Anda di halaman 1dari 17

CONSTRUCTION & INVESTMENT

DESIGN PRECAST PLAT HALF SLAB


Proyek TeknoLiving - Buah Batu - Bandung

A. DATA-DATA PEMBEBANAN
Diketahui :
fy = 414 MPa
fc0 = 24,49 MPa =K 295 kg/cm2
fc' pengangkatan = 46% fc0 = 11,26 MPa
fc' sebelum komposit = 65% fc0 = 15,92 MPa
fc' komposit = 88% fc0 = 21,55 MPa

Direncanakan :
Tebal plat precast = 7 Cm
Tebal plat overtopping = 6 Cm
Tulangan lentur plat (Rencana) Arah X = D 10 - 200 mm
Arah Y = D 10 - 200 mm
Tulangan susut plat (Rencana) = D 10 - 200 mm

Plaza -16
CONSTRUCTION & INVESTMENT

B. PERHITUNGAN PEBEBANAN PLAT LANTAI


Tebal Plat lantai precast = 7 cm
Tebal Plat lantai insitu = 6 cm
a. Kondisi saat pengangkatan
Beban mati ( DL )
2
Berat sendiri plat precast = 0,07 x 2400 = 168 Kg/m
2
Beban kejut saat pengangkatan = 1,5 x 168 = 252 Kg/m

Beban untuk 1 m pias lebar plat = 252 x 1


qu = 252 Kg/m

b. Kondisi saat sebelum komposit


Beban mati ( DL )
2
Berat sendiri plat precast = 0,07 x 2400 = 168 Kg/m
2
Berat plat cast insitu = 0,06 x 2400 = 144 Kg/m
2
Total DL = 312 Kg/m

2
Beban hidup ( LL ) = 100 Kg/m
2
Beban total ( 1.2 DL + 1.6 LL ) = 534,4 Kg/m

Beban untuk 1 m pias lebar plat = 534,4 x 1


qu = 534,4 Kg/m

c. Kondisi saat komposit


Beban mati ( DL )
Berat sendiri plat penuh ( t = 13 cm ) = 0,13 x 2400 = 312 Kg/m2
SDL 2 x 21 = 220 Kg/m2
Total DL = 532 Kg/m2

2
Beban hidup ( LL ) = 250 Kg/m ( Untuk Pasar )
Beban total ( 1.2 DL + 1.6 LL ) = 1038 Kg/m2

Beban untuk 1 m pias lebar plat = 1038 x 1


qu = 1038 Kg/m

Plaza -17
CONSTRUCTION & INVESTMENT

PERHITUNGAN PENULANGAN PLAT


Proyek TeknoLiving - Buah Batu - Bandung

1 PERENCANAAN PLAT KONDISI SAAT PENGANGKATAN


1,1 Data perencanaan
- Dimensi plat : 2,5 x 2,825 m
- Tebal plat : 7 cm
- Mutu beton fc0 = 24 MPa
fc' = 11,3 MPa ( umur 3 hari )
- Mutu baja U 50 , fy = 500 MPa
- Diameter tulangan f 10 mm, f 10 mm
- Selimut beton = 2 cm

1,2 Pembebanan

Lx = 2,5 m

a b a
0.207 0.586 0.207 Ly = 2,83 m

Perletakan sendi - sendi diasumsikan sebagai letak titik angkat plat precast

Plaza - 18
CONSTRUCTION & INVESTMENT

1,3 Penulangan Plat

a. Tulangan arah X

Q = qu saat angkat x 0.5 Ly= 315 Kg/m

Mu = 0.5 x Q x l2 = 53,859 Kg. m

r bal = 0.85. fc' . b x 600 = 0,0193


fy 600 + fy

r maks = 0.75 x r bal = 0,0145


r min = 0,0014

fy = 52,227
m=
0.85 * fc '

d = 60 - 20 - 7 - ( 0.5 x 7 ) = 35 mm

Mu = 0,440
Rn =
f bd 2

1  2 * m * Rn  = 0,0009 < r min


r= 1  1  
m fy 
2
As = r min . b . d = 63,0 mm
6,25 f
2
Dipasang tulangan 10 As = 490,63 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = Asmin
2
= 63,00 mm

