STRUKTUR &
KONSTRUKSI
“AVIAN TOWER SURABAYA”
05
Felicia Devi B. A 61170143 Felisa Febriola S. 61170187
Meliantha 61170148 Diazma Arsy Dewanto 61170210
Eben Haezer D. S. I 61170156 Jefferson Musa Gagola 61170215
(GRUP A)
No ID Gambar Judul Gambar Skala Halaman
37 S-4.21 Rencana Balok Lt. 20 1 : 400 22
S S-5 SLOOF & PONDASI
38 S-5.1 Rencana Sloof 1 : 400 23
39 S-5.2 Rencana Pondasi (Bored Pail) 1 : 400 24
S S-6 DETAIL STRUKTUR
40 S-6.1 Detail Core 1 : 100 25
41 S-6.1 Detail Pondasi A 1 : 50 26
M M-1 SANITASI
42 M-1.1 R. Instalasi Air Bersih Lantai 1-20 1 : 500 27
43 M-1.2 R. Instalasi Air Kotor Lantai 1-20 1 : 500 28
44 M-1.3 R. Instalasi Air Hujan Lantai 1-20 1 : 500 29
45 M-1.4 Skema Instalasi Sanitasi NTS 30
M M-2 MEE
46 M-2.1 R. Penerangan Lantai 1 1 : 400 31
47 M-2.2 R. Penerangan Lantai 2 1 : 400 32
48 M-2.3 R. Penerangan Lantai 3 1 : 400 33
49 M-2.4 R. Penerangan Lantai 4-11 1 : 400 34
50 M-2.5 R. Penerangan Lantai 12-20 1 : 400 35
51 M-2.6 Skema Penerangan Bangunan NTS 36
52 M-2.7 R. Listrik Lantai 1 1 : 400 37
53 M-2.8 R. Listrik Lantai 2 1 : 400 38
54 M-2.9 R. Listrikn Lantai 3 1 : 400 39
55 M-2.10 R. Listrik Lantai 4-11 1 : 400 40
56 M-2.11 R. Listrik Lantai 12-20 1 : 400 41
57 M-2.12 Skema Listrik Bangunan NTS 42
M M-3 FIRE DETECTOR
58 M-3.1 Instalasi Fire Detector Lantai 1 1 : 400 43
59 M-3.2 Instalasi Fire Detector Lantai 2 1 : 400 43
60 M-3.3 Instalasi Fire Detectora Lantai 3 1 : 400 44
61 M-3.4 Instalasi Fire Detector Lantai 4-11 & 17-20 1 : 400 44
62 M-3.5 Instalasi Fire Detector Lantai 12-16 1 : 400 44
63 M-3.6 R. Instalasi Fire Detector 1 : 500 45
M M-4 SPRIKLE
64 M-4.1 Skema Instalasi Sprikle NTS 46
65 M-4.2 Instalasi Sprikle Lantai 1-3 1 : 400 47
66 M-4.3 Instalasi Sprikle Lantai 4-11 1 : 400 47
67 M-4.4 Instalasi Sprikle Lantai 12-20 1 : 400 47
M M-5 SPRIKLE
68 M-5.1 Skema Instalasi AC NTS 48
69 M-5.2 Instalasi AC Lantai 1-3 1 : 400 49
DAFTAR ISI
No ID Gambar Judul Gambar Skala Halaman
A A-1 GENERAL
1 A-1.1 Situasi 1 : 600 1
2 A-1.2 Siteplan 1 : 600 2
S S-1 DENAH
3 S-1.1 Denah Lantai 1 1 : 400 3
4 S-1.2 Denah Lantai 2 1 : 400 3
5 S-1.3 Denah Lantai 3 1 : 400 4
6 S-1.4 Denah Lantai 4-11 & 17-19 1 : 400 4
7 S-1.5 Denah Lantai 12-16 1 : 400 5
8 S-1.6 Denah Lantai 20 1 : 400 5
9 S-1.7 Denah Mezzanine Lantai 20 1 : 400 6
10 S-1.8 Denah Helipad 1 : 400 6
S S-2 TAMPAK
11 S-2.1 Tampak Utara 1 : 400 7
12 S-2.2 Tampak Timur 1 : 400 8
13 S-2.3 Tampak Selatan 1 : 400 9
14 S-2.4 Tampak Barat 1 : 400 10
S S-3 POTONGAN
15 S-3.1 Potongan A-A 1 : 400 11
16 S-3.2 Potongan B-B 1 : 400 12
S S-4 SLOOF & PEMBALOKAN
17 S-4.1 Rencana Balok Basement 1 : 400 13
18 S-4.2 Rencana Balok Lt. 1 1 : 400 13
19 S-4.3 Rencana Balok Lt. 2 1 : 400 14
20 S-4.4 Rencana Balok Lt. 3 1 : 400 14
21 S-4.5 Rencana Balok Lt. 4 1 : 400 15
22 S-4.6 Rencana Balok Lt. 5 1 : 400 15
23 S-4.7 Rencana Balok Lt. 6 1 : 400 16
24 S-4.8 Rencana Balok Lt. 7 1 : 400 16
25 S-4.9 Rencana Balok Lt. 8 1 : 400 17
26 S-4.10 Rencana Balok Lt. 9 1 : 400 17
27 S-4.11 Rencana Balok Lt. 10 1 : 400 18
28 S-4.12 Rencana Balok Lt. 11 1 : 400 18
29 S-4.13 Rencana Balok Lt. 12 1 : 400 19
30 S-4.14 Rencana Balok Lt. 13 1 : 400 19
31 S-4.15 Rencana Balok Lt. 14 1 : 400 20
32 S-4.16 Rencana Balok Lt. 15 1 : 400 20
33 S-4.17 Rencana Balok Lt. 16 1 : 400 21
34 S-4.18 Rencana Balok Lt. 17 1 : 400 21
35 S-4.19 Rencana Balok Lt. 18 1 : 400 22
36 S-4.20 Rencana Balok Lt. 19 1 : 400 22
70 M-5.3 Instalasi AC Lantai 4-11 1 : 400 49
71 M-5.4 Instalasi AC Lantai 12-20 1 : 400 49
M M-6 PELETAKAN CCTV
72 M-6.1 R. Titik CCTV Lantai 1 1 : 400 50
73 M-6.2 R. Titik CCTV Lantai 2 1 : 400 50
74 M-6.3 R. Titik CCTV Lantai 3 1 : 400 51
75 M-6.4 R. Titik CCTV Lantai 4-11 & 17-19 1 : 400 51
76 M-6.5 R. Titik CCTV Lantai 12-16 1 : 400 51
77 M-6.6 Skema Titik CCTV Bangunan NTS 52
M M-7 PABX
78 M-7.1 R. PABX Lantai 1 1 : 400 53
79 M-7.2 R. PABX Lantai 2 1 : 400 53
80 M-7.3 R. PABX Lantai 3 1 : 400 54
81 M-7.4 R. PABX Lantai 4-11 & 17-19 1 : 400 54
82 M-7.5 R. PABX Lantai 12-16 1 : 400 54
83 M-7.6 Skema PABX Bangunan NTS 55
M M-8 PELETAKAN PANEL SURYA
84 M-8.1 R. Instalasi Panel Surya Lantai 1 1 : 400 56
85 M-8.2 R. Instalasi Panel Surya Lantai 2 1 : 400 56
85 M-8.3 R. Instalasi Panel Surya Lantai 3 1 : 400 57
86 M-8.4 R. Instalasi Panel Surya Lantai 4-11 & 17-19 1 : 400 57
87 M-8.5 R. Instalasi Panel Surya Lantai 12-16 1 : 400 58
88 M-8.6 R. Instalasi Panel Surya Lantai 20 1 : 400 58
89 M-8.7 Skema Panel Surya Bangunan NTS 59
M M-9 PELETAKAN PANEL SURYA
90 M-9.1 R. MATV Lantai 1 1 : 400 60
91 M-9.2 R. MATV Lantai 2 1 : 400 60
92 M-9.3 R. MATV Lantai 3 1 : 400 61
93 M-9.4 R. MATV Lantai 4-11 & 17-19 1 : 400 61
94 M-9.5 R. MATV Lantai 12-16 1 : 400 62
95 M-9.6 R. MATV Lantai 20 1 : 400 62
96 M-9.7 Skema MATV Bangunan NTS 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
Tampak Barat
Skala 1:400
Catatan :
SITUASI Pengesahan :
Skala 1:600
1 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
Tampak Barat
Skala 1:400
Catatan :
SITEPLAN Pengesahan :
Skala 1:600
2 63
STRUKTUR
2
KONSTRUKSI
1
2
1
3
12.6
4
5
05
3 5.6
3.3
9
2.3
A
8
Program Studi Arsitektur
A 0 19.4
B 19.4
0 4
B
8.0
4
0 4 Universitas Kristen
8.0
4 5
6 Duta Wacana
4
6
2019
5.5
2.3 5.6
0 8
B
3.3
B 9
8
5.6
8
5.6
C
C Dosen Pengampu :
0
30.4
19.4
Ir. Gregorius Dwi Atmono, MT
4
9
8.0
30.4
4
8.0
8
Judul Proyek :
5.6
8
5.6
E
E AVIAN TOWER
Lokasi : Surabaya
4
B B
5.5
0
F
21.0
F
0
Kontraktor : PT Archimetric
21.0
0
33.0
0
33.0
Dibangun : 2018
Judul Gambar :
G
Denah Lt. 1 (Skala 1:400)
G Denah Lt. 2 (Skala 1:400)
8.44
8.44
H
H Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
23.95
Meliantha (61170148)
23.95
8.43
8.43
7.07
7.07
J Catatan :
J
Pengesahan :
3 63
STRUKTUR
2 2
KONSTRUKSI
1
3
12.6
4
5
1
12.64
3
5 05
5.6 5.6
8 8
Program Studi Arsitektur
A 19.4 19.4
B
8.0
4
0 4
A
B
8.0
4
0 4 Universitas Kristen
6 6 Duta Wacana
B
5.6
8
B
5.6
8 2019
8
8
5.6
5.6
C C Dosen Pengampu :
0
19.4
19.4
Ir. Gregorius Dwi Atmono, MT
4
4
8.0
8.0
9
30.4
30.49
D D
8
8
Judul Proyek :
5.6
5.6
E E
AVIAN TOWER
B B B B
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
0
21.0
21.0
