Monitoring PJDSP 01-31 Juli 2017
Monitoring PJDSP 01-31 Juli 2017
Monitoring PJDSP 01-31 Juli 2017
48 253/PJDSP-SWN/III/2017 Pengadaan Jasa Sewa Kantor KP. Non PSO Semarang SWN
49 254/PJDSP-SWN/III/2017 Pengadaan Jasa Sewa Mooring Boat (4 Bulan) SWN
68 272/PJDSP-FDN/IV/2017 Pengadaan Jasa Sewa Gudang Parigi Parimo (baru) (retender) FDN
Pengadaan Jasa Pemuatan Pupuk Kantong ke Jala-Jala di Tersus PKT
69 273/PJDSP-SWN/III/2017 SWN
Bontang
70 274/PJDSP-SWN/III/2017 Pengadaan Jasa PBM di Tersus PKT Bontang SWN
77 281/PJDSP-FDN/IV/2017 Pengadaan Jasa Sewa Gudang Cilik Riwut Kapuas 2017 FDN
Pengadaan Jasa Angkutan dan JPT-EMKL Pupuk Curah Banyuwangi
78 282/PJDSP-SWN/IV/2017 SWN
Pilog 2017
79 283/PJDSP-TJA/IV/2017 Pengadaan Jasa Sewa Gudang Tulungagung Baru (Gondang) 2017 TJA
102 306/PJDSP-GAP/VI/2017 Pengadaan Jasa Sewa Gudang Selayar Makassar 2017 GAP
103 307/PJDSP-GAP/VI/2017 Pengadaan Jasa Stockholder Gudang Selayar Makassar 2017 GAP
104 308/PJDSP-GAP/VI/2017 Pengadaan Jasa Sewa Gudang Kalianak 55 Surabaya 2017 GAP
105 309/PJDSP-GAP/VI/2017 Pengadaan Jasa Stockholder Gudang Kalianak 55 Surabaya 2017 GAP
Pengadaan Jasa Perbaikan Fender Dermaga QAL dan Rantai
106 310/PJDSP-WIL/VII/2017 WIL
Fender Dermaga Tursina
107 311/PJDSP-WIL/VII/2017 Pengadaan Jasa Angkutan Laut Pupuk PTP Nonsubsidi 2017 WIL
109 313/PJSDP-WIL/VII/2017 Pengadaan Jasa JPT-EMKL Celukan Bawang Bali 2017 WIL
110 314/PJDSP-RAY/VII/2017 Sewa Rumah Dinas Karyawan Dept. Pemasaran PSO 2 di Makasssar 2017 RAY
Nilai
Target
Dokumen
User Selesai No. Surat / SR P3/PR
Diterima
(45) Hari HPS Jasa
Dept.
6-Jan-2017 241/SR-DIST/XII/2016 2400003846 135,000,000
Distribusi
Dept.
10-Jan-2017 243/SR-DIST/XII/2016 2400003848 388,893,960 388,893,960
Distribusi
Dept.
10-Jan-2017 240/SR-DIST/XII/2016 2400003845 255,434,250
Distribusi
Dept.
10-Jan-2017 242/SR-DIST/XII/2016 2400003847 510,000,000 460,200,000
Distribusi
Dept.
11-Jan-2017 322.1/D41200/XII/2016 2400003486 19,500,000 19,500,000
Distirbusi
Manager
Pemasaran 2-Jan-2017 04/SR.AMO/XII/2016 2400003844 USD6800000 USD6800000
Amoniak
Dept.
13-Jan-2017 001/SR-DIST/I/2017 2400003891 597,500,000
Distribusi
Dept.
20-Jan-2017 004/SR-DIST/I/2017 2400003919 3,482,700,000 3,480,000,000
Distribusi
Dept.
16-Feb-2017 006/SR-DIST/I/2017 2400004032 291,840,000 291,840,000
Distribusi
Dept.
16-Feb-2017 010/SR-DIST/I/2017 2400004035 120,000,000 120,000,000
Distribusi
Dept.
16-Feb-2017 011/SR-DIST/I/2017 2400004036 87,120,000 87,120,000
Distribusi
Dept.
16-Feb-2017 013/SR-DIST/I/2017 2400004038 397,742,400 397,742,400
Distribusi
Dept.
16-Feb-2017 240/SR-DIST/XII/2016 2400003845 101,574,000 100,035,000
Distribusi
Dept.
Distribusi 16-Feb-2017 182/SR-DIST/IX/2016 2400002963 302,000,000 302,000,000
Dept.
16-Feb-2017 240-II/SR-DIST/XII/2016 2400003845 153,860,250 153,860,250
Distribusi
Dept.
22-Feb-2017 012/SR-DIST/II/2017 2400004037 1,123,000,000 1,080,000,000
Distribusi
Dept.
20-Feb-2017 018/SR-DIST/I/2017 2400004051 102,600,000 102,600,000
Distribusi
Dept.
20-Feb-2017 008/SR-DIST/I/2017 2400004033 993,600,000 993,600,000
Distribusi
Dept.
20-Feb-2017 007/SR-DIST/I/2017 2400004031 4,461,475,000 4,461,475,000
Distribusi
Dept.
20-Feb-2017 009/SR-DIST/I/2017 2400004034 680,100,000 680,100,000
Distribusi
Dept.
23-Feb-2017 022/SR-DIST/II/2017 2400004243 32,760,000 32,760,000
Distribusi
Dept. 23-Feb-2017 031/SR-DIST/II/2017 2400004262 252,000,000
Distribusi
Dept.
Distribusi 23-Feb-2017 026/SR-DIST/II/2017 2400004247 483,840,000
Dept.
23-Feb-2017 023/SR-DIST/II/2017 2400004244 61,562,592 61,562,592
Distribusi
Dept.
23-Feb-2017 028/SR-DIST/II/2017 2400004249 290,799,750
Distribusi
Dept.
23-Feb-2017 020/SR-DIST/II/2017 2400004241 14,400,000,000 14,400,000,000
Distribusi
Dept.
23-Feb-2017 027/SR-DIST/II/2017 2400004248 1,700,250,000 1,700,250,000
Distribusi
Dept.
23-Feb-2017 024/SR-DIST/II/2017 2400004245 23,328,000
Distribusi
Dept.
23-Feb-2017 029/SR-DIST/II/2017 2400004260 118,830,000 118,830,000
Distribusi
Dept.
23-Feb-2017 033/SR-DIST/II/2017 2400004285 1,290,000,000
Distribusi
Dept. Non
1-Mar-2017 02/SR.UREA/II/2017 2400004224 50,000,000 50,000,000
PSO
Dept. P & P 1-Mar-2017 152/SR.PEL/II/2017 2400004345 209,967,544 209,967,544
Dept.
9-Mar-2017 035/SR.DIST/II/2017 2400004349 12,565,000,000
Distribusi
Dept.
Distribusi 31-Mar-2017 045/SR.DIST/III/2017 2400004553 14,939,800,000
Dept.
31-Mar-2017 054/SR-DIST/III/2017 2400004617 30,000,000 28,800,000
Distribusi
Dept.
31-Mar-2017 055/SR-DIST/III/2017 2400004591 216,000,000 198,000,000
Distribusi
Dept.
