RAB Suka Suka
RAB Suka Suka
II Pekerjaan Tanah
1 Galian Tanah
2 Pembuatan Lubang Foot Plate Type P1&P2 (100x100x30
3 Pembuatan Lubang Foot Plate Type P3 (100x150x30)
IV Pekerjaan Beton
1 Lantai Kerja (t=5cm)
2 Pondasi Foot Plate Type P1 (100x100x30)
3 Pondasi Foot Plate Type P2 (100x100x30)
4 Pondasi Foot Plate Type P3 (100x150x30)
5 Rabat Beton (t=5cm)
6 Beton Bertulang Sloof (15x30)
7 Beton Bertulang Kolom Type K1 (30x15)
8 Beton Bertulang Kolom Type K2 (15x30)
9 Beton Bertulang Kolom Type K3 (15x20)
10 Beton Bertulang Balok Type B1 (15x30)
11 Beton Bertulang Balok Type B2 (15x20)
12 Beton Bertulang Ring Balok (15x30)
13 Beton Bertulang Plat Lantai (t=12cm)
14 Beton Bertulang Tangga
15 Plat Talang Beton (t=8cm)
16 Sunscreen Beton (t=10cm)
V Pekerjaan Dinding
1 Pas. Trasram (1Pc : 3Ps)
2 Pas. Dinding Bata (1Pc : 4Ps)
3 Plesteran Dinding (1Pc : 5Ps)
4 Plesteran Trasram (1Pc : 2Ps)
5 Acian Dinding
VI Pekerjaan Keramik
1 Keramik Lantai 40x40
2 Keramik Lantai WC Kasar 20x20
3 Keramik Lantai Kasar 30x30
4 Keramik Dinding 20x25
5 Keramik Meja Dapur 20x20
6 List Keramik 10x20
IX Pekerjaan Pengecatan
1 Plamir Dinding
2 Cat Dinding
3 Cat Kusen Kayu
4 Cat Daun Pintu
5 Cat Daun Jendela
6 Cat Plafon
X Pekerjaan Sanitasi
1 Closed Jongkok
2 Closed Duduk
3 Kran Air
4 Floor Drain
5 Pipa PVC dia. 3/4"
6 Pipa PVC dia. 3"
7 Pipa PVC dia. 4"
8 Penyambung air PDAM
9 Septictank dan Resapan
10 Tandon Air
11 Pas. Tempat Cuci Piring (Kitchen Zink)
12 Pas. Wastafel
13 Pas. Bath up
14 Shower
B PEKERJAAN LANTAI 2
I Pekerjaan Beton
1 Beton Bertulang Kolom K1 (15x30)
2 Beton Bertulang Kolom K3 (15x15)
3 Beton Bertulang Balok B1 (15x30)
4 Beton Bertulang Balok B2 (15x20)
5 Beton Bertulang Ring Balok (15x30)
6 Plat Talang Beton (t=8cm)
7 Plat Sunscreen Beton
II Pekerjaan Dinding
1 Pas. Trasram
2 Pas. Dinding Bata (1Pc : 4Ps)
3 Plesteran Dinding (1Pc : 5Ps)
4 Plesteran Trasram (1Pc : 2Ps)
5 Acian
IV Pekerjaan Kayu
1 Kusen 6/15
2 Daun Pintu Jendela (PJ2)
3 Daun Pintu (P1)
4 Daun Pintu (P3)
5 Daun Ventilasi (BV)
6 Daun Jendela (J1)
7 Daun Jendela (J2)
8 Daun Jendela (J6)
VI Pekerjaan Pengecatan
1 Plamir Dinding
2 Cat Dinding
3 Cat Kusen Kayu
4 Cat Daun Pintu
5 Cat Daun Jendela
6 Cat Plafond
IX Pekerjaan Atap
1 Gording + Nok + Jurai 8/12 (Kamper)
2 Kuda-Kuda 8/12
3 1/2 Kuda-Kuda 8/12
4 Balok Tembok 8/12
5 Usuk 5/7 & Reng 3/5 (Kamper)
6 Genteng Wuwung (Karang Pilang)
7 Genteng Karang Pilang (Bambe)
X Pekerjaan Plafond
1 Rangka Plafond Gypsum Board
2 Penutup Plafond Gypsum Board
3 List Plafond Gypsum Board
XI Pekerjaan Lain-Lain
1 Pemasangan Kaca Jendela 6mm di Bevel
4.1 DAFTAR URAIAN VOLUME PEKERJAAN
I Pekerjaan Persiapan
1 Pembersuhan Lokasi
Panjang (p) = 37 m
Lebar (l) = 17 m
Volume = pxl m2
= 629 m2
Bawah Lantai 15 cm
4 Anstampeng
Panjang (p) = 204.123 m
204.12 m
Lebar (l) = 1 m
Tinggi (t) = 0.2 m
Volume = p x l xt m3
= 40.824 m3
= 40.82 m3
6 Ps. Rollag
Panjang (p) = 28.775 m
= 28.77 m
Lebar (l) = 0.3 m
Tinggi (t) = 0.2 m
Volume = pxlxt m3
= 1.7262 m3
= 1.72 m3
IV Pekerjaan Beton
1 Lantai Kerja (t=5cm)
P1&P2
Panjang (p) = 1.2 m
Lebar (l) = 1.2 m
Tinggi (t) = 0.05 m
Banyak (Σ) = 10 Buah
Volume = pxlxtxΣ m3
= 0.72 m3
0.72 m3
Volume Total = 1 m3
Bekisting
k = 0.24 m
= 0.58 m2
= 0.58 m2
As 2 3 4
Panjang (m) 11.55 11.35 11.5
As 8 9 A
Panjang (m) 7.2 7.25 20.03
Jumlah (m) 148.52
Balok Bordes
Panjang (p) = 1.85 m
Lebar (l) = 0.15 m
Tinggi (t) = 0.3 m
Volume = pxlxt m3
= 0.08325 m3
= 0.08 m3
Volume Total = 1.37 m3
Bekisting
V, Bekisting = 0.855 m
V. Bekisting = 1.2 m
Luas = 45.504 m2
Tinggi (t) = 0.1 m
Volume = Lxt m3
= 4.5504 m3
= 4.55 m3
V Pekerjaan Dinding
1 Pas. Trasram (1Pc:3Ps)
5 Acian Dinding
Luas = 2 x Luas Netto
= 790.12 m2
VI Pekerjaan Keramik
1 Keramik Lantai 40 x 40
R.mencuci KM 1
Panjang (m) 1.85 0.63 1.35
Lebar (m) 1.35 0.15 1.35
Luas (m²) 2.50 0.09 1.82
Luas Total (m²) 11.51
IX Pekerjaan Pengecatan
1 Plamir Dinding
Luas sama dengan Luas Acian
Luas = 790.12 m²
2 Cat Dinding
Luas sama dengan Luas Acian
Luas = 790.12 m²
X Pekerjaan Sanitasi
1 Closed Jongkok = 1 buah
2 Closed duduk = 2 buah
3 Kran Air = 9 buah
4 Floor drain = 4 buah
5 Instalasi air bersih Pipa PVC dia. 3/4 " = 30 m
6 Instalasi air kotor Pipa PVC dia. 3 " = 25 m
7 Instalasi air kotoran Pipa PVC dia. 4 " = 25 m
8 Penyambungan air PDAM = 1 Ls
9 Septictank dan Resapan = 1 buah
10 Tandon Air = 1 buah
11 Pas.Tempat Cuci Piring (Kitchen Zink) = 1 buah
12 Pas.Wastafel = 1 buah
13 Pas.Bath up = 1 buah
14 Shower = 1 buah
2 Kuda-kuda 8/12
Kuda-kuda 1 (2 buah)
Panjang (p) = 116.5 m
Lebar (l) = 0.08 m
Tinggi (t) = 0.12 m
Volume = pxlxt m³
= 1.1184 m³
= 1.11 m³
Kuda-kuda 4 (1 buah)
Panjang (p) = 47 m
Lebar (l) = 0.08 m
Tinggi (t) = 0.12 m
Volume = pxlxt m³
= 0.4512 m³
= 0.45 m³
Panjang Lebar
PJ1 = 1.74 0.48
PJ2 = 1.74 0.48
8BV = 0.26 0.48
BV1 = 0.26 0.48
2J1 = 1.34 0.48
2J2 = 1.34 0.48
J3 = 1.34 0.48
J4 = 0.94 0.48
J5 = 1.34 0.48
Total
B PEKERJAAN LANTAI 2
I Pekerjaan Beton
1 Beton Bertulang Kolom K1 (15x30)
Panjang (p) = 0.3 m
Lebar (l) = 0.15 m
Tinggi (t) = 4 m
Jumlah (Ʃ) = 12 m
Volume = pxlxtxƩ m³
= 2.16 m³
Bekisting
koef. = 2.946
II Pekerjaan Dinding
1 Pas. Trasram
5 Acian
Luas = 2 x Luas Netto m²
= 535.3456 m²
= 535.34 m²
R.Tidur
Panjang (m) 3.85 0.80 1
Lebar (m) 3.85 0.15 0.2
Luas (m²) 14.82 0.12 0.20
15.14
Luas Total (m²) 49.67
Teras depan
Panjang (m) 1.85 1.05 0.7
Lebar (m) 1.05 1.05 0.7
Luas (m²) 1.94 1.10 0.49
Luas Total (m²) 3.535
3 Keramik Dinding 20x25
Panjang = 6.58 m
Tinggi = 2.05 m
Luas = pxl m²
= 13.489 m²
= 13.48 m²
IV Pekerjaan Kayu
1 Kusen 6/15
PJ2 = 6.86 m²
P1 = 2.39 m²
P3 = 2.13 m²
BV = 0.69 m²
J1 = 2.48 m²
J2 = 3.67 m²
J6 = 3.78 m²
Total = 22.01 m²
= 22.00 m²
Volume Kusen 6/15
PJ2 = 1.03 m³
P1 = 0.05 m³
P3 = 0.05 m³
BV = 0.01 m³
J1 = 0.05 m³
J2 = 0.06 m³
J6 = 0.15 m³
Total = 1.40 m³
2 Daun Pintu-Jendela (PJ2) =
Pintu PJ2 = 3.48 m²
Jendela PJ2 = 2.64 m²
Jumlah PJ2 = 6.12 m²
3 Daun Pintu (P1) = 2.08 m²
4 Daun Pintu (P3) = 1.82 m²
5 Daun Ventilasi (BV) = 0.60 m²
6 Daun Jendela (J1) = 2.16 m²
7 Daun Jendela (J2) = 3.24 m²
8 Daun Jendela (J6) = 2.76 m²
6 Cat plafond
Tabel Luas Permukaan Plafond
R.Tidur
Panjang (m) 3.85 0.80 1
Lebar (m) 3.85 0.15 0.2
Luas (m²) 14.82 0.12 0.20
15.14
R.Santai Ruang
Panjang (m) 5.85 3.30 3.85
Lebar (m) 3.85 0.15 1.85
Luas (m²) 22.52 0.50 7.12
23.02 7.23
Luas Total (m²) 53.20
VII Pekerjaan Sanitasi
1 Closed Duduk = 1 buah
2 Kran Air = 1 buah
3 Floor drain = 1 buah
4 Instalasi air bersih Pipa PVC dia. 3/4 " = 15 m
5 Instalasi air kotor Pipa PVC dia. 3 " = 15 m
6 Instalasi air kotoran Pipa PVC dia. 4 " = 13 m
IX Pekerjaan Atap
1 Gording + Nok + Jurai 8/12 (Kamper)
Panjang Nok = 4.10 m
Panjang Gording = 20.40 m
Panjang Jurai = 3.90 m
Total Panjang = 28.40 m
2 Kuda-kuda 8/12
Kuda-kuda 3 (3 buah)
Panjang (p) = 157.5 m
Lebar (l) = 0.08 m
Tinggi (t) = 0.12 m
Volume = pxlxt m³
= 1.512 m³
= 1.51 m³
3 1/2 Kuda-kuda 8/12
Kuda-kuda 3 (2 buah)
Panjang (p) = 105 m
Lebar (l) = 0.08 m
Tinggi (t) = 0.12 m
Volume = 1/2 x (p x l x t) m³
= 0.504 m³
= 0.5 m³
X Pekerjaan Plafond
1 Rangka Plafond Gypsum Board
Tabel Luas Rangka Permukaan Plafond
R.Tidur
Panjang (m) 3.85 0.80 1
Lebar (m) 3.85 0.15 0.2
Luas (m²) 14.82 0.12 0.20
15.14
R.Santai Ruang
Panjang (m) 5.85 3.30 3.85
Lebar (m) 3.85 0.15 1.85
Luas (m²) 22.52 0.50 7.12
23.02 7.23
Luas Total (m²) 53.20
R.Tidur
Panjang (m) 3.85 0.80 1
Lebar (m) 3.85 0.15 0.2
Luas (m²) 14.82 0.12 0.20
15.14
R.Santai Ruang
Panjang (m) 5.85 3.30 3.85
Lebar (m) 3.85 0.15 1.85
Luas (m²) 22.52 0.50 7.12
23.02 7.23
Luas Total (m²) 53.20
R.Tidur
Panjang (m) 3.85 0.80 1
Lebar (m) 3.85 0.15 0.2
Keliling (m) 15.40 1.90 2.40
19.70
R.Santai Ruang
Panjang (m) 5.85 3.30 3.85
Lebar (m) 3.85 0.15 1.85
Keliling (m) 19.40 6.90 11.40
26.30 13.14
Keliling Total (m) 80.64
Tinggi 0.1
Volume (m²) 8.06
XI Pekerjaan Lain-lain
1 Pemasangan Kaca Jendela 6mm di Bevel
Panjang Lebar
250.058 250.050 m2
143.820 143.820 m2
ng foot plate+urugan pasir+anstampeng+pasangan batu kali+pasangan rollag)
P3
Panjang (p) = 1.7 m
Lebar (l) = 1.7 m
Tinggi (t) = 0.05 m
Banyak (Σ) = 2 Buah
Volume = pxlxtxΣ m3
= 0.289 m3
= 0.28 m3
Bekisting
k = 0.34 m
Bekisting
V. Bekisting = 1.2 m
Koef = 0.5714285714 m2
0.57 m2
Bekisting
V. Bekisting = 1.2 m
Koef = 1.3333333333 m2
1.33 m2
Bekisting
V. Bekisting = 3 m
Koef = 3.3333333333 m2
3.33 m2
Bekisting
V. Bekisting = 7.191 m
Koef = 0.57528 m2
0.57 m2
Bekisting
V. Bekisting = 122.562 m
Koef = 13.3509803922 m2
13.35 m2
Bekisting
V. Bekisting = 53.46 m
Koef = 20 m2
20 m2
Bekisting
V. Bekisting = 82.62 m
Koef = 20 m2
20 m2
Bekisting
V. Bekisting = 56.7 m
Koef = 23.3333333333 m2
23.33 m2
5 6 7
10.45 8.975 8.55
B C D
16.005 15.905 19.755
148.52
Bekisting
V. Bekisting = 89.202 m
Koef = 13.3467995332 m2
13.34 m2
Bekisting
V. Bekisting = 8.02 m
Koef = 13.4338358459 m2
13.43 m2
Bekisting
V. Bekisting = 103.086 m
Koef = 13.3449842712 m2