Kontraktor : PT Archimetric
0
33.0
33.0
F
F Dibangun : 2018
Judul Gambar :
G
Denah Lt. 3 (Skala 1:400)
Denah Lt. 4-11 & 17-19
(Skala 1:400)
8.44
Meliantha (61170148)
8.43
J Catatan :
7 8 9 10 11 12
DENAH LT. 3
Skala 1:400
Pengesahan :
4 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
5
Dosen Pengampu :
1
2
12.64 B
3
Dr.-Ing. Ir. Winarna, MA
5.6
8 6
Ir. Gregorius Dwi Atmono, MT
1.4
B 19.4
0
3.1
0 Yohanes Satyayoga ST,MSc,IAI
4 .15 0
8.0
4 22 16.5
8
7.3
6
5.6 0
8 3.1
B 6
1.4
Judul Proyek :
AVIAN TOWER
8
5.6
4.8
C
8
A Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
4.6
0
19.4
Dibangun : 2018
9
4
8.0
19.1
3
D
4.6
9
Judul Gambar :
8
4.8
E
1:400)
8
Denah Lt. 20 (Skala 1:400)
30.49
B B
B B
0
21.0
0
21.0
39
.15
0
33.0
Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
F Jefferson Musa Gagola (61170215)
B
B
Catatan :
Pengesahan :
5 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
B B
Dr.-Ing. Ir. Winarna, MA
6 6
Ir. Gregorius Dwi Atmono, MT
1.4 1.4
3.1
0
3.1
0 Yohanes Satyayoga ST,MSc,IAI
.15 0 .15 0
22 16.5 22 16.5
8 8
7.3 7.3
3.10 3.10
6 6
1.4 1.4
Judul Proyek :
AVIAN TOWER
4.8
4.8
Lokasi : Surabaya
8
8
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
4.6
4.6
Dibangun : 2018
9
9
19.1
19.1
3
3
4.6
4.6
GYM
9
9
Judul Gambar :
Denah Mezzanine Lt. 20
4.8
4.8
(Skala 1:400)
8
8
Denah Helipad (Skala 1:400)
B B B B
0
21.0
21.0
39
39
.15
.15
B B
Catatan :
DENAH HELIPAD
DENAH MEZZANINE LT. 20 Skala 1:400
Skala 1:400
Pengesahan :
6 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
Tampak Utara
Skala 1:400
Catatan :
TAMPAK UTARA
Skala 1:400
Pengesahan :
7 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
Tampak Timur
Skala 1:400
Catatan :
TAMPAK TIMUR
Skala 1:400
Pengesahan :
8 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
Tampak Selatan
Skala 1:400
Catatan :
TAMPAK SELATAN
Skala 1:400
Pengesahan :
9 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
Tampak Barat
Skala 1:400
Catatan :
TAMPAK BARAT
Skala 1:400
Pengesahan :
10 63
STRUKTUR
Helipad
+87.00
+87.00
Helipad
KONSTRUKSI
Gym
+83.00
+83.00
Mezzanine
05
Rooftop
Program Studi Arsitektur
+79.80
79.80 Lantai 20 Universitas Kristen
Duta Wacana
+75.60
Lantai 19
2019
Kolom Beton Ø1m
Vertikal
+71.40
Lantai 18
Dosen Pengampu :
Kantor Petinggi +67.20
+67.20 Lantai 17 Dr.-Ing. Ir. Winarna, MA
Kolom Baja Ø1m Ir. Gregorius Dwi Atmono, MT
Spiral Yohanes Satyayoga ST,MSc,IAI
Meeting Area +63.00
+63.00 Lantai 16
Balok Beton
30/60cm Toilet
+33.60
Office
+33.60
+33.60
Lantai 9
Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
Office +29.40 Meliantha (61170148)
+29.40 Lantai 8
Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
Lift Office +25.20 Diazma Arsy Dewanto (61170210)
+25.20 Lantai 7
Jefferson Musa Gagola (61170215)
Office +21.00
+21.00 Lantai 6
Catatan :
+16.80
Lantai 5
Balok Baja I
20.200.400
Toilet +12.60
+12.60 Lantai 4
Hall +4.20
+4.20 Lantai 2 POTONGAN A-A
Skala 1:400
Lobby Toilet ±0.00
±0.00 ±0.00 Lantai 1
Basemen -4.20
-4.20 Basement Pengesahan :
-6.05
Pondasi
11 63
STRUKTUR
Helipad
87.00
+87.00
Helipad
KONSTRUKSI
05
Program Studi Arsitektur
Rooftop +79.80
79.80 Lantai 20 Universitas Kristen
Duta Wacana
+75.60 2019
Lantai 19
+71.40
Lantai 18
Dosen Pengampu :
+58.80
Lantai 15
Judul Proyek :
AVIAN TOWER
+54.60
Lantai 14 Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
+50.40
Kontraktor : PT Archimetric
Lantai 13 Dibangun : 2018
+46.20
Lantai 12
Judul Gambar :
Office +42.00
Potongan B-B
+42.00 Lantai 11
Skala 1:400
+37.80
Lantai 10
Catatan :
+16.80
Lantai 5
+8.40
Lantai 3
Balok Beton
Foyer
+4.20
+4.20
Lantai 2
POTONGAN B-B
30/60cm Skala 1:400
Foyer ±0.00
±0.00 Lantai 1
Foyer
-4.20
-4.20
Basement Pengesahan :
-6.05
Pondasi
10.50 10.50
21.00
12 63
STRUKTUR
KONSTRUKSI
05
1 1
2 2
Program Studi Arsitektur
3.3
9
3
3.3
9
3 Universitas Kristen
A 2.3
0
19.4
A
2.3
0
19.4
Duta Wacana
0 0 4
8.0
4
4
5
8.0
4 5
2019
4
4
6 B1 6
5.5
5.5
B1 2.3 2.3
0 0
3.3 3.3
B B3 9 B 9
B3
B3
B1
B1
B1 B1
B1 Dosen Pengampu :
B1 B1 B3
B3
8
8
B3 B3
5.6
5.6
B3 B3
B1 B3
C B3 C
B3 Dr.-Ing. Ir. Winarna, MA
B2 B2 B1 B2 B2 B1 Ir. Gregorius Dwi Atmono, MT
B3 B3
B2 B3 Yohanes Satyayoga ST,MSc,IAI
B2 B3
9
4
30.4
30.6
4
4
B3
8.0
8.0
B3 B3 B3 B1
B2 B2 B1 B2
B3 B2
B1 B2 B1 B2
B3 B3
D D
B3
B3
B3
Judul Proyek :
B3
B3
B2
B3
B3 B2 B2
AVIAN TOWER
8
8
5.6
5.6
B2
B3
E E
B3
B3
Lokasi : Surabaya
B3
B1
B3
B3
B1 Arsitek : Ivan Priatman, LEED, IAI
B3 B2 B1 B2 B2
B3 Kontraktor : PT Archimetric
4
B3
7
B2 B1
5.5
5.6
B3
F B3 B2 F B2 B3 Dibangun : 2018
B2
B2 B3 B3
B2 B2 B2
B2
B1 B3 B1 B1 B3
B3 B3
B3 B1
B3
B3 Judul Gambar :
B3 B3
B3 B1
B3 B1 B1 Rencana Balok Basement
B1 B1 B1
B1 B3 B1 B3
B3 B1
(Skala 1:400)
Rencana Balok Lt. 1
B2 B2 B2 B2 B2
G G B1 (Skala 1:400)
B1 B1
B1
8.44
8.44
B1
B2
Digambar oleh : (Grup A)
B2 B2
H H Felicia Devi B. A (61170143)
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
23.95
23.95
B1
B2 B1 Felisa Febriola S. (61170187)
8.43
8.43
B1 B1
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
B2 B2
I I
Catatan :
7.07
7.07
B1 B2 B1 B1
B1
B2
J J
B1 B1
1.09 3.12 8.44 3.13 1.10 1.09 3.12 8.44 3.13 1.10
7 8 9
16.88
10 11 12 7 8 9
16.88
10 11 12
BALOK DIMENSI
20
B1 20x40
40
RENCANA BALOK BASEMENT RENCANA BALOK LT. 1
30
Skala 1:400 Skala 1:400
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
13 65
STRUKTUR
KONSTRUKSI
2
05
1 1
2
12.6
4
Program Studi Arsitektur
5
5.6
3
12.6
3 5.6
3 Universitas Kristen
8 8
A
19.4 5 A 19.4
Duta Wacana
0 0 4
8.0
4
4
8.0
4 2019
B1 B1
6 6
5.6 B3 5.6
8 B3 8
B B3 B3 B
B3
B1 B1
B1 B1 B3 B1 B1
Dosen Pengampu :
B1
8
8
5.6
5.6
B3 B1 B3 B3
B3
C B3 C
B3 Dr.-Ing. Ir. Winarna, MA
B1 B2 B1
B2
B2
B2
B2 Ir. Gregorius Dwi Atmono, MT
B3 B2
B3 Yohanes Satyayoga ST,MSc,IAI
B3
9
0
B3
30.4
B3
19.4
B1
4
4
B3 B2
8.0
8.0
9
30.4
B2 B2 B2 B1
B2 B3 B2
B1 B3
B1 B3
D B3 B3 D B3
B3 B3
B3 Judul Proyek :
B3
B2 B2 B2 B2
AVIAN TOWER
8
8
5.6
5.6
B3 E
B3 B3
E B3
Lokasi : Surabaya
B3 B3 B1
B2 B3 B1
B3 Arsitek : Ivan Priatman, LEED, IAI
B2 B2 B3
B3 B3 B2 Kontraktor : PT Archimetric
B1 B2 B1 B3 B2
F
B3 B2 B3 Dibangun : 2018
B2
B2
B3 B2
B2 F B3 B2
B3
B3 B3
B1 B3 B1 B1 B1 B1
B3
Judul Gambar :
B3 B3 B1
