RENCANA ANGGARAN BIAYA (RAB)

RENOVASI MUSHOLA PONDOK PESANTREN DAAR AT-TAUBAH


TAHUN 2019

HARGA
NO URAIAN VOLUME SATUAN JUMLAH
SATUAN
I Bahan material
1 Batu Belah 4 Kubik 250,000 1,000,000
2 Pasir 6 Kubik 250,000 1,500,000
3 Semen 20 Sak 56,000 1,120,000
4 Bata Merah 500 Buah 500 250,000
5 Kayu Kaso 4 kodi 150,000 600,000
6 Closed 2 Bh 150,000 300,000
7 Keran 10 Bh 25,000 250,000
8 Paku GRC 1 Pck 100,000 100,000
9 Paku 7 5 Kg 20,000 100,000
10 Lampu Penerang 4 bh 50,000 200,000
11 Keramik Kamar Mandi 12 m2 40,000 480,000
12 Kramik Lantai 33 m2 40,000 1,320,000
13 Cat tembok 2 Galon 500,000 1,000,000
14 Cat Kayu 4 Kaleng 60,000 240,000
15 internit GRC 18 lembar 50,000 900,000
16 Kanopi Rangka Baja 40 m2 - 4,975,000
17 Atap Rangka Baja 122 m2 200,000 24,400,000
II Upah Tukang
1 UpahTukang 20 1 150,000 3,000,000
2 UpahPembantutukang/Kenek 20 2 100,000 2,000,000
Jumlah 43,735,000
Terbilang : Empat Puluh Tiga Juta Tujuh Ratus Tiga Puluh Lima Ribu Rupiah
BAH
RENCANA ANGGARAN BIAYA (RAB)
RENOVASI MUSHOLA PONDOK PESANTREN DAAR AT-TAUBAH
TAHUN 2019

HARGA
NO URAIAN VOLUME SATUAN JUMLAH
SATUAN
I Bahan material
1 Batu Belah 4 Kubik
2 Pasir 6 Kubik
3 Semen 20 Sak
4 Bata Merah 500 Buah
5 Kayu Kaso 4 kodi
6 Closed 2 Bh
7 Keran 10 Bh
8 Paku GRC 1 Pck
9 Paku 7 5 Kg
10 Lampu Penerang 4 bh
11 Keramik Kamar Mandi 12 m2
12 Kramik Lantai 33 m2
13 Cat tembok 2 Galon
14 Cat Kayu 4 Kaleng
15 internit GRC 18 lembar
16 Kanopi Rangka Baja 40 m2
17 Atap Rangka Baja 122 m2
II Upah Tukang
1 UpahTukang 20 1 150,000 3,000,000
2 UpahPembantutukang/Kenek 20 2 100,000 2,000,000
Jumlah
Terbilang :