3-Apr-2017 241A/SR-DIST/III/2017 2400003846 432,000,000 423,000,000
Distribusi
Dept. P & P 29-Mar-2017 199/SR-PEL/III/2017 2400004537 2,041,708,000 2,041,708,000
Dept. P & P 29-Mar-2017 198/SR-PEL/III/2017 2400004571 18,572,010,900 18,572,010,900
Dept.
Distribusi 20-Mar-2017 032/SR-DIST/II/2017 2400004295 9,865,558,200
Dept. PSO 1 6-Apr-2017 007/SR-PSO.1/II/2017 2400004392 373,200,000 352,800,000
Dept.
12-Apr-2017 051/SR-DIST/III/2017 2400004614 953,250,000 953,250,000
Distribusi
Dept.
12-Apr-2017 053/SR-DIST/III/2017 2400004616 1,730,400,000 1,730,400,000
Distribusi
Dept.
12-Apr-2017 052/SR-DIST/III/2017 2400004615 1,091,137,500 1,091,137,500
Distribusi
Dept.
12-Apr-2017 050/SR-DIST/III/2017 2400004613 696,000,000 696,000,000
Distribusi
Dept.
12-Apr-2017 049/SR-DIST/III/2017 2400004612 261,360,000 261,360,000
Distribusi
Dept.
19-Apr-2017 002/SR-DIST/I/2017 2400004061 21,941,370,000 21,941,370,000
Distribusi
Dept.
19-Apr-2017 066/SR-DIST/IV/2017 2400004796 450,450,000
Distribusi
Dept.
19-Apr-2017 067/SR-DIST/IV/2017 2400004831 303,000,000
Distribusi
Dept.
19-Apr-2017 065/SR-DIST/IV/2017 2400004794 320,000,000
Distribusi
Dept.
Pemasaran 27-Apr-2017 03/SR.UREA/X/2016 2400004679 37,000,000 37,000,000
Non PSO
Dept. 2400004509
Pemsaran 26-Apr-2017 010/SR PSO-1/III/2017 & 1,701,885,488
PSO 1 2400004508
Dept.
27-Apr-2017 036/SR-DIST/II/2017 2400004390 260,000,000 260,000,000
Distribusi
Dept.
8-May-2017 061/SR-DIST/IV/2017 2400004790 338,400,000 338,400,000
Distribusi
Dept.
2-May-17 064/SR-DIST/IV/2017 2400004793 1,283,040,000 1,283,040,000
Distribusi
Dept.
2-May-17 062/SR-DIST/IV/2017 2400004791 1,872,000,000 1,872,000,000
Distribusi
Dept.
Pemasaran 2-May-17 116.1/D422000/IV/2017 2400004883 39,100,000 35,190,000
PSO 2
Dept.
23-May-17 021/SR-DIST/II/2017 2400004242 768,000,000 720,000,000
Distribusi
Dept.
Distribusi 29-May-17 057/SR-DIST/III/2017 2400004637 631,625,000
Dept.
2-Jun-17 069/SR-DIST/V/2017 2400004913 141,595,390,139
Distribusi
Dept.
2-Jun-17 068/SR-DIST/V/2017 2400004912 91,349,419,290
Distribusi
Dept.
2-Jun-17 384/SR-PEL/V/2017 2400004946 42,000,000 40,908,000
P&P
Dept. 2-Jun-17 04/SR.UREA/V/2017 2400005150 44,800,000
Non PSO
Dept.
8-Jun-17 024A/SR-DIST/V/2017 2400004245 34,020,000
Distribusi
Dept.
P&P 8-Jun-17 406/SR-PEL/V/2017 2400005332 917,400,000
Dept.
27-Jun-17 077SR-DIST/VI/2017 2400005349 1,444,500,000
Distribusi
Dept.
27-Jun-17 075/SR-DIST/VI/2017 2400005347 4,305,600,000
Distribusi
Dept. 27-Jun-17 074/SR-DIST/VI/2017 2400005346 1,863,000,000
Distribusi
Dept.
27-Jun-17 072/SR-DIST/VI/2017 2400005344 142,002,000
Distribusi
Dept.
Distribusi 27-Jun-17 076/SR-DIST/VI/2017 2400005348 540,000,000
Dept.
27-Jun-17 080/SR-DIST/VI/2017 2400005366 15,120,000
Distribusi
Dept.
27-Jun-17 078/SR-DIST/VI/2017 2400005365 3,538,080,000
Distribusi
Dept.
Distribusi 27-Jun-17 079/SR-DIST/VI/2017 2400005368 1,506,650,000
Dept. P & P 4-Jul-17 373/SR-PEL/V/2017 2400005457 232,806,676
Dept.
10-Jul-17 069-II/SR-DIST/V/2017 2400005583 33,509,618,419
Distribusi
Dept.
12-Jul-17 072/SR-DIST/VI/2017 2400005316 120,000,000
Distribusi
Pemilihan
15,107,105 PT Kaltim Bahana Adhiguna 20-Jan-2017 19-Jan-2018
Langsung
Penunjukan
- PT Pupuk Indonesia Logistik 10-Dec-2016 9-Mar-2017
Langsung
Penunjukan
PT Surya Samudra Perkasa 1-Jan-2017 31-Dec-2017
Langsung
Penunjukan
- Mulyadi S. 1-Feb-2017 31-Jan-2018
Langsung
Penunjukan
PUSKUD NTB 18-Jan-2017 17-Jan-2018
Langsung
Penunjukan
49,800,000 PT Gelora Makassar 1-Feb-2017 31-Jan-2018
Langsung
Penunjukan
PT LOGISTIK PRATAMA 1-Oct-2016 31-Dec-2016
Langsung
Penunjukan
PT Pupuk Indonesia Logistik 1-Jan-2017 31-Dec-2017
Langsung
Penunjukan
- RSO DON & Profesional 1-Feb-2017 28-Feb-2017
Langsung
Penunjukan
- ERNA MACHMUD ALASIRY 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- PT AUTO BAGUS UTAMA 1-Mar-2017 28-Feb-2018
Langsung
Penunjukan
- PT AUTO BAGUS UTAMA 1-Mar-2017 28-Feb-2018
Langsung
Penunjukan
- CV Pusaka Utama Mandiri 1-Dec-2016 30-Nov-2017
Langsung
Penunjukan
- PT Gresik Cipta Sejahtera 1-Jan-2017 31-Dec-2017
Langsung
Penunjukan
(212,500,000) CV Pusaka Utama Mandiri 20-Mar-2017 19-Mar-2018
Langsung
Penunjukan
- PT D-Asia Transbagging 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- CV Trijaya Indonusa 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- PT Sulawesi Jaya Mandiri 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- CV Nirwana 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- CV Trijaya Indonusa 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
1,539,000 PUSKUD NTB 18-Jan-2017 17-Jan-2018
