Anda di halaman 1dari 173

C00000Perencanaan Geometrik Jalan

by. Nasrul Nasir


2215 190 054
1 DAFTAR TINGGI TANAH
DAFTAR TINGGI TANAH

JARAK KEMIRINGAN
NO. STA JARAK PATOK ELEVASI BEDA TINGGI KET
LANGSUNG (%)

PA 0 25
100 -0.1 0.1
1 100 25.10
100 -0.05 0.05
2 200 25.15
100 0 0
3 300 25.15
100 0 0
4 400 25.15
100 0.1 -0.1
5 500 25.05
100 -0.05 0.05
6 600 25.1
50 0 0
7 650 25.1
50 0 0
8 700 25.1
50 0 0
9 750 25.1
50 0 0
10 800 25.1
100 -0.05 0.05
11 900 25.15
100 -0.05 0.05
12 1000 25.2
100 0.05 -0.05
13 1100 25.15
100 0.15 -0.15
14 1200 25
100 -0.3 0.3
15 1300 25.3
100 -4.7 4.7
16 1400 30
100 0 0
17 1500 30
100 4.7 -4.7
18 1600 25.3
50 0.3 -0.3
19 1650 25
50 0 0
20 1700 25
50 0 0
21 1750 25
50 0 0
22 1800 25

Page 1
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054

50 0 0
23 1850 25
100 -0.3 0.3
24 1950 25.3
100 -0.15 0.15
25 2050 25.45
100 0 0
PB 2150 25.45
100 -4.55 4.55
26 2250 30
100 4.55 -4.55
27 2350 25.45
100 0 0
28 2450 25.45
100 -4.65 4.65
29 2550 30.1
50 -0.05 0.05
30 2600 30.15
50 0 0
31 2650 30.15
50 0 0
32 2700 30.15
50 0 0
33 2750 30.15
50 0 0
34 2800 30.15
50 0 0
35 2850 30.15
50 0 0
36 2900 30.15
100 -0.2 0.2
37 3000 30.35
100 0.05 -0.05
38 3100 30.3
50 0.3 -0.3
39 3150 30
50 0 0
40 3200 30.0
50 0 0
41 3250 30
100 -0.2 0.2
42 3350 30.2
100 -0.2 0.2
43 3450 30.4
100 -4.6 4.6
44 3550 35
100
PC

Page 2
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054

Page 3
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054

Page 4
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
2. KLASIFIKASI MEDAN
ADA 3 KLASIFIKASI MEDAN ANTARA LAIN :

a. Daerah datar dengan kemiringan maksimum : 0.00 % - 9.90%

b. Daerah bukit dengan kemiringan maksimum : 10.00 % - 24 % - 24.9%

c. Daerah gunung dengan kemiringan maksimum : 25.00 % - Keatas

Kota A dan kota B

ketinggian kota A = 25 m

ketinggian kota B = 25.45 m

jarak kota A - B = 2150 m

25 - 25.45
kemiringan medan = X 100%
2150

= -0.02 %

Kota B dan kota C

ketinggian kota B = 25.45 m

ketinggian kota C = 35.0 m

jarak kota B - C = 1600 m

kemiringan medan 25.45 - 35.0


= X 100%
1600

= -0.01 %

maka klasifikasi kedua daerah ini adalah :

- Kota A dan kota B termasuk daerah datar

- Kota B dan kota C termasuk daerah datar

Page 5
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
3. PERHITUNGAN PANJANG BUSUR
Panjang busur tikungan adalah :

A. Tikungan I

Panjang busur antara P5 - P10

R = 300 m

D = 50 0

maka :
D
LC = x 2P x R
360

50
= x 6.28 x 300
360

= 261.67 m

B. Tikungan II

Panjang busur antara P18 - P23

R = 300 m

D = 55 0

maka :
D
LC = x 2P x R
360

55
= x 6.28 x 300
360

= 287.83 m

Page 6
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054

B. Tikungan III

Panjang busur antara P30 - P35

R = 200 m

D = 60 0

maka :
D
LC = x 2P x R
360

60
= x 6.28 x 200
360

= 209.33 m

B. Tikungan IV

Panjang busur antara P39- P41

R = 200 m

D = 45 0

maka :
D
LC = x 2P x R
360

45
= x 6.28 x 200
360

= 157.00 m

- Panjang tikungan I (LC1) = 261.67 m

- Panjang tikungan II (LC2) = 287.83 m

- Panjang tikungan III (LC3) = 209.33 m

- Panjang tikungan IV (LC4) = 157.00 m

Page 7
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
4. MENCARI KECEPATAN PADA TIKUNGAN
Fm = -0.000625 VR + 0.19

VR2
R =
127 (e+Fm)

Dimana e= kemiringan elevasi jalan yaitu 10 % atau 9,9%

VR2 = R x 127 (e+Fm)

Km/Jam 30 40 60 80 100 120

Fm 0.17125 0.165 0.1525 0.14 0.115 0.10

5. PENENTUAN TRASE

Dari perhitungan klasifikasi medan didapat :

A-B = (0.02) % Berarti daerah ini termasuk datar

B-C = 0.01 % Berarti daerah ini termasuk datar

Batas besaran R minimum Indonesia ditetapkan oleh Bina Marga


sebagai berikut :
Kecepatan Rencana (Km/Jam) Jari-jari lengkung dengan
emaks = 10 %
120 600
100 370
90 280
80 210
60 115
50 80
40 50
30 30
20 15

Pada medan datar Rminimum = 210 m

emax = 10%

VR = 80 km/jam

Page 8
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054
6. DAFTAR KECEPATAN RENCANA
DATAR BUKIT GUNUNG

80 Km/Jam 60 Km/Jam 40 Km/Jam

Kecepatan pada tikungan I dari patok 5-10


DIK. R = 300 m

VR = 80 km/jam

Fm = 0.14

e = 10%
Maka :
V2 = 300 x 127 ( 0.14 + 0.10 )

= 9144

V = 95.62 km/jam

Kecepatan pada tikungan II dari patok 18-23


DIK. R = 300 m

VR = 80 km/jam

Fm = 0.14

e = 10%
Maka:
V2 = 300 x 127 ( 0.14 + 0.10 )

= 9144

V = 95.62 km/jam

Page 9
C00000Perencanaan Geometrik Jalan
by. Nasrul Nasir
2215 190 054

Kecepatan pada tikungan III dari patok 30-35


DIK. R = 200 m

VR = 80 km/jam

Fm = 0.14

e = 10%
Maka :
V2 = 200 x 127 ( 0.14 + 0.10 )

= 6096

V = 78.08 km/jam

Kecepatan pada tikungan IV dari patok 39-41


DIK. R = 200 m

VR = 80 km/jam

Fm = 0.14

e = 10%
Maka :
V2 = 200 x 127 ( 0.14 + 0.10 )

= 6096

V = 78.08 km/jam

Page 10
7 PERHITUNGAN SUPERELEVASI

RUMUS VR2
E =
127 x R x Fm x 100 %

Dimana:
E = Superelevasi
Vt = Kecepatan
R = Jari-jari tikungan
Fm = Koefisien (konstanta)

a. Tikungan I
Kecepatan pada tikungan I ,II,II dan IV di dapatkan 95,62 Km/Jam Jadi Fm =……….?
dicari dengan cara Interpolasi karena kecepatan yang didapatkan tidak ada dalam tabel :

FM = 80 x1 0.14 y1
95.62 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
95.62 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
15.62 y2 - 0.14
=
20 -0.03
0.781 y2 - 0.14
=
-0.03
-0.0195 = y2 - 0.14
-0.0195 + 0.14 = y2
0.1205 = y2
y2 = 0.1205
Diketahui :
Vt = 95.62 km/jam
Fm = 0.120
R = 300 m

Maka :
Vt2
E =
127 x R x Fm x 100%

95.62 2
=
127 x 300 x 0.12048 x 100%

= 1.9921

b. Tikungan II

Diketahui :
Vt = 95.6 km/jam
Fm = 0.120
R = 300 m

FM = 80 x1 0.14 y1
95.62 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
95.624 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
15.62 y2 - 0.14
=
20 -0.03
0.781 y2 - 0.14
=
-0.03
-0.0195 = y2 - 0.14
-0.0195 + 0.14 = y2
0.1205 = y2
y2 = 0.1205

Maka :
Vt2
E =
127 x R x Fm x 100%

95.62 2
=
127 x 300 x 0.120 x 100%

= 1.9922

b. Tikungan III

Diketahui :
Vt = 78.1 km/jam
Fm = 0.142
R = 200 m

FM = 80 x1 0.14 y1
78.08 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
78.08 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
-1.92 y2 - 0.14
=
20 -0.03
-0.096 y2 - 0.14
=
-0.03
0.0024 = y2 - 0.14
0.0024 + 0.14 = y2
0.1424 = y2
y2 = 0.1424

Maka :
Vt2
E =
127 x R x Fm x 100%

78.08 2
=
127 x 200 x 0.142 x 100%

= 1.6855

b. Tikungan IV

Diketahui :
Vt = 78.1 km/jam
Fm = 0.142
R = 200 m

FM = 80 x1 0.14 y1
78.08 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
78.08 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
-1.92 y2 - 0.14
=
20 -0.03
-0.096 y2 - 0.14
=
-0.03
0.0024 = y2 - 0.14
0.0024 + 0.14 = y2
0.1424 = y2
y2 = 0.1424

Maka :
Vt2
E =
127 x R x Fm x 100%

78.08 2
=
127 x 200 x 0.142 x 100%

= 1.6855
8 PERHITUNGAN LENGKUNG PERALIHAN

a. Tikungan I
Diketahui :
R = 300 m
D = 50 0
VR = 80 km/jam
Dengan S-S

Syarat :
1
q = D
2
qs x R
Ls =
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*

1
Tt = ( R + P ) x tan D x k
2

( R + P )
Et = - Rc
1
cos D
2
Syarat pemakaian :

1 1 0
q = D = 50 = 25
2 2

qs x R 25 x 300
Ls = = = 261.798 m
28.648 28.648

Lc = 2 x Ls = 2x 261.798 = 523.597 m
Dari tabel J. Barnett :
q = 25 0 Jadi :
P* = 0.0468450 P = P* x Ls
k* = 0.4951154 = 0.046845 x 261.798
= 12.264

k = k* x Ls
= 0.4951154 x 261.798
= 129.620
1
Tt = ( R + P ) x tan D + k
2
1
= ( 300 + 12.264 ) x tan 50 + 129.62
2
= 312.26 x 0.466 + 129.62
= 275.23

( R + P ) ( 300 + 12.264 )
Et = - R = - 300
cos 1 D cos 1 50
2 2
312.264
= - 300
0.906307787
= 44.5451

Kontrol dengan : 2 Ls < 2 Tt = 2 x 261.8 < 2 x 275.231


= 523.59676068 < 550.46295756
= oke !!!!
b. Tikungan II
Diketahui :
R = 300 m
D = 55 0
VR = 80 km/jam

Dengan S-S

Syarat :
q = 1 D
2
Ls = qs x R
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*

