JARAK KEMIRINGAN
NO. STA JARAK PATOK ELEVASI BEDA TINGGI KET
LANGSUNG (%)
PA 0 25
100 -0.1 0.1
1 100 25.10
100 -0.05 0.05
2 200 25.15
100 0 0
3 300 25.15
100 0 0
4 400 25.15
100 0.1 -0.1
5 500 25.05
100 -0.05 0.05
6 600 25.1
50 0 0
7 650 25.1
50 0 0
8 700 25.1
50 0 0
9 750 25.1
50 0 0
10 800 25.1
100 -0.05 0.05
11 900 25.15
100 -0.05 0.05
12 1000 25.2
100 0.05 -0.05
13 1100 25.15
100 0.15 -0.15
14 1200 25
100 -0.3 0.3
15 1300 25.3
100 -4.7 4.7
16 1400 30
100 0 0
17 1500 30
100 4.7 -4.7
18 1600 25.3
50 0.3 -0.3
19 1650 25
50 0 0
20 1700 25
50 0 0
21 1750 25
50 0 0
22 1800 25
Page 1
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
50 0 0
23 1850 25
100 -0.3 0.3
24 1950 25.3
100 -0.15 0.15
25 2050 25.45
100 0 0
PB 2150 25.45
100 -4.55 4.55
26 2250 30
100 4.55 -4.55
27 2350 25.45
100 0 0
28 2450 25.45
100 -4.65 4.65
29 2550 30.1
50 -0.05 0.05
30 2600 30.15
50 0 0
31 2650 30.15
50 0 0
32 2700 30.15
50 0 0
33 2750 30.15
50 0 0
34 2800 30.15
50 0 0
35 2850 30.15
50 0 0
36 2900 30.15
100 -0.2 0.2
37 3000 30.35
100 0.05 -0.05
38 3100 30.3
50 0.3 -0.3
39 3150 30
50 0 0
40 3200 30.0
50 0 0
41 3250 30
100 -0.2 0.2
42 3350 30.2
100 -0.2 0.2
43 3450 30.4
100 -4.6 4.6
44 3550 35
100
PC
Page 2
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
Page 3
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
Page 4
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
2. KLASIFIKASI MEDAN
ADA 3 KLASIFIKASI MEDAN ANTARA LAIN :
ketinggian kota A = 25 m
25 - 25.45
kemiringan medan = X 100%
2150
= -0.02 %
= -0.01 %
Page 5
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
3. PERHITUNGAN PANJANG BUSUR
Panjang busur tikungan adalah :
A. Tikungan I
R = 300 m
D = 50 0
maka :
D
LC = x 2P x R
360
50
= x 6.28 x 300
360
= 261.67 m
B. Tikungan II
R = 300 m
D = 55 0
maka :
D
LC = x 2P x R
360
55
= x 6.28 x 300
360
= 287.83 m
Page 6
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
B. Tikungan III
R = 200 m
D = 60 0
maka :
D
LC = x 2P x R
360
60
= x 6.28 x 200
360
= 209.33 m
B. Tikungan IV
R = 200 m
D = 45 0
maka :
D
LC = x 2P x R
360
45
= x 6.28 x 200
360
= 157.00 m
Page 7
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
4. MENCARI KECEPATAN PADA TIKUNGAN
Fm = -0.000625 VR + 0.19
VR2
R =
127 (e+Fm)
5. PENENTUAN TRASE
emax = 10%
VR = 80 km/jam
Page 8
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
6. DAFTAR KECEPATAN RENCANA
DATAR BUKIT GUNUNG
VR = 80 km/jam
Fm = 0.14
e = 10%
Maka :
V2 = 300 x 127 ( 0.14 + 0.10 )
= 9144
V = 95.62 km/jam
VR = 80 km/jam
Fm = 0.14
e = 10%
Maka:
V2 = 300 x 127 ( 0.14 + 0.10 )
= 9144
V = 95.62 km/jam
Page 9
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
VR = 80 km/jam
Fm = 0.14
e = 10%
Maka :
V2 = 200 x 127 ( 0.14 + 0.10 )
= 6096
V = 78.08 km/jam
VR = 80 km/jam
Fm = 0.14
e = 10%
Maka :
V2 = 200 x 127 ( 0.14 + 0.10 )
= 6096
V = 78.08 km/jam
Page 10
7 PERHITUNGAN SUPERELEVASI
RUMUS VR2
E =
127 x R x Fm x 100 %
Dimana:
E = Superelevasi
Vt = Kecepatan
R = Jari-jari tikungan
Fm = Koefisien (konstanta)
a. Tikungan I
Kecepatan pada tikungan I ,II,II dan IV di dapatkan 95,62 Km/Jam Jadi Fm =……….?