B3 B1 Rencana Balok Lt. 2
B1 B1
B3
B3 B3 B1 B3
B3 (Skala 1:400)
B1 B1
Rencana Balok Lt. 3
B2 B2 B2
G
B3 (Skala 1:400)
B3 B1
B3
B1
B3 B1
8.44
B2 B2 B3
Digambar oleh : (Grup A)
B2 B2
H Felicia Devi B. A (61170143)
RENCANA BALOK LT. 3 Meliantha (61170148)
Skala 1:400 Eben Haezer D. S. I (61170156)
23.95
B1
Felisa Febriola S. (61170187)
8.43
B2 B2 B2
B1
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
I
B1 B2 B2 B2
Catatan :
7.07
B1
B2 B2
J
B1
7 8 9
16.88
10 11 12
BALOK DIMENSI
20
B1 20x40
40
RENCANA BALOK LT.2
30
Skala 1:400
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
14 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
2 2
12.63 12.63 5
1 5 1
3 3
Dosen Pengampu :
5.6 5.6
8 8
A
19.4
0 4
19.4
0 4
Dr.-Ing. Ir. Winarna, MA
8.0 8.0
B1
4
A B1 4
Ir. Gregorius Dwi Atmono, MT
6 6
5.6 B3
B3
5.6
Yohanes Satyayoga ST,MSc,IAI
B3 B3 8 8
B B
B1
B1
B1
B3
B3 B1
8
8
5.6 Judul Proyek :
5.6
B1 B3 B1
B1 B3 B3 B1
B1
C
B2 B2 B1
C
B2 B2 B3
AVIAN TOWER
B2 B3
B3 B3 B3
B2
B3 Lokasi : Surabaya
0
0
B3
19.4
19.4
B1 B3 B1
4
4
B3
Arsitek : Ivan Priatman, LEED, IAI
8.0
8.0
B2 B2
B2 B2
B3
30.49
B3 B3
B2 Kontraktor : PT Archimetric
30.51
D
B1 D B1 B2
B3 B3
B3 B3 Dibangun : 2018
B3
B3 B2 B3 B2
8
8
B2
5.6
5.6
B3
E B3 B3
B3
E B2 B3
Judul Gambar :
B3
B3 Rencana Balok Lt. 4-5
B1 B1
B1
B2 B3 B3 B3 (Skala 1:400)
B2 B2
B2 B1 B2
B3 B3 B3
B2 B3 B2 B2
B2 B2 B2 B2
B3
F B3 B3
B3
B3 B3 B1
F B3 B1
B1 B1 B3
B1 B1
B3 B1 B3 B1
B3
Digambar oleh : (Grup A)
B3
B1 B3 B1
B3
B3
Felicia Devi B. A (61170143)
B3 Meliantha (61170148)
Eben Haezer D. S. I (61170156)
B1 B1 Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
15 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2
2019
2
5
12.63 5 12.63
1 1
3 3 Dosen Pengampu :
5.6 5.6
8 8
19.4 19.4
8.0
0 4
8.0
0 4 Dr.-Ing. Ir. Winarna, MA
4 4
B1
B1 Ir. Gregorius Dwi Atmono, MT
A 6 6
B3 B3 5.6
8 A B3
5.6
8
Yohanes Satyayoga ST,MSc,IAI
B B
B1 B3 B1
B3 B3
B1
8
8
5.6
B1 B3 B3
5.6
B1 B1 B1 B3 B1 Judul Proyek :
C
B1 B3 C
B1 B1
B2 B2 B3 B3 AVIAN TOWER
B1 B2 B1
B1
B2 B3 B2
B3 B3
B3 Lokasi : Surabaya
0
0
19.4
19.4
B2
4
4
B3 B3
8.0
8.0
B2
B3 Arsitek : Ivan Priatman, LEED, IAI
B3 B3 B2 B2
B2
D B2 B3 D B2
B2 Kontraktor : PT Archimetric
Dibangun : 2018
30.53
B3 B3
B3
B3
30.55
B3 B3
B3 B3
8
8
5.6
5.6
B2 B2
B2
E B2
B3
E B3 Judul Gambar :
B3
B2 B2 B2 B3 Rencana Balok Lt. 6-7
B3
B2
B3
B3
(Skala 1:400)
B3 B2 B2
B2 B3 B3
B1 B2 B2 B2
B1
B3 B2 B3
B3 B3
B1 B2 B1
B1 B2
B2
B3
B3 B3
B3 B1 B3
B1 B1 B1 B3 B1
F B1
B3 B3 F
B3
B3
Digambar oleh : (Grup A)
B3
B3 B1
B1 B3
Felicia Devi B. A (61170143)
B3
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
B1
B1 Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
16 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
2 5
5 2
12.63 12.63
1 1
3 3 Dosen Pengampu :
5.6 5.6
8 8
19.4 19.4
8.0
0 4
8.0
0 4 Dr.-Ing. Ir. Winarna, MA
4 4
B1 Ir. Gregorius Dwi Atmono, MT
6 B1 6
B3
5.6
8
5.6
8
Yohanes Satyayoga ST,MSc,IAI
B B B3 B3
A
B1 B1
A
B3
B1 B3 B1
8
B3
8
B3
5.6
5.6
B3 B1 B3
B1 B3 Judul Proyek :
C
B1 B1 C
B3
B1 B3
AVIAN TOWER
B2 B1 B2 B1
B1 B1 B2
B3 B2
B3 B2 B3
B3
Lokasi : Surabaya
0
0
19.4
19.4
B2 B1
4
4
B3
8.0
8.0
B3
B3 B2
B2
B3 Arsitek : Ivan Priatman, LEED, IAI
B3 B2 B2
D B2
B2
D
B2 B3 B2 Kontraktor : PT Archimetric
B3 B3 Dibangun : 2018
B3 B3
30.58
B3 B3 B3
B3
8
8
5.6
5.6
30.60
B2 B2 B2 B2
E B3 E
B3 Judul Gambar :
B3
B2 B3 B2 B2 Rencana Balok Lt. 8-9
B3
B3 B3
B3 (Skala 1:400)
B2 B2 B2
B3 B2 B3
B2 B2 B2
B1
B3 B3 B2
B3 B3
B2 B1
B2 B2
B1
B1
B3 B3
B1 B3 B3
B3 B1 B1 B1
B1 B1
B3
B3
B3 B3 Digambar oleh : (Grup A)
B3
F
B1 B1
B3
F
B3
Felicia Devi B. A (61170143)
B3 B3 Meliantha (61170148)
Eben Haezer D. S. I (61170156)
B1
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
17 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
5 5 2019
2
12.63 2 12.63
1 1
3 3 Dosen Pengampu :
5.6 5.6
8 8
19.4 19.4
8.0
0 4
8.0
0 4 Dr.-Ing. Ir. Winarna, MA
4 4
B1
B1 Ir. Gregorius Dwi Atmono, MT
6 6
5.6
8
5.6
8
Yohanes Satyayoga ST,MSc,IAI
B B
B1 B1
B3
B3 B3
A B3 B3 B3 B3 B1
B1
8
8
B1
5.6
5.6
B1
A
B1
B3
B3 Judul Proyek :
C B3 C B1
B3
B3 B3 B3 AVIAN TOWER
B1 B1 B2 B3 B1
B2 B2 B3 B2
B3 B2 B1 B2
B3 B3 B3 Lokasi : Surabaya
0
0
19.4
19.4
4
4
B3
8.0
8.0
B1
B3
B2 B2 B3 B2
B2 Arsitek : Ivan Priatman, LEED, IAI
B2 B3
D D B2 B3
B2
Kontraktor : PT Archimetric
B3
B3
B2 B3 B3
Dibangun : 2018
B3
B3
8
8
B2
5.6
5.6
B2 B2 B2
Judul Gambar :
30.62
E B3 E
B2 B3
30.64
B3 B3
B2 Rencana Balok Lt. 10-11
B3 B2 B2
B3 B3 (Skala 1:400)
B1 B2 B3 B2
B1 B2
B3 B3
B3 B2
B1 B3
B3 B3
B2
B2 B3 B2 B1
B1
B3 B2 B2 B3
B3 B3 B3
B1
B3 B1
B3 B3 B3 B3 B1
B1 B3 B3
B1 B3 B1 B3
B3 B3 Digambar oleh : (Grup A)
B1
B1 B1 Felicia Devi B. A (61170143)
F Meliantha (61170148)
F
Eben Haezer D. S. I (61170156)
B1
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
18 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
5 2019
5
12.63
2
1
2 12.63
1 3 Dosen Pengampu :
5.6
8
3
19.4
5.6
8 8.0
0 4 Dr.-Ing. Ir. Winarna, MA
4
19.4
0 4
B1 Ir. Gregorius Dwi Atmono, MT
6
8.0
B1
4 5.6
8
Yohanes Satyayoga ST,MSc,IAI
B
6
5.6
8 B1
B B3 B3 B3
B3 B3
B3 B1
8
5.6
B1
B3
B1 B3
B1
Judul Proyek :
B1 C
8
AVIAN TOWER
5.6
B1 B3 B3 B1
B1 A
A C B1 B3 B2
B1 B1 B2
B1
B3 B3 B2
B3 B2 Lokasi : Surabaya
0
19.4
4
B1 B2 B3
8.0
B2
B2
B3
Arsitek : Ivan Priatman, LEED, IAI
0
B3
19.4
Kontraktor : PT Archimetric
4
B3 B2
8.0
B2 B2 D
B2
B3 B3 B3 B2 Dibangun : 2018
D B2 B2 B3
B3
8
B3 B2 B2
5.6
E Judul Gambar :
8
B3
5.6
B2
B3 Rencana Balok Lt. 12-13
E
B3 B3
B3 (Skala 1:400)
30.69
B2 B3 B2
B2
30.66
B2
B2
B3 B3 B3 B3 B1
B2 B1 B3 B2 B3
B2 B3
B1
B3 B3 B3 B2 B3
B1 B2 B2
B3 B1
B2 B1
B2 B3
B3
B1
B1 B3 B3
B3 B1
Digambar oleh : (Grup A)
B1
B1
B3 B3 Felicia Devi B. A (61170143)
B1 Meliantha (61170148)
Eben Haezer D. S. I (61170156)
B1
B1
F Felisa Febriola S. (61170187)
F Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
19 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
5 5 2019
3
12.6 3
2 1 12.6 1
2
3 3 Dosen Pengampu :
5.6 5.6
8 8
19.4 19.4
8.0
0 4
8.0
0 4 Dr.-Ing. Ir. Winarna, MA
4 4
B1 B1
Ir. Gregorius Dwi Atmono, MT
6 6
5.6
8
5.6
8
Yohanes Satyayoga ST,MSc,IAI
B B
B3 B1
B1
B1
8
8
5.6
5.6
B1
B1
B3
B3 B1
B1
B3
Judul Proyek :
C B1 C B1