13.34 m2
Bekisting
V. Bekisting = 118.15 m
Koef = 1.7243140689 m2
1.72 m2
Anak Tangga
Panjang (p) = 0.925 m
Lebar (l) = 0.3 m
Tinggi (t) = 0.19 m
Jumlah = 3
Volume = pxlxtxj m3
= 0.158175 m3
= 0.15 m3
Anak Tangga
Panjang (p) = 0.925 m
Lebar (l) = 0.3 m
Tinggi (t) = 0.185 m
Jumlah = 17
Volume = pxlxtxj m3
= 0.8727375 m3
= 0.87 m3
Bekisting
V. Bekisting = 0.4655 m
V. Bekisting = 0.45325 m
Bekisting
V. Bekisting = 10.2 m
Koef = 4.0476190476 m2
4.04 m2
Bekisting
V. Bekisting = 14.146 m
Koef = 3.109010989 m2
3.1 m2
Satuan
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
11.20 8.60 m2
2.48 10.12 m2
6.49 4.31 m2
0.00 12.60 m2
2.39 10.21 m2
0.00 12.60 m2
0.00 12.60 m2
0.00 3.60 m2
0.69 10.11 m2
0.00 14.40 m2
2.48 11.92 m2
0.69 10.11 m2
0.00 14.40 m2
0.00 14.40 m2
6.86 18.34 m2
2.07 37.53 m2
0.00 21.60 m2
0.00 9.00 m2
2.13 19.47 m2
4.86 16.74 m2
2.39 12.01 m2
2.13 5.07 m2
4.36 17.24 m2
0.00 9.00 m2
0.00 10.80 m2
2.35 19.25 m2
1.93 5.27 m2
0.00 9.00 m2
0.00 2.88 m2
0.00 9.20 m2
2.13 7.07 m2
2.21 6.79 m2
2.21 4.69 m2
1.95 3.99 m2
2.21 6.79 m2
Jumlah 401.69 m2
395.06 m2
(dikali 2 karena ada 2 sisi)
KM 2 KM3
2.85 0.85 1.85
1.05 0.8 1.85
2.99 0.68 3.42
11.51
KM3
1.85
1.85
6.58
Jumlah 1 paket
PJ1 = 1 buah
PJ2 = 1 buah
P1 = 3 buah
P2 = 2 buah
P3 = 2 buah
P4 = 1 buah
PG = 1 buah
BV = 8 buah
BV1 = 1 buah
J1 = 2 buah
J2 = 2 buah
J3 = 1 buah
J4 = 1 buah
J5 = 1 buah
Banyaknya Pintu dan Jendela dalam 1 paket
PJ1
P = 2 buah
J = 4 buah
PJ2
P = 2 buah
J = 2 buah
P1 = 1 buah
P2 = 1 buah
P3 = 1 buah
P4 = 1 buah
PG = 5 buah
BV = 2 buah
BV1 = 1 buah
J1 = 2 buah
J2 = 3 buah
J3 = 4 buah
J4 = 2 buah
J5 = 1 buah
m²
m²
m²
Kuda-kuda 2 (1 buah)
Panjang (p) = 76 m
Lebar (l) = 0.08 m
Tinggi (t) = 0.12 m
Volume = pxlxt m³
= 0.7296 m³
= 0.72 m³
Luas Satuan
3.3408 m²
1.6704 m²
1.9968 m²
0.1248 m²
2.5728 m²
3.8592 m²
2.5728 m²
0.9024 m²
0.6432 m²
17.6832 m²
17.68 m²
Bekisting
k = 43.2 m
= 20
20
Bekisting
k = 9.6 m
= 26.6666666667
26.66
Bekisting
k = 29.34 m
= 13.3743589744
13.37
Bekisting
k = 8.6 m
= 13.4270101483
13.42
Bekisting
k = 32.31 m
= 13.4066390041
13.4
k = 6.5 m
= 4.0625
4.06
Satuan
m²
m²
m
m³
m³
Satuan
m
m
m
m²
m²
Satuan
m²
m²
m²
m²
m²
4.968 31.03 m²
0.00 46.00 m²
0.00 22.40 m²
0.00 26.40 m²
7.4532 38.15 m²
2.392 32.01 m²
2.132 17.07 m²
7.546 56.05 m²
JUMLAH 269.1088 m²
267.67 m²
(dikali 2 karena ada 2 sisi)
m²
m²
m²
Teras depan
1.85 1.05 0.7
1.05 1.05 0.7
1.94 1.10 0.49
3.535
Ruang Balkon
0.72 2.85
0.15 1.50
0.11 4.28
7.23 4.28
53.20
Lebar = 0.08 m
Tinggi = 0.12 m
Volume = 0.27 m³
= 0.27 m³
Teras depan
1.85 1.05 0.7
1.05 1.05 0.7
1.94 1.10 0.49
3.535
Ruang Balkon
0.72 2.85
0.15 1.50
0.11 4.28
7.23 4.28
53.20
Teras depan
1.85 1.05 0.7
1.05 1.05 0.7
1.94 1.10 0.49
3.535
Ruang Balkon
0.72 2.85
0.15 1.50
0.11 4.28
7.23 4.28
53.20
Teras depan
1.85 1.05 0.7
1.05 1.05 0.7
5.80 4.20 2.80
12.800
Ruang Balkon
0.72 2.85
0.15 1.50
1.74 8.70
13.14 8.70
80.64
0.1
8.06
Luas Satuan
1.6704 m²
0.2496 m²
0.1248 m²
1.2864 m²
1.9296 m²
4.392 m²
9.6528 m²
9.65 m²
4.2 DAFTAR VOLUME PEKERJAAN
V Pekerjaan Dinding
1 Pas. Trasram (1Pc : 3Ps) 6.64 m²
2 Pas. Dinding Bata (1Pc : 4Ps) 395.06 m²
3 Plesteran Dinding (1Pc : 5Ps) 790.12 m²
4 Plesteran Trasram (1Pc : 2Ps) 13.27 m²
5 Acian Dinding 790.12 m²
VI Pekerjaan Keramik
1 Keramik Lantai 40x40 208.44 m²
2 Keramik Lantai WC Kasar 20x20 11.51 m²
3 Keramik Lantai Kasar 30x30 33.88 m²
4 Keramik Dinding 20x25 49.43 m²
5 Keramik Meja Dapur 20x20 2.16 m²
6 List Keramik 10x20 258.89 m²
VII Pekerjaan Kayu
1 Pasang Kusen Pintu dan Jendela 6/15 1.15 m³
2 Daun Pintu Jendela (PJ1) 10.33 m²
3 Daun Pintu Jendela (PJ2) 6.12 m²
4 Daun Pintu (P1) 6.24 m²
5 Daun Pintu (P2) 3.80 m²
6 Daun Pintu (P3) 3.64 m²
7 Daun Pintu (P4) 1.64 m²
8 Daun Pintu Garasi Type PG 6.21 m²
9 Daun BV Type (BV) 4.80 m²
10 Daun BV Type (BV1) 0.30 m²
11 Daun Jendela (J1) 4.32 m²
12 Daun Jendela (J2) 6.48 m²
13 Daun Jendela (J3) 4.32 m²
14 Daun Jendela (J4) 1.68 m²
15 Daun Jendela (J5) 1.08 m²
IX Pekerjaan Pengecatan
1 Plamir Dinding 790.12 m²
2 Cat Dinding 790.12 m²
3 Cat Kusen Kayu 1.15 m²
4 Cat Daun Pintu 60.10 m²
5 Cat Daun Jendela 10.6 m²
6 Cat Plafon 253.83 m²
X Pekerjaan Sanitasi
1 Closed Jongkok 1 Buah
2 Closed Duduk 2 Buah
3 Kran Air 9 Buah
4 Floor Drain 4 Buah
5 Pipa PVC dia. 3/4" 30 m
6 Pipa PVC dia. 3" 25 m
7 Pipa PVC dia. 4" 25 m
8 Penyambung air PDAM 1 Ls
9 Septictank dan Resapan 1 Buah
10 Tandon Air 1 Buah
11 Pas. Tempat Cuci Piring (Kitchen Zink) 1 Buah
12 Pas. Wastafel 1 Buah
13 Pas. Bath up 1 Buah
14 Shower 1 Buah
I Pekerjaan Beton
1 Beton Bertulang Kolom K1 (15x30) 2.16 m³
2 Beton Bertulang Kolom K3 (15x15) 0.36 m³
3 Beton Bertulang Balok B1 (15x30) 2.19 m³
4 Beton Bertulang Balok B2 (15x20) 0.64 m³
5 Beton Bertulang Ring Balok (15x30) 2.41 m³
6 Plat Talang Beton (t=8cm) 1.6 m³
7 Plat Sunscreen Beton 1.3 m³
II Pekerjaan Dinding
1 Pas. Trasram 1.44 m²
2 Pas. Dinding Bata (1Pc : 4Ps) 267.67 m²
3 Plesteran Dinding (1Pc : 5Ps) 535.34 m²
4 Plesteran Trasram (1Pc : 2Ps) 2.87 m²
5 Acian 535.34 m²
IV Pekerjaan Kayu
1 Kusen 6/15 1.40 m³
2 Daun Pintu Jendela (PJ2) 6.12 m²
3 Daun Pintu (P1) 2.08 m²
4 Daun Pintu (P3) 1.82 m²
5 Daun Ventilasi (BV) 0.60 m²
6 Daun Jendela (J1) 2.16 m²
7 Daun Jendela (J2) 3.24 m²
8 Daun Jendela (J6) 2.76 m²
VI Pekerjaan Pengecatan
1 Plamir Dinding 535.34 m²
2 Cat Dinding 535.34 m²
3 Cat Kusen Kayu 1.40 m³
4 Cat Daun Pintu 14.76 m²
5 Cat Daun Jendela 3.49 m²
6 Cat Plafond 53.20 m²
VII Pekerjaan Sanitasi
1 Closed Duduk 1 Buah
2 Kran Air 1 Buah
3 Floor Drain 1 Buah
4 Pipa PVC dia. 3/4" 15 m
5 Pipa PVC dia. 3" 15 m
6 Pipa PVC dia. 4" 13 m
IX Pekerjaan Atap
1 Gording + Nok + Jurai 8/12 (Kamper) 0.27 m³
2 Kuda-Kuda 8/12 1.51 m³
3 1/2 Kuda-Kuda 8/12 0.50 m³
4 Balok Tembok 8/12 0.19 m³
5 Usuk 5/7 & Reng 3/5 (Kamper) 77.04 m²
6 Genteng Wuwung (Karang Pilang) 4.1 m
7 Genteng Karang Pilang (Bambe) 77.04 m²
X Pekerjaan Plafond
1 Rangka Plafond Gypsum Board 53.20 m²
2 Penutup Plafond Gypsum Board 53.20 m²
3 List Plafond Gypsum Board 8.06 m²
XI Pekerjaan Lain-Lain
1 Pemasangan Kaca Jendela 6mm di Bevel 9.65 m²
Analisa Kebutuhan Tenaga Kerja (OH)
Durasi (Hari) Volume
Koefisien
Total Per Hari
(5) (6) (7)=(3)x(6) (8)=(7)/(5)
0.005 3.145
0.1 62.9
0.005 0.54
0.01 1.08
0.1 10.8
0.1 10.8
0.005 0.07
0.01 0.14
0.1 1.4
0.1 1.4
0.1 1.4
0.025 9.369
0.75 281.07
0.025 0.425
0.75 12.75
0.025 0.1275
0.75 3.825
0.025 0.25
0.75 7.5
0.025 0.05
0.75 1.5
0.01 0.575
0.3 17.25
0.039 1.59198
0.039 1.59198
0.39 15.9198
0.78 31.8396
0.075 6.73575
0.075 6.73575
0.75 67.3575
1.5 134.715
0.015 0.0258
0.01 0.0172
0.1 0.172
0.3 0.516
0.01 1.6281
0.3 48.843
0.06 0.06
0.02 0.02
0.2 0.2
1.2 1.2
0.083 0.1743
0.028 0.0588
0.275 0.5775
1.65 3.465
0.004 0.0084
0.007 0.0147
0.07 0.147
0.07 0.147
0.026 0.0546
0.026 0.0546
0.26 0.546
0.52 1.092
0.083 0.0747
0.028 0.0252
0.275 0.2475
1.65 1.485
0.004 0.0036
0.007 0.0063
0.07 0.063
0.07 0.063
0.026 0.0234
0.026 0.0234
0.26 0.234
0.52 0.468
5. Analisa Harga Satuan Pekerjaan (SNI, HSPK, BOW)
I. PEKERJAAN PERSIAPAN
MUTU BETON
PEMBESIAN
PEKERJAAN BEKISITNG
LANTAI 1
LANTAI 2
Jenis Pekerjaan : Beton Bertulang Kolom K1 (15x30)
Satuan : m3
Harga Satuan : Rp. 12,269,962.00
No. Uraian Koefisien
(1) (2) (3)
A. Upah
1 Beton f'c = 19,3 Mpa 1
2 Besi Beton Ulir dia. 12 223.92
3 Besi Beton Polos dia. 8 22
4 Bekisting Untuk Kolom 20
Sub
Overhead + P
Jumlah Ha
Jenis Pekerjaan : Membuat Dan Memasang Pintu Dan Jendela Kayu Kelas I Atau II
Satuan : m2
Harga Satuan Lt. 1 : Rp. 777,719.00
Harga Satuan Lt. 2 : Rp. 819,629.00
No. Uraian Koefisien
(1) (2) (3)
A. Upah
1 Mandor 0.05
2 Kepala Tukang Kayu 0.3
3 Tukang Kayu 3
4 Pekerja/Buruh Tak Terampil 1
Sub Total
Sub Total
B. Bahan
1 Papan Kayu 0.064
2 Lem Kayu 0.5
Sub To
Jumlah Harga Tenaga Kerja dan Bahan
Overhead + P
Jumlah Ha
IX Pekerjaan Pengecatan
X Pekerjaan Sanitasi
Jenis Pekerjaan : Memasang Pipa Air Bersih PVC dia. 3/4 ''
Satuan :m
Harga Satuan Lt. 1 : Rp. 20,496.00
Harga Satuan Lt. 2 : Rp. 21,477.00
No. Uraian Koefisien
(1) (2) (3)
A. Upah
1 Mandor 0.0018
2 Kepala Tukang Batu 0.006
3 Tukang Batu 0.06
4 Pekerja/Buruh Tak Terampil 0.036
Sub Total
Sub Total
B. Bahan
1 Pipa PVC 3/4" Type AW Pj. 4m 0.3
2 Pelengkapan 35% Harga Pipa 0.35
Sub To
Jumlah Harga Tenaga Kerja dan Bahan
Overhead + P
Jumlah Ha
m³ 3700000.00 25,900.00
m³ 4253000.00 51,036.00
Kg 23500.00 470.00
Sub Total Bahan 77,406.00
Jumlah Harga Tenaga Kerja dan Bahan (A+B) 95,506.00
Overhead + Profit (10%) 9,550.60
Harga Satuan Pekerjaan 105,056.60
Dibulatkan 105,056.00
m³ 105,900.00 127,080.00
Sub Total Bahan 127,080.00
Jumlah Harga Tenaga Kerja dab Bahan (A+B) 150,780.00
Overhead + Profit (10%) 15,078.00
Harga Satuan Pekerjaan 165,858.00
Dibulatkan 165,858.00
m³ 164,300.00 197,160.00
m³ 105,900.00 45,748.80
Sub Total Bahan 242,908.80
Jumlah Harga Tenaga Kerja dan Bahan (A+B) 345,088.80
Overhead + Profit (10%) 34,508.88
