Anda di halaman 1dari 2

REKAPITULASI BIAYA

Pekerjaan : Pekerjaan Pembuatan 2 (Dua) Unit Cold Storage


Lokasi : Kabupaten Donggala
Tahun Anggaran : 2019/2020

No. URAIAN PEKERJAAN UNIT JUMLAH HARGA (Rp)

I PENGADAAN MESIN PANEL / COLD STORAGE lot 158.695.882.400,00


II PEKERJAAN TANAH DAN PASIR lot 1.352.614.321,64
III PEKERJAAN PONDASI lot 1.753.309.459,54
IV PEKERJAAN STRUKTUR lot 46.898.858.750,00
V PEKERJAAN TEMBOK DAN PLESTERAN lot 1.361.574.000,00
VI PEKERJAAN ATAP lot 2.262.073.792,00
VII PEKERJAAN PASANGAN LANTAI KERAMIK lot 1.278.517.103,04
VIII PEKERJAAN PASANGAN PLAFON lot 1.247.837.117,00
IX PEKERJAAN KUSEN PINTU DAN GANTUNGAN lot 1.346.339.313,92
X PEKERJAAN ELEKTRIKAL lot 1.936.687.813,00
XI PEKERJAAN PENGECATAN lot 1.604.005.558,00
XII PEKERJAAN SANITASI lot 1.713.882.891,00
A JUMLAH Rp 221.451.582.519,14
B PPN 10 % ( A ) Rp 22.145.158.251,91
D TOTAL ( A + B + C ) Rp 243.596.740.771,05
DIBULATKAN Rp 243.596.000.000,00
TERBILANG :
Dua Ratus Empat Puluh Tiga Milyar Lima Ratus Sembilan Puluh Enam Juta Rupiah