.00 40,000.00 40,000.00 40,000.00 0.11 0.11 0.11 9,349.59 9,658.49 9,381.97 9,349.59 9,658.49 9,381.97 0.00 0.00 0.00
4 saklar ganda ttk 40,000.00 2.00 2.00 2.00 80,000.00 80,000.00 80,000.00 0.21 0.22 0.21 18,699.18 19,316.98 18,763.93 9,349.59 9,658.49 9,381.97 0.00 0.00 0.00
5 Ps. Sekering kast lengkap arde ttk 70,000.00 1.00 1.00 1.00 70,000.00 70,000.00 70,000.00 0.19 0.19 0.19 16,361.78 16,902.36 16,418.44 16,361.78 16,902.36 16,418.44 0.00 0.00 0.00
Sub total 470,000.00 470,000.00 470,000.00
VIII PEKERJAAN SANITAIR
1 Ps. Inst air bersih pipa PVC AW dia 1/2' + acc m' 13,442.32 8.60 8.60 8.60 115,603.95 115,603.95 115,603.95 0.31 0.32 0.31 27,021.23 27,914.00 27,114.81 3,142.00 3,245.81 3,152.88 0.00 0.00 0.00
2 Ps. Saluran Tinjak m' 16,612.92 4.20 4.20 4.20 69,774.26 69,774.26 69,774.26 0.19 0.19 0.19 16,309.02 16,847.85 16,365.49 3,883.10 4,011.39 3,896.55 0.00 0.00 0.00
3 Saluran air kotor pipa PVC dia O 3' m' 16,612.92 13.00 13.00 13.00 215,967.96 215,967.96 215,967.96 0.58 0.60 0.58 50,480.29 52,148.12 50,655.10 3,883.10 4,011.39 3,896.55 0.00 0.00 0.00
4 Saluran air hujan dari talang beton pipa PVC dia O 3 m' 16,612.92 0.50 0.50 0.50 8,306.46 8,306.46 8,306.46 0.02 0.02 0.02 1,941.55 2,005.70 1,948.27 3,883.10 4,011.39 3,896.55 0.00 0.00 0.00
5 Pasang Bak kontrol uk 30X30 cm bh 47,985.45 1.00 1.00 1.00 47,985.45 47,985.45 47,985.45 0.13 0.13 0.13 11,216.10 11,586.68 11,254.95 11,216.10 11,586.68 11,254.95 0.00 0.00 0.00
6 Pas. Closet jongkok porselin bh 294,869.14 1.00 1.00 1.00 294,869.14 294,869.14 294,869.14 0.79 0.81 0.79 68,922.63 71,199.78 69,161.30 68,922.63 71,199.78 69,161.30 0.00 0.00 0.00
7 Pasang Kran ledeng Q 1/2' kuningan bh 10,281.32 1.00 1.00 1.00 10,281.32 10,281.32 10,281.32 0.03 0.03 0.03 2,403.15 2,482.55 2,411.47 2,403.15 2,482.55 2,411.47 0.00 0.00 0.00
8 pasang saringan air mangkok bh 15,000.00 1.00 1.00 1.00 15,000.00 15,000.00 15,000.00 0.04 0.04 0.04 3,506.10 3,621.93 3,518.24 3,506.10 3,621.93 3,518.24 0.00 0.00 0.00
9 pasang beerput lengkap bh 870,191.20 1.00 1.00 1.00 870,191.20 870,191.20 870,191.20 2.32 2.40 2.33 203,398.23 210,118.36 204,102.60 203,398.23 210,118.36 204,102.60 0.00 0.00 0.00
Sub Total 1,647,979.75 1,647,979.75 1,647,979.75
IX PEKERJAAN LANTAI
1 Pas. Lantai keramik 30x30 ruangan & teras m2 131,542.43 18.02 18.02 18.02 2,370,394.59 2,370,394.59 2,370,394.59 6.33 6.54 6.35 554,055.33 572,360.91 555,974.02 30,746.69 31,762.54 30,853.16 0.00 0.00 0.00
2 pas. Lantai keramik 20x20 KM/WC m2 151,690.50 1.80 1.80 1.80 273,042.90 273,042.90 273,042.90 0.73 0.75 0.73 63,820.97 65,929.56 64,041.98 35,456.09 36,627.54 35,578.88 0.00 0.00 0.00
