PENGUJIAN BERAT ISI AGREGAT KASAR LEPAS
Pemeriksaan Benda Uji
I II Berat Mould W1 2.309 2309
Berat Mould + benda uji W2 4.933 4957
Berat benda uji W3 = W2 – W1 2624 2648
Berat Mould + air W4 4.865 4.865 Berat air / volume mould V = W4 – W1 2.556 2.556
Berat isi agregat W3 1,03 1,04
V Rata -rata berat isi agregat 1,03
PENGUJIAN BERAT ISI AGREGAT KASAR PADAT
Pemeriksaan Benda Uji
I II Berat Mould W1 2.309 2.309
Berat Mould + benda uji W2 5.270 5385
Berat benda uji W3 = W2 – W1 2.961 3076
Berat Mould + air W4 4.865 4.865
Berat air / volume mould V = W4 – W1 2.556 2.556
Berat isi agregat W3 1.16 1,20
V Rata -rata berat isi agregat 1.18 KEMENTERIAN RISET, TEKNOLOGI, DAN PENDIDIKAN TINGGI POLITEKNIK NEGERI MALANG – JURUSAN TEKNIK SIPIL LABORATORIUM BAHAN BANGUNAN DAN BETON Jalan Soekarno Hatta 9 PO. BOX 04 Malang – 65141 Telp (0341) 404424-404424 Fax. (0341) 4044423 http://www.polinema.ac.id
PENGUJIAN BERAT ISI AGREGAT KASAR GOYANG
Pemeriksaan Benda Uji
I II Berat Mould W1 2.309 2.309
Berat Mould + benda uji W2 5.474 5.715
Berat benda uji W3 = W2 – W1 3.165 3.409
Berat Mould + air W4 4.865 4.865 Berat air / volume mould V = W4 – W1 2.556 2.556