2018 MANDIRI
1 2 3 5
UMR SUMBAR 2018 RP.2.119.067.-/25 HARI 1,949,284.00 2,119,067.00
DAFTAR UPAH PEKERJA 77,971.36 84,762.68 8.01
1 Mandor hari 110,000 118,800.00 119,000.00 159,954.00 119,570.00 - -
2 Kepala Tukang hari 110,000 118,800.00 119,000.00 159,954.00 119,570.00 - -
3 Tukang hari 100,000 108,000.00 108,000.00 145,412.00 108,700.00 110,000.00 - -
4 Kepala Tukang Kayu hari 110,000 118,800.00 119,000.00 - -
5 Kepala Tukang Batu hari 110,000 118,800.00 119,000.00 - -
6 Kepala Tukang Besi hari 110,000 118,800.00 119,000.00 - -
7 Kepala Tukang Cat hari 110,000 118,800.00 119,000.00 - -
8 Kepala Tukang Aspal hari 110,000 118,800.00 119,000.00 - -
9 Kepala Tukang Beronjong hari 110,000 118,800.00 119,000.00 - -
10 Tukang Kayu hari 105,000 113,400.00 114,000.00 - -
11 Tukang Batu hari 100,000 108,000.00 108,000.00 - -
12 Tukang Besi hari 100,000 108,000.00 108,000.00 - -
13 Tukang Las hari 100,000 108,000.00 108,000.00 - -
14 Tukang Cat hari 100,000 108,000.00 108,000.00 - -
15 Tukang Masak Aspal hari 100,000 108,000.00 108,000.00 - -
16 Tukang Beronjong hari 100,000 108,000.00 108,000.00 - -
17 Tukang Profil Beton hari 120,000 129,600.00 130,000.00 - -
18 Pekerja hari 85,000 85,000.00 85,000.00 114,714.00 92,395.00 85,000.00 - -
19 Operator hari 120,000 129,600.00 130,000.00 164,800.00 130,440.00 110,000.00 - -
20 Pembantu Operator hari 100,000 108,000.00 108,000.00 127,639.00 108,700.00 85,000.00 - -
21 Penjaga Malam hari 80,000 86,400.00 87,000.00 - -
22 Mekanik hari 120,000 129,600.00 130,000.00 145,412.00 130,440.00 110,000.00 - -
23 Pembantu Mekanik hari 80,000 86,400.00 87,000.00 109,867.00 86,960.00 85,000.00 - -
24 Sopir hari 110,000 118,800.00 119,000.00 145,412.00 119,570.00 110,000.00 - -
25 Pembantu Sopir/driver hari 80,000 86,400.00 87,000.00 109,867.00 86,960.00 85,000.00 - -
Kerikil
- Kerikil Beton M3 150,000 150,000.00 136,666.67 150,000 100,000 160,000
- Kerikil Timbun M3 100,000 100,000.00 106,666.67 120,000 100,000 100,000
- Koral Sikat Kg 5,000 5,000.00 5,000.00
- Batu Alam(lempeng) M2 65,000 65,000.00
- batu alam M2 156,500 156,500.00 156,500.00
Pasir
- Pasir Pasang M3 140,000 140,000.00 158,525.00 170,666.00 135,000.00 289,100.00 120,000 125,000 100,000 500.000/tiper
- Pasir Beton M3 140,000 140,000.00 170,900.00 182,044.00 135,000.00 292,700.00 120,000 100,000 500.000/tiper
- Pasir halus (untuk HRS) M3 140,000 140,000.00 350,000.00 75,000.00 140,000.00 350,000.00 500.000/tiper
- Pasir Urug M3 90,000 90,000.00 91,850.00 170,666.00 90,000.00 152,400.00 50,000 65,000 100,000 300.000/tiper
- Sirtu M3 120,000 120,000.00 182,044.00 100,000.00 259,600.00 120,000 125,000
BATU BATA
- Batu Bata (5x11x23) U-Standar Bh 850 900.00 900 900 900
- Hollow Brick Bh 3,800 3,800.00
- Bataco Bh 3,700 3,700.00
- Paving Block (s=6, t = 6 cm) Bh 2,200 2,200
- Paving Block (s=6, t = 8 cm) Bh 2,700 2,700
- Paving Block (s=I, t = 6 cm) Bh 2,200 2,200
- Paving slove M2 180,000 180,000
- Concrete Block (s=4 t=6) min K225 M2 100,000 100,000
- Concrete Block (s=4 t=8) min K225 M2 110,000 110,000
- Concrete Block tebal 6 type 1 Bh 2,250 2,250
- Concrete Block tebal 8 type 1 Bh 2,600 2,600
- Concrete Block (s=4 t=6) Bh 17,000 17,000
- Concrete Block (s=4 t=8) Bh 18,000 18,000
- Grass block tebal 8 K 300 Bh 16,000 16,000
- grell resapan air con block 20x10 t:8 K 350 bh 27,500 27,500
- Lantai dekoratif M2 650,000 650,000
- Jubin warna 40 x 40 bh 23,000 23,000
Semen :
- Semen Padang TP 1 (50 Kg) Zak 62,500 64,000.00 63,823.71 68,266.00 62,500.00 65,000.00 60,000 60,000 70,000 61,000
- Semen/pc (kg) kg 1,250 1,280.00 1,365.00 1,250.00 1,300.00 1,200 1,400
- Semen Putih (40 Kg) Kg 3,000 3,000.00 2,375 2,500 100.000/sak
- Kapur Kg 2,000 2,000.00 - 20.000/krg
BAHAN KAYU
- Kayu Banio : Papan M3 5,750,000 6,000,000.00 6,000,000 4,000,000 6,000,000
- Kayu Banio Balok M3 5,500,000 6,000,000.00 6,000,000 6,000,000
- Kayu Marsawa : Papan M3 5,100,000 4,000,000.00 4,000,000 4,000,000
Kayu Marsawa Balok M3 5,000,000 4,000,000.00 4,000,000 4,000,000
- Kayu Marantih : Papan M3 4,000,000 4,000,000.00 4,000,000 4,000,000
Kayu Marantih Balok M3 3,900,000 4,000,000.00 4,000,000 4,000,000
- Kayu Bekisting : Papan M3 2,950,000 2,500,000.00 2,500,000 2,500,000
Kayu Bekisting Balok M3 2,900,000 2,250,000.00 2,500,000 2,000,000 2,500,000
- Tiang Pancang/dolken kayu 8-10/4 m btg 36,000 36,000.00 100,000
- Bambu dia 8-10 cm btg 15,000 15,000.00
- Kayu Api M3 100,000 100,000.00
- Kayu Perancah M3 2,250,000.00 2,941,155.00 2,900,000.00 1,500,000.00
Triplek :
- Tebal 3 mm (Kw 1) Lbr 60,000 50,000.00 49,333.33 48,000 50,000 50,000
- Tebal 4 mm (Kw 1) Lbr 70,000 67,000.00 67,000.00 73,955.00 68,000 65,000 68,000
- Tebal 6 mm (Kw 1) Lbr 90,000 87,000.00 87,666.67 108,088.00 88,000 85,000 90,000
- Tebal 9 mm (Kw 1) Lbr 130,000 122,500.00 122,500.00 136,533.00 115,000 120,000 130,000 125,000
- Kenari Putih Lbr 110,000 110,000.00 110,000.00 110,000
- Triplek Jati (teak wood) Lbr 95,000 85,000.00 85,000.00 85,000 85,000
- Eternit Asbes (1 m x 1 m) Lbr 30,000 18,000.00 18,000.00 18,000
- Gypsum Panel 6 mm (1,2 m x 2,4 m) Lbr 84,000 62,500.00 62,500.00 60,000 65,000
- Gypsum Panel 9 mm (1,2 m x 2,4 m) Lbr 107,000 60,000.00 60,000.00 60,000
- GRC/Kalsi 3,5 mm (1,2 m x 2,4 m) Lbr 70,000 69,000.00 69,000.00 65,000 70,000 72,000
- Les 1 x 3 x 400 cm Btg 15,000 15,000.00
- Les 1 x 5 x 400 cm Btg 17,000 17,000.00
UPAH /BAHAN PT.CITRA
HARGA SATUAN HARGA SATUAN UD.RIZKI
NO JENIS BAHAN BANGUNAN SATUAN BERDASARKAN BID.BINA PT.CITRA MUDA PT.STATIKA KARYA UD.LUMPUR UD.ILHAM UD.JASA SANGGAR BUNGA KET
2017 (Rp.) 2018 (Rp.) DPU PR PROV. NOER BERSAUDARA MITRASARANA MATERIAL
BANGUNAN MANAN LUBUK
UMR /SURVEY MARGA 2018 PRIMA BUKIT ALUNG
2018 MANDIRI
1 2 3 5
- Les Profil 3 x 3,5 x 400 cm Btg 22,000 22,000.00 18,000.00 - 18,000
- Les Profil 4 x 4,5 x 400 cm Btg 24,000 24,000.00 20,000.00 - 20,000
- ACP 0,4 SNI + rangka aluminium M2 850,000 850,000.00
- ACP 0,4 SNI + rangka hollow besi M2 750,000 750,000.00
Bahan Besi
- Besi beton Kg 10,500 10,500.00 11,280.00 10,500.00 11,500.00 9,000 9,500 10,000 105.000/btg uk 12
- Besi profil Kg 15,000 15,000.00 - 10,000
- Besi Ulir Kg 15,000 15,000.00 9,500 10,000 130.000/btg uk 13
Besi Siku
- L 25.25.2,5 Btg 35,000 26,000 26,000 -
- L 30.30.3 Btg 45,000 40,000 30,000 - 50,000
- L 40.40.4 Btg 65,000 65,000 48,000 - 80,000
- L 50.50.5 Btg 150,000 85,000 85,000 -
- L 60.60.6 Btg 250,000 250,000 -
- L 70.70.7 Btg 300,000 300,000
Bahan Paku :
- Paku triplek Kg 15,000.00 17,066.00 15,000.00 14,000.00 15,000
- 1 1/2" Kg 15,000 17,000.00 16,000 20,000 16,000
- (2 - 5)" Kg 15,000 17,000.00 15,000 20,000 16,000
- Paku seng (1/2 - 1)" RRC Kg 30,000 25,000.00 25,000 25,000 25.000/ktk
- Paku gypsum (kotak) kg 20,000 25,000.00 25,000 25,000 25,000
- Paku Sekrup 1-2,5 " (kotak) bh 15,000 34,000.00 58,000 10,000
- Paku hak panjang Kg 25,000 25,000.00
- Paku Sekrup 3-5 " 500 biji kg 20,000 58,000.00 58,000
- Sekrup ACP bh 58,000.00 58,000
Besi Plat
- Ukuran (4x8) m' tebal 1 mm Lbr 275,000 240,000 240,000 -
- Ukuran (4x8) m' tebal 2 mm Lbr 550,000 600,000 600,000 -
- Ukuran (4x8) m' tebal 3 mm Lbr 750,000 750,000 750,000 -
Plat Aluminium
UPAH /BAHAN PT.CITRA
HARGA SATUAN HARGA SATUAN UD.RIZKI
NO JENIS BAHAN BANGUNAN SATUAN BERDASARKAN BID.BINA PT.CITRA MUDA PT.STATIKA KARYA UD.LUMPUR UD.ILHAM UD.JASA SANGGAR BUNGA KET
2017 (Rp.) 2018 (Rp.) DPU PR PROV. NOER BERSAUDARA MITRASARANA MATERIAL
BANGUNAN MANAN LUBUK
UMR /SURVEY MARGA 2018 PRIMA BUKIT ALUNG
2018 MANDIRI
1 2 3 5
- Ukuran (2x1) m' tebal 0,3 mm Lbr 50,000 56,000 56,000 -
- Ukuran (2x1) m' tebal 0,4 mm Lbr 62,000 70,000 70,000 -
- Ukuran (2x1) m' tebal 0,5 mm Lbr 90,000 95,000 95,000 -
BAHAN ATAP
- Seng BJLS 0,20 x 3' x 6' bd 9 Lbr 42,000 42,000.00 -
- Seng BJLS 0,30 x 3' x 6' bd 9 Lbr 46,000 46,000.00 -
- Seng BJLS 0,20 x 3' x 6' bd 11 Lbr 48,000 45,500.00 44,500 46,000 46,000
- Seng BJLS 0,30 x 3' x 6' bd 11 Lbr 60,000 72,250.00 44,500 100,000
- atap asbes gelombang Lbr 30,000 30,000.00 315,000
- Atap Daun Rumbio Lbr 4,200 4,200.00 - -
- Atap Fiber (t = 1,3 mm) M2 126,000 70,000.00 70,000
- Fibre glass tebal 10 cm Lbr 275,000 275,000.00
- Pas. Atap Polycarbonit + Rangka M2 500,000 500,000.00 -
- Rangka Atap Baja Ringan, tebal = 0,75 mm M2 150,000 150,000.00 82,000 -
- Rangka Atap Baja Ringan, tebal = 0,85 mm M2 200,000 200,000.00 -
- Pas atap spandek + rangka stanles M2 600,000 600,000.00 44,000
- Pas atap spandek + rangka baja ringan M2 250,000 250,000.00 44,000
- Pas atap spandek + rangka baja hollow M2 350,000 350,000.00
BAHAN LANTAI/DINDING
Keramik Lantai Warna Gelap SNI
- Ukuran (20 x 20) cm M2 70,000 60,000.00 60,000 70,000
- Ukuran (30 x 30) cm KW I M2 75,000 60,000.00 60,000
- Ukuran (40 x 40) cm M2 80,000 60,000.00 60,000 70,000
Keramik Dinding/Jalusi
- Tralux ukuran (30 x30) cm M2 51,500 51,500
- Bunga/Warna ukuran (30 x 30) cm M2 51,500 51,500
- PC ukuran (20 x 20) cm M2 47,000 47,000
- PC ukuran (30 x30) cm M2 47,000 47,000 -
Granit
- Granit (Lantai) 60x60 M2 185,000 155,000 160,000 150,000