dicari dengan cara Interpolasi karena kecepatan yang didapatkan tidak ada dalam tabel :
FM = 80 x1 0.14 y1
95.62 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
95.62 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
15.62 y2 - 0.14
=
20 -0.03
0.781 y2 - 0.14
=
-0.03
-0.0195 = y2 - 0.14
-0.0195 + 0.14 = y2
0.1205 = y2
y2 = 0.1205
Diketahui :
Vt = 95.62 km/jam
Fm = 0.120
R = 300 m
Maka :
Vt2
E =
127 x R x Fm x 100%
95.62 2
=
127 x 300 x 0.12048 x 100%
= 1.9921
b. Tikungan II
Diketahui :
Vt = 95.6 km/jam
Fm = 0.120
R = 300 m
FM = 80 x1 0.14 y1
95.62 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
95.624 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
15.62 y2 - 0.14
=
20 -0.03
0.781 y2 - 0.14
=
-0.03
-0.0195 = y2 - 0.14
-0.0195 + 0.14 = y2
0.1205 = y2
y2 = 0.1205
Maka :
Vt2
E =
127 x R x Fm x 100%
95.62 2
=
127 x 300 x 0.120 x 100%
= 1.9922
b. Tikungan III
Diketahui :
Vt = 78.1 km/jam
Fm = 0.142
R = 200 m
FM = 80 x1 0.14 y1
78.08 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
78.08 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
-1.92 y2 - 0.14
=
20 -0.03
-0.096 y2 - 0.14
=
-0.03
0.0024 = y2 - 0.14
0.0024 + 0.14 = y2
0.1424 = y2
y2 = 0.1424
Maka :
Vt2
E =
127 x R x Fm x 100%
78.08 2
=
127 x 200 x 0.142 x 100%
= 1.6855
b. Tikungan IV
Diketahui :
Vt = 78.1 km/jam
Fm = 0.142
R = 200 m
FM = 80 x1 0.14 y1
78.08 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
78.08 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
-1.92 y2 - 0.14
=
20 -0.03
-0.096 y2 - 0.14
=
-0.03
0.0024 = y2 - 0.14
0.0024 + 0.14 = y2
0.1424 = y2
y2 = 0.1424
Maka :
Vt2
E =
127 x R x Fm x 100%
78.08 2
=
127 x 200 x 0.142 x 100%
= 1.6855
8 PERHITUNGAN LENGKUNG PERALIHAN
a. Tikungan I
Diketahui :
R = 300 m
D = 50 0
VR = 80 km/jam
Dengan S-S
Syarat :
1
q = D
2
qs x R
Ls =
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*
1
Tt = ( R + P ) x tan D x k
2
( R + P )
Et = - Rc
1
cos D
2
Syarat pemakaian :
1 1 0
q = D = 50 = 25
2 2
qs x R 25 x 300
Ls = = = 261.798 m
28.648 28.648
Lc = 2 x Ls = 2x 261.798 = 523.597 m
Dari tabel J. Barnett :
q = 25 0 Jadi :
P* = 0.0468450 P = P* x Ls
k* = 0.4951154 = 0.046845 x 261.798
= 12.264
k = k* x Ls
= 0.4951154 x 261.798
= 129.620
1
Tt = ( R + P ) x tan D + k
2
1
= ( 300 + 12.264 ) x tan 50 + 129.62
2
= 312.26 x 0.466 + 129.62
= 275.23
( R + P ) ( 300 + 12.264 )
Et = - R = - 300
cos 1 D cos 1 50
2 2
312.264
= - 300
0.906307787
= 44.5451
Dengan S-S
Syarat :
q = 1 D
2
Ls = qs x R
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*
Tt = ( R + P ) x tan 1
D x k
2
Et = ( R + P )
- Rc
1
cos D
2
Syarat pemakaian :
q = 1 D = 1 55 = 27.5 o
2 2
qs x R 27.5 x 300
Ls = = = 287.978 m
28.648 28.648
Lc = 2 x Ls = 575.9564 m
k = k* x Ls
= 0.4951154 x 288
= 142.5825
Tt = ( R + P ) x 1 D k
tan +
2
= ( 300 + 13.490 ) x 1
tan 60 + 142.582
2
= 313.49 x 0.577 + 142.58
= 323.5762
Et = ( R + P ) ( 300 + 13.4903 )
- R = - 300
cos 1 D cos 1 55
2 2
313.4903
= - 300
0.8870108
= 53.4233
Kontrol dengan : 2 Ls < 2 Tt = 2 x 288.0 < 2 x 323.5762
= 575.9564 < 647.152366
= oke !!!!