Tt = ( R + P ) x tan 1
D x k
2
Et = ( R + P )
- Rc
1
cos D
2
Syarat pemakaian :

q = 1 D = 1 55 = 27.5 o
2 2

qs x R 27.5 x 300
Ls = = = 287.978 m
28.648 28.648

Lc = 2 x Ls = 575.9564 m

Dari tabel J. Barnett :


q = 28 0 Jadi :
P* = 0.0468450 P = P* x Ls
k* = 0.4951154 = 0.046845 x 288
= 13.4903

k = k* x Ls
= 0.4951154 x 288
= 142.5825

Tt = ( R + P ) x 1 D k
tan +
2
= ( 300 + 13.490 ) x 1
tan 60 + 142.582
2
= 313.49 x 0.577 + 142.58
= 323.5762
Et = ( R + P ) ( 300 + 13.4903 )
- R = - 300
cos 1 D cos 1 55
2 2
313.4903
= - 300
0.8870108

= 53.4233
Kontrol dengan : 2 Ls < 2 Tt = 2 x 288.0 < 2 x 323.5762
= 575.9564 < 647.152366
= oke !!!!
b. Tikungan III
Diketahui :
R = 200 m
D = 60 0
VR = 80 km/jam

Dengan S-S

Syarat :
q = 1 D
2
Ls = qs x R
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*

Tt = ( R + P ) x tan 1
D x k
2
Et = ( R +P )
- Rc
1
cos D
2
Syarat pemakaian :

q = 1 D = 1 60 = 30.0 o
2 2

qs x R 30 x 200
Ls = = = 209.439 m
28.648 28.648

Lc = 2 x Ls = 418.8774 m

Dari tabel J. Barnett :


q = 30 0 Jadi :
P* = 0.0468450 P = P* x Ls
k* = 0.4951154 = 0.046845 x 209.4387042726
= 9.8112

k = k* x Ls
= 0.4951154 x 209.4387042726
= 103.6963

Tt = ( R + P ) x 1 D k
tan +
2
= ( 200 + 9.811 ) x 1
tan 60 + 103.696
2
= 209.81 x 0.577 + 103.70
= 224.8309
Et = ( R + P ) ( 200 + 9.8112 )
- R = - 200
cos 1 D cos 1 60
2 2
209.8112
= - 200
0.8660254

= 42.2691
Kontrol dengan : 2 Ls< 2 Tt = 2 x 209.4 < 2 x 224.8309
= 418.8774 < 449.661711
= oke !!!!
d. Tikungan IV
Diketahui :
R = 200 m
D = 45 0
VR = 80 km/jam

Dengan S-S

Syarat :
q = 1 D
2
Ls = qs x R
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*

Tt = ( R + P ) x tan 1
D x k
2
Et = ( R + P )
- Rc
1
cos D
2
Syarat pemakaian :

q = 1 D = 1 45 = 22.5 o
2 2

qs x R 22.5 x 200
Ls = = = 157.079 m
28.648 28.648

Lc = 2 x Ls = 314.1581 m

Dari tabel J. Barnett :


q = 23 0 Jadi :
P* = 0.0468450 P = P* x Ls
k* = 0.4951154 = 0.046845 x 157.079028
= 7.3584

k = k* x Ls
= 0.4951154 x 157.079028
= 77.7722

Tt = ( R + P ) x 1 D k
tan +
2
= ( 200 + 7.358 ) x 1
tan 60 + 77.772
2
= 207.36 x 0.577 + 77.77
= 197.4907
Et = ( R + P ) ( 200 + 7.3584 )
- R = - 200
cos 1 D cos 1 45
2 2
207.3584
= - 200
0.9238795

= 24.4431
Kontrol dengan : 2 Ls < 2 Tt = 2 x 157.1 < 2 x 197.4907
= 314.1581 < 394.9813098625
= oke !!!!
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028
9 PERHITUNGAN KEMIRINGAN MELINTANG

a. Tikungan I
Diketahui : R = 300 m
D = 50 0
VR = 80 km/jam

S - S (Spiral-Spiral)
Dipakai e = 10%

b. Tikungan II
Diketahui : R = 300 m
D = 55 0
VR = 80 km/jam

S - S (Spiral-Spiral)
Dipakai e = 10%

c. Tikungan III
Diketahui : R = 200 m
D = 60 0
VR = 80 km/jam

S - S (Spiral-Spiral)
Dipakai e = 10%

d. Tikungan IV
Diketahui : R = 200 m
D = 45 0
VR = 80 km/jam

S - S (Spiral-Spiral)
Dipakai e = 10%

10 PERHITUNGAN JARAK PANDANG BEBAS (MENYIAP)

RUMUS
dm = d1 + d2 + d3 + d4
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028

dm = Jarak pandang menyiap

d1 = Jarak yang ditempuh selama kendaraan menyiap :

d2 = Jarak yang ditempuh kendaraan menyiap selama jalur kanan

d3 = Jarak antara kendaraan yang menyiap dengan lendaraan yang datang

d4 = Jarak yang ditempuh untuk kendaraan yag menyiap

m = Perbedaan kecepatan ( 15 km/jam )

a = Percepatan rata-rata

maka :
d1 a t1
= 0.278 t1 ( V - m + )
2

d2 = 0.278 V t2

d3 = diambil 30 - 100 m

d4 = 2/3 . d2
FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028

maka :
d1 a t1
= 0.278 t1 ( V - m + )
2

d2 = 0.278 V t2

d3 = diambil 30 - 100 m

d4 = 2/3 . d2

a = 2.052 + ( 0.0036 x 80 )

= 2.34 km/jam2

Vm = VR + m

= 80 + 15

= 95 km/jam

t1 = 2.12 + 0.026 x VR
= 2.12 + 0.026 x 80 = 4.2
t2 = 6.56 + 0.048 x VR
= 6.56 + 0.048 x 80 = 10.4
Sehingga :
d1 a t1
= 0.278 t1 ( V - m + )
2
= 81.632 m

d2 = 0.278 V . t2

= 231.296 m

d3 = 75 m

VR 50-65 65-80 80-95 95-110

d3 30 55 75 90

d4 = 2/3 d2
= 2/3 231.296
= 154.20 m

Jadi :
dm = d1 + d2 + d3 + d4

dm = 81.632 + 231.296 + 75 + 154.20


FF0000Perencenaan Geometric Jalan
by Sahar Wela
209 190 028
= 542.1249 m
C00000Perencanaan Geometrik Jalan
by Sahar Wela
209 190 028
### PERHITUNGAN JARAK PANDANG HENTI

RUMUS :

dh = dp + dr

Dimana :

dh = Jarak yang ditempuh kendaraan dari waktu melihat benda


dimana harus berhenti sampai mengijak rem
dp = 0.278 x VR x tR
VR = Kecepatan
tR = Waktu berhenti ( 2.5 sekon )

Rumus untuk jalan mendaki dan menurun :

VR2
dr =
254 ( fm + L )

Dimana :

VR = Kecepatan rencana (km/jam)


fm = Koefisien gesek maksimum
L = kelandaian (12 % = 0,12)

a. Untuk Jalan datar

VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m

VR2
dr =
254 fm

80 2
=
254 0.1525
= 165.23 m
C00000Perencanaan Geometrik Jalan
by Sahar Wela
209 190 028
b. Untuk Jalan Mendaki (+)

VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m

VR2
dr =
254 ( fm + L )

80 2
=
254 ( 0.1525 + 0.12 )

= 92.466 m

Jadi :
dh = dp + dr

= 55.6 + 92.4655

= 148.066 m

c. Untuk Jalan menurun (-)

VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m

VR2
dr =
254 ( fm - L )

80 2
=
254 ( 0.1525 - 0.12 )

= 775.29 m

Jadi :
dh = dp + dr

= 55.6 + 775.29
= 830.888 m
12 PERHITUNGAN PELEBARAN JALAN

RUMUS :

B = n ( b' + c ) + ( n - 1 ) Td + 2

dimana :
B = Lebar perkerasan pada hitungan
n = Jumlah jalur lalu lintas
b' = Lebar lintasan pada tikungan
Td = Lebar melintang akibat tanjakan depan (m)
Z = Lebar tambahan akibat kalainan dalam mengemudi

c = Kebebasan samping ( 0.8 )

Untuk : b' = 2.4 + ( R - R2 - P2 )

Td = R2 + A ( 2P + A ) - R

0.105 x VR
Z =
R
dimana :

R = Jari-jari tikungan
P = Jarak ban muka dan ban belakang ( 6.100 )
A = Jarak ujung mobil dan ban depan ( 1.2 )
VR = Kecepatan rencana

Rumus pelebaran :

W = B - L W = Pelebaran
B = Lebar total
L = Lebar badan jalan

Syarat I

Bila B < 7 tidak perlu pelebaran


Bila B > 7 Perlu pelebaran
a. Tikungan I

R = 300 m
VR = 80 km/jam

b' = 2.4 + ( R - R2 - P 2 )

= 2.4 + ( 300 - 300 2 - 6.100 2 )

= 2.4 + ( 300 - 299.94 )

= 2.4620 m

Td = R2 + A ( 2P + A ) - R

= 300 2 + 1.20 ( ( 2 x 6.1 ) + 1.2 ) - 300

= 300.0268 - 300

= 0.0268 m

0.105 x VR
Z =
R

0.105 x 80
=
300
8.4
=
17.3205

= 0.4850

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.462023 + 0.8 ) + ( 2 - 1 ) x 0.027 + 0.4850
= 6.52405 + 0 + ###
= 7.0358 m > 7 (perlu pelebaran)
c. Tikungan III

R = 200 m
VR = 80 km/jam

b' = 2.4 + ( R - R2 - P2 )

= 2.4 + ( 200 - 200 2 - 6.100 2 )

= 2.4 + ( 200 - 199.907 )

= 2.493 m

Td = R2 + A ( 2P + A ) - R

= 200 2 + 1.2 ( ( 2x 6.1 ) + 1.2 ) - 200

= 200.040195961 - 200

= 0.0402 m

0.105 x VR
Z =
R

0.105 x 80
=
200
8.4
=
14.1421

= 0.5940

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.49305 + 0 ) + ( 2 - 1 ) x 0.04020 + 0.5940
= 4.9860932884 + 0.0401959607 + 0.59397
5.6203 m < 7 (tidak perlu pelebaran)
b. Tikungan II

R = 300 m
VR = 80 km/jam

b' = 2.4 + ( R - R2 - P2 )

= 2.4 + ( 300 - 300 2 - 6.100 2 )

= 2.4 + ( 300 - 299.93798 )

= 2.462 m

Td = R2 + A ( 2P + A ) - R

= 300 2 + 1.2 ( ( 2x 6.1 ) + 1.2 ) - 300

= 300.0267988 - 300

= 0.0268 m

0.105 x VR
Z =
R

0.105 x 80
=
300
8.4
=
17.3205

= 0.4850

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.46202 + 0.8 ) + ( 2 - 1 ) x 0.02680 + 0.4850
= 6.5240461562 + 0.026798803 + 0.48497
7.0358 m > 7 (perlu perlu pelebaran)
d. Tikungan IV

R= 200 m
VR= 80 km/jam

b' = 2.4 + ( R - R 2 - P2 )

= 2.4 + ( 200 - 200 2 - 6.100 2 )

= 2.4 + ( 200 - 199.907 )