- Granit (Lantai) 80x80 M2 280,000 280,000
UPAH /BAHAN PT.CITRA
HARGA SATUAN HARGA SATUAN UD.RIZKI
NO JENIS BAHAN BANGUNAN SATUAN BERDASARKAN BID.BINA PT.CITRA MUDA PT.STATIKA KARYA UD.LUMPUR UD.ILHAM UD.JASA SANGGAR BUNGA KET
2017 (Rp.) 2018 (Rp.) DPU PR PROV. NOER BERSAUDARA MITRASARANA MATERIAL
BANGUNAN MANAN LUBUK
UMR /SURVEY MARGA 2018 PRIMA BUKIT ALUNG
2018 MANDIRI
1 2 3 5
- Granit (Dinding) 30x60 M2 185,000 185,000 - -
- Granit (Dinding) 60x60 M2 185,000 185,000
BAHAN KACA
Kaca Polos
- Tebal 3 mm M2 60,000 60,000 -
- Tebal 5 mm M2 80,000 80,000 -
- Tebal 8 mm M2 209,000 209,000 -
Raybend :
- Tebal 3 mm M2 71,500 71,500 -
- Tebal 5 mm M2 98,000 98,000 -
Kaca Es
- Tebal 3 mm M2 80,000 80,000 -
- Tebal 5 mm M2 93,000 93,000 -
PENGGANTUNG/PENGUNCI
Kunci Pintu/Tanam
- Merk Jangkar 9702 RRC/692 LD Set 90,000 60,000.00 55,000 65,000 60,000
- Jangkar 746 Set 60,000 45,000.00 45,000 45,000 50,000
- Merk Setara SES Set 250,000 285,000.00 300,000 250,000 300,000
- Merk Ciga Brown 5009 Set 150,000 150,000.00 -
- Kunci Mandili 450 Itali Set 250,000 250,000.00 -
- Kunci Antik A/C Itali Set 350,000 150,000.00 150,000
- Kunci Sanghai 9702 LD Set 90,000 90,000.00
- Grendel Antik 2 Set 10,000 15,000.00 15,000
- Grendel Set 10,000 13,000.00 5,000 10,000 25,000
- Tarikan Antik Jendela Set 20,000 20,000.00 5,000
- Tarikan Jendela Set 20,000 20,000.00 5,000 5,000 6,000
- Engsel Nyilon Set 22,600 22,000.00 10,000 30,000 30,000
- Engsel Lokal Set 9,000 9,000.00 8,000 - 30,000
BAHAN CAT
- Platone Cat Tembok Kg 20,000 20,000.00 85,000 110,000 85.000/5 kg
- Dulux Cat Tembok Kg 110,000 110,000.00 280,000
- Rimatex Dempul Tembok Kg 10,000 10,000 50,000 16,000
- Platone Cat Besi Kg 50,000 50,000 50,000 58,000 53,000
- Multi Seal Cat Seng Kg 75,000 75,000 180,000 180,000
- Cat Alkali Kg 75,000 75,000 105,000 150,000 150.000/ 2,5 kg
- Plemer Kayu - wa Kg 23,750 23,750 48,000 50,000 30,000
- Meni Kayu - wa Kg 30,000 30,000 28,000 30,000 30,000
- Meni Besi - wa Kg 31,250 31,250 28,000 30,000 35,000
- Cat Tembok Matex Kg 18,000 18,000 - 95,000
- Cat Marka (Non Thermoplas) Kg 25,000 25,000 22,500.00 25,000.00 40,500.00
- Cat Marka (Thermoplastic) Kg 25,000 25,000 86,897.00 25,000.00 50,000.00
- Cat Tembok Caltilac Kg 25,000 25,000 125,000 - 130.000 / 5 kg
- Minyak Cat Ltr 15,000 15,000 10,000 10,000 18,000
- Cat Dasar TL Kg 27,500 27,500 70,000 25,000 16,000
- Pylox Btl 27,500 27,500 25,000
UPAH /BAHAN PT.CITRA
HARGA SATUAN HARGA SATUAN UD.RIZKI
NO JENIS BAHAN BANGUNAN SATUAN BERDASARKAN BID.BINA PT.CITRA MUDA PT.STATIKA KARYA UD.LUMPUR UD.ILHAM UD.JASA SANGGAR BUNGA KET
2017 (Rp.) 2018 (Rp.) DPU PR PROV. NOER BERSAUDARA MITRASARANA MATERIAL
BANGUNAN MANAN LUBUK
UMR /SURVEY MARGA 2018 PRIMA BUKIT ALUNG
2018 MANDIRI
1 2 3 5
- thinner Ltr 20,000.00 22,755.00 15,000.00 21,500.00
- Residu Kg 15,000 15,000.00 85,000
- ampelas Lbr 2,500 5,000.00 5,681.00 2,500.00 20,000 10,000
- soda api kg 8,500.00 7,000 10,000
- kuas bh 15,000.00 6,000 30,000
- wastafel bh 500,000.00 500,000
- Bak fibreglass bh 250,000.00 250,000
- waterdrain bh 15,000.00 15,000
- tee 2" bh 6,000.00 6,000
- vernis Ltr 50,000.00 50,000
- dempul kayu kg 28,000.00 28,000
- lem kayu klg 20,000.00 20,000
- engsel kupu-kupu buah 5,000 5,000
- kait angin buah 5,000 5,000
- Pengencer Kg 20,000 20,000
MINYAK
- Olie/ pelumas Ltr 20,000 35,000.00 33,422.00 40,000.00 35,000.00 -
- Solar (subsidi) Ltr -
- Solar (non subsidi) Ltr 7,210.00 10,000.00 -
- Bensin (subsidi) Ltr -
sesuai ketentuan sesuai ketentuan
- Bensin (non subsidi) Ltr 7,460.00 13,000.00 -
pemerintah pemerintah
- Minyak Tanah/ Kerosen Ltr 8,000.00 15,000.00 20,000
- Pertalite Ltr 7,500.00
- Dexlite Ltr 7,500.00
Aspal
- Aspal Emulsi Kg 8,500 12,000.00 6,800.00 12,000.00
- Aspal Minyak Kg 14,000 13,500.00 -
- Tack coat-asphalt emulsi (AE CSS-IR) Kg 8,500.00 8,500.00
- Aspal Modifikasi Kg 11,100.00 8,000.00 11,100.00
BAHAN SANITAIR
Closet Jongkok
- Merk KIA Type EX RAPI (1273A010) Bh 325,000 310,000.00 295,000 325,000
- Merk KIA Type DX RAPI (1273A010) Bh 350,000 350,000.00 - 350,000
- Merk Toto Bh 350,000 360,000.00 350,000 330,000 400,000
Closet Duduk
- Closet Duduk Manual SNI Bh 600,000 600,000.00 500,000 625,000
- Closet Duduk Otomatis SNI Bh 2,500,000 2,500,000.00 1,000,000 1,800,000 1,900,000
- Glas blok 19/19 Bh 23,000 21,000.00 21,000 20,000 22,000
- sower (biasa) unit 230,000 230,000.00 60,000 125.000/85.000
- bak cuci piring (1 bak) unit 200,000 200,000.00 145,000 150,000 170,000
- bak cuci piring (2 bak) unit 250,000 375,000.00 350,000 400,000
- Kran 1/2" bh 8,000.00 8,000
- TBA (sealtape) bh 5,000.00 5,000
PIPA
- pipa PVC 1/2" btg 19,000.00 10,000 25,000 22,000
- pipa PVC 3/4" btg 25,000.00 13,000 35,000 28,000
- pipa PVC 1" btg 37,000.00 28,000 45,000 38,000
UPAH /BAHAN PT.CITRA
HARGA SATUAN HARGA SATUAN UD.RIZKI
NO JENIS BAHAN BANGUNAN SATUAN BERDASARKAN BID.BINA PT.CITRA MUDA PT.STATIKA KARYA UD.LUMPUR UD.ILHAM UD.JASA SANGGAR BUNGA KET
2017 (Rp.) 2018 (Rp.) DPU PR PROV. NOER BERSAUDARA MITRASARANA MATERIAL
BANGUNAN MANAN LUBUK
UMR /SURVEY MARGA 2018 PRIMA BUKIT ALUNG
2018 MANDIRI
1 2 3 5
- pipa PVC 1 1/2" btg 51,000.00 25,000 65,000 65,000
- pipa PVC 2" btg 70,000.00 30,000 95,000 85,000
- pipa PVC 3" btg 138,000.00 50,000 190,000 175,000
- pipa PVC 4" btg 210,000.00 70,000 290,000 280,000
- plastik filter M2 22,000.00 15,000.00 15,000.00 38,500.00
- Pipa Porus M' 65,000.00 40,000.00 40,000.00 115,565.00
- pipa galvanis dia 1/2" btg
- pipa galvanis dia 3/4" btg
- pipa galvanis dia 1" btg 55,000
- pipa galvanis dia 1,5" btg 80,850 15,000.00 80,850.00 275,000.00 65,000
- pipa galvanis dia 1,6" btg 154,000.00 225,600.00
- pipa galvanis dia 3" btg 206,250 20,000.00 206,250.00 601,300.00
- pipa galvanis dia 4" btg 300,000
- pipa baja 3" M 15,000.00 77,500.00 78,250.00
Baja
- baja bergelombang Kg 43,041.67 53,475.00 40,000.00 35,650.00
- Baja Struktur Kg 20,000.00 14,500.00 20,000.00 17,650.00
- Tiang pancang baja M' 995,166.67 20,000.00 15,500.00 2,950,000.00
- tiang pancang beton pratekan M3 355,590.67 400,000.00 210,000.00 456,772.00
- baja prategang Kg 55,000.00 55,000.00 55,000.00 10,950.00
- Baja tulangan (polos) U32 Kg 12,000 12,500.00 14,000.00 10,500.00 13,100.00
- Baja Tulangan (Ulir) D32 Kg 13,000.00 15,000.00 11,000.00 13,000.00
- Baja tulangan (ulir) D39 Kg 13,000 15,000.00 16,000.00 13,000.00 16,000.00
- Baja tulangan (ulir) D48 Kg 14,000 16,000.00 17,000.00 14,000.00 17,000.00
- Baja Tulangan (Polos) U24 Kg 12,000.00 13,368.00 10,500.00 12,500.00
PJU
- Tiang lampu antik type tunggal H= 9 M bh 7,800,000.00
- Tiang lampu antik type ganda H= 9 M bh 8,450,000.00
- Lampu sodium 250 watt bh 4,225,000.00
- Kabel NFGBY 4 x 6 mm m1 85,000.00
- MCB, 1P, 6A bh 35,000.00
- Kabel NYM 2 x 2,5 mm m1 11,500.00
- Pembayaran BP + Jaminan Langganan VA 1,500.00
- Pipa PVC dia 3/4" + Klem m1 34,133.33
- Panel Komplit 30x40x60 cm unit 7,500,000.00
- Piching Connector 2 baut bh 22,500.00
- Gali/Timbun (untuk kabel lampu) m3 135,000.00
- Friction Tie m1 35,000.00
- Drainase Sistem m1 20,000.00
- Tiang Lampu octagonal H=7m bh 6,500,000.00
- Lampu LED 40 watt bh 3,000,000.00
- Solar cell Panel 135 wp bh 4,500,000.00
- Aki Deep Cycle 120 Ah bh 2,000,000.00
- Solar Control 20 Amp bh 1,500,000.00
- Box Battery bh 500,000.00
- Kabel Solar Cell NYYHY 2x2,5 mm m1 15,000.00
- Kabel lampu NYYHY 2x1,5 mm m1 13,000.00
- Kabel Aki NYAF 1x4 mm m1 11,000.00
- Aksesories Baut Mur dll Ls 50,000.00
- Profil Beton 2 Lapis m1 150,000.00
- Tiang Penyangga Solar Panel dan Braket set 500,000.00
BUIS BETON
- Ø 100 cm Bh 231,000 231,000 67,000
- Ø 80 cm Bh 157,000 157,000 45,000
- Ø 60 cm Bh 126,000 126,000 28,000
- Ø 40 cm Bh 78,000 78,000 -
- Ø 30 cm Bh 68,000 68,000 -
- Ø 20 cm Bh 47,000 47,000
Trali Beton : -
- Tinggi 63 cm (20 x 40) Bh 20,000 20,000 -
- Tinggi 63 cm (30 x 30) Bh 23,000 23,000 -
- Tinggi 63 cm Bh 28,000 28,000 -
- Tinggi 87 cm Bh 38,000 38,000
Trali Besi : -
- Besi Polos (Tanpa Bermotif) M' 18,900 18,900 -
- Besi Ulir (Tanpa Bermotif) M' 20,000 20,000 -
- Besi Polos M' 26,000 26,000 -
- Besi Ulir M' 36,000 36,000 -
UPAH /BAHAN PT.CITRA
HARGA SATUAN HARGA SATUAN UD.RIZKI
NO JENIS BAHAN BANGUNAN SATUAN BERDASARKAN BID.BINA PT.CITRA MUDA PT.STATIKA KARYA UD.LUMPUR UD.ILHAM UD.JASA SANGGAR BUNGA KET
2017 (Rp.) 2018 (Rp.) DPU PR PROV. NOER BERSAUDARA MITRASARANA MATERIAL
BANGUNAN MANAN LUBUK
UMR /SURVEY MARGA 2018 PRIMA BUKIT ALUNG
2018 MANDIRI
1 2 3 5
Tiang Pancang
- Tiang Pancang Beton Pratekan 300 mm K400 M' 275,000 275,000
- Tiang Pancang Beton dia 400 min K400 M' 475,000 475,000
- Tiang Pancang Beton dia 600 min K400 M' 965,000 965,000 -
Taman :
- Gebalan rumput m2 20,000 20,000 5,000.00 25,000.00
- geotextile TS 70 m2 18,000 18,000
- geotextile TS 30 m2 15,000 15,000 -
- Rumput Gajah Mini m2 27,500.00 30,000.00 - 30,000.00
- Rumput gajah m2 17,500.00 20,000.00 - 20,000.00
- Rumput jepang m2 25,000.00 20,000.00 - 20,000.00
- Palem Phonik t = 2 m btg 375,000.00 350,000.00 - 350,000.00
UPAH /BAHAN PT.CITRA
HARGA SATUAN HARGA SATUAN UD.RIZKI
