Anda di halaman 1dari 4

PERHITUNGAN VOLUME RETAINING WALL ZONE A

1. LANTAI BASEMENT

TYPE DIMENSI TULANGAN UTAMA TULANGAN PEMBAGI


JUMLAH VOLUME BEKISTING
KOLOM p l t DIA BERAT PANJANG JUMLAH TOTAL DIA BERAT PANJANG JUMLAH TOTAL
(m) (m) (m) ( m3 ) ( m2 ) ( mm ) ( kg/m ) (m) ( kg ) ( mm ) ( kg/m ) (m) ( kg )
a b c d e f g h I j k l m n o p q
RW1 1 89.40 0.25 3.50 78.23 625.80 16 1.5783 5.38 1194 10138.5573 10 0.6165 89.400 37 2039.2587
RW2 1 42.78 0.25 3.50 37.43 299.46 16 1.5783 5.38 572 4860.3938 10 0.6165 42.780 37 975.8332
RW5 1 46.31 0.25 3.50 40.52 324.17 19 2.2257 5.55 743 9169.2457 10 0.6165 46.310 37 1056.3543
RW6 1 54.59 0.25 3.50 47.77 382.13 16 1.5783 5.38 730 6197.4833 10 0.6165 54.590 37 1245.2252
STP 1 25.11 0.20 3.50 17.58 175.77 16 1.5783 5.38 504 4281.2903 10 0.6165 25.110 37 572.7717
W. TANK 1 56.10 0.20 3.50 39.27 392.70 16 1.5783 5.38 1124 9544.1695 10 0.6165 56.100 37 1279.6691
TOTAL 260.79 2200.03 44191.1398 7169.1120

2. LANTAI LOWER GROUND

TYPE DIMENSI TULANGAN UTAMA SENGKANG


JUMLAH VOLUME BEKISTING
KOLOM p l t DIA BERAT PANJANG JUMLAH TOTAL DIA BERAT PANJANG JUMLAH TOTAL
(m) (m) (m) ( m3 ) ( m2 ) ( mm ) ( kg/m ) (m) ( kg ) ( mm ) ( kg/m ) (m) ( kg )
a b c d e f g h I j k l m n o p q
RW1 1 89.40 0.20 3.50 62.58 625.80 16 1.5783 4.14 1194 7801.7894 10 0.6165 89.400 37 2039.2587
RW3 1 48.36 0.20 3.50 33.85 338.52 16 1.5783 4.14 647 4226.2960 10 0.6165 48.360 37 1103.1158
RW5 1 46.31 0.25 3.50 40.52 324.17 16 1.5783 4.14 619 4047.6956 10 0.6165 46.310 37 1056.3543
RW6 1 54.59 0.20 3.50 38.21 382.13 16 1.5783 4.14 730 4769.0670 10 0.6165 54.590 37 1245.2252
TOTAL 175.17 1670.62 20844.8480 5443.9539

3. LANTAI GROUND

TYPE DIMENSI TULANGAN UTAMA SENGKANG


JUMLAH VOLUME BEKISTING
KOLOM p l t DIA BERAT PANJANG JUMLAH TOTAL DIA BERAT PANJANG JUMLAH TOTAL
(m) (m) (m) ( m3 ) ( m2 ) ( mm ) ( kg/m ) (m) ( kg ) ( mm ) ( kg/m ) (m) ( kg )
a b c d e f g h I j k l m n o p q
RW5 1 46.31 0.20 3.50 32.42 324.17 16 1.5783 4.14 619 4047.6956 10 0.6165 46.310 37 1056.3543
TOTAL 32.42 324.17 4047.6956 1056.3543
FORMULA

LANTAI BASEMENT

VOLUME ( f ) = bxcxdxe
BEKISTING ( g ) = bxcxex2
PANJANG ( j ) = e + 1 + 15 ( h / 1000 ) + 40 ( h / 1000 )
TOTAL ( l ) = bxixjxk
PANJANG ( o ) = c
TOTAL ( q ) = bxnxoxp

