HARGA
HARGA
A. PEMBANGUNAN PHISIK
TAHAP I
3 Laboratorium + ICU / ICCU + Ruang Bedah (Ruang Operasi) + 1,509.49 1.00 2,121,767.56 3,202,778,423.06
7 Mortuary, Gudang dan Ruang Panil Listrik 855.00 1.00 1,110,612.07 949,573,317.81
B. PRASARANA LINGKUNGAN
- Penyambungan meter air ke saluran primer PDAM 386.10 64.35 125,000.00 8,043,750.00
- Pemasangan instalasi dari meter air ke bangunan 2,574.00 429.00 125,000.00 53,625,000.00
TOTAL 15,775,681,661.38
DAFTAR ANALISA UPAH & BAHAN
Material -
Jumlah -
Material -
Jumlah -
Material -
Jumlah -
Material -
Jumlah -
###
Jumlah
1
21b
A3 tap
42a
A5 tap
6
A7 tap
83b
A9 tap
104a
10
Atap
11
12
Atap
13
14
Atap
15
16
Atap
17
18
Atap
195a
A1 tap
2
A3 tap
4
A5 tap
6
A7 tap
87b
9
10
11
12
###
13
14
15
16
17
18
19
20
21
22
23
24
25
KANAL 3.868 5.130
1.261 5.000
4.642 m
2.439
KANAL
0.929 6.022 m
0.312 2.097 m
5.950 0.531
3.950 2.000 3.682 m
0.312
2.024
11.900 3.400
0.617 3.998 m
2.154 m
0.297 1.923 m
3.950
2.134
7.900 1.900
10.5
4.642 3.998
8.106 5.527 7.437 4.9983
8.900 4.900
2.5787 2.097 2.4388 1.923
15.900 11.900
0.5 m
18
29.7485
12.9305
20.2515
27.500
6
Bubungan 125.514
Talang 33.4935
Listplang 135.6
1.471
3.449
1.314
Trap2 183.088
Trapesium 366.176 732.352
Segitiga 13.5 67.324 134.6476592368
Segitiga 12 35.743 71.4855661273
Segitiga 10.5 0.000 0
Jajaran Gen 11.842 47.3669049237
Luas Atap 1166.087
12M 10.421
8M 5.921
0.000
3.000 1.5
-3.000
1.5 0.000
4.000
5.921 0.000
2.000 1.500
6.565 m
3.449
8.516 m
0.442 3.023 m
8.415 0.419
0.5 m
5.586 2.828 2.863 m
0.312
JURAI WF 250.125.6.9
2.687 WF 200.150.6.9
KONSOL 3.682 M
3.046
M
2.154 M
total
0.000
0.000
total
IX
1
2
3
4
5
6
7
8
9
10
11
12
13
13
14
15
15
16
16
17
18
19
20
21
I. PEKERJAAN PERSIAPAN
1. 1 m2 PEMBERSIHAN LOKASI
Upah :
0.100 oh Pekerja @ Rp. 0.00 = Rp. -
0.050 oh Mandor @ Rp. 0.00 = Rp. -
Jumlah = Rp. -
2. 1 m1 PASANG BOWPLANK
0.007 m3 Usuk Meranti @ Rp. 0.00 = Rp. -
0.004 m3 Papan Meranti @ Rp. 0.00 = Rp. -
0.020 kg Paku @ Rp. 0.00 = Rp. -
Upah :
0.100 oh Pekerja @ Rp. 0.00 = Rp. -
0.100 oh Tukang kayu @ Rp. 0.00 = Rp. -
0.010 oh Kepala tukang @ Rp. 0.00 = Rp. -
0.005 oh Mandor @ Rp. 0.00 = Rp. -
Jumlah = Rp. -
I BAHAN PASIR
1 Pasir urug ( lokal ) m³
2 Pasir pasang ( lokal ) m³
3 Pasir pasang ( jawa ) m³
4 Sirtu ( jawa ) m³
5 Pasir cor ( jawa ) m³
6 Tanah urug ( lokal ) m³
7 Pudel putih ( lokal ) m³
8 Pudel kuning ( lokal ) m³
9 Abu batu m³
II BAHAN BATU
1 Batu gunung belah 15/20 ( lokal ) m³
2 Batu gunung belah 10/15 ( lokal ) m³
3 Batu gunung pecah 5/7 ( lokal ) m³
4 Batu gunung pecah 4/6 ( lokal ) m³
5 Batu gunung pecah 3/5 ( lokal ) m³
6 Batu gunung pecah 2/3 ( lokal ) m³
7 Batu kali pecah 5/7 ( jawa ) m³
8 Batu kali pecah 3/5 ( jawa ) m³
9 Batu pecah tempel/hiasan ( jawa ) m²
III BAHAN KORAL/KERIKIL
1 Batu koral bulat 2/3 ( jawa ) m³
2 Batu pecah mesin 1/2 ( jawa ) m³
3 Batu pecah mesin 2/3 ( jawa ) m³
IV BAHAN BATU BATA
1 Batu bata merah ( jawa ) bh
2 Batu putih ( lokal ) bh
3 Batu merah ( lokal ) bh
4 Bataco bh
5 Koral sikat m²
V. PORTLAND CEMENT ( PC )
1 Semen Gresik 40 Kg Kg
2 Semen Warna Kg
3 Semen Putih ( Azona / Tiga Roda ) 50 Kg Zak
4 Semen Putih ( Gresik ) 40 Kg Zak
5 Semen AM/Epoxy Kg
VI. BAHAN BESI/LOGAM & KACA
1 Besi Beton Polos Kg
