Anda di halaman 1dari 50

STANDAR NASIONAL INDON

DAFTAR ANALISA HARGA UPA


DINAS PEKERJAAN UMUM KABUPA
TAHUN ANGGARAN

( 1 ) PEKERJAAN PERSIAPAN
1 PAGAR SEMENTARA DARI KAYU TINGGI 2 METER

6,1,1 Bahan
1.25 btg Dolken Ø 8-10 Cm
2.5 kg Semen (PC)
0.005 m3 Pasir Beton/Pasangan
0.009 m3 Batu Pecah 2/3 cm
0.072 m3 Kayu Kelas IV Usuk 5/7
0.06 kg Paku 2-5"
0.4 ltr Teer Residu
Upah :
0.2 Oh Tukang Kayu
0.4 Oh Pekerja
0.02 Oh Kepala Tukang
0.02 Oh Mandor Lapangan
2 PAGAR SEMENTARA/ SENG GELOMBANG TINGGI 2 METER
6,2,1 Bahan
1.25 btg Dolken Ø 8-10 Cm
2.5 kg Semen (PC)
1.2 lbr Seng Gelombang
0.005 m3 Pasir Beton/Pasangan
0.009 m3 Batu Pecah 2/3 cm
0.072 m3 Kayu Kelas IV Usuk 5/7
0.06 kg Paku 2-5"
0.45 kg Cat Meni Besi/kayu
Upah :
0.2 Oh Tukang Kayu
0.4 Oh Pekerja
0.02 Oh Kepala Tukang
0.02 Oh Mandor Lapangan
3 PAGAR SEMENTARA DARI KAWAT DURI TINGGI 1.8 m
6,3,1 Bahan
1 bt Dolken Ø 8-10 Cm
2 kg Semen (PC)
25 kg Kawat duri
0.005 m3 Pasir Beton/Pasangan
0.009 m3 Batu Pecah 2/3 cm
0.06 kg Paku 2-5"
Upah :
0.2 Oh Tukang Kayu
0.3 Oh Pekerja
0.02 Oh Kepala Tukang
0.02 Oh Mandor Lapangan
4 PENGUKURAN DAN PEMASANGAN BOWPLANK
6,4,1 Bahan
0.012 m3 Kayu Kelas IV Usuk 5/7
0.02 kg Paku 2-5"
0.007 m3 Kayu Kelas IV Papan 2/20
Upah :
0.1 Oh Tukang Kayu
0.1 Oh Pekerja
0.01 Oh Kepala Tukang
0.005 Oh Mandor Lapangan
5 PEMBUATAN KANTOR SEMENTARA/DIREKSI KEET/Lt. plesteran
6,5,1 Bahan
1.25 bt Dolken Ø 8-10 Cm
0.18 m3 Kayu Kelas IV
0.85 kg Paku 2-5"
1.1 kg Besi Strip
35 Kg Semen (PC)
0.15 m3 Pasir Beton/Pasangan
0.1 m3 Pasir Beton/Pasangan
0.15 m3 Batu Pecah 0,5 + 1 cm Koral beton
30 Bh Batu Bata Kecil
0.25 Lbr Seng Plat
2 Bh Kaca nako reyben 5 mm (lengkap)
0.08 M2 Kaca 3 mm
0.15 Bh Kunci tanam 1 x putar
0.06 Lbr Teakwood
Upah :
2 Oh Tukang Kayu
1 Oh Tukang Batu
2 Oh Pekerja
0.3 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
6 PEMBUATAN GUDANG SEMEN DAN ALAT2
6,6,1 Bahan
1.7 bt Dolken Ø 8-10 Cm
0.21 m3 Kayu Kelas IV
0.3 Kg Paku 2-5"
10.5 Kg Semen (PC)
0.03 m3 Pasir Beton/Pasangan
0.05 m3 Batu Pecah 2/3 cm
1.5 lbr Seng Gelombang
0.3 kg Paku 2-5"
Upah :
2 Oh Tukang Kayu
1 Oh Pekerja
0.2 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
7 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
6,7,1 Bahan
3 bt Dolken Ø 8-10 Cm
0.276 m3 Kayu Kelas IV Usuk 5/7
1.5 lbr Seng Gelombang
0.7 kg Paku 2-5"
Upah :
1.5 Oh Tukang Kayu
1 Oh Pekerja
0.15 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
8 PEKERJAAN PEMBERSIHAN LAPANGAN DAN PEMERATAAN
6,8,1 Bahan -
Upah :
0.1 Hr Pekerja
0.05 Hr Mandor Lapangan
9 PEMBUATAN BEDENG BURUH
6,9,1 Bahan
1.25 bt Dolken Ø 8-10 Cm
18 kg Semen (PC)
0.186 m3 Kayu Kelas IV Usuk 5/7
0.03 m3 Pasir Beton/Pasangan
0.05 m3 Batu Pecah 2/3 cm
1.35 lbr - Triplek Uk. 4,0 mm
1.5 lbr Seng Gelombang
0.3 kg Paku 2-5"
Upah :
2 Oh Tukang Kayu
1 Oh Pekerja
0.2 Oh Kepala Tukang
0.05 Oh Mandor Lapangan
10 PEMBUATAN BAK ADUKAN ( 40 X 50 X 20 )
6,10,1 Bahan
0.036 m3 Kayu Kelas IV Kayu Terentang
0.08 Btng Kayu Papan Kelas II Kaso 5/7
1 kg Paku 2-5"
Upah :
0.3 Oh Tukang Kayu
0.0015 Oh Mandor Lapangan
11 PEMBUATAN STEGGER BAMBU/40 X 50 X 20
6,11,1 Bahan
1 BT Bambu 6-8/600cm
0.25 kg Tali ijuk
Upah :
0.017 Oh Tukang Kayu
0.002 Oh Pekerja
0.25 Oh Kepala Tukang
0.013 Oh Mandor Lapangan
12 PEMBUATAN JALAN SEMENTARA
6,12,1 Bahan
0.15 m3 Batu Belah / Batu Gunung
0.09 m3 Batu Pecah 5/7 cm
0.01 m3 Pasir Beton/Pasangan
Upah :
1 Oh Tukang
0.05 Oh Mandor Lapangan
13 PEMBERSIHAN LAPANGAN DAN PERATAAN
6,13,1 Upah :
0.100 Oh Pekerja
0.050 Oh Mandor Lapangan
14 BONGKARAN BETON BERTULANG
6,14,1
Upah
6.667 Oh Pekerja
0.333 Oh Mandor Lapangan
15 BONGKARAN DINDING TEMBOK BATA MERAH
6,15,1
Upah
6.667 Oh Pekerja
0.333 Oh Mandor Lapangan
16 BONGKAR GENTING BUBUNGAN
6,16,1 Bahan -
Upah
0.04 Oh Pekerja
17 BONGKAR ATAP
6,17,1 Bahan -
Upah
0.025 Oh Tukang Kayu
0.0025 Oh Pekerja
0.1 Oh Kepala Tukang
0.005 Oh Mandor Lapangan
18 MENURUNKAN GENTENG
6,18,1 Bahan -
Upah
0.02 Oh Pekerja
0.001 Oh Mandor Lapangan
19 BONGKAR PLAFON HANGER
6,19,1 Bahan -
Upah
0.5 Oh Pekerja
20 BONGKAR KUDA-KUDA
6,20,1 Bahan -
Upah
6 Oh Tukang Kayu
0.6 Oh Pekerja
4 Oh Kepala Tukang
0.2 Oh Mandor Lapangan
21 MENGUPAS PLESTERAN
6,21,1 Bahan -
Upah
0.05 Oh Pekerja
0.0025 Oh Mandor Lapangan
22 BONGKAR DINDING TEMBOK
6,22,1 Bahan -
Upah
2 Oh Pekerja
0.1 Oh Mandor Lapangan
23 BONGKAR LANTAI
6,23,1 Bahan -
Upah
0.2 Oh Pekerja
0.01 Oh Mandor Lapangan
24 BONGKAR PONDASI
6,24,1 Bahan -
Upah
4 Oh Pekerja
0.4 Oh Mandor Lapangan
25 MENGUPAS BIDANG CAT
6,25,1 Bahan -
Upah
0.04 Oh Pekerja
( 2 ) PEKERJAAN TA
1 GALIAN TANAH BIASA SEDALAM 1 M
6,1,2 Bahan -
Upah :
0.4 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.04 Oh Mandor Lapangan
2 GALIAN TANAH BIASA SEDALAM 2 M
6,2,2 Bahan -
Upah :
0.526 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.052 Oh Mandor Lapangan
3 BOR STRUSS
6,3,2 Bahan -
Upah :
1.23 Oh Pekerja
0 Oh Tukang Gali
0.05 Oh Kepala Tukang Gali
0.073 Oh Mandor Lapangan
4 GALIAN TANAH KERAS SEDALAM 1 M
6,4,2 Bahan -
Upah :
0.625 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.062 Oh Mandor Lapangan
5 GALIAN TANAH LUMPUR SEDALAM 1 M
6,5,2 Bahan -
Upah :
0.823 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.083 Oh Mandor Lapangan
6 PEKERJAAN STRIPPING SETINGGI 1 M
6,6,2 Bahan -
Upah :
0.05 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.005 Oh Mandor Lapangan
7 PEMBUANGAN TANAH SEJAUH 150 M
6,7,2 Bahan -
Upah :
0.516 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.05 Oh Mandor Lapangan
8 URUGAN KEMBALI
6,8,2 Bahan -
Upah :
0.192 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.019 Oh Mandor Lapangan
9 PEKERJAAN PEMADATAN TANAH
6,9,2 Bahan -
Upah :
0.5 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.05 Oh Mandor Lapangan
10 URUGAN PASIR
6,10,2 Bahan
1.2 M3 Pasir Urug
Upah :
0.3 Oh Pekerja
0 Oh Tukang Gali
0 Oh Kepala Tukang Gali
0.01 Oh Mandor Lapangan
15 URUGAN SIRTU
6,15,2 Bahan
1.2 M3 Sirtu
Upah :
0.25 Oh Pekerja
0 Oh Tukang
0 Oh Kepala Tukang
0.025 Oh Mandor Lapangan
16 URUGAN TANAH GUNUNG/MERAH
6,16,2 Bahan
1.2 m3 Tanah Puru
Upah :
0.3 Oh Pekerja
0.004 Oh Tukang Gali
0.042 Oh Kepala Tukang Gali
0.01 Oh Mandor Lapangan
( 3 ) PEKERJAAN PON
5 PONDASI BATU KALI 1 PC : 4 PS
6,5,3 Bahan
1.1 m3 Batu Belah / Batu Gunung
163 kg Semen (PC)
0.52 m3 Pasir Beton/Pasangan
Upah :
1.5 Oh Pekerja
0.6 Oh Tukang
0.06 Oh Kepala Tukang
0.075 Oh Mandor Lapangan
6 PONDASI BATU KALI 1 PC : 5 PS
6,6,3 Bahan
1.1 m3 Batu Belah / Batu Gunung
136 kg Semen (PC)
0.544 m3 Pasir Beton/Pasangan
Upah :
1.5 Oh Pekerja
0.6 Oh Tukang
0.06 Oh Kepala Tukang
0.075 Oh Mandor Lapangan
14 PONDASI BATU KOSONG/ ANSTAMPENG
6,14,3 Bahan
1.2 m3 Batu Belah / Batu Gunung
0.3 m3 Pasir Urug
Upah :
0.78 Oh Pekerja
0.39 Oh Tukang
0.039 Oh Kepala Tukang
0.039 Oh Mandor Lapangan
15 PONDASI SIKLOP 40% BATU KALI
6,15,3 Bahan
75 kg Besi Beton
202 kg Semen (PC)
0.8 kg Kawat Beton
0.49 m3 Batu Pecah 2/3 cm
0.32 m3 Pasir Beton/Pasangan
Upah :
3 Oh Pekerja
0.85 Oh Tukang
0.085 Oh Kepala Tukang
0.15 Oh Mandor Lapangan
16 PONDASI SUMURAN/ D : 100 CM
6,16,3 Bahan
0.45 m3 Batu Belah / Batu Gunung
280 kg Semen (PC)
0.67 m3 Batu Pecah 2/3 cm
0.45 m3 Pasir Beton/Pasangan
Upah :
2.38 Oh Pekerja
0.3 Oh Tukang
0.03 Oh Kepala Tukang
0.08 Oh Mandor Lapangan
17 PEMBUATAN TIANG PANCANG/40 X 40/ BETON BERTULANG
6,17,3 Bahan
0.019 m3 Pasir Urug
0.094 m3 Pasir Beton/Pasangan
0.15 m3 Batu Pecah 2/3 cm
60 kg Semen (PC)
45 kg Besi Beton
AL INDONESIA (S N I )
ARGA UPAH DAN BAHAN
M KABUPATEN BANGKA BARAT
NGGARAN 2016