Sub Total 2,643,437.49 2,643,437.49 2,643,437.49
X PEKERJAAN DAUN PINTU DAN JENDELA
1 Pas. Daun jendela J1 + kaca polos 3 mm bh 264,843.64 1.00 1.00 1.00 264,843.64 264,843.64 264,843.64 0.71 0.73 0.71 61,904.47 63,949.75 62,118.85 61,904.47 63,949.75 62,118.85 0.00 0.00 0.00
2 Pas. Daun pintu panel kayu P1 engsel & kunci tanam bh 659,903.83 2.00 2.00 2.00 1,319,807.66 1,319,807.66 1,319,807.66 3.53 3.64 3.54 308,491.45 318,683.78 309,559.76 154,245.73 159,341.89 154,779.88 0.00 0.00 0.00
3 Pas. Daun pintu panil kayu PJ 1 + engsel & kunci tanam bh 659,903.83 1.00 1.00 1.00 659,903.83 659,903.83 659,903.83 1.76 1.82 1.77 154,245.73 159,341.89 154,779.88 154,245.73 159,341.89 154,779.88 0.00 0.00 0.00
4 Pas. Daun jendela PJ 1 + engsel & Grandel bh 264,843.64 1.00 1.00 1.00 264,843.64 264,843.64 264,843.64 0.71 0.73 0.71 61,904.47 63,949.75 62,118.85 61,904.47 63,949.75 62,118.85 0.00 0.00 0.00
5 pas. Daun pintu P2 dan kusen PVC super lengkap bh 300,000.00 1.00 1.00 1.00 300,000.00 300,000.00 300,000.00 0.80 0.83 0.80 70,121.91 72,438.69 70,364.74 70,121.91 72,438.69 70,364.74 0.00 0.00 0.00
Sub Total 2,809,398.77 2,809,398.77 2,809,398.77
XI PEKERJAAN PENGECETAN
1 Pengecetan plafon luar & dalam m2 17,332.69 24.76 24.76 24.76 429,157.40 429,157.40 429,157.40 1.15 1.18 1.15 100,311.12 103,625.33 100,658.50 4,051.34 4,185.19 4,065.37 0.00 0.00 0.00
2 pengecetan tembok bagian dalam setara metrolite m2 17,332.69 60.07 59.17 60.07 1,041,174.69 1,025,575.27 1,041,174.69 2.78 2.83 2.79 243,363.86 247,637.76 244,206.63 4,051.34 4,185.19 4,065.37 0.00 0.00 0.00
3 pengecetan tembok bagian luar setara mowilex m2 32,431.85 53.12 39.31 52.31 1,722,779.87 1,274,896.02 1,696,510.07 4.60 3.52 4.55 402,682.06 307,839.32 397,914.99 7,580.61 7,831.07 7,606.86 0.00 0.00 0.00
4 Pengecetan bidang kusen, daun pintu dan jendela m2 22,064.15 8.64 8.64 8.64 190,634.26 190,634.26 190,634.26 0.51 0.53 0.51 44,558.79 46,030.98 44,713.10 5,157.27 5,327.66 5,175.13 0.00 0.00 0.00
5 pengecetan listplank m2 22,064.15 1.13 1.13 1.13 24,932.49 24,932.49 24,932.49 0.07 0.07 0.07 5,827.71 6,020.26 5,847.89 5,157.27 5,327.66 5,175.13 0.00 0.00 0.00
Sub Total 3,408,678.71 2,945,195.44 3,382,408.91 0.00
XII PEKERJAAN LAIN - LAIN
1 Perapihan dinding pembatas unit 50,000.00 1.00 1.00 1.00 50,000.00 50,000.00 50,000.00 0.13 0.14 0.13 11,686.99 12,073.11 11,727.46 11,686.99 12,073.11 11,727.46 0.00 0.00 0.00
Sub Total 50,000.00 50,000.00 50,000.00
1JUMLAH FISIK 37,434,804.10 36,237,541.95 37,305,614.64 100.00 100.00 100.00 8,750,000.00 8,750,000.00 8,750,000.00