LANTAI LOWER GROUND S/D GROUND

VOLUME ( f ) = bxcxdxe
BEKISTING ( g ) = bxcxex2
PANJANG ( j ) = e + 40 ( h / 1000 )
TOTAL ( l ) = bxixjxk
PANJANG ( o ) = c
TOTAL ( q ) = bxnxoxp
PERHITUNGAN VOLUME RETAINING WALL ZONE B

1. LANTAI BASEMENT

TYPE DIMENSI TULANGAN UTAMA TULANGAN PEMBAGI


JUMLAH VOLUME BEKISTING
KOLOM p l t DIA BERAT PANJANG JUMLAH TOTAL DIA BERAT PANJANG JUMLAH TOTAL
(m) (m) (m) ( m3 ) ( m2 ) ( mm ) ( kg/m ) (m) ( kg ) ( mm ) ( kg/m ) (m) ( kg )
a b c d e f g h I j k l m n o p q
RW1 1 36.00 0.25 3.50 31.50 252.00 16 1.5783 5.38 482 4092.7844 10 0.6165 36.000 37 821.1780
RW4 1 56.00 0.40 3.50 78.40 392.00 19 2.2257 5.55 1122 13847.1703 10 0.6165 56.000 37 1277.3880
RW5 1 86.20 0.25 3.50 75.43 603.40 19 2.2257 5.55 1381 17046.0888 10 0.6165 86.200 37 1966.2651
RW6 1 27.44 0.25 3.50 24.01 192.08 16 1.5783 5.38 368 3123.6493 10 0.6165 27.440 37 625.9201
TOTAL 209.34 1439.48 38109.6928 4690.7512

2. LANTAI LOWER GROUND

TYPE DIMENSI TULANGAN UTAMA SENGKANG


JUMLAH VOLUME BEKISTING
KOLOM p l t DIA BERAT PANJANG JUMLAH TOTAL DIA BERAT PANJANG JUMLAH TOTAL
(m) (m) (m) ( m3 ) ( m2 ) ( mm ) ( kg/m ) (m) ( kg ) ( mm ) ( kg/m ) (m) ( kg )
a b c d e f g h I j k l m n o p q
RW1 1 36.00 0.20 3.50 25.20 252.00 16 1.5783 4.14 482 3149.4661 10 0.6165 36.000 37 821.1780
RW4 1 56.00 0.25 2.20 30.80 246.40 16 1.5783 2.84 749 3355.8025 10 0.6165 56.000 24 828.5760
RW5 1 86.20 0.25 3.50 75.43 603.40 16 1.5783 4.14 1151 7522.9985 10 0.6165 86.200 37 1966.2651
RW6 1 27.44 0.20 2.20 12.07 120.74 16 1.5783 2.84 368 1648.9152 10 0.6165 27.440 24 406.0022
TOTAL 143.50 1222.54 15677.1824 4022.0213

3. LANTAI GROUND

TYPE DIMENSI TULANGAN UTAMA SENGKANG


JUMLAH VOLUME BEKISTING
KOLOM p l t DIA BERAT PANJANG JUMLAH TOTAL DIA BERAT PANJANG JUMLAH TOTAL
(m) (m) (m) ( m3 ) ( m2 ) ( mm ) ( kg/m ) (m) ( kg ) ( mm ) ( kg/m ) (m) ( kg )
a b c d e f g h I j k l m n o p q
RW5 1 86.20 0.20 3.50 60.34 603.40 16 1.5783 4.14 1151 7522.9985 10 0.6165 86.200 37 1966.2651
TOTAL 60.34 603.40 7522.9985 1966.2651
FORMULA

LANTAI BASEMENT

VOLUME ( f ) = bxcxdxe
BEKISTING ( g ) = bxcxex2
PANJANG ( j ) = e + 1 + 15 ( h / 1000 ) + 40 ( h / 1000 )
TOTAL ( l ) = bxixjxk
PANJANG ( o ) = c
TOTAL ( q ) = bxnxoxp

LANTAI LOWER GROUND S/D GROUND

VOLUME ( f ) = bxcxdxe
BEKISTING ( g ) = bxcxex2
PANJANG ( j ) = e + 40 ( h / 1000 )
TOTAL ( l ) = bxixjxk
PANJANG ( o ) = c
TOTAL ( q ) = bxnxoxp

Anda mungkin juga menyukai