= 2.493 m

Td = R2 + A ( 2P + A ) - R

= 200 2 + 1.2 ( ( 2x 6.1 ) + 1.2 ) - 200

= 200.0402 - 200

= 0.0402 m

0.105 x VR
Z =
R

0.105 x 80
=
200
8.4
=
14.1421

= 0.5940

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.49305 + 0 ) + ( 2 - 1 ) x 0.04020 + 0.5940
= 4.9860932884 + 0.0401959607 + 0.59397
5.6203 m < 7 (tidak perlu pelebaran)
PERHITUNGAN ALINEMEN VERTIKAL

A. ALINEMEN VERTIKAL PA (STA 0 + 000)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0.1

Jadi A = 0 - 0.1
= -0.1

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + #REF! = 50 m
Station = 0 + 0.000 = 0m

Berdasarkan grafik V maka :


LV = 60
EV = A x LV -0.1 x 60
=
800 800
= -0.0075

Peninjauan titik
1
Misalnya X = LV
4
1
= 60
4
= 15

Y = A . X2 -0.1 x 15 2
=
= 200.LV 200 x 60
= -0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 15 30
Y -0.002 -0.0075

Sta PLV = Sta PV1 - 1/2LV


= 0 - 30
= -30

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 50 - ( 0 x 30 )
= 50 - 0
= 50.00

Sta 1/4 LV = Sta PLV + 1/4 LV


= -30 + 15
= -15 meter
ALINEMEN VERTIKAL P6 (STA 0 + 600)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.05
G2 = 0

Jadi A = 0.05 - 0
= 0.05

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.10 = 25.10 m
Station = 0 + 600 = 600 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV 0.05 x 48
=
800 800
= 0.0030

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 0.05 x 12 2
=
= 200.LV 200 x 48
= 0.001

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12 24
Y 0.001 0.0030

Sta PLV = Sta PV1 - 1/2LV


= 600 - 24
= 576

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 25.1 - ( 0.0005 x 24 )
= 25.1 - 0.012
= 25.09

Sta 1/4 LV = Sta PLV + 1/4 LV


= 576 + 12
= 588 meter
ALINEMEN VERTIKAL P12 (STA 1 + 000)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.05
G2 = -0.05

Jadi A = 0.05 - -0.05


= 0.1

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.20 = 25.20 m
Station = 1 + 0 = 1000 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV 0.1 x 48
=
800 800
= 0.0060

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 0.1 x 12 2
=
= 200.LV 200 x 48
= 0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12 24
Y 0.002 0.0060

Sta PLV = Sta PV1 - 1/2LV


= 1000 - 24
= 976

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 25.2 - ( 0.0005 x 24 )
= 25.2 - 0.012
= 25.19

Sta 1/4 LV = Sta PLV + 1/4 LV


= 976 + 12
= 988 meter
ALINEMEN VERTIKAL P18 (STA 1 + 600)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.00
G2 = -4.70

Jadi A = 0 - -4.7
= 4.7

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.30 = 25.3 m
Station = 1 + 600 = 1600 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV 4.7 x 48
=
800 800
= 0.2820

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 4.7 x 12 2
=
= 200.LV 200 x 48
= 0.071

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12 24
Y 0.071 0.2820

Sta PLV = Sta PV1 - 1/2LV


= 1600 - 24
= 1576

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 25.3 - ( 0 x 24 )
= 25.3 - 0
= 25.30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1576 + 12
= 1588 meter
ALINEMEN VERTIKAL P24 (STA 1 + 950)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.00
G2 = 0.30

Jadi A = 0 - 0.3
= -0.3

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.30 = 25.3 m
Station = 1 + 950 = 1950 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV -0.3 x 48
=
800 800
= -0.0180

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -0.3 x 12 2
=
= 200.LV 200 x 48
= -0.005

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12 24
Y -0.005 -0.0180

Sta PLV = Sta PV1 - 1/2LV


= 1950 - 24
= 1926

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 25.3 - ( 0 x 24 )
= 25.3 - 0
= 25.30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1926 + 12
= 1938 meter
ALINEMEN VERTIKAL P29 (STA 2 + 550)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 4.65
G2 = 0.05

Jadi A = 4.65 - 0.05


= 4.6

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.10 = 30.1 m
Station = 2 + 550 = 2550 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV 4.6 x 48
=
800 800
= 0.2760

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 4.6 x 12 2
=
= 200.LV 200 x 48
= 0.069

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12 24
Y 0.069 0.2760

Sta PLV = Sta PV1 - 1/2LV


= 2550 - 24
= 2526

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 30.1 - ( 0.0465 x 24 )
= 30.1 - 1.116
= 28.98

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2526 + 12
= 2538 meter
ALINEMEN VERTIKAL P35 (STA 2 + 850)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.00
G2 = 0.00

Jadi A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.15 = 30.2 m
Station = 2 + 850 = 2850 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV 0 x 48
=
800 800
= 0.0000

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 0 x 12 2
=
= 200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12 24
Y 0.000 0.0000

Sta PLV = Sta PV1 - 1/2LV


= 2850 - 24
= 2826

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 30.15 - ( 0 x 24 )
= 30.15 - 0
= 30.15

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2826 + 12
= 2838 meter
ALINEMEN VERTIKAL P41 (STA 3 + 250)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0.2

Jadi A = A = 0 - 0.2
= -0.2

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30 = 30.0 m
Station = 3 + 250 = 3250 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.2 x 48
800 800
= -0.012

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = -0.2 x 12.0 2
200.LV 200 x 48
= -0.003

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.003 -0.012

Sta PLV = Sta PV6 - 1/2LV


= 3250 - 24
= 3226

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 30 - ( 0 x 24 )
= 30 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 3226.0 + 12.0
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 50 - ( 0.00 x 15 ) - -0.002
= 50 - 0 - -0.002
= 50.0

Sta PV = 0
Elevasi = Elevasi PV1 - EV
= 50 - -0.0075
= 50.01

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 0 + 15
= 15

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 50 + ( 0.00 x 15 ) + -0.002
= 50 + 0.0131
= 50.01

Sta PEV = Sta PV1 + 1/2 LV


= 0 + 30
= 30

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 50 + ( 0.00 x 30 )
= 50 + 0.03
= 50.03
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 25.1 - ( 0.00 x 12 ) - 0.001
= 25.1 - 0.006 - 0.001
= 25.1

Sta PV = 600
Elevasi = Elevasi PV1 - EV
= 25.1 - 0.003
= 25.10

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 600 + 12
= 612

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 25.1 + ( 0.00 x 12 ) + 0.001
= 25.1 + 0.0008
= 25.10

Sta PEV = Sta PV1 + 1/2 LV


= 600 + 24
= 624

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 25.1 + ( 0.00 x 24 )
= 25.1 + 0
= 25.1
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 25.2 - ( 0.00 x 12 ) - 0.002
= 25.2 - 0.006 - 0.002
= 25.2

Sta PV = 1000
Elevasi = Elevasi PV1 - EV
= 25.2 - 0.006
= 25.19

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 1000 + 12
= 1012

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 25.2 + ( 0.00 x 12 ) + 0.002
= 25.2 + -0.0045
= 25.20

Sta PEV = Sta PV1 + 1/2 LV


= 1000 + 24
= 1024

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 25.2 + ( 0.00 x 24 )
= 25.2 + -0.012
= 25.188
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 25.3 - ( 0.00 x 12 ) - 0.071
= 25.3 - 0 - 0.071
= 25.2

Sta PV = 1600
Elevasi = Elevasi PV1 - EV
= 25.3 - 0.282
= 25.02

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 1600 + 12
= 1612

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 25.3 + ( -0.05 x 12 ) + 0.071
= 25.3 + -0.4935
= 24.81

Sta PEV = Sta PV1 + 1/2 LV


= 1600 + 24
= 1624

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 25.3 + ( -0.05 x 24 )
= 25.3 + -1.128
= 24.172
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 25.3 - ( 0.00 x 12 ) - -0.005
= 25.3 - 0 - -0.005
= 25.3

Sta PV = 1950
Elevasi = Elevasi PV1 - EV
= 25.3 - -0.018
= 25.32

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 1950 + 12
= 1962

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 25.3 + ( 0.00 x 12 ) + -0.005
= 25.3 + 0.0315
= 25.33

Sta PEV = Sta PV1 + 1/2 LV


= 1950 + 24
= 1974

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 25.3 + ( 0.00 x 24 )
= 25.3 + 0.072
= 25.372
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 30.1 - ( 0.05 x 12 ) - 0.069
= 30.1 - 0.558 - 0.069
= 29.5

Sta PV = 2550
Elevasi = Elevasi PV1 - EV
= 30.1 - 0.276
= 29.82

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 2550 + 12
= 2562

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 30.1 + ( 0.00 x 12 ) + 0.069
= 30.1 + 0.0750
= 30.18

Sta PEV = Sta PV1 + 1/2 LV


= 2550 + 24
= 2574

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 30.1 + ( 0.00 x 24 )
= 30.1 + 0.012
= 30.112
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 30.15 - ( 0.00 x 12 ) - 0.000
= 30.15 - 0 - 0.000
= 30.2

Sta PV = 2850
Elevasi = Elevasi PV1 - EV
= 30.15 - 0
= 30.15

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 2850 + 12
= 2862

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 30.15 + ( 0.00 x 12 ) + 0.000
= 30.15 + 0.0000
= 30.15

Sta PEV = Sta PV1 + 1/2 LV


= 2850 + 24
= 2874

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 30.15 + ( 0.00 x 24 )
= 30.15 + 0
= 30.15
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30 - ( 0 x 12.0 ) - -0.003
= 30 - 0 - -0.003
= 30

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30 - -0.012
= 30

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 3250 + 12
= 3262

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 30 + ( 0.00 x 12 ) + -0.003
= 30 + 0.021
= 30

Sta PEV = Sta PV6 + 1/2 LV


= 3250 + 24
= 3274

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 30 + ( 0.00 x 24 )
= 30 + 0.048
= 30
B. ALINEMEN VERTIKAL P1 (STA 0 + 100)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.1
G2 = 0.5

Jadi A = A = 0.1 - 0.5


= -0.4

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.10 = 25.10 m
Station = 0 + 100 = 100 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.4 x
800 800
= -0.02

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 -0.4
=
200.LV 200
= -0.006

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.006 -0.02

Sta PLV = Sta PV2 - 1/2LV


= 100 - 24
= 76

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 25.1 - ( 0.001 x 24 )
= 25.1 - 0.024
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 76.0 + 12.0
= 88 meter
ALINEMEN VERTIKAL P7 (STA 0 + 650)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.10 = 25.10 m
Station = 0 + 650 = 650 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x
800 800
= 0.00

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0 x 12.0
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.00

Sta PLV = Sta PV2 - 1/2LV


= 650 - 24
= 626

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 25.1 - ( 0 x 24 )
= 25.1 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 626.0 + 12.0
= 638 meter
ALINEMEN VERTIKAL P13 (STA 1 + 100)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.05
G2 = -0.15

Jadi A = A = -0.05 - -0.15


= 0.1

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.15 = 116.67 m
Station = 1 + 100 = 1100 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.1 x
800 800
= 0.01

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0.1 x 12.0
200.LV 200 x 48
= 0.001

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.001 0.01

Sta PLV = Sta PV2 - 1/2LV


= 1100 - 24
= 1076

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 116.67 - ( -0.0005 x 24 )
= 116.67 - -0.012
= 117