Tulangan terpasang 6,25 f


2
10 As = 490,63 mm Oke!
Jarak spasi 200 mm f 10 200 mm

Plaza - 19
CONSTRUCTION & INVESTMENT

b. Tulangan arah Y

Q = qu saat angkat x 0.5 Lx= 355,95 Kg/m

Mu = 0.5 x Q x l2 = 47,663 Kg. m

r bal = 0.85. fc' . b x 600 = 0,0193


fy 600 + fy

r maks = 0.75 x r bal = 0,0145


r min = 0,0014

fy = 52,227
m=
0.85 * fc '

d = 60 - 20 - 8 - ( 0.5 x 10 ) = 35 mm

Mu = 0,344
Rn =
f bd 2

1  2 * m * Rn  = 0,0007 < r min


r= 1  1  
m fy 
2
As = r min . b . d = 71,2 mm
7,06 f
2
Dipasang tulangan 10 As = 554,41 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = Asmin
2
= 71,19 mm

Tulangan terpasang 7,06 f


2
10 As = 554,41 mm Oke!
Jarak spasi 142 mm f 10 142 mm

Plaza - 20
CONSTRUCTION & INVESTMENT

PERHITUNGAN PENULANGAN PLAT


Proyek TeknoLiving - Buah Batu - Bandung

2 PERENCANAAN PLAT KONDISI SEBELUM KOMPOSIT


2,1 Data perencanaan
- Dimensi plat : 2,5 x 2,83 m
- Tebal plat : 7 cm
- Mutu beton fc0 = 24 Mpa
fc' = 15,9 Mpa ( umur 7 hari )
- Mutu baja U 50 , fy = 414 Mpa
- Diameter tulangan f 10 mm, f 10 mm
- Selimut beton = 2 cm

1,2 Pembebanan

Lx = 2,5 m

Ly/2 Ly/2 Ly = 2,83 m

Perletakan sendi tengah diasumsikan sebagai letak shoring plat precast

Plaza - 20
CONSTRUCTION & INVESTMENT
1,3 Penulangan Plat

a. Tulangan Tumpuan Arah X

Q = qu sebelum komposit = 534,4 Kg/m

Mu = 1/8 x Q x Ly/22 = 133,28 Kg. m

r bal = 0.85. fc' . b x 600 = 0,0253


fy 600 + fy

r maks = 0.75 x r bal = 0,0190


r min = 0,0014

fy = 30,603
m=
0.85 * fc '

d = 60 - 20 - 8 - ( 0.5 x 10 ) = 35 mm

Mu = 1,360
Rn =
f bd 2

1  2 * m * Rn  = 0,0035 > r min


r= 1  1  
m fy 
As = r . b . d =
2
121,4 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = r min * b * d
2
= 50,40 mm

5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

Plaza - 21
CONSTRUCTION & INVESTMENT
b. Tulangan Lapangan Arah X

Q = qu sebelum komposit = 534,4 Kg/m

Mu = 1/10 x Q x Ly/22 = 106,62 Kg. m

r bal = 0.85. fc' . b x 600 = 0,0253


fy 600 + fy

r maks = 0.75 x r bal = 0,0190


r min = 0,0014

fy = 30,603
m=
0.85 * fc '

d = 70 - 20 - 8 - ( 0.5 x 10 ) = 35 mm

Mu = 1,088
Rn =
f bd 2

1  2 * m * Rn  = 0,0027 > r min


r= 1  1  
m fy 
As = r . b . d =
2
96,0 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = r min * b * d
2
= 50,40 mm

