JUMLAH Rp.
Terbilang : Empat Ratus Sepuluh Juta Sembilan Ratus Tujuh Puluh Sembilan Ribu Sembilan Ratus Sa
20/100 Rupiah.
ERMAYULIS
Direktur
N BIAYA
JUMLAH HARGA
1,347,500.00
179,617,350.00
3,190,000.00
76,969,734.60
114,656,822.50
35,198,494.10
410,979,901.20
5 Agustus 2019
ar,
ULANDA
ULIS
ur
NO. BAHAN SAT. VOL HARGA
2,496,000.00
1,893,840.00
3,124,836.00
29,543,904.00
128,214.00
3,326,400.00
12,597,200.00
14,838,875.31
3,058,801.20
1,825,200.00
3,053,700.00
1,200,000.00
28,058,800.00
39,585,791.70
89,529,290.55
3,873,375.00
5,115,600.00
3,479,831.25
4,361,940.00
251,091,599.01
RENCANA ANGGARAN BIAYA
Kegiatan : Rehabilitasi Sedang/Berat Rumah Jabatan
Pekerjaan : Pemeliharaan Rumah Wakil Ketua II DPRD, Pekerjaan Landscape Dan Lampu Taman Rumah Jaba
Lokasi : Kecamatan Siak
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek Ls 1.00
2 Pek. Pembersihan Lokasi Ls 1.00
Sub Jumlah
II PEKERJAAN PENGECATAN
1 Pek. Pengikisan Cat Lama Cara manual M2 780.00
2 Pek. Cat Dinding M2 780.00
3 Pek. Cat Pintu dan Jendela M2 251.40
4 Pek. Cat Coating Batu Alam M2 158.40
Sub Jumlah
I PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran Beton Taman Type 1 Ls 1.00
2 Pek. Pembersihan Akar Pohon Ls 1.00
3 Pek. Pembersihan Batu Alam dan Paving Blok Ls 1.00
Sub Jumlah
II PEKERJAAN STRUKTUR
1 Pek. Pas. Dinding Bata 1 Batu 1:2 Taman Type 1 M2 160.30
2 Pek. Pas. Dinding Bata 1/2 Batu 1:2 Taman Type 1 M2 6.60
3 Pek. Cor Beton Lantai 1 : 3 : 5 t=5 cm M3 10.80
4 Pek. Pas. Kanstin Taman Type 1 M' 20.00
5 Pek. Plesteran Dinding Bata Taman Type 1 M2 166.92
Sub Jumlah
III PEKERJAAN TAMAN
1 Pek. Pasang Batu Alam Templek Taman Type 1 M2 72.88
2 Pek. Koral Sikat Terang Taman type 1 M2 52.78
3 Pek. Koral Sikat GelapTaman type 1 M2 119.37
4 Pek. Urugan Tanah M3 60.90
Sub Jumlah
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Bagian Taman 1 Dengan Cat Air M2 166.92
2 Pek. Pengecatan Kembali Bagian Batu Alam Templek Taman 1 M2 67.27
3 Pek. Pengecatan Kembali Paving Blok Dengan Cat Minyak M2 29.14
4 Pek. Pengecatan Kembali Kanstin Dengan Cat Minyak M2 44.21
Sub Jumlah
ANALISA HARGA SATUAN PEKERJAAN
3. Pemasangan 1m2 dinding bata tebal 1/2 batu campuran 1SP : 2PP
Harga Satuan
No Uraian Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.300 118,000.00
Tukang Batu OH 0.100 145,000.00
Kepala tukang OH 0.010 153,400.00
Mandor OH 0.015 153,400.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah Bh 70.000 640.00
Semen portland Kg 18.950 1,240.00
Pasir pasang M3 0.038 290,100.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
G DIBULATKAN
C PERALATAN
Jumlah Harga Alat
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
G Dibulatkan
11. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.020 118,000.00
Tukang cat OH 0.630 145,000.00
Kepala tukang OH 0.006 153,400.00
Mandor OH 0.003 153,400.00
Jumlah Tenaga Kerja
B BAHAN
Plamuur Kg 0.100 25,700.00
Cat dasar Kg 0.100 20,000.00
Cat penutup Kg 0.260 180,000.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
G DIBULATKAN
12. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.070 118,000.00
Tukang cat OH 0.009 145,000.00
Kepala tukang OH 0.006 153,400.00
Mandor OH 0.003 153,400.00
Jumlah Tenaga Kerja
B BAHAN
Cat dasar Kg 0.170 88,000.00
Cat penutup Kg 0.260 88,000.00