B3 B3
B1
B3
B3
B1
AVIAN TOWER
B2 B2 B2
A B3 B2
B2 B3
B2 B3 B3 Lokasi : Surabaya
0
0
B1 A
19.4
19.4
4
4
B1
8.0
8.0
B3
B2 B3
B2 B2 Arsitek : Ivan Priatman, LEED, IAI
B2 B2 B2 B2
D B3 D
Kontraktor : PT Archimetric
B3 B3 B2
B3
Dibangun : 2018
B3 B3
B3
8
8
B2
5.6
5.6
B2 B2 B2
E B3 E B3 B3 Judul Gambar :
B2
B3
B3 B3 Rencana Balok Lt. 14-15
B2 B3
B1 B2 B2 (Skala 1:400)
B3 B2 B3 B1
30.7
B2 B3 B1
B2 B2 B3 B3 B3
1
30.7
B3 B3
B3 B3 B3
B2
3
B2 B2 B3
B3
B2 B2 B2
B1 B3 B1
B3
B1 B1
B1
B1
B1 Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
Meliantha (61170148)
B1 B1 Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
F
F
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
20 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
5 5
2019
3 1 1
12.6 3
12.6
2
3
2
3 Dosen Pengampu :
5.6 5.6
8 8
19.4 19.4
8.0
0 4
8.0
0 4 Dr.-Ing. Ir. Winarna, MA
4 4
Ir. Gregorius Dwi Atmono, MT
B1 6 6
5.6
8
B1
5.6
8
Yohanes Satyayoga ST,MSc,IAI
B B
B1 B3 B1 B1
B3 B1 B3 B3
8
8
5.6
5.6
B3 B3
B3 B1 B3 Judul Proyek :
C B1 C B1
B1 B3
B3
B1 B3 B3 B1 AVIAN TOWER
B2 B2
B2 B2 B2
B2 B3
B3 B3 B3 Lokasi : Surabaya
0
0
19.4
19.4
4
4
8.0
8.0
B3
A
B3 B2
B1
B3
B3 B2 Arsitek : Ivan Priatman, LEED, IAI
B2 B2
D
B1
B3 B2
B1 A
D B2 B3 B2
Kontraktor : PT Archimetric
B3 B1
B2
B3 Dibangun : 2018
B3
B3
B3 B3
8
8
B2
5.6
5.6
B2 B2 B2
B3
E B3 E
B3
Judul Gambar :
B3
B3 B2 B2 Rencana Balok Lt. 16-17
B3 B2
B3
B3 B1 (Skala 1:400)
B2 B3 B1
B3 B2 B2 B2
B3
B3 B3
B3 B3 B3 B3
30.7
B2 B3
B1 B3 B2
B2
5
30.7
B2 B2 B2 B1 B3
B1
7
B3
B1
B3 B3
B3 B3
Digambar oleh : (Grup A)
B1 B1
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
20
B3 20x40
40
No. lembar : Jml lembar :
21 65
5
STRUKTUR
5
1 1 KONSTRUKSI
.63
05
12 3
3 12.6 3
5.6 5.6
2 8 8
19.4 2 19.4
0 4 0 4
8.0 8.0
4 4
Program Studi Arsitektur
6 6
B1 5.6
8
5.6
8
Universitas Kristen
B B B1
Duta Wacana
B3 B1
B1 2019
B1 B3 B3
8
B3 B3 B1
5.6
5.6
B3 B3
B3 B3 B1
C B1 C B3
B3 B3
B1 B1
B1 B3 B3
B2
B3 B2 B2 B3
B1
B2 Dosen Pengampu :
B2
0
0
19.4
19.4
B3
4
4
8.0 B1 B1 B2
8.0
B3 B2 B3 B2
B3 B2
B3 Dr.-Ing. Ir. Winarna, MA
B1 B3
D B3 B2
B1 D Ir. Gregorius Dwi Atmono, MT
A
B2 B3 B2
B2
B3
B3
B3
Yohanes Satyayoga ST,MSc,IAI
A B3
B3
8
8
B2 B2
5.6
5.6
B2 B2
B3 B3
E E
B1 B3 B3 B2
B2
B3
B3 B2 B1
Judul Proyek :
B2 B3 B1
B3
B3 B2
AVIAN TOWER
B1 B3
B2 B2 B2 B3
B3 B3 B2
B2 B3 B3
B3 B3
B2 Lokasi : Surabaya
B3 B3 B3 B3
B3 B3
B1
Arsitek : Ivan Priatman, LEED, IAI
30
B1 B2 B2
Kontraktor : PT Archimetric
.79
B1
30
B1 B1
.8
B3 B3 B1 B3
Dibangun : 2018
1
B3 B3
B3
B3
B1 B3 B3 B1
B1 B1
Judul Gambar :
B1 B1
Rencana Balok Lt. 18-20
(Skala 1:400)
F
RENCANA BALOK LT.18 RENCANA BALOK LT. 19
Skala 1:400 Skala 1:400 Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
Catatan :
BALOK DIMENSI
20
B1 20x40
40
30
B2 30x60
60
Pengesahan :
40
No. lembar : Jml lembar :
22 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
1
2
Duta Wacana
3 2019
A
19.4
0 4
5
6
Dosen Pengampu :
B
S1
Dr.-Ing. Ir. Winarna, MA
S1
S2
S1 Ir. Gregorius Dwi Atmono, MT
C
Yohanes Satyayoga ST,MSc,IAI
S2 S2 S2
S2
9
30.4
Judul Proyek :
S2 S2
S1
AVIAN TOWER
D S1 S2
Lokasi : Surabaya
S2 S2 Arsitek : Ivan Priatman, LEED, IAI
E Kontraktor : PT Archimetric
Dibangun : 2018
S1
S2
S1 S2
S2
F
S2 Judul Gambar :
S2 S2 S2
Rencana Sloof (Skala 1:400)
S1
S1 S2
S1
G
A S1 A
S1 S1 S1
I S1 Catatan :
S1 S1
S1
16.88
7 8 9 10 11 12
SLOOF DIMENSI
150
RENCANA SLOOF
S1 150 x 100
100
Skala 1:400 Pengesahan :
100
100 x 100
100
S2
No. lembar : Jml lembar :
23 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
1
2
Duta Wacana
3 2019
A
19.4
0 4
5
6 6
Dosen Pengampu :
B
9
30.4
Judul Proyek :
AVIAN TOWER
D
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
E Kontraktor : PT Archimetric
Dibangun : 2018
F
Judul Gambar :
Rencana Pondasi
(Skala 1:400)
A A
I Catatan :
16.88
7 8 9 10 11 12
24 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
C1
SHAFT FIRE PROTECTOR Judul Proyek :
AVIAN TOWER
C1 C1 C1 C1 SHAFT LISTRIK
C1 Lokasi : Surabaya
C4 C4 Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
C4 Dibangun : 2018
SHAFT JARINGAN
Judul Gambar :
Detail Core
SHAFT JARINGAN C2 (Skala 1:100)
C1
C4
C4 C4 Digambar oleh : (Grup A)
C1
C3 C3 C1 Felicia Devi B. A (61170143)
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
SHAFT LISTRIK Felisa Febriola S. (61170187)
SHAFT FIRE PROTECTOR
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
LIFT LIFT LIFT
Catatan :
C1 60
C2 80
C3 100 Pengesahan :
C4 160
No. lembar : Jml lembar :
25 65
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
KOLOM H-12
Dosen Pengampu :
Judul Gambar :
TULANGAN SPIRAL
DIAMETER 2 CM Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
Catatan :
Pengesahan :
26 65
STRUKTUR
KONSTRUKSI
Key Map
05
Program Studi Arsitektur
Pressure House
GWT Pompa Tank
DISTRIBUSI Universitas Kristen
Tank
Duta Wacana
2019
Dosen Pengampu :
Lantai 1-19
Helipad
+87.00
+87.00
Helipad Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
Gym +83.00
+83.00 Mezzanine
Yohanes Satyayoga ST,MSc,IAI
Zone 4
Rooftop
79.80
RT +79.80
Lantai 20
+75.60
Lantai 19
Balok Beton
30/60cm
Toilet Office +33.60
+33.60 +33.60 Lantai 9
Lift Office
Felicia Devi B. A (61170143)
+25.20
+25.20 Lantai 7
Meliantha (61170148)
Office +21.00
Eben Haezer D. S. I (61170156)
Lantai 6
+21.00
Felisa Febriola S. (61170187)
Zone 1 Diazma Arsy Dewanto (61170210)
HT +16.80
Lantai 5
Balok Baja I Jefferson Musa Gagola (61170215)
20.200.400
Toilet +12.60
+12.60 Lantai 4
PT PT PT
Roof Garden
+8.40
PT
+8.40
Lantai 3 Lantai 1-19
Hall
Catatan :
+4.20
+4.20 Lantai 2
P P P P
Lobby Toilet ±0.00
±0.00 ±0.00 Lantai 1
Simbol Ket
GWT
Basemen
-4.20
-4.20
Basement Saluran air bersih
-6.05
Pondasi
Pipa Distribusi
2.21 7.07 8.43 8.84 5.98 6.25 10.15 4.60 5.99
59.52
SIMBOL KETERANGAN
GWT GROUND WATER TANK
P POMPA
PT PRESSURE TANK
Pengesahan :
HT HOUSE TANK R. INSTALASI AIR BERSIH LT. 1-20
RT ROOF TANK Skala 1:500
27 63
STRUKTUR
KONSTRUKSI
Key Map
BK ST RES
Air Tinja
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
AIR KOTOR BK BPL SPAK PK 2019
Helipad
+87.00
+87.00
Helipad
Dosen Pengampu :
Gym +83.00 Lantai 1-19
+83.00 Mezzanine
Dr.-Ing. Ir. Winarna, MA
Rooftop
79.80