Langsung
Penunjukan
- Langsung CV Pusaka Utama Mandiri 12-Oct-2016 11-Oct-2017
Penunjukan
- PUSKUD NTB 18-Jan-2017 17-Jan-2018
Langsung
Penunjukan
43,000,000 CV Trijaya Indonusa 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- PT Gede Langgeng Makmur 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- CV Trijaya Indonusa 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- PT Bromo Transindo 1-Mar-2017 28-Feb-2018
Langsung
Penunjukan
- PT Gede Langgeng Makmur 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan
- PT Surya Samudra Perkasa 1-May-2017 30-Apr-2018
Langsung
Penunjukan CV Fajar Utama 1-Jun-2017 31-May-2018
Langsung
Penunjukan
Langsung CV Fajar Utama 1-Jun-2017 31-May-2018
Penunjukan
- CV Sawit Fertilizer 1-May-2017 30-Apr-2018
Langsung
Penunjukan
PT Bhanda Ghara Reksa 1-May-2017 30-Apr-2018
Langsung
Penunjukan
- PT Bromo Transindo 13-May-2017 12-May-2018
Langsung
Penunjukan
- PT Bromo Transindo 13-May-2017 12-May-2018
Langsung
Penunjukan
KUD SAN RANEPAO 1-Jun-2017 31-May-2018
Langsung
Penunjukan
- CV Perdana 1-Jun-2017 31-May-2018
Langsung
21-Feb-2017 20-Feb-2018
Penunjukan
- Tirta Kusuma Ningsih 1-Mar-2017 28-Feb-2018
Langsung
Penunjukan
- PT Kaltim Bahana Adhiguna 20-Jan-2017 19-Apr-2017
Langsung
Penunjukan
- PT BUMI JAYA UTAMA 1-Jan-2017 31 may 2017
Langsung
75,000 Penunjukan PT ADI SARANA ARMADA 1-Jan-2017 31 may 2017
Langsung (ASSA)
Penunjukan
- PT Surya Samudra Perkasa 1-Jan-2017 31 may 2017
Langsung
Penunjukan
442,500 CV KHARISMA 1-Jan-2017 31 may 2017
Langsung
28-Apr-2017 27-Apr-2018
8-Apr-2017 7-Apr-2018
11-Apr-2017 10-Apr-2018
Penunjukan
7,500,000 PT Surya Samudera Perkasa 2-Mar-2017 1-Mar-2017
Langsung
1-Apr-2017 31-Mar-2018
Penunjukan
- DG. Patappa S 1-Dec-2016 30-Nov-2017
Langsung
Penunjukan
1,200,000 PT Yepeka Usaha Mandiri 5-Dec-2016 4-Mar-2017
Langsung
Penunjukan
18,000,000 PT Yepeka Usaha Mandiri 5-Jun-2017 4-Jun-2020
Langsung
Penunjukan
9,000,000 PT Surya Samudera Perkasa 1-Jan-2017 31-Dec-2019
Langsung
PT KAD
Penunjukan
- PT KSS 1-May-2017 31-Aug-2017
Langsung
PT BES
Penunjukan
- PT Kaltim Adhiguna Dermaga 1 may 2017 31-Aug-2017
Langsung
Penunjukan
Langsung PT Pusri Palembang 1-Apr-2017 31-Mar-2018
20,400,000 Penunjukan PT Auto Bagus Utama 1-Apr-2017 31-Mar-2019
Langsung
Penunjukan
- CV Nirwana 21-Jun-2017 20-Jun-2020
Langsung
Penunjukan
- CV Nirwana 21-Jun-2017 20-Jun-2020
Langsung
Penunjukan
- CV Nirwana 21-Jun-2017 20-Jun-2020
Langsung
Penunjukan
- CV Pusaka Utama Mandiri 11-Jun-2017 10-Jul-2020
Langsung
Penunjukan
- PT Gede Langgeng Makmur 1-Jul-2017 30-Jun-2020
Langsung
Penunjukan
- PT Pupuk Indonesia Logistik 10-Mar-2017 9-Mar-2018
Langsung
Penunjukan
PT Bhanda Ghara Reksa 01 may 2017 31-Mar-2018
Langsung
Penunjukan
PT Bhanda Ghara Reksa 01 may 2017 31-Mar-2018
Langsung
Penunjukan
PT Bhanda Ghara Reksa 1-Mar-2017 31-Mar-2018
Langsung
Penunjukan
- FAIRAS APRIROSA 1 may 2017 30-Apr-2018
Langsung
Penunjukan
PT Pupuk Sriwidjaja Palembang 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan PT ISPETTORE CARGANTARA
- 1-Jan-2017 31-Dec-2017
Langsung INDONESIA
Penunjukan
- PT Samudera Perdana Selaras 10-Jul-2017 9-Jan-2018
Langsung
Penunjukan
- CV Noor Afiat 1-Aug-2017 31-Jul-2020
Langsung
Penunjukan
- PT Gede Langgeng Makmur 1-Aug-2017 31-Jul-2020
Langsung
Penunjukan
3,910,000 Langsung Hamka 1-Apr-17 31-Mar-18
Penunjukan
48,000,000 CV Trijaya Indonusa 1-Apr-17 31-Mar-18
Langsung
Penunjukan
Langsung PT Pan Asia Superintendence 1-Jun-17 31-May-20
1-Aug-17 31-Jul-20
1-Aug-17 31-Jul-20
Penunjukan
1,092,000 PT Kaltim Bahana Adhiguna
Langsung
Penunjukan 1-Jun-17 31-May-18
Langsung
Penunjukan
KUD SAN RANEPAO 1-Jun-17 31-May-18
Langsung
1-Aug-17 31-Jul-18
Penunjukan
CV Fajar Utama 7-Sep-17 6-Sep-20
Langsung
Penunjukan
CV Trijaya Indonusa 1-Oct-17 30-Sep-20
Langsung
Penunjukan CV Trijaya Indonusa 1-Oct-17 30-Sep-20
Langsung
Penunjukan
CV Fajar Utama 21-Sep-17 20-Sep-20
Langsung
Penunjukan
Langsung CV Fajar Utama 21-Sep-17 20-Sep-20
Penunjukan
CV Fajar Utama 21-Sep-17 20-Sep-18
Langsung
Penunjukan
Tony Kuntjoro 1-Sep-17 31-Aug-18
Langsung
Penunjukan
Langsung PT D-Asia Transbagging 1-Sep-17 31-Aug-18
Lelang
1-Aug-17 31-Jul-20
Terbatas
Penunjukan
1-Jul-17 30-Jun-19
Langsung
11-Jul-17 10-Jul-18
Penunjukan Langsung
DUR
Mgr Daan GM DAAN
Posisi Sekarang
IN OUT IN
1. sudah selesai
1. Dok dikembalikan ke PPBJ perihal kelengkapan dokumen vendor di SAP 3/3/17 s/d
10/4/17
2. draft DUR ke checker (dede) 11/4/17
3. draft DuR ke checker (agustin) 11/4/17
4. revisi DUR 12/4/17
5. draft DUR ke manag dansa 13/4/17 s/d 17/4/17
