1 2 3
I. PEKERJAAN PENGADAAN JARINGAN PJU 33,077,000.00
A. J U M L A H 154,547,549.00
SABRI, S.Pkp
NIP. 195912281 198803 1 009
SUDIYONO,S.PKP
Mengetahui : Penata TK.I ( III / d)
KEPALA DINAS PERTANIAN TANAMAN PANGAN DAN Nip. 19651224 199003 1 009
PETERNAKAN
KABUPATEN AKPAUS HULU
HARGA JUMLAH
NO URAIAN JENIS PEKERJAAN SATUAN VOLUME SATUAN H A R G A
(Rp.) (Rp.)
1 2 4 5 6 7
I. PEKERJAAN PENGADAAN JARINGAN PJU
33,077,000.00
1 Pengadan dan Pemasangan PJU Led 100 Watt Unit 53.00 2,069,633.00 109,690,549.00
109,690,549.00
1,650,000.00
10,130,000.00
BUPATI KAPUAS HULU
DAFTAR HARGA SATUAN UPAH
BAHAN / MATERIAL DAN PERALATAN
UPAH
NO URAIAN TENAGA KERJA KODE KETERANGAN
(Rp / Hari)
A B C D E
1 Mandor Lapangan L.061 108,000.00
2 Mekanik L.071 95,000.00
3 Mekanik Pembantu L.072 80,000.00
4 Kepala Tukang L.073 108,000.00
5 Tukang L.079 102,000.00
6 Teknisi Listrik 125,000.00
7 Operator Terlatih L.081 97,000.00
8 Operator Kurang terlatih L.082 72,500.00
9 Pembantu Operator L.089 80,000.00
10 Supir Truck Material L.091 90,000.00
11 Supir Personil L.092 72,000.00
12 Pembantu Supir L.099 80,000.00
13 Buruh lapangan tak terlatih / Pekerja L.101 75,000.00
14 Buruh lapangan agak terlatih L.103 77,000.00
15 Buruh lapangan terlatih L.106 79,000.00
* Tenaga Kerja Dihitung 7 (Tujuh) Jam Kerja / Hari
CATATAN :
HARGA SATUAN
NO URAIAN BAHAN / MATERIAL KODE SATUAN KETERANGAN
(Rp)
A B C D E F
BAHAN LISTRIK
1 Kerikil
Saklardari
Ganda
galian
Kualitas
bukit Biasa M - 262 Set 11,055.00
2 Kerikil
Saklardari
Ganda
galian
Kualitas
bukit Baik M - 262.a Set 27,555.00
3 Kerikil
Saklardari
Tunggal
galianKualitas
bukit Biasa M - 262.b Set 9,955.00
4 Kerikil
Saklardari
Tunggal
galianKualitas
bukit Baik M - 262.c Set 22,055.00
5 Kerikil
Stop Kontak
dari galian
Kualitas
bukitBiasa M - 263 Set 11,055.00
6 Stop Kontak Kualitas Baik M - 263.a Set 18,755.00
7 Kerikil
Sekring dari
Boxgalian
/ MCBbukit M - 264 Set 132,110.00
8 Kerikil
Lampudari
Pijar
galian
40 Watt
bukit M - 265.a Set 27,555.00
9 Kerikil
Lampudari
XL galian
20 Wattbukit M - 265.b Set 49,555.00
10 Kerikil
Lampudari
TL 20
galian
Wattbukit M - 266.c Set 49,555.00
11 Lampu PLC 42 Watt M - 265.d Set 0.00
12 Lampu PLC 58 Watt M -265.e Set 0.00
13 Taping Contracroe - Set 35,000.00
14 Kabel TC 2 x 10 mm - M' 6,500.00
15 Kabel NYM 2 x 2,5 mm M' 9,000.00
16 Isolator - Bh 10,000.00
17 Wage klem - Bh 15,000.00
18 Box Panel 20 x 30 x 12 - Set 500,000.00
19 MCB Box - Set 25,000.00
20 MCB 20 A - Set 125,000.00
21 MCB 10 A - Set 75,000.00
22 Magnetik Kontaktor - Set 350,000.00
23 Timer Switch - Set 400,000.00
24 Pasang Instalasi Box Panel - Set 550,000.00
25 Join Klem Set 15,000.00
26 Housing Lamp Set 1,355,000.00
27 Armature Kup Lampu Jalan - Set 400,000.00
BAHAN LAINNYA
27 Alat Bantu - Unit 625,000.00
PEKERJAAN PENERANGAN JALAN UMUM
Estimasi Harga Pasang dan Bahan Instalasi Penerangan Jalan Umum /50 M'
HARGA BIAYA
KEBUTUHAN SATUAN SATUAN KUANTITAS SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja Orang 79,000.00 1.0000 79,000.00
TENAGA KERJA Tukang Listrik Orang 125,000.00 1.0000 125,000.00
Pengawas Orang 108,000.00 0.0500 5,400.00
Kabel TC 2 x 10 mm M' 6,500.00 50.0000 325,000.00
Wage Klem Set 15,000.00 2.0000 30,000.00
BAHAN / MATERILA Join Klem Set 15,000.00 2.0000 30,000.00
Alat Bantu Set 35,000.00 0.2000 7,000.00
Estimasi Harga Pasang dan Bahan 1 Unit Lampu PJU Tenaga Surya
HARGA BIAYA
KEBUTUHAN SATUAN SATUAN KUANTITAS SATUAN
(Rp.) (Rp.)
1 2 3 4 5
Pekerja Orang 79,000.00 4.2500 335,750.00
Tukang Listrik Orang 125,000.00 4.2500 531,250.00
TENAGA KERJA
Pengawas Orang 108,000.00 2.9300 316,440.00
Mandor Lapangan Orang 108,000.00 1.3000 140,400.00
Lampu Jalan Tenaga Surya Unit 25,000,000.00 1.0000 25,000,000.00
BAHAN / MATERILA
Alat Bantu Unit 35,000.00 0.2500 8,750.00
JUMLAH HARGA PERSATUAN PEKERJAAN 26,332,590.00
UPAH TENAGA KERJA DAN HARGA
HARGA SATUAN MATERIAL / BAHAN
K.9
Propinsi Kalimantan Barat : 61
Kabupaten Kapuas Hulu : 06
BAHAN LAINNYA
321 Alat Bantu Unit - 625,000.00 - - 625,000.00 - - 625,000.00