SIAPAN Overhead 10%

1m' Harga upah+Bahan Jumlah Rp 275,375 Rp 302,913

@ Rp 8,500 Rp 10,625
@ Rp 1,300 Rp 3,250
@ Rp 65,000 Rp 325
@ Rp 475,000 Rp 4,275
@ Rp 2,000,000 Rp 144,000
@ Rp 15,000 Rp 900
@ Rp 100,000 Rp 40,000 Rp 203,375

@ Rp 130,000 Rp 26,000
@ Rp 101,000 Rp 40,400
@ Rp 140,000 Rp 2,800
@ Rp 140,000 Rp 2,800 Rp 72,000
1m' Rp 319,915 Rp 351,907

@ Rp 8,500 Rp 10,625
@ Rp 1,300 Rp 3,250
@ Rp 51,700 Rp 62,040
@ Rp 65,000 Rp 325
@ Rp 475,000 Rp 4,275
@ Rp 2,000,000 Rp 144,000
@ Rp 15,000 Rp 900
@ Rp 50,000 Rp 22,500 Rp 247,915

@ Rp 130,000 Rp 26,000
@ Rp 101,000 Rp 40,400
@ Rp 140,000 Rp 2,800
@ Rp 140,000 Rp 2,800 Rp 72,000
1m' Rp 453,500 Rp 498,850

@ Rp 8,500 Rp 8,500
@ Rp 1,300 Rp 2,600
@ Rp 15,000 Rp 375,000
@ Rp 65,000 Rp 325
@ Rp 475,000 Rp 4,275
@ Rp 15,000 Rp 900 Rp 391,600

@ Rp 130,000 Rp 26,000
@ Rp 101,000 Rp 30,300
@ Rp 140,000 Rp 2,800
@ Rp 140,000 Rp 2,800 Rp 61,900
1m' Rp 63,500 Rp 69,850
@ Rp 2,000,000 Rp 24,000
@ Rp 15,000 Rp 300
@ Rp 2,000,000 Rp 14,000 Rp 38,300

@ Rp 130,000 Rp 13,000
@ Rp 101,000 Rp 10,100
@ Rp 140,000 Rp 1,400
@ Rp 140,000 Rp 700 Rp 25,200
1m2 Rp 1,363,625 Rp 1,499,988

@ Rp 8,500 Rp 10,625
@ Rp 2,000,000 Rp 360,000
@ Rp 15,000 Rp 12,750
@ Rp 25,000 Rp 27,500
@ Rp 1,300 Rp 45,500
@ Rp 65,000 Rp 9,750
@ Rp 65,000 Rp 6,500
@ Rp 485,000 Rp 72,750
@ Rp 1,600 Rp 48,000
@ Rp 45,000 Rp 11,250
@ Rp 40,000 Rp 80,000
@ Rp 160,000 Rp 12,800
@ Rp 120,000 Rp 18,000
@ Rp 120,000 Rp 7,200 Rp 722,625

@ Rp 130,000 Rp 260,000
@ Rp 130,000 Rp 130,000
@ Rp 101,000 Rp 202,000
@ Rp 140,000 Rp 42,000
@ Rp 140,000 Rp 7,000 Rp 641,000
1m2 Rp 951,850 Rp 1,047,035

@ Rp 8,500 Rp 14,450
@ Rp 2,000,000 Rp 420,000
@ Rp 15,000 Rp 4,500
@ Rp 1,300 Rp 13,650
@ Rp 65,000 Rp 1,950
@ Rp 475,000 Rp 23,750
@ Rp 51,700 Rp 77,550 Rp 555,850
@ Rp -

@ Rp 130,000 Rp 260,000
@ Rp 101,000 Rp 101,000
@ Rp 140,000 Rp 28,000
@ Rp 140,000 Rp 7,000 Rp 396,000
1m2 Rp 1,006,650 Rp 1,107,315

@ Rp 8,500 Rp 25,500
@ Rp 2,000,000 Rp 552,000
@ Rp 51,700 Rp 77,550
@ Rp 15,000 Rp 10,500 Rp 665,550

@ Rp 130,000 Rp 195,000
@ Rp 101,000 Rp 101,000
@ Rp 140,000 Rp 21,000
@ Rp 140,000 Rp 7,000 Rp 324,000
1m2 17,100.00 Rp 18,810

@ Rp 101,000 Rp 10,100
@ Rp 140,000 Rp 7,000 Rp 17,100
1m2 Rp 1,009,675 Rp 1,110,643

@ Rp 8,500 Rp 10,625
@ Rp 1,300 Rp 23,400
@ Rp 2,000,000 Rp 372,000
@ Rp 65,000 Rp 1,950
@ Rp 475,000 Rp 23,750
@ Rp 74,000 Rp 99,900
@ Rp 51,700 Rp 77,550
@ Rp 15,000 Rp 4,500 Rp 613,675

@ Rp 130,000 Rp 260,000
@ Rp 101,000 Rp 101,000
@ Rp 140,000 Rp 28,000
@ Rp 140,000 Rp 7,000 Rp 396,000
1m2 Rp 326,210 Rp 358,831

@ Rp 2,000,000 Rp 72,000
@ Rp 2,500,000 Rp 200,000
@ Rp 15,000 Rp 15,000 Rp 287,000

@ Rp 130,000 Rp 39,000
@ Rp 140,000 Rp 210 Rp 39,210
1m2 Rp 65,482 Rp 72,030

@ Rp 20,000 Rp 20,000
@ Rp 25,000 Rp 6,250 Rp 26,250

@ Rp 130,000 Rp 2,210
@ Rp 101,000 Rp 202
@ Rp 140,000 Rp 35,000
@ Rp 140,000 Rp 1,820 Rp 39,232
1m2 Rp 205,525 Rp 226,078

@ Rp 212,500 Rp 31,875
@ Rp 400,000 Rp 36,000
@ Rp 65,000 Rp 650 Rp 68,525

@ Rp 130,000 Rp 130,000
@ Rp 140,000 Rp 7,000 Rp 137,000
1m2 Rp 17,100 Rp 18,810

@ Rp 101,000 Rp 10,100
@ Rp 140,000 Rp 7,000 Rp 17,100
1m3 Rp 719,987 Rp 791,986

@ Rp 101,000 Rp 673,367
@ Rp 140,000 Rp 46,620 Rp 719,987
1m3 Rp 719,987 Rp 791,986

@ Rp 101,000 Rp 673,367
@ Rp 140,000 Rp 46,620 Rp 719,987
1m' Rp 4,040 Rp 4,444

@ Rp 101,000 Rp 4,040 Rp 4,040


1m2 Rp 17,503 Rp 19,253

@ Rp 130,000 Rp 3,250
@ Rp 101,000 Rp 253
@ Rp 140,000 Rp 14,000
@ Rp - Rp 17,503
1m2 Rp 2,160 Rp 2,376

@ Rp 101,000 Rp 2,020
@ Rp 140,000 Rp 140 Rp 2,160
1m' Rp 50,500 Rp 55,550

@ Rp 101,000 Rp 50,500 Rp 50,500


1m3 Rp 1,428,600 Rp 1,571,460

@ Rp 130,000 Rp 780,000
@ Rp 101,000 Rp 60,600
@ Rp 140,000 Rp 560,000
@ Rp 140,000 Rp 28,000 Rp 1,428,600
1m2 Rp 5,400 Rp 5,940

@ Rp 101,000 Rp 5,050
@ Rp 140,000 Rp 350 Rp 5,400
1m3 Rp 216,000 Rp 237,600

@ Rp 101,000 Rp 202,000
@ Rp 140,000 Rp 14,000 Rp 216,000
1m2 Rp 21,600 Rp 23,760

@ Rp 101,000 Rp 20,200
@ Rp 140,000 Rp 1,400 Rp 21,600
1m2 Rp 460,000 Rp 506,000

@ Rp 101,000 Rp 404,000
@ Rp 140,000 Rp 56,000 Rp 460,000
1m2 Rp 4,040 Rp 4,444

@ Rp 101,000 Rp 4,040 Rp 4,040


RJAAN TANAH
1m3 Rp 46,000 Rp 50,600

@ Rp 101,000 Rp 40,400
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 5,600 Rp 46,000
1m3 Rp 60,406 Rp 66,447

@ Rp 101,000 Rp 53,126
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 7,280 Rp 60,406
1m' Rp 141,450 Rp 155,595

@ Rp 101,000 Rp 124,230
@ Rp 130,000 Rp -
@ Rp 140,000 Rp 7,000
@ Rp 140,000 Rp 10,220 Rp 141,450
1m3 Rp 71,805 Rp 78,986

@ Rp 101,000 Rp 63,125
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 8,680 Rp 71,805
1m3 Rp 94,743 Rp 104,217

@ Rp 101,000 Rp 83,123
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 11,620 Rp 94,743
1m2 Rp 5,750 Rp 6,325

@ Rp 101,000 Rp 5,050
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 700 Rp 5,750
1m3 Rp 59,116 Rp 65,028

@ Rp 101,000 Rp 52,116
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 7,000 Rp 59,116
1m3 Rp 22,052 Rp 24,257

@ Rp 101,000 Rp 19,392
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 2,660 Rp 22,052
1m3 Rp 57,500 Rp 63,250
@ Rp 101,000 Rp 50,500
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 7,000 Rp 57,500
1m3 Rp 91,700 Rp 100,870

@ Rp 50,000 Rp 60,000 Rp 60,000

@ Rp 101,000 Rp 30,300
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 1,400 Rp 31,700
1m3 Rp 130,750 Rp 143,825

@ Rp 85,000 Rp 102,000 Rp 102,000

@ Rp 101,000 Rp 25,250
@ Rp 130,000 Rp -
@ Rp 140,000 Rp -
@ Rp 140,000 Rp 3,500 Rp 28,750
1m3 Rp 113,100 Rp 124,410

@ Rp 62,500 Rp 75,000 Rp 75,000

@ Rp 101,000 Rp 30,300
@ Rp 130,000 Rp 520
@ Rp 140,000 Rp 5,880
@ Rp 140,000 Rp 1,400 Rp 38,100
RJAAN PONDASI
1m3 Rp 727,850 Rp 800,635

@ Rp 212,500 Rp 233,750
@ Rp 1,300 Rp 211,900
@ Rp 65,000 Rp 33,800 Rp 479,450

@ Rp 101,000 Rp 151,500
@ Rp 130,000 Rp 78,000
@ Rp 140,000 Rp 8,400
@ Rp 140,000 Rp 10,500 Rp 248,400
1m3 Rp 694,310 Rp 763,741

