RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN TAMAN


LOKASI : WATES KEDIRI
TAHUN :2020

Harga Satuan Jumlah


No. Jenis Pekerjaan Volume Satuan Analisa
( Rp ) ( Rp )
1 2 3 4 5 6 7
A PEMBANGUNAN AIR MANCUR
A.1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi dan bongkaran 56.60 Ls ls Rp 50,000.00 Rp 2,830,000.00
SUB TOTAL Rp 2,830,000.00
A.2 PEKERJAAN TANAH
1 Galian tanah 11.30 m3 A.2.3.1.1 Rp 63,250.00 Rp 714,978.00
2 Urugan pasir 6.04 m3 A.2.3.1.11 Rp 163,300.00 Rp 986,332.00
SUB TOTAL Rp 1,701,310.00
A.3 PEKERJAAN PONDASI
1 Pasang aanstampeng 3.77 m3 A.3.2.1.9 398,940.00 Rp 1,503,205.92
2 Pasang pondasi batu kali 1:4 10.36 m3 A.3.2.1.2 767,590.00 Rp 7,953,767.58
SUB TOTAL Rp 9,456,973.50
A.4 PEKERJAAN BETON
1 Dinding beton
Mengecor 2.28 m3 A.4.1.1.5 Rp 938,010.00 Rp 2,138,662.80
Pembesian 282.72 kg A.4.1.1.17a Rp 15,037.00 Rp 4,251,260.64
Bekisting 15.12 m2 A.4.1.1.25 Rp 507,680.00 Rp 7,676,121.60

2 Lantai beton
Mengecor 5.04 m3 A.4.1.1.5 Rp 938,010.00 Rp 4,727,570.40
Pembesian 396.80 kg A.4.1.1.17a Rp 15,037.00 Rp 5,966,681.60

3 Lantai luar
Mengecor 2.63 m3 A.4.1.1.17a Rp 938,010.00 Rp 2,468,842.32
Pembesian 233.12 kg A.4.1.1.24 Rp 15,037.00 Rp 3,505,425.44
Bekisting 7.52 m2 A.4.1.1.21 Rp 151,830.00 Rp 1,141,761.60
SUB TOTAL Rp 31,876,326.40
A.5 PEKERJAAN PASANGAN
1 Pasangan dinding bata 1:4 18.84 m2 A.4.4.1.3 Rp 473,660.00 Rp 8,923,754.40
2 Pasangan dinding batu alam 18.84 m2 A.4.4.3.58 Rp 214,740.00 Rp 4,045,701.60
3 Plesteran 76.08 m2 A.4.4.2.3 Rp 57,780.00 Rp 4,395,902.40
4 Pengecatan 76.08 m2 A.4.7.1.10 Rp 18,650.00 Rp 1,418,892.00
SUB TOTAL Rp 18,784,250.40
A.6 PEKERJAAN SANITASI
1 Pasang pipa pvc Ø 4'' 8.00 m1 A.5.1.1.32 Rp 127,740.00 Rp 1,021,920.00
2 Pasang pipa pvc Ø 3/4'' 8.00 m1 A.5.1.1.26 Rp 21,680.00 Rp 173,440.00
3 Pasang Popmpa air simber sible 2.00 bh Ls Rp 6,000,000.00 Rp 12,000,000.00
4 Pasang kran air mancur 2.00 bh ls Rp 500,000.00 Rp 1,000,000.00
SUB TOTAL Rp 14,195,360.00

JUMLAH. A Rp 78,844,220.30
B PEMBANGUNAN PATUNG SINGA
B.1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi dan bongkaran 28.30 Ls ls Rp 50,000.00 Rp 1,415,000.00
SUB TOTAL Rp 1,415,000.00
B.2 PEKERJAAN TANAH
1 Galian tanah 5.65 m3 A.4.1.1.18a Rp 145,210.00 Rp 820,726.92
2 Urugan pasir 0.94 m3 A.4.1.1.27 Rp 86,480.00 Rp 81,464.16
SUB TOTAL Rp 902,191.08
B.3 PEKERJAAN PONDASI
1 Pasang aanstampeng 1.88 m3 A.4.2.1.17 453,560.00 Rp 854,507.04
2 Pasang pondasi batu kali 1:4 5.18 m3 A.4.2.1.8 706,100.00 Rp 3,658,304.10
SUB TOTAL Rp 4,512,811.14
B.4 PEKERJAAN BETON
1 Umpak beton
Mengecor 5.04 m3 A.4.1.1.5 Rp 938,010.00 Rp 4,727,570.40
Pembesian 396.80 kg A.4.1.1.17a Rp 15,037.00 Rp 5,966,681.60