+79.80
Lantai 20 Ir. Gregorius Dwi Atmono, MT
Yohanes Satyayoga ST,MSc,IAI
+75.60
Lantai 19
Lokasi : Surabaya
Meeteng Area Toilet +58.80
+58.80 +58.80 Lantai 15
Arsitek : Ivan Priatman, LEED, IAI
Balok Baja I
20.300.600 Meeteng Area +54.60
Kontraktor : PT Archimetric
+54.60 Lantai 14
Dibangun : 2018
Meeteng Area +50.40
+50.40 Lantai 13
Balok Beton
30/60cm Toilet Office +33.60
+33.60 +33.60 Lantai 9
Office +29.40
+29.40 Lantai 8
Office +21.00
Felicia Devi B. A (61170143)
+21.00 Lantai 6
Meliantha (61170148)
+16.80 Eben Haezer D. S. I (61170156)
Lantai 5
Balok Baja I Felisa Febriola S. (61170187)
20.200.400
Toilet
+12.60
+12.60
Lantai 4
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
Roof Garden +8.40
+8.40 Lantai 3
Hall +4.20
+4.20 Lantai 2
Lobby
±0.00
Toilet
±0.00
±0.00
Lantai 1
Lantai 1-19 Catatan :
RES ST BK
PK SPAK BPL
Basemen
BK -4.20
-4.20 Basement
-6.05
Pondasi
SPAK SUMUR PENAMPUNGAN AIR KOTOR R. INSTALASI AIR KOTOR LT. 1-20
Skala 1:500
PK PEMBUANGAN KOTA
No. lembar : Jml lembar :
28 63
STRUKTUR
Key Map
KONSTRUKSI
05
Distribusi
AIR HUJAN Roof Drain Penyaringan BPAH
Program Studi Arsitektur
(non Konsumsi)
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Lantai 1-19
Helipad +87.00
+87.00 Helipad Dr.-Ing. Ir. Winarna, MA
Gym +83.00
Ir. Gregorius Dwi Atmono, MT
+83.00 Mezzanine
Yohanes Satyayoga ST,MSc,IAI
Rooftop +79.80
79.80 Lantai 20
+75.60
Lantai 19
Tangga Darurat
+37.80
Lantai 10
Roof Drain
Balok Beton
30/60cm
Toilet Office +33.60
+33.60 +33.60 Lantai 9
Office +29.40
Digambar oleh : (Grup A)
+29.40 Lantai 8
Hall +4.20
Catatan :
+4.20 Lantai 2
BPAH
Basemen -4.20
-4.20 Basement
-6.05
Pondasi
Ket
BPAH BAK PENAMPUNGAN AIIR HUJAN
Pengesahan :
R. INSTALASI AIR HUJAN LT. 1-20
Skala 1:500
29 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
BK BPL SPAK PK
Dosen Pengampu :
BK ST BK RES
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
SKEMATIK CCTV
SIMBOL KETERANGAN BANGUNAN (NTS)
BK BAK KONTROL
ST SEPTICTANK
Catatan :
30 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
SDP
Judul Proyek :
SDP
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
DP
M
Dibangun : 2018
AT
S
Judul Gambar :
Rencana Penerangan Lantai
1
(Skala 1:400)
R. PENERANGAN LT. 1
Skala 1:400
Pengesahan :
31 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
SDP
Judul Proyek :
AVIAN TOWER
SDP
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
DP
M
ATS
Judul Gambar :
Rencana Penerangan Lantai
3
(Skala 1:400)
R. Penerangan LT. 3
Skala 1:400
Pengesahan :
33 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
SDP
SDP
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
DP
Kontraktor : PT Archimetric
M
Dibangun : 2018
ATS
Judul Gambar :
Rencana Penerangan Lantai
2
(Skala 1:400)
Simbol Keterangan
Lampu TL
Catatan :
R. PENERANGAN LT. 2
Skala 1:400
Pengesahan :
32 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
SDP
Kontraktor : PT Archimetric
Dibangun : 2018
SDP
Judul Gambar :
Rencana Penerangan Lantai
4-11
DP
(Skala 1:400)
M
AT
Simbol Keterangan
S
Lampu TL
Lampu PL
Digambar oleh : (Grup A)
Saklar
Catatan :
Pengesahan :
34 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
PLN
Judul Gambar :
Skema Penerangan
Bangunan
(NTS)
Simbol Keterangan
Digambar oleh : (Grup A)
NTS
36 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
SDP
Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
SDP
Yohanes Satyayoga ST,MSc,IAI
Judul Proyek :
DP
AVIAN TOWER
M
ATS
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
Rencana Listrik Lantai 1
(Skala 1:400)
Simbol Keterangan
Lampu TL
Lampu PL
Saklar
Catatan :
R. LISTRIK LT. 1
Skala 1:400
Pengesahan :
37 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
SDP
Judul Proyek :
AVIAN TOWER
SDP
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
DP
M
ATS
Judul Gambar :
Rencana Listrik Lantai 2
(Skala 1:400)
Simbol Keterangan
Lampu TL
Digambar oleh : (Grup A)
Lampu PL
Felicia Devi B. A (61170143)
Saklar Meliantha (61170148)
Kabel dari Lampu ke Saklar Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
Kabel dari saklar ke MDP
Diazma Arsy Dewanto (61170210)
Kabel dari MDP ke SDP
Jefferson Musa Gagola (61170215)
MDP Main Distribution Panel
R. LISTRIK LT. 2
Skala 1:400
Pengesahan :
38 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
SDP
Judul Proyek :
AVIAN TOWER
SDP
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
DP
M
ATS
Judul Gambar :
Rencana Listrik Lantai 3
(Skala 1:400)
Simbol Keterangan
Lampu TL Digambar oleh : (Grup A)
Lampu PL
Catatan :
R. LISTRIK LT. 3
Skala 1:400
Pengesahan :
39 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
SDP
AVIAN TOWER
Lokasi : Surabaya
SDP
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
DP
Judul Gambar :
M
AT
Simbol Keterangan
S
Rencana Listrik Lantai 4-11
Lampu TL
(Skala 1:400)
Lampu PL
Saklar
Catatan :
Pengesahan :
40 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
SDP
Judul Gambar :
Rencana Listrik 11-20
(Skala 1:400)
DP
M
Simbol Keterangan
AT
S
Lampu TL
Lampu PL
Saklar
Digambar oleh : (Grup A)
Kabel dari Lampu ke Saklar
Catatan :
Pengesahan :
41 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
SDP
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
SDP
Judul Gambar :
Rencana Penerangan Lantai
11-20
DP
M
AT
S
Simbol Keterangan (Skala 1:400)
Lampu TL
Lampu PL
Saklar
Pengesahan :
35 63
SDP Saklar Lampu LPD ( Low Preasure Discharge) STRUKTUR
AC
Telepon
Stop kontak KONSTRUKSI
SDP Saklar Lampu LPD ( Low Preasure Discharge)
AC
Telepon
05
Stop kontak
Program Studi Arsitektur
SDP Saklar Lampu LPD ( Low Preasure Discharge) Universitas Kristen
AC
Telepon
Stop kontak
Duta Wacana
2019
SDP Saklar Lampu LPD ( Low Preasure Discharge)
AC
Telepon
Stop kontak
SDP Saklar
Dosen Pengampu :
Lampu LPD ( Low Preasure Discharge)
AC
Telepon
Stop kontak Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
SDP Saklar Lampu LPD ( Low Preasure Discharge) Yohanes Satyayoga ST,MSc,IAI
AC
Telepon
Stop kontak
SDP Saklar Lampu LPD ( Low Preasure Discharge) Digambar oleh : (Grup A)
AC
Telepon
Stop kontak
Felicia Devi B. A (61170143)
SDP Saklar Lampu LPD ( Low Preasure Discharge)
