Provinsi : Aceh
Kabupaten : Simeulue
Ukuran : 50 M
DANA DESA
1 BAHAN 72,231,766.57
2 PERALATAN 557,500.00
3 UPAH 22,194,274.21
4 OPERASIONAL 3 % 5,016,459.22
JUMLAH 100,000,000.00
Jumlah Total
Dibulatkan
Terbilang : Seratus Juta Rupiah
Jumlah Biaya Upah 22,194,274.21
Jumlah HOK Konstruksi 232.56
556,574,361.39
Diketahui Oleh
Kepala Desa Suka Karya Pendamping Desa Teknik Infra
Kecamatan Simeulue Tim
22,194,274.21
HOK 232.56 HOK
VOLUME
Kategori
NO. URAIAN Satuan Biaya
Dari
Total Dari Dana
Swadaya
I. BAHAN
II. PERALATAN
III. UPAH
Sumber Dana
YA
: 01/RAB-DD/SK-ST/XII/2019
: Dana Desa
: DANA DESA TA. 2020
: 50 Meter
150,000.00 150,000.00
80,000.00 80,000.00
98,886.36 24,326,045.45
232,250.00 6,693,073.40
232,250.00 1,023,380.43
232,250.00 1,591,925.11
311,250.00 20,699,370.00
2,798,863.64 1,094,915.45
2,798,863.64 6,261,057.95
22,090.91 310,244.73
2,761.36 12,326.73
109,409.09 5,251,636.36
59,704.55 3,821,090.91
27,613.64 496,870.49
16,793.18 419,829.55
557,500.00 557,500.00
Sub Total 2 557,500.00
95,000.00 15,064,345.44
95,000.00 6,389,594.85
110,000.00 740,333.92
Sub Total 2 22,194,274.21
2,166,953.00 2,166,953.00
2,849,506.22 2,849,506.22
Sub Total 3 5,016,459.22
Dibuat Oleh :
Konsultan Perencana
CV. ALF DESIGN CONSULTANT
FITRA ELFIANTO
PEMERINTAH KABUPATEN SIMEULUE
DESA NANCAWA KECAMATAN TEUPAH TENGAH
KABUPATEN SIMEULUE
Pajak Sumbangan
Harga Satuan Jumlah Harga
No. Uraian Volume Sat. Pihak Ke III 1,5
(Rp) (Rp)
PPh 1,5 % PPn 10 % Galian C %
a b c d e f=cxe g h i j
I BAHAN
1 Papan Nama Kegiatan 1.00 Bh 150,000.00 150,000.00
2 Papan Penunjuk Arah Kegiatan 1.00 Bh 80,000.00 80,000.00
3 Semen @ 50 Kg 246.00 Zak 85,000.00 20,910,000.00 1,159.09 7,727.27
4 Pasir Pasang 28.82 M³ 221,000.00 6,368,866.40 11,250.00
5 Pasir Beton 4.41 M³ 221,000.00 973,808.72 11,250.00
6 Kerikil (Maksimum 30mm) 6.85 M³ 221,000.00 1,514,813.56 11,250.00
7 Batu Belah / Batu Gunung 66.50 M³ 300,000.00 19,951,200.00 11,250.00
8 Kayu Kelas II balok 5/7 p = 4 0.39 M³ 2,500,000.00 978,000.00 34,090.91 227,272.73 37,500.00
9 Kayu Klas III 2/25 p = 4 2.24 M³ 2,500,000.00 5,592,500.00 34,090.91 227,272.73 37,500.00
10 Paku 2"- 4" 14.04 Kg 20,000.00 280,880.00 272.73 1,818.18
11 Minyak bekisting 4.46 Liter 2,500.00 11,160.00 34.09 227.27
12 Besi Beton Ø 12 48.00 Btg 90,000.00 4,320,000.00 1,227.27 8,181.82
13 Besi Beton Ø 8 64.00 Btg 45,000.00 2,880,000.00 613.64 4,090.91
14 Kawat Beton 17.99 Kg 25,000.00 449,841.60 340.91 2,272.73
15 Cerucuk Bambu 25.00 Btg 15,000.00 375,000.00 204.55 1,363.64 225.00
k l=e+g+h+I+j+k m=cxl n
150,000.00 150,000.00
80,000.00 80,000.00
5,000.00 98,886.36 24,326,045.45
232,250.00 6,693,073.40
232,250.00 1,023,380.43