@ Rp 212,500 Rp 233,750
@ Rp 1,300 Rp 176,800
@ Rp 65,000 Rp 35,360 Rp 445,910

@ Rp 101,000 Rp 151,500
@ Rp 130,000 Rp 78,000
@ Rp 140,000 Rp 8,400
@ Rp 140,000 Rp 10,500 Rp 248,400
1m3 Rp 410,400 Rp 451,440

@ Rp 212,500 Rp 255,000
@ Rp 50,000 Rp 15,000 Rp 270,000

@ Rp 101,000 Rp 78,780
@ Rp 130,000 Rp 50,700
@ Rp 140,000 Rp 5,460
@ Rp 140,000 Rp 5,460 Rp 140,400
1m3 Rp 1,647,650 Rp 1,812,415

@ Rp 8,900 Rp 667,500
@ Rp 1,300 Rp 262,600
@ Rp 22,000 Rp 17,600
@ Rp 475,000 Rp 232,750
@ Rp 65,000 Rp 20,800 Rp 1,201,250

@ Rp 101,000 Rp 303,000
@ Rp 130,000 Rp 110,500
@ Rp 140,000 Rp 11,900
@ Rp 140,000 Rp 21,000 Rp 446,400
1m3 Rp 1,101,905 Rp 1,212,096

@ Rp 212,500 Rp 95,625
@ Rp 1,300 Rp 364,000
@ Rp 475,000 Rp 318,250
@ Rp 65,000 Rp 29,250 Rp 807,125

@ Rp 101,000 Rp 240,380
@ Rp 130,000 Rp 39,000
@ Rp 140,000 Rp 4,200
@ Rp 140,000 Rp 11,200 Rp 294,780
1m3 Rp 849,754 Rp 934,729

@ Rp 50,000 Rp 950
@ Rp 65,000 Rp 6,110
@ Rp 475,000 Rp 71,250
@ Rp 1,300 Rp 78,000
@ Rp 8,900 Rp 400,500
UPAH TENAGA KERJA DAN HARGA SATU
TAHUN 2017 KECAMATAN

PROPINSI : KEPULAUAN BANGKA BELITUNG


KABUPATEN : BANGKA BARAT
ZONA I : KECAMATAN MUNTOK & SIMPANG TERITIP
SURVEI : BULAN FEBRUARI 2017

HARI/ UPAH/HARI PAJAK ( Rp


NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN
(Rp) 10 %
1 Mandor Lapangan 1 130,000.00 0.00
2 Mekanik 1 110,000.00 0.00
3 Mekanik Pembantu 1 101,000.00 0.00
4 Kepala Tukang 1 130,000.00 0.00
5 Tukang 1 120,000.00 0.00
6 Operator Terlatih 1 120,000.00 0.00
7 Operator Kurang Terlatih 1 101,000.00 0.00
8 Pembantu Operator 1 101,000.00 0.00
9 Supir 1 110,000.00 0.00
10 Supir Personil 1 110,000.00 0.00
11 Pembantu Supir / Knek 1 101,000.00 0.00
12 Pekerja 1 101,000.00 0.00
13 Buruh Lapangan Agak Terlatih 1 101,000.00 0.00
14 Buruh Lapangan Terlatih 1 101,000.00 0.00
15 Penjaga 1 101,000.00 0.00
16 Pemasak Aspal 1 101,000.00 0.00
17 Pengangkut Air 1 101,000.00 0.00
JUMLAH HARGA PAJAK ( Rp
SATUAN /
NO. BAHAN / MATERIAL (TANPA PAJAK) PPN
UNIT
(Rp) 10 %
1 Batu Belah / Batu Gunung M3 280,000.00 0.00
2 Batu Belah untuk Saluran Pasangan M3 280,000.00 0.00
3 Batu Kacang M3 280,000.00 0.00
4 Batu Pecah 5/7 cm M3 475,000.00 0.00
5 Batu Pecah 3/5 cm M3 475,000.00 0.00
6 Batu Pecah 2/3 cm M3 475,000.00 0.00
7 Batu Pecah 1/2 cm M3 480,000.00 0.00
8 Batu Pecah 0,5 + 1 cm M3 485,000.00 0.00
9 Pasir Urug M3 50,000.00 0.00
10 Pasir Beton/Pasangan M3 65,000.00 0.00
11 Pasir Kasar M3 50,000.00 0.00
12 Tanah Puru M3 62,500.00 0.00
13 Semen (PC) Kg 1,400.00 0.00
14 Kayu Bakar m3 110,000.00 0.00
15 Kayu Cerucuk 0 8-10 cm m3 400,000.00 0.00
16 Kayu Kelas II m3 2,000,000.00 0.00
17 Kayu Kelas III m3 2,050,000.00 0.00
18 Kayu Kelas IV m3 2,000,000.00 0.00
19 Besi Beton Kg 11,000.00 0.00
20 Kawat Beton Kg 22,500.00 0.00
21 Paku Kg 14,750.00 0.00
22 Aspal Kg 12.000 s/d 14.000 0.00
23 Minyak Solar Lt 11,000.00 0.00
24 Minyak tanah Lt 14,000.00 0.00
25 Minyak Olie Lt 23,000.00 0.00
- Minyak Pelumas Bensin (Mesran) Lt 28,000.00 0.00
- Minyak Pelumas Bensin (Helix HX 7) Lt 72,000.00 0.00
- Minyak Pelumas Diesel (Mediteran S) Lt 25,000.00 0.00
- Minyak Pelumas Diesel (Curah Drum) Lt 14,000.00 0.00
26 Minyak Gemuk Klg 22,000.00 0.00
- Minyak Gemuk (Retopi 0.45 kg) klg 27,000.00
- Minyak Gemuk (Win 0.45 kg) klg 20,000.00
27 Besi Siku L. 70. 70. 7 KG 19,000.00 0.00
28 Gorong - gorong 40 Cm. Bh 300,000.00 0.00
29 Gorong - gorong 60 Cm. Bh 450,000.00 0.00
30 Gorong - gorong 80 cm Bh 600,000.00 0.00
31 Gorong - gorong 100 cm Bh 850,000.00 0.00
32 Rubber Bearing ( 60 x 30 x 2 Cm ) Bh 1,300,000.00 0.00
33 Alat bantu Set 200,000.00 0.00
34 Cat Perak Kg 55,000.00 0.00
35 Kapur Klg 70,000.00 0.00
36 Batu Bata Kecil Bh 1,500.00 0.00
37 Batu Bata Besar Bh 1,533.00 0.00
38 Cat Tembok Kg 16,500.00 0.00
- Mowilex / 20 Kg 1,200,000.00 0.00
- Platone / 20 Kg 330,000.00 0.00
39 Bensin Premium Ltr 6,450.00 0.00
40 Pipa Besi Ø 3" (Hitam) Btg 285,000.00 0.00
41 Teer Klg 105,000.00 0.00
42 Besi kanal C. 100 Kg 14,500.00 0.00
43 Beton roster Bh 25,000.00 0.00
44 Bataco Kp 1,560.00 0.00
45 Con Block M2 47,500.00 0.00
46 Ubin abu - abu 20 x 20 cm Polos 25 kpg Ktk 60,000.00 0.00
47 Ubin porselin 11 x 11 cm Ktk 60,000.00 0.00
48 Keramik 30 x 30 putih polos Ktk 52,400.00 0.00
49 Keramik 20 x 20 (Putih Polos) Ktk 59,000.00 0.00
50 Tegel plint 10/20 cm Kpng 7,000.00 0.00
51 Eternit Harplek 1 x 1 m m2 24,250.00 0.00
52 Triplek
53 - Triplek Uk. 3,0 mm Lbr 60,000.00 0.00
54 - Triplek Uk. 4,0 mm Lbr 81,250.00 0.00
55 - Triplek Uk. 6,0 mm Lbr 83,000.00 0.00
56 Rabung Beton Kp 8,333.33 0.00
57 Milamin 1,2 x 2,4 m Kp 137,500.00 0.00
58 Teakwood Lbr 120,000.00 0.00
59 Seng Gelombang Feet 6,200.00 0.00
60 Seng Plat M2 45,000.00 0.00
61 Seng Aluminium 03 M2 50,000.00 0.00
- Seng Talang 45 cm M 25,000.00 0.00
- Seng Talang 90 cm M 35,000.00 0.00
- Alumunium Talang 50 cm M 50,000.00 0.00
- Alumunium Talang 100 cm M 70,000.00 0.00
62 Karpet talang Lebar 90cm M' 12,500.00 0.00
63 Atap asbes gelombang = 0,3 mm (P=180 CM) Lbr 56,140.00 0.00
64 Atap asbes gelombang = 0,3 mm (P=210 CM) Lbr 66,150.00 0.00
65 Atap asbes gelombang = 0,3 mm (P=240 CM) Lbr 75,520.00 0.00
66 Atap asbes gelombang = 0,3 mm (P=270 CM) Lbr 83,210.00 0.00
67 Atap asbes gelombang = 0,3 mm (P=300 CM) Lbr 94,300.00 0.00
68 Genteng soka / kodok Kp 8,000.00 0.00
69 Genteng bubungan soka Kp 6,000.00 0.00
70 Genteng beton Kp 12,500.00 0.00
71 Paku sekrup Kg 68,333.33 0.00
72 Kawat harmonika Haas M2 35,000.00 0.00
73 Kawat duri M' 15,000.00 0.00
74 Paku ulir Kg 25,000.00 0.00
75 Paku sumbat Biasa kg 21,000.00 0.00
76 Paku seng kg 25,000.00 0.00
77 Cat mengkilat Kg 57,250.00 0.00
78 Minyak cat Ltr 36,000.00 0.00
79 Plamir Kg 9,680.00 0.00
80 Dempul kayu Kg 33,750.00 0.00
81 Kapur sirih Klg 65,000.00 0.00
82 Kaca 3 mm M2 160,000.00 0.00
83 Kaca 5 mm M2 180,000.00 0.00
84 Kaca reyben 5 mm M2 190,000.00 0.00
85 Kaca nako reyben 5 mm (lengkap) Daun 40,000.00 0.00
86 Kunci tanam 1 x putar Set 120,000.00 0.00
87 Kunci tanam 2 x putar kuningan Set 160,000.00 0.00
88 Grendel kuningan Bh 8,500.00 0.00
89 Kait angin Bh 6,500.00 0.00
90 Engsel kuningan Bh 17,500.00 0.00
91 Closed duduk monoblok porslint (Lengkap) Bh 1,500,000.00 0.00
92 Closed jongkok Standart Bh 339,000.00 0.00
93 Closed jongkok keramik (American Style) Bh 475,000.00 0.00
94 Closed duduk porslint Bh 700,000.00 0.00
95 Wastafel Standart Set 812,000.00 0.00
96 Pipa besi medium 0 1" (6 m') Btg 175,000.00 0.00
97 Pipa besi medium 0 2" x 6 m' Btg 275,000.00 0.00
98 Pipa besi medium 0 3" x 6 m' Btg 400,000.00 0.00
99 Pipa besi medium 0 4" x 6 m' Btg 475,000.00 0.00
100 Pipa besi medium 0 6" x 6 m' Btg 1,050,000.00 0.00
101 Pipa besi medium 0 8" x 6 m' Btg 1,350,000.00 0.00
102 Pipa PVC 1" x 4 m' M' 8,900.00 0.00
103 Pipa PVC 2" x 4 m' M' 17,000.00 0.00
104 Pipa PVC 3" x 4 m' M' 31,000.00 0.00
105 Pipa PVC 4" x 4 m' M' 49,250.00 0.00
106 Pipa PVC 6" x 4 m' M' 105,000.00 0.00
107 Pipa PVC 8" x 4 m' M' 150,000.00 0.00
108 Pipa PVC 10" x 4 m' M' 255,000.00 0.00
109 Pipa PVC ø 3/4 " AW M' 6,593.75 0.00
110 Pipa PVC ø 1/2 " AW M' 5,187.50 0.00
111 Besi siku besar L.40.40.4 kg 20,000.00 0.00
112 Besi siku L.30.30.3 kg 65,250.00 0.00
113 Semen putih (50 kg) Kg 3,541.67 0.00
114 Bola lampu Tl.20 Bh 45,000.00 0.00
115 Lampu Tl 20 watt lengkap Set 120,000.00 0.00
116 Lampu pijar Bh 8,000.00 0.00
117 Saklar Unit 15,666.67 0.00
118 Stop kontak Unit 15,000.00 0.00
119 Box mcb Set 50,500.00 0.00
120 Lem fox/lem putih Kg 18,333.33 0.00
121 Rubber bearing 20x30x2 cm Bh 750,000.00 0.00
122 Lis kayu kembang M' 8,000.00 0.00
123 Kawat Bronjong Kg 46,000.00 0.00
124 Chain Saw Bh 14,000,000.00 0.00
125 Glass Block Bh 28,000.00 0.00
126 el Bow 1/2 " Bh 3,340.00 0.00
127 El Bow 3/4 " Bh 4,200.00 0.00
128 El Bow 1 " Bh 6,000.00 0.00
129 El Bow 2 " Bh 10,200.00 0.00
130 El Bow 3 " Bh 17,500.00 0.00
131 El Bow 4 " Bh 26,250.00 0.00
132 List Gypsum M¹ 22,000.00 0.00
133 Keramik 30x30 Standart ktk 45,000.00 0.00
134 bubungan Asbes Gelombang Bh 8,000.00 0.00
135 Pagar BRC Jadi ( tinggi 1 Meter) m 300,000.00 0.00
136 Bak Mandi fiber Glass 70 x 70 x 66 Bh 380,000.00 0.00
137 Pipa GIP Dia 1" m 35,000.00 0.00
138 Pipa GIP Dia 1" 1/2 m 55,000.00 0.00
139 Pipa GIP Dia 2" m 70,000.00 0.00
140 Pipa GIP Dia 1/2" m 25,000.00 0.00
141 Pipa GIP Dia 3/4" m 30,000.00 0.00
142 Pompa Tangan Bh 135,000.00 0.00
143 Kayu Lapis 4 mm Uk. 120 x 240 Lbr 75,000.00 0.00
144 Besi Beton Ulir Dia 13 mm (Btng) kg 15,000.00 0.00
145 Urinoar ,(lengkap) bh 1,150,000.00 0.00
146 Batu Tela Uk. 20 x 30 x 10 bh 3,000.00 0.00
147 Seng Gelombang Kecil (Satu Kaki,0,3) kaki 6,500.00 0.00
148 Kayu Lapis 4 mm Uk 8" x 4" Lbr 11,000.00 0.00
149 Besi Profile C a Pipa Besi Dia 2" kg 14,000.00 0.00
150 Kayu Papan Kelas I m3 3,000,000.00 0.00
151 Kayu Papan Kelas II m3 2,500,000.00 0.00
152 Kayu Papan Kelas III m3 2,500,000.00 0.00
153 Kayu Papan Kelas IV m3 2,500,000.00 0.00
154 Cat Meni Besi/kayu Kg 50,000.00 0.00
155 Besi Strip Kg 25,000.00 0.00
156 Bambu 6-8/600cm Btng 20,000.00 0.00
157 Tali Ijuk kg 25,000.00 0.00
158 Kapur padam M3 450,000.00 0.00
159 Tanah Liat M3 50,000.00 0.00
160 Sirtu M3 85,000.00 0.00
161 Kapur Pasangan M3 200,000.00 0.00
162 Semen Merah kG 17,000.00 0.00
163 Bilik dari bambu M2 30,000.00 0.00
164 Batu Granito Kg 5,000.00 0.00
165 Kayu Jati Bojonegoro (balok/Usuk) M3 6,000,000.00 0.00
166 Kayu Kamper (balok/Usuk) M3 3,000,000.00 0.00
167 Formika Lbr 40,000.00 0.00
168 Vernis Ltr 60,000.00 0.00
169 Kayu Kruing M3 1,800,000.00 0.00
170 Kayu Bengkirai M3 2,200,000.00 0.00
171 Alumunium Foil M2 12,000.00 0.00
172 Baja Profil Kg 18,000.00 0.00
173 Folding Gate 8mm M2 750,000.00 0.00
174 Alumunium/Plate M2 125,000.00 0.00
175 Paku Gybsum Bks 40,000.00 0.00
176 Genteng Karang pilang Bh 6,000.00 0.00
177 Genteng Keramik Bh 12,166.67 0.00
178 Nok Genteng keramik Bh 27,000.00 0.00
179 Genteng bubungan karangpilang Bh 10,000.00 0.00
180 Bubunga stel gelombang Lmr 10,000.00 0.00
181 Bak cuci stainless steel
Bak Cuci Stainless Steel (Single) Bh 220,000.00 0.00
Bak Cuci Stainless Steel (Double) Bh 450,000.00 0.00
182 Floor Drain Bh 14,000.00 0.00
183 Keramik 20x20 Warna Variasi Ktk 60,000.00 0.00
184 Keramik 20x25 Warna Variasi Ktk 66,000.00 0.00
185 Keramik 30x30 Warna Variasi Ktk 56,000.00 0.00
186 Keramik 40x40 Warna Variasi Ktk 65,600.00 0.00
187 Stepnose 8 x 30 Bh 65,000.00 0.00
188 Lantai Granit M2 93,000.00 0.00
189 Canstin M1 100,000.00 0.00
190 Batu Tempel M2 250,000.00 0.00
191 Marmer M2 170,000.00 0.00
192 Plitur Ltr 63,333.33 0.00
193 Amplas Lbr 5,750.00 0.00
194 Door Closer Bh 40,000.00 0.00
195 Kran Air Bh 27,600.00 0.00
196 Fitting plafond Bh 18,333.33 0.00
197 Isolator Bh 7,500.00 0.00
198 Kabel NYA 500 2x1,5 mm2 M1 10,000.00 0.00
199 Las Doof Bh 2,500.00 0.00
200 T Doos PVC Bh 2,500.00 0.00
201 Kable BC 25 mm M1 55,000.00 0.00
202 Seal tapy Bh 5,000.00 0.00
203 Pipa Paralon Listrik 5/8" btg 8,333.33 0.00
204 Gybsum board 9 mm Lbr 69,500.00 0.00
205 Genteng Metal M2 31,250.00 0.00
206 Sealer/Cat Dasar Ltr 45,000.00 0.00
207 Tedmon 500 Liter bh 850,000.00 0.00
208 Tedmon 1000 Liter bh 1,080,000.00 0.00
209 Tedmon 2000 Liter bh 3,000,000.00 0.00
210 Dolken Ø 8-10 Cm Btng 8,500.00 0.00
211 Shower bh 120,000.00 0.00
212 Keramik 60 /60 Motif Ktk 148,333.33 0.00
213 Keramik 60 /60 Polos Ktk 225,000.00 0.00
214 Bak Fiber bh 243,333.33 0.00
215 Pintu Fiber Polos bh 241,250.00 0.00
216 Pintu fiber Kaca bh 366,250.00 0.00
217 Kusen Lobang 150,000.00 0.00
218 Daun Pintu Lobang 500,000.00 0.00
219 Daun Jendela / Kaca biru Lobang 275,000.00 0.00
220 hollow Galvalum 4x4 Btng 29,000.00 0.00
221 hollow Galvalum 2x4 Btng 24,000.00 0.00