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1076.0 + 12.0
= 1088 meter
ALINEMEN VERTIKAL P19 (STA 1 + 650)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -4.7
G2 = -0.3

Jadi A = A = -4.7 - -0.3


= -4.4

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.00 = 25.00 m
Station = 1 + 650 = 1650 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -4.4 x
800 800
= -0.26

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 -4.4
=
200.LV 200
= -0.066

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.066 -0.26

Sta PLV = Sta PV2 - 1/2LV


= 1650 - 24
= 1626

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 25 - ( -0.047 x 24 )
= 25 - -1.128
= 26

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1626.0 + 12.0
= 1638 meter
ALINEMEN VERTIKAL P25 (STA 2 + 050)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.3
G2 = 0.2

Jadi A = A = 0.3 - 0.15


= 0.15

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.45 = 157.69 m
Station = 2 + 50 = 2050 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.15 x
800 800
= 0.01

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0.15 x 12.0
200.LV 200 x 48
= 0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.002 0.01

Sta PLV = Sta PV2 - 1/2LV


= 2050 - 24
= 2026

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 157.69 - ( 0.003 x 24 )
= 157.69 - 0.072
= 158

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2026.0 + 12.0
= 2038 meter
ALINEMEN VERTIKAL P30 (STA 2 + 600)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.05
G2 = 0.0

Jadi A = A = 0.05 - 0
= 0.05

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.15 = 30.15 m
Station = 2 + 600 = 2600 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.05 x
800 800
= 0.00

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0.05 x 12.0
200.LV 200 x 48
= 0.00

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.001 0.00

Sta PLV = Sta PV2 - 1/2LV


= 2600 - 24
= 2576

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 30.15 - ( 0.0005 x 24 )
= 30.15 - 0.012
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2576.0 + 12.0
= 2588 meter
ALINEMEN VERTIKAL P36 (STA 2 + 900)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.00
G2 = 0.2

Jadi A = A = 0 - 0.2
= -0.2

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.15 = 30.15 m
Station = 2 + 900 = 2900 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.2 x
800 800
= -0.01

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = -0.2 x 12.0
200.LV 200 x 48
= 0.00

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.003 -0.01

Sta PLV = Sta PV2 - 1/2LV


= 2900 - 24
= 2876

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 30.15 - ( 0 x 24 )
= 30.15 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2876.0 + 12.0
= 2888 meter
ALINEMEN VERTIKAL P42 (STA 3 + 350)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0.2

Jadi A = A = 0 - 0.2
= -0.2

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.2 = 30.2 m
Station = 3 + 350 = 3350 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.2 x 48
800 800
= -0.012

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = -0.2 x 12.0 2
200.LV 200 x 48
= -0.003

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.003 -0.012

Sta PLV = Sta PV6 - 1/2LV


= 3350 - 24
= 3326

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 30.2 - ( 0 x 24 )
= 30.2 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 3326.0 + 12.0
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 25.1 - ( 0.1 x 12.0
= 25.1 - 1.2 - -0.006
= 23.9

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 25.1 - -0.024
= 25.1

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 100 + 12
= 112.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV


= 25.1 + ( 0.01 x 12
= 25.1 + 0.054
= 25

48 Sta PEV = Sta PV2 + 1/2 LV


= 100 + 24
= 124

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv


= 25.1 + ( 0.01 x
= 25.1 + 0.12
= 25

x 12.0 2
x 48
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 25.1 - ( 0 x 12.0
= 25.1 - 0 - 0.000
= 25.1

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 25.1 - 0
= 25.1

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 650 + 12
= 662.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV


= 25.1 + ( 0.00 x 12
= 25.1 + 0
= 25

48 Sta PEV = Sta PV2 + 1/2 LV


= 650 + 24
= 674

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv


= 25.1 + ( 0.00 x
= 25.1 + 0
= 25

2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 116.67 - ( -0.05 x 12.0
= 116.67 - -0.6 - 0.001
= 117.3

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 116.67 - 0.006
= 116.7

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 1100 + 12
= 1112.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV


= 116.67 + ( 0.00 x 12
= 116.67 + -0.0165
= 117

48 Sta PEV = Sta PV2 + 1/2 LV


= 1100 + 24
= 1124

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv


= 116.67 + ( 0.00 x
= 116.67 + -0.036
= 117

2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 25 - ( -4.7 x 12.0
= 25 - -56.4 - -0.066
= 81.5

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 25 - -0.264
= 25.3

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 1650 + 12
= 1662.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV


= 25 + ( 0.00 x 12
= 25 + -0.102
= 25

48 Sta PEV = Sta PV2 + 1/2 LV


= 1650 + 24
= 1674

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv


= 25 + ( 0.00 x
= 25 + -0.072
= 25

x 12.0 2
x 48
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 157.69 - ( 0.3 x 12.0
= 157.69 - 3.6 - 0.002
= 154.1

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 157.69 - 0.009
= 157.7

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 2050 + 12
= 2062.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV


= 157.69 + ( 0.00 x 12
= 157.69 + 0.02025
= 158

48 Sta PEV = Sta PV2 + 1/2 LV


= 2050 + 24
= 2074

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv


= 157.69 + ( 0.00 x
= 157.69 + 0.036
= 158

2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 30.15 - ( 0.05 x 12.0
= 30.15 - 0.6 - 0.001
= 29.5

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 30.15 - 0.003
= 30.1

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 2600 + 12
= 2612.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV


= 30.15 + ( 0.00 x 12
= 30.15 + 0.00075
= 30

48 Sta PEV = Sta PV2 + 1/2 LV


= 2600 + 24
= 2624

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv


= 30.15 + ( 0.00 x
= 30.15 + 0
= 30

2
Elevasi = Elevasi PV2 - ( G1% x 1/4LV
= 30.15 - ( 0 x 12.0
= 30.15 - 0 - -0.003
= 30.2

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 30.15 - -0.012
= 30.2

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 2900 + 12
= 2912.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV


= 30.15 + ( 0.00 x 12
= 30.15 + 0.021
= 30

48 Sta PEV = Sta PV2 + 1/2 LV


= 2900 + 24
= 2924

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv


= 30.15 + ( 0.00 x
= 30.15 + 0.048
= 30

2
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30.2 - ( 0 x 12.0 ) - -0.003
= 30.2 - 0 - -0.003
= 30

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30.2 - -0.012
= 30

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 3350 + 12
= 3362

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 30.2 + ( 0.00 x 12 ) + -0.003
= 30.2 + 0.021
= 30

Sta PEV = Sta PV6 + 1/2 LV


= 3350 + 24
= 3374

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 30.2 + ( 0.00 x 24 )
= 30.2 + 0.048
= 30
) - Y
) - -0.006

) + Y
) + -0.006

)
24 )
) - Y
) - 0.000

) + Y
) + 0.000

)
24 )
) - Y
) - 0.001

) + Y
) + 0.001

)
24 )
) - Y
) - -0.066

) + Y
) + -0.066

)
24 )
) - Y
) - 0.002

) + Y
) + 0.002

)
24 )
) - Y
) - 0.001

) + Y
) + 0.001

)
24 )
) - Y
) - -0.003

) + Y
) + -0.003

)
24 )
C. ALINEMEN VERTIKAL P2 (STA 0 + 200)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.05
G2 = 0

Jadi A = A = 0.05 - 0
= 0.05

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.15 = 25.15 m
Station = 0 + 200 = 200 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.05 x 48
800 800
= 0.003

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 0.05 x 12.0
=
200.LV 200 x 48
= 0.001

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.001 0.003

Sta PLV = Sta PV3 - 1/2LV


= 200 - 24
= 176

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 25.15 - ( 0.0005 x 24 )
= 25.15 - 0.012
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 176.0 + 12.0
= 188 meter
ALINEMEN VERTIKAL P8 (STA 0 + 700)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.1 = 25.1 m
Station = 0 + 700 = 700 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV3 - 1/2LV


= 700 - 24
= 676

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 25.1 - ( 0 x 24 )
= 25.1 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 676.0 + 12.0
= 688 meter
ALINEMEN VERTIKAL P14 (STA 1 + 200)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.15
G2 = 0.3

Jadi A = A = -0.15 - 0.3


= -0.45

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25 = 25.0 m
Station = 1 + 200 = 1200 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.45 x 48
800 800
= -0.027

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 -0.45 x 12.0
=
200.LV 200 x 48
= -0.007

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.007 -0.027

Sta PLV = Sta PV3 - 1/2LV


= 1200 - 24
= 1176

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 25 - ( -0.0015 x 24 )
= 25 - -0.036
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1176.0 + 12.0
= 1188 meter
ALINEMEN VERTIKAL P20 (STA 1 + 700)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.3
G2 = 0

Jadi A = A = -0.3 - 0
= -0.3

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25 = 25.0 m
Station = 1 + 700 = 1700 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.3 x 48
800 800
= -0.018

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 -0.3 x 12.0
=
200.LV 200 x 48
= -0.005

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.005 -0.018

Sta PLV = Sta PV3 - 1/2LV


= 1700 - 24
= 1676

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 25 - ( -0.003 x 24 )
= 25 - -0.072
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1676.0 + 12.0
= 1688 meter
ALINEMEN VERTIKAL PB (STA 2 + 150)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.15
G2 = 0

Jadi A = A = 0.15 - 0
= 0.15

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.45 = 25.5 m
Station = 2 + 150 = 2150 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.15 x 48
800 800
= 0.009

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 0.15 x 12.0
=
200.LV 200 x 48
= 0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.002 0.009

Sta PLV = Sta PV3 - 1/2LV


= 2150 - 24
= 2126

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 25.45 - ( 0.0015 x 24 )
= 25.45 - 0.036
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2126.0 + 12.0
= 2138 meter
ALINEMEN VERTIKAL P31 (STA 2 + 650)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.15 = 30.2 m
Station = 2 + 650 = 2650 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV3 - 1/2LV


= 2650 - 24
= 2626

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 30.15 - ( 0 x 24 )
= 30.15 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2626.0 + 12.0
= 2638 meter
ALINEMEN VERTIKAL P37 (STA 3 + 000)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.2
G2 = -0.05

Jadi A = A = 0.2 - -0.05


= 0.25

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.35 = 30.4 m
Station = 3 + 0 = 3000 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.25 x 48
800 800
= 0.015

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 0.25 x 12.0
=
200.LV 200 x 48
= 0.004

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.004 0.015

Sta PLV = Sta PV3 - 1/2LV


= 3000 - 24
= 2976

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 30.35 - ( 0.002 x 24 )
= 30.35 - 0.048
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2976.0 + 12.0
= 2988 meter
ALINEMEN VERTIKAL P43 (STA 3 + 450)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.2
G2 = 0.2

Jadi A = A = 0.2 - 0.2


= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.4 = 30.4 m
Station = 3 + 450 = 3450 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV6 - 1/2LV


= 3450 - 24
= 3426

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 30.4 - ( 0.002 x 24 )
= 30.4 - 0.048
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 3426.0 + 12.0
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25.15 - ( 0.05 x 12.0 )
= 25.15 - 0.6 - 0.001
= 25

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25.15 - 0.003
= 25

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 200 + 12
= 212

Elevasi = Elevasi PV3 + ( G2% x 1/4LV )