NO JENIS BAHAN BANGUNAN SATUAN BERDASARKAN BID.BINA PT.CITRA MUDA PT.STATIKA KARYA UD.LUMPUR UD.ILHAM UD.JASA SANGGAR BUNGA KET
2017 (Rp.) 2018 (Rp.) DPU PR PROV. NOER BERSAUDARA MITRASARANA MATERIAL
BANGUNAN MANAN LUBUK
UMR /SURVEY MARGA 2018 PRIMA BUKIT ALUNG
2018 MANDIRI
1 2 3 5
- Palem Phonik t = 1.5 m btg 350,000.00 250,000.00 - 250,000.00
- Palem Phonik t = 1 m btg 150,000.00 150,000.00 - 150,000.00
- Dadap Merah btg 50,000.00 50,000.00 -
- Mangga Malaysia btg 35,000.00 40,000.00 40,000.00
- Palem Sikas Besar btg 1,000,000.00 1,000,000.00 - 1,000,000.00
- Palem Sikas Kecil btg 50,000.00 50,000.00 -
- Asoka t = 30 cm btg 25,000.00 25,000.00 - 25,000.00
- Pucuk Merah t = 2 m btg 100,000.00 80,000.00 - 80,000.00
- Pucuk Merah t = 1.5 m btg 50,000.00 50,000.00 - 50,000.00
- Pucuk Merah t = 1 m btg 25,000.00 25,000.00 - 25,000.00
- Pucuk Merah t = 0.5 m btg 15,000.00 15,000.00 - 15,000.00
- Pucuk Merah t = 0.25 m btg 5,000.00 5,000.00 - 5,000.00
- Asoka Jepang btg 45,000.00 45,000.00 -
- Ketapang Kencana t = 2 m btg 250,000.00 250,000.00 - 250,000.00
- Ketapang Kencana t = 1.5 m btg 200,000.00 200,000.00 - 200,000.00
- Ketapang Kencana t = 1 m btg 100,000.00 100,000.00 - 100,000.00
- Glodokan Tiang btg 35.000/20.000 35.000/20.000 - 35.000/20.000
- Pisang Orange plb 5,500.00 6,000.00 - 6,000.00
- Kribo Kuning plb 4,500.00 5,000.00 - 5,000.00
- Bakung lili plb 8,000.00 8,000.00 - 8,000.00
- Pisang Katalea plb 26,500.00 28,000.00 - 28,000.00
- Agave besar plb 50,000.00 50,000.00 - 50,000.00
- Agave kecil plb 25,000.00 25,000.00 - 25,000.00
- Tricolor t = 1.5 m plb 75,000.00 75,000.00 - 75,000.00
- Tricolor t = 1 m plb 65,000.00 65,000.00 - 65,000.00
- Tricolor t = 0.5 m plb 42,500.00 40,000.00 - 40,000.00
- Tricolor t = 25 cm plb 7,750.00 8,000.00 - 8,000.00
- Sambang Dara plb 50.000/4.000 50,000.00 - 50,000.00
- Krokot Putih plb 1,500.00 1,500.00 - 1,500.00
- Krokot Merah plb 2,000.00 2,500.00 - 2,500.00
- Ubi Rambat Mas plb 5,500.00 6,000.00 - 6,000.00
- Olyander Pink t = 2 m btg 100,000.00 100,000.00 - 100,000.00
- Olyander Pink t = 1. 5 m btg 67,500.00 70,000.00 - 70,000.00
- Olyander Pink t = 0.5 m btg 15,000.00 15,000.00 - 15,000.00
- Bayam Merah plb 2,500.00 2,500.00 - 2,500.00
- Beringin Korea t = 2 m btg 2,500,000.00 2,500,000.00 - 2,500,000.00
- Beringin Korea t = 1.5 m btg 1,500,000.00 1,500,000.00 - 1,500,000.00
- Cemara Udang t = 2 m btg 2,500,000.00 2,500,000.00 - 2,500,000.00
- Cemara Udang t = 1.5 m btg 1,500,000.00 1,500,000.00 - 1,500,000.00
- Cemara Lilin t = 2 m btg 75,000.00 75,000.00 - 75,000.00
- Cemara Lilin t = 1.5 m btg 50,000.00 50,000.00 - 50,000.00
- Pandan Bali t = 1.5 m btg 1,500,000.00 1,500,000.00 - - 1,500,000.00
- Pandan Bali t = 1 m btg 750,000.00 750,000.00 - - 750,000.00
- Melati Mini Besar t = 1 m btg 50,000.00 50,000.00 - - 50,000.00
- Melati Mini Kecil t = 25 cm btg 4,500.00 5,000.00 - - 5,000.00
- Saberna t = 1,5 m btg 75,000.00 75,000.00 - - 75,000.00
- Saberna t = 30 cm btg 45,000.00 50,000.00 - - 50,000.00
- Airis btg 4,000.00 4,000.00 - - 4,000.00
- Lili Brazil btg 5,000.00 5,000.00 - - 5,000.00
- Pandan Itali btg 8,000.00 8,000 8,000
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KOTA PARIAMAN TAHUN 2018
1 2 3
Kerikil
Pasir
Semen :
41 - Semen Padang TP 1 (50 Kg) Zak 64,000
42 -Semen/pc (kg) kg 1,280
BAHAN KAYU
46 - Kayu Banio : Papan M3 6,000,000
47 Kayu Banio Balok M3 6,000,000
48 - Kayu Marsawa : Papan M3 4,000,000
49 Kayu Marsawa Balok M3 4,000,000
50 - Kayu Marantih : Papan M3 4,000,000
51 Kayu Marantih Balok M3 4,000,000
HARGA SATUAN 2018
NO JENIS BAHAN BANGUNAN SATUAN KET
(Rp.)
1 2 3
52 - Kayu Bekisting : Papan M3 2,500,000
53 Kayu Bekisting Balok M3 2,250,000
54 - Dolken kayu dia 8 - 10 /400 cm btg 36,000
55 - Bambu dia 8-10 cm btg 15,000
56 - Kayu Api M3 100,000
Triplek :
57 - Tebal 3 mm (Kw 1) Lbr 50,000
Bahan Besi
Bahan Paku :
92 - 1 1/2" Kg 17,000
93 - (2 - 5)" Kg 17,000
94 - Paku seng (1/2 - 1)" RRC Kg 25,000
BAHAN CAT
1 2 3
169 - Plemer Kayu - wa Kg 23,750
170 - Meni Kayu - wa Kg 30,000
171 - Meni Besi - wa kg 31,250
172 - Cat Tembok Matex Kg 18,000
177 - Minyak Cat Ltr 15,000
MINYAK :
DAFTAR HARGA SATUAN PEKERJAAN
PEKERJAAN BIDANG TATA RUANG & PENATAN BANGUNAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PARIAMAN
TAHUN ANGGARAN 2018
Harga Satuan
No Uraian Pekerjaan Satuan
(Rp)
DIVISI 2
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter m2 311,302.20
2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m2
374,528.30
2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter m2
423,392.20
2.2.1.4 Pengukuran dan pemasangan 1 m' Bouwplank m' 73,108.20
2.2.1.5 Pembuatan 1 m2 kantor sementara lantai plesteran m2 1,256,871.00
2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu) m2 1,191,036.00
2.2.1.9 Pembersihan 1 m2 lapangan dan perataan m2 15,884.00
2.2.1.13 Pembongkaran 1 m3 beton bertulang m3
1,333,761.88
2.2.1.14 Pembongkaran 1 m3 dinding tembok bata m3
666,880.94
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m m3 73,392.00
2.3.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m m3 90,030.60
2.3.1.3 Menggali 1 m3 tanah biasa sedalam 3 m m3
106,930.56
2.3.1.4 Menggali 1 m3 tanah keras sedalam 1 m m3
97,681.76
2.3.1.5 Menggali 1 m3 tanah cadas sedalam 1 m m3
148,090.80
2.3.1.6 Menggali 1 m3 tanah lumpur sedalam 1 m m3
118,080.60
2.3.1.8 Pembuangan 1 m3 tanah sejauh 30 meter m3 32,161.80
2.3.1.9 Pengurugan kembali 1 m3 galian tanah m3 53,284.00
2.3.1.10 Pemadatan tanah 1 m3 tanah (per 20 cm) m3
53,284.00
2.3.1.11 Pengurugan 1 m3 dengan pasir urug m3
148,156.80
Pengurugan 1 m3 dengan tanah urug m3
121,756.80
2.3.1.14 Pengurugan 1 m3 sirtu padat m3
185,042.00
DIVISI 3
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
Pemasangan 1 m3 pondasi batu kali campuran 1SP : 3SP m3 825,858.00
Pemasangan 1 m3 pondasi batu kali campuran 1SP : 4SP m3
776,336.00
Pemasangan 1 m3 batu kosong ( Anstamping ) m3
413,783.04
Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 Kr dan 40% batu belah m3 2,432,643.40
Pemasangan 1 m3 pondasi sumuran, diameter 100 cm m3 825,540.32
DIVISI 4
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
4.1.1.1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), slump (12 ± 2) cm, w/c = 0.87 m3 790,566.48
4.1.1.2 Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0.78 m3
828,477.37
4.1.1.3 Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0.72 m3 858,282.48
4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa(K 100), slump (3-6) cm, w/c = 0.87 m3 716,006.62
4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 MPa(K 175), slump (12 ± 2) cm, w/c = 0.66 m3
893,475.15
4.1.1.6 Membuat 1 m3 beton mutu f'c = 16,9 MPa(K 200), slump (12 ± 2) cm, w/c = 0.61 m3
927,137.59
4.1.1.7 Membuat 1 m3 beton mutu f'c = 19.3 MPa(K 225), slump (12 ± 2) cm, w/c = 0.58 m3
952,215.15
4.1.1.8 Membuat 1 m3 beton mutu f'c = 21,7 MPa(K 250), slump (12 ± 2) cm, w/c = 0.56 m3
968,881.37
4.1.1.9 Membuat 1 m3 beton mutu f'c = 24,0 MPa(K 275), slump (12 ± 2) cm, w/c = 0.53 m3 997,388.48
4.1.1.10 Membuat 1 m3 beton mutu f'c = 26,4 MPa(K 300), slump (12 ± 2) cm, w/c = 0.52 m3 1,006,303.37
4.1.1.11 Membuat 1 m3 beton mutu f'c = 28,8 MPa(K 325), slump (12 ± 2) cm, w/c = 0.49 m3
1,094,642.76
4.1.1.12 Membuat 1 m3 beton mutu f'c = 31,2 MPa(K 350), slump (12 ± 2) cm, w/c = 0.48 m3
1,106,251.42
4.1.1.17 Pembesian 10 Kg dengan besi polos 10 kg 140,873.48
4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi m 2
270,337.76
4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof m2 292,337.76
4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom m2 489,101.58
4.1.1.23 Pemasangan 1 m2 bekisting untuk balok m 2
502,301.58
4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai m 2
647,501.58
4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga m 2
444,661.58
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) m3 4,354,083.36
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) m3 5,105,129.48
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) m3 9,460,663.08
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) m 3
7,373,826.68
Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) m 3
7,185,325.40
4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11 x 11)cm m' 87,615.00
4.1.1.36 Membuat 1 m' ring balok beton bertulang (10 x 15)cm m' 110,852.72
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
4.2.1.10 Pemasangan 1 m2 rolling door alluminium m2 882,992.00
4.2.1.11 Pemasangan 1 m kusen pintu alluminium M' 121,298.67
4.2.1.12 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m 2
464,522.04
4.2.1.13 Pemasangan 1 m2 pintu kaca rangka alluminum m 2
464,691.92
4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm, partisi m2 168,150.84
4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafon m2 207,071.04
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
4.4.1.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2 PP m2 298,562.00
4.4.1.2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3 PP m 2
285,401.60