232,250.00 1,591,925.11
311,250.00 20,699,370.00
2,798,863.64 1,094,915.45
2,798,863.64 6,261,057.95
22,090.91 310,244.73
2,761.36 12,326.73
10,000.00 109,409.09 5,251,636.36
10,000.00 59,704.55 3,821,090.91
27,613.64 496,870.49
16,793.18 419,829.55
557,500.00 557,500.00
- 557,500.00 557,500.00
15,064,345.44
6,389,594.85
740,333.92
- - 22,194,274.21
2,166,953.00
2,849,506.22
- - 5,016,459.22
7,730,486.36 100,000,000.00
Kabupaten : Simeulue
Kecamatan : Simeulue Tengah Take Of Sheet
Desa : Suka Karya
VOLUM
NO. KETERANGAN SATUAN
P La Lb T
(M¹) (M¹) (M¹) (M¹)
Pekerjaan Bouwplank M¹
Segmen 1 20.60
Segmen 2 12.00
A Tenaga
Pekerja HOK = 0.100 x 32.600
Tukang Kayu HOK = 0.100 x 32.600
Kepala Tukang HOK = 0.010 x 32.600
Mandor HOK = 0.005 x 32.600
B Bahan
Kayu balok 5/7 M³ = 0.012 x 32.600
Paku 2"- 4" Kg = 0.020 x 32.600
Kayu papan 2/25 M³ = 0.007 x 32.600
C Peralatan
A Tenaga
Pekerja HOK = 1.000 x 25.990
Mandor HOK = 0.032 x 25.990
B Bahan
C Peralatan
VOLUM
NO. KETERANGAN SATUAN
P La Lb T
(M¹) (M¹) (M¹) (M¹)
a. Tapak Tanggul M³
Segmen 1 20.60 0.80 1.00
Segmen 2 12.00 0.80 1.00
b. Dinding Tanggul M³
Segmen 1 20.60 0.30 3.00
Segmen 2 12.00 0.30 3.00
A Tenaga
Pekerja HOK = 1.500 x 55.420
Tukang Batu HOK = 0.750 x 55.420
Kepala Tukang HOK = 0.075 x 55.420
Mandor HOK = 0.075 x 55.420
B Bahan
Batu Belah/Batu Gunung M³ = 1.200 x 55.420
Semen Portland Kg = 163.000 x 55.420
Pasir Pasang M³ = 0.520 x 55.420
C Peralatan
Kabupaten : Simeulue
Kecamatan : Simeulue Tengah Take Of Sheet
Desa : Suka Karya
VOLUM
NO. KETERANGAN SATUAN
P La Lb T
(M¹) (M¹) (M¹) (M¹)
a. Pekerjaan Beton M³
Sloof 30/30 cm
Segmen 1 20.60 0.30 0.30
Segmen 2 12.00 0.30 0.30
Kolom 30/30 cm
Segmen 1 3.00 0.30 0.30
Segmen 2 3.00 0.30 0.30
Balok 30/30 cm
Segmen 1 20.60 0.30 0.30
Segmen 2 12.00 0.30 0.30
Dinding Saluran
Segmen 1 20.60 0.15 0.30
Segmen 2 12.00 0.15 0.30
A Tenaga
Pekerja HOK = 1.650 x 8.838
Tukang Batu HOK = 0.275 x 8.838
Kepala Tukang HOK = 0.028 x 8.838
Mandor HOK = 0.083 x 8.838
B Bahan
Semen Portland M³ = 371.000 x 8.838
Pasir Beton M³ = 0.499 x 8.838
Kerikil (Maksimum 30mm) M³ = 0.776 x 8.838
Air Liter = 215.000 x 8.838
C Peralatan
a. Pekerjaan Pembesian Kg
Besi Utama 4 Ø 12
* Sloof 30/30 cm
Segmen 1 20.60
Kabupaten : Simeulue
Kecamatan : Simeulue Tengah Take Of Sheet
Desa : Suka Karya
VOLUM
NO. KETERANGAN SATUAN
P La Lb T
(M¹) (M¹) (M¹) (M¹)
Segmen 2 12.00
* Kolom 30/30 cm
Segmen 1 3.80
Segmen 2 3.80
* Balok 30/30 cm
Segmen 1 20.60
Segmen 2 12.00
* Angkur
Segmen 1 0.60
Segmen 2 0.60
Besi Begel Ø 8 - 14 cm
* Sloof 30/30 cm
Segmen 1 1.06
Segmen 2 1.06
* Kolom 30/30 cm
Segmen 1 1.06
Segmen 2 1.06
* Balok 30/30 cm
Segmen 1 1.06
Segmen 2 1.06