= 25.15 + ( 0.00 x 12 )
= 25.15 + 0.00075
= 25

Sta PEV = Sta PV3 + 1/2 LV


= 200 + 24
= 224

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 25.15 + ( 0.00 x 24 )
= 25.15 + 0
= 25

2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25.1 - ( 0 x 12.0 )
= 25.1 - 0 - 0.000
= 25

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25.1 - 0
= 25

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 700 + 12
= 712

Elevasi = Elevasi PV3 + ( G2% x 1/4LV )


= 25.1 + ( 0.00 x 12 )
= 25.1 + 0
= 25

Sta PEV = Sta PV3 + 1/2 LV


= 700 + 24
= 724

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 25.1 + ( 0.00 x 24 )
= 25.1 + 0
= 25

2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25 - ( -0.15 x 12.0 )
= 25 - -1.8 - -0.007
= 27

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25 - -0.027
= 25

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 1200 + 12
= 1212

Elevasi = Elevasi PV3 + ( G2% x 1/4LV )


= 25 + ( 0.00 x 12 )
= 25 + 0.02925
= 25

Sta PEV = Sta PV3 + 1/2 LV


= 1200 + 24
= 1224

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 25 + ( 0.00 x 24 )
= 25 + 0.072
= 25

2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25 - ( -0.3 x 12.0 )
= 25 - -3.6 - -0.005
= 29

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25 - -0.018
= 25

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 1700 + 12
= 1712

Elevasi = Elevasi PV3 + ( G2% x 1/4LV )


= 25 + ( 0.00 x 12 )
= 25 + -0.0045
= 25

Sta PEV = Sta PV3 + 1/2 LV


= 1700 + 24
= 1724

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 25 + ( 0.00 x 24 )
= 25 + 0
= 25

2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 25.45 - ( 0.15 x 12.0 )
= 25.45 - 1.8 - 0.002
= 24

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 25.45 - 0.009
= 25

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 2150 + 12
= 2162

Elevasi = Elevasi PV3 + ( G2% x 1/4LV )


= 25.45 + ( 0.00 x 12 )
= 25.45 + 0.00225
= 25

Sta PEV = Sta PV3 + 1/2 LV


= 2150 + 24
= 2174

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 25.45 + ( 0.00 x 24 )
= 25.45 + 0
= 25

2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 30.15 - ( 0 x 12.0 )
= 30.15 - 0 - 0.000
= 30

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 30.15 - 0
= 30

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 2650 + 12
= 2662

Elevasi = Elevasi PV3 + ( G2% x 1/4LV )


= 30.15 + ( 0.00 x 12 )
= 30.15 + 0
= 30

Sta PEV = Sta PV3 + 1/2 LV


= 2650 + 24
= 2674

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 30.15 + ( 0.00 x 24 )
= 30.15 + 0
= 30

2
Elevasi = Elevasi PV3 - ( G1% x 1/4LV )
= 30.35 - ( 0.2 x 12.0 )
= 30.35 - 2.4 - 0.004
= 28

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 30.35 - 0.015
= 30

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 3000 + 12
= 3012

Elevasi = Elevasi PV3 + ( G2% x 1/4LV )


= 30.35 + ( 0.00 x 12 )
= 30.35 + -0.00225
= 30

Sta PEV = Sta PV3 + 1/2 LV


= 3000 + 24
= 3024

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 30.35 + ( 0.00 x 24 )
= 30.35 + -0.012
= 30

2
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30.4 - ( 0.2 x 12.0 ) - 0.000
= 30.4 - 2.4 - 0.000
= 28

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30.4 - 0
= 30

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 3450 + 12
= 3462

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 30.4 + ( 0.00 x 12 ) + 0.000
= 30.4 + 0.024
= 30

Sta PEV = Sta PV6 + 1/2 LV


= 3450 + 24
= 3474

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 30.4 + ( 0.00 x 24 )
= 30.4 + 0.048
= 30
- Y
- 0.001

+ Y
+ 0.001
- Y
- 0.000

+ Y
+ 0.000
- Y
- -0.007

+ Y
+ -0.007
- Y
- -0.005

+ Y
+ -0.005
- Y
- 0.002

+ Y
+ 0.002
- Y
- 0.000

+ Y
+ 0.000
- Y
- 0.004

+ Y
+ 0.004
D. ALINEMEN VERTIKAL P3 (STA 0 + 300)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.15 = 25.15 m
Station = 0 + 300 = 300 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV4 - 1/2LV


= 300 - 24
= 276

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 25.15 - ( 0 x 24 )
= 25.15 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 276.0 + 12.0
= 288 meter
ALINEMEN VERTIKAL P9 (STA 0 + 750)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.1 = 25.1 m
Station = 0 + 750 = 750 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV4 - 1/2LV


= 750 - 24
= 726

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 25.1 - ( 0 x 24 )
= 25.1 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 726.0 + 12.0
= 738 meter
ALINEMEN VERTIKAL P15 (STA 1 + 300)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.15
G2 = 0.3

Jadi A = A = -0.15 - 0.3


= -0.45

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.3 = 25.3 m
Station = 1 + 300 = 1300 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.45 x 48
800 800
= -0.027

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = -0.45 x 12.0 2
200.LV 200 x 48
= -0.007

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.007 -0.027

Sta PLV = Sta PV4 - 1/2LV


= 1300 - 24
= 1276

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 25.3 - ( -0.0015 x 24 )
= 25.3 - -0.036
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1276.0 + 12.0
= 1288 meter
ALINEMEN VERTIKAL P21 (STA 1 + 750)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25 = 25 m
Station = 1 + 750 = 1750 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV4 - 1/2LV


= 1750 - 24
= 1726

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 25 - ( 0 x 24 )
= 25 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1726.0 + 12.0
= 1738 meter
ALINEMEN VERTIKAL P26 (STA 2 + 250)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 4.55

Jadi A = A = 0 - 4.55
= -4.55

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30 = 30 m
Station = 2 + 250 = 2250 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -4.55 x 48
800 800
= -0.273

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = -4.55 x 12.0 2
200.LV 200 x 48
= -0.068

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.068 -0.273

Sta PLV = Sta PV4 - 1/2LV


= 2250 - 24
= 2226

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 30 - ( 0 x 24 )
= 30 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2226.0 + 12.0
= 2238 meter
ALINEMEN VERTIKAL P32 (STA 2 + 700)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.15 = 30.15 m
Station = 2 + 700 = 2750 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV4 - 1/2LV


= 2750 - 24
= 2726

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 30.15 - ( 0 x 24 )
= 30.15 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2726.0 + 12.0
= 2738 meter
ALINEMEN VERTIKAL P38 (STA 3 + 100)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.05
G2 = -0.3

Jadi A = A = -0.05 - -0.3


= 0.25

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.3 = 30.3 m
Station = 3 + 100 = 3100 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.25 x 48
800 800
= 0.015

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 = 0.25 x 12.0 2
200.LV 200 x 48
= 0.004

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.004 0.015

Sta PLV = Sta PV4 - 1/2LV


= 3100 - 24
= 3076

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 30.3 - ( -0.0005 x 24 )
= 30.3 - -0.012
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 3076.0 + 12.0
= 3088 meter
ALINEMEN VERTIKAL P44 (STA 3 + 550)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.2
G2 = 4.6

Jadi A = A = 0.2 - 4.6


= -4.4

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 35 = 35.0 m
Station = 3 + 550 = 3550 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -4.4 x 48
800 800
= -0.264

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = -4.4 x 12.0 2
200.LV 200 x 48
= -0.066

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.066 -0.264

Sta PLV = Sta PV6 - 1/2LV


= 3550 - 24
= 3526

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 35 - ( 0.002 x 24 )
= 35 - 0.048
= 35

Sta 1/4 LV = Sta PLV + 1/4 LV


= 3526.0 + 12.0
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 25.15 - ( 0 x 12.0 )
= 25.15 - 0 - 0.000
= 25

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25.15 - 0
= 25

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 300 + 12
= 312

Elevasi = Elevasi PV4 + ( G2% x 1/4LV )


= 25.15 + ( 0.00 x 12 )
= 25.15 + 0
= 25

Sta PEV = Sta PV4 + 1/2 LV


= 300 + 24
= 324

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 25.15 + ( 0.00 x 24 )
= 25.15 + 0
= 25.15

2
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 25.1 - ( 0 x 12.0 )
= 25.1 - 0 - 0.000
= 25

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25.1 - 0
= 25

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 750 + 12
= 762

Elevasi = Elevasi PV4 + ( G2% x 1/4LV )


= 25.1 + ( 0.00 x 12 )
= 25.1 + 0
= 25

Sta PEV = Sta PV4 + 1/2 LV


= 750 + 24
= 774

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 25.1 + ( 0.00 x 24 )
= 25.1 + 0
= 25.1
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 25.3 - ( -0.15 x 12.0 )
= 25.3 - -1.8 - -0.007
= 27

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25.3 - -0.027
= 25

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 1300 + 12
= 1312

Elevasi = Elevasi PV4 + ( G2% x 1/4LV )


= 25.3 + ( 0.00 x 12 )
= 25.3 + 0.02925
= 25

Sta PEV = Sta PV4 + 1/2 LV


= 1300 + 24
= 1324

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 25.3 + ( 0.00 x 24 )
= 25.3 + 0.072
= 25.372
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 25 - ( 0 x 12.0 )
= 25 - 0 - 0.00
= 25

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 25 - 0
= 25

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 1750 + 12
= 1762

Elevasi = Elevasi PV4 + ( G2% x 1/4LV )


= 25 + ( 0.00 x 12 )
= 25 + 0
= 25

Sta PEV = Sta PV4 + 1/2 LV


= 1750 + 24
= 1774

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 25 + ( 0.00 x 24 )
= 25 + 0
= 25
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 30 - ( 0 x 12.0 )
= 30 - 0 - -0.07
= 30

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 30 - -0.273
= 30

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 2250 + 12
= 2262

Elevasi = Elevasi PV4 + ( G2% x 1/4LV )


= 30 + ( 0.05 x 12 )
= 30 + 0.47775
= 30

Sta PEV = Sta PV4 + 1/2 LV


= 2250 + 24
= 2274

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 30 + ( 0.05 x 24 )
= 30 + 1.092
= 31.092
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 30.15 - ( 0 x 12.0 )
= 30.15 - 0 - 0.00
= 30

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 30.15 - 0
= 30

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 2750 + 12
= 2762

Elevasi = Elevasi PV4 + ( G2% x 1/4LV )


= 30.15 + ( 0.00 x 12 )
= 30.15 + 0
= 30

Sta PEV = Sta PV4 + 1/2 LV


= 2750 + 24
= 2774

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 30.15 + ( 0.00 x 24 )
= 30.15 + 0
= 30.15
Elevasi = Elevasi PV4 - ( G1% x 1/4LV )
= 30.3 - ( -0.05 x 12.0 )
= 30.3 - -0.6 - 0.00
= 31

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 30.3 - 0.015
= 30

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 3100 + 12
= 3112

Elevasi = Elevasi PV4 + ( G2% x 1/4LV )