b. Tikungan III
Diketahui :
R = 200 m
D = 60 0
VR = 80 km/jam
Dengan S-S
Syarat :
q = 1 D
2
Ls = qs x R
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*
Tt = ( R + P ) x tan 1
D x k
2
Et = ( R +P )
- Rc
1
cos D
2
Syarat pemakaian :
q = 1 D = 1 60 = 30.0 o
2 2
qs x R 30 x 200
Ls = = = 209.439 m
28.648 28.648
Lc = 2 x Ls = 418.8774 m
k = k* x Ls
= 0.4951154 x 209.4387042726
= 103.6963
Tt = ( R + P ) x 1 D k
tan +
2
= ( 200 + 9.811 ) x 1
tan 60 + 103.696
2
= 209.81 x 0.577 + 103.70
= 224.8309
Et = ( R + P ) ( 200 + 9.8112 )
- R = - 200
cos 1 D cos 1 60
2 2
209.8112
= - 200
0.8660254
= 42.2691
Kontrol dengan : 2 Ls< 2 Tt = 2 x 209.4 < 2 x 224.8309
= 418.8774 < 449.661711
= oke !!!!
d. Tikungan IV
Diketahui :
R = 200 m
D = 45 0
VR = 80 km/jam
Dengan S-S
Syarat :
q = 1 D
2
Ls = qs x R
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*
Tt = ( R + P ) x tan 1
D x k
2
Et = ( R + P )
- Rc
1
cos D
2
Syarat pemakaian :
q = 1 D = 1 45 = 22.5 o
2 2
qs x R 22.5 x 200
Ls = = = 157.079 m
28.648 28.648
Lc = 2 x Ls = 314.1581 m
k = k* x Ls
= 0.4951154 x 157.079028
= 77.7722
Tt = ( R + P ) x 1 D k
tan +
2
= ( 200 + 7.358 ) x 1
tan 60 + 77.772
2
= 207.36 x 0.577 + 77.77
= 197.4907
Et = ( R + P ) ( 200 + 7.3584 )
- R = - 200
cos 1 D cos 1 45
2 2
207.3584
= - 200
0.9238795
= 24.4431
Kontrol dengan : 2 Ls < 2 Tt = 2 x 157.1 < 2 x 197.4907
= 314.1581 < 394.9813098625
= oke !!!!