6. Doc DUR ke checker GM DAAN 17/4/17
7. Doc DUR di ttd GM DAAN 18/4/17
8. Draft SPPH 25/4/17 CD 2/5/17
9. draft LUP-SP 3/5/17
10. draft LUP-SP ke checker (agustin) 4/5/17 s/d 8/5/17
11. draft LUP-SP ke checker (dede) 9/5/17 S/D 12/5/17
12. draft LUP-SP ke manag dansa 15/5/17
13. Doc LUP-SP ke checker GM DAAN 16/5/17
14. Doc LUP-SP ke GM DAAN 16/5/17
15. Doc LUP-SP di ttd GM DAAN 16/5/17
16. Doc LUP-SP ke lt 3 ttd D3 16/5/17 s/d 18/5/17
17. Doc LUP-SP di ttd D3 18/5/17
18. selesai 18/5/17
1. Dok dikembalikan ke PPBJ perihal kelengkapan dokumen 3/3/17
2. draft DUR ke checker (agustin) 5/4/17
3. draft DUR ke manag dansa 5/4/17
4. draft DUR di ttd manag dansa 6/4/17
5. Doc DUR ke checker GM DAAN 6/4/17
6. Doc DUR ke GM DAAN 10/4/17
7. Doc DUR di ttd GM DAAN 11/4/17
8. Draft LUP & SP ke checker (dede) 18/5/2017 s/d 19/5/17
9. Revisi LUP-SP 22/5/17
10. draft LUP-SP ke Checker Dede 23/5/17
11. draft LUP-SP ke Checker Agustin 23/5/17
12. draft LUP-SP ke Manag 24/5/17
13. Doc LUP-SP ke checker GM DAAN 26/5/17
14. Doc LUP-SP ke GM DAAN 26/5/17
15. Doc LUP-SP di ttd GM DAAN 26/5/17
16. Doc SP ke lt 3 ttd D3 29/5/17 s/d 31/5/17
17. Doc kembali ke daan jasa untuk dibawa ke jkt 2/6/17
18. Doc kembali ke lt 3 ttd D3 2/6/17
19. Doc SP di ttd D3 2/6/17
20. Doc selesai 2/5/17
1. Doc dikembalikan ke PPBJ perihal kelengkapan dokumen vendor di SAP 5/4/17 s/d
10/4/17
2. draft DUR ke checker (agustin) 20/4/17
3. draft DUR ke manag dansa 20/4/17
4. Doc DUR ke checker GM DAAN 25/4/17
5. ttd DUR ke D3 25/4/17 s/d 2/5/17 (Dok ke Lt. 3)
6. Doc DUR di ttd D3 8/5/17
7. draft SPPH ttd manag dansa 16/5/17 CD 22/5/17
8. Doc SPPH ke checker GM DAAN 16/5/17 CD 22/5/17
9. surat pengingat I ke penyedia jasa 22/5/17 s/d 6/6/17
10. surat balasan SPPH diterima 6/6/17
11. negosiasi akan dilakukan dengan penyedia jasa disurabaya (pak tomy)
12. jawaban nego diterima 4/7/17
13. review penawaran hasil negosiasi 5/7/17
1. Draft DUR ke checker (agustin) 19/4/17 s/d 21/4/17
2. Revisi DUR 25/4/17
3. draft DUR ke checker (dede) 26/4/17 s/d 27/4/17
4. draft DUR menunggu ttd manag dansa cuti-kembali bekerja 27/4/17 s/d 2/5/17
5. Doc DUR ke checker GM DAAN 2/5/17 s/d 3/5/17
6. Doc DUR di ttd GM DAAN 4/5/17
7. draft SPPH 5/5/17 CD 10/5/17
8. draft Nego 15/5/17 CD 18/5/17
9. draft LUP-SP ke checker (dede) 17/5/17 s/d 18/5/17
10. draft LUP-SP ttd manag dansa 19/5/17
11. Doc LUP-SP ke checker GM DAAN 19/5/17
12. Doc LUP-SP ke GM DAAN 22/5/17
13. Doc LUP-SP di ttd GM DAAN 23/5/17
14. Doc SP menunggu ttd D3 (dinas luar kota-kembali ke btg) (doc ada di daan jasa)
23/5/17
15. Doc SP ke lt 3 ttd D3 24/5/17 s/d 29/5/17
16. Doc SP di ttd D3 29/5/17
17. Doc selesai 29/5/17
1. draft DUR pararel SPPH ke checker (agustin) 15/5/17 s/d 16/5/17 CD 22/5/17
2. draft DUR pararel SPPH ke checker (dede) 17/5/17 CD 22/5/17
3. draft DUR pararel SPPH ttd manag dansa 18/5/17 CD 22/5/17
4. draft DUR pararel SPPH di ttd manag dansa 18/5/17
5. Doc DUR pararel SPPH ke checker GM DAAN 18/5/17
6. Doc DUR pararel SPPH di ttd GM DAAN 19/5/17
7. menunggu balasan SPPH CD 22/5/17
8. draft LUP-SP 23/5/17
9. draft LUP-SP ke checker (dede) 24/5/17
10. revisi LUP-SP 26/5/17
11. draft LUP-SP ke checker (dede) 29/5/17
12. draft LUP-SP ke checker (agustin) 30/5/17
13. Draft LUP-SP ttd Manag Dansa 30/05/2017
14. Doc LUP-SP Ke Checker GM Daan 30/05/2017 s/d 30/5/17
14. Doc LUP-SP ke GM DAAN 30/5/17
15. Doc LUP-SP di ttd GM DAAN 31/5/17
16. Doc LUP-SP ke lt. 3 ttd D3 31/5/17
17. Doc kembali ke daan jasa untuk dibawa ke jkt 2/6/17
18. Doc kembali ke lt 3 ttd D3 2/6/17
19. Doc di ttd D3 2/6/2017
20. Doc selesai 2/6/2017
1. draft DUR pararel SPPH ke checker (agustin) 15/5/17 s/d 16/5/17 CD 22/5/17
2. draft DUR pararel SPPH ke checker (dede) 17/5/17 CD 22/5/17
3. draft DUR pararel SPPH ttd manag dansa 18/5/17 CD 22/5/17
4. draft DUR pararel SPPH di ttd manag dansa 18/5/17
5. Doc DUR pararel SPPH ke checker GM DAAN 18/5/17
6. Doc DUR pararel SPPH di ttd GM DAAN 19/5/17
7. Doc DUR ke lt 3 ttd D3 19/5/17 s/d 24/5/17
8. Doc DUR di ttd D3 24/5/17
9. draft LUP-SP ke Checker Agustin 26/5/17
10. draft LUP-SP ke checker (dede) 29/5/17
11. draft LUP-SP ttd Manag Dansa 29/05/17
12. Doc LUP-SP ke checker GM DAAN 29/05/17
13. Doc LUP-SP di ttd GM DAAN 30/5/17
14. Doc LUP-SP ke lt 3 ttd D4,D3 & D1 30/5/17 s/d 31/5/17
15. Doc kembali ke daan jasa untuk dibawa ke jkt 2/6/17
16. Doc kembali ke lt 3 ttd D4 & D1 5/6/17
17. Doc kembali Ke Dansa 07/6/17
18. Doc dikirim via email ke staf D4 ttd Kesdok - SP 7/6/17
19. Doc via email dikirim staf D4 9/6/17