= 30.3 + ( 0.00 x 12 )
= 30.3 + -0.03225
= 30

Sta PEV = Sta PV4 + 1/2 LV


= 3100 + 24
= 3124

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 30.3 + ( 0.00 x 24 )
= 30.3 + -0.072
= 30.228
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 35 - ( 0.2 x 12.0 ) - -0.066
= 35 - 2.4 - -0.066
= 33

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 35 - -0.264
= 35

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 3550 + 12
= 3562

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 35 + ( 0.05 x 12 ) + -0.066
= 35 + 0.486
= 35

Sta PEV = Sta PV6 + 1/2 LV


= 3550 + 24
= 3574

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 35 + ( 0.05 x 24 )
= 35 + 1.104
= 36
- Y
- 0.000

+ Y
+ 0.000
- Y
- 0.000

+ Y
+ 0.000
- Y
- -0.007

+ Y
+ -0.007
- Y
- 0.000

+ Y
+ 0.000
- Y
- -0.068

+ Y
+ -0.068
- Y
- 0.000

+ Y
+ 0.000
- Y
- 0.004

+ Y
+ 0.004
E. ALINEMEN VERTIKAL P4 (STA 0 + 400)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0.5

Jadi A = A = 0 - 0.5
= -0.5

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.15 = 25.15 m
Station = 0 + 400 = 400 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.5 x 48
800 800
= -0.03

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -0.5 x 12.0
=
200.LV 200 x 48
= -0.008

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.008 -0.030

Sta PLV = Sta PV5 - 1/2LV


= 400 - 24
= 376

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 25.15 - ( 0 x 24 )
= 25.15 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 376.0 + 12.0
= 388 meter
E. ALINEMEN VERTIKAL P10 (STA 0 + 800 )

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0.05

Jadi A = A = 0 - 0.05
= -0.05

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.10 = 25.1 m
Station = 0 + 800 = 800 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.05 x 48
800 800
= -0.003

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -0.05 x 12.0
=
200.LV 200 x 48
= -0.001

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.001 -0.003

Sta PLV = Sta PV5 - 1/2LV


= 800 - 24
= 776

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 25.1 - ( 0 x 24 )
= 25.1 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 776.0 + 12.0
= 788 meter
E. ALINEMEN VERTIKAL P16 (STA 1 + 400)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.3
G2 = 4.7

Jadi A = A = 0.3 - 4.7


= -4.4

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30 = 30 m
Station = 1 + 400 = 1400 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -4.4 x 48
800 800
= -0.264

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -4.4 x 12.0
=
200.LV 200 x 48
= -0.066

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.066 -0.264

Sta PLV = Sta PV5 - 1/2LV


= 1400 - 24
= 1376

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 30 - ( 0.003 x 24 )
= 30 - 0.072
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1376.0 + 12.0
= 1388 meter
E. ALINEMEN VERTIKAL P22 (STA 1 + 800)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25 = 25 m
Station = 1 + 800 = 1800 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV5 - 1/2LV


= 1800 - 24
= 1776

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 25 - ( 0 x 24 )
= 25 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1776.0 + 12.0
= 1788 meter
E. ALINEMEN VERTIKAL P27 (STA 2 + 350)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -4.55
G2 = 0

Jadi A = A = -4.55 - 0
= -4.55

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.45 = 25.45 m
Station = 2 + 350 = 2350 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -4.55 x 48
800 800
= -0.273

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -4.55 x 12.0
=
200.LV 200 x 48
= -0.068

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.068 -0.273

Sta PLV = Sta PV5 - 1/2LV


= 2350 - 24
= 2326

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 25.45 - ( -0.0455 x 24 )
= 25.45 - -1.092
= 27

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2326.0 + 12.0
= 2338 meter
E. ALINEMEN VERTIKAL P33 (STA 2 + 750)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.15 = 30.15 m
Station = 2 + 750 = 2750 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 0 x 12.0
=
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV5 - 1/2LV


= 2750 - 24
= 2726

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 30.15 - ( 0 x 24 )
= 30.15 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2726.0 + 12.0
= 2738 meter
E. ALINEMEN VERTIKAL P39 (STA 3 + 150)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.3
G2 = 0

Jadi A = A = -0.3 - 0
= -0.3

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30 = 30 m
Station = 3 + 150 = 3150 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.3 x 48
800 800
= -0.018

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -0.3 x 12.0
=
200.LV 200 x 48
= -0.005

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.005 -0.018

Sta PLV = Sta PV5 - 1/2LV


= 3150 - 24
= 3126

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 30 - ( -0.003 x 24 )
= 30 - -0.072
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 3126.0 + 12.0
= 3138 meter
2
2
2
2
2
2
2
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 25.15 - ( 0 x 12.0 ) - -0.008
= 25.15 - 0 - -0.008
= 25

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25.15 - -0.03
= 25

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 400 + 12
= 412

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 25.15 + ( 0.01 x 12 ) + -0.008
= 25.15 + 0.0525
= 25

Sta PEV = Sta PV5 + 1/2 LV


= 400 + 24
= 424

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 25.15 + ( 0.01 x 24 )
= 25.15 + 0.12
= 25
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 25.1 - ( 0 x 12.0 ) - -0.001
= 25.1 - 0 - -0.001
= 25

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25.1 - -0.003
= 25

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 800 + 12
= 812

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 25.1 + ( 0.00 x 12 ) + -0.001
= 25.1 + 0.00525
= 25

Sta PEV = Sta PV5 + 1/2 LV


= 800 + 24
= 824

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 25.1 + ( 0.00 x 24 )
= 25.1 + 0.012
= 25
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 30 - ( 0.3 x 12.0 ) - -0.066
= 30 - 3.6 - -0.066
= 26

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 30 - -0.264
= 30

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 1400 + 12
= 1412

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 30 + ( 0.05 x 12 ) + -0.066
= 30 + 0.498
= 30

Sta PEV = Sta PV5 + 1/2 LV


= 1400 + 24
= 1424

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 30 + ( 0.05 x 24 )
= 30 + 1.128
= 31
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 25 - ( 0 x 12.0 ) - 0.000
= 25 - 0 - 0.000
= 25

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25 - 0
= 25

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 1800 + 12
= 1812

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 25 + ( 0.00 x 12 ) + 0.000
= 25 + 0
= 25

Sta PEV = Sta PV5 + 1/2 LV


= 1800 + 24
= 1824

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 25 + ( 0.00 x 24 )
= 25 + 0
= 25
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 25.45 - ( -4.55 x 12.0 ) - -0.068
= 25.45 - -54.6 - -0.068
= 80

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 25.45 - -0.273
= 26

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 2350 + 12
= 2362

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 25.45 + ( 0.00 x 12 ) + -0.068
= 25.45 + -0.06825
= 25

Sta PEV = Sta PV5 + 1/2 LV


= 2350 + 24
= 2374

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 25.45 + ( 0.00 x 24 )
= 25.45 + 0
= 25
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 30.15 - ( 0 x 12.0 ) - 0.000
= 30.15 - 0 - 0.000
= 30

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 30.15 - 0
= 30

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 2750 + 12
= 2762

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 30.15 + ( 0.00 x 12 ) + 0.000
= 30.15 + 0
= 30

Sta PEV = Sta PV5 + 1/2 LV


= 2750 + 24
= 2774

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 30.15 + ( 0.00 x 24 )
= 30.15 + 0
= 30
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 30 - ( -0.3 x 12.0 ) - -0.005
= 30 - -3.6 - -0.005
= 34

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 30 - -0.018
= 30

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 3150 + 12
= 3162

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 30 + ( 0.00 x 12 ) + -0.005
= 30 + -0.0045
= 30

Sta PEV = Sta PV5 + 1/2 LV


= 3150 + 24
= 3174

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 30 + ( 0.00 x 24 )
= 30 + 0
= 30
F. ALINEMEN VERTIKAL P5 (STA 0 + 500)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.1
G2 = 0.05

Jadi A = A = -0.1 - 0.05


= -0.15

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.15 = 25.15 m
Station = 0 + 500 = 500 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.15 x 48
800 800
= -0.009

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -0.15 x 12.0
=
200.LV 200 x 48
= -0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.002 -0.009

Sta PLV = Sta PV6 - 1/2LV


= 500 - 24
= 476

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 25.15 - ( -0.001 x 24 )
= 25.15 - -0.024
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 476.0 + 12.0
= 488 meter
ALINEMEN VERTIKAL P11 (STA 0 + 900)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.05
G2 = 0.05

Jadi A = A = 0.05 - 0.05


= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.15 = 25.15 m
Station = 0 + 850 = 850 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV6 - 1/2LV


= 850 - 24
= 826

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 25.15 - ( 0.0005 x 24 )
= 25.15 - 0.012
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 826.0 + 12.0
= 838 meter
ALINEMEN VERTIKAL P17 (STA 1 + 500)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 4.7
G2 = 0

Jadi A = A = 4.7 - 0
= 4.7

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30 = 30 m
Station = 1 + 500 = 1500 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 4.7 x 48
800 800
= 0.282

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 = 4.7 x 12.0 2
200.LV 200 x 48
= 0.071

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.071 0.282

Sta PLV = Sta PV6 - 1/2LV


= 1500 - 24
= 1476

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 30 - ( 0.047 x 24 )
= 30 - 1.128
= 29

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1476.0 + 12.0
= 1488 meter
ALINEMEN VERTIKAL P23 (STA 1 + 850)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25 = 25 m
Station = 1 + 850.00 = 1850 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV6 - 1/2LV


= 1850 - 24
= 1826

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 25 - ( 0 x 24 )
= 25 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1826.0 + 12.0
= 1838 meter
ALINEMEN VERTIKAL P28 (STA 2 + 450)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 4.65

Jadi A = A = 0 - 4.65
= -4.65

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 25.45 = 25 m
Station = 2 + 450 = 2450 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -4.65 x 48
800 800
= -0.279

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 = -4.65 x 12.0 2
200.LV 200 x 48
= -0.070

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.070 -0.279

Sta PLV = Sta PV6 - 1/2LV


= 2450 - 24
= 2426

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 25.45 - ( 0 x 24 )
= 25.45 - 0
= 25

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2426.0 + 12.0
= 2438 meter
ALINEMEN VERTIKAL P34 (STA 2 + 2800)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30.15 = 30.2 m
Station = 2 + 800 = 2800 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV6 - 1/2LV


= 2800 - 24
= 2776

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 30.15 - ( 0 x 24 )
= 30.15 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 2776.0 + 12.0
= 2788 meter
ALINEMEN VERTIKAL P40 (STA 3 + 200)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = 0

Jadi A = A = 0 - 0
= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 30 = 30.0 m
Station = 3 + 350 = 3200 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV6 - 1/2LV


= 3200 - 24
= 3176

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 30 - ( 0 x 24 )
= 30 - 0
= 30

Sta 1/4 LV = Sta PLV + 1/4 LV


= 3176.0 + 12.0
= 3188 meter
2
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 25.15 - ( -0.1 x 12.0 ) - -0.002
= 25.15 - -1.2 - -0.002
= 26

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25.15 - -0.009
= 25

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 500 + 12
= 512

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 25.15 + ( 0.00 x 12 ) + -0.002
= 25.15 + 0.00375
= 25

Sta PEV = Sta PV6 + 1/2 LV


= 500 + 24
= 524

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 25.15 + ( 0.00 x 24 )
= 25.15 + 0.012
= 25
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 25.15 - ( 0.05 x 12.0 ) - 0.000
= 25.15 - 0.6 - 0.000
= 25

