A. DATA-DATA PEMBEBANAN
Diketahui :
fy = 414 MPa
fc0 = 24,49 MPa =K 295 kg/cm2
fc' pengangkatan = 46% fc0 = 11,26 MPa
fc' sebelum komposit = 65% fc0 = 15,92 MPa
fc' komposit = 88% fc0 = 21,55 MPa
Direncanakan :
Tebal plat precast = 7 Cm
Tebal plat overtopping = 6 Cm
Tulangan lentur plat (Rencana) Arah X = D 10 - 200 mm
Arah Y = D 10 - 200 mm
Tulangan susut plat (Rencana) = D 10 - 200 mm
Plaza -16
CONSTRUCTION & INVESTMENT
2
Beban hidup ( LL ) = 100 Kg/m
2
Beban total ( 1.2 DL + 1.6 LL ) = 534,4 Kg/m
2
Beban hidup ( LL ) = 250 Kg/m ( Untuk Pasar )
Beban total ( 1.2 DL + 1.6 LL ) = 1038 Kg/m2
Plaza -17
CONSTRUCTION & INVESTMENT
1,2 Pembebanan
Lx = 2,5 m
a b a
0.207 0.586 0.207 Ly = 2,83 m
Perletakan sendi - sendi diasumsikan sebagai letak titik angkat plat precast
Plaza - 18
CONSTRUCTION & INVESTMENT
a. Tulangan arah X
fy = 52,227
m=
0.85 * fc '
d = 60 - 20 - 7 - ( 0.5 x 7 ) = 35 mm
Mu = 0,440
Rn =
f bd 2
As susut = Asmin
2
= 63,00 mm
Plaza - 19
CONSTRUCTION & INVESTMENT
b. Tulangan arah Y
fy = 52,227
m=
0.85 * fc '
d = 60 - 20 - 8 - ( 0.5 x 10 ) = 35 mm
Mu = 0,344
Rn =
f bd 2
As susut = Asmin
2
= 71,19 mm
Plaza - 20
CONSTRUCTION & INVESTMENT
1,2 Pembebanan
Lx = 2,5 m
Plaza - 20
CONSTRUCTION & INVESTMENT
1,3 Penulangan Plat
fy = 30,603
m=
0.85 * fc '
d = 60 - 20 - 8 - ( 0.5 x 10 ) = 35 mm
Mu = 1,360
Rn =
f bd 2
As susut = r min * b * d
2
= 50,40 mm
5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
Plaza - 21
CONSTRUCTION & INVESTMENT
b. Tulangan Lapangan Arah X
fy = 30,603
m=
0.85 * fc '
d = 70 - 20 - 8 - ( 0.5 x 10 ) = 35 mm
Mu = 1,088
Rn =
f bd 2
As susut = r min * b * d
2
= 50,40 mm
5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
Plaza - 22
CONSTRUCTION & INVESTMENT
3,2 Pembebanan
LY/LX = 1,132
Ctx = 62
Lx = 2,5 m Cty = 35
Clx = 62
Cly = 35
Ly = 2,83 m
Plaza - 22
CONSTRUCTION & INVESTMENT
1,3 Penulangan Plat
a. Tulangan Tumpuan X
fy = 19,892
m=
0.85 * fc '
d = 120 - 20 - 7 - ( 0.5 x 7 ) = 95 mm
Mu = 0,557
Rn =
f bd 2
As susut = rmin . b . d
2
= 136,80 mm
5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
Plaza - 23
CONSTRUCTION & INVESTMENT
b. Tulangan Tumpuan Y
fy = 19,892
m=
0.85 * fc '
d = 140 - 20 - 8 - ( 0.5 x 10 ) = 95 mm
Mu = 0,315
Rn =
f bd 2
As susut = rmin . b . d
2
= 136,80 mm
5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
Plaza - 24
CONSTRUCTION & INVESTMENT
c. Tulangan Lapangan X
fy = 19,892
m=
0.85 * fc '
d = 140 - 20 - 8 - ( 0.5 x 10 ) = 95 mm
Mu = 0,557
Rn =
f bd 2
As = r . b . d =
2
129,6 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
As susut = rmin . b . d
2
= 136,80 mm
5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
Plaza - 25
CONSTRUCTION & INVESTMENT
d. Tulangan Lapangan Y
fy = 19,892
m=
0.85 * fc '
d = 140 - 20 - 8 - ( 0.5 x 10 ) = 95 mm
Mu = 0,315
Rn =
f bd 2
1 2 * m * Rn > r min
r= 1 1
= 0,0008
m fy
As = r . b . d =
2
72,7 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
As susut = rmin . b . d
2
= 136,80 mm
5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm
Plaza - 26
CONSTRUCTION & INVESTMENT
DIPAKAI
LUAS TULANGAN
PLAT TULANGAN
(mm2/m)
DIPAKAI
LUAS TULANGAN
PLAT TULANGAN
(mm2/m)
Tulangan Sesuai 10 - 200 392,5
Kondisi Precast 10 - 200 392,5
Plaza - 25
CONSTRUCTION & INVESTMENT
0.207
0.586b
0.207b
Diketahui :
a = 2,5 m
b = 2,825 m
Plaza - 27
CONSTRUCTION & INVESTMENT
a) Kontrol pada 2 titik angkat pada saat pengangkatan dengan koefisien
pengali x = 1,5 ( Tabel 5.2.1 PCI Hand Book )
Beban mati akibat beban terbesar saat pengangkatan 3 lapis plat precast
t = 18 cm
2
q = 432 Kg/m
2
Akibat kejut = 648 Kg/m
2
w = 648 Kg/m
z = 5400000 mm3
Plaza - 28
Ref. No. LT-007/MKUA-MK/AMCK/BTL/III/2015 Bandung, 20 Maret 2015
Kepada Yth.
PT. Anugrah Multi Cipta Karya
Jl. Rajawali Timur
Komp. Rajawali Plaza 34
Bandung
Tel : (022) 6003595 / 6041685
Fax : (022) 6003596
Perihal : Pengajuan Metode Half Slab untuk Plat Lantai Lt. 3-20
Proyek “Apartemen Technoplex Living Bandung”
Dengan hormat,
Sehubungan dengan perihal di atas dan berdasarkan pengajuan resmi dari Kontraktor PT. PP
(Persero) Tbk. dengan referensi surat no. 004/Ext/PP/TLA/III/2015 perihal Desain dan Perhitungan
Metode Precast Half Slab pada tanggal 20 Maret 2015, berikut kami sampaikan usulan untuk
perubahan metode plat lantai dari konvensional menjadi half slab, lengkap dengan perhitungan desain
(data terlampir). Metode half slab yang diajukan hanya untuk Lt. 3-20 (tipikal).
Demikian kami sampaikan, atas perhatian dan kerjasamanya kami ucapkan terima kasih,
Hormat kami,
Manajeman Konstruksi
Wenarto Leo
Project manager