Harga Satuan Pekerjaan 379,597.68
Dibulatkan 379,597.00
HSPK 2015
m3 81,300.00 97,560.00
Sub Total Bahan 97,560.00
Kg 1,375.00 510,125.00
Kg 116.00 80,968.00
Kg 138.00 144,486.00
Liter 100.00 21,500.00
Sub Total Bahan lt.1 757,079.00
Sub Total Bahan lt.2 832,786.90
mlah Harga Tenaga Kerja dan Bahan (A+B) lt.1 918,339.00
Overhead + Profit (10%) 91,833.90
Harga Satuan Pekerjaan 1,010,172.90
Dibulatkan 1,010,172.00
mlah Harga Tenaga Kerja dan Bahan (A+B) lt.2 1,010,172.90
Overhead + Profit (10%) 101,017.29
Harga Satuan Pekerjaan 1,111,190.19
Dibulatkan 1,111,190.00
Kg 8,428.00 8,849.40
Kg 21,000.00 3,150.00
Sub Total Bahan/10Kg 11,999.40
Sub Total Bahan/Kg 1,199.94
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 13,929.94
Overhead + Profit (10%) 1,392.99
Harga Satuan Pekerjaan 15,322.93
Dibulatkan 15,322.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 15,202.94
Overhead + Profit (10%) 1,520.29
Harga Satuan Pekerjaan 16,723.23
Dibulatkan 16,723.00
Kg 7,184.00 7,543.20
Kg 21,000.00 3,150.00
Sub Total Bahan/10Kg 10,693.20
Sub Total Bahan/Kg 1,069.32
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 13,799.32
Overhead + Profit (10%) 1,379.93
Harga Satuan Pekerjaan 15,179.25
Dibulatkan 15,179.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 15,072.32
Overhead + Profit (10%) 1,507.23
Harga Satuan Pekerjaan 16,579.55
Dibulatkan 16,579.00
Kg 9,400.00 9,870.00
Kg 21,000.00 3,150.00
Sub Total Bahan/10Kg 13,020.00
Sub Total Bahan/Kg 1,302.00
sh Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 14,032.00
Overhead + Profit (10%) 1,403.20
Harga Satuan Pekerjaan 15,435.20
Dibulatkan 15,435.00
sh Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 15,305.00
Overhead + Profit (10%) 1,530.50
Harga Satuan Pekerjaan 16,835.50
Dibulatkan 16,835.00
m³ 1,966,000.00 78,640.00
Kg 17,500.00 5,250.00
Liter 6,000.00 600.00
Sub Total Bahan 84,490.00
Jumlah Harga Tenaga Kerja dan Bahan (A+B) 152,610.00
Overhead + Profit (10%) 15,261.00
Harga Satuan Pekerjan 167,871.00
Dibulatkan 167,871.00
m³ 1,966,000.00 88,470.00
Kg 17,500.00 5,250.00
Liter 6,000.00 600.00
Sub Total Bahan 94,320.00
Jumlah Harga Tenaga Kerja dan Bahan (A+B) 162,440.00
Overhead + Profit (10%) 16,244.00
Harga Satuan Pekerjan 178,684.00
Dibulatkan 178,684.00
m³ 1,966,000.00 78,640.00
Kg 17,500.00 7,000.00
Liter 6,000.00 1,200.00
m³ 2,732,500.00 40,987.50
Lembar 85,000.00 29,750.00
Sub Total Bahan lt.1 157,577.50
Sub Total Bahan lt.2 173,335.25
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 244,037.50
Overhead + Profit (10%) 24,403.75
Harga Satuan Pekerjaan 268,441.25
Dibulatkan 268,441.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 268,441.25
Overhead + Profit (10%) 26,844.13
Harga Satuan Pekerjaan 295,285.38
Dibulatkan 295,285.00
m³ 1,966,000.00 78,640.00
Kg 17,500.00 7,000.00
Liter 6,000.00 1,200.00
m³ 2,732,500.00 49,185.00
Lembar 85,000.00 29,750.00
Sub Total Bahan Lt. 1 165,775.00
Sub Total Bahan Lt. 2 182,352.50
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 252,235.00
Overhead + Profit (10%) 25,223.50
Harga Satuan Pekerjaan 277,458.50
Dibulatkan 277,458.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 277,458.50
Overhead + Profit (10%) 27,745.85
Harga Satuan Pekerjaan 305,204.35
Dibulatkan 305,204.00
m³ 1,966,000.00 78,640.00
Kg 17,500.00 7,000.00
Liter 6,000.00 1,200.00
m³ 2,732,500.00 40,987.50
Lembar 85,000.00 29,750.00
Sub Total Bahan Lt. 1 157,577.50
Sub Total Bahan Lt. 2 173,335.25
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 244,037.50
Overhead + Profit (10%) 24,403.75
Harga Satuan Pekerjaan 268,441.25
Dibulatkan 268,441.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 268,441.25
Overhead + Profit (10%) 26,844.13
Harga Satuan Pekerjaan 295,285.38
Dibulatkan 295,285.00
m³ 1,966,000.00 78,640.00
Kg 17,500.00 7,000.00
Liter 6,000.00 1,200.00
m³ 2,732,500.00 40,987.50
Lembar 85,000.00 29,750.00
Sub Total Bahan 157,577.50
Jumlah Harga Tenaga Kerja dan Bahan (A+B) 244,037.50
Overhead + Profit (10%) 24,403.75
Harga Satuan Pekerjaan 268,441.25
Dibulatkan 268,441.00
m³ 1,010,172.00 1,010,172.00
kg 15,179.00 1,667,181.85
m² 167,871.00 95,686.47
Sub Total Upah 2,773,040.32
Overhead + Profit (10%) 277,304.03
Jumlah Harga Satuan 3,050,344.35
Dibulatkan 3,050,344.00
m³ 1,010,172.00 1,010,172.00
kg 15,179.00 2,791,131.39
m² 167,871.00 223,268.43
Sub Total Upah 4,024,571.82
Overhead + Profit (10%) 402,457.18
Jumlah Harga Satuan 4,427,029.00
Dibulatkan 4,427,028.00
m³ 1,010,172.00 1,010,172.00
kg 15,179.00 2,272,970.92
m² 167,871.00 559,010.43
Sub Total Upah 3,842,153.35
Overhead + Profit (10%) 384,215.34
Jumlah Harga Satuan 4,226,368.69
Dibulatkan 4,226,368.00
HSPK 2015
m³ 1,010,172.00 1,010,172.00
kg 15,435.00 2,378,671.37
kg 15,322.00 525,387.71
m² 178,684.00 2,385,431.40
Sub Total Upah 6,299,662.48
Overhead + Profit (10%) 629,966.25
Jumlah Harga Satuan 6,929,628.73
Dibulatkan 6,929,628.00
m³ 1,010,172.00 1,010,172.00
kg 15,435.00 2,527,700.76
kg 15,322.00 499,383.70
m² 268,441.00 5,368,820.00
Sub Total Upah 9,406,076.47
Overhead + Profit (10%) 940,607.65
Jumlah Harga Satuan 10,346,684.11
Dibulatkan 10,346,684.00
m³ 1,010,172.00 1,010,172.00
kg 15,435.00 2,843,660.56
kg 15,322.00 522,082.96
m² 268,441.00 6,262,728.53
Sub Total Upah 10,638,644.05
Overhead + Profit (10%) 1,063,864.40
Jumlah Harga Satuan 11,702,508.45
Dibulatkan 11,702,508.00
m³ 1,010,172.00 1,010,172.00
kg 15,435.00 3,097,747.94
kg 15,322.00 632,998.46
m² 277,458.00 3,701,289.72
Sub Total Upah 8,442,208.12
Overhead + Profit (10%) 844,220.81
Jumlah Harga Satuan 9,286,428.93
Dibulatkan 9,286,428.00
m³ 1,010,172.00 1,010,172.00
kg 15,435.00 3,803,165.38
kg 15,322.00 420,248.84
m² 277,458.00 3,726,260.94
Sub Total Upah 8,959,847.16
Overhead + Profit (10%) 895,984.72
Jumlah Harga Satuan 9,855,831.88
Dibulatkan 9,855,831.00
m³ 1,010,172.00 1,010,172.00
kg 15,435.00 4,302,458.67
kg 15,322.00 160,069.45
m² 277,458.00 3,701,289.72
Sub Total Upah 9,173,989.84
Overhead + Profit (10%) 917,398.98
Jumlah Harga Satuan 10,091,388.82
Dibulatkan 10,091,388.00
m³ 1,010,172.00 1,010,172.00
kg 15,179.00 388,888.04
m² 268,441.00 461,718.52
Sub Total Upah 1,860,778.56
Overhead + Profit (10%) 186,077.86
Jumlah Harga Satuan 2,046,856.42
Dibulatkan 2,046,856.00
m³ 1,010,172.00 1,010,172.00
kg 15,179.00 1,425,873.16
m² 268,441.00 582,683.52
Sub Total Upah 3,018,728.68
Overhead + Profit (10%) 301,872.87
Jumlah Harga Satuan 3,320,601.55
Dibulatkan 3,320,601.00
m³ 1,010,172.00 1,010,172.00
kg 15,322.00 2,582,239.64
m² 268,441.00 1,084,501.64
Sub Total Upah 4,676,913.28
Overhead + Profit (10%) 467,691.33
Jumlah Harga Satuan 5,144,604.61
Dibulatkan 5,144,604.00
m³ 1,010,172.00 1,010,172.00
kg 15,179.00 3,703,077.51
m² 268,441.00 832,167.10
Sub Total Upah 5,545,416.61
Overhead + Profit (10%) 554,541.66
Jumlah Harga Satuan 6,099,958.28
Dibulatkan 6,099,958.00
SNI 2008 Dimodifikasi
m³ 1,111,190.00 1,111,190.00
kg 16,835.00 3,769,715.02
Kg 16,723.00 367,906.00
m² 295,285.00 5,905,700.00
Sub Total Upah 11,154,511.02
Overhead + Profit (10%) 1,115,451.10
Jumlah Harga Satuan 12,269,962.13
Dibulatkan 12,269,962.00
m³ 1,111,190.00 1,111,190.00
kg 16,835.00 4,189,109.17
Kg 16,723.00 1,025,677.33
m² 295,285.00 7,872,298.10
Sub Total Upah 14,198,274.60
Overhead + Profit (10%) 1,419,827.46
Jumlah Harga Satuan 15,618,102.06
Dibulatkan 15,618,102.00
m³ 1,111,190.00 1,111,190.00
kg 16,835.00 3,054,176.01
Kg 16,723.00 758,545.37
m² 305,204.00 4,080,577.48
Sub Total Upah 9,004,488.86
Overhead + Profit (10%) 900,448.89
Jumlah Harga Satuan 9,904,937.74
Dibulatkan 9,904,937.00
m³ 1,111,190.00 1,111,190.00
kg 16,835.00 3,630,276.38
Kg 16,723.00 830,191.86
m² 305,204.00 4,095,837.68
Sub Total Upah 9,667,495.92
Overhead + Profit (10%) 966,749.59
Jumlah Harga Satuan 10,634,245.51
Dibulatkan 10,634,245.00
m³ 1,111,190.00 1,111,190.00
kg 16,835.00 4,251,855.98
Kg 16,723.00 152,832.95
m² 305,204.00 4,089,733.60
Sub Total Upah 9,605,612.54
Overhead + Profit (10%) 960,561.25
Jumlah Harga Satuan 10,566,173.79
Dibulatkan 10,566,173.00
m³ 1,111,190.00 1,111,190.00
kg 16,723.00 4,672,462.22
m² 295,285.00 1,198,857.10
Sub Total Upah 6,982,509.32
Overhead + Profit (10%) 698,250.93
Jumlah Harga Satuan 7,680,760.25
Dibulatkan 7,680,760.00
m³ 1,111,190.00 1,111,190.00
kg 16,579.00 4,128,971.89
m² 295,285.00 869,955.04
Sub Total Upah 6,110,116.93
Overhead + Profit (10%) 611,011.69
Jumlah Harga Satuan 6,721,128.62
Dibulatkan 6,721,128.00
Kg 1,375.00 8,580.00
m³ 140,000.00 3,360.00
Sub Total Bahan 11,940.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 51,240.00
Overhead + Profit (10%) 5,124.00
Jumlah Harga Satuan 56,364.00
Dibulatkan 56,364.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 55,170.00
Overhead + Profit (10%) 5,517.00
Jumlah Harga Satuan 60,687.00
Dibulatkan 60,687.00