4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4 PP m 2
276,698.40
4.4.1.7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2 PP m2 145,030.60
4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3 PP m2 138,889.96
4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 4 PP m 2
135,311.00
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
4.4.2.1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm m2 74,084.03
4.4.2.2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm m2 67,265.79
4.4.2.3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm m2 64,281.01
4.4.2.4 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm m 2
62,272.32
4.4.2.20 Pemasangan 1 m' plesteran skoning 1SP : 3PP lebar 10 cm m' 63,455.92
4.4.2.23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m 2
50,203.56
4.4.2.27 Pemasangan 1 m2 acian m 2
37,769.60
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
4.4.3.35 Pemasangan 1 m2 lantai keramik ukuran 30 x 30 cm m2 211,987.60
Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm m 2
220,215.60
Pemasangan 1 m2 lantai keramik ukuran 40 x 40 cm (motif kasar) m 2
220,215.60
4.4.3.36 Pemasangan 1 m2 lantai keramik ukuran 20 x 20 cm m 2
212,550.80
Pemasangan 1 m2 lantai Granit ukuran 60 x 60 cm m 2
262,657.12
4.4.3.54 Pemasangan 1 m2 dinding keramik ukuran 20 x 20 cm m2 259,452.60
Pemasangan 1 m2 dinding keramik ukuran 20 x 25 cm m2 260,483.85
Pemasangan 1 m2 dinding GRC Board (120 x 240 cm) m 2
47,514.72
Pemasangan 1 m2 Alumanium Composit Panel /ACP m 2
83,760.60
4.4.3.57 Pemasangan 1 m2 dinding batu paras m 2
298,436.60
4.4.3.64 Pemasangan 1 m2 Paving Block T= 6 cm , S = 6 m2 173,230.24
4.4.3.65 Pemasangan 1 m2 Paving Block T= 8 cm, S= 6 m2 217,102.64
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT - LANGIT ( PLAFOND )
4.5..1.5 Pemasangan 1 m2 langit - langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm m2 44,904.20
4.5..1.6 Pemasangan 1 m2 langit - langit lumbersering kayu, tebal 9 mm m2 256,438.60
4.5..1.7 Pemasangan 1 m2 langit - langit gypsum board ukuran (120x240x9)mm , tebal 9 mm m2 47,935.80
4.5.1.9 Pemasangan 1 m' list langit-langit kayu profil m' 18,496.94
A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
4.5.2.32 Pemasangan 1 m2 genteng metal Ukuran 80 x 100 Atap Pelana m2 100,701.48
4.5.2.33 Pemasangan 1 m2 genteng metal Ukuran 80 x 100 Atap Jurai m2 135,351.48
4.5.2.37 Pemasangan 1 m' nok genteng metal m' 62,107.54
4.5.2.39 Pemasangan 1 m2 Atap Seng Gelombang m2 52,986.56
4.5.2.40 Pemasangan 1 m' Nok Atap Seng m' 50,954.64
4.5.2.43 Pemasangan 1 m2 aluminium foil/sisalation m 2
122,099.34
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
4.6.1.2 Pembuatan dan pemasangsan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III m3 6,107,783.00
4.6.1.5 Pembuatan dan pemasangsan 1 m2 daun pintu panel, kayu kelas I atau II m2 706,288.00
4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II m 2
526,464.40
4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvesional, kayu kelas I,II dan III bentang 6 meter m 3
7,180,052.00
4.6.1.14 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I m 3
11,646,388.60
4.6.1.15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II m 3
8,517,768.60
4.6.1.16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 248,459.20
4.6.1.19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III m2 136,668.40
4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III m 2
137,744.20
4.6.1.21 Pemasangan 1 m' listplank ukuran (3 x 20) cm, kayu kelas I atau II m' 86,955.00
4.6.1.22 Pemasangan 1 m' listplank ukuran (3 x 30) cm, kayu kelas I atau II m' 86,900.00
4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm, kayu kelas II atau III m 2
203,089.04
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
4.6.2.1 Pemasangan 1 buah kunci tanam antik buah 253,686.84
4.6.2.2 Pemasangan 1 buah kunci tanam biasa buah 119,992.40
4.6.2.5 Pemasangan 1 buah engsel pintu buah 32,078.24
4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu buah 40,081.14
4.6.2.9 Pemasangan 1 buah kait angin buah 31,534.14
4.6.2.16 Pemasangan 1 m2 kaca tebal 3 mm m2 96,406.64
4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm m 2
120,606.64
4.6.2.18 Pemasangan 1 m2 kaca tebal 8 mm m 2
278,711.97
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama m2 10,044.54
4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat m2 2,344.54
4.7.1.4. 1 m2 Pengecatan bidang kayu (1 lapis palmuur, 1 lapis cat dasar, 2 lapis cat penutup) m2 43,997.14
4.7.1.9 Pelaburan 1 m2 Bidang Kayu dengan Vernis m 2
46,790.92
4.7.1.10. 1 m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m 2
21,844.72
1 m2 Pengecatan tembok baru Setara Dulux (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m 2
50,279.72
4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) m 2
17,128.50
DIVISI 5
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
5.1.1.1. Pemasangan 1 buah closet duduk/monoblock buah 3,376,445.60
5.1.1.2. Pemasangan 1 buah closet jongkok porslen buah 663,198.80
5.1.1.4. Pemasangan 1 buah urinoir buah 2,429,790.00
5.1.1.5. Pemasangan 1 buah wastafel buah 1,506,722.80
5.1.1.7. Pemasangan 1 buah bak fibreglass vol 1 m3 buah 1,316,238.00
5.1.1.8 Pemasangan 1 buah bak mandi batu bata vol 0.30 m3 buah 3,005,864.40
5.1.1.10 Pemasangan 1 buah bak air Fiberglass vol 1 m3 buah 910,654.80
5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel buah 376,525.60
5.1.1.14. Pemasangan 1 buah floor drain buah 31,605.20
5.1.1.18. Pemasangan 1 m' pipa galvanis diameter ½" m' 101,517.57
5.1.1.19. Pemasangan 1 buah kran diameterr ½" atau 3/4" buah 66,215.60
5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4" m' 116,085.42
5.1.1.21. Pemasangan 1 m' pipa galvanis diameter 1" m' 152,527.32
5.1.1.22. Pemasangan 1 m' pipa galvanis diameter 1 ½" m' 161,900.64
5.1.1.23. Pemasangan 1 m' pipa galvanis diameter 3" m' 364,879.35
5.1.1.24. Pemasangan 1 m' pipa galvanis diameter 4" m' 515,021.76
5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter ½" m' 45,397.44
5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" m' 56,089.44
5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1" m' 77,473.44
5.1.1.28. Pemasangan 1 m' pipa PVC tipe AW diameter 1 ½" m' 108,191.16
5.1.1.29. Pemasangan 1 m' pipa PVC tipe AW diameter 2" m' 142,049.16
5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3" m' 271,814.40
5.1.1.32. Pemasangan 1 m' pipa PVC tipe AW diameter 4" m' 400,118.40
Pemasangan 1 m' List Plafond Gypsum (Analisa Kab. P. Pariaman) m' 59,670.49
Pemasangan 1 m2 Loteng Gypsum + rangka baja ringan (Analisa Kab. P. Pariaman) m2 177,351.90
Pembuatan 1 unit Septick Tank Kap. 25 Orang Lengkap Peresapan (Uk. 1.10 x 2.20 x 1.70 M') Unit 6,205,377.81
Pembuatan 1 unit Septick Tank Kap. 15 Orang Lengkap Peresapan (Uk. 1.00 x 2.00 x 1.40 M') Unit 5,093,969.65
Pengecatan 1 m2 beton dengan cat anti bocor m 2
25,048.50
KUMPULAN ANALISA
DILINGKUNGAN DINAS PEKERJAAN UMUM KOTA PARIAMAN
TRIWULAN I TAHUN 2011
KELOMPOK I
1. Analisa Pembersihan lapangan /M2
UPAH :
0.1000 Pekerja Rp. 45,000.00 Rp. 4,500.00
0.0500 Mandor Rp. 70,000.00 Rp. 3,500.00 Rp. 8,000.00
Jumlah Rp. 8,000.00
Over Head + Fee 10% Rp. 800.00
Dibulatkan Rp. 8,800.00
19
BAHAN :
0.0070 M3 Papan Bekisting Rp. 1,800,000.00 Rp. 12,600.00
0.0120 M3 Tiang Pancang 5/7 Rp. 1,600,000.00 Rp. 19,200.00
0.0200 Kg Paku Rp. 17,500.00 Rp. 350.00 Rp. 32,150.00
Jumlah Rp. 44,800.00
Over Head + Fee 10% Rp. 4,480.00
Dibulatkan Rp. 49,280.00
20
0.1500 Kepala tukang Rp. 80,000.00 Rp. 12,000.00
0.0500 Mandor Rp. 70,000.00 Rp. 3,500.00 Rp. 165,500.00
BAHAN :
3.0000 Btg Kayu pancang Rp. 24,000.00 Rp. 72,000.00
0.2760 M3 Kayu Rp. 2,000,000.00 Rp. 552,000.00
0.7000 Kg Paku biasa Rp. 17,500.00 Rp. 12,250.00
1.5000 Lbr Seng BJLS 0,20 x 3' x 6' b Rp. 36,000.00 Rp. 54,000.00 Rp. 690,250.00
Jumlah Rp. 855,750.00
Over Head + Fee 10% Rp. 85,575.00
Dibulatkan Rp. 941,325.00
8 analisa pembuatan bedeng buruh/M2
UPAH :
1.5000 Tukang kayu Rp. 70,000.00 Rp. 105,000.00
1.0000 Pekerja Rp. 45,000.00 Rp. 45,000.00
0.1500 Kepala tukang Rp. 80,000.00 Rp. 12,000.00
0.0500 Mandor Rp. 70,000.00 Rp. 3,500.00 Rp. 165,500.00
BAHAN :
3.0000 Btg Kayu pancang Rp. 24,000.00 Rp. 72,000.00
0.2760 M3 Kayu Rp. 2,000,000.00 Rp. 552,000.00
0.7000 Kg Paku biasa Rp. 17,500.00 Rp. 12,250.00
0.7000 Kg Semen Pc (50 Kg) Rp. 1,000.00 Rp. 700.00
0.7000 M3 Pasir beton Rp. 75,000.00 Rp. 52,500.00
0.7000 M3 Koral beton Rp. 85,000.00 Rp. 59,500.00
0.7000 Lbr Plywood 4 mm Rp. 49,000.00 Rp. 34,300.00
1.5000 Lbr Seng BJLS 0,20 x 3' x 6' b Rp. 36,000.00 Rp. 54,000.00 Rp. 837,250.00
Jumlah Rp. 1,002,750.00
Over Head + Fee 10% Rp. 100,275.00
Dibulatkan Rp. 1,103,025.00
21
UPAH :
6.6670 Pekerja Rp. 45,000.00 Rp. 300,015.00
0.3330 Mandor Rp. 70,000.00 Rp. 23,310.00 Rp. 323,325.00
Jumlah Rp. 323,325.00
Over Head + Fee 10% Rp. 32,332.50
Dibulatkan Rp. 355,658.00
22
0.0450 Mandor Rp. 70,000.00 Rp. 3,150.00 Rp. 57,150.00
Jumlah Rp. 57,150.00
Over Head + Fee 10% Rp. 5,715.00
Dibulatkan Rp. 62,865.00
23
25 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