Meliantha (61170148)
AC Eben Haezer D. S. I (61170156)
Telepon Felisa Febriola S. (61170187)
Stop kontak
Diazma Arsy Dewanto (61170210)
SDP Saklar Lampu LPD ( Low Preasure Discharge) Jefferson Musa Gagola (61170215)
AC
Telepon
Stop kontak
42 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
Skema Saluran Fire Detector 2019
skala 1 : 100
Dosen Pengampu :
EOLR
Judul Proyek :
EOLR
AVIAN TOWER
EOLR
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
EOLR
Kontraktor : PT Archimetric
Dibangun : 2018
EOLR
EOLR
EOLR
Catatan :
EOLR
EOLR
EOLR
MCFA MCFA-FA
EOLR
Pengesahan :
43 63
STRUKTUR
2
KONSTRUKSI
1
2
1
3
12.6
4
5
05
3 5.6
3.3
9
2.3
A
8
Program Studi Arsitektur
A 0 19.4
B 19.4
0 4
B
8.0
4
0 4 Universitas Kristen
8.0
4 5
6 Duta Wacana
4
6
2019
5.5
2.3 5.6
0 8
B
3.3
B 9
8
5.6
8
5.6
C
C Dosen Pengampu :
0
30.4
19.4
Ir. Gregorius Dwi Atmono, MT
4
9
8.0
30.4
4
8.0
8
Judul Proyek :
5.6
8
5.6
E
E AVIAN TOWER
Lokasi : Surabaya
4
B B
5.5
0
F
21.0
F
0
Kontraktor : PT Archimetric
21.0
0
33.0
0
33.0
Dibangun : 2018
Judul Gambar :
EOLR Instalasi Fire Detector Lt. 1
(Skala 1:400)
EOLR
G
G
Instalasi Fire Detector Lt. 2
(Skala 1:400)
8.44
8.44
H
H Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
23.95
Meliantha (61170148)
23.95
8.43
8.43
7.07
7.07
J Catatan :
J
Pengesahan :
1
STRUKTUR
12.64 5
2 5.6
3 KONSTRUKSI
8
3
12.6
4 5
A
B 19.4
8.0
4
0 4
05
6
5.6
8
B
5.6
8 Program Studi Arsitektur
A 19.4
B
8.0
4
0 4 Universitas Kristen
6 Duta Wacana
8
5.6
B
5.6
8 2019
C
8
5.6
0
19.4
Dosen Pengampu :
4
C
8.0
30.49
D
Dr.-Ing. Ir. Winarna, MA
0
19.4
8
5.6
D
E
8
Judul Proyek :
5.6
B B
E
AVIAN TOWER
0
21.0
0
33.0
B B
F Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
0
21.0
Kontraktor : PT Archimetric
0
33.0
F
Dibangun : 2018
EOLR
Judul Gambar :
Instalasi Fire Detector Lt. 3 (Skala
EOLR 1:400)
G Instalasi Fire Detector Lt. 4-11 dan
B
17-20 (Skala 1:400)
Instalasi Fire Detector Lt. 12-16
INSTALASI FIRE DETECTOR LT. 4-11 & 17-20 (Skala 1:400)
8.44
Skala 1:400
1
H
2
12.64 Digambar oleh : (Grup A)
3
5.6
8
Felicia Devi B. A (61170143)
23.95
19.4
Meliantha (61170148)
8.43
B 0 4
8.0
4
Eben Haezer D. S. I (61170156)
6
Felisa Febriola S. (61170187)
5.6
8
I B Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
8
7.07
5.6
C
A
J Catatan :
0
19.4
4
8.0
7 8 9 10 11 12
E
B
30.49
B B
0
21.0
0
INSTALASI FIRE DETECTOR LT. 3
33.0
EOLR Skala 1:400
Pengesahan :
EOLR
B
No. lembar : Jml lembar :
INSTALASI FIRE DETECTOR LT. 12-16
Skala 1:400 45 63
STRUKTUR
Helipad
+87.00
+87.00
Helipad KONSTRUKSI
Gym
+83.00
+83.00
Mezzanine
05
Rooftop +79.80 Program Studi Arsitektur
79.80 Lantai 20
Universitas Kristen
IHB Duta Wacana
+75.60
Lantai 19 2019
Kolom Beton Ø1m
IHB
Vertikal
+71.40
Lantai 18
Dosen Pengampu :
IHB
Kantor Petinggi +67.20
+67.20 Lantai 17 Dr.-Ing. Ir. Winarna, MA
Kolom Baja Ø1m Ir. Gregorius Dwi Atmono, MT
Spiral IHB
Meeting Area +63.00 Yohanes Satyayoga ST,MSc,IAI
+63.00 Lantai 16
IHB
Meeteng Area Toilet +58.80
+58.80 +58.80 Lantai 15 Judul Proyek :
Balok Baja I IHB
AVIAN TOWER
20.300.600 Meeteng Area +54.60
+54.60 Lantai 14
Lokasi : Surabaya
IHB Arsitek : Ivan Priatman, LEED, IAI
Meeteng Area +50.40
+50.40 Lantai 13 Kontraktor : PT Archimetric
Dibangun : 2018
IHB
Meeteng Area +46.20
+46.20 Lantai 12
IHB +16.80
Catatan :
Lantai 5
Balok Baja I
20.200.400
IHB
Toilet +12.60
+12.60 Lantai 4
IHB
Roof Garden +8.40
+8.40 Lantai 3
IHB
Hall +4.20
+4.20 Lantai 2 SKEMA INSTALASI SPRIKLE
Skala 1:400
IHB
Lobby Toilet ±0.00
±0.00 ±0.00 Lantai 1
IHB
TANGKI POMPA TANGKI KOMPR
PAM KATUP METERAN Basemen -4.20
BAWAH TEKAN ESOR
Basement
-4.20
-6.05
Pengesahan :
Pondasi
1
STRUKTUR
12.64 5
5.6
3 KONSTRUKSI
8
2
A
B 19.4
8.0
4
0 4
05
3 6
3.3
9
2.3 B
5.6
8 Program Studi Arsitektur
A 0
B 19.4
0 4
Universitas Kristen
8.0
4 5
Duta Wacana
8
4
5.6
6
2019
5.5
2.3
0
3.3 C
B 9
8
5.6
0
19.4
Dosen Pengampu :
4
8.0
C
30.49
D
Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
9
30.4
4
8.0
8
5.6
B
V
C
P
V
R
D E
IHB
Judul Proyek :
8
5.6
B B
V
C
B
AVIAN TOWER
V
P
R
0
E
21.0
IHB
0
33.0
F Lokasi : Surabaya
4
5.5
0
Kontraktor : PT Archimetric
21.0
0
33.0
Dibangun : 2018
Judul Gambar :
Instalasi Sprikle Lt. 1-3 (Skala
1:400)
Instalasi Fire Detector Lt. 4-11,
B
G
7-20 (Skala 1:400)
Instalasi Fire Detector Lt. 12-16
INSTALASI FIRE DETECTOR LT. 4-11 & 17-20 (Skala 1:400)
8.44
Skala 1:400
1
H
2
12.64 Digambar oleh : (Grup A)
3
5.6
8
Felicia Devi B. A (61170143)
Meliantha (61170148)
23.95
19.4
B 0 4
8.43
8.0
4
Eben Haezer D. S. I (61170156)
6
Felisa Febriola S. (61170187)
5.6
8
B Diazma Arsy Dewanto (61170210)
I
Jefferson Musa Gagola (61170215)
8
5.6
7.07
C
A
Catatan :
J
0
19.4
4
8.0
V
C
B
V
P
R
7 8 9 10 11 12
E
IHB
B
30.49
B B
0
21.0
0
INSTALASI SPRIKLE LT. 1-3
33.0
Skala 1:400
Pengesahan :
B
No. lembar : Jml lembar :
INSTALASI FIRE DETECTOR LT. 12-16
Skala 1:400 47 63
2
STRUKTUR
KONSTRUKSI
05
Helipad +87.00
+87.00 Helipad
Gym +83.00
+83.00 COOLING Mezzanine Program Studi Arsitektur
TOWER
Rooftop +79.80
Universitas Kristen
79.80 Lantai 20 Duta Wacana
AIR TERMINAL AC 2019
HANDLER
OUTSTAKE+75.60
Lantai 19
AIR INSIDE
Kolom Beton Ø1m AIR TERMINAL AC
Vertikal HANDLER
OUTSTAKE+71.40 Dosen Pengampu :
Lantai 18
AIR INSIDE
AIR TERMINAL AC
HANDLER Dr.-Ing. Ir. Winarna, MA
Kantor Petinggi OUTSTAKE+67.20 Ir. Gregorius Dwi Atmono, MT
+67.20 AIR INSIDE Lantai 17
Kolom Baja Ø1m AIR
Yohanes Satyayoga ST,MSc,IAI
TERMINAL AC
Spiral HANDLER
Meeting Area OUTSTAKE+63.00
+63.00
AIR INSIDE Lantai 16
AIR TERMINAL AC
HANDLER
Office OUTSTAKE+21.00
+21.00 Lantai 6
AIR INSIDE Catatan :
AIR TERMINAL AC
HANDLER
OUTSTAKE+16.80Lantai 5
AIR INSIDE
Balok Baja I AIR TERMINAL AC
20.200.400 HANDLER
Toilet OUTSTAKE
+12.60
+12.60 AIR INSIDE Lantai 4
AIR TERMINAL AC
HANDLER
Roof Garden OUTSTAKE+8.40 Lantai 3
+8.40
AIR INSIDE
AIR TERMINAL AC
HANDLER
Hall OUTSTAKE+4.20
+4.20 Lantai 2
AIR INSIDE
AIR TERMINAL AC
HANDLER
Lobby Toilet OUTSTAKE±0.00
±0.00 ±0.00 Lantai 1
AIR INSIDE
AIR TERMINAL AC
BOILER HANDLER SKEMA INSTALASI AC Pengesahan :
Basemen POMPA OUTSTAKE-4.20
-4.20 CHILLER Basement
Skala 1:400
AIR INSIDE
-6.05
Pondasi
2
05
3
3.3
9 Program Studi Arsitektur