Kg 1,375.00 10,692.00
m³ 140,000.00 3,220.00
Sub Total Bahan 13,912.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 53,212.00
Overhead + Profit (10%) 5,321.20
Jumlah Harga Satuan 58,533.20
Dibulatkan 58,533.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 57,142.00
Overhead + Profit (10%) 5,714.20
Jumlah Harga Satuan 62,856.20
Dibulatkan 62,856.00
m³ 140,000.00 6,300.00
kg 1,375.00 14,300.00
kg 12,500.00 20,250.00
Buah 2,300.00 60,950.00
Sub Total Bahan 101,800.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 193,500.00
Overhead + Profit (10%) 19,350.00
Jumlah Harga Satuan 212,850.00
Dibulatkan 212,850.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 202,670.00
Overhead + Profit (10%) 20,267.00
Jumlah Harga Satuan 222,937.00
Dibulatkan 222,937.00
m³ 140,000.00 6,300.00
kg 1,375.00 13,750.00
kg 12,500.00 18,750.00
Buah 6,500.00 77,155.00
Sub Total Bahan 115,955.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 207,655.00
Overhead + Profit (10%) 20,765.50
Jumlah Harga Satuan 228,420.50
Dibulatkan 228,420.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 216,825.00
Overhead + Profit (10%) 21,682.50
Jumlah Harga Satuan 238,507.50
Dibulatkan 238,507.00
(SNI 7395:2008(6.39))
m3 7,505,000.00 8,255,500.00
Kg 15,000.00 18,750.00
Kg 10,500.00 10,500.00
Sub Total Bahan 8,284,750.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 10,762,750.00
Overhead + Profit (10%) 1,076,275.00
Jumlah Harga Satuan 11,839,025.00
Dibulatkan 11,839,025.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 11,010,550.00
Overhead + Profit (10%) 1,101,055.00
Jumlah Harga Satuan 12,111,605.00
Dibulatkan 12,111,605.00
m3 5,012,000.00 320,768.00
Kg 10,500.00 5,250.00
Sub Total Bahan 326,018.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 707,018.00
Overhead + Profit (10%) 70,701.80
Jumlah Harga Satuan 777,719.80
Dibulatkan 777,719.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 745,118.00
Overhead + Profit (10%) 74,511.80
Jumlah Harga Satuan 819,629.80
Dibulatkan 819,629.00
(Pt-T-30:2000-C (tabel 1))
HSPK 2015
HSPK 2015
Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
(4) (5) (6)=(3)x(5)
HSPK 2015
Kg 10,000.00 1,000.00
Lembar 4,500.00 2,250.00
Sub Total Bahan 3,250.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 7,870.00
Overhead + Profit (10%) 787.00
Jumlah Harga Satuan 8,657.00
Dibulatkan 8,657.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 8,563.00
Overhead + Profit (10%) 856.30
Jumlah Harga Satuan 9,419.30
Dibulatkan 9,419.00
Kg 17,000.00 7,990.00
Buah 20,000.00 200.00
Sub Total Bahan 8,190.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 14,430.00
Overhead + Profit (10%) 1,443.00
Jumlah Harga Satuan 15,873.00
Dibulatkan 15,873.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 15,054.00
Overhead + Profit (10%) 1,505.40
Jumlah Harga Satuan 16,559.40
Dibulatkan 16,559.00
HSPK 2015
Kg 16,000.00 2,400.00
Kg 24,100.00 7,230.00
Kg 49,000.00 9,800.00
Kg 2,500.00 750.00
Sub Total Bahan 20,180.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 38,280.00
Overhead + Profit (10%) 3,828.00
Jumlah Harga Satuan 42,108.00
Dibulatkan 42,108.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 40,090.00
Overhead + Profit (10%) 4,009.00
Jumlah Harga Satuan 44,099.00
Dibulatkan 44,099.00
HSPK 2015
Kg 60,000.00 2,040.00
Liter 15,000.00 9,750.00
Lembar 4,500.00 2,250.00
Sub Total Bahan 14,040.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 93,240.00
Overhead + Profit (10%) 9,324.00
Jumlah Harga Satuan 102,564.00
Dibulatkan 102,564.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 101,160.00
Overhead + Profit (10%) 10,116.00
Jumlah Harga Satuan 111,276.00
Dibulatkan 111,276.00
HSPK 2015
Kg 60,000.00 2,040.00
Liter 15,000.00 9,750.00
Lembar 4,500.00 2,250.00
Sub Total Bahan 14,040.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 93,240.00
Overhead + Profit (10%) 9,324.00
Jumlah Harga Satuan 102,564.00
Dibulatkan 102,564.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 101,160.00
Overhead + Profit (10%) 10,116.00
Jumlah Harga Satuan 111,276.00
Dibulatkan 111,276.00
HSPK 2015
Kg 17,000.00 5,100.00
Kg 24,100.00 2,892.00
Lembar 4,500.00 450.00
Sub Total Bahan 8,442.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 19,992.00
Overhead + Profit (10%) 1,999.20
Jumlah Harga Satuan 21,991.20
Dibulatkan 21,991.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 21,147.00
Overhead + Profit (10%) 2,114.70
Jumlah Harga Satuan 23,261.70
Dibulatkan 23,261.00
(SNI 2008)
(SNI 2008)
HSPK 2015
HSPK 2015
HSPK 2015
HSPK 2015
Kg 1,375.00 412.50
m3 140,000.00 49,000.00
Lembar 41,000.00 12,300.00
Unit 4,550,000.00 1,365,000.00
Lonjor 50,000.00 17,500.00
Sub Total Bahan 1,444,212.50
Jumlah Harga Tenaga Kerja dan Bahan (A+B) 1,553,462.50
Overhead + Profit (10%) 155,346.25
Jumlah Harga Satuan 1,708,808.75
Dibulatkan 1,708,808.00
HSPK 2015
(SNI 2008)
(SNI 2008)
(SNI 2008)
(SNI 2008)
(SNI 2008)
(SNI 2008)
HSPK 2015
(SNI 2008)
m3 7,505,000.00 8,255,500.00
Kg 19,000.00 3,800.00
Doz 15,000.00 225,000.00
Sub Total Bahan 8,484,300.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 9,398,700.00
Overhead + Profit (10%) 939,870.00
Jumlah Harga Satuan 10,338,570.00
Dibulatkan 10,338,570.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 9,490,140.00
Overhead + Profit (10%) 949,014.00
Jumlah Harga Satuan 10,439,154.00
Dibulatkan 10,439,154.00
(SNI 2008)
m3 7,505,000.00 8,255,500.00
Kg 17,500.00 262,500.00
Doz 15,000.00 75,000.00
Sub Total Bahan 8,593,000.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 10,117,000.00
Overhead + Profit (10%) 1,011,700.00
Jumlah Harga Satuan 11,128,700.00
Dibulatkan 11,128,700.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 10,269,400.00
Overhead + Profit (10%) 1,026,940.00
Jumlah Harga Satuan 11,296,340.00
Dibulatkan 11,296,340.00
HSPK 2015
m3 7,505,000.00 8,255,500.00
Kg 23,500.00 4,700.00
Sub Total Bahan 8,260,200.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 9,584,200.00
Overhead + Profit (10%) 958,420.00
Jumlah Harga Satuan 10,542,620.00
Dibulatkan 10,542,620.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 9,716,600.00
Overhead + Profit (10%) 971,660.00
Jumlah Harga Satuan 10,688,260.00
Dibulatkan 10,688,260.00
(SNI 2008)
Satuan Harga Satuan (Rp) Jumlah Harga (Rp)
(4) (5) (6)=(3)x(5)
m3 2,732,500.00 19,674.00
m3 6,500,000.00 91,000.00
Kg 17,500.00 4,375.00
Sub Total Bahan 115,049.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 133,149.00
Overhead + Profit (10%) 13,314.90
Jumlah Harga Satuan 146,463.90
Dibulatkan 146,463.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 134,959.00
Overhead + Profit (10%) 13,495.90
Jumlah Harga Satuan 148,454.90
Dibulatkan 148,454.00
HSPK 2015
Kg 1,375.00 11,000.00
m3 140,000.00 4,522.00
Buah 9,000.00 45,000.00
Sub Total Bahan 60,522.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 110,762.00
Overhead + Profit (10%) 11,076.20
Jumlah Harga Satuan 121,838.20
Dibulatkan 121,838.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 115,786.00
Overhead + Profit (10%) 11,578.60
Jumlah Harga Satuan 127,364.60
Dibulatkan 127,364.00
HSPK 2015
HSPK 2015
m3 4,253,000.00 4,678,300.00
Kg 23,500.00 47,000.00
Sub Total Bahan 4,725,300.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 4,843,200.00
Overhead + Profit (10%) 484,320.00
Jumlah Harga Satuan 5,327,520.00
Dibulatkan 5,327,520.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 4,854,990.00
Overhead + Profit (10%) 485,499.00
Jumlah Harga Satuan 5,340,489.00
Dibulatkan 5,340,489.00
( SNI 2008 )
m2 4,253,000.00 65,496.20
Kg 23,500.00 4,700.00
Sub Total Bahan 70,196.20
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 120,446.20
Overhead + Profit (10%) 12,044.62
Jumlah Harga Satuan 132,490.82
Dibulatkan 132,490.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 125,471.20
Overhead + Profit (10%) 12,547.12
Jumlah Harga Satuan 138,018.32
Dibulatkan 138,018.00
( SNI 2008 )
m2 75,000.00 27,300.00
Kg 8,500.00 935.00
Sub Total Bahan 28,235.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 41,335.00
Overhead + Profit (10%) 4,133.50
Jumlah Harga Satuan 45,468.50
Dibulatkan 45,468.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 42,645.00
Overhead + Profit (10%) 4,264.50
Jumlah Harga Satuan 46,909.50
Dibulatkan 46,909.00
( SNI 2008 )
m1 23,000.00 24,150.00
Kg 7,000.00 1,050.00
Sub Total Bahan 25,200.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 36,060.00
Overhead + Profit (10%) 3,606.00
Jumlah Harga Satuan 39,666.00
Dibulatkan 39,666.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 37,146.00
Overhead + Profit (10%) 3,714.60
Jumlah Harga Satuan 40,860.60
Dibulatkan 40,860.00
HSPK 2015
m2 87,500.00 96,250.00
Sub Total Bahan 96,250.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 1 112,465.00