20. Doc SP menunggu ttd D1 9/6/17 s/d 12/6/17 (doc ada di daan jasa)
21. Doc SP ke lt 3 ttd D1 13/6/17
22. selesai 14/6/17
1. draft DUR pararel SPPH ke checker (agustin) 15/5/17 s/d 16/5/17 CD 22/5/17
2. draft DUR pararel SPPH ke checker (dede) 17/5/17 CD 22/5/17
3. draft DUR pararel SPPH ttd manag dansa 18/5/17 CD 22/5/17
4. draft DUR pararel SPPH di ttd manag dansa 18/5/17
5. Doc DUR pararel SPPH ke checker GM DAAN 18/5/17
6. Doc DUR di ttd GM DAAN 22/5/17
7. Doc DUR menunggu ttd D3 (dinas luar kota-kembali ke btg) (doc ada di daan jasa)
23/5/17
8. Doc DUR ke lt 3 ttd D3 24/5/17 s/d 29/5/17
9. Doc DUR di ttd D3 29/5/17
10. draft SPPH 24/5/17 CD 30/5/17
11. Nego 26/5/17 CD 30/5/17
12. draft LUP-SP ke checker (agustin) 30/5/17 s/d 31/5/17
13. draft LUP-SP ke checker (dede) 2/6/17
14. draft LUP-SP ttd ke manag dansa 5/6/17
15. Doc LUP-SP ke checker GM DAAN 5/6/17
16. Doc Lup- SP di ttd GM DAAN 6/6/17
17. Doc LUP-SP menunggu ttd D4, D3 & D1 7/6/17 s/d 12/6/17 (doc ada di daan jasa)
18. Doc LUP-SP ke lt 3 ttd D4,D3 & D1 13/6/17
19. selesai 14/6/17
1. akan ditender bersama PT Pupuk Indonesia pada tgl 3-4 juli 2017
1. akan ditender bersama PT Pupuk Indonesia pada tgl 3-4 juli 2017
1. 2 rekanan belum terdaftar di SAP doc dikembalikan ke PPBJ 9/6/17 s/d 12/6/17
2. Doc diterima kembali 14/6/17
3. draft DUR ke checker (agustin) 14/6/17
4. draft DUR ttd manag dansa 14/6/17
5. Doc DUR ke checker GM DAAN 14/6/17
6. Doc DUR di ttd GM DAAN 15/6/17
7. Doc DUR ke Lt. 3 ttd D3 15/6/17 s.d 19/6/17
8. Doc DUR di komen D3 Perihal ttd Otorisator 20/6/17
9. Doc DUR ke checker GM DAAN 20/6/17 s/d 21/6/17
10. draft DUR ttd Mgr Dansa 21/6/17
11. menunggu ttd Doc DUR ke GM DAAN 22/6/17 s/d 23/6/17 (cuti)
12. Penandatanganan D3 di doc DUR dirubah ttd D2 28/6/17
13. Doc DUR ke GM DAAN 28/6/17
14. Doc DUR di ttd GM DAAN 28/6/17
15. Doc DUR ke lt 3 ttd D2 plt D3 3/7/17
16 DUR ditandatagani tgl 03/7/2017
17. Rapat pratender internal panitia (11/7/2017)
18. Rencana aanwijzing (24/7/2017)
21-Jun-17 21-Jun-17
1. draft DUR pararel SPPH 27/6/17
2. draft DUR pararel SPPH ttd mgr dansa 28/6/17
3. Doc DUR pararel SPPH ke checker GM DAAN 29/6/17 s/d 30/6/17
4. Doc DUR ke GM DAAN 3/7/17
5. Doc dikoment GM DAAN perihal fasilitas digudang 3/7/17 28-Jun-17 28-Jun-17 29-Jun-17
6. Doc dikembalikan ke user perihal jangka waktu 3 thn dirubah menjadi 1 thn 5/7/17
30-Jun-17
30-Jun-17
30-Jun-17
30-Jun-17
30-Jun-17
30-Jun-17
30-Jun-17
SP
GM Teknik Ketua Tim Mgr User GM User Direksi (D3,D2,D4,D5,D1)
035/SR.DI
Dept.
SWN 9-Mar-2017 ST/II/201 2400004349 ###
Distribusi 7
045/SR.DI
Dept.
SWN Distribusi 31-Mar-2017 ST/III/201 2400004553 ###
7
032/SR-
Dept.
SWN Distribusi 20-Mar-2017 DIST/II/20 2400004295 9,865,558,200
17
002/SR-
Dept. 19-Apr-2017
SWN DIST/I/20 2400004061 ### ### -
Distribusi
17
Dept. 010/SR 2400004509
SWN Pemsaran 26-Apr-2017 PSO- & 1,701,885,488
PSO 1 1/III/2017 2400004508
Dept.
WIL 29-May-17 057/SR-DIST/III/2017
2400004637 631,625,000
Distribusi
Dept.
SWN 2-Jun-17 069/SR-DIST/V/2017
2400004913 ###
Distribusi
Dept.
SWN 2-Jun-17 068/SR-DIST/V/2017
2400004912 ###
Distribusi
Dept.
FDN 2-Jun-17 04/SR.UREA/V/2017
2400005150 44,800,000
Non PSO
Dept.
FDN 8-Jun-17 024A/SR-DIST/V/2017
2400004245 34,020,000
Distribusi
Dept.
WIL 8-Jun-17 406/SR-PEL/V/2017
2400005332 917,400,000
P&P
Dept.
FDN 27-Jun-17 077SR-DIST2400005349 1,444,500,000
Distribusi
Dept.
FDN 27-Jun-17 075/SR-DIST/VI/2017
2400005347 4,305,600,000
Distribusi
Dept.
FDN 27-Jun-17 074/SR-DIST/VI/2017
2400005346 1,863,000,000
Distribusi
Dept.
FDN 27-Jun-17 072/SR-DIST/VI/2017
2400005344 142,002,000
Distribusi
Dept.
FDN 27-Jun-17 076/SR-DIST/VI/2017
2400005348 540,000,000
Distribusi
Dept.
GAP Distribusi 27-Jun-17 080/SR-DIST/VI/2017
2400005366 15,120,000
Dept.
GAP 27-Jun-17 081/SR-DIST/VI/2017
2400005367 132,000,000
Distribusi
Penunjuk
Dept. 27-Jun-17
078/SR-DIST/VI/2017
2.4E+09 ### an
Distribusi
Langsung
Penunjuk
Dept. 27-Jun-17
079/SR-DIST/VI/2017
2.4E+09 ### an
Distribusi
Langsung
Dept. P & P 4-Jul-17 373/SR-PEL/V/2017
2.4E+09 ###
Dept. Lelang
10-Jul-17 069-II/SR-DIST/V/2017
2.4E+09 ###
Distribusi Terbatas
Dept. Pemilihan
12-Jul-17 072/SR-DIST/VI/2017
2.4E+09 ###
Distribusi Langsung
Dept. Lelang
14-Jul-17 082/SR-DIST/VI/2017
2.4E+09 ###
Distribusi Terbatas
1. Doc
dikembali
kan ke
Dept.
PPBJ
perihal
kelengkap
an
dokumen
8/3/17
2. draft
DUR
31/3/17
3. draft
pengumu
man
tender ke
checker
21-Feb-2017 20-Feb-2018 (agustin)
31/3/17
s/d
4/4/17
4. Draft
Penetapa
n Metode
dan Draft
Pengumu
man
Lelang
Terbuka
ke
checker
(agustin)
7/7/17
s/d
10/4/17
5. revisi
1. Doc
dikembali
kan ke
Dept.
