Anda di halaman 1dari 1

PEMILIK PROYEK

STA 2+275
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN SIDOARJO

12.00 12.00
KEGIATAN

PENINGKATAN JALAN

11.00 11.00 PEKERJAAN

AC-BC (L) t= 6 cm
Prime Coat PENINGKATAN JALAN
℄ BARU
Agregat Klas A t= 15 cm TAMBAK KEMERAAN-KRIAN (GRESIKAN)
Bahu Jalan Agregat Klas A
10.00 Bahu Jalan Agregat Klas A 10.00
LOKASI PEKERJAAN
4% 2% 2% 4%

KECAMATAN KRIAN
9.00 9.00
KONSULTAN PERENCANA

8.00 8.00
9.504

9.504

9.504

9.395

9.536

9.576

9.536

9.265
DIRENCANAKAN TANDA TANGAN

-6.85 -4.25 -2.00 0.00 2.00 3.45 RINNO IQSYAM P., ST.
OPERATOR AUTOCAD

DIPERIKSA

STA 2+300 YULIONO, S.T


AHLI PERENCANAAN JALAN

DISETUJUI

Ir. Moch. Agus Mucharom


TEAM LEADER

MENYETUJUI
KEPALA BIDANG PEMBANGUNAN
12.00 12.00 DAN PENINGKATAN
JALAN DAN JEMBATAN

Ir. JUDI TETRAHASTOTO


NIP. 19670423 199403 1 010

11.00 11.00 MENGETAHUI


KEPALA DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN SIDOARJO

AC-BC (L) t= 6 cm
Prime Coat
℄ BARU
Agregat Klas A t= 15 cm
Bahu Jalan Agregat Klas A Ir. SIGIT SETYAWAN, MT

10.00 Bahu Jalan Agregat Klas A 10.00 NIP. 19611121 198903 1 008

JUDUL GAMBAR SKALA


4% 2% 2% 4%

9.00 9.00

8.00 8.00
KODE GAMBAR NOMER GAMBAR JUMLAH GAMBAR
9.349

9.349

9.349

9.395

9.539

9.579

9.539

9.232
CR

KETERANGAN :
-6.15 -3.55 -2.00 0.00 2.00 3.55

Anda mungkin juga menyukai