2 Lantai beton
Mengecor 1.32 m3 A.4.4.1.12 Rp 938,010.00 Rp 1,234,421.16
Pembesian 116.56 kg A.4.4.2.4 Rp 15,037.00 Rp 1,752,712.72
Harga Satuan Jumlah
No. Jenis Pekerjaan Volume Satuan Analisa
( Rp ) ( Rp )
Bekisting 3.76 m2 A.4.4.2.1 Rp 67,800.00 Rp 254,928.00
3 Pembuatan patung singa 1.00 bh ls Rp 25,000,000.00 Rp 25,000,000.00
SUB TOTAL Rp 13,936,313.88
B.5 PEKERJAAN PASANGAN
1 Pasangan dinding bata 1:4 25.20 m2 A.4.4.3.11 Rp 690,440.00 Rp 17,399,088.00
2 Plesteran 25.20 m2 A.4.5.1.6 Rp 115,170.00 Rp 2,902,284.00
3 Pengecatan 25.20 m2 XV.A.8.4.5.4 Rp 540.00 Rp 13,608.00
SUB TOTAL Rp 20,314,980.00

JUMLAH. B Rp 41,081,296.10
C PEMBANGUNAN GAZEBU
C.1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi dan bongkaran 18.00 Ls ls Rp 50,000.00 Rp 900,000.00
SUB TOTAL Rp 900,000.00
C.2 PEKERJAAN TANAH
1 Galian tanah 8.64 m3 A.4.4.1.3 Rp 236,830.00 Rp 2,046,211.20
2 Urugan pasir 1.44 m3 A.4.4.1.13 Rp 117,380.00 Rp 169,027.20
SUB TOTAL Rp 2,215,238.40
C.3 PEKERJAAN PONDASI
1 Pasang aanstampeng 2.88 m3 A.4.4.2.14 65,020.00 Rp 187,257.60
2 Pasang pondasi batu kali 1:4 7.92 m3 A.4.4.2.2 60,840.00 Rp 481,852.80
SUB TOTAL Rp 669,110.40
C.4 PEKERJAAN BETON
1 Sloof
Mengecor 0.72 m3 A.4.1.1.5 Rp 938,010.00 Rp 675,367.20
Pembesian 103.54 kg A.4.1.1.17a Rp 15,037.00 Rp 1,556,870.83
Bekisting 9.60 m2 A.4.1.1.21 Rp 151,830.00 Rp 1,457,568.00

2 Rabat lantai
Mengecor 1.80 m3 A.4.4.3.9 Rp 938,010.00 Rp 1,688,418.00

SUB TOTAL Rp 5,378,224.03


C.5 PEKERJAAN PLAFOND
1 Pasang plafond eternit 50.00 m2 A.4.5.1.1 Rp 30,080.00 Rp 1,504,000.00
2 Pasang rangka plafond 50.00 m2 A.4.6.1.19a Rp 173,590.00 Rp 8,679,500.00

SUB TOTAL Rp 10,183,500.00


C.6 PEKERJAAN PENUTUP ATAP
1 Pasang penutup atap genteng 86.00 m2 A.4.5.2.1 Rp 79,070.00 Rp 6,800,020.00
2 Pasang genteng bubungan 34.40 m1 A.4.5.2.4 Rp 84,040.00 Rp 2,890,976.00
SUB TOTAL Rp 9,690,996.00
C.7 PEKERJAAN KAYU
1 Pasang rangka atap 86.00 m2 A.4.6.1.16 Rp 172,040.00 Rp 14,795,440.00
2 Pasang kuda-kuda 0.61 m3 A.4.6.1.13b Rp 15,734,300.00 Rp 9,576,524.35
3 Pasang konstruksi gording 0.23 m3 A.4.6.1.15 Rp 18,130,260.00 Rp 4,177,211.90
4 Pasang tiang kayu 0.54 m3 A.4.6.1.2a Rp 12,756,660.00 Rp 6,888,596.40
5 Pasang lantai papan kayu 0.54 m3 A.4.6.1.5b Rp 822,420.00 Rp 444,106.80
SUB TOTAL Rp 35,881,879.46
C.8 PEKERJAAN PENGECATAN
1 Pengecatan gazebu 2.00 unit Ls Rp 2,500,000.00 Rp 5,000,000.00
SUB TOTAL Rp 5,000,000.00
JUMLAH. C Rp 69,918,948.29
D PEMBANGUNAN PLYGROUND
D.1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi dan bongkaran 45.00 Ls ls Rp 50,000.00 Rp 2,250,000.00
SUB TOTAL Rp 2,250,000.00
D.2 PEKERJAAN TANAH
1 Galian tanah 0.72 m3 A.4.4.3.20 Rp 63,040.00 Rp 45,388.80
2 Urugan pasir 4.50 m3 A.4.4.3.60 Rp 147,840.00 Rp 665,280.00
SUB TOTAL Rp 710,668.80
D.3 PEKERJAAN BETON
1 Sloof
Mengecor 0.81 m3 A.4.1.1.5 Rp 938,010.00 Rp 759,788.10
Pembesian 87.08 kg A.4.1.1.17a Rp 15,037.00 Rp 1,309,482.11
Bekisting 10.80 m2 A.4.1.1.21 Rp 151,830.00 Rp 1,639,764.00