UPAH :
0.2500 Pekerja Rp. 45,000.00 Rp. 11,250.00
0.0250 mandor Rp. 70,000.00 Rp. 1,750.00 Rp. 13,000.00
BAHAN :
1.2000 M3 Sirtu Rp. 60,000.00 Rp. 72,000.00 Rp. 72,000.00
Jumlah Rp. 85,000.00
Over Head + Fee 10% Rp. 8,500.00
Dibulatkan Rp. 93,500.00
KELOMPOK II
1 Analisa pas.Pondasi batu kali, 1 Pc ; 1 Ps/M3
UPAH :
1.5000 Pekerja Rp. 45,000.00 Rp. 67,500.00
0.6000 Tukang batu Rp. 70,000.00 Rp. 42,000.00
0.0600 kepala tukang Rp. 80,000.00 Rp. 4,800.00
0.0750 mandor Rp. 70,000.00 Rp. 5,250.00 Rp. 119,550.00
BAHAN :
1.2000 M3 Batu belah 15/20 Rp. 150,000.00 Rp. 180,000.00
392.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 392,000.00
0.3140 M3 Pasir Pasang Rp. 65,000.00 Rp. 20,410.00 Rp. 592,410.00
Jumlah Rp. 711,960.00
Over Head + Fee 10% Rp. 71,196.00
Dibulatkan Rp. 783,156.00
24
0.6000 Tukang batu Rp. 70,000.00 Rp. 42,000.00
0.0600 kepala tukang Rp. 80,000.00 Rp. 4,800.00
0.0750 mandor Rp. 70,000.00 Rp. 5,250.00 Rp. 119,550.00
BAHAN :
1.2000 M3 Batu belah 15/20 Rp. 150,000.00 Rp. 180,000.00
163.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 163,000.00
0.5200 M3 Pasir Pasang Rp. 65,000.00 Rp. 33,800.00 Rp. 376,800.00
Jumlah Rp. 496,350.00
Over Head + Fee 10% Rp. 49,635.00
Dibulatkan Rp. 545,985.00
25
0.0500 kepala tukang Rp. 80,000.00 Rp. 4,000.00
0.0400 mandor Rp. 70,000.00 Rp. 2,800.00 Rp. 77,800.00
BAHAN :
0.0160 M3 Pasir urug Rp. 40,000.00 Rp. 640.00
0.0800 M3 Pasir beton Rp. 75,000.00 Rp. 6,000.00
0.1250 M3 Koral beton Rp. 85,000.00 Rp. 10,625.00
49.0000 Kg Semen Pc (50 Kg) Rp. 1,000.00 Rp. 49,000.00
34.5000 Kg Besi beton Rp. 10,000.00 Rp. 345,000.00
0.7000 Kg Kawat beton Rp. 18,000.00 Rp. 12,600.00
0.0270 M3 Kayu 5/7 Rp. 1,600,000.00 Rp. 43,200.00
0.1200 Kg Paku biasa Rp. 17,500.00 Rp. 2,100.00
0.0900 Lt Minyak bekisting Rp. 30,000.00 Rp. 2,700.00
0.2000 Kg Plamur tembok Rp. 20,000.00 Rp. 4,000.00 Rp. 475,865.00
Jumlah Rp. 553,665.00
Over Head + Fee 10% Rp. 55,366.50
Dibulatkan Rp. 609,032.00
KELOMPOK III
1 Analisa pasangan bata merah tebal satu bata, 1 Pc : 2 Ps/M2
UPAH :
0.6000 Pekerja Rp. 45,000.00 Rp. 27,000.00
0.2000 Tukang batu Rp. 70,000.00 Rp. 14,000.00
0.0200 kepala tukang Rp. 80,000.00 Rp. 1,600.00
0.0300 mandor Rp. 70,000.00 Rp. 2,100.00 Rp. 44,700.00
BAHAN :
140.0000 Bh Bata merah 5x11x22cm Rp. 700.00 Rp. 98,000.00
43.5000 Kg Semen Pc (50 kg) Rp. 1,000.00 Rp. 43,500.00
0.0800 M3 Pasir pasang Rp. 65,000.00 Rp. 5,200.00 Rp. 146,700.00
Jumlah Rp. 191,400.00
Over Head + Fee 10% Rp. 19,140.00
Dibulatkan Rp. 210,540.00
26
4 Analisa pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps/M2
UPAH :
0.3000 Pekerja Rp. 45,000.00 Rp. 13,500.00
0.1000 Tukang batu Rp. 70,000.00 Rp. 7,000.00
0.0100 kepala tukang Rp. 80,000.00 Rp. 800.00
0.0150 mandor Rp. 70,000.00 Rp. 1,050.00 Rp. 22,350.00
BAHAN :
70.0000 Bh Bata merah 5x11x22cm Rp. 700.00 Rp. 49,000.00
18.9500 Kg Semen Pc (50 kg) Rp. 1,000.00 Rp. 18,950.00
0.0380 M3 Pasir pasang Rp. 65,000.00 Rp. 2,470.00 Rp. 70,420.00
Jumlah Rp. 92,770.00
Over Head + Fee 10% Rp. 9,277.00
Dibulatkan Rp. 102,047.00
27
Dibulatkan Rp. 100,661.00
28
UPAH :
0.2000 Pekerja Rp. 45,000.00 Rp. 9,000.00
0.0600 mandor Rp. 70,000.00 Rp. 4,200.00 Rp. 13,200.00
BAHAN :
35.0000 Bh Paving Block Type I Rp. 2,500.00 Rp. 87,500.00
0.0350 M3 Pasir Urug Rp. 40,000.00 Rp. 1,400.00 Rp. 88,900.00
Jumlah Rp. 102,100.00
Over Head + Fee 10% Rp. 10,210.00
Dibulatkan Rp. 112,310.00
KELOMPOK IV
1 Analisa Pasang kusen pintu dan jendela kayu Banio/M3
UPAH :
6.0000 Pekerja Rp. 45,000.00 Rp. 270,000.00
20.0000 Tukang kayu Rp. 70,000.00 Rp. 1,400,000.00
2.0000 kepala tukang Rp. 80,000.00 Rp. 160,000.00
0.3000 mandor Rp. 70,000.00 Rp. 21,000.00 Rp. 1,851,000.00
BAHAN :
1.1000 M3 Kayu banio, balok Rp. 3,200,000.00 Rp. 3,520,000.00
1.2500 Kg Paku 10 cm Rp. 17,500.00 Rp. 21,875.00
1.0000 Kg Lem kayu Rp. 10,000.00 Rp. 10,000.00 Rp. 3,551,875.00
Jumlah Rp. 5,402,875.00
Over Head + Fee 10% Rp. 540,287.50
Dibulatkan Rp. 5,943,163.00
29
0.0500 mandor Rp. 70,000.00 Rp. 3,500.00 Rp. 282,500.00
BAHAN :
0.0640 M3 Kayu jati, papan Rp. 3,500,000.00 Rp. 224,000.00
0.5000 Kg Lem kayu Rp. 10,000.00 Rp. 5,000.00 Rp. 229,000.00
Jumlah Rp. 511,500.00
Over Head + Fee 10% Rp. 51,150.00
Dibulatkan Rp. 562,650.00
30
Jumlah Rp. 101,625.00
Over Head + Fee 10% Rp. 10,162.50
Dibulatkan Rp. 111,788.00
BAHAN :
0.0270 M3 Kayu balok kelas II Rp. 2,350,000.00 Rp. 63,450.00
0.2000 Kg paku biasa 2" - 5" Rp. 17,500.00 Rp. 3,500.00 Rp. 66,950.00
Jumlah Rp. 106,375.00
Over Head + Fee 10% Rp. 10,637.50
Dibulatkan Rp. 117,013.00
31
13 Analisa pasang dinding dari papan surian/M2
UPAH :
0.6000 Pekerja Rp. 45,000.00 Rp. 27,000.00
1.8000 Tukang kayu Rp. 70,000.00 Rp. 126,000.00
0.1800 kepala tukang Rp. 80,000.00 Rp. 14,400.00
0.0300 mandor Rp. 70,000.00 Rp. 2,100.00 Rp. 169,500.00
BAHAN :
0.0070 M3 Kayu surian,papan Rp. 3,500,000.00 Rp. 24,500.00
0.1500 Kg paku sekrup 3-5" Rp. 20,000.00 Rp. 3,000.00
0.1000 Kg paku biasa 2" - 5" Rp. 17,500.00 Rp. 1,750.00 Rp. 29,250.00
Jumlah Rp. 198,750.00
Over Head + Fee 10% Rp. 19,875.00
Dibulatkan Rp. 218,625.00
KELOMPOK V
1 Analisa pembesian dengan besi polos atau besi ulir/Kg
UPAH :
0.0070 Pekerja Rp. 45,000.00 Rp. 315.00
0.0070 Tukang besi Rp. 70,000.00 Rp. 490.00
0.0007 kepala tukang Rp. 80,000.00 Rp. 56.00
0.0004 mandor Rp. 70,000.00 Rp. 28.00 Rp. 889.00
BAHAN :
1.0500 Kg Besi beton Rp. 10,000.00 Rp. 10,500.00
0.0150 Kg Kawat beton Rp. 18,000.00 Rp. 270.00 Rp. 10,770.00
Jumlah Rp. 11,659.00
Over Head + Fee 10% Rp. 1,165.90
Dibulatkan Rp. 12,825.00
32
0.0330 kepala tukang Rp. 80,000.00 Rp. 2,640.00
0.0330 mandor Rp. 70,000.00 Rp. 2,310.00 Rp. 57,750.00
BAHAN :
0.0400 M3 Kayu terentang Rp. 1,800,000.00 Rp. 72,000.00
0.4000 Kg Paku biasa 2"-5" Rp. 17,500.00 Rp. 7,000.00
0.2000 Ltr Minyak bekisting Rp. 30,000.00 Rp. 6,000.00
0.0150 M3 Balok kayu kelas II Rp. 2,350,000.00 Rp. 35,250.00
0.3500 Kg Plywood tebal 9 mm Rp. 95,000.00 Rp. 33,250.00
2.0000 Btg Dolken kayu Rp. 24,000.00 Rp. 48,000.00 Rp. 201,500.00
Jumlah Rp. 259,250.00
Over Head + Fee 10% Rp. 25,925.00
Dibulatkan Rp. 285,175.00
33
7 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
UPAH :
1.2000 Pekerja Rp. 45,000.00 Rp. 54,000.00
0.2000 Tukang batu Rp. 70,000.00 Rp. 14,000.00
0.0200 kepala tukang Rp. 80,000.00 Rp. 1,600.00
0.0600 mandor Rp. 70,000.00 Rp. 4,200.00 Rp. 73,800.00
BAHAN :
230.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 230,000.00
893.0000 Kg Pasir beton Rp. 53.57 Rp. 47,839.29
1,027.0000 Kg Koral beton Rp. 62.96 Rp. 64,662.96
200.0000 Ltr Air Rp. 250.00 Rp. 50,000.00 Rp. 392,502.25
Jumlah Rp. 466,302.25
Over Head + Fee 10% Rp. 46,630.22
Dibulatkan Rp. 512,932.00
8 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = ,78
UPAH :
1.6500 Pekerja Rp. 45,000.00 Rp. 74,250.00
0.2750 Tukang batu Rp. 70,000.00 Rp. 19,250.00
0.0280 kepala tukang Rp. 80,000.00 Rp. 2,240.00
0.0830 mandor Rp. 70,000.00 Rp. 5,810.00 Rp. 101,550.00
BAHAN :
276.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 276,000.00
828.0000 Kg Pasir beton Rp. 53.57 Rp. 44,357.14
1,012.0000 Kg Koral beton Rp. 62.96 Rp. 63,718.52
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 437,825.66
Jumlah Rp. 539,375.66
Over Head + Fee 10% Rp. 53,937.57
Dibulatkan Rp. 593,313.00
9 Membuat 1 m3 beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
UPAH :
1.6500 Pekerja Rp. 45,000.00 Rp. 74,250.00
0.2750 Tukang batu Rp. 70,000.00 Rp. 19,250.00
0.0280 kepala tukang Rp. 80,000.00 Rp. 2,240.00
0.0830 mandor Rp. 70,000.00 Rp. 5,810.00 Rp. 101,550.00
BAHAN :
299.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 299,000.00
799.0000 Kg Pasir beton Rp. 53.57 Rp. 42,803.57
1,017.0000 Kg Koral beton Rp. 62.96 Rp. 64,033.33
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 459,586.90
Jumlah Rp. 561,136.90
Over Head + Fee 10% Rp. 56,113.69
Dibulatkan Rp. 617,251.00
10 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
UPAH :
1.6500 Pekerja Rp. 45,000.00 Rp. 74,250.00
0.2750 Tukang batu Rp. 70,000.00 Rp. 19,250.00
0.0280 kepala tukang Rp. 80,000.00 Rp. 2,240.00
0.0830 mandor Rp. 70,000.00 Rp. 5,810.00 Rp. 101,550.00
BAHAN :
326.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 326,000.00
760.0000 Kg Pasir beton Rp. 53.57 Rp. 40,714.29
1,029.0000 Kg Koral beton Rp. 62.96 Rp. 64,788.89
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 485,253.17
Jumlah Rp. 586,803.17
Over Head + Fee 10% Rp. 58,680.32
34
Dibulatkan Rp. 645,483.00
11 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
UPAH :
1.6500 Pekerja Rp. 45,000.00 Rp. 74,250.00
0.2750 Tukang batu Rp. 70,000.00 Rp. 19,250.00
0.0280 kepala tukang Rp. 80,000.00 Rp. 2,240.00
0.0830 mandor Rp. 70,000.00 Rp. 5,810.00 Rp. 101,550.00
BAHAN :
371.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 371,000.00
698.0000 Kg Pasir beton Rp. 53.57 Rp. 37,392.86
1,047.0000 Kg Koral beton Rp. 62.96 Rp. 65,922.22
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 528,065.08
Jumlah Rp. 629,615.08
Over Head + Fee 10% Rp. 62,961.51
Dibulatkan Rp. 692,577.00
12 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