20,000.00 2.40
80,000.00 #REF!
Ditetapkan Oleh

Kepala Dinas Pekerjaan Umum dan Penataan Ruang Plt.Kepal


Kabupaten Bangka Barat
Ir. SUHARLI
NIP. 19610606199303 1003

NOTE :
* Mengacu Harga HSPK Th.2016
HARGA SATUAN MATERIAL/BAHAN
ECAMATAN MUNTOK

PAJAK ( Rp. ) JUMLAH HARGA


GALIAN TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
"C" (Rp/Hari)
0.00 0.00 0.00 130,000.00
0.00 0.00 0.00 110,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 130,000.00
0.00 0.00 0.00 120,000.00
0.00 0.00 0.00 120,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 110,000.00
0.00 0.00 0.00 110,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 101,000.00
0.00 0.00 0.00 101,000.00
PAJAK ( Rp. ) JUMLAH HARGA
GALIAN TRANSPORT OVERHEAD TERMASUK PAJAK KETERANGAN
"C" DLL
0.00 0.00 0.00 280,000.00
0.00 0.00 0.00 280,000.00
0.00 0.00 0.00 280,000.00
0.00 0.00 0.00 475,000.00
0.00 0.00 0.00 475,000.00
0.00 0.00 0.00 475,000.00
0.00 0.00 0.00 480,000.00
0.00 0.00 0.00 485,000.00
0.00 0.00 0.00 50,000.00
0.00 0.00 0.00 65,000.00
0.00 0.00 0.00 50,000.00
0.00 0.00 0.00 62,500.00 On Site
0.00 0.00 0.00 1,400.00
0.00 0.00 0.00 110,000.00
0.00 0.00 0.00 400,000.00
0.00 0.00 0.00 2,000,000.00
0.00 0.00 0.00 2,050,000.00
0.00 0.00 0.00 2,000,000.00
0.00 0.00 0.00 11,000.00
0.00 0.00 0.00 22,500.00
0.00 0.00 0.00 14,750.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 11,000.00
0.00 0.00 0.00 14,000.00
0.00 0.00 0.00 23,000.00
0.00 0.00 0.00 28,000.00
0.00 0.00 0.00 72,000.00
0.00 0.00 0.00 25,000.00
0.00 0.00 0.00 14,000.00
0.00 0.00 0.00 22,000.00

0.00 0.00 0.00 19,000.00


0.00 0.00 0.00 300,000.00
0.00 0.00 0.00 450,000.00
0.00 0.00 0.00 600,000.00
0.00 0.00 0.00 850,000.00
0.00 0.00 0.00 1,300,000.00
0.00 0.00 0.00 200,000.00
0.00 0.00 0.00 55,000.00
0.00 0.00 0.00 70,000.00
0.00 0.00 0.00 1,500.00
0.00 0.00 0.00 1,533.00
0.00 0.00 0.00 16,500.00 Platon
0.00 0.00 0.00 1,200,000.00
0.00 0.00 0.00 330,000.00
0.00 0.00 0.00 6,450.00
0.00 0.00 0.00 285,000.00
0.00 0.00 0.00 105,000.00
0.00 0.00 0.00 14,500.00
0.00 0.00 0.00 25,000.00
0.00 0.00 0.00 1,560.00
0.00 0.00 0.00 47,500.00
0.00 0.00 0.00 60,000.00
0.00 0.00 0.00 60,000.00
0.00 0.00 0.00 52,400.00
0.00 0.00 0.00 59,000.00
0.00 0.00 0.00 7,000.00
0.00 0.00 0.00 24,250.00