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028
9 PERHITUNGAN KEMIRINGAN MELINTANG
a. Tikungan I
Diketahui : R = 300 m
D = 50 0
VR = 80 km/jam
S - S (Spiral-Spiral)
Dipakai e = 10%
b. Tikungan II
Diketahui : R = 300 m
D = 55 0
VR = 80 km/jam
S - S (Spiral-Spiral)
Dipakai e = 10%
c. Tikungan III
Diketahui : R = 200 m
D = 60 0
VR = 80 km/jam
S - S (Spiral-Spiral)
Dipakai e = 10%
d. Tikungan IV
Diketahui : R = 200 m
D = 45 0
VR = 80 km/jam
S - S (Spiral-Spiral)
Dipakai e = 10%
RUMUS
dm = d1 + d2 + d3 + d4
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028
a = Percepatan rata-rata
maka :
d1 a t1
= 0.278 t1 ( V - m + )
2
d2 = 0.278 V t2
d3 = diambil 30 - 100 m
d4 = 2/3 . d2
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028
maka :
d1 a t1
= 0.278 t1 ( V - m + )
2
d2 = 0.278 V t2
d3 = diambil 30 - 100 m
d4 = 2/3 . d2
a = 2.052 + ( 0.0036 x 80 )
= 2.34 km/jam2
Vm = VR + m
= 80 + 15
= 95 km/jam
t1 = 2.12 + 0.026 x VR
= 2.12 + 0.026 x 80 = 4.2
t2 = 6.56 + 0.048 x VR
= 6.56 + 0.048 x 80 = 10.4
Sehingga :
d1 a t1
= 0.278 t1 ( V - m + )
2
= 81.632 m
d2 = 0.278 V . t2
= 231.296 m
d3 = 75 m
d3 30 55 75 90
d4 = 2/3 d2
= 2/3 231.296
= 154.20 m
Jadi :
dm = d1 + d2 + d3 + d4
RUMUS :
dh = dp + dr
Dimana :
VR2
dr =
254 ( fm + L )
Dimana :
VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m
VR2
dr =
254 fm
80 2
=
254 0.1525
= 165.23 m
C00000Perencanaan Geometrik Jalan
by Sahar Wela
209 190 028
b. Untuk Jalan Mendaki (+)
VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m
VR2
dr =
254 ( fm + L )
80 2
=
254 ( 0.1525 + 0.12 )
= 92.466 m
Jadi :
dh = dp + dr
= 55.6 + 92.4655
= 148.066 m
VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m
VR2
dr =
254 ( fm - L )
80 2
=
254 ( 0.1525 - 0.12 )
= 775.29 m
Jadi :
dh = dp + dr
= 55.6 + 775.29
= 830.888 m
12 PERHITUNGAN PELEBARAN JALAN
RUMUS :
B = n ( b' + c ) + ( n - 1 ) Td + 2
dimana :
B = Lebar perkerasan pada hitungan
n = Jumlah jalur lalu lintas
b' = Lebar lintasan pada tikungan
Td = Lebar melintang akibat tanjakan depan (m)
Z = Lebar tambahan akibat kalainan dalam mengemudi
Td = R2 + A ( 2P + A ) - R
0.105 x VR
Z =
R
dimana :
R = Jari-jari tikungan
P = Jarak ban muka dan ban belakang ( 6.100 )
A = Jarak ujung mobil dan ban depan ( 1.2 )
VR = Kecepatan rencana
Rumus pelebaran :
W = B - L W = Pelebaran
B = Lebar total
L = Lebar badan jalan
Syarat I
R = 300 m
VR = 80 km/jam
b' = 2.4 + ( R - R2 - P 2 )
= 2.4620 m
Td = R2 + A ( 2P + A ) - R
= 300.0268 - 300
= 0.0268 m
0.105 x VR
Z =
R
0.105 x 80
=
300
8.4
=
17.3205
= 0.4850
Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.462023 + 0.8 ) + ( 2 - 1 ) x 0.027 + 0.4850
= 6.52405 + 0 + ###
= 7.0358 m > 7 (perlu pelebaran)
c. Tikungan III
R = 200 m
VR = 80 km/jam
b' = 2.4 + ( R - R2 - P2 )
= 2.493 m
Td = R2 + A ( 2P + A ) - R
= 200.040195961 - 200
= 0.0402 m
0.105 x VR
Z =
R
0.105 x 80
=
200
8.4
=
14.1421
= 0.5940
Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.49305 + 0 ) + ( 2 - 1 ) x 0.04020 + 0.5940
= 4.9860932884 + 0.0401959607 + 0.59397
5.6203 m < 7 (tidak perlu pelebaran)
b. Tikungan II
R = 300 m
VR = 80 km/jam
b' = 2.4 + ( R - R2 - P2 )
= 2.462 m
Td = R2 + A ( 2P + A ) - R
= 300.0267988 - 300
= 0.0268 m
0.105 x VR
Z =
R
0.105 x 80
=
300
8.4
=
17.3205
= 0.4850
Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.46202 + 0.8 ) + ( 2 - 1 ) x 0.02680 + 0.4850
= 6.5240461562 + 0.026798803 + 0.48497
7.0358 m > 7 (perlu perlu pelebaran)
d. Tikungan IV
R= 200 m
VR= 80 km/jam
b' = 2.4 + ( R - R 2 - P2 )
= 2.493 m
Td = R2 + A ( 2P + A ) - R
= 200.0402 - 200
= 0.0402 m
0.105 x VR
Z =
R
0.105 x 80
=
200
8.4
=
14.1421
= 0.5940
Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.49305 + 0 ) + ( 2 - 1 ) x 0.04020 + 0.5940
= 4.9860932884 + 0.0401959607 + 0.59397
5.6203 m < 7 (tidak perlu pelebaran)