Overhead + Profit (10%) 11,246.50
Jumlah Harga Satuan 123,711.50
Dibulatkan 123,711.00
ah Harga Tenaga Kerja dan Bahan (A+B) Lt. 2 114,086.50
Overhead + Profit (10%) 11,408.65
Jumlah Harga Satuan 125,495.15
Dibulatkan 125,495.00
6.1 RENCANA ANGGARAN BIAYA
8,910.00 5,604,390.00
105,056.00 11,346,048.00
1,088,936.00 15,245,104.00
32,195,542.00
65,175.00 24,424,983.00
65,175.00 1,107,975.00
65,175.00 332,392.50
25,865,350.50
- -
- -
165,858.00 9,536,835.00
379,597.00 15,495,149.54
747,989.00 67,176,892.09
116,187.00 199,841.64
142,186.00 23,149,302.66
115,558,020.93
710,118.00 710,118.00
3,050,344.00 6,405,722.40
4,427,028.00 3,984,325.20
4,226,368.00 3,803,731.20
952,376.00 11,904,700.00
6,929,628.00 63,613,985.04
11,054,064.00 29,547,513.07
10,346,684.00 42,742,151.60
11,702,508.00 28,437,094.44
9,286,428.00 62,064,912.90
9,855,831.00 5,883,931.11
10,091,388.00 77,905,515.36
2,046,856.00 140,250,573.12
3,320,601.00 4,549,223.37
5,144,604.00 12,964,402.08
6,099,958.00 27,754,808.90
522,522,707.79
98,202.00 651,668.47
116,358.00 45,968,158.76
56,364.00 44,534,098.22
58,533.00 776,849.98
33,503.00 26,471,256.35
118,402,031.78
254,339.00 53,014,293.99
212,850.00 2,449,797.08
228,420.00 7,739,840.39
234,548.00 11,592,652.17
212,850.00 459,756.00
686,070.00 177,615,976.23
252,872,315.85
11,839,025.00 13,614,878.75
777,719.00 8,030,726.39
777,719.00 4,762,751.16
777,719.00 4,852,966.56
777,719.00 2,952,221.32
777,719.00 2,830,897.16
777,719.00 1,273,903.72
777,719.00 4,827,146.29
777,719.00 3,733,051.20
777,719.00 233,315.70
777,719.00 3,359,746.08
777,719.00 5,039,619.12
777,719.00 3,359,746.08
777,719.00 1,306,567.92
777,719.00 839,936.52
61,017,473.98
341,000.00 3,410,000.00
24,255.00 1,237,005.00
20,350.00 936,100.00
122,760.00 613,800.00
94,710.00 2,178,330.00
8,375,235.00
8,657.00 6,840,034.21
15,873.00 12,541,511.27
42,108.00 48,424.20
102,564.00 6,164,096.40
102,564.00 1,087,178.40
21,991.00 5,582,047.00
32,263,291.48
1,435,016.00 1,435,016.00
1,406,240.00 2,812,480.00
55,605.00 500,445.00
96,140.00 384,560.00
20,496.00 614,880.00
42,057.00 1,051,425.00
45,311.00 1,132,775.00
985,000.00 985,000.00
1,708,808.00 1,708,808.00
3,988,600.00 3,988,600.00
481,872.00 481,872.00
589,056.00 589,056.00
888,432.00 888,432.00
130,845.00 130,845.00
16,704,194.00
500,775.00 28,043,400.00
70,158.00 70,158.00
58,058.00 2,554,552.00
167,948.00 503,844.00
41,558.00 332,464.00
52,448.00 104,896.00
74,913.00 1,198,608.00
66,058.00 132,116.00
56,158.00 898,528.00
3,270,520.00 3,270,520.00
37,109,086.00
10,338,570.00 15,818,012.10
11,128,700.00 25,373,436.00
11,128,700.00 9,459,395.00
10,542,620.00 3,057,359.80
146,463.00 28,214,632.32
121,838.00 1,218,380.00
105,061.00 20,238,951.04
103,380,166.26
132,490.00 33,630,367.29
45,468.00 11,541,290.21
39,666.00 1,330,278.64
46,501,936.15
123,711.00 2,187,210.48
2,187,210.48
12,269,962.00 26,503,117.92
15,618,102.00 5,622,516.72
9,904,937.00 21,728,955.54
10,634,245.00 6,811,233.92
10,566,173.00 25,464,476.93
7,680,760.00 12,289,216.00
6,721,128.00 8,737,466.40
107,156,983.44
101,975.00 146,436.10
120,131.00 32,155,801.14
60,687.00 32,488,178.58
62,856.00 180,396.72
36,385.00 19,478,345.90
84,449,158.44
264,426.00 13,132,849.50
222,937.00 788,082.30
244,635.00 3,297,679.80
699,039.00 56,370,504.96
73,589,116.56
12,111,605.00 16,983,619.23
819,629.00 5,019,408.00
819,629.00 1,704,828.32
819,629.00 1,491,724.78
819,629.00 491,777.40
819,629.00 1,770,398.64
819,629.00 2,655,597.96
819,629.00 2,261,192.49
32,378,546.81
347,600.00 1,042,800.00
25,635.00 307,620.00
21,450.00 300,300.00
96,756.00 193,512.00
1,844,232.00
9,419.00 5,042,367.46
16,559.00 8,864,695.06
44,099.00 61,838.26
111,276.00 1,642,433.76
111,276.00 388,353.24
23,261.00 1,237,496.83
17,237,184.61
1,446,588.00 1,446,588.00
57,420.00 57,420.00
99,110.00 99,110.00
21,477.00 322,155.00
44,265.00 663,975.00
47,518.00 617,734.00
3,206,982.00
511,225.00 10,224,500.00
59,892.00 958,272.00
43,392.00 173,568.00
77,451.00 464,706.00
58,696.00 176,088.00
11,997,134.00
10,439,154.00 2,818,571.58
11,296,340.00 17,057,473.40
11,296,340.00 5,648,170.00
10,688,260.00 2,030,769.40
148,454.00 11,436,896.16
127,364.00 522,192.40
107,317.00 8,267,701.68
47,781,774.62
138,018.00 7,342,626.61
46,909.00 2,495,582.25
40,860.00 329,495.04
10,167,703.90
125,495.00 1,211,026.75
1,211,026.75
6.2 REKAPITULASI RENCANA ANGGARAN BIAYA
B PEKERJAAN LANTAI 2
I Pekerjaan Beton 107,156,983.44
Total 1,765,974,405.33
PPN (10%) 176,597,440.53
Grand Total 1,942,571,845.86
Dibulatkan 1,942,571,000.00
7.1 DAFTAR HARGA SATUAN UPAH
Nama Suplier
(6)
JALAN TIDAR 93 K SURABAYA TELP (031) 5455235, FAX (031) 5345887
Alamat
JALAN TIDA
UD. SUMBER RAHAYU
II Pekerjaan Tanah
1 Galian Tanah
2 Pembuatan Lubang Foot Plate Type P1&P2 (100x100x30)
3 Pembuatan Lubang Foot Plate Type P3 (100x150x30)
IV Pekerjaan Beton
1 Lantai Kerja (t=5cm)
Semen Portland (40kg) 1 Zak 5.75
Pasir beton 1 m³ 0.5581
Kerikil 1 m³ 0.5405
air ( biaya air tawar ) 1 Liter 215
2 Pondasi Foot Plate Type P1 (100x100x30)
Semen Portland (40kg) 2.1 Kg 371
Pasir beton 2.1 Kg 698
Kerikil 2.1 Kg 1047
air ( biaya air tawar ) 2.1 Liter 215
Besi Beton Polos dia. 10 2.1 Kg (Terlampir)
Kawat Beton 2.1 Kg 0.15
Kayu meranti bekisting 2.1 m³ 0.04
Paku Usuk 2.1 Kg 0.3
Minyak Bekisting 2.1 Liter 0.1
5 Acian Dinding
Semen PC (Portland Cement) 50 kg 790.12 Zak 0.065
VI Pekerjaan Keramik
1 Keramik Lantai 40x40
Semen PC (Portland Cement) 50 kg 208.44 Zak 0.065
Semen Berwarna Yiyitan 208.44 Kg 1.3
Pasir Pasang 208.44 m³ 0.045
Tegel Keramik 40x40 (motif/warna gelap) 208.44 m² 6.63
2 Engsel pintu
Engsel Pintu Kuningan 2" 51 Buah 1
3 Engsel Jendela
Engsel Jendela 46 Buah 1
4 Grendel Tanam
Grendel Tanam 5 Buah 1
5 Grendel jendela
Grendel Jendela 23 Buah 1
IX Pekerjaan Pengecatan
1 Plamir Dinding
Plamir Tembok 790.12 Kg 0.1
Kertas Gosok 790.12 Lembar 0.5
2 Cat Dinding
Cat Tembok 790.12 Kg 0.47
Roll 790.12 Buah 0.01
X Pekerjaan Sanitasi
1 Closed Jongkok
Closed Jongkok/ Monoblok 1 Buah 1
PC 1 Zak 0.12
PP 1 m3 0.01
2 Closed duduk
Closed Duduk/ Monoblok 2 Buah 1
Perlengkapan 2 Harga 0.06
3 Kran Air
Kran Air 9 Buah 1
Rol TBA 9 Roll 1
4 Floor drain
Floor Drain Kuningan 4 Buah 1
Lem Pipa PVC 4 Buah 1
12 Pas.Wastafel
Wastafel 1 Buah 1
Perlengkapan 1 Harga 0.12
Semen PC 1 Kg 0.12
Pasir Pasang 1 Kg 0.01
13 Pas.Bath up
Bathup 1 Buah 1
Perlengkapan 1 Harga 0.12
Semen PC 1 Kg 0.12
Pasir Pasang 1 Kg 0.01
14 Shower
Shower 1 Buah 1
Rol TBA 1 Roll 1
2 Lampu Baret
Lampu Baret 1 Buah 1
4 Lampu Gantung
Lampu Gantung 3 Buah 1
5 Lampu SL
Lampu SL 14 Wat 8 Buah 1
6 Lampu Dinding
Lampu Dinding 2 Buah 1
7 Saklar Ganda
Saklar Ganda 16 Buah 1
Kabel NYA 500 Volt 2x1.5m 16 m 0.012
Pipa Paralon 5/8 16 Batang 1
T Dos PVC 16 Buah 0.75
8 Saklar Tunggal
Saklar Tunggal 2 Buah 1
Kabel NYA 500 Volt 2x1.5m 2 m 0.012
Pipa Paralon 5/8 2 Batang 1
T Dos PVC 2 Buah 0.75
9 Stop Kontak
Stop Kontak 16 Buah 1
Kabel NYA 500 Volt 2x1.5m 16 m 0.012
Pipa Paralon 5/8 16 Batang 1
T Dos PVC 16 Buah 0.75
10 Box MCB
Panel (60x40x20) cm 1 Buah 1
Time Switch 1 Buah 1
MCB 1 Kutub 4 A 1 Buah 1
MCB 16 A 1 Phase 1 Buah 2
MCB 10 A 1 Phase 1 Buah 3
Magnet Kontaktor LC-1 D12-25A 1 Buah 1
Grounding Roud 1 Unit 1
Besi Beaugel/Baut (Ornamen) 1 Pasang 2
2 Kuda-kuda 8/12
Kayu Kamper 8/12 2.28 m3 1.1
Paku Reng 2.28 Kg 15
Paku Klem no 4 2.28 Doz 5
B PEKERJAAN LANTAI 2
I Pekerjaan Beton
1 Beton Bertulang Kolom K1 (15x30)
Semen Portland (40kg) 2.16 Kg 371
Pasir beton 2.16 Kg 698
Kerikil 2.16 Kg 1047
air ( biaya air tawar ) 2.16 Liter 215
Besi Beton Polos dia. 8 2.16 Kg (Terlampir)
Kawat Beton 2.16 Kg 0.15
Besi Beton Polos dia. 12 2.16 Kg (Terlampir)
Kawat Beton 2.16 Kg 0.15
Kayu meranti bekisting 2.16 m³ 0.04
Paku Usuk 2.16 Kg 0.4
Minyak Bekisting 2.16 Liter 0.2
Kayu Kamper balok 3/5 2.16 m³ 0.015
Plywood tebal 9 mm 2.16 Lembar 0.35
2 Beton Bertulang Kolom K3 (15x15)
Semen Portland (40kg) 0.36 Kg 371
Pasir beton 0.36 Kg 698
Kerikil 0.36 Kg 1047
air ( biaya air tawar ) 0.36 Liter 215
Besi Beton Polos dia. 8 0.36 Kg (Terlampir)
Kawat Beton 0.36 Kg 0.15
Besi Beton Polos dia. 12 0.36 Kg (Terlampir)
Kawat Beton 0.36 Kg 0.15
Kayu meranti bekisting 0.36 m³ 0.04
Paku Usuk 0.36 Kg 0.4
Minyak Bekisting 0.36 Liter 0.2
Kayu Kamper balok 3/5 0.36 m³ 0.015
Plywood tebal 9 mm 0.36 Lembar 0.35
II Pekerjaan Dinding
1 Pas. Trasram
Semen PC (Portland Cement) 50 kg 1.44 Zak 0.01
Pasir Pasang 1.44 m³ 0.013
Batu Bata Merah uk 22x22x4.5 cm 1.44 Buah 70
5 Acian
Semen PC (Portland Cement) 50 kg 535.34 Zak 0.065
III Pekerjaan Keramik
1 Keramik Lantai 40x40
Semen PC (Portland Cement) 50 kg 49.67 Zak 0.065
Semen Berwarna Yiyitan 49.67 Kg 1.3
Pasir Pasang 49.67 m³ 0.045
Tegel Keramik 40x40 (motif/warna gelap) 49.67 m² 6.63
2 Keramik Lantai WC Kasar 20x20
Pasir Pasang 3.535 m³ 0.0450
Portland Cement 3.535 Kg 10.4000