A 2.3
0
B 19.4
0 4
Universitas Kristen
8.0
4 5 Duta Wacana
4
6
2019
5.5
2.3
0
3.3
B 9
8
5.6
C
Dosen Pengampu :
9
30.4
4
8.0
Yohanes Satyayoga ST,MSc,IAI
D
Judul Proyek :
8
5.6
E AVIAN TOWER
Lokasi : Surabaya
4
5.5
B B Arsitek : Ivan Priatman, LEED, IAI
F
0
Kontraktor : PT Archimetric
21.0
0
Dibangun : 2018
33.0
Judul Gambar :
Instalasi AC Lt. 1-3 (Skala 1:400)
Instalasi AC Lt. 4-11, 7-20 (Skala
G
1:400)
Instalasi AC Lt. 12-16 (Skala 1:400)
8.44
Catatan :
J
7 8 9 10 11 12
Pengesahan :
2
Duta Wacana
1
3.3
9
3
12.6
2019
4
2.3 3 5
0
19.4 5.6
8
A 0 4 A
8.0
4 5 19.4
0 4
8.0
2.3
0
6 4
Dosen Pengampu :
4
3.3 6
5.5
9
5.6
8
B B
Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
Yohanes Satyayoga ST,MSc,IAI
8
8
5.6
5.6
C C
Judul Proyek :
9
9
0
30.4
30.4
19.4
MONITOR
4
4
AVIAN TOWER
8.0
8.0
SERVER
D D
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
8
8
Kontraktor : PT Archimetric
5.6
5.6
E E Dibangun : 2018
4
5.5
F
F Judul Gambar :
R. TITIK CCTV LT. 1
R. TITIK CCTV LT. 2
(Skala 1 : 400)
G G
Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
8.44
8.44
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
H H Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
23.95
23.95
8.43
8.43
Catatan :
I I
7.07
7.07
J J
1.09 3.12 8.44 3.13 1.10 1.09 3.12 8.44 3.13 1.10
16.88 16.88
7 8 9 10 11 12 7 8 9 10 11 12
KETERANGAN
50 63
2
12.64
STRUKTUR
5
1
KONSTRUKSI
5.6
8
3
05
19.4
0 4
8.0
4 Program Studi Arsitektur
2
6 Universitas Kristen
5.6
8
B Duta Wacana
1
12.6
4
2019
5
3
8
5.6
5.6
8
C
A 19.4
0 4
8.0
4
Dosen Pengampu :
6
0
5.6
19.4
8
4
B
8.0
Dr.-Ing. Ir. Winarna, MA
30.49
Ir. Gregorius Dwi Atmono, MT
D
Yohanes Satyayoga ST,MSc,IAI
8
5.6
8
5.6
E
Judul Proyek :
0
19.4
AVIAN TOWER
8.0
9
30.4
D
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
8
F
Kontraktor : PT Archimetric
5.6
E Dibangun : 2018
2
12.64
1
G
Digambar oleh : (Grup A)
3
5.6
8
Felicia Devi B. A (61170143)
8.44
19.4
0 4 Meliantha (61170148)
8.0
4
Eben Haezer D. S. I (61170156)
6
Felisa Febriola S. (61170187)
5.6
8
H B Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
23.95
8
5.6
8.43
C
A
Catatan :
I
0
19.4
4
8.0
7.07
J
8
5.6
E
30.49
7 8 9 10 11 12
KETERANGAN
F
R. TITIK CCTV LT. 12-16
FIXED DOME CAMERA
Skala 1:400
PTZ DOME CAMERA No. lembar : Jml lembar :
51 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
SKEMATIK CCTV
BANGUNAN (NTS)
Catatan :
Pengesahan :
SKEMATIK CCTV BANGUNAN
NTS
52 63
STRUKTUR
KONSTRUKSI
05
1
2 Program Studi Arsitektur
2 1 Universitas Kristen
3
3.3
9
3
12.6
4 Duta Wacana
2.3 5
0
19.4
0 A
5.6
8 2019
A 4
8.0 19.4
4 5 0 4
8.0
6 4
2.3
0
6
4
3.3
5.5
9
B B
5.6
8 Dosen Pengampu :
8
8
5.6
5.6
Ir. Gregorius Dwi Atmono, MT
C C
Yohanes Satyayoga ST,MSc,IAI
PABX DARI PSTN
MDF
0
9
30.4
19.4
30.4
4
4
8.0
8.0
IDF
TB A
Judul Proyek :
D AVIAN TOWER
Lokasi : Surabaya
8
8
5.6
5.6
E E
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
4
5.5
F F
Judul Gambar :
R. PABX LT. 1
R. PABX LT. 2
(Skala 1 : 400)
G G
8.44
8.44
23.95
23.95
8.43
8.43
I I
Catatan :
7.07
7.07
J J
1.09 3.12 8.44 3.13 1.10 1.09 3.12 8.44 3.13 1.10
16.88 16.88
7 8 9 10 11 12 7 8 9 10 11 12
R. PABX LT. 2
R. PABX LT. 1 Pengesahan :
KETERANGAN : Skala 1:400
Skala 1:400
PABX : PRIVATE AUTOMATIC BRANCH EXCHANGE
PSTN : PUBLIC SWITCHED TELEPHONE NETWORK
MDF : MAIN DISTRIBUTION FRAME
IDF : INTERMEDIATE DITRIBUTION FRAME
TB : TERMINAL BOX
JB : JUNCTION BOX
: TELEPON
No. lembar : Jml lembar :
53 63
2
STRUKTUR
12.64 5
1
KONSTRUKSI
5.6
8
3
05
19.4
0 4
2 8.0
4 Program Studi Arsitektur
1 6 Universitas Kristen
5.6
3
12.6
4 5 B
8
Duta Wacana
5.6
8 2019
A 19.4
8
0 4
5.6
8.0
4
C
6
JB
B
5.6 A3
8 Dosen Pengampu :
0
19.4
4
8.0
Dr.-Ing. Ir. Winarna, MA
8
5.6
30.49
Ir. Gregorius Dwi Atmono, MT
C D
TB B&C Yohanes Satyayoga ST,MSc,IAI
8
5.6
0
19.4
4
8.0
9
E
30.4
Judul Proyek :
D AVIAN TOWER
Lokasi : Surabaya
8
5.6
E
Arsitek : Ivan Priatman, LEED, IAI
F Kontraktor : PT Archimetric
Dibangun : 2018
5
G
2
12.64
1 Digambar oleh : (Grup A)
8.44
3
5.6
Felicia Devi B. A (61170143)
8
Meliantha (61170148)
19.4
H
8.0
0 4 Eben Haezer D. S. I (61170156)
4
Felisa Febriola S. (61170187)
6
5.6
Diazma Arsy Dewanto (61170210)
23.95
8
B Jefferson Musa Gagola (61170215)
8.43
8
5.6
I
C
A Catatan :
7.07
0
19.4
4
8.0
J
D
JB
TB D
B1-C4 8
5.6
E
1.09 3.12 8.44 3.13 1.10
16.88
30.49
7 8 9 10 11 12
54 63
STRUKTUR
KONSTRUKSI
UNIT TELEPON
UNIT TELEPON
UNIT TELEPON
05
UNIT TELEPON
UNIT TELEPON
Program Studi Arsitektur
UNIT TELEPON Universitas Kristen
DARI PSTN
JB A1 UNIT TELEPON Duta Wacana
UNIT TELEPON
UNIT TELEPON 2019
UNIT TELEPON
UNIT TELEPON
UNIT TELEPON
PABX MDF IDF TB A JB A2 UNIT TELEPON
UNIT TELEPON Dosen Pengampu :
UNIT TELEPON
JB B1 UNIT TELEPON
UNIT TELEPON
UNIT TELEPON Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
UNIT TELEPON
UNIT TELEPON
Yohanes Satyayoga ST,MSc,IAI
UNIT TELEPON
UNIT TELEPON
JB A3 UNIT TELEPON
JB B2 UNIT TELEPON
UNIT TELEPON
UNIT TELEPON
UNIT TELEPON
UNIT TELEPON Judul Proyek :
TB B AVIAN TOWER
UNIT TELEPON
UNIT TELEPON UNIT TELEPON Lokasi : Surabaya
UNIT TELEPON JB B3 UNIT TELEPON
Arsitek : Ivan Priatman, LEED, IAI
JB C1 UNIT TELEPON UNIT TELEPON
UNIT TELEPON UNIT TELEPON
Kontraktor : PT Archimetric
UNIT TELEPON Dibangun : 2018
UNIT TELEPON
UNIT TELEPON UNIT TELEPON
UNIT TELEPON JB B4 UNIT TELEPON
Judul Gambar :
JB C2 UNIT TELEPON UNIT TELEPON
UNIT TELEPON UNIT TELEPON SKEMATIK PABX
UNIT TELEPON BANGUNAN (NTS)
TB C
UNIT TELEPON
UNIT TELEPON
JB C3 UNIT TELEPON
UNIT TELEPON
UNIT TELEPON
Digambar oleh : (Grup A)
UNIT TELEPON
UNIT TELEPON
JB D1 UNIT TELEPON Felicia Devi B. A (61170143)
UNIT TELEPON Meliantha (61170148)
UNIT TELEPON
UNIT TELEPON
Eben Haezer D. S. I (61170156)
JB C4 UNIT TELEPON
UNIT TELEPON Felisa Febriola S. (61170187)
UNIT TELEPON
UNIT TELEPON
UNIT TELEPON Diazma Arsy Dewanto (61170210)
JB D2 UNIT TELEPON Jefferson Musa Gagola (61170215)
UNIT TELEPON
UNIT TELEPON
UNIT TELEPON
TB D JB D3 UNIT TELEPON Catatan :
UNIT TELEPON
UNIT TELEPON
UNIT TELEPON
JB D4 UNIT TELEPON
UNIT TELEPON UNIT TELEPON
JB E1 UNIT TELEPON
UNIT TELEPON UNIT TELEPON
UNIT TELEPON
UNIT TELEPON JB D5 UNIT TELEPON
UNIT TELEPON