2 Besi Beton Ulir Kg
3 Besi Siku 5.50.50 x 6.00 m Kg
4 Pipa air Galvanis Medium 1/2" x 6,00 m' Ljr
5 Pipa air Galvanis Medium 3/4" x 6,00 m' Ljr
6 Pipa Air Galvanis Medium 1" Ljr
7 Kawat Beton / Kawat Bendrat Kg
8 Kawat BWG ( Penggantung Rangka Plafond ) Kg
9 Kawat Suspention Root ( Rangka Plafond ) M'
16 Alluminium 4" anodized M'
16 Sunscreen Aluminium M2
17 Sealent Karet tube
18 Skrup Fixer Bh
19 U Climb Bh
20 Wall Angle Bh
VII. BAHAN KAYU
1 Kayu Kamper Balok 8/12, 6/12, 8/15 Klas I M³
2 Kayu Kamper Papan 3/20, 3/30 x 4,00 m' M³
3 Kayu Bangkirai Balok 8/12, 6/12, 8/15 Klas I M³
4 Kayu Bangkirai Balok 8/12, 6/12, 8/15 Klas II M³
5 Kayu Bangkirai Papan 2/20, 3/20 x 4,00 m' M³
6 Kayu Meranti Balok 3/15, 8/12, 6/12 Klas I M³
7 Kayu Meranti Balok 5/7, 4/6, 6/12 Klas II M³
8 Kayu Meranti Papan 2/20, 3/20 x 4,00 m' M³
DAFTAR HARGA BAHAN & UPAH
PEMBANGUNAN GEDUNG UNIVERSITAS TRUNOJOYO MADURA
BANGKALAN - MADURA
1 2 3 4 5 6
I.PEKERJAAN PERSIAPAN :
1 Pasang Bouwplank m' 0.00 16,652.00 0.00
2 Pembersihan dan Pembongkaran ls 0.00 350,000.00 0.00
0.00
II. PEKERJAAN TANAH :
1 Galian Tanah Pondasi m3 0.00 14,050.00 0.00
2 Urugan Pasir Bawah Pondasi m3 0.00 80,860.00 0.00
3 Urugan Tanah bawah lantai m3 0.00 15,000.00 0.00
4 Urugan Tanah (Peninggian Halaman) m3 0.00 15,000.00 0.00
5 Urugan Tanah Kembali m3 0.00 0.00 0.00
6 Bor strauss pall m' 0.00 5,000.00 0.00
0.00
1 2 3 4 5 6
1 2 3 4 5 6
0.00
TOTAL 403,943,252.64
###
Satuan
###
Jumlah
1
21b
A3 tap
42a
A5 tap
6
A7 tap
83b
A9 tap
104a
10
Atap
11
12
Atap
13
14
Atap
15
16
Atap
17
18
Atap
195a
A1 tap
2
A3 tap
4
A5 tap
6
A7 tap
87b
9
10
11
12
###
13
14
15
16
17
18
19
20
21
22
23
24
25
KANAL 4.138 5.130
1.261 5.000
4.965 m 8.51058 7.335
2.608 2.350 1.925
KANAL
0.972 6.300 m
0.312 2.097 m
6.225 0.219
4.225 2.000 1.448 m
0.312
2.024
12.450 1.400
KANAL
0.660 4.276 m
0.312 2.097 m
4.225 0.219
2.225 2.000 1.448 m
0.312
2.024
8.450 1.400
total
10.5
4.965 4.276
2.954 8.380 5.801 7.802 5.2236
4.000 9.450 5.450
2.5787 2.097 2.5787 2.097
16.450 12.450
0.5 m
18
31.2089
13.4021
20.7232
27.500
6
Bubungan 113.623
Talang 36.0549
Listplang 135.6
1.471
3.689
1.374
Trap2 192.332
Trapesium 384.664 769.328
Segitiga 13.5 74.085 148.1694522282
Segitiga 12 42.078 84.1554884578
Segitiga 10.5 0.000 0
Jajaran Gen 12.747 50.9893813966
Luas Atap 1022.844
12M 8.511
8M 6.374
0.000
3.000 1.5
-3.000
1.5 0.000
4.000
6.374 0.000
2.000 1.500
7.022 m
3.689
8.910 m
0.442 3.023 m
8.803 0.419
0.5 m
5.975 2.828 2.863 m
0.312
JURAI WF 250.125.6.9
2.687 WF 200.150.6.9
KONSOL 1.448 M
2.048
M
total
0.000
0.000
total
64.0000 129.1792 160.0000 80.0000 120.0000 218.7040 10.6200 151.2680 18.1400 150.0000 193,729,098.90
KUSEN JUMLAH KACA ENGSEL JENDELAGRENDEL JENDELA ENGSEL PINTU ENGSEL PINTU LEBAR PINTU TINGGI PINTU LUAS PINTU LEBAR JENDELA TINGGI JENDELA LUAS PINTU
A. PEMBANGUNAN PHISIK
Genset + Gudang
B. PRASARANA LINGKUNGAN
C. KONSULTAN
- DED
#REF!
#REF!
#REF!
#REF!
1,131,958,171.29
#REF!
#REF!
#REF!
#REF!
-
8,043,956.36
53,625,000.00
-
-
75,000,000.00
-
24,500,000.00
DANA APBD
161,168,956.36
426,951,600.00
A. PEMBANGUNAN PHISIK
Genset + Gudang
B. PRASARANA LINGKUNGAN
Sub Total B
PPN 10% (tidak dipungut)
TOTAL B
A. PEMBANGUNAN PHISIK
Sub Total A
TOTAL A