Semen Warna 3.535 Kg 1.6200
Ubin Keramik 20x20 3.535 Buah 26.5000
IV Pekerjaan Kayu
1 Kusen 6/15
Balok Kayu Kamper 1.40 m3 1.1
Paku 10cm 1.40 Kg 1.25
Lem Kayu 1.40 Kg 1
2 Engsel pintu
Engsel Pintu Kuningan 2" 12 Buah 1
3 Engsel Jendela
Engsel Jendela 14 Buah 1
4 Grendel jendela
Grendel Jendela 2 Buah 1
VI Pekerjaan Pengecatan
1 Plamir Dinding
Plamir Tembok 535.34 Kg 0.1
Kertas Gosok 535.34 Lembar 0.5
2 Cat Dinding
Cat Tembok 535.34 Kg 0.47
Roll 535.34 Buah 0.01
2 Kran Air
Kran Air 1 Buah 1
Rol TBA 1 Roll 1
3 Floor drain
Floor Drain Kuningan 1 Buah 1
Lem Pipa PVC 1 Buah 1
3 Lampu SL
Lampu SL 14 Wat 4 Buah 1
4 Saklar Ganda
Saklar Ganda 6 Buah 1
Kabel NYA 500 Volt 2x1.5m 6 m 0.012
Pipa Paralon 5/8 6 Batang 1
T Dos PVC 6 Buah 0.75
5 Stop Kontak
Stop Kontak 3 Buah 1
Kabel NYA 500 Volt 2x1.5m 3 m 0.012
Pipa Paralon 5/8 3 Batang 1
T Dos PVC 3 Buah 0.75
IX Pekerjaan Atap
1 Gording + Nok + Jurai 8/12 (Kamper)
Kayu Kamper( Balok 8/12) 0.27 m3 1.1
Besi Plat Strip 0.27 Kg 0.2
Paku Klem no 4 0.27 Doz 15
2 Kuda-kuda 8/12
Kayu Kamper 8/12 1.51 m3 1.1
Paku Reng 1.51 Kg 15
Paku Klem no 4 1.51 Doz 5
X Pekerjaan Plafond
1 Rangka Plafond Gypsum Board
Kaso-Kaso 5/7 53.20 m2 0.0154
Paku 53.20 Kg 0.2
XI Pekerjaan Lain-lain
1 Pemasangan Kaca Jendela 6mm di Bevel
Kaca Polos Tebal 6 mm 9.65 m2 1.1
Analisa Kebutuhan Bahan
Volume Satuan
(6)=(3)x(5) (7)
0.756 m³
1.296 m³
2.16 Kg
17.5 Batang
2.52 m³
11.9 Kg
15.4 Kg
9.8 Zak
2.1 m³
0.07 m³
2.1 m³
420 Buah
3.5 Lembar
1.12 m²
69 m³
48.984 m³
17.634 m³
107.772 m³
292.781 Kg
46.701 m³
0.494 Zak
120.400 Buah
195.372 m³
5.75 Zak
0.5581 m³
0.5405 m³
215 Liter
779.1 Kg
1465.8 Kg
2198.7 Kg
451.5 Liter
35 Lonjor
0.315 Kg
0.084 m³
0.63 Kg
0.21 Liter
333.9 Kg
628.2 Kg
942.3 Kg
193.5 Liter
26 Lonjor
0.135 Kg
0.036 m³
0.27 Kg
0.09 Liter
333.9 Kg
628.2 Kg
942.3 Kg
193.5 Liter
21 Lonjor
0.135 Kg
0.036 m³
0.27 Kg
0.09 Liter
115.938 Zak
5.454 m³
6.889 m³
2687.5 Liter
3405.78 Kg
6407.64 Kg
9611.46 Kg
1973.7 Liter
71 Lonjor
1.377 Kg
148 Lonjor
1.377 Kg
0.4131 m³
2.754 Kg
0.918 Liter
991.683 Kg
1865.754 Kg
2798.631 Kg
574.695 Liter
12 Lonjor
0.401 Kg
55 Lonjor
0.401 Kg
0.107 m³
1.069 Kg
0.535 Liter
0.040 m³
0.936 Lembar
1532.601 Kg
2883.438 Kg
4325.157 Kg
888.165 Liter
29 Lonjor
0.61965 Kg
68 Lonjor
0.620 Kg
0.165 m³
1.652 Kg
0.826 Liter
0.062 m³
1.446 Lembar
901.53 Kg
1696.14 Kg
2544.21 Kg
522.45 Liter
18 Lonjor
0.365 Kg
45 Lonjor
0.365 Kg
0.097 m³
0.972 Kg
0.486 Liter
0.036 m³
0.851 Lembar
2479.541 Kg
4665.013 Kg
6997.520 Kg
1436.931 Liter
65 Lonjor
1.003 Kg
159 Lonjor
1.003 Kg
0.267 m³
2.673 Kg
1.337 Liter
0.120 m³
2.339 Lembar
221.487 Kg
416.706 Kg
625.059 Kg
128.355 Liter
5 Lonjor
0.090 Kg
19 Lonjor
0.090 Kg
0.024 m³
0.239 Kg
0.119 Liter
0.011 m³
0.209 Lembar
2864.12 Kg
5388.56 Kg
8082.84 Kg
1659.8 Liter
18 Lonjor
1.158 Kg
192 Lonjor
1.158 Kg
0.309 m³
3.088 Kg
1.544 Liter
0.139 m³
2.702 Lembar
25420.92 Kg
47826.96 Kg
71740.44 Kg
14731.8 Liter
335 Lonjor
10.278 Kg
2.741 m³
27.408 Kg
13.704 Liter
1.028 m³
23.982 Lembar
508.27 Kg
956.26 Kg
1434.39 Kg
294.55 Liter
23 Lonjor
0.206 Kg
0.055 m³
0.548 Kg
0.274 Liter
0.021 m³
0.480 Lembar
934.92 Kg
1758.96 Kg
2638.44 Kg
541.8 Liter
44 Lonjor
0.378 Kg
0.101 m³
1.008 Kg
0.504 Liter
0.038 m³
0.882 Lembar
1688.05 Kg
3175.9 Kg
4763.85 Kg
978.25 Liter
209 Lonjor
0.683 Kg
0.182 m³
1.82 Kg
0.91 Liter
0.068 m³
1.593 Lembar
0.066 Zak
0.086 m³
464.520 Buah
76.483 Zak
17.778 m³
27654.06 Buah
4930.324 Kg
18.963 m³
103.203 Kg
0.305 m3
51.358 Zak
13.549 Zak
270.971 Kg
9.380 m³
1381.954 m²
0.518 m³
119.699 Kg
18.645 Kg
305.002 Buah
1.525 m³
338.843 Kg
50.826 Kg
402.206 Buah
0.890 m³
9.193 Zak
95.885 Kg
1037.936 Buah
0.0972 m³
22.464 Kg
3.4992 Kg
57.24 Buah
13721.117 Buah
295.133 Kg
0.777 m³
6.472 Kg
1.265 m3
1.4375 Kg
1.15 Kg
0.661 m3
5.163 Kg
0.392 m3
3.062 Kg
0.39936 m3
3.12 Kg
0.243 m3
1.898 Kg
0.233 m3
1.82 Kg
0.104832 m3
0.819 Kg
0.3972352 m3
3.1034 Kg
0.3072 m3
2.4 Kg
0.0192 m3
0.15 Kg
0.27648 m3
2.16 Kg
0.41472 m3
3.24 Kg
0.27648 m3
2.16 Kg
0.10752 m3
0.84 Kg
0.06912 m3
0.54 Kg
10 Buah
51 Buah
46 Buah
5 Buah
23 Buah
79.0116 Kg
395.058 Lembar
371.35452 Kg
7.90116 Buah
0.1725 Kg
0.345 Kg
0.23 Kg
0.345 Kg
2.0434 Kg
39.065 Liter
30.05 Lembar
0.3604 Kg
6.89 Liter
5.3 Lembar
76.150 Kg
30.460 Kg
25.383 Lembar
1 Buah
0.12 Zak
0.01 m3
2 Buah
0.12 Harga
9 Buah
9 Roll
4 Buah
4 Buah
9 Batang
10.5 Buah
7.5 Batang
8.75 Buah
7.5 Batang
8.75 Buah
0.3 Kg
0.35 m3
0.3 Lembar
0.3 Unit
0.35 Lonjor
1 Buah
1 Roll
1 Buah
0.12 Harga
0.12 Kg
0.01 Kg
1 Buah
0.12 Harga
0.12 Kg
0.01 Kg
1 Buah
0.12 Harga
0.12 Kg
0.01 Kg
1 Buah
1 Roll
224 Buah
560 m1
56 Batang
56 Buah
56 Buah
1 Buah
44 Buah
3 Buah
8 Buah
2 Buah
16 Buah
0.192 m
16 Batang
12 Buah
2 Buah
0.024 m
2 Batang
1.5 Buah
16 Buah
0.192 m
16 Batang
12 Buah
1 Buah
1 Buah
1 Buah
2 Buah
3 Buah
1 Buah
1 Unit
2 Pasang
1.683 m3
0.306 Kg
22.95 Doz
2.508 m3
34.2 Kg
11.4 Doz
0.935 m3
12.75 Kg
4.25 Doz
0.319 m3
0.058 Kg
1.387008 m3
2.69696 m3
48.16 Kg
80 Kg
0.323 m3
50 Buah
4816 Buah
3.909 m2
50.767 Kg
92.395 m2
27.922 Kg
35.214 m
5.031 Kg
19.448 m2
801.36 Kg
1507.68 Kg
2261.52 Kg
464.4 Liter
10 Lonjor
0.324 Kg
60 Lonjor
0.324 Kg
0.0864 m³
0.864 Kg
0.432 Liter
0.0324 m³
0.756 Lembar
133.56 Kg
251.28 Kg
376.92 Kg
77.4 Liter
5 Lonjor
0.054 Kg
12 Lonjor
0.054 Kg
0.0144 m³
0.144 Kg
0.072 Liter
0.0054 m³
0.126 Lembar
813.881 Kg
1531.238 Kg
2296.856 Kg
471.656 Liter
22 Lonjor
0.329 Kg
88 Lonjor
0.329 Kg
0.088 m³
0.878 Kg
0.439 Liter
0.039 m³
0.768 Lembar
237.626 Kg
447.069 Kg
670.604 Kg
137.708 Liter
8 Lonjor
0.096 Kg
20 Lonjor
0.096 Kg
0.026 m³
0.256 Kg
0.128 Liter
0.012 m³
0.224 Lembar
894.11 Kg
1682.18 Kg
2523.27 Kg
518.15 Liter
5 Lonjor
0.362 Kg
58 Lonjor
0.362 Kg
0.096 m³
0.964 Kg
0.482 Liter
0.043 m³
0.844 Lembar
593.6 Kg
1116.8 Kg
1675.2 Kg
344 Liter
42.00 Lonjor
0.24 Kg
0.064 m³
0.64 Kg
0.32 Liter
0.024 m³
0.56 Lembar
482.3 Kg
907.4 Kg
1361.1 Kg
279.5 Liter
64 Lonjor
0.195 Kg
0.052 m³
0.52 Kg
0.26 Liter
0.0195 m³
0.455 Lembar
0.01436 Zak
0.018668 m³
100.52 Buah
51.8214541 Zak
12.045276 m³
18737.096 Buah
3340.5216 Kg
12.84816 m³
22.31712 Kg
0.06601 m³
34.7971 Zak
3.228 Zak
64.565 Kg
2.235 m³
329.282 m²
0.159 m³
36.764 Kg
5.727 Kg
93.678 Buah
0.243 m³
2.507 Zak
26.151 Kg
283.080 Buah
4273.92 Buah
91.930 Kg
0.242 m³
2.016 Kg
1.542 m3
1.753 Kg
1.402 Kg
0.392 m3
3.062 Kg
0.133 m3
1.04 Kg
0.116 m3
0.91 Kg
0.038 m3
0.3 Kg
0.138 m3
1.08 Kg
0.207 m3
1.62 Kg
0.177 m3
1.379 Kg
3 Buah
12 Buah
14 Buah
2 Buah
53.534 Kg
267.67 Lembar
251.610 Kg
5.353 Buah
0.210 Kg
0.421 Kg
0.280 Kg
0.421 Kg
0.502 Kg
9.594 Liter
7.38 Lembar
0.119 Kg
2.269 Liter
1.745 Lembar
15.960 Kg
6.384 Kg
5.320 Lembar
1 Buah
0.06 Harga
1 Buah
1 Roll
1 Buah
1 Buah
4.5 Batang
5.25 Buah
4.5 Batang
5.25 Buah
3.9 Batang
4.55 Buah
80 Buah
200 m
20 Batang
20 Buah
20 Buah
16 Buah
4 Buah
6 Buah
0.072 m
6 Batang
4.5 Buah
3 Buah
0.036 m
3 Batang
2.25 Buah
0.297 m3
0.054 Kg
4.05 Doz
1.661 m3
22.65 Kg
7.55 Doz
0.55 m3
7.5 Kg
2.5 Doz
0.209 m3
0.038 Kg
0.554688 m3
1.07856 m3
19.26 Kg
32.8 Kg
0.13243 m3
20.5 Buah
1926 Buah
0.819 m2
10.640 Kg
19.365 m2
5.852 Kg
8.467 m
1.210 Kg
10.615 m2
8.2 REKAPITULASI KEBUTUHAN BAHAN
Proyek : Pembangunan Rumah Ideal
Pemilik : Tn. Han
Lokasi : Surabaya
Kontraktor: P.T. SUKA SUKA
Luas : 689 m2
Tahun : 2015
No. Nama Bahan Volume Satuan
(1) (2) (3) (4)
1 Air ( biaya air tawar ) 29764.310 Liter
2 Batu Bata Merah Uk 22 x 11 x 4.5 cm 27076.596 Buah
3 Bata Merah (kelas 1) 420 Buah
4 Batu Belah 15 cm/20cm 156.756 m³
5 Batu Pecah Mesin 2/3 2.1 m³
6 Besi polos dia.8 418 Lonjor
7 Besi polos dia.10 649 Lonjor
8 Besi polos dia.12 924 Lonjor
9 Besi Palt Strip 15.76 Kg
10 Dolken Kayu Gelam 8-10/400cm 17.5 Batang
11 Gel. BJLS 30 UK. (80cmx180cm) 3.5 Lembar
12 Kaca Polos tbl 6mm 30.063 m²
13 Kayu Meranti Kaso 5/7 7.2483 m³
14 Kayu Meranti (Papan 2/20) 0.756 m³
15 Kayu Meranti (Usuk 5/7) 1.296 m³
16 Kawat Beton 24.917595 Kg
17 Paku Biasa 2"-5" 14.06 Kg
18 Pasir Beton 87213.260 m³
19 Pasir Pasang 126.19916975 m³
20 Pasir Urug 86.63424 m³
21 Semen PC (Portland Cement) 50kg 253.4316 Zak
22 Semen PC (Portland Cement) 50kg 9627.3186 Kg
23 Semen PC (Portland Cement) 40kg 121.6875 Zak
24 Semen PC (Portland Cement) 40kg 46352.23915 Kg
25 Cat Tembok 715.074445 Kg
26 Plamir Tembok 138.92966 Kg
27 Cat Kayu 0.510452 Kg
28 Semen Warna/nat 544.75906 Kg
29 Lem Kayu 42.41906 Kg
30 Batu Kerikil Beton 130810.76655 Kg
31 Paku Usuk 48.66746 Kg
32 Minyak Bekisting 23.67973 Liter
33 Keramik Lantai Motif/Warna 40x40 1711.23615 Buah
34 Keramik Lantai Motif/Warna 30x30 402.2060475 Buah
35 Keramik Lantai Motif/Warna 20x20 455.91925 Buah
36 Keramik Dinding 20x25 1321.0155 Buah
37 Plint Keramik 10x20 17995.037 Buah
38 Kaca Bening 3mm 1.12 m2
39 Tanah Urug 195.372 m3
40 Kayu Meranti papan (Bekisting) 5.043446 m3
41 Kayu Kamper Balok 6/15, 6/12 8.162 m3
42 Kayu Kamper (Papan) 7.259702 m3
43 Kunci Tanam Silinder Yale + Handle 13 Buah