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25.15 - 0
= 25

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 850 + 12
= 862

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 25.15 + ( 0.00 x 12 ) + 0.000
= 25.15 + 0.006
= 25

Sta PEV = Sta PV6 + 1/2 LV


= 850 + 24
= 874

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 25.15 + ( 0.00 x 24 )
= 25.15 + 0.012
= 25
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30 - ( 4.7 x 12.0 ) - 0.071
= 30 - 56.4 - 0.071
= -26

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30 - 0.282
= 30

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 1500 + 12
= 1512

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 30 + ( 0.00 x 12 ) + 0.071
= 30 + 0.0705
= 30

Sta PEV = Sta PV6 + 1/2 LV


= 1500 + 24
= 1524

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 30 + ( 0.00 x 24 )
= 30 + 0
= 30
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 25 - ( 0 x 12.0 ) - 0.000
= 25 - 0 - 0.000
= 25

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25 - 0
= 25

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 1850 + 12
= 1862

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 25 + ( 0.00 x 12 ) + 0.000
= 25 + 0
= 25

Sta PEV = Sta PV6 + 1/2 LV


= 1850 + 24
= 1874

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 25 + ( 0.00 x 24 )
= 25 + 0
= 25
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 25.45 - ( 0 x 12.0 ) - -0.070
= 25.45 - 0 - -0.070
= 26

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 25.45 - -0.279
= 26

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 2450 + 12
= 2462

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 25.45 + ( 0.05 x 12 ) + -0.070
= 25.45 + 0.48825
= 26

Sta PEV = Sta PV6 + 1/2 LV


= 2450 + 24
= 2474

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 25.45 + ( 0.05 x 24 )
= 25.45 + 1.116
= 27
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30.15 - ( 0 x 12.0 ) - 0.000
= 30.15 - 0 - 0.000
= 30

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30.15 - 0
= 30

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 2800 + 12
= 2812

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 30.15 + ( 0.00 x 12 ) + 0.000
= 30.15 + 0
= 30

Sta PEV = Sta PV6 + 1/2 LV


= 2800 + 24
= 2824

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 30.15 + ( 0.00 x 24 )
= 30.15 + 0
= 30
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 30 - ( 0 x 12.0 ) - 0.000
= 30 - 0 - 0.000
= 30

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 30 - 0
= 30

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 3200 + 12
= 3212

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 30 + ( 0.00 x 12 ) + 0.000
= 30 + 0
= 30

Sta PEV = Sta PV6 + 1/2 LV


= 3200 + 24
= 3224

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 30 + ( 0.00 x 24 )
= 30 + 0
= 30
Patok 1,2,3,4,5
Sta 0 + 25.15
Jarak sta 0 + 500 adalah 500 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 1 0.5 0.19 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 0.76 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3025.11


Y = 4 + 3.25 + 1.52 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2020.22

1 1
luas = X Y = 3025.11 2020.22
2 2
1
= x 1005
2
= 502.445 M2

Volume timbunan = Luas x Jarak (Sta 0 + 000 s/d Sta 0 + 500)


= 502.445 x 500
= 251223 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1 87.05 86.05 76.05 76.05 85.05 2 1.81 1.5

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 16 + 14.48 + 9.75 + 0 = 2051.68


Y = 4 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 13 + 7.24 + 0 = 3048.59

1 1
luas = X Y = 2051.68 3048.59
2 2
1
= x -996.9
2
= -498.455 M2

Volume galiang = Luas x Jarak (Sta 0 + 000 s/d Sta 0 + 500)


= -498.455 x 500
= -249228 M3
Patok 5-9
Sta 0 + 25.1
Jarak sta 0 + 750 adalah 250 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 1.5 0.75 0.28 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 1.12 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3025.47


Y = 6 + 4.875 + 2.24 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2024.565

1 1
luas = X Y = 3025.47 2024.565
2 2
1
= x 1001
2
= 500.4525 M2

Volume timbunan = Luas x Jarak (Sta 0 + 500 s/d Sta 0 + 750)


= 500.4525 x 250
= 125113 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1.5 87.05 86.05 76.05 76.05 85.05 3 2.72 2.25

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 24 + 21.76 + 14.625 + 0 = 2071.835


Y = 6 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 19.5 + 10.88 + 0 = 3060.73

1 1
luas = X Y = 2071.835 3060.73
2 2
1
= x -988.9
2
= -494.448 M2

Volume galiang = Luas x Jarak (Sta 0 + 500 s/d Sta 0 + 750)


= -494.448 x 250
= -123612 M3
Patok 10-13
Sta 0 + 25.2
Jarak sta 1 + 100 adalah 350 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 1.36 0.8 0.44 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 1.76 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3026.11


Y = 5.44 + 5.2 + 3.52 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2025.61

1 1
luas = X Y = 3026.11 2025.61
2 2
1
= x 1000.5
2
= 500.25 M2

Volume timbunan = Luas x Jarak (Sta 0 + 750 s/d Sta 1 + 100)


= 500.25 x 350
= 175088 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1.36 87.05 86.05 76.05 76.05 85.05 2.5 2.29 1.93

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 20 + 18.32 + 12.545 + 0 = 2062.315


Y = 5.44 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 16.25 + 9.16 + 0 = 3055.2

1 1
luas = X Y = 2062.315 3055.2
2 2
1
= x -992.9
2
= -496.443 M2

Volume galiang = Luas x Jarak (Sta 0 + 750 s/d Sta 1 + 100)


= -496.443 x 350
= -173755 M3
Patok 14-15
Sta 0 + 25.3
Jarak sta 1 + 300 adalah 200 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 0.25 0.13 0.50 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 2 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3026.35


Y = 1 + 0.845 + 4 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2017.295

1 1
luas = X Y = 3026.35 2017.295
2 2
1
= x 1009
2
= 504.5275 M2

Volume timbunan = Luas x Jarak (Sta 1 + 100 s/d Sta 1 + 300)


= 504.5275 x 200
= 100906 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.25 87.05 86.05 76.05 76.05 85.05 0.5 0.45 0.38

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 4 + 3.6 + 2.47 + 0 = 2021.52


Y = 1 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 3.25 + 1.8 + 0 = 3030.4

1 1
luas = X Y = 2021.52 3030.4
2 2
1
= x -1009
2
= -504.44 M2

Volume galiang = Luas x Jarak (Sta 1 + 100 s/d Sta 1 + 300)


= -504.44 x 200
= -100888 M3
Patok 16
Sta 0 + 30
Jarak sta 1 + 400 adalah 100 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 1 0.5 0.19 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 0.76 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3025.11


Y = 4 + 3.25 + 1.52 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2020.22

1 1
luas = X Y = 3025.11 2020.22
2 2
1
= x 1005
2
= 502.445 M2

Volume timbunan = Luas x Jarak (Sta 1 + 300 s/d Sta 1 + 400)


= 502.445 x 100
= 50245 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1 87.05 86.05 76.05 76.05 85.05 0.5 0.45 0.38

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 4 + 3.6 + 2.47 + 0 = 2021.52


Y = 4 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 3.25 + 1.8 + 0 = 3033.4

1 1
luas = X Y = 2021.52 3033.4
2 2
1
= x -1012
2
= -505.94 M2

Volume galiang = Luas x Jarak (Sta 1 + 300 s/d Sta 1 + 400)


= -505.94 x 100
= -50594 M3
Patok 17-18
Sta 0 + 30
Jarak sta 1 + 600 adalah 200 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 0.45 0.23 0.80 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 3.2 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3027.55


Y = 1.8 + 1.495 + 6.4 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2021.145

1 1
luas = X Y = 3027.55 2021.145
2 2
1
= x 1006
2
= 503.2025 M2

Volume timbunan = Luas x Jarak (Sta 1 + 400 s/d Sta 1 + 600)


= 503.2025 x 200
= 100641 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.45 87.05 86.05 76.05 76.05 85.05 0.9 0.82 0.7

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 7.2 + 6.56 + 4.55 + 0 = 2029.76


Y = 1.8 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 5.85 + 3.28 + 0 = 3035.28

1 1
luas = X Y = 2029.76 3035.28
2 2
1
= x -1006
2
= -502.76 M2

Volume galiang = Luas x Jarak (Sta 1 + 400 s/d Sta 1 + 600)


= -502.76 x 200
= -100552 M3
Patok 19- 26
Sta 0 + 25.45
Jarak sta 2 + 250 adalah 650 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 0.49 0.25 0.09 0 85.05 76.05 0.49 0.25 0.09

X = 0 + 0.36 + 0 + 680.4 608.4 + 3.822 + 1.675 + 0.585 + 0 + 0 = 1295.242


Y = 1.96 + 1.625 + 0.72 + 0 663.39 + 509.5 + 3.185 + 1 + 0 + 0 = 1181.415

1 1
luas = X Y = 1295.242 1181.415
2 2
1
= x 113.83
2
= 56.9135 M2

Volume timbunan = Luas x Jarak (Sta 1 + 600 s/d Sta 2 + 250)


= 56.9135 x 650
= 36994 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.49 0.09 0.25 0.49 0.49 85.05 1 0.91 0.75

X = 0 + 1 + 3.185 + 3.283 663.39 + 8 + 7.28 + 4.875 + 0 = 691.013


Y = 1.96 + 0.585 + 1.675 + 3.822 3.92 + 680.4 + 6.5 + 3.64 + 0 = 702.502

1 1
luas = X Y = 691.013 702.502
2 2
1
= x -11.49
2
= -5.7445 M2

Volume galiang = Luas x Jarak (Sta 1 + 600 s/d Sta 2 + 250)


= -5.7445 x 650
= -3733.93 M3
Patok 27 - 28
Sta 0 + 25.45
Jarak sta 2 + 450 adalah 200 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 0.2 0.1 0.4 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 1.6 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3025.95


Y = 0.8 + 0.65 + 3.2 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2016.1

1 1
luas = X Y = 3025.95 2016.1
2 2
1
= x 1010
2
= 504.925 M2

Volume timbunan = Luas x Jarak (Sta 2 + 250 s/d Sta 2 + 450)


= 504.925 x 200
= 100985 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.2 87.05 86.05 76.05 76.05 85.05 0.4 0.36 0.32

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 3.2 + 2.88 + 2.08 + 0 = 2019.61


Y = 0.8 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 2.6 + 1.44 + 0 = 3029.19

1 1
luas = X Y = 2019.61 3029.19
2 2
1
= x -1010
2
= -504.79 M2

Volume galiang = Luas x Jarak (Sta 2 + 250 s/d Sta 2 + 450)


= -504.79 x 200
= -100958 M3
Patok 29
Sta 0 + 30.1
Jarak sta 2 + 550 adalah 100 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 1 0.5 0.19 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 0.76 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3025.11


Y = 4 + 3.25 + 1.52 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2020.22

1 1
luas = X Y = 3025.11 2020.22
2 2
1
= x 1005
2
= 502.445 M2

Volume timbunan = Luas x Jarak (Sta 2 + 450 s/d Sta 2 + 500)


= 502.445 x 100
= 50245 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 1 87.05 86.05 76.05 76.05 85.05 2 1.81 1.5

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 16 + 14.48 + 9.75 + 0 = 2051.68