0.00 0.00 0.00 60,000.00


0.00 0.00 0.00 81,250.00
0.00 0.00 0.00 83,000.00
0.00 0.00 0.00 8,333.33
0.00 0.00 0.00 137,500.00
0.00 0.00 0.00 120,000.00
0.00 0.00 0.00 6,200.00
0.00 0.00 0.00 45,000.00
0.00 0.00 0.00 50,000.00
0.00 0.00 0.00 25,000.00
0.00 0.00 0.00 35,000.00
0.00 0.00 0.00 50,000.00
0.00 0.00 0.00 70,000.00
0.00 0.00 0.00 12,500.00
0.00 0.00 0.00 56,140.00
0.00 0.00 0.00 66,150.00
0.00 0.00 0.00 75,520.00
0.00 0.00 0.00 83,210.00
0.00 0.00 0.00 94,300.00
0.00 0.00 0.00 8,000.00
0.00 0.00 0.00 6,000.00
0.00 0.00 0.00 12,500.00
0.00 0.00 0.00 68,333.33
0.00 0.00 0.00 35,000.00
0.00 0.00 0.00 15,000.00
0.00 0.00 0.00 25,000.00
0.00 0.00 0.00 21,000.00
0.00 0.00 0.00 25,000.00
0.00 0.00 0.00 57,250.00
0.00 0.00 0.00 36,000.00
0.00 0.00 0.00 9,680.00
0.00 0.00 0.00 33,750.00
0.00 0.00 0.00 65,000.00
0.00 0.00 0.00 160,000.00
0.00 0.00 0.00 180,000.00
0.00 0.00 0.00 190,000.00
0.00 0.00 0.00 40,000.00
0.00 0.00 0.00 120,000.00
0.00 0.00 0.00 160,000.00
0.00 0.00 0.00 8,500.00
0.00 0.00 0.00 6,500.00
0.00 0.00 0.00 17,500.00
0.00 0.00 0.00 1,500,000.00
0.00 0.00 0.00 339,000.00
0.00 0.00 0.00 475,000.00
0.00 0.00 0.00 700,000.00
0.00 0.00 0.00 812,000.00
0.00 0.00 0.00 175,000.00 *
0.00 0.00 0.00 275,000.00 *
0.00 0.00 0.00 400,000.00 *
0.00 0.00 0.00 475,000.00 *
0.00 0.00 0.00 1,050,000.00 *
0.00 0.00 0.00 1,350,000.00 *
0.00 0.00 0.00 8,900.00
0.00 0.00 0.00 17,000.00
0.00 0.00 0.00 31,000.00
0.00 0.00 0.00 49,250.00
0.00 0.00 0.00 105,000.00 *
0.00 0.00 0.00 150,000.00 *
0.00 0.00 0.00 255,000.00 *
0.00 0.00 0.00 6,593.75
0.00 0.00 0.00 5,187.50
0.00 0.00 0.00 20,000.00
0.00 0.00 0.00 65,250.00
0.00 0.00 0.00 3,541.67
0.00 0.00 0.00 45,000.00
0.00 0.00 0.00 120,000.00 *
0.00 0.00 0.00 8,000.00
0.00 0.00 0.00 15,666.67
0.00 0.00 0.00 15,000.00
0.00 0.00 0.00 50,500.00
0.00 0.00 0.00 18,333.33
0.00 0.00 0.00 750,000.00 *
0.00 0.00 0.00 8,000.00 *
0.00 0.00 0.00 46,000.00 *
0.00 0.00 0.00 14,000,000.00 *
0.00 0.00 0.00 28,000.00
0.00 0.00 0.00 3,340.00
0.00 0.00 0.00 4,200.00
0.00 0.00 0.00 6,000.00
0.00 0.00 0.00 10,200.00
0.00 0.00 0.00 17,500.00
0.00 0.00 0.00 26,250.00
0.00 0.00 0.00 22,000.00
0.00 0.00 0.00 45,000.00
0.00 0.00 0.00 8,000.00 *
0.00 0.00 0.00 300,000.00 *
0.00 0.00 0.00 380,000.00 *
0.00 0.00 0.00 35,000.00 *
0.00 0.00 0.00 55,000.00 *
0.00 0.00 0.00 70,000.00 *
0.00 0.00 0.00 25,000.00 *
0.00 0.00 0.00 30,000.00 *
0.00 0.00 0.00 135,000.00 *
0.00 0.00 0.00 75,000.00 *
0.00 0.00 0.00 15,000.00 *
0.00 0.00 0.00 1,150,000.00 *
0.00 0.00 0.00 3,000.00 *
0.00 0.00 0.00 6,500.00 *
0.00 0.00 0.00 11,000.00 *
0.00 0.00 0.00 14,000.00 *
0.00 0.00 0.00 3,000,000.00 *
0.00 0.00 0.00 2,500,000.00 *
0.00 0.00 0.00 2,500,000.00 *
0.00 0.00 0.00 2,500,000.00 *
0.00 0.00 0.00 50,000.00 *
0.00 0.00 0.00 25,000.00 *
0.00 0.00 0.00 20,000.00 *
0.00 0.00 0.00 25,000.00 *
0.00 0.00 0.00 450,000.00 *
0.00 0.00 0.00 50,000.00 *
0.00 0.00 0.00 85,000.00 *
0.00 0.00 0.00 200,000.00 *
0.00 0.00 0.00 17,000.00 *
0.00 0.00 0.00 30,000.00 *
0.00 0.00 0.00 5,000.00 *
0.00 0.00 0.00 6,000,000.00 *
0.00 0.00 0.00 3,000,000.00 *
0.00 0.00 0.00 40,000.00 *
0.00 0.00 0.00 60,000.00 *
0.00 0.00 0.00 1,800,000.00 *
0.00 0.00 0.00 2,200,000.00 *
0.00 0.00 0.00 12,000.00 *
0.00 0.00 0.00 18,000.00 *
0.00 0.00 0.00 750,000.00 *
0.00 0.00 0.00 125,000.00 *
0.00 0.00 0.00 40,000.00 *
0.00 0.00 0.00 6,000.00 *
0.00 0.00 0.00 12,166.67
0.00 0.00 0.00 27,000.00
0.00 0.00 0.00 10,000.00 *
0.00 0.00 0.00 10,000.00 *

0.00 0.00 0.00 220,000.00


0.00 0.00 0.00 450,000.00
0.00 0.00 0.00 14,000.00
0.00 0.00 0.00 60,000.00
0.00 0.00 0.00 66,000.00
0.00 0.00 0.00 56,000.00
0.00 0.00 0.00 65,600.00
0.00 0.00 0.00 65,000.00
0.00 0.00 0.00 93,000.00
0.00 0.00 0.00 100,000.00 *
0.00 0.00 0.00 250,000.00 *
0.00 0.00 0.00 170,000.00 *
0.00 0.00 0.00 63,333.33
0.00 0.00 0.00 5,750.00
0.00 0.00 0.00 40,000.00
0.00 0.00 0.00 27,600.00
0.00 0.00 0.00 18,333.33
0.00 0.00 0.00 7,500.00 *
0.00 0.00 0.00 10,000.00
0.00 0.00 0.00 2,500.00 *
0.00 0.00 0.00 2,500.00
0.00 0.00 0.00 55,000.00 *
0.00 0.00 0.00 5,000.00
0.00 0.00 0.00 8,333.33
0.00 0.00 0.00 69,500.00
0.00 0.00 0.00 31,250.00
0.00 0.00 0.00 45,000.00 *
0.00 0.00 0.00 850,000.00
0.00 0.00 0.00 1,080,000.00
0.00 0.00 0.00 3,000,000.00
0.00 0.00 0.00 8,500.00
0.00 0.00 0.00 120,000.00
0.00 0.00 0.00 148,333.33
0.00 0.00 0.00 225,000.00
0.00 0.00 0.00 243,333.33
0.00 0.00 0.00 241,250.00
0.00 0.00 0.00 366,250.00
0.00 0.00 0.00 150,000.00
0.00 0.00 0.00 500,000.00
0.00 0.00 0.00 275,000.00
0.00 0.00 0.00 29,000.00
0.00 0.00 0.00 24,000.00

Muntok, Februari 2017

Ditetapkan Oleh

Plt.Kepala Dinas Perumahan Kawasan Permukiman Dan Perhubungan


Kabupaten Bangka Barat
MUHAMMAD KAIDI, S.E
NIP. 19670408 199403 1006
UPAH TENAGA KERJA DAN HARGA SATUAN
TAHUN 2017 KECAMATAN MU

PROPINSI : KEPULAUAN BANGKA BELITUNG


KABUPATEN : BANGKA BARAT
ZONA : KECAMATAN MUNTOK
SURVEI : BULAN FEBRUARI 2017

JUMLAH HARGA PAJAK ( Rp. )