UPAH :
1.6500 Pekerja Rp. 45,000.00 Rp. 74,250.00
0.2750 Tukang batu Rp. 70,000.00 Rp. 19,250.00
0.0280 kepala tukang Rp. 80,000.00 Rp. 2,240.00
0.0830 mandor Rp. 70,000.00 Rp. 5,810.00 Rp. 101,550.00
BAHAN :
384.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 384,000.00
692.0000 Kg Pasir beton Rp. 53.57 Rp. 37,071.43
1,039.0000 Kg Koral beton Rp. 62.96 Rp. 65,418.52
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 540,239.95
Jumlah Rp. 641,789.95
Over Head + Fee 10% Rp. 64,178.99
Dibulatkan Rp. 705,969.00
13 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
UPAH :
1.6500 Pekerja Rp. 45,000.00 Rp. 74,250.00
0.2750 Tukang batu Rp. 70,000.00 Rp. 19,250.00
0.0280 kepala tukang Rp. 80,000.00 Rp. 2,240.00
0.0830 mandor Rp. 70,000.00 Rp. 5,810.00 Rp. 101,550.00
BAHAN :
406.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 406,000.00
684.0000 Kg Pasir beton Rp. 53.57 Rp. 36,642.86
1,026.0000 Kg Koral beton Rp. 62.96 Rp. 64,600.00
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 560,992.86
Jumlah Rp. 662,542.86
Over Head + Fee 10% Rp. 66,254.29
Dibulatkan Rp. 728,797.00
14 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
UPAH :
1.6500 Pekerja Rp. 45,000.00 Rp. 74,250.00
0.2750 Tukang batu Rp. 70,000.00 Rp. 19,250.00
0.0280 kepala tukang Rp. 80,000.00 Rp. 2,240.00
0.0830 mandor Rp. 70,000.00 Rp. 5,810.00 Rp. 101,550.00
BAHAN :
413.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 413,000.00
681.0000 Kg Pasir beton Rp. 53.57 Rp. 36,482.14
1,021.0000 Kg Koral beton Rp. 62.96 Rp. 64,285.19
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 567,517.33
35
Jumlah Rp. 669,067.33
Over Head + Fee 10% Rp. 66,906.73
Dibulatkan Rp. 735,974.00
BAHAN :
0.2700 M3 Kayu terentang Rp. 1,800,000.00 Rp. 486,000.00
2.0000 Kg Paku biasa 2"-5" Rp. 17,500.00 Rp. 35,000.00
0.6000 Lt Minyak bekisting Rp. 30,000.00 Rp. 18,000.00
210.0000 Kg Besi beton polos Rp. 10,000.00 Rp. 2,100,000.00
3.0000 Kg kawat beton Rp. 18,000.00 Rp. 54,000.00
336.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 336,000.00
0.5400 M3 Pasir beton Rp. 53.57 Rp. 28.93
0.8100 M3 Koral beton Rp. 62.96 Rp. 51.00 Rp. 3,029,079.93
Jumlah Rp. 3,555,429.93
Over Head + Fee 10% Rp. 355,542.99
Dibulatkan Rp. 3,910,973.00
36
336.0000 Kg Semen Pc ( 50 Kg) Rp. 1,000.00 Rp. 336,000.00
0.5400 M3 Pasir beton Rp. 53.57 Rp. 28.93
0.8100 M3 Koral beton Rp. 62.96 Rp. 51.00
0.1500 M3 Balok kayu kelas II Rp. 2,350,000.00 Rp. 352,500.00
3.5000 Lbr Plywood 9 mm Rp. 95,000.00 Rp. 332,500.00
20.0000 Btg kayu dolken Rp. 24,000.00 Rp. 480,000.00 Rp. 5,582,079.93
Jumlah Rp. 6,238,029.93
Over Head + Fee 10% Rp. 623,802.99
Dibulatkan Rp. 6,861,833.00
37
Dibulatkan Rp. 4,749,654.00
38
26 Analisa Beton Kolom ukuran 15 x 15 / m3
BAHAN :
1.0000 m3 Beton camp K.225 Rp. 692,577.00 Rp. 692,577.00
10.0000 m2 Cetakan Kolom Rp. 285,175.00 Rp. 2,851,750.00
138.7000 kg Pembesian Besi Polos Rp. 12,825.00 Rp. 1,778,827.50 Rp. 5,323,154.50
Jumlah Rp. 5,323,200.00
39
Jumlah Rp. 5,507,400.00
KELOMPOK VI
1 Analisa pasang atap asbes gelombang(2.5x0.92m)x5 mm/M2
UPAH :
0.1400 Pekerja Rp. 45,000.00 Rp. 6,300.00
0.0750 Tukang kayu Rp. 70,000.00 Rp. 5,250.00
0.0080 kepala tukang Rp. 80,000.00 Rp. 640.00
0.0080 mandor Rp. 70,000.00 Rp. 560.00 Rp. 12,750.00
BAHAN :
0.5000 Lbr Asbes gelombang Rp. 25,000.00 Rp. 12,500.00
0.1200 Kg Paku Rp. 19,000.00 Rp. 2,280.00 Rp. 14,780.00
Jumlah Rp. 27,530.00
Over Head + Fee 10% Rp. 2,753.00
Dibulatkan Rp. 30,283.00
40
0.0150 kepala tukang Rp. 80,000.00 Rp. 1,200.00
0.0130 mandor Rp. 70,000.00 Rp. 910.00 Rp. 23,860.00
BAHAN :
3.3000 Bh Nok genteng Rp. 37,500.00 Rp. 123,750.00
0.0200 Kg Paku biasa 1/2"-1" Seng 19,000.00 Rp. 380.00 Rp. 124,130.00
Jumlah Rp. 147,990.00
Over Head + Fee 10% Rp. 14,799.00
Dibulatkan Rp. 162,789.00
BAHAN :
0.3000 Hl Seng plat t- 4 mm Rp. 85,000.00 Rp. 25,500.00
0.0400 Kg Paku biasa 1/2"-1" Rp. 19,000.00 Rp. 760.00 Rp. 26,260.00
Jumlah Rp. 38,970.00
Over Head + Fee 10% Rp. 3,897.00
Dibulatkan Rp. 42,867.00
BAHAN :
1.0500 Lbr Aluminium foil Rp. 85,000.00 Rp. 89,250.00 Rp. 89,250.00
Jumlah Rp. 100,460.00
Untuk 1 M' Rp. 10,046.00
Over Head + Fee 10% Rp. 1,004.60
Dibulatkan Rp. 11,051.00
41
0.7000 Hl Seng gelombang Bjls 20 Rp. 37,500.00 Rp. 26,250.00
0.0200 Kg Paku Atap Rp. 26,000.00 Rp. 520.00 Rp. 26,770.00
Jumlah Rp. 37,270.00
Over Head + Fee 10% Rp. 3,727.00
Dibulatkan Rp. 40,997.00
KELOMPOK VII
1 Analisa Memasang Loteng Triplek Tebal 4 mm + rangka kayu kelas II / M2
UPAH :
0.2700 Pekerja Rp. 45,000.00 Rp. 12,150.00
0.4000 Tukang Kayu Rp. 70,000.00 Rp. 28,000.00
0.0400 Kepala Tukang Rp. 80,000.00 Rp. 3,200.00
0.0135 Mandor Rp. 70,000.00 Rp. 945.00 Rp. 44,295.00
BAHAN :
0.0230 M3 Kayu balok kelas II Rp. 2,350,000.00 Rp. 54,050.00
0.0600 Kg Paku 2"-5" Rp. 17,500.00 Rp. 1,050.00
0.3900 Lbr Triplek tebal 4 mm Rp. 49,000.00 Rp. 19,110.00 Rp. 74,210.00
42
Jumlah Rp. 118,505.00
Over Head + Fee 10% Rp. 11,850.50
Dibulatkan Rp. 130,356.00
43
Over Head + Fee 10% Rp. 1,178.50
Dibulatkan Rp. 12,964.00
KELOMPOK VIII
1 Analisa memasang kloset duduk/buah
UPAH :
3.3000 Pekerja Rp. 45,000.00 Rp. 148,500.00
1.1000 Tukang batu Rp. 70,000.00 Rp. 77,000.00
0.0010 Kepala tukang Rp. 80,000.00 Rp. 80.00
0.1600 Mandor Rp. 70,000.00 Rp. 11,200.00 Rp. 236,780.00
BAHAN :
1.0000 Bh Kloset duduk manual Rp. 800,000.00 Rp. 800,000.00
1.0000 Ls aksesoris ( 30% bahan ) Rp. 240,000.00 Rp. 240,000.00 Rp. 1,040,000.00
Jumlah Rp. 1,276,780.00
Over Head + Fee 10% Rp. 127,678.00
Dibulatkan Rp. 1,404,458.00
44
1.0000 Ls Perlengkapan Rp. 39,000.00 Rp. 39,000.00
6.0000 Kg Semen Pc (50 kg) Rp. 1,000.00 Rp. 6,000.00
0.0100 M3 Pasir Pasang Rp. 65,000.00 Rp. 650.00 Rp. 695,650.00
Jumlah Rp. 861,150.00
Over Head + Fee 10% Rp. 86,115.00
Dibulatkan Rp. 947,265.00
45
BAHAN :
22.0000 Bh Batu bata Rp. 700.00 Rp. 15,400.00
77.0000 Kg Semen Pc(50 kg) Rp. 1,000.00 Rp. 77,000.00
0.1300 M3 Pasir pasang Rp. 65,000.00 Rp. 8,450.00
0.0200 M3 Batu kerikil Rp. 60,000.00 Rp. 1,200.00
2.6000 Kg Besi beton Rp. 10,000.00 Rp. 26,000.00
0.0900 M3 Pasir beton Rp. 75,000.00 Rp. 6,750.00 Rp. 134,800.00
Jumlah Rp. 240,540.00
Over Head + Fee 10% Rp. 24,054.00
Dibulatkan Rp. 264,594.00
46
0.0054 Mandor Rp. 70,000.00 Rp. 378.00 Rp. 19,278.00
UPAH :
1.2000 M' Pipa Galvanis 1 1/2" Rp. 25,000.00 Rp. 30,000.00
1.0000 Ls Perlengkapan Rp. 8,750.00 Rp. 8,750.00 Rp. 38,750.00
Jumlah Rp. 58,028.00
Over Head + Fee 10% Rp. 5,802.80
Dibulatkan Rp. 63,831.00
UPAH :
1.2000 M' Pipa Galvanis 4" Rp. 60,000.00 Rp. 72,000.00
1.0000 Ls Perlengkapan Rp. 21,000.00 Rp. 21,000.00 Rp. 93,000.00
Jumlah Rp. 117,101.00
Over Head + Fee 10% Rp. 11,710.10
Dibulatkan Rp. 128,811.00
BAHAN :
1.2000 M' Pipa 3/4" Rp. 5,000.00 Rp. 6,000.00
1.0000 Ls Perlengkapan Rp. 1,750.00 Rp. 1,750.00 Rp. 7,750.00
47
Jumlah Rp. 14,176.00
Over Head + Fee 10% Rp. 1,417.60
Dibulatkan Rp. 15,594.00
48
UPAH :
0.0300 Pekerja Rp. 45,000.00 Rp. 1,350.00
0.3000 Tukang batu Rp. 70,000.00 Rp. 21,000.00
0.0300 Kepala tukang Rp. 80,000.00 Rp. 2,400.00
0.0015 Mandor Rp. 70,000.00 Rp. 105.00 Rp. 24,855.00
BAHAN :
1.0000 Bh Bak cuci satinles steel Rp. 250,000.00 Rp. 250,000.00
1.0000 Set waterdrain+aksesoris Rp. 75,000.00 Rp. 75,000.00 Rp. 325,000.00
Jumlah Rp. 349,855.00
Over Head + Fee 10% Rp. 34,985.50
Dibulatkan Rp. 384,841.00
KELOMPOK IX
1 Analisa pasang rolling door/M2
UPAH :
1.0000 Pekerja Rp. 45,000.00 Rp. 45,000.00
1.0000 Tukang besi Rp. 70,000.00 Rp. 70,000.00
0.1000 Kepala tukang Rp. 80,000.00 Rp. 8,000.00
0.0500 Mandor Rp. 70,000.00 Rp. 3,500.00 Rp. 126,500.00
BAHAN :
1.0000 M2 Roll door Rp. 300,000.00 Rp. 300,000.00 Rp. 300,000.00
Jumlah Rp. 426,500.00
Over Head + Fee 10% Rp. 42,650.00
Dibulatkan Rp. 469,150.00
49
BAHAN :
1.1000 M' Kusen Aluminium Rp. 150,000.00 Rp. 165,000.00
2.0000 Bh Sekrup fixer Rp. 400.00 Rp. 800.00
0.0600 Tube Sealent Rp. 12,000.00 Rp. 720.00 Rp. 166,520.00
Jumlah Rp. 171,956.00
Over Head + Fee 10% Rp. 17,195.60
Dibulatkan Rp. 189,152.00
BAHAN :
6.1770 Kg Besi trip 2 x 3 Rp. 10,000.00 Rp. 61,770.00
27.0800 cm Pengelasan Rp. 3,500.00 Rp. 94,780.00 Rp. 156,550.00
Jumlah Rp. 367,770.00
Over Head + Fee 10% Rp. 36,777.00
Dibulatkan Rp. 404,547.00
50
Over Head + Fee 10% Rp. 8,114.00
Dibulatkan Rp. 89,254.00
KELOMPOK X
1 Analisa pasang kunci tanam antik/Bh
UPAH :
0.0600 Pekerja Rp. 45,000.00 Rp. 2,700.00
0.6000 Tukang kayu Rp. 70,000.00 Rp. 42,000.00
0.0600 Kepala tukang Rp. 80,000.00 Rp. 4,800.00
0.0030 Mandor Rp. 70,000.00 Rp. 210.00 Rp. 49,710.00
BAHAN :
1.0000 Bh Kunci tanam antik Rp. 330,000.00 Rp. 330,000.00 Rp. 330,000.00
Jumlah Rp. 379,710.00
Over Head + Fee 10% Rp. 37,971.00
Dibulatkan Rp. 417,681.00
51
Dibulatkan Rp. 24,690.00
52
BAHAN :
1.1000 M2 Kaca Rp. 100,000.00 Rp. 110,000.00 Rp. 110,000.00
Jumlah Rp. 123,668.50
Over Head + Fee 10% Rp. 12,366.85
Dibulatkan Rp. 136,035.00
KELOMPOK XI
1 Analisa pasang lantai ubin PC (40 x 40)/M2
UPAH :
0.2500 Pekerja Rp. 45,000.00 Rp. 11,250.00
0.1200 Tukang batu Rp. 70,000.00 Rp. 8,400.00
0.0120 Kepala tukang Rp. 80,000.00 Rp. 960.00
0.0130 Mandor Rp. 70,000.00 Rp. 910.00 Rp. 21,520.00
BAHAN :