PPBJ
perihal
kelengkap
an
dokumen
8/3/17
8-Apr-2017 7-Apr-2018 2. draft
DUR
31/3/17
3. draft
pengumu
man
tender ke
checker
(agustin)
31/3/17
s/d
4/4/17
4. Draft
Penetapa
n Metode
dan Draft
Pengumu
man
Lelang
1. Doc
dikembali
kan ke
Dept.
PPBJ
perihal
kelengkap
an
dokumen
8/3/17
11-Apr-2017 10-Apr-2018 2. draft
DUR
31/3/17
3. draft
pengumu
man
tender ke
checker
(agustin)
31/3/17
s/dDoc
1.
4/4/17
dikembali
4.
kanDraft
ke
Penetapa
PPBJ
n Metode
perihal
dan Draft
kelengkap
Pengumu
an
man
dokumen
Lelang
vendor di
Terbuka
SAP
7/7/17
5/4/17
s/d
10/4/17
5. draft
2. revisi
Penetapa
DUR ke
n Metode
checker
dan Draft
(agustin)
Penunjuk PT Pusri Pengumu
20/4/17
an man
Palemban 1-Apr-2017 31-Mar-2018 3. draft
Langsung g Lelang
DUR ke
Terbuka
manag
10/4/17
dansa
6. draft
20/4/17
Penetapa
4. Doc
n Metode
DUR ke
dan Draft
checker
Pengumu
GM DAAN
man
25/4/17
Lelang
5. ttd DUR
Terbuka
ke D3
ke
25/4/17
checker
s/d
(agustin)
2/5/17
11/4/17
(Dok ke
7.
Lt.Doc
3)
Penetapa
6. Doc
n Metode
DUR di ttd
dan Draft
Pengumu
man
Lelang
Terbuka
ke
checker
GM DAAN
11/4/17
1.
klarifikasi
ke user
perihal
revisi OE
&
dokumen
perminta
an lainnya
20/4/17
s/d
18/5/17
2. Revisi
OE akan
dikirimka
n Dept
Distribusi
Penunjuk PT Pupuk 22/05/20
an Indonesia 10-Mar-2017 9-Mar-2018 17 (Info
Langsung Logistik GM
Rendal
Distribusi)
3. Dok
dikembali
kan ke
Dept.
PPB&J
perihal
Revisi OE
22/5/17
cc Dept.
Distribusi
4. Doc
revisi OE
& TOR
diterima
23/5/17
1. Draft
DUR
27/4/17
2. draft
DUR ke
checker
(agustin)
27/4/17
3. draft
DUR ke
checker
(dede)
27/4/17
4. draft
DUR
menungg
PT Pupuk u paraf
Penunjuk manag
Sriwidjaja
an 1-Apr-2017 31-Mar-2018 dansa
Palemban
Langsung 28/4/17
g
(cuti-
kembali
bekerja)
s/d
2/5/17
5. Doc
DUR ke
checker
GM DAAN
2/5/17
6. Doc
DUR ke
GM DAAN
3/5/17
7. Doc
DUR di ttd
GM DAAN
1. draft 1. revisi
DUR ke SR perihal
checker jangka
(agustin) waktu
30/5/17 dari 3
s/d tahun
31/5/17 menjadi 1
2. drat tahun
DUR ttd 7/6/17
manag 2.
dansa klarifikasi
2/6/17 ke user
3. Doc perihal
DUR ke jangka
checker waktu
GM DAAN dari 3
5/6/17 tahun
Penunjuk 4. revisi menjadi 1
an PT Pan Asi 1-Jun-17 31-May-20 SR perihal tahun
Langsung jangka 7/6/17
waktu s/d
dari 3 12/6/17
tahun 3. surat
menjadi 1 klarifikasi
tahun dari user
7/6/17 diterima
5. 20/6/17
klarifikasi 4.
ke user menungg
perihal u PR
jangka direlease
waktu Dept.
dari 3 Anggaran
tahun 21/6/17
menjadi 1
tahun
7/6/17
1. akan ditender bersama PT Pupuk Indonesia pada tgl 3-4 juli 2017
1-Aug-17 31-Jul-20
1. akan ditender bersama PT Pupuk Indonesia pada tgl 3-4 juli 2017
1-Aug-17 31-Jul-20
1.
menungg
u surat
urgent
dari user
6/6/17 CD
8/6/17
2. surat
urgent
diterima
7/6/17
3. draft
DUR
pararel
SPPH ke
checker
(agustin)
Penunjuk 7/6/17
an 1-Jun-17 31-May-18 4.
Langsung menungg
u balasan
SPPH dari
penyedia
jasa
7/6/17 CD
12/6/17
5. draft
LUP-SPK
12/6/17
1. draft
DUR
pararel
SPPH ke
checker
(agustin)
9/6/7 s/d
12/6/17
2. draft
LUP-SP ke
Penunjuk checker
an KUD SAN 1-Jun-17 31-May-18 (agustin)
Langsung 12/6/17
3. draft
LUP-SPK
12/6/17
1. 2
rekanan
belum
terdaftar
di SAP
doc
dikembali
kan ke
PPBJ
9/6/17
s/d
12/6/17
2. Doc
diterima
kembali
14/6/17
3. draft
DUR ke
1-Aug-17 31-Jul-18 checker
(agustin)
14/6/17
4. draft
DUR ttd
manag
dansa
14/6/17
5. Doc
DUR ke
checker
GM DAAN
14/6/17
6. Doc
DUR di ttd
GM DAAN
15/6/17
7. Doc
DUR ke 21-Jun-17 21-Jun-17
1. draft 1. Doc
DUR sementar
pararel a di hold
SPPH perihal
27/6/17 fasilitas
2. draft digudang
DUR 2. Doc
pararel dikembali
SPPH ttd kan ke
mgr user
dansa perihal
28/6/17 jangka
3. Doc waktu 3
DUR thn
pararel dirubah
SPPH ke menjadi 1
checker thn
Penunjuk GM DAAN 5/7/17
an CV Fajar U 7-Sep-17 6-Sep-20 29/6/17 28-Jun-17 28-Jun-17
Langsung s/d
30/6/17
4. Doc
DUR ke
GM DAAN
3/7/17
5. Doc
dikoment
GM DAAN
perihal
fasilitas
digudang
3/7/17
6. Doc
dikembali
kan ke
user
perihal
1. draft 1. Doc
DUR sementar
pararel a di hold
SPPH perihal
27/6/17 fasilitas
2. draft digudang
DUR 2. Doc
pararel dikembali
SPPH ttd kan ke
mgr user
dansa perihal
28/6/17 jangka
3. Doc waktu 3
DUR thn
pararel dirubah
SPPH ke menjadi 1
checker thn
Penunjuk GM DAAN 5/7/17
an CV Trijaya 1-Oct-17 30-Sep-20 29/6/17 28-Jun-17 28-Jun-17
Langsung s/d
30/6/17
4. Doc
DUR ke
GM DAAN
3/7/17
5. Doc
dikoment
GM DAAN
perihal
fasilitas
digudang
3/7/17
6. Doc
dikembali
kan ke
user
perihal
1. draft 1. Doc
DUR sementar
pararel a di hold
SPPH perihal
27/6/17 fasilitas
2. draft digudang
DUR 2. Doc
pararel dikembali
SPPH ttd kan ke
mgr user
dansa perihal
28/6/17 jangka
3. Doc waktu 3
DUR thn
pararel dirubah
SPPH ke menjadi 1
checker thn
Penunjuk GM DAAN 5/7/17
an CV Trijaya 1-Oct-17 30-Sep-20 29/6/17 28-Jun-17 28-Jun-17
Langsung s/d
30/6/17
4. Doc
DUR ke
GM DAAN
3/7/17
5. Doc
dikoment
GM DAAN
perihal
fasilitas
digudang
3/7/17
6. Doc
dikembali
kan ke
user
perihal
1. draft 1. Doc
DUR sementar
pararel a di hold
SPPH perihal
27/6/17 fasilitas
2. draft digudang
DUR 2. Doc
pararel dikembali
SPPH ttd kan ke
mgr user
dansa perihal
28/6/17 jangka
3. Doc waktu 3
DUR thn
pararel dirubah
SPPH ke menjadi 1
checker thn
Penunjuk GM DAAN 5/7/17
an CV Fajar U 21-Sep-17 20-Sep-20 29/6/17 28-Jun-17 28-Jun-17
Langsung s/d
30/6/17
4. Doc
DUR ke
GM DAAN
3/7/17
5. Doc
dikoment
GM DAAN
perihal
fasilitas
digudang
3/7/17
6. Doc
dikembali
kan ke
user
perihal
1. draft 1. Doc
DUR sementar
pararel a di hold
SPPH perihal
27/6/17 fasilitas
2. draft digudang
DUR 2. Doc
pararel dikembali
SPPH ttd kan ke
mgr user
dansa perihal
28/6/17 jangka
3. Doc waktu 3
DUR thn
pararel dirubah
SPPH ke menjadi 1
checker thn
Penunjuk GM DAAN 5/7/17
an CV Fajar U 21-Sep-17 20-Sep-20 29/6/17 28-Jun-17 28-Jun-17
Langsung s/d
30/6/17
4. Doc
DUR ke
GM DAAN
3/7/17
5. Doc
dikoment
GM DAAN
perihal
fasilitas
digudang
3/7/17
6. Doc
dikembali
kan ke
user
perihal
1. draft D
1.