SATUAN /
NO. BAHAN / MATERIAL (TANPA PAJAK) PPN GALIAN
UNIT
(Rp) 10 % "C"
1 Minyak tanah Lt 14,000.00 0.00 0.00
2 Minyak Olie Lt 23,000.00 0.00 0.00
3 Minyak Gemuk Klg 22,000.00 0.00 0.00
4 Besi Siku L. 70. 70. 7 KG 19,000.00 0.00 0.00
5 Gorong - gorong 40 Cm. Bh 300,000.00 0.00 0.00
6 Gorong - gorong 60 Cm. Bh 450,000.00 0.00 0.00
7 Gorong - gorong 80 cm Bh 600,000.00 0.00 0.00
8 Gorong - gorong 100 cm Bh 850,000.00 0.00 0.00
9 Rubber Bearing ( 60 x 30 x 2 Cm ) Bh 1,300,000.00 0.00 0.00
10 Alat bantu Set 200,000.00 0.00 0.00
11 Kapur Klg 70,000.00 0.00 0.00
12 Pipa Besi 0 3" (Hitam) Btg 285,000.00 0.00 0.00
13 Besi kanal C. 100 Kg 14,500.00 0.00 0.00
14 Ubin porselin 11 x 11 cm Ktk 60,000.00 0.00 0.00
15 Tegel plint 10/20 cm Kpng 7,000.00 0.00 0.00
16 Seng Gelombang Lbr 51,700.00 0.00 0.00
17 Seng Plat M2 45,000.00 0.00 0.00
18 Seng Aluminium 03 M2 50,000.00 0.00 0.00
19 Genteng soka / kodok Kp 8,000.00 0.00 0.00
20 Kawat duri M' 15,000.00 0.00 0.00
21 Paku sumbat Biasa kg 21,000.00 0.00 0.00
22 Kapur sirih Klg 65,000.00 0.00 0.00
23 Kaca 3 mm M2 160,000.00 0.00 0.00
24 Kaca 5 mm M2 180,000.00 0.00 0.00
25 Kaca reyben 5 mm M2 190,000.00 0.00 0.00
26 Kaca nako reyben 5 mm (lengkap) Daun 40,000.00 0.00 0.00
27 Closed jongkok keramik Bh 400,000.00 0.00 0.00
28 Pipa besi medium 0 1" (6 m') Btg 175,000.00 0.00 0.00
29 Pipa besi medium 0 2" x 6 m' Btg 275,000.00 0.00 0.00
30 Pipa besi medium 0 3" x 6 m' Btg 400,000.00 0.00 0.00
31 Pipa besi medium 0 4" x 6 m' Btg 475,000.00 0.00 0.00
32 Pipa besi medium 0 6" x 6 m' Btg 1,050,000.00 0.00 0.00
33 Pipa besi medium 0 8" x 6 m' Btg 1,350,000.00 0.00 0.00
34 Pipa PVC 6" x 4 m' M' 105,000.00 0.00 0.00
35 Pipa PVC 8" x 4 m' M' 150,000.00 0.00 0.00
36 Pipa PVC 10" x 4 m' M' 255,000.00 0.00 0.00
37 Lampu Tl 20 watt lengkap Set 120,000.00 0.00 0.00
38 Rubber bearing 20x30x2 cm Bh 750,000.00 0.00 0.00
39 Lis kayu kembang M' 8,000.00 0.00 0.00
40 Kawat Bronjong Kg 46,000.00 0.00 0.00
41 Chain Saw Bh 14,000,000.00 0.00 0.00
42 Lis, GYB Sumboat 9 mm M¹ 22,000.00 0.00 0.00
43 bubungan Asbes Gelombang Bh 8,000.00 0.00 0.00
44 Pagar BRC Jadi ( tinggi 1 Meter) m 300,000.00 0.00 0.00
45 Bak Mandi fiber Glass 70 x 70 x 66 Bh 380,000.00 0.00 0.00
46 Pipa GIP Dia 1" m 35,000.00 0.00 0.00
47 Pipa GIP Dia 1" 1/2 m 55,000.00 0.00 0.00
48 Pipa GIP Dia 2" m 70,000.00 0.00 0.00
49 Pipa PVC Dia 1/2" m 25,000.00 0.00 0.00
50 Pipa PVC Dia 3/4" m 30,000.00 0.00 0.00
51 Pompa Tangan Bh 135,000.00 0.00 0.00
52 Kayu Lapis 4 mm Uk. 120 x 240 Lbr 75,000.00 0.00 0.00
53 Besi Beton Ulir Dia 13 mm (Btng) kg 15,000.00 0.00 0.00
54 Urinoar ,(lengkap) bh 1,150,000.00 0.00 0.00
55 Batu Tela Uk. 20 x 30 x 10 bh 3,000.00 0.00 0.00
56 Seng Gelombang Kecil (Satu Kaki,0,3) kaki 6,500.00 0.00 0.00
57 Kayu Lapis 4 mm Uk 8" x 4" Lbr 11,000.00 0.00 0.00
58 Besi Profile C a Pipa Besi Dia 2" kg 14,000.00 0.00 0.00
59 Kayu Papan Kelas I m3 3,000,000.00 0.00 0.00
60 Kayu Papan Kelas II m3 2,500,000.00 0.00 0.00
61 Kayu Papan Kelas III m3 2,500,000.00 0.00 0.00
62 Kayu Papan Kelas IV m3 2,500,000.00 0.00 0.00
63 Cat Meni Besi/kayu Kg 50,000.00 0.00 0.00
64 Besi Strip Kg 25,000.00 0.00 0.00
65 Bambu 6-8/600cm Btng 20,000.00 0.00 0.00
66 Tali Ijuk kg 25,000.00 0.00 0.00
67 Kapur padam M3 450,000.00 0.00 0.00
68 Tanah Liat M3 50,000.00 0.00 0.00
69 Sirtu M3 85,000.00 0.00 0.00
70 Kapur Pasangan M3 200,000.00 0.00 0.00
71 Semen Merah kG 17,000.00 0.00 0.00
72 Bilik dari bambu M2 30,000.00 0.00 0.00
73 Batu Granito Kg 5,000.00 0.00 0.00
74 Kayu Jati Bojonegoro (balok/Usuk) M3 6,000,000.00 0.00 0.00
74 Kayu Kamper (balok/Usuk) M3 3,000,000.00 0.00 0.00
76 Formika Lbr 40,000.00 0.00 0.00
77 Vernis Ltr 60,000.00 0.00 0.00
78 Kayu Kruing M3 1,800,000.00 0.00 0.00
79 Kayu Bengkirai M3 2,200,000.00 0.00 0.00
80 Alumunium Foil M2 12,000.00 0.00 0.00
81 Baja Profil Kg 18,000.00 0.00 0.00
82 Folding Gate 8mm M2 750,000.00 0.00 0.00
83 Alumunium/Plate M2 125,000.00 0.00 0.00
84 Paku Gybsum Bks 40,000.00 0.00 0.00
85 Genteng Karang pilang Bh 6,000.00 0.00 0.00
86 Genteng bubungan karangpilang Bh 10,000.00 0.00 0.00
87 Bubunga stel gelombang Lmr 10,000.00 0.00 0.00
88 Bak cuci stainless steel Bh 350,000.00 0.00 0.00
89 Canstin M1 100,000.00 0.00 0.00
90 Batu Tempel M2 250,000.00 0.00 0.00
91 Marmer M2 170,000.00 0.00 0.00
92 Isolator Bh 7,500.00 0.00 0.00
93 Las Doof Bh 2,500.00 0.00 0.00
94 Kable BC 25 mm M1 55,000.00 0.00 0.00
95 Sealer/Cat Dasar Ltr 45,000.00 0.00 0.00

20,000.00 2.40
80,000.00 #REF!

Kepala Dinas Per

NOTE :

WARNA BIRU MASIH BELUM FIX, KARENA BANYAK JENIS/MODEL DARI MATERIAL TERSEBUT.
WARNA HIJAU TIDAK DITULIS/DI ISI DARI TOKO.
ARGA SATUAN MATERIAL/BAHAN
ECAMATAN MUNTOK

JUMLAH HARGA
TRANSPORT OVERHEAD TERMASUK PAJAK KETERANGAN
DLL
0.00 0.00 14,000.00
0.00 0.00 23,000.00
0.00 0.00 22,000.00
0.00 0.00 19,000.00
0.00 0.00 300,000.00
0.00 0.00 450,000.00
0.00 0.00 600,000.00
0.00 0.00 850,000.00
0.00 0.00 1,300,000.00
0.00 0.00 200,000.00
0.00 0.00 70,000.00
0.00 0.00 285,000.00
0.00 0.00 14,500.00
0.00 0.00 60,000.00
0.00 0.00 7,000.00
0.00 0.00 51,700.00
0.00 0.00 45,000.00
0.00 0.00 50,000.00
0.00 0.00 8,000.00
0.00 0.00 15,000.00
0.00 0.00 21,000.00
0.00 0.00 65,000.00
0.00 0.00 160,000.00
0.00 0.00 180,000.00
0.00 0.00 190,000.00
0.00 0.00 40,000.00
0.00 0.00 400,000.00
0.00 0.00 175,000.00
0.00 0.00 275,000.00
0.00 0.00 400,000.00
0.00 0.00 475,000.00
0.00 0.00 1,050,000.00
0.00 0.00 1,350,000.00
0.00 0.00 105,000.00
0.00 0.00 150,000.00
0.00 0.00 255,000.00
0.00 0.00 120,000.00
0.00 0.00 750,000.00
0.00 0.00 8,000.00
0.00 0.00 46,000.00
0.00 0.00 14,000,000.00
0.00 0.00 22,000.00
0.00 0.00 8,000.00
0.00 0.00 300,000.00
0.00 0.00 380,000.00
0.00 0.00 35,000.00
0.00 0.00 55,000.00
0.00 0.00 70,000.00
0.00 0.00 25,000.00
0.00 0.00 30,000.00
0.00 0.00 135,000.00
0.00 0.00 75,000.00
0.00 0.00 15,000.00
0.00 0.00 1,150,000.00
0.00 0.00 3,000.00
0.00 0.00 6,500.00
0.00 0.00 11,000.00
0.00 0.00 14,000.00
0.00 0.00 3,000,000.00
0.00 0.00 2,500,000.00
0.00 0.00 2,500,000.00
0.00 0.00 2,500,000.00
0.00 0.00 50,000.00
0.00 0.00 25,000.00
0.00 0.00 20,000.00
0.00 0.00 25,000.00
0.00 0.00 450,000.00
0.00 0.00 50,000.00
0.00 0.00 85,000.00
0.00 0.00 200,000.00
0.00 0.00 17,000.00
0.00 0.00 30,000.00
0.00 0.00 5,000.00
0.00 0.00 6,000,000.00
0.00 0.00 3,000,000.00
0.00 0.00 40,000.00
0.00 0.00 60,000.00
0.00 0.00 1,800,000.00
0.00 0.00 2,200,000.00
0.00 0.00 12,000.00
0.00 0.00 18,000.00
0.00 0.00 750,000.00
0.00 0.00 125,000.00
0.00 0.00 40,000.00
0.00 0.00 6,000.00
0.00 0.00 10,000.00
0.00 0.00 10,000.00
0.00 0.00 350,000.00
0.00 0.00 100,000.00
0.00 0.00 250,000.00
0.00 0.00 170,000.00
0.00 0.00 7,500.00
0.00 0.00 2,500.00
0.00 0.00 55,000.00
0.00 0.00 45,000.00

Muntok, Februari 2017

Disiapkan oleh
Kepala Dinas Perumahan Kawasan Permukiman Dan Perhubungan
Kabupaten Bangka Barat

MUHAMMAD KAIDI, S.E


NIP. 19670408 199403 1 006
UPAH TENAGA KERJA DAN HARGA SATUAN
TAHUN 2017 KECAMATAN M

PROPINSI : KEPULAUAN BANGKA BELITUNG


KABUPATEN : BANGKA BARAT
ZONA : KECAMATAN MUNTOK
SURVEI : BULAN FEBRUARI 2017

HARI/ UPAH/HARI PAJAK ( Rp. )


NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN GALIAN
(Rp) 10 % "C"
1 Mandor Lapangan 1 140,000.00 0.00 0.00
2 Mekanik 1 110,000.00 0.00 0.00
3 Mekanik Pembantu 1 101,000.00 0.00 0.00
4 Kepala Tukang 1 140,000.00 0.00 0.00
5 Tukang 1 130,000.00 0.00 0.00
6 Operator Terlatih 1 130,000.00 0.00 0.00
7 Operator Kurang Terlatih 1 101,000.00 0.00 0.00
8 Pembantu Operator 1 101,000.00 0.00 0.00
9 Supir 1 110,000.00 0.00 0.00
10 Supir Personil 1 110,000.00 0.00 0.00
11 Pembantu Supir / Knek 1 101,000.00 0.00 0.00
12 Pekerja 1 101,000.00 0.00 0.00
13 Buruh Lapangan Agak Terlatih 1 101,000.00 0.00 0.00
14 Buruh Lapangan Terlatih 1 101,000.00 0.00 0.00
15 Penjaga 1 101,000.00 0.00 0.00
16 Pemasak Aspal 1 101,000.00 0.00 0.00
17 Pengangkut Air 1 101,000.00 0.00 0.00
PAJAK ( Rp. )
SATUAN /
NO. BAHAN / MATERIAL (TANPA PAJAK) PPN GALIAN
UNIT
(Rp) 10 % "C"
1 Batu Belah / Batu Gunung M3 212,500.00 0.00 0.00
2 Batu Belah untuk Saluran Pasangan M3 212,500.00 0.00 0.00
3 Batu Kacang M3 280,000.00 0.00 0.00
4 Batu Pecah 5/7 cm M3 400,000.00 0.00 0.00
5 Batu Pecah 3/5 cm M3 400,000.00 0.00 0.00
6 Batu Pecah 2/3 cm M3 475,000.00 0.00 0.00
7 Batu Pecah 1/2 cm M3 480,000.00 0.00 0.00
8 Batu Pecah 0,5 + 1 cm M3 485,000.00 0.00 0.00
9 Pasir Urug M3 50,000.00 0.00 0.00
10 Pasir Beton/Pasangan M3 65,000.00 0.00 0.00
11 Pasir Kasar M3 50,000.00 0.00 0.00
12 Tanah Puru M3 62,500.00 0.00 0.00
13 Semen (PC) Kg 1,300.00 0.00 0.00
14 Kayu Bakar m3 110,000.00 0.00 0.00
HARI/ UPAH/HARI PAJAK ( Rp. )
NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN GALIAN
(Rp) 10 % "C"
15 Kayu Cerucuk 0 8-10 cm m3 400,000.00 0.00 0.00
16 Kayu Kelas II m3 2,000,000.00 0.00 0.00
17 Kayu Kelas III m3 2,050,000.00 0.00 0.00
18 Kayu Kelas IV m3 2,000,000.00 0.00 0.00
19 Besi Beton Kg 8,900.00 0.00 0.00
20 Kawat Beton Kg 22,000.00 0.00 0.00
21 Paku Kg 15,000.00 0.00 0.00
22 Aspal Kg 13.000 s/d 17.000 0.00 0.00
23 Minyak Solar Lt 5,150.00 0.00 0.00
24 Minyak tanah Lt 14,000.00 0.00 0.00
25 Minyak Olie Lt 23,000.00 0.00 0.00
26 Minyak Gemuk Klg 22,000.00 0.00 0.00
27 Besi Siku L. 70. 70. 7 KG 19,000.00 0.00 0.00
28 Gorong - gorong 40 Cm. Bh 300,000.00 0.00 0.00
29 Gorong - gorong 60 Cm. Bh 450,000.00 0.00 0.00
30 Gorong - gorong 80 cm Bh 600,000.00 0.00 0.00
31 Gorong - gorong 100 cm Bh 850,000.00 0.00 0.00
32 Rubber Bearing ( 60 x 30 x 2 Cm ) Bh 1,300,000.00 0.00 0.00
33 Alat bantu Set 200,000.00 0.00 0.00
34 Cat Perak Kg 55,000.00 0.00 0.00
35 Kapur Klg 70,000.00 0.00 0.00
36 Batu Bata Kecil Bh 1,600.00 0.00 0.00
37 Batu Bata Besar Bh 1,450.00 0.00 0.00
38 Cat Tembok Kg 16,000.00 0.00 0.00
39 Bensin Premium Ltr 6,950.00 0.00 0.00
40 Pipa Besi 0 3" (Hitam) Btg 285,000.00 0.00 0.00
41 Teer Klg 100,000.00 0.00 0.00
42 Besi kanal C. 100 Kg 14,500.00 0.00 0.00
43 Beton roster Bh 25,000.00 0.00 0.00
44 Bataco Kp 1,550.00 0.00 0.00
45 Con Block M2 47,500.00 0.00 0.00
46 Ubin abu - abu 20 x 20 cm Polos 25 kpg Ktk 60,000.00 0.00 0.00
47 Ubin porselin 11 x 11 cm Ktk 60,000.00 0.00 0.00
48 Keramik 30 x 30 putih polos Ktk 52,500.00 0.00 0.00
49 Keramik 20 x 20 (Putih Polos) Ktk 60,000.00 0.00 0.00
50 Tegel plint 10/20 cm Kpng 7,000.00 0.00 0.00
51 Eternit Harplek 1 x 1 m m2 25,000.00 0.00 0.00
52 Triplek
53 - Triplek Uk. 3,0 mm Lbr 58,000.00 0.00 0.00
54 - Triplek Uk. 4,0 mm Lbr 74,000.00 0.00 0.00
55 - Triplek Uk. 6,0 mm Lbr 88,500.00 0.00 0.00
56 Rabung Beton Kp 8,000.00 0.00 0.00
57 Milamin 1,2 x 2,4 m Kp 137,500.00 0.00 0.00
58 Teakwood Lbr 120,000.00 0.00 0.00
59 Seng Gelombang Lbr 51,700.00 0.00 0.00
60 Seng Plat M2 45,000.00 0.00 0.00
HARI/ UPAH/HARI PAJAK ( Rp. )
NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN GALIAN
(Rp) 10 % "C"
61 Seng Aluminium 03 M2 50,000.00 0.00 0.00
62 Karpet talang Lebar 90cm M' 12,500.00 0.00 0.00
63 Atap asbes gelombang = 0,3 mm (P=180 CM) Lbr 57,500.00 0.00 0.00
64 Atap asbes gelombang = 0,3 mm (P=210 CM) Lbr 66,950.00 0.00 0.00
65 Atap asbes gelombang = 0,3 mm (P=240 CM) Lbr 76,550.00 0.00 0.00
66 Atap asbes gelombang = 0,3 mm (P=270 CM) Lbr 86,000.00 0.00 0.00
67 Atap asbes gelombang = 0,3 mm (P=300 CM) Lbr 95,500.00 0.00 0.00
68 Genteng soka / kodok Kp 8,000.00 0.00 0.00
69 Genteng bubungan soka Kp 6,000.00 0.00 0.00
70 Genteng beton Kp 97,500.00 0.00 0.00
71 Paku sekrup Kg 63,750.00 0.00 0.00
72 Kawat harmonika Haas M2 40,000.00 0.00 0.00
73 Kawat duri M' 15,000.00 0.00 0.00
74 Paku ulir Kg 25,000.00 0.00 0.00
75 Paku sumbat Biasa kg 21,000.00 0.00 0.00
HARI/ UPAH/HARI PAJAK ( Rp. )
NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN GALIAN
(Rp) 10 % "C"
76 Paku seng kg 25,000.00 0.00 0.00
77 Cat mengkilat Kg 57,250.00 0.00 0.00
78 Minyak cat Ltr 37,000.00 0.00 0.00
79 Plamir Kg 10,000.00 0.00 0.00
80 Dempul kayu Kg 26,600.00 0.00 0.00
81 Kapur sirih Klg 65,000.00 0.00 0.00
82 Kaca 3 mm M2 160,000.00 0.00 0.00
83 Kaca 5 mm M2 180,000.00 0.00 0.00
84 Kaca reyben 5 mm M2 190,000.00 0.00 0.00
85 Kaca nako reyben 5 mm (lengkap) Daun 40,000.00 0.00 0.00
86 Kunci tanam 1 x putar Set 120,000.00 0.00 0.00
87 Kunci tanam 2 x putar kuningan Set 160,000.00 0.00 0.00
88 Grendel kuningan Bh 8,500.00 0.00 0.00
89 Kait angin Bh 25,000.00 0.00 0.00
90 Engsel kuningan Bh 20,000.00 0.00 0.00
91 Closed duduk monoblok porslint (Lengkap) Bh 1,575,000.00 0.00 0.00
92 Closed jongkok Standart Bh 307,500.00 0.00 0.00
93 Closed jongkok keramik Bh 400,000.00 0.00 0.00
94 Closed duduk porslint Bh 700,000.00 0.00 0.00
95 Wastafel Standart Set 812,000.00 0.00 0.00
96 Pipa besi medium 0 1" (6 m') Btg 175,000.00 0.00 0.00
97 Pipa besi medium 0 2" x 6 m' Btg 275,000.00 0.00 0.00
98 Pipa besi medium 0 3" x 6 m' Btg 400,000.00 0.00 0.00
99 Pipa besi medium 0 4" x 6 m' Btg 475,000.00 0.00 0.00
100 Pipa besi medium 0 6" x 6 m' Btg 1,050,000.00 0.00 0.00
101 Pipa besi medium 0 8" x 6 m' Btg 1,350,000.00 0.00 0.00
102 Pipa PVC 1" x 4 m' M' 8,875.00 0.00 0.00
103 Pipa PVC 2" x 4 m' M' 16,500.00 0.00 0.00
104 Pipa PVC 3" x 4 m' M' 29,500.00 0.00 0.00
105 Pipa PVC 4" x 4 m' M' 46,875.00 0.00 0.00
106 Pipa PVC 6" x 4 m' M' 105,000.00 0.00 0.00
107 Pipa PVC 8" x 4 m' M' 150,000.00 0.00 0.00
108 Pipa PVC 10" x 4 m' M' 255,000.00 0.00 0.00
109 Pipa PVC ø 3/4 " AW M' 6,500.00 0.00 0.00
110 Pipa PVC ø 1/2 " AW M' 5,150.00 0.00 0.00
111 Besi siku besar L.40.40.4 kg 15,000.00 0.00 0.00
112 Besi siku L.30.30.3 kg 20,000.00 0.00 0.00
113 Semen putih (50 kg) Kg 3,700.00 0.00 0.00
114 Bola lampu Tl.20 Bh 45,000.00 0.00 0.00
115 Lampu Tl 20 watt lengkap Set 120,000.00 0.00 0.00
116 Lampu pijar Bh 8,000.00 0.00 0.00
117 Saklar Unit 15,500.00 0.00 0.00
118 Stop kontak Unit 15,000.00 0.00 0.00
119 Box mcb Set 50,000.00 0.00 0.00
120 Lem fox/lem putih Kg 18,750.00 0.00 0.00
121 Rubber bearing 20x30x2 cm Bh 750,000.00 0.00 0.00
HARI/ UPAH/HARI PAJAK ( Rp. )
NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN GALIAN
(Rp) 10 % "C"
122 Lis kayu kembang M' 8,000.00 0.00 0.00
123 Kawat Bronjong Kg 46,000.00 0.00 0.00
124 Chain Saw Bh 14,000,000.00 0.00 0.00
125 Glass Block Bh 26,000.00 0.00 0.00
126 el Bow 1/2 " Bh 3,500.00 0.00 0.00
127 El Bow 3/4 " Bh 4,200.00 0.00 0.00
128 El Bow 1 " Bh 6,000.00 0.00 0.00
129 El Bow 2 " Bh 9,800.00 0.00 0.00
130 El Bow 3 " Bh 17,000.00 0.00 0.00
131 El Bow 4 " Bh 28,000.00 0.00 0.00
132 Lis, GYB Sumboat 9 mm M¹ 22,000.00 0.00 0.00
134 bubungan Asbes Gelombang Bh 8,000.00 0.00 0.00
136 Bak Mandi fiber Glass 70 x 70 x 66 Bh 380,000.00 0.00 0.00
137 Pipa GIP Dia 1" m 35,000.00 0.00 0.00
138 Pipa GIP Dia 1" 1/2 m 55,000.00 0.00 0.00
139 Pipa GIP Dia 2" m 70,000.00 0.00 0.00
140 Pipa PVC Dia 1/2" m 25,000.00 0.00 0.00
141 Pipa PVC Dia 3/4" m 30,000.00 0.00 0.00
142 Pompa Tangan Bh 135,000.00 0.00 0.00
143 Kayu Lapis 4 mm Uk. 120 x 240 Lbr 75,000.00 0.00 0.00
144 Besi Beton Ulir Dia 13 mm (Btng) kg 15,000.00 0.00 0.00
145 Urinoar ,(lengkap) bh 1,150,000.00 0.00 0.00
146 Batu Tela Uk. 20 x 30 x 10 bh 3,000.00 0.00 0.00
147 Seng Gelombang Kecil (Satu Kaki,0,3) kaki 6,500.00 0.00 0.00
150 Kayu Papan Kelas I m3 3,000,000.00 0.00 0.00
151 Kayu Papan Kelas II m3 2,500,000.00 0.00 0.00
152 Kayu Papan Kelas III m3 2,500,000.00 0.00 0.00
153 Kayu Papan Kelas IV m3 2,500,000.00 0.00 0.00
154 Cat Meni Besi/kayu Kg 50,000.00 0.00 0.00
155 Besi Strip Kg 25,000.00 0.00 0.00
157 Tali Ijuk kg 25,000.00 0.00 0.00
160 Sirtu M3 85,000.00 0.00 0.00
161 Kapur Pasangan M3 200,000.00 0.00 0.00
162 Semen Merah kG 17,000.00 0.00 0.00
164 Batu Granito Kg 5,000.00 0.00 0.00
168 Vernis Ltr 60,000.00 0.00 0.00
171 Alumunium Foil M2 12,000.00 0.00 0.00
172 Baja Profil Kg 18,000.00 0.00 0.00
173 Folding Gate 8mm M2 750,000.00 0.00 0.00
174 Alumunium/Plate M2 125,000.00 0.00 0.00
175 Paku Gybsum Bks 38,500.00 0.00 0.00
176 Genteng Karang pilang Bh 6,000.00 0.00 0.00
177 Genteng Keramik Bh 12,500.00 0.00 0.00
178 Nok Genteng keramik Bh 27,000.00 0.00 0.00
179 Genteng bubungan karangpilang Bh 10,000.00 0.00 0.00
181 Bak cuci stainless steel Bh 350,000.00 0.00 0.00
HARI/ UPAH/HARI PAJAK ( Rp. )
NO. TENAGA KERJA UNIT (TANPA PAJAK) PPN GALIAN
(Rp) 10 % "C"
182 Floor Drain Bh 7,500.00 0.00 0.00
183 Keramik 20x20 Warna Variasi Ktk 60,000.00 0.00 0.00
184 Keramik 20x25 Warna Variasi Ktk 66,000.00 0.00 0.00
185 Keramik 30x30 Warna Variasi Ktk 54,000.00 0.00 0.00
186 Keramik 40x40 Warna Variasi Ktk 67,000.00 0.00 0.00
187 Stepnose 8 x 30 Bh 25,000.00 0.00 0.00
188 Lantai Granit M2 93,000.00 0.00 0.00
189 Canstin M1 100,000.00 0.00 0.00
190 Batu Tempel M2 250,000.00 0.00 0.00
192 Plitur Ltr 62,500.00 0.00 0.00
193 Amplas Lbr 7,000.00 0.00 0.00
194 Door Closer Bh 40,000.00 0.00 0.00
195 Kran Air Bh 20,600.00 0.00 0.00
196 Fitting plafond Bh 15,250.00 0.00 0.00
197 Isolator Bh 7,500.00 0.00 0.00
198 Kabel NYA 500 2x1,5 mm2 M1 10,000.00 0.00 0.00
199 Las Doof Bh 2,500.00 0.00 0.00
200 T Doos PVC Bh 2,500.00 0.00 0.00
201 Kable BC 25 mm M1 55,000.00 0.00 0.00
202 Seal tapy Bh 5,000.00 0.00 0.00
203 Pipa Paralon Listrik 5/8" btg 8,000.00 0.00 0.00
204 Gybsum board 9 mm Lbr 69,500.00 0.00 0.00
205 Genteng Metal M2 32,500.00 0.00 0.00
206 Sealer/Cat Dasar Ltr 45,000.00 0.00 0.00
207 Tedmon 500 Liter bh 850,000.00 0.00 0.00
208 Tedmon 1000 Liter bh 1,358,000.00 0.00 0.00
209 Tedmon 2000 Liter bh 3,000,000.00 0.00 0.00
210 Dolken Ø 8-10 Cm Btng 8,500.00 0.00 0.00
211 Shower bh 135,000.00 0.00 0.00
212 Keramik 60 /60 Motif Ktk 148,000.00 0.00 0.00
213 Keramik 60 /60 Polos Ktk 227,500.00 0.00 0.00
214 Bak Fiber bh 245,000.00 0.00 0.00
215 Pintu Fiber Polos bh 239,000.00 0.00 0.00
216 Pintu fiber Kaca bh 363,000.00 0.00 0.00
217 Kusen Lobang 162,500.00 0.00 0.00
218 Daun Pintu Lobang 550,000.00 0.00 0.00
219 Daun Jendela / Kaca biru Lobang 275,000.00 0.00 0.00
220 hollow Galvalum 4x4 Btng 25,250.00 0.00 0.00
221 hollow Galvalum 2x4 Btng 21,800.00 0.00 0.00