6.6300 Bh Ubin Rp. 6,711.92 Rp. 44,500.00 Rp.
9.8000 Kg Semen Pc (50 kg) Rp. 1,000.00 Rp. 9,800.00 Rp.
0.0450 M3 Pasir pasang Rp. 65,000.00 Rp. 2,925.00 Rp. 57,225.00
Jumlah Rp. 78,745.00
Over Head + Fee 10% Rp. 7,874.50
Dibulatkan Rp. 86,620.00
BAHAN :
11.8700 Bh Ubin taraso Rp. 3,580.45 Rp. 42,500.00 Rp.
10.0000 Kg Semen Pc (50 kg) Rp. 1,000.00 Rp. 10,000.00 Rp.
0.0450 M3 Pasir pasang Rp. 65,000.00 Rp. 2,925.00 Rp.
1.5000 Kg Semen warna Rp. 6,000.00 Rp. 9,000.00 Rp. 64,425.00
Jumlah Rp. 86,825.00
Over Head + Fee 10% Rp. 8,682.50
Dibulatkan Rp. 95,508.00
53
10.0000 Kg Semen Pc (50 kg) Rp. 1,000.00 Rp. 10,000.00 Rp.
0.0450 M3 Pasir pasang Rp. 65,000.00 Rp. 2,925.00 Rp.
1.5000 Kg Semen warna Rp. 6,000.00 Rp. 9,000.00 Rp. 64,425.00
Jumlah Rp. 121,725.00
Over Head + Fee 10% Rp. 12,172.50
Dibulatkan Rp. 133,898.00
54
2.7500 Kg Semen warna Rp. 6,000.00 Rp. 16,500.00 Rp. 71,970.00
Jumlah Rp. 136,170.00
Over Head + Fee 10% Rp. 13,617.00
Dibulatkan Rp. 149,787.00
BAHAN :
2.6500 Bh Plin keramik 10 X 40 Rp. 1,696.83 Rp. 4,496.61 Rp.
1.1400 Kg Semen Pc (50 kg) Rp. 1,000.00 Rp. 1,140.00 Rp.
0.0030 M3 Pasir pasang Rp. 65,000.00 Rp. 195.00 Rp.
0.1000 Kg Semen warna Rp. 6,000.00 Rp. 600.00 Rp. 6,431.61
Jumlah Rp. 17,851.61
Over Head + Fee 10% Rp. 1,785.16
Dibulatkan Rp. 19,637.00
55
0.1200 Tukang batu Rp. 70,000.00 Rp. 8,400.00
0.0120 Kepala tukang Rp. 80,000.00 Rp. 960.00
0.0060 Mandor Rp. 70,000.00 Rp. 420.00 Rp. 15,180.00
BAHAN :
0.0030 M3 Papan kayu kelas II Rp. 2,500,000.00 Rp. 7,500.00 Rp.
0.0500 Kg Paku Rp. 17,500.00 Rp. 875.00 Rp. 8,375.00
Jumlah Rp. 23,555.00
Over Head + Fee 10% Rp. 2,355.50
Dibulatkan Rp. 25,911.00
KELOMPOK XII
1 Analisa pengecatan bidang kayu lama/M2
UPAH :
0.0700 Pekerja Rp. 45,000.00 Rp. 3,150.00
0.0750 Tukang cat Rp. 70,000.00 Rp. 5,250.00
0.0075 Kepala tukang Rp. 80,000.00 Rp. 600.00
0.0025 Mandor Rp. 70,000.00 Rp. 175.00 Rp. 9,175.00
BAHAN :
0.1500 Kg Plamir Rp. 20,000.00 Rp. 3,000.00
0.1700 Kg cat dasar Rp. 20,000.00 Rp. 3,400.00
0.1700 Kg cat penutup Rp. 40,000.00 Rp. 6,800.00 Rp. 13,200.00
Jumlah Rp. 22,375.00
Over Head + Fee 10% Rp. 2,237.50
Dibulatkan Rp. 24,613.00
2 1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
UPAH :
0.0700 Pekerja Rp. 45,000.00 Rp. 3,150.00
0.0090 Tukang cat Rp. 70,000.00 Rp. 630.00
0.0060 Kepala tukang Rp. 80,000.00 Rp. 480.00
0.0025 Mandor Rp. 70,000.00 Rp. 175.00 Rp. 4,435.00
BAHAN :
0.2000 Kg Cat meni Rp. 20,000.00 Rp. 4,000.00
0.1500 Kg Plemir Rp. 20,000.00 Rp. 3,000.00
0.1700 Kg cat dasar Rp. 20,000.00 Rp. 3,400.00
0.2600 Kg cat penutup Rp. 40,000.00 Rp. 10,400.00 Rp. 20,800.00
Jumlah Rp. 25,235.00
Over Head + Fee 10% Rp. 2,523.50
Dibulatkan Rp. 27,759.00
BAHAN :
0.1200 Kg cat dasar Rp. 20,000.00 Rp. 2,400.00
0.1800 Kg cat penutup Rp. 12,000.00 Rp. 2,160.00 Rp. 4,560.00
Jumlah Rp. 9,271.00
Over Head + Fee 10% Rp. 927.10
Dibulatkan Rp. 10,198.00
4 1 m² Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
UPAH :
56
0.0200 Pekerja Rp. 45,000.00 Rp. 900.00
0.0630 Tukang cat Rp. 70,000.00 Rp. 4,410.00
0.0063 Kepala tukang Rp. 80,000.00 Rp. 504.00
0.0025 Mandor Rp. 70,000.00 Rp. 175.00 Rp. 5,989.00
BAHAN :
0.1000 Kg Plemir Rp. 20,000.00 Rp. 2,000.00
0.1000 Kg cat dasar Rp. 20,000.00 Rp. 2,000.00
0.2600 Kg cat penutup Rp. 12,000.00 Rp. 3,120.00 Rp. 7,120.00
Jumlah Rp. 13,109.00
Over Head + Fee 10% Rp. 1,310.90
Dibulatkan Rp. 14,420.00
8 Analisa ( Satu ) Unit Septick Tank Kap. 15 Orang lengkap peresapan ( Uk.1.00 x 2.00 x 1.40 M' )
4.8000 M3 Galian Tanah Rp. 57,134.00 Rp. 274,243.20
Urugan kembali 1/4 Eks Galian Rp. 68,560.80
1.1000 M3 Pas. Bata 1 : 2 Rp. 102,047.00 Rp. 112,251.70
8.5000 M2 Plesteran 1 : 2 Rp. 36,216.00 Rp. 307,836.00
57
0.1600 M3 Lantai kerja Beton K.100 Rp. 512,932.00 Rp. 82,069.12
0.3000 M3 Beton Bertulang 1:2:3 Rp. 3,092,749.00 Rp. 927,824.70
1.0000 M3 Kerikil Saringan Rp. 85,000.00 Rp. 85,000.00
2.0000 M3 Pasir Saringan Rp. 75,000.00 Rp. 150,000.00
5.0000 M' Pipa PVC dia 4" Rp. 35,000.00 Rp. 175,000.00
3.0000 M' Pipa GIP 2" Rp. 40,000.00 Rp. 120,000.00
1.0000 Bh TEE 2" Rp. 10,000.00 Rp. 10,000.00
2.0000 Bh Keni 2" Rp. 5,000.00 Rp. 10,000.00
20.0000 Kg Ijuk Rp. 35,000.00 Rp. 700,000.00
Jumlah Rp. 3,022,785.52
Dibulatkan Rp. 3,022,786.00
9 Analisa ( Satu ) Unit Septick Tank Kap. 25 Orang lengkap peresapan ( Uk. 1.10 x 2.20 x 1,70 M' )
9.0000 M3 Galian Tanah Rp. 57,134.00 Rp. 514,206.00
Urugan kembali 1/4 Eks Galian Rp. 128,551.50
1.4000 M3 Pas. Bata 1 : 2 Rp. 102,047.00 Rp. 142,865.80
11.5000 M3 Plesteran 1 : 2 Rp. 36,216.00 Rp. 416,484.00
0.2000 M3 Lantai kerja Beton K.100 Rp. 512,932.00 Rp. 102,586.40
0.3500 M3 Beton Bertulang 1:2:3 Rp. 3,092,749.00 Rp. 1,082,462.15
1.0000 M3 Kerikil Saringan Rp. 85,000.00 Rp. 85,000.00
2.0000 M3 Pasir Saringan Rp. 75,000.00 Rp. 150,000.00
5.0000 M' Pipa PVC dia 4" Rp. 8,750.00 Rp. 43,750.00
3.0000 M' Pipa GIP 2" Rp. 18,333.33 Rp. 55,000.00
1.0000 Bh TEE 2" Rp. 10,000.00 Rp. 10,000.00
2.0000 Bh Keni 2" Rp. 5,000.00 Rp. 10,000.00
20.0000 Kg Ijuk Rp. 35,000.00 Rp. 700,000.00
Jumlah Rp. 3,440,905.85
Dibulatkan Rp. 3,440,906.00
10 Analisa C.1 ( Satu ) Unit Septick Tank Kap. 50 Orang lengkap peresapan ( Uk. 1.30 x 3.40 x 2.05 M' )
15.1000 M3 Galian Tanah Rp. 57,134.00 Rp. 862,723.40
Urugan kembali 1/4 Eks Galian Rp. 215,680.85
2.3000 M3 Pas. Bata 1 : 2 Rp. 102,047.00 Rp. 234,708.10
19.3000 M3 Plesteran 1 : 2 Rp. 36,216.00 Rp. 698,968.80
0.4800 M3 Lantai kerja Beton K.100 Rp. 512,932.00 Rp. 246,207.36
0.5920 M3 Beton Bertulang 1:2:3 Rp. 3,092,749.00 Rp. 1,830,907.41
1.0000 M3 Kerikil Saringan Rp. 85,000.00 Rp. 85,000.00
2.0000 M3 Pasir Saringan Rp. 75,000.00 Rp. 150,000.00
5.0000 M' Pipa PVC dia 4" Rp. 8,750.00 Rp. 43,750.00
3.0000 M' Pipa GIP 2" Rp. 18,333.33 Rp. 55,000.00
1.0000 Bh T Stuck 2" Rp. 10,000.00 Rp. 10,000.00
2.0000 Bh Keni 2" Rp. 5,000.00 Rp. 10,000.00
20.0000 Kg Ijuk Rp. 35,000.00 Rp. 700,000.00
Jumlah Rp. 5,142,945.92
Dibulatkan Rp. 5,142,946.00
58
Analisa Kuda-Kuda Smartruss/m2
a. Analisa Pemotongan Bahan Kuda-Kuda/500 m2
6.000 OH Pekerja Smartruss Rp. 50,000.00 Rp. 300,000.00
6.000 OH Tukang Smartruss Rp. 60,000.00 Rp. 360,000.00
3.000 OH Mandor Smartruss Rp. 60,000.00 Rp. 180,000.00
3.000 OH Supervisor Smartruss Rp. 65,000.00 Rp. 195,000.00
Jumlah Rp. 1,035,000.00
Untuk 1 M2 = 1/500 Jumlah Rp. 2,070.00
Dibulatkan Rp. 2,000.00
59
f. Analisa Pemakaian Material/500 m2
1890.000 M' Supertruss C. 75.100 Rp. 18,000.00 Rp. 34,020,000.00
462.000 M' Supertruss C. 75.75 Rp. 17,000.00 Rp. 7,854,000.00
1680.000 M' Reng/Topspan Rp. 15,500.00 Rp. 26,040,000.00
14175.000 Bh Baut/Screw Rp. 400.00 Rp. 5,670,000.00
63.000 M' Talang/Valey Gutter Rp. 43,000.00 Rp. 2,709,000.00
210.000 Bh L-Plate Rp. 2,750.00 Rp. 577,500.00
210.000 Bh Dynabolt Rp. 2,000.00 Rp. 420,000.00
Jumlah Rp. 77,290,500.00
Untuk 1 M2 = 1/500 Jumlah Rp. 154,581.00
Dibulatkan Rp. 155,000.00
Disetujui Oleh :
KEPALA DINAS PEKERJAAN UMUM
KOTA PARIAMAN
60
DAFTAR HARGA SATUAN UPAH DAN BAHAN
DILINGKUNGAN DINAS PEKERJAAN UMUM KOTA PARIAMAN
TRIWULAN I TAHUN 2011
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
1 2 3 4 5
II. B A H A N
A. BATU - BATUAN
1 Batu Kali
a Batu Bulat Utuh M³ 120,000.00
c Batu Pecah 5/7 M³ 150,000.00
2 Kerikil
a Kerikil Beton M³ 90,000.00
b Kerikil Timbun (timbunan pilihan) M³ 75,000.00
3 Pasir
a Pasir Pasang M³ 75,000.00
b Pasir beton M³ 80,000.00
c Pasir Urug M³ 60,000.00
d Tanah Timbun M³ 60,000.00
e Sirtu M³ 80,000.00
1 2 3 4 5
IV BAHAN KAYU
1 Kayu jati/surian : Papan M³ -
Balok M³ -
1 Kayu Banio : Papan M³ 4,500,000.00
(Kelas I ) Balok M³ 4,000,000.00
2 Kayu Marsawa : Papan M³ 3,500,000.00
( Kelas II ) Balok M³ 3,500,000.00
3 Kayu Meranti : Papan M³ 2,750,000.00
( Kelas III ) Balok M³ 2,750,000.00
4 Kayu Bekisting : Papan M³ 2,250,000.00
( Kelas IV ) Balok M³ 2,250,000.00
5 Kayu Perancah / kayu api M³ 800,000.00
6 Tiang Pancang M1 18,000.00
7 Bambu dia 6 - 8 cm Btg -
V TRIPLEK / BAHAN LOTENG
1 Tebal 3 mm (Kw 1 ) Lbr 42,000.00
2 Tebal 4 mm ( Kw1 ) Lbr 52,000.00
3 Tebal 6 mm ( Kw1 ) Lbr 75,000.00