PERHITUNGAN ALINEMEN VERTIKAL
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0.1
Jadi A = 0 - 0.1
= -0.1
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 60
4
= 15
Y = A . X2 -0.1 x 15 2
=
= 200.LV 200 x 60
= -0.002
A = G1 - G2
Diperoleh : G1 = 0.05
G2 = 0
Jadi A = 0.05 - 0
= 0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 0.05 x 12 2
=
= 200.LV 200 x 48
= 0.001
A = G1 - G2
Diperoleh : G1 = 0.05
G2 = -0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 0.1 x 12 2
=
= 200.LV 200 x 48
= 0.002
A = G1 - G2
Diperoleh : G1 = 0.00
G2 = -4.70
Jadi A = 0 - -4.7
= 4.7
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 4.7 x 12 2
=
= 200.LV 200 x 48
= 0.071
A = G1 - G2
Diperoleh : G1 = 0.00
G2 = 0.30
Jadi A = 0 - 0.3
= -0.3
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 -0.3 x 12 2
=
= 200.LV 200 x 48
= -0.005
A = G1 - G2
Diperoleh : G1 = 4.65
G2 = 0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 4.6 x 12 2
=
= 200.LV 200 x 48
= 0.069
A = G1 - G2
Diperoleh : G1 = 0.00
G2 = 0.00
Jadi A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 0 x 12 2
=
= 200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0.2
Jadi A = A = 0 - 0.2
= -0.2
VR = 80 Km/Jam
Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12
Y = A . X2 = -0.2 x 12.0 2
200.LV 200 x 48
= -0.003
Sta PV = 0
Elevasi = Elevasi PV1 - EV
= 50 - -0.0075
= 50.01
Sta PV = 600
Elevasi = Elevasi PV1 - EV
= 25.1 - 0.003
= 25.10
Sta PV = 1000
Elevasi = Elevasi PV1 - EV
= 25.2 - 0.006
= 25.19
Sta PV = 1600
Elevasi = Elevasi PV1 - EV
= 25.3 - 0.282
= 25.02
Sta PV = 1950
Elevasi = Elevasi PV1 - EV
= 25.3 - -0.018
= 25.32
Sta PV = 2550
Elevasi = Elevasi PV1 - EV
= 30.1 - 0.276
= 29.82
Sta PV = 2850
Elevasi = Elevasi PV1 - EV
= 30.15 - 0
= 30.15
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30 - -0.012
= 30
A = G1 - G2
Diperoleh : G1 = 0.1
G2 = 0.5
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 -0.4
=
200.LV 200
= -0.006
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0 x 12.0
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = -0.05
G2 = -0.15
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0.1 x 12.0
200.LV 200 x 48
= 0.001
A = G1 - G2
Diperoleh : G1 = -4.7
G2 = -0.3
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 -4.4
=
200.LV 200
= -0.066
A = G1 - G2
Diperoleh : G1 = 0.3
G2 = 0.2
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0.15 x 12.0
200.LV 200 x 48
= 0.002
A = G1 - G2
Diperoleh : G1 = 0.05
G2 = 0.0
Jadi A = A = 0.05 - 0
= 0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0.05 x 12.0
200.LV 200 x 48
= 0.00
A = G1 - G2
Diperoleh : G1 = 0.00
G2 = 0.2
Jadi A = A = 0 - 0.2
= -0.2
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = -0.2 x 12.0
200.LV 200 x 48
= 0.00
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0.2
Jadi A = A = 0 - 0.2
= -0.2
VR = 80 Km/Jam
Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12
Y = A . X2 = -0.2 x 12.0 2
200.LV 200 x 48
= -0.003
Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 25.1 - -0.024
= 25.1
x 12.0 2
x 48
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 25.1 - ( 0 x 12.0
= 25.1 - 0 - 0.000
= 25.1
Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 25.1 - 0
= 25.1
2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 116.67 - ( -0.05 x 12.0
= 116.67 - -0.6 - 0.001
= 117.3
Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 116.67 - 0.006
= 116.7
2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 25 - ( -4.7 x 12.0
= 25 - -56.4 - -0.066
= 81.5
Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 25 - -0.264
= 25.3
x 12.0 2
x 48
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 157.69 - ( 0.3 x 12.0
= 157.69 - 3.6 - 0.002
= 154.1
Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 157.69 - 0.009
= 157.7