2 PPN 10%=(1)X10% 3,743,480.41 3,623,754.19 3,730,561.46
3 JUMLAH TOTAL=(1+2) 41,178,284.51 39,861,296.14 41,036,176.10
4 PEMBULATAN 41,170,000.00 39,860,000.00 41,030,000.00
VOLUME MINGGU INI VOLUME S/D MINGGU INI PERSENTASE S/D MINGGU LALU PERSENTASE MINGGU INI PERSENTASE S/D MINGGU INI BOBOT S/D MINGGU LALU BOBOT MINGGU INI BOBOT S/D MINGGU INI
Tepi Tepi Tepi Tepi Tepi Tepi Tepi
TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur TENGAH
KM/WC KM/WC KM/WC KM/WC KM/WC KM/WC KM/WC
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.74 0.00 0.74 0.00 0.00 0.00 0.00 0.00 12.13 0.00 0.00 12.13 0.00 0.00 0.00 0.00 0.00 0.06 0.00 0.00 0.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
37.66 37.66 37.66 37.66 37.66 0.00 0.00 0.00 53.09 53.09 53.09 53.09 53.09 53.09 0.00 0.00 0.00 8.99 9.28 9.02 8.99 9.28
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BOBOT S/D MINGGU INI UPAH BORONGAN MINGGU INI
Tepi
Tepi K. Tidur
KM/WC
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
9.02 786,202.21
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
LAPORAN KEMAJUAN PEKERJAAN
Proyek
Pekerjaan
Lokasi
Departemen/Instansi
Harga satuan VOLUME JUMLAH BOBOT % UPAH BORONGAN Rp. 8.750.000 UPAH BORONGAN TERTIMBANG TERHADAP VOLUME
Tepi
SAT Tepi
No. Jenis Pekerjaan Tepi Tepi Tepi K. Tepi K. Tepi Tepi
(Rp) TENGAH TENGAH TENGAH TENGAH Tepi K. Tidur TENGAH Tepi K. Tidur
K. Tidur KM/WC Tidur Tidur KM/WC KM/WC
KM/WC
I PEKERJAAN PENDAHULUAN KM/WC
1 Pengukuran dan pematokan LS 1,000.00 90.00 60.00 90.00 90,000.00 60,000.00 90,000.00 0.24 0.17 0.24 21,036.57 14,487.74 21,109.42 233.74 241.46 234.55
2 air kerja LS 100,000.00 1.00 1.00 1.00 100,000.00 100,000.00 100,000.00 0.27 0.28 0.27 23,373.97 24,146.23 23,454.91 23,373.97 24,146.23 23,454.91
3 pemasangan bouwplank m' 11,166.59 20.00 20.00 20.00 223,331.70 223,331.70 223,331.70 0.60 0.62 0.60 52,201.49 53,926.18 52,382.26 2,610.07 2,696.31 2,619.11
II PKERJAAN PONDASI
1 Galian pondasi batu kali m3 30,510.00 6.63 6.06 6.34 202,281.30 184,890.60 193,433.40 0.54 0.51 0.52 47,281.17 44,644.11 45,369.64 7,131.40 7,367.01 7,156.09
2 Urungan & Penimbuman tanah kembali bekas galian & bawah lantai m3 14,785.20 4.34 4.04 4.19 64,167.77 59,732.21 61,949.99 0.17 0.16 0.17 14,998.56 14,423.08 14,530.32 3,455.89 3,570.07 3,467.86
3 Urungan pasir dibawah pondasi & di bawah lantai t : 5 cm m3 156,254.21 1.59 1.54 1.56 248,444.19 240,631.48 243,756.57 0.66 0.66 0.65 58,071.27 58,103.43 57,172.89 36,522.81 37,729.50 36,649.29