4 Tebal 9 mm ( Kw1 ) Lbr 115,000.00
5 Triplek Jati ( Teak wood ) Lbr 80,000.00
6 Lamberzering Btg 15,000.00
7 Eternit Asbes 1 m X 1 m Lbr 14,000.00
8 Gipsum Panel 9 mm ( 1.2m X 2.4m ) Lbr 100,000.00
9 Les 1x3x400 Cm (biasa) Btg 10,000.00
10 Les 1x5x400 Cm (biasa) Btg 15,000.00
11 Lies Profil 3x3, 5x400 Btg 20,000.00
12 Lies Profil 4x4, 5x400 Btg 20,000.00
13 Gipsum Panel 6 mm ( 1.2m X 2.4m ) Lbr 80,000.00
Bahan Besi
1 Besi Beton Kg 8,500.00
2 Besi Kanal C Kg 20,000.00
3 Besi Propil Kg 20,000.00
4 Besi Strip Kg 15,000.00
Bahan Paku
1 1 1/2 " Kg 13,500.00
2 ( 2 - 5 )" Kg 13,000.00
3 Paku Seng ( 1 1/2 - 1 )" RRC Kg 20,000.00
4 Paku hak panjang 15 cm Kg -
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
1 2 3 4 5
VI BAHAN PIPA
Pipa Besi Standard Medium
1 Merk Spindo Galvanis Dia 1/2" Pj 6 mm M' -
2 Merk Spindo Galvanis Dia 3/4" Pj 6 mm M' -
3 Merk Spindo Galvanis Dia 1" Pj 6 mm M' -
4 Merk Spindo Galvanis Dia 1 3/4" Pj 6 mm M' -
5 Merk Spindo Galvanis Dia 1 1/2" Pj 6 mm M' -
6 Merk Spindo Galvanis Dia 2" Pj 6 mm M' 77,825.00
7 Merk Spindo Galvanis Dia 2 1/2" Pj 6 mm M' 99,275.00
8 Merk Spindo Galvanis Dia 3" Pj 6 mm M' 125,250.00
9 Merk Spindo Galvanis Dia 4" Pj 6 mm M' 184,500.00
1 2 3 4 5
13 Elbow PVC 90° Ø 3 " buah -
14 Elbow PVC 45° Ø 3 " buah -
15 Elbow PVC 22.5° Ø 1,5 " buah -
16 Elbow PVC 45° Ø 1 " buah -
17 Elbow PVC 2 2,5° Ø 1 " buah -
18 Elbow PVC 90° Ø 1 " buah -
19 Elbow PVC 22,5° Ø 3 " buah -
20 Valve Socket PVC Ø 2,5 " buah -
21 Valve Socket PVC Ø 1,5 " buah -
22 Valve Socket PVC Ø 0,5 " buah -
23 Valve Socket PVC Ø 3/4 " buah -
24 Valve Socket PVC Ø 1 " buah -
25 Valve Socket PVC Ø 1 1/4 " buah -
26 Valve Socket PVC Ø 1 1/2 " buah -
27 Lok Socket ( reduser ) PVC Ø 1 3/4 " buah -
28 Lok Socket ( reduser ) PVC Ø 1 1/4 " buah -
29 Lok Socket ( reduser ) PVC Ø 1 1/2 " buah -
30 Lok Socket ( reduser ) PVC Ø 2 X 1 " buah -
31 Lok Socket ( reduser ) PVC Ø 1 X 1 " buah -
32 Tee PVC Ø 1/2 " buah -
33 Tee PVC Ø 3/4 " buah -
34 Tee PVC Ø 1 " buah -
35 Tee PVC Ø 1 1/4 " buah -
36 Tee PVC Ø 1 1/2 " buah -
37 Tee PVC Ø 2 " buah -
38 Tee PVC Ø 3 " buah -
39 Tee PVC Ø 4 " buah -
40 Knie GIP Ø 1/2 " buah -
41 Knie GIP Ø 3/4 " buah -
42 Knie GI Ø 1 " buah -
43 Knie GI Ø 1 1/4 " buah -
44 Knie GI Ø 1 1/2 " buah -
45 Knie GI Ø 2 " buah -
46 Knie GI Ø 2 1/2 " buah -
47 Knie GI Ø 3 " buah -
48 Knie GI Ø 4 " buah -
49 Socket GI Ø 1 1/2 " buah -
50 Socket GI Ø 3/4 " buah -
51 Socket GI Ø 1 " buah -
52 Socket GI Ø 1 1/4 " buah -
53 Socket GI Ø 1 1/2 " buah -
54 Socket GI Ø 2 " buah -
55 Socket GI Ø 2 1/2 " buah -
56 Socket GI Ø 3 " buah -
57 Socket GI Ø 4 " buah -
58 Tee GI Ø 1/2 " buah -
59 Tee GI Ø 3/4 " buah -
60 Tee GI Ø 1 " buah -
61 Tee GI Ø 1 1/4 " buah -
62 Tee GI Ø 1 1/2 " buah -
63 Tee GI Ø 2 " buah -
64 Tee GI Ø 2 1/2 " buah -
65 Tee GI Ø 3 " buah -
66 Tee GI Ø 4 " buah -
-
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
1 2 3 4 5
Atap Plastik :
- Warna Putih Acrylic Lbr 90,000.00
- Fibre Glass Lbr 70,000.00
- Parabung genteng metal Bh 25,000.00
Atap Seng Warna :
Keramik Dinding
- ukuran 20 x 25cm M2 44,000.00
- ukuran 20 x 30 cm M2 -
- walpaper M³ -
Ubin
- Ubin PC abu-abu M2 30,000.00
- Ubin Warna M2 35,000.00
- Teraso M2 25,000.00
- Karpet M2 50,000.00
- Parquet Jati M2 100,000.00
- Poselin M2 25,000.00
IX BAHAN KACA
kaca Polos
- Tebal 3 mm M2 55,000.00
- Tebal 5 mm M2 75,000.00
- Tebal 6 mm M2 -
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
1 2 3 4 5
Raiben
- Tebal 3 mm M2 61,500.00
- Tebal 5 mm M2 97,000.00
kaca Es
- Tebal 3 mm M2 72,150.00
- Tebal 5 mm M2 85,000.00
Kaca Naco Polos
- ( 15 X 90 ) cm + rangka Bh -
X PENGGANTUNG / PENGUNCI
Kunci Pintu Tanam
- Merk Jangkar 9702 RRC/692 LD Set 50,000.00
- Jangkar 746 Set 40,000.00
- Merk Ciga Brown 5404 Set 60,000.00
- Merk Ciga Brown 5009 Set 75,000.00
- Kunci Mandili 450 Itali Set 125,000.00
- Kunci Antik A/C Itali Set 125,000.00
- Kunci Antik SES Set -
- Kunci Sanghai 9702 LD Set 45,000.00
- Grendel Antik 2 Set 5,000.00
- Tarikan Antik Jendela Set 7,000.00
- Engsel Nylon Set 10,000.00
- Engsel Lokal Set 6,000.00
- Kait angin Set -
- Pegangan pintu Set -
XI BAHAN CAT
- Platone Cat Tembok Kg 15,000.00
- Dulux Cat Tembok Kg 100,000.00
- Rimatek Dempol Tembok Kg 42,000.00
- Platone Cat Besi/cat kayu Kg 43,000.00
- Multi Seal Cat Seng Kg 50,000.00
- Plemer Kayu - wa Kg 20,000.00
- Meni Kayu - wa Kg 20,000.00
- Meni Besi - wa Kg 25,000.00
- Residu Ltr 6,000.00
- Minyak Cat Ltr 15,000.00
- Aspal Kg 9,500.00
- Oil Ltr 17,500.00
- Cat Dasar TL Kg 20,000.00
- Pylox Btl 19,000.00
- Lem kayu Ltr 4,500.00
Closed duduk
- Merk Toto manual Bh 400,000.00
- Merk Toto otomatis Bh -
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN KETERANGAN
Rp.
1 2 3 4 5
Closed Jongkok
- Merk Tato Type CE 7 Warna Tua Bh 180,000.00
- Merk Tato Type C Warna Tua Bh 170,000.00
Closed Jongkok
- Merk KIA Type 1207 F210 Bh -
- Merk KIA Type Susan ( 126.F.110 ) Bh -
Bak fiber
- voll 0.3 M3 Bh 100,000.00
Bak fiber
- voll 1 M3 Bh 150,000.00
Bak Cuci
- Bak cuci stainles steel Bh 450,000.00
- waterdrain+aksesoris Set -
Wastafel Komplek
- Merk KIA Type 1207 F 210 Bh 300,000.00
- Merk KIA Type Susan ( 1263. F. 110 ) Bh 350,000.00
Pariaman, 2009
………………………………………. …………………………………………….
………………………………… ……………………
HARGA PERKIRAAN SENDIRI (HPS)
PROGRAM : PERLINDUNGAN DAN KONSERVASI SUMBER DAYA ALAM
KEGIATAN : PEMBANGUNAN HUTAN KOTA
PEKERJAAN : BELANJA MODAL PEMBANGUNAN FASILITAS HUTAN KOTA
LOKASI : KOTA PARIAMAN
TAHUN : 2018
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN SUB TOTAL TOTAL HARGA
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Pembersihan Lapangan Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
2 Pekerjaan Pasangan Bowplank Ls 1.00 Rp 500,000.00 Rp 500,000.00
JUMLAH I Rp 2,000,000.00
II PEKERJAAN PAGAR
1 Pekerjaan Galian Tanah biasa M³ 53.93 Rp 73,392.00 Rp 3,958,091.62
2 Pekerjaan Plat Pondasi 80 x 80x 25 M³ 17.92 Rp 4,354,083.36 Rp 78,012,982.38
3 Pekerjaan Kolom 20 x 20 x 230 M³ 10.30 Rp 7,373,826.68 Rp 75,959,263.40
4 Pekerjaan Urugan Tanah Kembali M³ 33.60 Rp 53,284.00 Rp 1,790,342.40
5 Pekerjaan Afwerking Kolom M² 161.28 Rp 37,769.60 Rp 6,091,481.09
6 Pekerjaan Pengecatan M² 161.28 Rp 50,279.72 Rp 8,109,113.89
7 Pekerjaan Kawat Berduri M' 2,331.00 Rp 2,530.00 Rp 5,897,430.00
JUMLAH II Rp 179,818,704.77
II PEKERJAAN PAGAR
1 Pekerjaan Galian Tanah biasa M³ Rp 73,392.00
2 Pekerjaan Plat Pondasi 80 x 80x 25 M³ Rp 4,354,083.36
3 Pekerjaan Kolom 20 x 20 x 230 M³ Rp 7,373,826.68
4 Pekerjaan Urugan Tanah Kembali M³ Rp 53,284.00
5 Pekerjaan Afwerking Kolom M² Rp 37,769.60
6 Pekerjaan Pengecatan M² Rp 50,279.72
7 Pekerjaan Kawat Berduri M' Rp 2,530.00
1 m2 Pengecatan tembok baru Setara Dulux (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefeisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 85,000.00 1,700.00
Tukang cat L.02 OH 0.063 108,000.00 6,804.00
Kepala Tukang L.03 OH 0.0063 118,800.00 748.44
Mandor L.04 OH 0.003 118,800.00 356.40
JUMLAH TENAGA KERJA 9,608.84
B BAHAN
Plamuur Kg 0.100 - -
Cat dasar/Alkali Kg 0.100 75,000.00 7,500.00
Cat penutup Setara Dulux Kg 0.260 110,000.00 28,600.00
JUMLAH HARGA BAHAN 36,100.00
C PERALATAN
I Pekerjaan Pendahuluan
1 Pekerjaan Pembersihan Lapangan 1 Ls
2 Pekerjaan Pasangan Bowplank 1 Ls
II PEKERJAAN PAGAR
Jumlah Patok = 112 bh
1 Pekerjaan Galian 53.7572 m3
0.75
0.8
0.8
0.25
0.8
0.8
2.3
0.2
0.2
1.8
0.2
0.2
1.8
0.2
0.2
Jumlah baris = 6m
Panjang = 3.5 x 111 = 388.5 bh
Total Panjang = 6x 388.5 = 2331 m
TIME SCHEDULE
MINGGU KE
NO. URAIAN PEKERJAAN BOBOT KET
%. 1 2 3 4 5 6 7 8 9 10 11 12 13
RENCANA BOBOT PERMINGGU 100.000 0.550 8.242 8.242 8.242 8.242 8.242 8.242 8.242 8.242 8.242 8.242 8.242 8.792
REALISASI BOBOT PERMINGGU 0.550 8.792 17.033 25.275 33.517 41.758 50.000 58.242 66.483 74.725 82.967 91.208 100.000
RENCANA BOBOT KUMULATIF PERMINGGU
REALISASI BOBOT KUMULATIF PERMINGGU
CEPAT/ LAMBAT
WAKTU PELAKSANAAN DIRENCANAKAN 90 ( Sembilan Puluh) HARI KALENDER PEJABAT PEMBUAT KOMITMEN
DINAS LINGKUNGAN HIDUP KOTA PARIAMAN