TB E JB E2 UNIT TELEPON
KETERANGAN : UNIT TELEPON
UNIT TELEPON
55 63
STRUKTUR
KONSTRUKSI
05
2
1
2 1
Program Studi Arsitektur
3.3
9
3
12.6
Universitas Kristen
4
3
2.3
0
19.4 5.6
8
5 Duta Wacana
0 A
A
8.0
4
4
5 19.4
2019
0 4
8.0
2.3 6 4
0
4
3.3 6
5.5
9
5.6
8
B B
Dosen Pengampu :
8
Dr.-Ing. Ir. Winarna, MA
5.6
5.6
C C Ir. Gregorius Dwi Atmono, MT
Yohanes Satyayoga ST,MSc,IAI
9
9
0
30.4
30.4
19.4
4
4
8.0
8.0
D D Judul Proyek :
AVIAN TOWER
8
8
5.6
5.6
Lokasi : Surabaya
E E
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
4
5.5
Judul Gambar :
R. INSTALASI PANEL SURYA LT 1
R. INSTALASI PANEL SURYA LT 2
(Skala 1 : 400)
G G
8.44
Felicia Devi B. A (61170143)
H H
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
23.95
23.95
Diazma Arsy Dewanto (61170210)
8.43
8.43
Jefferson Musa Gagola (61170215)
I I
Catatan :
7.07
7.07
TV/MONITOR
J J
1.09 3.12 8.44 3.13 1.10 1.09 3.12 8.44 3.13 1.10
16.88 16.88
7 8 9 10 11 12 7 8 9 10 11 12
56 63
STRUKTUR
KONSTRUKSI
2
12.64 5
05
2
1 1
Program Studi Arsitektur
12.6
4
5
Universitas Kristen
3 3
5.6
8
5.6
8
Duta Wacana
A 19.4 19.4
2019
0 4 0 4
8.0 8.0
4 4
6 6
5.6 5.6
8 8
B B
Dosen Pengampu :
8
8
Dr.-Ing. Ir. Winarna, MA
5.6
5.6
C C DISTRIBUSI KE ALAT
KANTOR YANG
Ir. Gregorius Dwi Atmono, MT
MENGGUNAKAN LISTRIK
Yohanes Satyayoga ST,MSc,IAI
0
0
19.4
19.4
4
4
8.0
8.0
9
30.4
30.49
D D Judul Proyek :
AVIAN TOWER
8
8
5.6
5.6
Lokasi : Surabaya
E E
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
DISTRIBUSI KE ALAT
KANTOR YANG
MENGGUNAKAN LISTRIK
F
F Judul Gambar :
R. INSTALASI PANEL SURYA LT. 3
R. INSTALASI PANEL SURYA LT.
4-10 & 17-19
(Skala : 1 : 400)
G
R. INSTALASI PANEL SURYA LT. 4-10 & 17-19 Jefferson Musa Gagola (61170215)
Skala 1:400
I
Catatan :
7.07
7 8 9 10 11 12
57 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
5
Dr.-Ing. Ir. Winarna, MA
2
12.64
Ir. Gregorius Dwi Atmono, MT
1
Yohanes Satyayoga ST,MSc,IAI
3
5.6
8
6
1.4
19.4 0
0 4 3.1
8.0
4
22
.15
16.5
0 Judul Proyek :
6 7.3
8
AVIAN TOWER
5.6
8 0
B 3.1
6
1.4
SOLAR PANEL Lokasi : Surabaya
DISTRIBUSI KE ALAT
KANTOR YANG Arsitek : Ivan Priatman, LEED, IAI
8
5.6
4.8
C
Dibangun : 2018
8
A SOLAR PANEL
SOLAR PANEL
SOLAR PANEL
0
4.6
19.4
Judul Gambar :
4
8.0
9
R. INSTALASI PANEL SURYA LT.
19.1
3
D SOLAR PANEL 12-16
R. INSTALASI PANEL SURYA LT.
4.6
9
INVERTER
20
8
(Skala : 1 : 400)
5.6
CONTROLER BATERRY
E
4.8
8
SOLAR PANEL
30.49
39
SOLAR PANEL
.15
SOLAR PANEL
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
SOLAR PANEL
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
SOLAR PANEL Jefferson Musa Gagola (61170215)
F
Catatan :
Pengesahan :
58 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
BATTERY Universitas Kristen
Duta Wacana
SOLAR PANEL 2019
Dosen Pengampu :
SOLAR PANEL
Judul Proyek :
SOLAR PANEL AVIAN TOWER
Lokasi : Surabaya
BATTERY Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
SOLAR PANEL
Judul Gambar :
SKEMA INSTALASI PANEL
SOLAR PANEL SURYA BANGUNAN
DISTRIBUSI KE ALAT (NTS)
CONTROLER INVERTER KANTOR YANG
MENGGUNAKAN LISTRIK
SOLAR PANEL
Digambar oleh : (Grup A)
Felicia Devi B. A (61170143)
SOLAR PANEL Meliantha (61170148)
Eben Haezer D. S. I (61170156)
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
BATTERY Jefferson Musa Gagola (61170215)
SOLAR PANEL
Catatan :
SOLAR PANEL
CONTROLER
SOLAR PANEL
SOLAR PANEL
59 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
1
2 Universitas Kristen
2
3
1 Duta Wacana
3.3
9
2.3 3
12.6
4
5
2019
0
19.4 5.6
8
A 0 4 A
8.0
4 5 19.4
0 4
8.0
2.3 6 4
0
Dosen Pengampu :
4
3.3 6
5.5
9
5.6
8
B B
TV/MONITOR
Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
8
5.6
5.6
Yohanes Satyayoga ST,MSc,IAI
C C
TV/MONITOR
PC/ SERVER LAINNYA
POWER
BOOSTER
DEVIDER RECIEVER
9
9
0
Judul Proyek :
30.4
30.4
19.4
4
4
8.0
8.0
AVIAN TOWER
D D
TV/MONITOR
MODULATOR BOOSTER
KOMBINER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
8
8
5.6
5.6
E E Kontraktor : PT Archimetric
Dibangun : 2018
4
5.5
F
F
Judul Gambar :
R. MATV LT 1
R. MATV LT 2
TV/MONITOR (Skala 1 : 400)
TV/MONITOR
G G
8.44
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
BOOSTER
23.95
TV/MONITOR
8.43
8.43
I I Catatan :
7.07
7.07
TV/MONITOR
J J
1.09 3.12 8.44 3.13 1.10 1.09 3.12 8.44 3.13 1.10
16.88 16.88
7 8 9 10 11 12 7 8 9 10 11 12
60 63
STRUKTUR
KONSTRUKSI
2
05
Program Studi Arsitektur
12.64
2 5
Universitas Kristen
1 1 Duta Wacana
12.6
3
4 5
3 2019
5.6 5.6
8 8
A 19.4 19.4
0 4 0 4
8.0 8.0
4 4
6 6 Dosen Pengampu :
5.6 5.6
8 8
B B
TV/MONITOR TV/MONITOR
Dr.-Ing. Ir. Winarna, MA
Ir. Gregorius Dwi Atmono, MT
8
8
5.6
5.6
TV/MONITOR TV/MONITOR
Yohanes Satyayoga ST,MSc,IAI
C C
0
0
Judul Proyek :
19.4
19.4
4
4
8.0
8.0
9
30.4
AVIAN TOWER
30.49
D D
Lokasi : Surabaya
BOOSTER BOOSTER
Arsitek : Ivan Priatman, LEED, IAI
8
8
5.6
5.6
E E Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
F
R. MATV LT. 3
F
R. MATV LT. 4-10 & 17-19
(Skala : 1 : 400)
TV/MONITOR TV/MONITOR
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
H Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
R. MATV LT. 4-10 & 17-19 Jefferson Musa Gagola (61170215)
23.95
Skala 1:400
8.43
I Catatan :
7.07
7 8 9 10 11 12
61 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
5
6
7.3
Judul Proyek :
B
5.6
8
6
3.1
0
AVIAN TOWER
1.4
4.8
8
C TV/MONITOR
Kontraktor : PT Archimetric
A
Dibangun : 2018
BOOSTER
PARABOLA
4.6
0
9
19.4
4
8.0
19.1
Judul Gambar :
3
D R. MATV LT. 12-16
4.6
POWER
R. MATV LT. 20
9
DEVIDER
(Skala : 1 : 400)
8
5.6
4.8
E
8
30.49
39
.15
TV/MONITOR Felicia Devi B. A (61170143)
Meliantha (61170148)
Eben Haezer D. S. I (61170156)
PARABOLA
Felisa Febriola S. (61170187)
Diazma Arsy Dewanto (61170210)
Jefferson Musa Gagola (61170215)
Catatan :
R. MATV LT. 20
R. MATV LT. 12-16 Skala 1:400
Skala 1:400
Pengesahan :
62 63
STRUKTUR
KONSTRUKSI
05
Program Studi Arsitektur
Universitas Kristen
Duta Wacana
2019
Dosen Pengampu :
Judul Proyek :
AVIAN TOWER
Lokasi : Surabaya
Arsitek : Ivan Priatman, LEED, IAI
Kontraktor : PT Archimetric
Dibangun : 2018
Judul Gambar :
SKEMA MATV BANGUNAN
(NTS)
POWER
PARABOLA DEVIDER RECIEVER MODULATOR
KOMBINER BOOSTER
TV / MONITOR
(TERDAPAT DI SETIAP LANTAI)
Catatan :
63 63