2 Rabat lantai
Mengecor 4.50 m3 A.4.6.1.2b Rp 938,010.00 Rp 4,221,045.00
Pembesian 558.00 kg A.4.1.1.17a Rp 15,037.00 Rp 8,390,646.00
SUB TOTAL Rp 16,320,725.21
Harga Satuan Jumlah
No. Jenis Pekerjaan Volume Satuan Analisa
( Rp ) ( Rp )
D.4 PEKERJAAN BESI
1 Pembuatan prusutan 1.00 bh LS Rp 35,000,000.00 Rp 35,000,000.00
2 Pembuatan ayunan 2.00 bh LS Rp 1,750,000.00 Rp 3,500,000.00
3 Pasang kursi taman 2.00 bh LS Rp 1,250,000.00 Rp 2,500,000.00
SUB TOTAL Rp 41,000,000.00
JUMLAH. D Rp 60,281,394.01
E PERKERASAN SIRKULASI
E.1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi dan bongkaran 150.00 Ls ls Rp 50,000.00 Rp 7,500,000.00
SUB TOTAL Rp 7,500,000.00
E.2 PEKERJAAN TANAH
1 Galian tanah 30.00 m3 A.2.3.1.1 Rp 63,250.00 Rp 1,897,500.00
2 Urugan pasir 15.00 m3 A.2.3.1.11 Rp 163,300.00 Rp 2,449,500.00
SUB TOTAL Rp 4,347,000.00
E.3 PEKERJAAN BETON
1 Jalan setapak
Mengecor 15.00 m3 A.4.1.1.5 Rp 938,010.00 Rp 14,070,150.00
Pembesian 1860.00 kg A.4.1.1.17a Rp 15,037.00 Rp 27,968,820.00
Bekisting 15.00 m2 A.4.1.1.21 Rp 151,830.00 Rp 2,277,450.00
SUB TOTAL Rp 44,316,420.00
JUMLAH. E Rp 56,163,420.00
F PEMBANGUNAN TUGU PENANDA
F.1 PEKERJAAN TANAH
1 Galian tanah 5.00 m3 A.2.3.1.1 Rp 63,250.00 Rp 316,250.00
2 Urugan pasir 0.50 m3 A.2.3.1.11 Rp 163,300.00 Rp 81,650.00
SUB TOTAL Rp 397,900.00
F.2 PEKERJAAN BETON
1 Tugu
Mengecor 6.00 m3 A.4.1.1.5 Rp 938,010.00 Rp 5,628,060.00
Pembesian 843.20 kg A.4.1.1.17a Rp 15,037.00 Rp 12,679,198.40
Bekisting 72.00 m2 A.4.1.1.25 Rp 507,680.00 Rp 36,552,960.00
SUB TOTAL Rp 54,860,218.40
F.3 PEKERJAAN PENGECATAN -
1 Pengecatan tugu 48.00 m2 A.4.7.1.10 18,650.00 Rp 895,200.00
SUB TOTAL Rp 895,200.00
JUMLAH. F Rp 56,153,318.40
G PEMBANGUNAN PAPAN NAMA TAMN SINGO MERTO
G.1 PEKERJAAN TANAH
1 Galian tanah 6.00 m3 A.2.3.1.1 Rp 63,250.00 Rp 379,500.00
2 Urugan pasir 0.40 m3 A.2.3.1.11 Rp 163,300.00 Rp 65,320.00
SUB TOTAL Rp 444,820.00
G.2 PEKERJAAN BETON
1 Foot plat
Mengecor 0.80 m3 A.4.1.1.5 Rp 938,010.00 Rp 750,408.00
Pembesian 75.72 kg A.4.1.1.17a Rp 15,037.00 Rp 1,138,641.74
Bekisting 2.32 m2 A.4.1.1.20 Rp 143,890.00 Rp 333,824.80
2 Sloof
Mengecor 0.30 m3 A.4.1.1.5 Rp 938,010.00 Rp 281,403.00
Pembesian 39.71 kg A.4.1.1.17a Rp 15,037.00 Rp 597,119.27
Bekisting 3.00 m2 A.4.1.1.21 Rp 151,830.00 Rp 455,490.00
3 Pilar
Mengecor 1.26 m3 A.4.1.1.5 Rp 938,010.00 Rp 1,181,892.60
Pembesian 166.78 kg A.4.1.1.17a Rp 15,037.00 Rp 2,507,900.93
Bekisting 21.00 m2 A.4.1.1.22 Rp 344,380.00 Rp 7,231,980.00
SUB TOTAL Rp 14,478,660.34
G.3 PEKERJAAN BESI
1 Pasang huruf stainlees (taman singo merto) 900.00 cm ls 9,500.00 Rp 8,550,000.00
SUB TOTAL Rp 8,550,000.00
G.4 PEKERJAAN PENGECATAN -
1 Pengecatan pilar 21.00 m2 A.4.7.1.10 18,650.00 Rp 391,650.00