2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 30.15 - ( 0.05 x 12.0
= 30.15 - 0.6 - 0.001
= 29.5
Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 30.15 - 0.003
= 30.1
2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 30.15 - ( 0 x 12.0
= 30.15 - 0 - -0.003
= 30.2
Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 30.15 - -0.012
= 30.2
2
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30.2 - ( 0 x 12.0 ) - -0.003
= 30.2 - 0 - -0.003
= 30
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30.2 - -0.012
= 30
) + Y
) + -0.006
)
24 )
) - Y
) - 0.000
) + Y
) + 0.000
)
24 )
) - Y
) - 0.001
) + Y
) + 0.001
)
24 )
) - Y
) - -0.066
) + Y
) + -0.066
)
24 )
) - Y
) - 0.002
) + Y
) + 0.002
)
24 )
) - Y
) - 0.001
) + Y
) + 0.001
)
24 )
) - Y
) - -0.003
) + Y
) + -0.003
)
24 )
C. ALINEMEN VERTIKAL P2 (STA 0 + 200)
A = G1 - G2
Diperoleh : G1 = 0.05
G2 = 0
Jadi A = A = 0.05 - 0
= 0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 0.05 x 12.0
=
200.LV 200 x 48
= 0.001
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = -0.15
G2 = 0.3
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 -0.45 x 12.0
=
200.LV 200 x 48
= -0.007
A = G1 - G2
Diperoleh : G1 = -0.3
G2 = 0
Jadi A = A = -0.3 - 0
= -0.3
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 -0.3 x 12.0
=
200.LV 200 x 48
= -0.005
A = G1 - G2
Diperoleh : G1 = 0.15
G2 = 0
Jadi A = A = 0.15 - 0
= 0.15
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 0.15 x 12.0
=
200.LV 200 x 48
= 0.002
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = 0.2
G2 = -0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 0.25 x 12.0
=
200.LV 200 x 48
= 0.004
A = G1 - G2
Diperoleh : G1 = 0.2
G2 = 0.2
VR = 80 Km/Jam
Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25.15 - 0.003
= 25
2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25.1 - ( 0 x 12.0 )
= 25.1 - 0 - 0.000
= 25
Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25.1 - 0
= 25
2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25 - ( -0.15 x 12.0 )
= 25 - -1.8 - -0.007
= 27
Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25 - -0.027
= 25
2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25 - ( -0.3 x 12.0 )
= 25 - -3.6 - -0.005
= 29
Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25 - -0.018
= 25
2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25.45 - ( 0.15 x 12.0 )
= 25.45 - 1.8 - 0.002
= 24
Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25.45 - 0.009
= 25
2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 30.15 - ( 0 x 12.0 )
= 30.15 - 0 - 0.000
= 30
Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 30.15 - 0
= 30
2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 30.35 - ( 0.2 x 12.0 )
= 30.35 - 2.4 - 0.004
= 28
Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 30.35 - 0.015
= 30
2
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30.4 - ( 0.2 x 12.0 ) - 0.000
= 30.4 - 2.4 - 0.000
= 28
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30.4 - 0
= 30
+ Y
+ 0.001
- Y
- 0.000
+ Y
+ 0.000
- Y
- -0.007
+ Y
+ -0.007
- Y
- -0.005
+ Y
+ -0.005
- Y
- 0.002
+ Y
+ 0.002
- Y
- 0.000
+ Y
+ 0.000
- Y
- 0.004
+ Y
+ 0.004
D. ALINEMEN VERTIKAL P3 (STA 0 + 300)
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = -0.15
G2 = 0.3
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = -0.45 x 12.0 2
200.LV 200 x 48
= -0.007
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = 0
G2 = 4.55
Jadi A = A = 0 - 4.55
= -4.55
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = -4.55 x 12.0 2
200.LV 200 x 48
= -0.068
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = -0.05
G2 = -0.3
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0
Y = A . X2 = 0.25 x 12.0 2
200.LV 200 x 48
= 0.004
A = G1 - G2
Diperoleh : G1 = 0.2
G2 = 4.6