4 Pas. Pondasi batu kali 1: 5 menerus m3 508,400.28 3.66 3.45 3.55 1,860,745.02 1,753,980.97 1,804,820.99 4.97 4.84 4.84 434,929.99 423,520.27 423,319.22 118,833.33 122,759.50 119,244.85
5 Pas. Ulang batu bata (teras) m' 31,257.96 3.60 3.60 3.60 112,528.67 112,528.66 112,528.66 0.30 0.31 0.30 26,302.42 27,171.43 26,393.50 7,306.23 7,547.62 7,331.53
Sub Total 2,488,166.95 2,351,763.92 2,416,489.61
III PEKERJAAN DINDING
1 Sloof balk Uk. 10/15 m3 3,418,982.48 0.37 0.37 0.37 1,265,023.52 1,265,023.52 1,265,023.52 3.38 3.49 3.39 295,686.22 305,455.48 296,710.18 799,151.95 825,555.35 801,919.42
2 Ring balk & balk sofi Uk 10/10 m3 4,205,503.34 0.41 0.41 0.41 1,724,256.37 1,724,256.37 1,724,256.37 4.61 4.76 4.62 403,027.17 416,342.90 404,422.86 982,993.10 1,015,470.48 986,397.21
3 kolom beton + tiang sopi uk. 10/10 m3 4,205,503.34 0.33 0.33 0.33 1,387,816.10 1,387,816.10 1,387,816.10 3.71 3.83 3.72 324,387.72 335,105.26 325,511.08 982,993.10 1,015,470.48 986,397.21
4 pas. Dinidng batu bata
Spesie 1 Pc : 5 ps m2 89,308.47 70.94 70.94 70.94 6,335,542.52 6,335,542.52 6,335,542.52 16.92 17.48 16.98 1,480,867.83 1,529,794.63 1,485,996.08 20,874.93 21,564.63 20,947.22
5 plesteran dinding + Acian m2 38,570.76 105.71 91.00 104.90 4,077,314.85 3,509,939.00 4,046,072.54 10.89 9.69 10.85 953,030.36 847,517.92 949,002.85 9,015.52 9,313.38 9,046.74
6 Plesteran dinding KM/WC AD 1: 3 T 160 cm m2 38,051.72 7.48 7.48 7.48 284,626.87 284,626.87 284,626.87 0.76 0.79 0.76 66,528.60 68,726.66 66,758.99 8,894.20 9,188.06 8,925.00
7 kantileuvel teras P 140 cm, t 8 cm, lebar 50 cm & balok uk. 10/10 cm m3 2,850,074.20 0.07 0.07 0.07 199,505.19 199,505.19 199,505.19 0.53 0.55 0.53 46,632.28 48,172.98 46,793.77 666,175.50 688,185.45 668,482.47
8 Kantileuvel di atas jendela depan P 75 cm t : 7 cm lebar 30 cm & balok Uk 10/10 cm m3 2,850,074.20 0.02 0.02 0.02 66,264.23 66,264.23 66,264.23 0.18 0.18 0.18 15,488.58 16,000.31 15,542.22 774,429.07 800,015.65 777,110.92
9 pasang rooster Uk. 10X25 cm bh 10,000.00 6.00 6.00 6.00 60,000.00 60,000.00 60,000.00 0.16 0.17 0.16 14,024.38 14,487.74 14,072.95 2,337.40 2,414.62 2,345.49
10 Pas. Kusen kayu kls II uk. 5/10 cm
- kusen type P 1 bh 305,927.12 2.00 2.00 2.00 611,854.24 611,854.24 611,854.24 1.63 1.69 1.64 143,014.63 147,739.73 143,509.89 71,507.31 73,869.86 71,754.94
- kusen type PJ 1 bh 409,756.62 1.00 1.00 1.00 409,756.62 409,756.62 409,756.62 1.09 1.13 1.10 95,776.39 98,940.77 96,108.06 95,776.39 98,940.77 96,108.06
- kusen type J 1 bh 265,788.61 1.00 1.00 1.00 265,788.61 265,788.61 265,788.61 0.71 0.73 0.71 62,125.35 64,177.93 62,340.49 62,125.35 64,177.93 62,340.49