44 Engsel Pintu Kuningan 2" 63 Buah
45 Engsel Jendela 60 Buah
46 Grendel Jendela 25 Buah
47 Grendel Tanam Pintu 5 Buah
48 Ampelas 737.906375 Lembar
49 Roll 13.25456 Buah
50 Cat Meni Kayu 0.382839 Kg
51 Cat Penutup 0.765678 Kg
52 Cerlax 3.0243 Kg
53 Spirtus 57.8175 Liter
54 Closet Jongkok Porselin (INA) Putih 1 Buah
55 Closet Duduk Komplit 3 Buah
56 Rol TBA 11 Roal
57 Kran Air Uk.3/4" 10 Buah
58 Floor Drain Kuningan 5 Buah
59 Lem Pipa PVC 5 Buah
60 Pipa PVC 3/4" Type AW Pj.4m 13.5 Lonjor
61 Pipa PVC 3" Type C Pj.4m 12 Lonjor
62 Pipa PVC 4" Type C Pj.4m 11.4 Lonjor
63 Tandon Air Stainlees V= 1 m3 1 Buah
64 Wastafel 1 Buah
65 Bak Cuci /Kitchen Zink 1 Buah
66 Bahtup 1 Buah
67 Shower 1 Buah
68 Isolator 304 Buah
69 Kabel NYA 500 Volt 2x1.5m 760.516 m
70 Pipa Paralon 5/8 119 Batang
71 T Dos PVC 108.25 Buah
72 Fiting Plafond 76 Buah
73 Septictank 0.3 Unit
74 Lampu SL 14 Wat 12 Buah
75 Lampu Down Light 60 Buah
76 Stop Kontak 19 Buah
77 Saklar Tunggal (Broco) 2 Buah
78 Saklar Ganda (Broco) 22 Buah
79 Panel (60x40x20) cm 1 Buah
80 Time Switch 1 Buah
81 MCB 1 Kutub 4 A 1 Buah
82 MCB 16 A 1 Phase 2 Buah
83 MCB 10 A 1 Phase 3 Buah
84 Grounding Roud 1 Unit
85 Besi Beaugel/Baut (Ornamen) 2 Pasang
86 Besi Palt Strip 0.36 Kg
87 Paku Klem no 4 52.7 Kg
88 Kayu Kamper 3/5 1.941696 m³
89 Genteng Wuwung Karang Pilang / Wisma 70.5 Buah
90 Genteng Karang Pilang / Wisma 6742 Buah
91 Paku Sekrup Gypsum 2cm 33.7737125 Kg
92 Gypsum Board 111.760285 Lembar
93 List Gypsum Board Uk. 1x10 cm 43.68105 m
94 Tepung Gypsum 6.24015 Kg
Lampiran Bar Bending Schedule (Bestat)
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
1 FOOT PLATE 100 x 100 Type P1
1 Begel 1 Tekukan 10
Jarak 150
0.3 0.617 2.7 35 94.5 58.307 4 9 1.2
ARAH X 0.05
Berat (kg/m)
1
Begel 2 Tekukan 10
Jarak 150
ARAH Y 0.3 0.617 2.7 35 94.5 58.307 4 9 1.2
0.05
Berat (kg/m)
1
ɸ
0.01 0.617 1.06 70 74.2 45.79
11 7 0.34
0.05 0.96
0.05 ɸ
0.01 0.617 1.58 70 110.6 68.25
0.26
7 10 0.94
0.96
Total Berat 230.653
KEBUTUHAN: 35 LONJOR
Berat/m3 109.835
No. Sket Potongan Diameter Besi Berat Besi/m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
2 FOOT PLATE 100 x 100 Type P2
1 Begel 1 Tekukan 10
ɸ
0.01 0.617 1.06 30 31.8 19.63
11 3 0.34
0.05 0.96
0.05 ɸ
0.01 0.617 1.58 30 47.4 29.25
0.26
7 5 0.94
0.96
Total Berat 165.493
KEBUTUHAN : 26 Lonjor
Berat/m3 183.881
No. Sket Potongan Diameter Besi Berat Besi/m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
3 FOOT PLATE 100 x 150 Type P3
1 Begel 1 Tekukan 10
Jarak 150
0.3 0.617 2.7 50 135 83.295 4 13 1.2
ARAH X 0.05
Berat (kg/m)
1 0.617
Begel 2 Tekukan 10
Jarak 150
ARAH Y 0.3 0.617 2.7 50 135 83.295 4 13 1.2
0.05
Berat (kg/m)
1.5 0.617
ɸ
0.01 0.617 1.56 60 93.6 57.76
7 9 1.08
0.05 1.46
0.05 ɸ
0.01 0.617 2.08 60 124.8 77.01
0.26
5 12 1.6
1.46
Total Berat 134.770
KEBUTUHAN : 21 Lonjor
Berat/m3 149.744
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
4 SLOOF 15/30
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 330 223.08 89.24 17 20 0.508
0.22 0.22
0.07
- Tul. Utama Menerus Ø 12
ɸ
0.012 0.887 12 12 144 127.73 1 12 0
0.144
11.376 0.48
ɸ
0.48 0.144 0.012 0.887 13.27 12 159.216 141.23 0.90 14 0
12.644
ɸ
0.144 0.012 0.887 6.449 4 25.796 22.89 1 4 5.551
6.125 0.18
ɸ
0.144 0.012 0.887 6.449 4 25.796 22.89 1 4 5.551
0.18 6.125
ɸ
0.012 0.887 12.17 4 48.68 43.18 0.99 5 0
0.24 11.69 0.24
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 145 98.02 39.21 17 9 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 12 12 144 127.73 1 12 0
0.144
11.376 0.48
ɸ
0.48 0.144 0.012 0.887 10.268 12 123.216 109.3 1.17 11 0
9.644
ɸ
0.144 0.012 0.887 5.699 4 22.796 20.23 2 2 0.602
5.375 0.18
ɸ
0.144 0.012 0.887 5.699 4 22.796 20.23 2 2 0.602
0.18 5.375
ɸ
0.012 0.887 10.67 4 42.68 37.86 1.12 4 0
0.24 10.19 0.24
PANJANG 12 AS 4, AS B, AS C, AS D, AS E
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 405 273.78 109.52 17 24 0.508
0.22 0.22
0.07
- Tul. Utama Menerus Ø 12
ɸ
0.012 0.887 12.208 30 366.24 324.86 0.98 31 0
0.144 0.144
11.920
ɸ
0.144 0.012 0.887 3.304 10 33.04 29.31 3 4 12
2.98 0.18
ɸ
0.144 0.012 0.887 3.304 10 33.04 29.31 3 4 12
0.18 2.98
ɸ
0.012 0.887 5.96 10 59.6 52.87 2 5 12
0.24 5.480 0.24
PANJANG 5.5 AS A
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 38 25.688 10.28 17 3 0.508
0.22 0.22
0.07
ɸ
0.144 0.012 0.887 5.708 6 34.248 30.38 2.10 3 0
0.144
5.420
ɸ
0.144 0.012 0.887 1.679 2 3.358 2.98 7 1 12
1.355 0.18
ɸ
0.144 0.012 0.887 1.679 2 3.358 2.98 7 1 12
0.18 1.355
ɸ
0.012 0.887 2.71 2 5.42 4.81 4 1 12
0.24 2.230 0.24
PANJANG 10 AS F & AS G
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 136 91.936 36.78 17 8 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 10.208 12 122.496 108.66 1.18 11 0
0.144 0.144
9.920
ɸ
0.144 0.012 0.887 2.804 4 11.216 9.95 4 1 12
2.48 0.18
ɸ
0.144 0.012 0.887 2.804 4 11.216 9.95 4 1 12
0.18 2.48
ɸ
0.012 0.887 4.96 4 19.84 17.6 2 2 12
0.24 4.480 0.24
PANJANG 8 AS H & AS I
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 110 74.36 29.75 17 7 0.508
0.22 0.22
0.07
7.920
ɸ
0.144 0.012 0.887 2.304 4 9.216 8.18 5 1 12
1.98 0.18
ɸ
0.144 0.012 0.887 2.304 4 9.216 8.18 5 1 12
0.18 1.98
ɸ
0.012 0.887 3.96 4 15.84 14.06 3 2 12
0.24 3.480 0.24
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
5 KOLOM 15/30 Type K1
LANTAI 1
0.04 0.22 ɸ
0.04 0.008 0.4 0.66 209 137.94 55.18 18 12 0.12
0.07 0.07
0.22
0.48 ɸ
0.012 0.887 5.944 110 653.84 579.96 2 55 0.112
5.32
0.144
LANTAI 2
0.04 0.22 ɸ
0.04 0.008 0.4 0.66 180 118.8 47.52 18 10 0.12
0.07 0.07
0.22
0.144 ɸ
0.012 0.887 4.544 120 545.28 483.67 2 60 2.912
3.92
0.48
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
6 KOLOM 15/30 Type K2
LANTAI 1
0.07
0.04 ɸ
0.04 0.008 0.4 0.66 510 336.6 134.64 18 29 0.12
0.22 0.22
0.07
0.144 ɸ
0.012 0.887 5.608 136 762.688 676.51 2 68 0.784
5.32
0.144
0.04 0.12 ɸ
0.04 0.008 0.4 0.46 450 207 82.8 26 18 0.04
0.07 0.07
0.12
0.144 ɸ
0.012 0.887 5.608 90 504.72 447.69 2 45 0.784
5.32
0.144
LANTAI 2
0.04 0.12 ɸ
0.04 0.008 0.4 0.46 120 55.2 22.08 26 5 0.04
0.07 0.07
0.12
0.144 ɸ
0.012 0.887 4.208 24 100.992 89.58 2 12 3.584
3.92
0.144
berat/m3 61.333 TOTAL BESI POLOS ɸ 8 22.0800 Kebutuhan 5 Lonjor
berat/m3 248.833 TOTAL BESI ULIR ɸ 12 89.5800 Kebutuhan 12 Lonjor
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
8 BALOK 15/30 Type B1
LANTAI 1
PANJANG 21.5
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 145 98.02 39.21 17 9 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 12 12 144 127.73 1 12 0
0.144
11.376 0.48
ɸ
0.48 0.144 0.012 0.887 10.268 12 123.216 109.3 1.17 11 0
9.644
ɸ
0.144 0.012 0.887 5.699 4 22.796 20.23 2 2 0.602
5.375 0.18
ɸ
0.144 0.012 0.887 5.699 4 22.796 20.23 2 2 0.602
0.18 5.375
ɸ
0.012 0.887 10.67 4 42.68 37.86 1.12 4 0
0.24 10.19 0.24
TOTAL BESI POLOS ɸ 8 39.2100 Kebutuhan 9 Lonjor
TOTAL BESI ULIR ɸ 12 315.3500 Kebutuhan 31 Lonjor
PANJANG 6
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 123 83.148 33.26 17 8 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 6.208 18 111.744 99.12 1 18 5.792
0.144 0.144
5.920
ɸ
0.144 0.012 0.887 1.804 6 10.824 9.61 6 1 1.176
1.48 0.18
ɸ
0.144 0.012 0.887 1.804 6 10.824 9.61 6 1 1.176
0.18 1.48
ɸ
0.012 0.887 2.96 6 17.76 15.76 4 2 0.16
0.24 2.480 0.24
PANJANG 4.5
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 31 20.956 8.39 17 2 0.508
0.22 0.22
0.07
- Tul. Utama Menerus Ø 12
ɸ
0.012 0.887 4.708 6 28.248 25.06 2.55 3 0
0.144 0.144
4.420
ɸ
0.144 0.012 0.887 1.429 2 2.858 2.54 8 1 0.568
1.105 0.18
ɸ
0.144 0.012 0.887 1.429 2 2.858 2.54 8 1 0.568
0.18 1.105
ɸ
0.012 0.887 2.21 2 4.42 3.93 5 1 0.95
0.24 1.730 0.24
PANJANG 3
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 21 14.196 5.68 17 2 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 3.208 6 19.248 17.08 3.74 2 0
0.144 0.144
2.920
ɸ
0.144 0.012 0.887 1.054 2 2.108 1.87 11 1 0.406
0.73 0.18
ɸ
0.144 0.012 0.887 1.054 2 2.108 1.87 11 1 0.406
0.18 0.73
ɸ
0.012 0.887 1.46 2 2.92 2.6 8 1 0.32
0.24 0.980 0.24
TOTAL BESI POLOS ɸ 8 5.6800 Kebutuhan 2 Lonjor
TOTAL BESI ULIR ɸ 12 23.4200 Kebutuhan 5 Lonjor
PANJANG 4
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 28 18.928 7.58 17 2 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 4.208 6 25.248 22.4 2.85 3 0
0.144 0.144
3.920
ɸ
0.144 0.012 0.887 1.304 2 2.608 2.32 9 1 0.264
0.98 0.18
ɸ
0.144 0.012 0.887 1.304 2 2.608 2.32 9 1 0.264
0.18 0.98
ɸ
0.012 0.887 1.96 2 3.92 3.48 6 1 0.24
0.24 1.480 0.24
PANJANG 7
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 48 32.448 12.98 17 3 0.508
0.22 0.22
0.07
- Tul. Utama Menerus Ø 12
ɸ
0.012 0.887 7.208 6 43.248 38.37 1 6 4.792
0.144 0.144
6.920
ɸ
0.144 0.012 0.887 2.054 2 4.108 3.65 5 1 1.73
1.73 0.18
ɸ
0.144 0.012 0.887 2.054 2 4.108 3.65 5 1 1.73
0.18 1.73
ɸ
0.012 0.887 3.46 2 6.92 6.14 3 1 1.62
0.24 2.980 0.24
PANJANG 8