VR = 80 Km/Jam
Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12
Y = A . X2 = -4.4 x 12.0 2
200.LV 200 x 48
= -0.066
Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25.15 - 0
= 25
2
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 25.1 - ( 0 x 12.0 )
= 25.1 - 0 - 0.000
= 25
Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25.1 - 0
= 25
Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25.3 - -0.027
= 25
Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25 - 0
= 25
Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 30 - -0.273
= 30
Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 30.15 - 0
= 30
Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 30.3 - 0.015
= 30
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 35 - -0.264
= 35
+ Y
+ 0.000
- Y
- 0.000
+ Y
+ 0.000
- Y
- -0.007
+ Y
+ -0.007
- Y
- 0.000
+ Y
+ 0.000
- Y
- -0.068
+ Y
+ -0.068
- Y
- 0.000
+ Y
+ 0.000
- Y
- 0.004
+ Y
+ 0.004
E. ALINEMEN VERTIKAL P4 (STA 0 + 400)
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0.5
Jadi A = A = 0 - 0.5
= -0.5
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 -0.5 x 12.0
=
200.LV 200 x 48
= -0.008
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0.05
Jadi A = A = 0 - 0.05
= -0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 -0.05 x 12.0
=
200.LV 200 x 48
= -0.001
A = G1 - G2
Diperoleh : G1 = 0.3
G2 = 4.7
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 -4.4 x 12.0
=
200.LV 200 x 48
= -0.066
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = -4.55
G2 = 0
Jadi A = A = -4.55 - 0
= -4.55
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 -4.55 x 12.0
=
200.LV 200 x 48
= -0.068
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = -0.3
G2 = 0
Jadi A = A = -0.3 - 0
= -0.3
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 -0.3 x 12.0
=
200.LV 200 x 48
= -0.005
Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25.15 - -0.03
= 25
Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25.1 - -0.003
= 25
Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 30 - -0.264
= 30
Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25 - 0
= 25
Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25.45 - -0.273
= 26
Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 30.15 - 0
= 30
Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 30 - -0.018
= 30
A = G1 - G2
Diperoleh : G1 = -0.1
G2 = 0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 -0.15 x 12.0
=
200.LV 200 x 48
= -0.002
A = G1 - G2
Diperoleh : G1 = 0.05
G2 = 0.05
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = 4.7
G2 = 0
Jadi A = A = 4.7 - 0
= 4.7
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 = 4.7 x 12.0 2
200.LV 200 x 48
= 0.071
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = 0
G2 = 4.65
Jadi A = A = 0 - 4.65
= -4.65
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 = -4.65 x 12.0 2
200.LV 200 x 48
= -0.070
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
A = G1 - G2
Diperoleh : G1 = 0
G2 = 0
Jadi A = A = 0 - 0
= 0
VR = 80 Km/Jam
Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12
Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25.15 - -0.009
= 25
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25.15 - 0
= 25
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30 - 0.282
= 30
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25 - 0
= 25
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25.45 - -0.279
= 26
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30.15 - 0
= 30
Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30 - 0
= 30
1 1
luas = X Y = 3025.11 2020.22
2 2
1
= x 1005
2
= 502.445 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1 87.05 86.05 76.05 76.05 85.05 2 1.81 1.5
1 1
luas = X Y = 2051.68 3048.59
2 2
1
= x -996.9