Besi Ø 12 p = 10 meter
Besi Ø 8 p = 10 meter
A Tenaga
Pekerja HOK = 0.007 x 1,199.578
Tukang Besi HOK = 0.007 x 1,199.578
Kepala Tukang HOK = 0.0007 x 1,199.578
Mandor HOK = 0.0004 x 1,199.578
B Bahan
Besi Beton M3 = 1.050 x 1,199.578
Kawat Beton Kg = 0.015 x 1,199.578
Kabupaten : Simeulue
Kecamatan : Simeulue Tengah Take Of Sheet
Desa : Suka Karya
VOLUM
NO. KETERANGAN SATUAN
P La Lb T
(M¹) (M¹) (M¹) (M¹)
C Peralatan
Kabupaten : Simeulue
Kecamatan : Simeulue Tengah Take Of Sheet
Desa : Suka Karya
VOLUM
NO. KETERANGAN SATUAN
P La Lb T
(M¹) (M¹) (M¹) (M¹)
a. Sloof 30/30 cm M²
Segmen 1 20.60 0.60
Segmen 2 12.00 0.60
b. Kolom 30/30 cm M²
Segmen 1 3.00 0.60
Segmen 2 3.00 0.60
c. Balok 30/30 cm M²
Segmen 1 20.60 0.60
Segmen 2 12.00 0.60
d. Dinding Saluran M²
Segmen 1 20.60 0.60
Segmen 2 12.00 0.60
A Tenaga
Pekerja HOK = 0.520 x 44.640
Tukang kayu HOK = 0.260 x 44.640
Kepala Tukang HOK = 0.026 x 44.640
Mandor HOK = 0.026 x 44.640
B Bahan
Kayu Klas III M3 = 0.045 x 44.640
Paku biasa 2" - 4" Kg = 0.300 x 44.640
Minyak bekisting Liter = 0.100 x 44.640
C Peralatan
VOLUM
NO. KETERANGAN SATUAN
P La Lb T
(M¹) (M¹) (M¹) (M¹)
M. DJOHAN
Jenis Kegiatan : Tanggul Mesjid Khatib M. Nur
Take Of Sheet Lokasi : Desa Suka Karya
Volume : 50 Meter
VOLUME
KET
KELILING LUAS VOLUME BERAT
N (M1) (M2) (M3) (Kg)
32.60
1.00 20.600
1.00 12.000
= 3.26
= 3.26
= 0.33
= 0.16
= 0.39
= 0.65
= 0.23
25.99
1.00 16.423
1.00 9.567
= 25.99
= 0.83
55.42
Jenis Kegiatan : Tanggul Mesjid Khatib M. Nur
Take Of Sheet Lokasi : Desa Suka Karya
Volume : 50 Meter
VOLUME
KET
KELILING LUAS VOLUME BERAT
N (M1) (M2) (M3) (Kg)
1.00 16.48
1.00 9.60
1.00 18.54
1.00 10.80
= 83.13
= 41.57
= 4.16
= 4.16
= 66.50
= 9,033.46
= 28.82
Jenis Kegiatan : Tanggul Mesjid Khatib M. Nur
Take Of Sheet Lokasi : Desa Suka Karya
Volume : 50 Meter
VOLUME
KET
KELILING LUAS VOLUME BERAT
N (M1) (M2) (M3) (Kg)
8.84
1.00 1.85
1.00 1.08
7.00 1.89
4.00 1.08
1.00 1.85
1.00 1.08
1.00 0.93
1.00 0.54
= 14.58
= 2.43
= 0.25
= 0.73
= 3,278.90
= 4.41
= 6.85
= 1,900.17
1,199.58
VOLUME
KET
KELILING LUAS VOLUME BERAT
N (M1) (M2) (M3) (Kg)
48.00 Batang
64.00 Batang
58.00 Batang
77.00 Batang
= 8.40
= 8.40
= 0.84
= 0.48
= 1,259.56
= 17.99
Jenis Kegiatan : Tanggul Mesjid Khatib M. Nur
Take Of Sheet Lokasi : Desa Suka Karya
Volume : 50 Meter
VOLUME
KET
KELILING LUAS VOLUME BERAT
N (M1) (M2) (M3) (Kg)
Jenis Kegiatan : Tanggul Mesjid Khatib M. Nur
Take Of Sheet Lokasi : Desa Suka Karya
Volume : 50 Meter
VOLUME
KET
KELILING LUAS VOLUME BERAT
N (M1) (M2) (M3) (Kg)
89.280 @ 1 x Pakai
1.00 12.36
1.00 7.20
13.00 23.40
4.00 7.20
1.00 12.36
1.00 7.20
1.00 12.36
1.00 7.20
44.640 @ 2 x Pakai
= 23.213
= 11.606
= 1.161