SUB TOTAL Rp 391,650.00
JUMLAH. G Rp 23,865,130.34
H PEMBANGUNAN RUKO
H.1 PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 40.00 m2 A.2.2.1.9 13,800.00 Rp 552,000.00
2 Pengukuran dan pemasangan bowplank 34.00 m1 A.2.2.1.4 50,570.00 Rp 1,719,380.00
SUB TOTAL Rp 2,271,380.00
H.2 PEKERJAAN TANAH
1 Galian tanah 16.64 m3 A.2.3.1.1 63,250.00 Rp 1,052,480.00
2 Urugan sirtu 24.00 m3 A.2.3.1.14 188,600.00 Rp 4,526,400.00
Harga Satuan Jumlah
No. Jenis Pekerjaan Volume Satuan Analisa
( Rp ) ( Rp )
3 Urugan pasir 2.08 m3 A.2.3.1.11 163,300.00 Rp 339,664.00
SUB TOTAL Rp 5,918,544.00
H.3 PEKERJAAN PONDASI
1 Pasang aanstampeng 4.16 m3 A.3.2.1.9 398,940.00 Rp 1,659,590.40
2 Pasang pondasi batu kali 1:4 18.20 m3 A.3.2.1.2 767,590.00 Rp 13,970,138.00
SUB TOTAL Rp 15,629,728.40
H.4 PEKERJAAN BETON
1 Foot plat
Mengecor 0.51 m3 A.4.1.1.5 938,010.00 Rp 480,261.12
Pembesian 52.91 kg A.4.1.1.17a 15,037.00 Rp 795,557.55
Begesting 2.56 m2 A.4.1.1.20 143,890.00 Rp 368,358.40
2 Kolom pedestail Rp -
Mengecor 1.28 m3 A.4.1.1.5 938,010.00 Rp 1,200,652.80
Pembesian 90.30 kg A.4.1.1.17a 15,037.00 Rp 1,357,901.25
Begesting 12.80 m2 A.4.1.1.22 344,380.00 Rp 4,408,064.00
3 Sloof 20/30 Rp -
Mengecor 1.56 m3 A.4.1.1.5 938,010.00 Rp 1,463,295.60
Pembesian 206.49 kg A.4.1.1.17a 15,037.00 Rp 3,105,020.20
Begesting 15.60 m2 A.4.1.1.21 151,830.00 Rp 2,368,548.00
4 Kolom 30/40 Rp -
Mengecor 3.84 m3 A.4.1.1.5 938,010.00 Rp 3,601,958.40
Pembesian 344.45 kg A.4.1.1.17a 15,037.00 Rp 5,179,464.58
Begesting 44.80 m2 A.4.1.1.22 344,380.00 Rp 15,428,224.00
5 Kolom 15/15 Rp -
Mengecor 0.27 m3 A.4.1.1.5 938,010.00 Rp 253,262.70
Pembesian 61.44 kg A.4.1.1.17a 15,037.00 Rp 923,873.28
Begesting 7.20 m2 A.4.1.1.22 344,380.00 Rp 2,479,536.00
6 Balok induk Rp -
Mengecor 4.32 m3 A.4.1.1.5 938,010.00 Rp 4,052,203.20
Pembesian 578.45 kg A.4.1.1.17a 15,037.00 Rp 8,698,122.58
Begesting 39.60 m2 A.4.1.1.23 358,730.00 Rp 14,205,708.00
7 Balok anak Rp -
Mengecor 1.60 m3 A.4.1.1.5 938,010.00 Rp 1,500,816.00
Pembesian 248.88 kg A.4.1.1.17a 15,037.00 Rp 3,742,408.56
Begesting 20.00 m2 A.4.1.1.23 358,730.00 Rp 7,174,600.00
8 Plat atap Rp -
Mengecor 8.40 m3 A.4.1.1.5 938,010.00 Rp 7,879,284.00
Pembesian 868.00 kg A.4.1.1.17a 15,037.00 Rp 13,052,116.00
Begesting 70.00 m2 A.4.1.1.24 468,580.00 Rp 32,800,600.00
SUB TOTAL Rp 136,519,836.21
H.5 PEKERJAAN BESI DAN ALUMUNIUM
1 Pasang pintu harmonika 12.00 m2 ls 1,500,000.00 Rp 18,000,000.00
2 Pasang kusen alumunium 17.50 m1 A.4.2.1.11a 170,540.00 Rp 2,984,450.00
3 Pasang Huruf Stainlees (taman desa) 540.00 cm Ls 9,500.00 Rp 5,130,000.00
4 Pasang tangga besi 1.00 bh ls Rp 500,000.00 Rp 500,000.00
SUB TOTAL Rp 26,614,450.00