KETERANGAN
* = Harga toko tidak tersedia, harga mengikuti tahun sebelumnya (2016)
RGA SATUAN MATERIAL/BAHAN
AMATAN MUNTOK

JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 140,000.00
0.00 0.00 110,000.00
0.00 0.00 101,000.00
0.00 0.00 140,000.00
0.00 0.00 130,000.00
0.00 0.00 130,000.00
0.00 0.00 101,000.00
0.00 0.00 101,000.00
0.00 0.00 110,000.00
0.00 0.00 110,000.00
0.00 0.00 101,000.00
0.00 0.00 101,000.00
0.00 0.00 101,000.00
0.00 0.00 101,000.00
0.00 0.00 101,000.00
0.00 0.00 101,000.00
0.00 0.00 101,000.00
JUMLAH HARGA
TRANSPORT OVERHEAD TERMASUK PAJAK KETERANGAN
DLL
0.00 0.00 212,500.00
0.00 0.00 212,500.00
0.00 0.00 280,000.00 *
0.00 0.00 400,000.00
0.00 0.00 400,000.00
0.00 0.00 475,000.00
0.00 0.00 480,000.00
0.00 0.00 485,000.00 *
0.00 0.00 50,000.00
0.00 0.00 65,000.00
0.00 0.00 50,000.00
0.00 0.00 62,500.00 On Site
0.00 0.00 1,300.00
0.00 0.00 110,000.00 *
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 400,000.00 *
0.00 0.00 2,000,000.00
0.00 0.00 2,050,000.00 *
0.00 0.00 2,000,000.00 *
0.00 0.00 8,900.00 *
0.00 0.00 22,000.00
0.00 0.00 15,000.00
0.00 0.00 0.00 *
0.00 0.00 5,150.00
0.00 0.00 14,000.00 *
0.00 0.00 23,000.00 *
0.00 0.00 22,000.00 *
0.00 0.00 19,000.00
0.00 0.00 300,000.00 *
0.00 0.00 450,000.00 *
0.00 0.00 600,000.00 *
0.00 0.00 850,000.00 *
0.00 0.00 1,300,000.00 *
0.00 0.00 200,000.00 *
0.00 0.00 55,000.00
0.00 0.00 70,000.00
0.00 0.00 1,600.00 *
0.00 0.00 1,450.00
0.00 0.00 16,000.00
0.00 0.00 6,950.00 *
0.00 0.00 285,000.00 *
0.00 0.00 100,000.00 *
0.00 0.00 14,500.00 *
0.00 0.00 25,000.00
0.00 0.00 1,550.00
0.00 0.00 47,500.00
0.00 0.00 60,000.00 *
0.00 0.00 60,000.00 *
0.00 0.00 52,500.00
0.00 0.00 60,000.00
0.00 0.00 7,000.00 *
0.00 0.00 25,000.00

0.00 0.00 58,000.00


0.00 0.00 74,000.00
0.00 0.00 88,500.00
0.00 0.00 8,000.00
0.00 0.00 137,500.00
0.00 0.00 120,000.00
0.00 0.00 51,700.00
0.00 0.00 45,000.00 *
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 50,000.00 *
0.00 0.00 12,500.00
0.00 0.00 57,500.00
0.00 0.00 66,950.00
0.00 0.00 76,550.00
0.00 0.00 86,000.00
0.00 0.00 95,500.00
0.00 0.00 8,000.00 *
0.00 0.00 6,000.00
0.00 0.00 97,500.00
0.00 0.00 63,750.00
0.00 0.00 40,000.00
0.00 0.00 15,000.00
0.00 0.00 25,000.00
0.00 0.00 21,000.00
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 25,000.00
0.00 0.00 57,250.00
0.00 0.00 37,000.00
0.00 0.00 10,000.00
0.00 0.00 26,600.00
0.00 0.00 65,000.00 *
0.00 0.00 160,000.00 *
0.00 0.00 180,000.00 *
0.00 0.00 190,000.00 *
0.00 0.00 40,000.00 *
0.00 0.00 120,000.00
0.00 0.00 160,000.00
0.00 0.00 8,500.00
0.00 0.00 25,000.00
0.00 0.00 20,000.00
0.00 0.00 1,575,000.00
0.00 0.00 307,500.00
0.00 0.00 400,000.00
0.00 0.00 700,000.00
0.00 0.00 812,000.00
0.00 0.00 175,000.00 *
0.00 0.00 275,000.00 *
0.00 0.00 400,000.00 *
0.00 0.00 475,000.00 *
0.00 0.00 1,050,000.00 *
0.00 0.00 1,350,000.00 *
0.00 0.00 8,875.00
0.00 0.00 16,500.00
0.00 0.00 29,500.00
0.00 0.00 46,875.00
0.00 0.00 105,000.00 *
0.00 0.00 150,000.00 *
0.00 0.00 255,000.00 *
0.00 0.00 6,500.00
0.00 0.00 5,150.00
0.00 0.00 15,000.00 *
0.00 0.00 20,000.00
0.00 0.00 3,700.00
0.00 0.00 45,000.00
0.00 0.00 120,000.00 *
0.00 0.00 8,000.00
0.00 0.00 15,500.00
0.00 0.00 15,000.00
0.00 0.00 50,000.00
0.00 0.00 18,750.00
0.00 0.00 750,000.00 *
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 8,000.00 *
0.00 0.00 46,000.00 *
0.00 0.00 14,000,000.00
0.00 0.00 26,000.00
0.00 0.00 3,500.00
0.00 0.00 4,200.00
0.00 0.00 6,000.00
0.00 0.00 9,800.00
0.00 0.00 17,000.00
0.00 0.00 28,000.00
0.00 0.00 22,000.00 *
0.00 0.00 8,000.00 *
0.00 0.00 380,000.00 *
0.00 0.00 35,000.00 *
0.00 0.00 55,000.00 *
0.00 0.00 70,000.00 *
0.00 0.00 25,000.00 *
0.00 0.00 30,000.00 *
0.00 0.00 135,000.00 *
0.00 0.00 75,000.00 *
0.00 0.00 15,000.00 *
0.00 0.00 1,150,000.00 *
0.00 0.00 3,000.00 *
0.00 0.00 6,500.00 *
0.00 0.00 3,000,000.00 *
0.00 0.00 2,500,000.00 *
0.00 0.00 2,500,000.00 *
0.00 0.00 2,500,000.00 *
0.00 0.00 50,000.00 *
0.00 0.00 25,000.00 *
0.00 0.00 25,000.00
0.00 0.00 85,000.00 *
0.00 0.00 200,000.00 *
0.00 0.00 17,000.00 *
0.00 0.00 5,000.00
0.00 0.00 60,000.00
0.00 0.00 12,000.00 *
0.00 0.00 18,000.00 *
0.00 0.00 750,000.00 *
0.00 0.00 125,000.00 *
0.00 0.00 38,500.00
0.00 0.00 6,000.00 *
0.00 0.00 12,500.00
0.00 0.00 27,000.00
0.00 0.00 10,000.00 *
0.00 0.00 350,000.00
JUMLAH HARGA
TRANSPORT OVERHEAD TENAGA KERJA KETERANGAN
(Rp/Hari)
0.00 0.00 7,500.00
0.00 0.00 60,000.00
0.00 0.00 66,000.00
0.00 0.00 54,000.00
0.00 0.00 67,000.00
0.00 0.00 25,000.00 *
0.00 0.00 93,000.00
0.00 0.00 100,000.00 *
0.00 0.00 250,000.00 *
0.00 0.00 62,500.00
0.00 0.00 7,000.00
0.00 0.00 40,000.00
0.00 0.00 20,600.00
0.00 0.00 15,250.00
0.00 0.00 7,500.00
0.00 0.00 10,000.00
0.00 0.00 2,500.00 *
0.00 0.00 2,500.00
0.00 0.00 55,000.00 *
0.00 0.00 5,000.00
0.00 0.00 8,000.00
0.00 0.00 69,500.00
0.00 0.00 32,500.00
0.00 0.00 45,000.00 *
0.00 0.00 850,000.00
0.00 0.00 1,358,000.00
0.00 0.00 3,000,000.00
0.00 0.00 8,500.00
0.00 0.00 135,000.00
0.00 0.00 148,000.00
0.00 0.00 227,500.00
0.00 0.00 245,000.00
0.00 0.00 239,000.00
0.00 0.00 363,000.00
0.00 0.00 162,500.00
0.00 0.00 550,000.00
0.00 0.00 275,000.00
0.00 0.00 25,250.00
0.00 0.00 21,800.00