Kuas Bh 0.010 15,400.00
Pengencer Kg 0.030 25,000.00
Ampelas Lbr 0.200 5,000.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
G Dibulatkan
Jumlah Harga
(Rp)
141,600.00
29,000.00
3,068.00
9,204.00
182,872.00
285,200.00
183,040.00
319,986.00
788,226.00
971,098.00
97,109.80
1,068,207.80
1,068,200.00
Jumlah Harga
(Rp)
23,600.00
14,500.00
1,534.00
1,534.00
41,168.00
89,600.00
53,940.00
23,208.00
166,748.00
207,916.00
20,791.60
228,707.60
228,700.00
Jumlah Harga
(Rp)
35,400.00
14,500.00
1,534.00
2,301.00
53,735.00
44,800.00
23,498.00
11,023.80
79,321.80
133,056.80
13,305.68
146,362.48
146,300.00
Jumlah Harga
(Rp)
35,400.00
21,750.00
2,301.00
2,301.00
61,752.00
9,642.24
6,672.30
16,314.54
78,066.54
7,806.65
85,873.19
85,800.00
Jumlah Harga
(Rp)
73,160.00
50,750.00
5,369.00
4,602.00
133,881.00
187,000.00
14,570.00
10,153.50
211,723.50
345,604.50
34,560.45
380,164.95
380,100.00
Jumlah Harga
(Rp)
73,160.00
50,750.00
5,369.00
4,602.00
133,881.00
133,336.00
291.40
10,153.50
4,000.00
147,780.90
281,661.90
28,166.19
309,828.09
309,800.00
Jumlah Harga
(Rp)
73,160.00
50,750.00
5,369.00
4,602.00
133,881.00
241,671.50
291.40
10,153.50
4,000.00
256,116.40
389,997.40
38,999.74
428,997.14
428,900.00
Jumlah Harga
(Rp)
59,000.00
36,250.00
3,835.00
3,835.00
102,920.00
192,000.00
192,000.00
294,920.00
29,492.00
324,412.00
324,400.00
Jumlah Harga
(Rp)
35,400.00
1,534.00
36,934.00
97,200.00
97,200.00
134,134.00
13,413.40
147,547.40
147,500.00
Jumlah Harga
(Rp)
17,700.00
460.20
18,160.20
1,500.00
1,500.00
-
19,660.20
1,966.02
21,626.22
21,600.00
2,360.00
91,350.00
966.42
460.20
95,136.62
2,570.00
2,000.00
46,800.00
51,370.00
146,506.62
14,650.66
161,157.28
161,100.00
cat dasar, 2 lapis cat penutup)
Jumlah Harga
(Rp)
8,260.00
1,305.00
920.40
460.20
10,945.60
14,960.00
22,880.00
154.00
750.00
1,000.00
39,744.00
50,689.60
5,068.96
55,758.56
55,700.00
Jumlah Harga
(Rp)
2,360.00
9,135.00
966.42
460.20
12,921.62
8,800.00
8,800.00
3,249.00
1,540.00
4,789.00
26,510.62
2,651.06
29,161.68
29,100.00
Jumlah Harga
(Rp)
2,360.00
14,500.00
1,534.00
460.20
18,854.20
19,800.00
308.00
20,108.00
38,962.20
3,896.22
42,858.42
42,800.00
Jumlah Harga
(Rp)
2,360.00
9,135.00
966.42
460.20
12,921.62
25,900.00
25,900.00
1,386.00
1,386.00
40,207.62
4,020.76
44,228.38
44,200.00
DAFTAR SATUAN UPAH DAN BAHAN
B BAHAN PASANGAN
1 Semen Portland 50 Kg Kg
2 Semen Putih Kg
3 Pasir Beton/Cor M3
4 Pasir Pasang M3
5 Pasir Urug M3
6 Koral Beton/Kerikil M3
7 Tanah Urug Didatangkan M3
8 Batu Bata Bh
9 Koral Sikat Terang/Putih Kg
10 Koral Sikat Gelap/Hitam Kg
11 Batu AlamTemplek M2
12 Crub Beton/kanstin Bh
C BAHAN FINISHING
1 Cat Air Kg
2 Cat Dasar Kg
3 Cat Minyak Kg
4 Cat Batu Alam Kg
5 Thinner Ltr
6 Pernis Ltr
7 Minyak Pengencer Ltr
8 Minyak bekisting Ltr
9 Plastik Hitam M2
10 Amplas Lbr
11 Kuas Tangan Pcs
12 Kuas Roll Pcs
13 Plamour Kg
14 HCL Ltr
15 Soda Api Kg
N BAHAN
HARGA
Rp 118,000.00
Rp 145,000.00
Rp 153,400.00
Rp 153,400.00
Rp 1,240.00
Rp 2,640.00
Rp 352,000.00
Rp 290,100.00
Rp 217,900.00
Rp 367,800.00
Rp 81,000.00
Rp 640.00
Rp 8,000.00
Rp 14,500.00
Rp 170,000.00
Rp 80,000.00
Rp 180,000.00
Rp 20,000.00
Rp 88,000.00
Rp 74,000.00
Rp 23,000.00
Rp 66,000.00
Rp 25,000.00
Rp 8,200.00
Rp 3,000.00
Rp 5,000.00
Rp 15,400.00
Rp 36,100.00
Rp 25,700.00
Rp 8,000.00
Rp 30,000.00