- kusen BV 1 + kaca es bh 95,028.91 1.00 1.00 1.00 95,028.91 95,028.91 95,028.91 0.25 0.26 0.25 22,212.03 22,945.90 22,288.95 22,212.03 22,945.90 22,288.95
11 Pas. Locis kusen ad 1Pc : 2 Ps : 3 Cipping (Kerilkil) bh 2,500.00 6.00 6.00 6.00 15,000.00 15,000.00 15,000.00 0.04 0.04 0.04 3,506.10 3,621.93 3,518.24 584.35 603.66 586.37
Sub Total 16,797,778.03 16,230,402.18 16,766,535.71
IV PEK. RANGKAP ATAP KAYU KLS II
1 Pas. Rangka atap gording uk. 5/10 kayu Kls II m' 18,207.91 56.00 56.00 56.00 1,019,642.81 1,019,642.81 1,019,642.81 2.72 2.81 2.73 238,331.01 246,205.29 239,156.35 4,255.91 4,396.52 4,270.65
2 Pas. Angkur O 8 mm pengikat gording bh 18,207.91 20.00 20.00 20.00 364,158.15 364,158.15 364,158.15 0.97 1.00 0.98 85,118.22 87,930.46 85,412.98 4,255.91 4,396.52 4,270.65
3 pas. Listplank 2X2/25 m' 34,771.49 16.88 16.88 16.88 586,942.68 586,942.68 586,942.68 1.57 1.62 1.57 137,191.81 141,724.53 137,666.90 8,127.48 8,396.00 8,155.62
Sub Total 1,970,743.64 1,970,743.64 1,970,743.64
V Pek. Penutup Atap
1 pas. Seng gelombang BJLS20 m2 58,784.16 32.95 32.95 32.95 1,936,938.07 1,936,938.07 1,936,938.07 5.17 5.35 5.19 452,739.33 467,697.51 454,307.17 13,740.19 14,194.16 13,787.77
2 Pas. Nok seng gelombang BJLS20 m' 48,750.38 6.35 6.35 6.35 309,564.91 309,564.91 309,564.91 0.83 0.85 0.83 72,357.61 74,748.25 72,608.19 11,394.90 11,771.38 11,434.36
3 Pas. Talang beton Uk. 35/30 m3 2,850,074.20 0.13 0.13 0.13 370,509.65 370,509.65 370,509.65 0.99 1.02 0.99 86,602.81 89,464.11 86,902.72 666,175.50 688,185.45 668,482.47
sub Total 2,617,012.63 2,617,012.63 2,617,012.63
VI PEKERJAAN PLAFOND
1 Pas. Rangka plafond kayu bagian dalam m2 50,714.96 17.82 17.82 17.82 903,740.59 903,740.59 903,740.59 2.41 2.49 2.42 211,240.06 218,219.28 211,971.58 11,854.10 12,245.75 11,895.15
2 pas. Rangka plafond kayu bagian luar m2 50,714.96 6.94 6.94 6.94 351,961.82 351,961.82 351,961.82 0.94 0.97 0.94 82,267.45 84,985.51 82,552.34 11,854.10 12,245.75 11,895.15
3 pas. Penutup plafond kalsiboard bagian dalam m' 34,837.40 17.82 17.82 17.82 620,802.47 620,802.47 620,802.47 1.66 1.71 1.66 145,106.18 149,900.39 145,608.69 8,142.88 8,411.92 8,171.08
4 pas. Penutup plafond kalsiboard luar m2 34,837.40 6.94 6.94 6.94 241,771.56 241,771.56 241,771.56 0.65 0.67 0.65 56,511.61 58,378.71 56,707.31 8,142.88 8,411.92 8,171.08
sub Total 2,118,276.43 2,118,276.43 2,118,276.43
VII PEKERJAAN INSTALASI LISTRIK & JILDAK + KONSUIL
1 Pas. Titik lampu ttk 40,000.00 5.00 5.00 5.00 200,000.00 200,000.00 200,000.00 0.53 0.55 0.54 46,747.94 48,292.46 46,909.83 9,349.59 9,658.49 9,381.97