H.6 PEKERJAAN PASANGAN DINDING


1 Pasangngan 1/2 bata 1:4 140.00 m2 A.4.4.1.9 116,870.00 Rp 16,361,800.00
2 Plesteran 1:4 280.00 m2 A.4.4.2.4 Rp 55,730.00 Rp 15,604,400.00
SUB TOTAL Rp 31,966,200.00
H.7 PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Rabat lantai 11.20 m3 A.4.1.1.1 Rp 830,960.00 Rp 9,306,752.00
2 Pasang keramik lantai 40.00 m2 A.4.4.3.34a Rp 212,640.00 Rp 8,505,600.00
3 Pasang keramik KM 2.25 m2 A.4.4.3.35c 218,940.00 Rp 492,615.00
4 Pasang keramik dinding KM 7.50 m2 A.4.4.3.35c Rp 218,940.00 Rp 1,642,050.00
SUB TOTAL Rp 19,947,017.00
H.8 PEKERJAAN KUNCI DAN KACA
1 Pasang kunci tanam 1.00 bh A.4.6.2.1 591,330.00 Rp 591,330.00
2 Pasang Kaca 10.00 m2 A.4.6.2.18 339,990.00 Rp 3,399,900.00
SUB TOTAL Rp 3,991,230.00
H.9 PEKERJAAN PENGECATAN
1 Pengecatan gedung 328.00 m2 A.4.7.1.10 18,650.00 Rp 6,117,200.00
SUB TOTAL Rp 6,117,200.00
H.10 PEKERJAAN SANITASI
1 Pembuatan sumur bor 1.00 bh Ls 200,000.00 Rp 200,000.00
2 Pasang pompa air 1.00 bh Ls 480,000.00 Rp 480,000.00
3 Pasang pipa pvc Ø 3/4'' 80.00 m1 A.5.1.1.26 21,680.00 Rp 1,734,400.00
4 Pasang pipa pvc Ø 4'' 16.00 m1 A.5.1.1.32 127,740.00 Rp 2,043,840.00
5 Pembuatan sapticktank 1.00 bh Ls 2,500,000.00 Rp 2,500,000.00
6 Pembuatan sumur resapan 1.00 bh Ls 1,700,000.00 Rp 1,700,000.00
Harga Satuan Jumlah
No. Jenis Pekerjaan Volume Satuan Analisa
( Rp ) ( Rp )
7 Pasang tandon air 1.00 bh Ls 1,350,000.00 Rp 1,350,000.00
8 Pasang kloset jongkok 1.00 bh A.5.1.1.1 2,014,780.00 Rp 2,014,780.00
SUB TOTAL Rp 12,023,020.00
H.11 PEKERJAAN INSTALASI LISTRIK
1 Pasang daya 1300 1.00 titk Ls 1,300,000.00 Rp 1,300,000.00
2 Pasang instalasi listrik 10.00 titik Ls 85,000.00 Rp 850,000.00
3 Pasang kabel 300.00 m1 Ls 10,500.00 Rp 3,150,000.00
4 Pasang stop kontak 4.00 bh Ls 24,000.00 Rp 96,000.00
5 Pasang skakelar 10.00 bh Ls 29,000.00 Rp 290,000.00
SUB TOTAL Rp 5,686,000.00

JUMLAH. H Rp 266,684,605.61

JUMLAH KESELURUHAN Rp 652,992,333.05


DIBULATKAN Rp 652,992,000.00