Y = 4 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 13 + 7.24 + 0 = 3048.59

1 1
luas = X Y = 2051.68 3048.59
2 2
1
= x -996.9
2
= -498.455 M2

Volume galiang = Luas x Jarak (Sta 2 + 450 s/d Sta 2 + 550)


= -498.455 x 100
= -49845.5 M3
Patok 30-36
Sta 0 + 30.15
Jarak sta 2 + 900 adalah 450 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 0.8 0.38 0.14 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 0.56 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3024.91


Y = 3.2 + 2.47 + 1.12 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2018.24

1 1
luas = X Y = 3024.91 2018.24
2 2
1
= x 1007
2
= 503.335 M2

Volume timbunan = Luas x Jarak (Sta 2 + 500 s/d Sta 2 + 900)


= 503.335 x 450
= 226501 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.8 87.05 86.05 76.05 76.05 85.05 1.6 1.45 1.2

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 12.8 + 11.6 + 7.8 + 0 = 2043.65


Y = 3.2 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 10.4 + 5.8 + 0 = 3043.75

1 1
luas = X Y = 2043.65 3043.75
2 2
1
= x -1000
2
= -500.05 M2

Volume galiang = Luas x Jarak (Sta 2 + 550 s/d Sta 2 + 900)


= -500.05 x 450
= -225023 M3
Patok 37- 41
Sta 0 + 30.3
Jarak sta 3 + 350 adalah 450 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 0.8 0.38 0.14 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 0.56 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3024.91


Y = 3.2 + 2.47 + 1.12 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2018.24

1 1
luas = X Y = 3024.91 2018.24
2 2
1
= x 1007
2
= 503.335 M2

Volume timbunan = Luas x Jarak (Sta 2 + 900 s/d Sta 3 + 350)


= 503.335 x 450
= 226501 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.8 87.05 86.05 76.05 76.05 85.05 1.5 1.36 1.13

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 12 + 10.88 + 7.345 + 0 = 2041.675


Y = 3.2 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 9.75 + 5.44 + 0 = 3042.74

1 1
luas = X Y = 2041.675 3042.74
2 2
1
= x -1001
2
= -500.533 M2

Volume galiang = Luas x Jarak (Sta 2 + 900 s/d Sta 3 + 350)


= -500.533 x 450
= -225240 M3
Patok 42- 44
Sta 0 + 35
Jarak sta 3 + 350 adalah 300 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 0.8 0.38 0.14 0 85.05 76.05 76.05 86.05 87.05

X = 0 + 0.56 + 0 + 680.4 608.4 + 593.2 + 576.54 + 565.83 + 0 + 0 = 3024.91


Y = 3.2 + 2.47 + 1.12 + 0 663.39 + 509.5 + 494.33 + 344.2 + 0 + 0 = 2018.24

1 1
luas = X Y = 3024.91 2018.24
2 2
1
= x 1007
2
= 503.335 M2

Volume timbunan = Luas x Jarak (Sta 2 + 900 s/d Sta 3 + 350)


= 503.335 x 300
= 151001 M3

B. Galian
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 0.8 87.05 86.05 76.05 76.05 85.05 1.5 1.36 1.13

X = 0 + 344.2 + 494.33 + 509.54 663.39 + 12 + 10.88 + 7.345 + 0 = 2041.675


Y = 3.2 + 565.83 + 576.54 + 593.19 608.4 + 680.4 + 9.75 + 5.44 + 0 = 3042.74

1 1
luas = X Y = 2041.675 3042.74
2 2
1
= x -1001
2
= -500.533 M2

Volume galiang = Luas x Jarak (Sta 2 + 900 s/d Sta 3 + 350)


= -500.533 x 300
= -150160 M3
REKAPITULASI VOLUME GALIAN DAN TIMBUNAN

NO PATOK VOLUME TIMBUNAN VOLUME GALIAN


1 P1 251223.000 M³ 498445.000 M³
2 P2 251223.000 M³ 498445.000 M³
3 P3 251223.000 M³ 498445.000 M³
4 P4 251223.000 M³ 498445.000 M³
5 P5 251223.000 M³ 498445.000 M³
6 P6 125113.000 M³ 123612.000 M³
7 P7 125113.000 M³ 123612.000 M³
8 P8 125113.000 M³ 123612.000 M³
9 P9 125113.000 M³ 123612.000 M³
10 P10 175088.000 M³ 173775.000 M³
11 P11 175088.000 M³ 173775.000 M³
12 P12 175088.000 M³ 173775.000 M³
13 P13 175088.000 M³ 173775.000 M³
14 P14 100906.000 M³ 100888.000 M³
15 P15 100906.000 M³ 100888.000 M³
16 P16 50245.000 M³ 50594.000 M³
17 P17 100641.000 M³ 100552.000 M³
18 P18 100641.000 M³ 100552.000 M³
19 P19 36994.000 M³ 3733.330 M³
20 P20 36994.000 M³ 3733.330 M³
21 P21 36994.000 M³ 3733.330 M³
22 P22 36994.000 M³ 3733.330 M³
23 P23 36994.000 M³ 3733.330 M³
24 P24 36994.000 M³ 3733.330 M³
25 P25 36994.000 M³ 3733.330 M³
26 P26 36994.000 M³ 3733.330 M³
27 P27 100985.000 M³ 100985.000 M³
28 P28 100985.000 M³ 100985.000 M³
29 P29 50245.000 M³ 49845.500 M³
30 P30 226501.000 M³ 225023.000 M³
31 P31 226501.000 M³ 225023.000 M³
32 P32 226501.000 M³ 225023.000 M³
33 P33 226501.000 M³ 225023.000 M³
34 P34 226501.000 M³ 225023.000 M³
35 P35 226501.000 M³ 225023.000 M³
36 P36 226501.000 M³ 225023.000 M³
37 P37 225501.000 M³ 225540.000 M³
38 P38 225501.000 M³ 225540.000 M³
39 P39 225501.000 M³ 225540.000 M³
40 P40 225501.000 M³ 225540.000 M³
41 P41 225501.000 M³ 225540.000 M³
42 P42 151001.000 M³ 150160.000 M³
43 P43 151001.000 M³ 150160.000 M³
44 P44 151001.000 M³ 150160.000 M³
JUMLAH 6624.400 M³ 7570.610 M³
VOLUME GALIAN PROFIL MEMANJANG

A. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 3 X 100
2
LUAS = 150 M²
VOLUME = 2400 M³

B. GALIAN
LEBAR JALAN = 16 M
1
X ALAS ATAS + ALAT BAWAH X TINGGI
2
1
X 8 X 100
2
LUAS = 400 M²
VOLUME = 6400 M³

C. GALIAN P
LEBAR JALAN = 16 M

PANJANG X LEBAR X TINGGI

16 X 5 X 100
LUAS = 80 M²
VOLUME = 1280 M³

D. GALIAN
LEBAR JALAN = 16 M
1
X ALAS ATAS + ALAT BAWAH X TINGGI
2
1
X 8 X 100
2
LUAS = 400 M²
VOLUME = 6400 M³

E. GALIAN PV6
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 3 X 100
2
LUAS = 150 M²
VOLUME = 2400 M³
F. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 5 X 100
2
LUAS = 250 M²
VOLUME = 4000 M³

G. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 5 X 100
2
LUAS = 250 M²
VOLUME = 4000 M³

G. GALIAN
LEBAR JALAN = 16 M
1
X ALAS X TINGGI
2
1
X 6 X 100
2
LUAS = 300 M²
VOLUME = 4800 M³

NO V. GALIAN
1 31680.000 M³

TOTAL VOLUME GALIAN HORIZONTAL DAN PROFIL MEMANJANG


= 31680.0000 + 7570.610 M³
= 7570.6100 M ³

TOTAL VOLUME TIMBUNAN HORIZONTAL DAN PROPIL MEMANJANG


= 6624.400 M³
= 6624.400 M ³

PERHITUNGAN PEKERJAAN LAPISAN BAWAH (LPB)

TEBAL RENCANA = 3.5


LEBAR = 16
PANJANG = 3550
VOLUME = 198800
DAFTAR ANALISA BIAYA KONSTRUKSI (ABK)

ANALISA URAIAN PEKERJAAN KOEFISIAN SATUAN HARGA SATUAN JML. HARGA


1 2 3 4 5 6
A 1M³ GALIAN TANAH DENGAN MENGGUNAKAN ALAT BERAT
TENAGA
PEKERJA 0.21 OH Rp 2,857.14 Rp 600.00
MANDOR 0.0525 OH Rp 3,214.29 Rp 168.75
ALAT
EXAVATOR 0.6 JAM Rp 502,500.00 Rp 301,500.00
BULDOZER 0.331 JAM Rp 458,500.00 Rp 151,763.50
DUMP TRUCK 0.1271 JAM Rp 292,300.00 Rp 37,151.33
JUMLAH Rp 491,183.58
B 1M³ TIMBUNAN TANAH DENGAN MENGGUNAKAN ALAT BERAT
TENAGA
PEKERJA 0.21 OH Rp 2,857.14 Rp 600.00
MANDOR 0.0525 OH Rp 3,214.29 Rp 168.75
ALAT
BULDOZER 0.331 JAM Rp 458,500.00 Rp 151,763.50
MOTOR GRADER 0.0088 JAM Rp 664,500.00 Rp 5,847.60
VIBRATOR ROLLER 0.0161 JAM Rp 267,100.00 Rp 4,300.31
JUMLAH Rp 162,680.16
C 1M³ PEKERJAAN LAPISAN PONDASI BAWAH
TENAGA
PEKERJA 0.21 OH Rp 2,857.14 Rp 600.00
MANDOR 0.0525 OH Rp 3,214.29 Rp 168.75
MATERIAL/BAHAN
AGREGAT KELAS B 1.2 1M³ Rp 40,000.00 Rp 48,000.00
ALAT
WHEEL LOADER 0.0134 JAM Rp 52,854.00 Rp 708.244
DUMP TRUCK 0.1063 JAM Rp 292,300.00 Rp 31,071.49
MOTOR GRADER 0.0088 JAM Rp 664,500.00 Rp 5,847.60
VIBRATOR ROLLER 0.0161 JAM Rp 267,100.00 Rp 4,300.31
WATER TANKER 0.0383 JAM Rp 241,296.00 Rp 9,241.64
JUMLAH Rp 99,938.03
DAFTAR RINCIAN RENCANA ANGGARAN BIAYA

NO URAIAN KEGIATAN
1M³ GALIAN TANAH VOLUME SAT. HARGA SATUAN JML. HARGA
DENGAN
1 7570.61 M³ Rp 491,183.58 Rp 3,718,559,319.74
MENGGUNAKAN
1M³ ALAT
TIMBUNAN TANAH
BERAT
DENGAN
2 6624.400 M³ Rp 162,680.16 Rp 1,077,658,449.42
MENGGUNAKAN ALAT
1M³ PEKERJAAN
BERAT
3 LAPISAN PONDASI 198800 M³ Rp 99,938.03 Rp 19,867,680,368.97
BAWAH
JUMLAH Rp 24,663,898,138.13
DIBULATKAN Rp 24,700,000,000,00
TERBILANG :
DUA PULUH EMPAT MILYAR TUJUH RATUS JUTA RUPIAH

Anda mungkin juga menyukai