STA 2+275
DINAS PEKERJAAN UMUM
DAN PENATAAN RUANG
KABUPATEN SIDOARJO
12.00 12.00
KEGIATAN
PENINGKATAN JALAN
AC-BC (L) t= 6 cm
Prime Coat PENINGKATAN JALAN
℄ BARU
Agregat Klas A t= 15 cm TAMBAK KEMERAAN-KRIAN (GRESIKAN)
Bahu Jalan Agregat Klas A
10.00 Bahu Jalan Agregat Klas A 10.00
LOKASI PEKERJAAN
4% 2% 2% 4%
KECAMATAN KRIAN
9.00 9.00
KONSULTAN PERENCANA
8.00 8.00
9.504
9.504
9.504
9.395
9.536
9.576
9.536
9.265
DIRENCANAKAN TANDA TANGAN
-6.85 -4.25 -2.00 0.00 2.00 3.45 RINNO IQSYAM P., ST.
OPERATOR AUTOCAD
DIPERIKSA
DISETUJUI
MENYETUJUI
KEPALA BIDANG PEMBANGUNAN
12.00 12.00 DAN PENINGKATAN
JALAN DAN JEMBATAN
AC-BC (L) t= 6 cm
Prime Coat
℄ BARU
Agregat Klas A t= 15 cm
Bahu Jalan Agregat Klas A Ir. SIGIT SETYAWAN, MT
10.00 Bahu Jalan Agregat Klas A 10.00 NIP. 19611121 198903 1 008
9.00 9.00
8.00 8.00
KODE GAMBAR NOMER GAMBAR JUMLAH GAMBAR
9.349
9.349
9.349
9.395
9.539
9.579
9.539
9.232
CR
KETERANGAN :
-6.15 -3.55 -2.00 0.00 2.00 3.55