5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

Plaza - 22
CONSTRUCTION & INVESTMENT

PERHITUNGAN PENULANGAN PLAT


Proyek TeknoLiving - Buah Batu - Bandung

3 PERENCANAAN PLAT KONDISI SAAT KOMPOSIT


3,1 Data perencanaan
- Dimensi plat : 2,50 x 2,83 m
- Tebal plat : 13 cm
- Mutu beton fc0 = 24 Mpa
fc' = 21,5 Mpa ( umur 14 hari )
- Mutu baja U 50 , fy = 414 Mpa
- Diameter tulangan f 10 mm, f 10 mm
- Selimut beton = 2 cm

3,2 Pembebanan
LY/LX = 1,132

Ctx = 62
Lx = 2,5 m Cty = 35
Clx = 62
Cly = 35

Ly = 2,83 m

Mtx = Ctx x Qu x Lx2 = 402,38 Kg.m per meter panjang


Mty = Cty x Qu x Lx2 = 227,15 Kg.m per meter panjang
Mlx = Clx x Qu x Lx2 = 402,38 Kg.m per meter panjang
Mly = Cly x Qu x Lx2 = 227,15 Kg.m per meter panjang

Plaza - 22
CONSTRUCTION & INVESTMENT
1,3 Penulangan Plat

a. Tulangan Tumpuan X

r bal = 0.85. fc' . b x 600 = 0,0253


fy 600 + fy

r maks = 0.75 x r bal = 0,0190


r min = = 0,0014

fy = 19,892
m=
0.85 * fc '

d = 120 - 20 - 7 - ( 0.5 x 7 ) = 95 mm

Mu = 0,557
Rn =
f bd 2

1  2 * m * Rn  = 0,0014 < r min


r= 1  1  
m fy 
2
As = rmin . b . d = 129,6 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = rmin . b . d
2
= 136,80 mm

5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

Plaza - 23
CONSTRUCTION & INVESTMENT
b. Tulangan Tumpuan Y

r bal = 0.85. fc' . b x 600 = 0,0253


fy 600 + fy

r maks = 0.75 x r bal = 0,0190


r min = = 0,0014

fy = 19,892
m=
0.85 * fc '

d = 140 - 20 - 8 - ( 0.5 x 10 ) = 95 mm

Mu = 0,315
Rn =
f bd 2

1  2 * m * Rn  = 0,0008 < r min


r= 1  1  
m fy 
2
As = rmin . b . d = 72,7 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = rmin . b . d
2
= 136,80 mm

5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

Plaza - 24
CONSTRUCTION & INVESTMENT
c. Tulangan Lapangan X

r bal = 0.85. fc' . b x 600 = 0,0253


fy 600 + fy

r maks = 0.75 x r bal = 0,0190


r min = = 0,0014

fy = 19,892
m=
0.85 * fc '

d = 140 - 20 - 8 - ( 0.5 x 10 ) = 95 mm

Mu = 0,557
Rn =
f bd 2

1  2 * m * Rn  = 0,0014 > r min


r= 1  1  
m fy 

As = r . b . d =
2
129,6 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = rmin . b . d
2
= 136,80 mm

5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

Plaza - 25
CONSTRUCTION & INVESTMENT
d. Tulangan Lapangan Y

r bal = 0.85. fc' . b x 600 = 0,0253


fy 600 + fy

r maks = 0.75 x r bal = 0,0190


r min = = 0,0014

fy = 19,892
m=
0.85 * fc '

d = 140 - 20 - 8 - ( 0.5 x 10 ) = 95 mm

Mu = 0,315
Rn =
f bd 2

1  2 * m * Rn  > r min
r= 1  1  
= 0,0008
m fy 

As = r . b . d =
2
72,7 mm
5 f
2
Dipasang tulangan 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

As susut = rmin . b . d
2
= 136,80 mm

5 f
2
Tulangan terpasang 10 As = 392,50 mm Oke!
Jarak spasi 200 mm f 10 200 mm

Plaza - 26
CONSTRUCTION & INVESTMENT

PLAT BETON PROYEK :