Penunjuk menungg
an CV Fajar U 21-Sep-17 20-Sep-18 u SK ke
Langsung panitiaan
intern
pjdsp utk
penandat
anganan
DUR
1. draft
DUR
pararel
SPPH
27/6/17
2. draft
DUR
pararel
SPPH ttd
mgr
dansa
28/6/17
3. Doc
DUR
pararel
SPPH ke
checker
Penunjuk GM DAAN
an CV Fajar U 21-Sep-17 20-Sep-18 29/6/17 28-Jun-17 28-Jun-17
Langsung s/d
30/6/17
4. Doc
DUR ke
GM DAAN
3/7/17
5. Doc
DUR di ttd
GM DAAN
3/7/17
6.
menungg
u balasan
SPPH CD
7/7/17
1. draft DUR
pararel SPPH
27/6/17
2. draft DUR
pararel SPPH
ttd mgr dansa
28/6/17
3. Doc DUR
pararel SPPH
ke checker
GM DAAN
29/6/17 s/d
30/6/17
4. Doc DUR
ke GM DAAN
3/7/17
5. Doc DUR di
ttd GM DAAN
Tony Kuntj 1-Sep-17 31-Aug-18 3/7/17 28-Jun-17 28-Jun-17 29-Jun-17
6. Doc DUR
ke lt 3 ttd D2
plt D3 3/7/17
7. Doc DUR
kembali ke
dansa perihal
ttd D2
dirubah
menjadi D3
5/7/17
8. Doc DUR
ke lt 3 ttd D3
10/7/17 s/d
12/7/17
1. draft DUR
pararel SPPH
27/6/17
2. draft DUR
pararel SPPH
ttd mgr dansa
28/6/17
3. Doc DUR
pararel SPPH
ke checker
GM DAAN
29/6/17 s/d
30/6/17
4. Doc DUR
ke GM DAAN
3/7/17
5. Doc DUR di
ttd GM DAAN
PT D-Asia 1-Sep-17 31-Aug-18 3/7/17 28-Jun-17 28-Jun-17 29-Jun-17
6. Doc DUR
ke lt 3 ttd D2
plt D3 3/7/17
7. Doc DUR
kembali ke
dansa perihal
ttd D2
dirubah
menjadi D3
5/7/17
8. Doc DUR
ke lt 3 ttd D3
10/7/17 s/d
12/7/17
1. Doc
diterima dari
Staf Daan
Jasa Pabrik
6/7/17
2. menunggu
daftar
rekanan dari
user 7/7/17
3. Pengingat
1 daftar
rekanan dari
user 13/7/17
4. menunggu
surat daftar
rekanan dari
user 13/7/27
s.d 18/7/17
5. menunggu
konfirmasi
rekanan dari
Dept. PPB&J
untuk
didaftarkan
sap 18/7/17
1. Doc DUR
ke checker
GM DAAN
11/7/17
2. Doc DUR
ke GM DAAN
11/7/17
3. Doc DUR di
ttd GM DAAN
11/7/17
4. Doc DUR
ke lt 3 ttd D3
12/7/17
5. Doc DUR
1-Aug-17 31-Jul-20 dibawa Pak
Ryco Daan
Barang ke
Jakarta
13/7/17
1. draft DUR
13/7/17
2. Doc Dur ke
Mgr Dansa
14/7/17
3. Doc Dur di
ttd Mgr
Dansa
14/7/17
4. Doc ke
checker GM
DAAN
14/7/17
5. Doc Dur di
ttd GM DAAN
14/7/17
1-Jul-17 30-Jun-19 6. Doc Dur
dirubah
menjadi
penunjukan
langsung
18/7/17
1. draft DUR
14/7/17
2. menunggu
konfirmasi
rekanan dari
1-Oct-17 30-Sep-20 PIHC 17/7/17
esia pada tgl 3-4 juli 2017
11
12
Target Nilai
Dokumen
User Selesai No. Surat / SR P3/PR
Diterima
(45) Hari
HPS
Dept.
23-Feb-2017 020/SR-DIST/II/2017 2400004241 14,400,000,000
Distribusi
Dept.
23-Feb-2017 027/SR-DIST/II/2017 2400004248 1,700,250,000
Distribusi
Dept.
23-Feb-2017 033/SR-DIST/II/2017 2400004285 1,290,000,000
Distribusi
Dept.
20-Mar-2017 032/SR-DIST/II/2017 2400004295 9,865,558,200
Distribusi
Dept. PSO 1 6-Apr-2017 007/SR-PSO.1/II/2017 2400004392 373,200,000
Dept.
19-Apr-2017 002/SR-DIST/I/2017 2400004061 19,355,850,000
Distribusi
Dept.
19-Apr-2017 066/SR-DIST/IV/2017 2400004796 450,450,000
Distribusi
Dept.
19-Apr-2017 067/SR-DIST/IV/2017 2400004831 303,000,000
Distribusi
Dept. 2400004509
Pemsaran 26-Apr-2017 010/SR PSO-1/III/2017 & 1,701,885,488
PSO 1 2400004508
Dept.