= 1.161
= 2.009
= 13.392
= 4.464
VOLUME
KET
KELILING LUAS VOLUME BERAT
N (M1) (M2) (M3) (Kg)
FITRA ELFIANTO
PEMERINTAH KABUPATEN SIMEULU
DESA NANCAWA KECAMATAN TEUPAH
KABUPATEN SIMEULUE
REKAPITULASI RENCANA ANGGARAN BIAY
Jenis Kegiatan : Kegiatan Rehabilitasi / Pemeliharaan Sarana dan Pr
Provinsi : Aceh
Kabupaten : Simeulue
DANA DESA
1 BAHAN 62,787,778.00
2 PERALATAN 3,400,000.00
3 UPAH 14,000,000.00
JUMLAH 80,187,778.00
Jumlah Total
Dibulatkan
Terbilang : Delapan Puluh Juta Seratus Delapan Puluh Tujuh Rib
Jumlah Biaya Upah 14,000,000.00
Jumlah HOK Konstruksi 162.00
556,574,361.39
Diketahui Oleh
Kepala Desa Nancawa Pendamping Desa Teknik Infra
Kecamatan Teupah Tenga
x 14.00 M
JUMLAH TOTAL Bobot
Bobot
(%) (%)
AB-DD SILPA/NA-TT/V/2018
14,000,000.00
HOK 162.00 HOK
VOLUME
Kategori
NO. URAIAN Satuan Biaya
Dari
Total Swadaya Dari Dana
I. BAHAN
II. PERALATAN
III. UPAH
Sumber Dana
Sumber Dana
YA
: 02/RAB-DD SILPA/NA-TT/V/2018
: Dana Desa
: Rehabilitasi / Pemeliharaan Sarana dan Prasarana Ibadah
: 19.00 x 14.00 Meter
90,000.00 8,460,000.00
196,560.00 2,751,840.00
211,680.00 1,058,400.00
450,000.00 6,300,000.00
286,250.00 8,645,363.00
94,775.00 3,127,575.00
54,600.00 1,419,600.00
25,000.00 875,000.00
10,000.00 150,000.00
150,000.00 30,000,000.00
Sub Total 1 62,787,778.00
65,000.00 260,000.00
70,000.00 140,000.00
1,500,000.00 3,000,000.00
Sub Total 2 3,400,000.00
70,000.00 8,610,000.00
85,000.00 3,230,000.00
2,160,000.00 2,160,000.00
Sub Total 3 14,000,000.00
Dibuat Oleh :
Konsultan Perencana
CV. ALF DESIGN CONSULTANT
FITRA ELFIANTO, ST
Semen 90,000.00
Batu Belah 286,250.00
Kubah 6 m 90,000,000.00
Kerikil (Maks. 30 mm) / Batu Pecah 450,000.00 lokasi 11,250.00 pajak
1050
5.5 6.10
16.7 10.50 16
7 64.05 19
11.1 19
77.7 16
4 14
310.8 14
246.75 14
14
Luasan Atap Kubah 246.75 14
Luasan Atap Ruang Imam, Audio 251.10 11
Total Luasan Atap 497.85 151 302
Luasan Seng Spandek 4.20
118.54
0.20 99.57
0.40
199.14
8
13.7
Segi 3 109.6
1.5
6.1
L1 9.15
2.6
4.2
2
3.4
L2 6.8
125.55
Kayu Kuda2 3 M3
31.66666667
Kusen P1 5.2
1.8
7
28
J1 8.4
5.2
13.6
54.4
J2 2.7
6.3
9
18
J3 4.05
5.55
9.6
19.2
119.6
29.9
0.026
38.46154
12
Gording
1 65.025
2 61.5244
3 58.0236
4 54.5228
5 51.022 3.5008
6 47.5212 3.5008
7 44.0204
8 40.5196
9 37.0188
10 33.518
11 30.0172
12 26.5164
13 23.0156
572.265 M1
143.06625 Btg
0.01 M3/Btg
100
1.4306625
20,000.00 Palang
2,511,250.00
2,787,500.00
9.6
2
19.2
16
2
38
75.2
Kaki Kuda2 12
12
144 M1
36 Btg
3 m1
3 m1
24 m1
30 m1
360 M1
90 Btg
126 Btg
0.02
50
2.52
M1
M1
M1
M1
M1
22.4
10.666666667
20
21
420
Lisplang 55.65
30
85.65
21.4125
0.02
50
52
120
6240
124.8
Kusen Jendela 1.7 0.55 3
Jelusi 0.5 0.55 3
Jendela Dalam 1 0.55
6
6