2
= -498.455 M2
1 1
luas = X Y = 3025.47 2024.565
2 2
1
= x 1001
2
= 500.4525 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1.5 87.05 86.05 76.05 76.05 85.05 3 2.72 2.25
1 1
luas = X Y = 2071.835 3060.73
2 2
1
= x -988.9
2
= -494.448 M2
1 1
luas = X Y = 3026.11 2025.61
2 2
1
= x 1000.5
2
= 500.25 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1.36 87.05 86.05 76.05 76.05 85.05 2.5 2.29 1.93
1 1
luas = X Y = 2062.315 3055.2
2 2
1
= x -992.9
2
= -496.443 M2
1 1
luas = X Y = 3026.35 2017.295
2 2
1
= x 1009
2
= 504.5275 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.25 87.05 86.05 76.05 76.05 85.05 0.5 0.45 0.38
1 1
luas = X Y = 2021.52 3030.4
2 2
1
= x -1009
2
= -504.44 M2
1 1
luas = X Y = 3025.11 2020.22
2 2
1
= x 1005
2
= 502.445 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1 87.05 86.05 76.05 76.05 85.05 0.5 0.45 0.38
1 1
luas = X Y = 2021.52 3033.4
2 2
1
= x -1012
2
= -505.94 M2
1 1
luas = X Y = 3027.55 2021.145
2 2
1
= x 1006
2
= 503.2025 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.45 87.05 86.05 76.05 76.05 85.05 0.9 0.82 0.7
1 1
luas = X Y = 2029.76 3035.28
2 2
1
= x -1006
2
= -502.76 M2
1 1
luas = X Y = 1295.242 1181.415
2 2
1
= x 113.83
2
= 56.9135 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.49 0.09 0.25 0.49 0.49 85.05 1 0.91 0.75
1 1
luas = X Y = 691.013 702.502
2 2
1
= x -11.49
2
= -5.7445 M2
1 1
luas = X Y = 3025.95 2016.1
2 2
1
= x 1010
2
= 504.925 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.2 87.05 86.05 76.05 76.05 85.05 0.4 0.36 0.32
1 1
luas = X Y = 2019.61 3029.19
2 2
1
= x -1010
2
= -504.79 M2
1 1
luas = X Y = 3025.11 2020.22
2 2
1
= x 1005
2
= 502.445 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1 87.05 86.05 76.05 76.05 85.05 2 1.81 1.5
1 1
luas = X Y = 2051.68 3048.59
2 2
1
= x -996.9
2
= -498.455 M2
1 1
luas = X Y = 3024.91 2018.24
2 2
1
= x 1007
2
= 503.335 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.8 87.05 86.05 76.05 76.05 85.05 1.6 1.45 1.2
1 1
luas = X Y = 2043.65 3043.75
2 2
1
= x -1000
2
= -500.05 M2
1 1
luas = X Y = 3024.91 2018.24
2 2
1
= x 1007
2
= 503.335 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.8 87.05 86.05 76.05 76.05 85.05 1.5 1.36 1.13
1 1
luas = X Y = 2041.675 3042.74
2 2
1
= x -1001
2
= -500.533 M2
1 1
luas = X Y = 3024.91 2018.24
2 2
1
= x 1007
2
= 503.335 M2
B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.8 87.05 86.05 76.05 76.05 85.05 1.5 1.36 1.13
1 1
luas = X Y = 2041.675 3042.74
2 2
1
= x -1001
2
= -500.533 M2
A. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 3 X 100
2
LUAS = 150 M²
VOLUME = 2400 M³
B. GALIAN
LEBAR JALAN = 16 M
1
X ALAS ATAS + ALAT BAWAH X TINGGI
2
1
X 8 X 100
2
LUAS = 400 M²
VOLUME = 6400 M³
C. GALIAN P
LEBAR JALAN = 16 M
16 X 5 X 100
LUAS = 80 M²
VOLUME = 1280 M³
D. GALIAN
LEBAR JALAN = 16 M
1
X ALAS ATAS + ALAT BAWAH X TINGGI
2
1
X 8 X 100
2
LUAS = 400 M²
VOLUME = 6400 M³
E. GALIAN PV6
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 3 X 100
2
LUAS = 150 M²
VOLUME = 2400 M³
F. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 5 X 100
2
LUAS = 250 M²
VOLUME = 4000 M³
G. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 5 X 100
2
LUAS = 250 M²
VOLUME = 4000 M³
G. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 6 X 100
2
LUAS = 300 M²
VOLUME = 4800 M³
NO V. GALIAN
1 31680.000 M³
NO URAIAN KEGIATAN
1M³ GALIAN TANAH VOLUME SAT. HARGA SATUAN JML. HARGA
DENGAN
1 7570.61 M³ Rp 491,183.58 Rp 3,718,559,319.74
MENGGUNAKAN
1M³ ALAT
TIMBUNAN TANAH
BERAT
DENGAN
2 6624.400 M³ Rp 162,680.16 Rp 1,077,658,449.42
MENGGUNAKAN ALAT
1M³ PEKERJAAN
BERAT
3 LAPISAN PONDASI 198800 M³ Rp 99,938.03 Rp 19,867,680,368.97
BAWAH
JUMLAH Rp 24,663,898,138.13
DIBULATKAN Rp 24,700,000,000,00
TERBILANG :
DUA PULUH EMPAT MILYAR TUJUH RATUS JUTA RUPIAH