2 pas. Stop kontak ttk 40,000.00 2.00 2.00 2.00 80,000.00 80,000.00 80,000.00 0.21 0.22 0.21 18,699.18 19,316.98 18,763.93 9,349.59 9,658.49 9,381.97
3 saklar tunggal ttk 40,000.00 1.00 1.00 1.00 40,000.00 40,000.00 40,000.00 0.11 0.11 0.11 9,349.59 9,658.49 9,381.97 9,349.59 9,658.49 9,381.97
4 saklar ganda ttk 40,000.00 2.00 2.00 2.00 80,000.00 80,000.00 80,000.00 0.21 0.22 0.21 18,699.18 19,316.98 18,763.93 9,349.59 9,658.49 9,381.97
5 Ps. Sekering kast lengkap arde ttk 70,000.00 1.00 1.00 1.00 70,000.00 70,000.00 70,000.00 0.19 0.19 0.19 16,361.78 16,902.36 16,418.44 16,361.78 16,902.36 16,418.44
Sub total 470,000.00 470,000.00 470,000.00
VIII PEKERJAAN SANITAIR
1 Ps. Inst air bersih pipa PVC AW dia 1/2' + acc m' 13,442.32 8.60 8.60 8.60 115,603.95 115,603.95 115,603.95 0.31 0.32 0.31 27,021.23 27,914.00 27,114.81 3,142.00 3,245.81 3,152.88
2 Ps. Saluran Tinjak m' 16,612.92 4.20 4.20 4.20 69,774.26 69,774.26 69,774.26 0.19 0.19 0.19 16,309.02 16,847.85 16,365.49 3,883.10 4,011.39 3,896.55
3 Saluran air kotor pipa PVC dia O 3' m' 16,612.92 13.00 13.00 13.00 215,967.96 215,967.96 215,967.96 0.58 0.60 0.58 50,480.29 52,148.12 50,655.10 3,883.10 4,011.39 3,896.55
4 Saluran air hujan dari talang beton pipa PVC dia O 3 m' 16,612.92 0.50 0.50 0.50 8,306.46 8,306.46 8,306.46 0.02 0.02 0.02 1,941.55 2,005.70 1,948.27 3,883.10 4,011.39 3,896.55
5 Pasang Bak kontrol uk 30X30 cm bh 47,985.45 1.00 1.00 1.00 47,985.45 47,985.45 47,985.45 0.13 0.13 0.13 11,216.10 11,586.68 11,254.95 11,216.10 11,586.68 11,254.95
6 Pas. Closet jongkok porselin bh 294,869.14 1.00 1.00 1.00 294,869.14 294,869.14 294,869.14 0.79 0.81 0.79 68,922.63 71,199.78 69,161.30 68,922.63 71,199.78 69,161.30
7 Pasang Kran ledeng Q 1/2' kuningan bh 10,281.32 1.00 1.00 1.00 10,281.32 10,281.32 10,281.32 0.03 0.03 0.03 2,403.15 2,482.55 2,411.47 2,403.15 2,482.55 2,411.47
8 pasang saringan air mangkok bh 15,000.00 1.00 1.00 1.00 15,000.00 15,000.00 15,000.00 0.04 0.04 0.04 3,506.10 3,621.93 3,518.24 3,506.10 3,621.93 3,518.24
9 pasang beerput lengkap bh 870,191.20 1.00 1.00 1.00 870,191.20 870,191.20 870,191.20 2.32 2.40 2.33 203,398.23 210,118.36 204,102.60 203,398.23 210,118.36 204,102.60
Sub Total 1,647,979.75 1,647,979.75 1,647,979.75
IX PEKERJAAN LANTAI
1 Pas. Lantai keramik 30x30 ruangan & teras m2 131,542.43 18.02 18.02 18.02 2,370,394.59 2,370,394.59 2,370,394.59 6.33 6.54 6.35 554,055.33 572,360.91 555,974.02 30,746.69 31,762.54 30,853.16
2 pas. Lantai keramik 20x20 KM/WC m2 151,690.50 1.80 1.80 1.80 273,042.90 273,042.90 273,042.90 0.73 0.75 0.73 63,820.97 65,929.56 64,041.98 35,456.09 36,627.54 35,578.88
