Pemeriksaan Benda Uji


I II
Berat Mould W1 2.309 2309

Berat Mould + benda uji W2 4.933 4957

Berat benda uji W3 = W2 – W1 2624 2648


Berat Mould + air W4 4.865 4.865
Berat air / volume mould V = W4 – W1 2.556 2.556

Berat isi agregat W3 1,03 1,04


V
Rata -rata berat isi agregat 1,03

PENGUJIAN BERAT ISI AGREGAT KASAR PADAT

Pemeriksaan Benda Uji


I II
Berat Mould W1 2.309 2.309

Berat Mould + benda uji W2 5.270 5385

Berat benda uji W3 = W2 – W1 2.961 3076


Berat Mould + air W4 4.865 4.865

Berat air / volume mould V = W4 – W1 2.556 2.556

Berat isi agregat W3 1.16 1,20


V
Rata -rata berat isi agregat 1.18
KEMENTERIAN RISET, TEKNOLOGI, DAN PENDIDIKAN TINGGI
POLITEKNIK NEGERI MALANG – JURUSAN TEKNIK SIPIL
LABORATORIUM BAHAN BANGUNAN DAN BETON
Jalan Soekarno Hatta 9 PO. BOX 04 Malang – 65141
Telp (0341) 404424-404424 Fax. (0341) 4044423
http://www.polinema.ac.id

PENGUJIAN BERAT ISI AGREGAT KASAR GOYANG

Pemeriksaan Benda Uji


I II
Berat Mould W1 2.309 2.309

Berat Mould + benda uji W2 5.474 5.715

Berat benda uji W3 = W2 – W1 3.165 3.409


Berat Mould + air W4 4.865 4.865
Berat air / volume mould V = W4 – W1 2.556 2.556

Berat isi agregat W3 1,24 1,33


V
Rata -rata berat isi agregat 1,29