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 110 74.36 29.75 17 7 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 8.208 12 98.496 87.37 1.46 9 0
0.144 0.144
7.920
ɸ
0.144 0.012 0.887 2.304 4 9.216 8.18 5 1 0.48
1.98 0.18
ɸ
0.144 0.012 0.887 2.304 4 9.216 8.18 5 1 0.48
0.18 1.98
ɸ
0.012 0.887 3.96 4 15.84 14.06 3 2 0.12
0.24 3.480 0.24
PANJANG 9
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 61 41.236 16.5 17 4 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 9.208 6 55.248 49.01 1.30 5 0
0.144 0.144
8.920
ɸ
0.144 0.012 0.887 2.554 2 5.108 4.53 4 1 1.784
2.23 0.18
ɸ
0.144 0.012 0.887 2.554 2 5.108 4.53 4 1 1.784
0.18 2.23
ɸ
0.012 0.887 4.46 2 8.92 7.91 2 1 3.08
0.24 3.980 0.24
PANJANG 10
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 136 91.936 36.77 17 8 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 10.208 12 122.496 108.65 1.18 11 0
0.144 0.144
9.920
ɸ
0.144 0.012 0.887 2.804 4 11.216 9.95 4 1 0.784
2.48 0.18
ɸ
0.144 0.012 0.887 2.804 4 11.216 9.95 4 1 0.784
0.18 2.48
ɸ
0.012 0.887 4.96 4 19.84 17.60 2 2 2.08
0.24 4.480 0.24
PANJANG 11
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 75 50.7 20.28 17 5 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 11.208 12 134.496 119.30 1.07 12 0
0.144 0.144
10.920
ɸ
0.144 0.012 0.887 3.054 4 12.216 10.84 3 2 2.838
2.73 0.18
ɸ
0.144 0.012 0.887 3.054 4 12.216 10.84 3 2 2.838
0.18 2.73
ɸ
0.012 0.887 5.46 4 21.84 19.37 2 2 1.08
0.24 4.980 0.24
PANJANG 12
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 243 164.268 65.71 17 15 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 12.208 18 219.744 194.91 0.98 19 0
0.144 0.144
11.920
ɸ
0.144 0.012 0.887 3.304 6 19.824 17.58 3 2 2.088
2.98 0.18
ɸ
0.144 0.012 0.887 3.304 6 19.824 17.58 3 2 2.088
0.18 2.98
ɸ
0.012 0.887 5.96 6 35.76 31.72 2 3 0.08
0.24 5.480 0.24
PANJANG 6
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 164 110.864 44.35 17 10 0.508
0.22 0.22
0.07
ɸ
0.012 0.887 6.208 24 148.992 132.16 1 24 5.792
0.144 0.144
5.920
ɸ
0.144 0.012 0.887 1.804 8 14.432 12.80 6 2 1.176
1.48 0.18
ɸ
0.144 0.012 0.887 1.804 8 14.432 12.80 6 2 1.176
0.18 1.48
ɸ
0.012 0.887 2.96 8 23.68 21.00 4 2 0.16
0.24 2.480 0.24
PANJANG 10
0.07
0.05 ɸ
0.05 0.008 0.4 0.676 204 137.904 55.16 17 12 0.508
0.22 0.22
0.07
- Tul. Utama Menerus Ø 12
ɸ
0.012 0.887 10.208 18 183.744 162.98 1 18 1.792
0.144 0.144
0.144 0.144
9.920
ɸ
0.144 0.012 0.887 2.804 6 16.824 14.92 4 2 0.784
2.48 0.18
ɸ
0.144 0.012 0.887 2.804 6 16.824 14.92 4 2 0.784
0.18 2.48
ɸ
0.012 0.887 4.96 6 29.76 26.40 2 3 2.08
0.24 4.480 0.24
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
9 BALOK 15/20 Type B2
LANTAI 1
PANJANG 4.5
0.07
0.05 ɸ
0.05 0.008 0.4 0.476 31 14.756 5.90 25 2 0.1
0.12 0.12
0.07
ɸ
0.012 0.887 4.708 16 75.328 66.82 2 8 2.584
0.144 0.144
4.420
ɸ
0.144 0.012 0.887 1.429 8 11.432 10.14 8 1 0.568
1.105 0.18
ɸ
0.144 0.012 0.887 1.429 8 11.432 10.14 8 1 0.568
0.18 1.105
ɸ
0.012 0.887 2.21 8 17.68 15.68 5 2 0.95
0.24 1.730 0.24
PANJANG 8
0.07
0.05 ɸ
0.05 0.008 0.4 0.476 55 26.18 10.47 25 3 0.1
0.12 0.12
0.07
ɸ
0.012 0.887 8.208 4 32.832 29.12 1 4 3.792
0.144 0.144
7.920
ɸ
0.144 0.012 0.887 2.304 2 4.608 4.09 5 1 0.48
1.98 0.18
ɸ
0.144 0.012 0.887 2.304 2 4.608 4.09 5 1 0.48
0.18 1.98
ɸ
0.012 0.887 3.96 2 7.92 7.03 3 1 0.12
0.24 3.480 0.24
TOTAL BESI POLOS ɸ 8 10.47 Kebutuhan 3 Lonjor
TOTAL BESI ULIR ɸ 12 44.32 Kebutuhan 7 Lonjor
PANJANG 2
0.07
0.05 ɸ
0.05 0.008 0.4 0.476 90 42.84 17.14 25 4 0.1
0.12 0.12
0.07
ɸ
0.012 0.887 2.208 24 52.992 47.00 5 5 0.96
0.144 0.144
1.920
ɸ
0.144 0.012 0.887 0.804 12 9.648 8.56 14 1 0.744
0.48 0.18
ɸ
0.144 0.012 0.887 0.804 12 9.648 8.56 14 1 0.744
0.18 0.48
ɸ
0.012 0.887 0.96 12 11.52 10.22 12 1 0.48
0.24 0.480 0.24
PANJANG 3
0.07
0.05 ɸ
0.05 0.008 0.4 0.476 21 9.996 4.00 25 1 0.1
0.12 0.12
0.07
- Tul. Utama Menerus Ø 12
ɸ
0.012 0.887 3.208 4 12.832 11.38 3 2 2.376
0.144 0.144
0.144 0.144
2.920
ɸ
0.144 0.012 0.887 1.054 2 2.108 1.87 11 1 0.406
0.73 0.18
ɸ
0.144 0.012 0.887 1.054 2 2.108 1.87 11 1 0.406
0.18 0.73
ɸ
0.012 0.887 1.46 2 2.92 2.59 8 1 0.32
0.24 0.980 0.24
PANJANG 4
0.07
0.05 ɸ
0.05 0.008 0.4 0.476 56 26.656 10.66 25 3 0.1
0.12 0.12
0.07
ɸ
0.012 0.887 4.208 8 33.664 29.86 2 4 3.584
0.144 0.144
3.920
ɸ
0.144 0.012 0.887 1.304 4 5.216 4.63 9 1 0.264
0.98 0.18
ɸ
0.144 0.012 0.887 1.304 4 5.216 4.63 9 1 0.264
0.18 0.98
ɸ
0.012 0.887 1.96 4 7.84 6.95 6 1 0.24
0.24 1.480 0.24
No. Sket Potongan Panjang As Panjang Besi Berat Panjang Potongan Jumlah Potongan Total Panjang Berat Total Jml.Pot Besi Jumlah Lonjor Sisa Besi
(m) (m) (kg) (m) (buah) (m) (kg)
1 2 3 5 6 7 8 9 10 11 12
10 TANGGA
1 Tulangan Arah X
1
0.81
Tebal Plat
0.05
0.05
Lebar Plat
0.85
Tulangan Arah Y 0.4
2.22 2.22
Tebal Plat
0.81
0.05 0.15 0.81 0.617 0.910 16 14.560 8.9836 13 2 0.170
0.05
PELAT BORDES
Panjang
Plat
0.85
Tulangan Arah Y
0.85 0.85
Lebar Plat
0.05 0.05
ANAK TANGGA
0.85
Tulangan Anak Tangga 2
Lebar Plat
0.4
0.85
0.62 0.617 0.82 120 98.4 60.7128 14 9 0.52
0.05
0.22
Jml. anak
tangga
20
BERAT TOTAL 128.694 berat/m3 93.937
Kebutuhan = 23 Lonjor
No. Sket Potongan Panjang As Panjang Besi Berat Panjang Potongan Jumlah Potongan Total Panjang Berat Total Jml.Pot Besi Jumlah Lonjor Sisa Besi
(m) (m) (kg) (m) (buah) (m) (kg)
1 2 3 5 6 7 8 9 10 11 12
10 Pondasi FootPlate untuk Tangga
1 Begel 1 Tekukan
ARAH X
1
Begel 2 Tekukan
ARAH Y
1
2 Tulangan Kolom Plat
1.04
1.08 1.04 0.888 1.16 80 92.8 82.406 10 8 0.400
0.06 0.06
0.26
0.3 0.395 0.82 30 24.6 9.717 14 3 0.52
0.11
BERAT TOTAL 208.736
Kebutuhan = 29 Lonjor
No. Sket Potongan Panjang As Panjang Besi Berat Panjang Potongan Jumlah Potongan Total Panjang Berat Total Jml.Pot Besi Jumlah Lonjor Sisa Besi
(m) (m) (kg) (m) (buah) (m) (kg)
1 2 3 5 6 7 8 9 10 11 12
11 Ring Balok 15/30
LANTAI 1
1 Tulangan Kolom Plat
13.96
14 13.96 0.888 14.08 94 1323.52 1175.286 1 111 0.000
0.06 0.06
Sengkang / Begel
0.04
0.26
0.11
2 Tulangan Kolom Plat
10.46
10.5 10.46 0.888 10.58 71 751.18 667.048 1 63 0.000
0.06 0.06
Sengkang / Begel
0.04
0.26
0.11
3 Tulangan Kolom Plat
4.46
4.5 4.46 0.888 4.58 31 141.98 252.157 3 12 0.000
0.06 0.06
Sengkang / Begel
0.26
0.395 0.82 31 25.42 20.0818 14 3 0.52
0.26
0.395 0.82 31 25.42 20.0818 14 3 0.52
0.11
4 Tulangan Kolom Plat
2.96
3 2.96 0.888 3.08 21 64.68 57.436 4 6 0.000
0.06 0.06
Sengkang / Begel
0.04
0.26
0.395 0.82 21 17.22 6.8019 14 2 0.52
0.11
Sengkang / Begel
0.04
0.26
0.11
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
12 PLAT LANTAI
1 Begel 1 Tekukan 10
Jarak 150
ARAH X
Jarak 150
0.12 0.617 4.040 208 840.320 518.478 2 104 3.92
0.05
Berat (kg/m)
1.85 0.617
ɸ
0.01 0.617 1.91 130 248.3 153.21
6 22 0.54
0.05 1.81
0.05 ɸ
0.01 0.617 2.07 130 269.1 166.04
0.08
5 26 1.65
1.81
Total Berat 1356.205
KEBUTUHAN : 256 Lonjor
1 Begel 1 Tekukan 10
Jarak 150
ARAH X
ɸ
0.01 0.617 3.91 10 39.1 24.13
3 4 0.27
0.05 3.81
0.05 ɸ
0.01 0.617 4.07 10 40.7 25.12
0.08
2 5 3.86
3.81
Total Berat 287.758
KEBUTUHAN : 57 Lonjor
1 Begel 1 Tekukan 10
Jarak 150
ARAH X
Jarak 150
0.12 0.617 8.040 13 104.520 64.489 1 13 3.96
0.05
Berat (kg/m)
3.85 0.617
ɸ
0.01 0.617 1.56 10 15.6 9.63
7 2 1.08
0.05 1.46
0.05 ɸ
0.01 0.617 1.72 10 17.2 10.62
0.08
6 2 1.68
1.46
Total Berat 111.529
KEBUTUHAN : 22 Lonjor
Jarak 150
0.12 0.617 4.040 112 452.480 279.180 2 56 3.92
0.05
Berat (kg/m)
0.8 0.617
ɸ
0.01 0.617 0.86 160 137.6 84.9
13 13 0.82
0.05 0.76
0.05 ɸ
0.01 0.617 0.98 160 156.8 96.75
0.06
12 14 0.24
0.76
Total Berat 740.010
KEBUTUHAN : 139 Lonjor
1 Begel 1 Tekukan 10
Jarak 150
ARAH X
Jarak 150
0.12 0.617 4.040 56 226.240 139.590 2 28 3.92
0.05
Berat (kg/m)
0.8 0.617
ɸ
0.01 0.617 0.86 80 68.8 42.45
13 7 0.82
0.05 0.76
0.05 ɸ
0.01 0.617 0.98 80 78.4 48.38
0.06
12 7 0.24
12 7 0.24
0.76
Total Berat 370.010
KEBUTUHAN : 70 Lonjor
Jarak 150
0.12 0.617 4.040 28 113.120 69.795 2 14 3.92
0.05
Berat (kg/m)
0.8 0.617
ɸ
0.01 0.617 0.86 40 34.4 21.23
13 4 0.82
0.05 0.76
0.05 ɸ
0.01 0.617 0.98 40 39.2 24.19
0.06
12 4 0.24
0.76
Total Berat 185.010
KEBUTUHAN : 36 Lonjor
1 Begel 1 Tekukan 10
ARAH X Jarak 150
0.1 0.617 4.040 21 84.840 52.346 2 11 3.92
0.05
Berat (kg/m)
3 0.617
Begel 2 Tekukan 10
ARAH Y
Jarak 150
0.12 0.617 4.040 21 84.840 52.346 2 11 3.92
0.05
Berat (kg/m)
0.8 0.617
ɸ
0.01 0.617 0.86 30 25.8 15.92
13 3 0.82
0.05 0.76
0.05 ɸ
0.01 0.617 0.98 30 29.4 18.14
0.06
12 3 0.24
0.76
Total Berat 138.753
KEBUTUHAN : 28 Lonjor
No. Sket Potongan Diameter Besi Berat Besi / m Panjang Potongan Jumlah Potongan Total Panjang Berat Jumlah Pot. Besi Jumlah Lonjor Sisa Besi
(m) (kg) (m) (buah) (m) (kg)
1 2 3 4 5 6 7 8 9 10 11
14 TALANG BETON
LANTAI 1 bentang (500x50)
tulangan ly 5 0.008 0.393 5.08 168.00 853.44 335.40 2.36
168.00 2.00
2 1.84
bentang (400x50)
tulangan ly 4 0.008 0.393 4.08 51.00 208.08 81.78 2.94
2 3.84
51.00 2.00
2 3.84
bentang (600x50)
tulangan ly 6 0.008 0.393 6.08 50.00 304.00 119.47 1.97
50.00 1.00
1 5.92