Sub Total 2,643,437.49 2,643,437.49 2,643,437.49
X PEKERJAAN DAUN PINTU DAN JENDELA
1 Pas. Daun jendela J1 + kaca polos 3 mm bh 264,843.64 1.00 1.00 1.00 264,843.64 264,843.64 264,843.64 0.71 0.73 0.71 61,904.47 63,949.75 62,118.85 61,904.47 63,949.75 62,118.85
2 Pas. Daun pintu panel kayu P1 engsel & kunci tanam bh 659,903.83 2.00 2.00 2.00 1,319,807.66 1,319,807.66 1,319,807.66 3.53 3.64 3.54 308,491.45 318,683.78 309,559.76 154,245.73 159,341.89 154,779.88
3 Pas. Daun pintu panil kayu PJ 1 + engsel & kunci tanam bh 659,903.83 1.00 1.00 1.00 659,903.83 659,903.83 659,903.83 1.76 1.82 1.77 154,245.73 159,341.89 154,779.88 154,245.73 159,341.89 154,779.88
4 Pas. Daun jendela PJ 1 + engsel & Grandel bh 264,843.64 1.00 1.00 1.00 264,843.64 264,843.64 264,843.64 0.71 0.73 0.71 61,904.47 63,949.75 62,118.85 61,904.47 63,949.75 62,118.85
5 pas. Daun pintu P2 dan kusen PVC super lengkap bh 300,000.00 1.00 1.00 1.00 300,000.00 300,000.00 300,000.00 0.80 0.83 0.80 70,121.91 72,438.69 70,364.74 70,121.91 72,438.69 70,364.74
Sub Total 2,809,398.77 2,809,398.77 2,809,398.77
XI PEKERJAAN PENGECETAN
1 Pengecetan plafon luar & dalam m2 17,332.69 24.76 24.76 24.76 429,157.40 429,157.40 429,157.40 1.15 1.18 1.15 100,311.12 103,625.33 100,658.50 4,051.34 4,185.19 4,065.37
2 pengecetan tembok bagian dalam setara metrolite m2 17,332.69 60.07 59.17 60.07 1,041,174.69 1,025,575.27 1,041,174.69 2.78 2.83 2.79 243,363.86 247,637.76 244,206.63 4,051.34 4,185.19 4,065.37
3 pengecetan tembok bagian luar setara mowilex m2 32,431.85 53.12 39.31 52.31 1,722,779.87 1,274,896.02 1,696,510.07 4.60 3.52 4.55 402,682.06 307,839.32 397,914.99 7,580.61 7,831.07 7,606.86
4 Pengecetan bidang kusen, daun pintu dan jendela m2 22,064.15 8.64 8.64 8.64 190,634.26 190,634.26 190,634.26 0.51 0.53 0.51 44,558.79 46,030.98 44,713.10 5,157.27 5,327.66 5,175.13
5 pengecetan listplank m2 22,064.15 1.13 1.13 1.13 24,932.49 24,932.49 24,932.49 0.07 0.07 0.07 5,827.71 6,020.26 5,847.89 5,157.27 5,327.66 5,175.13
Sub Total 3,408,678.71 2,945,195.44 3,382,408.91
XII PEKERJAAN LAIN - LAIN
1 Perapihan dinding pembatas unit 50,000.00 1.00 1.00 1.00 50,000.00 50,000.00 50,000.00 0.13 0.14 0.13 11,686.99 12,073.11 11,727.46 11,686.99 12,073.11 11,727.46
Sub Total 50,000.00 50,000.00 50,000.00
1 JUMLAH FISIK 37,434,804.10 36,237,541.95 37,305,614.64 100.00 100.00 100.00 8,750,000.00 8,750,000.00 8,750,000.00
2 PPN 10%=(1)X10% 3,743,480.41 3,623,754.19 3,730,561.46
3 JUMLAH TOTAL=(1+2) 41,178,284.51 39,861,296.14 41,036,176.10
4 PEMBULATAN 41,170,000.00 39,860,000.00 41,030,000.00