DIPAKAI
LUAS TULANGAN
PLAT TULANGAN
(mm2/m)

a. Kondisi Pengangkatan  10 - 200 392,5


 10 - 200 392,5

b. Kondisi Sebelum  10 - 200 392,5


Komposit  10 - 200 392,5

c. Kondisi Setelah  10 - 200 392,5


Komposit  10 - 200 392,5

DIPAKAI
LUAS TULANGAN
PLAT TULANGAN
(mm2/m)
Tulangan Sesuai  10 - 200 392,5
Kondisi Precast  10 - 200 392,5

Plaza - 25
CONSTRUCTION & INVESTMENT

PERENCANAAN TITIK ANGKAT PLAT PRE-CAST

Plat pre-cast pada saat diangkat, perletakannya diasumsikan


terletak di atas sendi - sendi. Sedangkan letak titik angkat
direncanakan seperti pada gambar.

0.207

0.586b

0.207b

0.207a 0.586a 0.207a

Diketahui :
a = 2,5 m
b = 2,825 m

fr = 0 . 7 fc ' = 2,35 Mpa


2
z = 1/6 bh
h = 7 cm

Plaza - 27
CONSTRUCTION & INVESTMENT
a) Kontrol pada 2 titik angkat pada saat pengangkatan dengan koefisien
pengali x = 1,5 ( Tabel 5.2.1 PCI Hand Book )

Beban mati akibat beban terbesar saat pengangkatan 3 lapis plat precast
t = 18 cm
2
q = 432 Kg/m
2
Akibat kejut = 648 Kg/m
2
w = 648 Kg/m

+My = -My = 0,0107 w*a*b2*x


= 207,5 Kg.m

z = 5400000 mm3

s = 0,384 Mpa < fr OK !

b) Perencanaan Tulangan Angkat

Berat sendiri plat precast = 1.187 kg


Akibat beban kejut = 1.780 kg

Beban tiap titik angkat = 444,94 kg


Tegangan tarik baja U - 24 = 240 Mpa
fy
s bj = = 160 Mpa
2
1 .5 = 1600 kg/cm
P
As =
2
= 0,2781 cm
s bj

Dipakai tulangan f- 10 As = 0,785 cm


2
Oke !

Plaza - 28
Ref. No. LT-007/MKUA-MK/AMCK/BTL/III/2015 Bandung, 20 Maret 2015

Kepada Yth.
PT. Anugrah Multi Cipta Karya
Jl. Rajawali Timur
Komp. Rajawali Plaza 34
Bandung
Tel : (022) 6003595 / 6041685
Fax : (022) 6003596

Up. Bpk. Nathan Madutujuh / Bpk. Enggar Priambada

Perihal : Pengajuan Metode Half Slab untuk Plat Lantai Lt. 3-20
Proyek “Apartemen Technoplex Living Bandung”

Dengan hormat,

Sehubungan dengan perihal di atas dan berdasarkan pengajuan resmi dari Kontraktor PT. PP
(Persero) Tbk. dengan referensi surat no. 004/Ext/PP/TLA/III/2015 perihal Desain dan Perhitungan
Metode Precast Half Slab pada tanggal 20 Maret 2015, berikut kami sampaikan usulan untuk
perubahan metode plat lantai dari konvensional menjadi half slab, lengkap dengan perhitungan desain
(data terlampir). Metode half slab yang diajukan hanya untuk Lt. 3-20 (tipikal).

Kami tunggu tanggapan dari Konsultan Perencana Struktur secepatnya.

Demikian kami sampaikan, atas perhatian dan kerjasamanya kami ucapkan terima kasih,

Hormat kami,
Manajeman Konstruksi

Wenarto Leo
Project manager

Cc. Bpk. Rahmanto Tanzil (PT. Multikarya Utama Abadi)


Bpk. Yansen Theniko (PT. Multikarya Utama Abadi)
Bpk. Mulsani P (PT. Multikarya Utama Abadi)
Arsip