Distribusi 26-Dec-2016 235/SR-DIST/XII/2016 2400003698 2,575,500,000
Nilai Jangka Waktu
Metode Penyedia Jasa
Penunjukan
PT Bromo Transindo 13-May-2017 12-May-2018
Langsung
Penunjukan
PT Bromo Transindo 13-May-2017 12-May-2018
Langsung
21-Feb-2017 20-Feb-2018
Penunjukan
PT Pusri Palembang 1-Apr-2017 31-Mar-2018
Langsung
Penunjukan PT Auto Bagus Utama 1-Apr-2017 31-Mar-2019
Langsung
1. Doc dikembalikan ke PPBJ perihal kelengkapan dokumen vendor di SAP 5/4/17 s/d
10/4/17
2. draft DUR ke checker (agustin) 20/4/17
3. draft DUR ke manag dansa 20/4/17
4. Doc DUR ke checker GM DAAN 25/4/17
5. ttd DUR ke D3 25/4/17 s/d 2/5/17 (Dok ke Lt. 3)
6. Doc DUR di ttd D3 8/5/17
7. draft SPPH ttd manag dansa 16/5/17 CD 22/5/17
8. Doc SPPH ke checker GM DAAN 16/5/17 CD 22/5/17
9. surat pengingat I ke penyedia jasa 22/5/17 s/d 6/6/17
10. surat balasan SPPH diterima 6/6/17
11. negosiasi akan dilakukan dengan penyedia jasa disurabaya (pak tomy)
1. Draft DUR ke checker (agustin) 19/4/17 s/d 21/4/17
2. Revisi DUR 25/4/17
3. draft DUR ke checker (dede) 26/4/17 s/d 27/4/17
4. draft DUR menunggu ttd manag dansa cuti-kembali bekerja 27/4/17 s/d 2/5/17
5. Doc DUR ke checker GM DAAN 2/5/17 s/d 3/5/17
6. Doc DUR di ttd GM DAAN 4/5/17
7. draft SPPH 5/5/17 CD 10/5/17
8. draft Nego 15/5/17 CD 18/5/17
9. draft LUP-SP ke checker (dede) 17/5/17 s/d 18/5/17
10. draft LUP-SP ttd manag dansa 19/5/17
11. Doc LUP-SP ke checker GM DAAN 19/5/17
12. Doc LUP-SP ke GM DAAN 22/5/17
13. Doc LUP-SP di ttd GM DAAN 23/5/17
14. Doc SP menunggu ttd D3 (dinas luar kota-kembali ke btg) (doc ada di daan jasa)
23/5/17
15. Doc SP ke lt 3 ttd D3 24/5/17 s/d 29/5/17
16. Doc SP di ttd D3 29/5/17
17. Doc selesai 29/5/17
1. klarifikasi ke user perihal revisi OE & dokumen permintaan lainnya 20/4/17 s/d 18/5/17
2. Revisi OE akan dikirimkan Dept Distribusi 22/05/2017 (Info GM Rendal Distribusi)
3. Dok dikembalikan ke Dept. PPB&J perihal Revisi OE 22/5/17 cc Dept. Distribusi
4. Doc revisi OE & TOR diterima 23/5/17
1.
5. Doc
Doc dikerjakan disurabaya
DUR ke checker 20/4/17
(agustin) 23/5/17
6. Doc DUR paraf manag dansa 24/5/17
7. Doc DUR ke checker GM DAAN 24/5/17
8.
1. Doc DUR ke lt 3disurabaya
dikerjakan ttd D3 26/5/17 s/d 31/5/17
20/4/17
9. Doc kembali ke daan jasa untuk dibawa ke jkt 2/6/17
10. Doc DUR di ttd D3 2/5/17
11. draft LUP-SP 5/6/17
1.
12.Draft
draftDUR 27/4/17
LUP-SP ke checker (dede) 7/6/17 s/d 8/6/17
2.
13.draft
draftDUR ke checker
LUP-SP (agustin)
ke checker 27/4/17
(agustin) 9/6/17
3. draft DUR ke checker (dede) 27/4/17
4. draft DUR menunggu paraf manag dansa 28/4/17 (cuti-kembali bekerja) s/d 2/5/17
5. Doc DUR ke checker GM DAAN 2/5/17
6. Doc DUR ke GM DAAN 3/5/17
7. Doc DUR di ttd GM DAAN 4/5/17
8. Doc DUR ke lt 3 ttd D3 4/5/17
9. Doc DUR di ttd D3 8/5/17
10. draft SPPH ttd manag dansa 16/5/17 CD 22/5/17
11. Doc SPPH ke checker GM DAAN 16/5/17 CD 22/5/17
12. Doc SPPH di ttd GM DAAN 18/5/17
13. menunggu balasan SPPH CD 22/5/17
14. surat pengingat I ke penyedia jasa 22/5/17 s/d 6/6/17
15. surat balasan SPPH diterima 6/6/17
16. negosiasi akan dilakukan dengan penyedia jasa disurabaya (pak tomy)
1. draft DUR 28/12/16
2. Doc dikembalikan ke Dept. PPBJ perihal perubahan dokumen 29/12/16
3. draft DUR ke checker (dede) 5/1/17
4. draft DUR ke checker (agustin) 6/1/17
5. Doc DUR ke GM DAAN 9/1/17
6. Doc DUR di ttd GM DAAN 9/1/17
7. Doc DUR ke lt 3 ttd D3 11/1/17 s/d 18/1/17
8. Doc DUR di ttd D3 18/1/17
9. draft SPPH 19/1/17 cd 27/1/17
10. Negosiasi 3/2/17
11. Balasan Negosiasi 7/2/17 (masih diatas HPS)
12. Draft surat pengembalian dokumen ke User karena Harga penawaran > HPS
13. Doc BA & pengumuman tender gagal ke checker GM DAAN 21/2/17 s/d 22/2/17
14. Doc BA & pengumuman tender gagal ke GM DAAN 22/2/17
15. Doc BA & pengumumn tender gagal di ttd GM DAAN 23/2/17
16. koordinasi dengan PILOG perihal negosiasi lanjutan (pak tomy)
17. Pengingat Negosiasi 25/4/17 s/d 8/5/17
18. revisi nilai penawaran 9/5/17 s/d 12/5/17
19. draft LUP-SP ke checker (dede) 15/5/17 s/d 16/5/17
20. revisi LUP-SP 16/5/17
21. draft LUP-SP ke checker (dede) 17/5/17
22. revisi LUP-SP 18/5/17
23. draft LUP-SP ke checker (dede) 19/5/17
24. draft LUP-SP ke checker (agustin) 22/5/17
26. draft LUP-SP ttd manag dansa 22/5/17
27. Doc LUP-SP ke checker GM DAAN 23/5/17
28. Doc LUP-SP ke lt 3 ttd D3 26/5/17 s/d 31/5/17
29. Doc kembali ke daan jasa untuk dibawa ke jkt 2/6/17
30. Doc LUP-SP kembali ke lt 3 ttd D4 & D1 5/6/17
31. Doc kembali Ke Dansa 07/6/17
32. Doc dikirim via email ke staf D4 ttd Kesdok - SP 7/6/17
33. Doc via email dikirim staf D4 9/6/17
34. Doc SP menunggu ttd D1 9/6/17 s/d 12/6/17 (doc ada di daan jasa)
35. Doc SP ke lt 3 ttd D1 13/6/17