Keterangan
No Uraian Data Uji
0% 5%
2 Analisis saringan
D10 0.221 Err:509
D30 0.893 Err:509
D60 1.956 Err:509
Cc 1.85 Err:509
Cu 8.86 Err:509
11 Batas Konsistensi
Batas Cair - Liquid Limits (%) 62.18 0.00
Batas Plastis - Plastic Limits (%) 29.80 Err:509
Indeks Plastisitas (Plasticity Index) (%) 32.39 Err:509
SAMPEL - SPECIMEN
No URAIAN DATA
1 2 3
1 Berat picnometer kosong (W1) gram 89.15 89.35
2 Berat picnometer + tanah (W2) gram 125.00 130.00
3 Berat tanah (W2-W1) 35.85 40.65
4 Berat picnometer + tanah + air (W3) gram 354.65 357.75
5 Berat picnometer + air (W4) gram 332.40 332.60
6 Suhu (T) o C 28.00 28.00
7 Faktor koreksi suhu (Ct) 0.9992 0.9992
8 Berat picnometer + air terkoreksi (W4xCt) 332.13 332.33
9 Berat jenis (Gs) = (W1-W2)/(W4.Ct+W2-W1-W3) 2.69 2.67
10 Berat jenis rata-rata 2.68
LABORATORIUM MEKANIKA TANAH
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS NEGERI MALANG
Alamat:Gd D9 Lantai 2 Kampus UM Jl Semarang 05 Malang Telp. 0341 587 082
UJI KADAR AIR; BERAT ISI TANAH (SOIL DENSITY), POROSITAS, ANGKA PORI (VOID RATIO), DERAJAT
KEJENUHAN (DEGREE OF SATURATION)
SAMPEL - SPECIMEN
N0 URAIAN DATA UJI CATATAN
1 2 3
ANALISIS SARINGAN
Proyek : Peta Daerah Rawan Benc. Geologi Tgl Uji : 20 - 29 Nop 2011
Lokasi/ Site : Pandansari - Poncokusumo - Malang Diuji Oleh : Abisatya, dkk.
Sampel : CV. Tirta Adinugraha Deskripsi : 05.Pdsr.Pckm (-3.00 m)
100.00
80.00
60.00
40.00
20.00
0.00
10.000 1.000
66
f(x) = − 1.18651895645728 x + 93.4803606602221
3; 64.90
% Kadar air
64
62 2; 62.18
60
58
56
54
52
1; 51.32
50
1 10
N (jumlah pukulan)
B. Batas Plastis
No Uraian Uji Sampel Uji Sampel 01
1 Berat cawan kosong (W1) gram 16.5
Proyek : Perenc. Pembangunan Jar. Irigasi (Paket 1) Tanggal Uji : 13 - 14 Mei 2011
Konsultan : CV. Tirta Adinugraha Diuji Oleh : Abisatya, dkk.
Sampel Uji : Site 01.1 Diperiksa oleh
Waktu (dt) Deformasi Dial Beban Gaya Geser Teg. Geser Dial Beban Gaya Geser Teg. Geser Dial Beban Gaya Geser Teg Geser
1.000
0 0 0 0
4 2 4 21 0.800
8 16 17 33
12 20 32 39
16 26 46 44 0.600
20 51 - 54 53
24 65 63 76
0.400
28 70 70 82 -
32 f(x) = 0.193040004535714 x + 0.241376968666667
76 85 93
36 85 91.00 100 0.200
40 91 7.39648 0.261491717 108 8.77824 0.310341818 110 94.08 0.31608889
44 89 102 99
0.000
48 88 101 96 0.0000 0.2000 0.4000 0.6000 0.8000 1.0000 1.2000
52 85 100 94
Hasil c = 0.430 Ø = 10.92
Proyek : Specimen No 1
Lokasi : Tinggi Specimen (Cm) 9.00
Deskripsi Specimen : Diameter Specimen (Cm) 5.00
Tanggal Uji : Luas Tampang Tanah 19.64285714
Diuji Oleh : Kalibrasi Proving Ring (Kgf/Div) 0.509
0.600
0.500
Tegangan σ (Kg/Cm2)
0.400
0.300
0.200
0.100
0.000
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
%
R
n
e
ɛ
g
)
LABORATORIUM MEKANIKA TANAH
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS NEGERI MALANG
Alamat : Gedung D9 Lantai 2 Kampus UM Jl. Semarang 5 Malang 65145 Telp. (0341) 587 082
Rearata 0.000099328
16 0.00008632
Rerata k 1.49988730837329E-05
16 0.00001303
LABORATORIUM MEKANIKA TANAH
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS NEGERI MALANG
Alamat : Gedung D9 Lantai 2 Kampus UM Jl. Semarang 5 Malang 65145 Telp. (0341) 587 082
0 0
1 1 3.00 1 2.6341
Chart Title
2 2 2 4.2010
T
3 3
e
4 g. 4
2.00
5 5
G 1 0.8170
e
Column B 2 1.1005
s 1.00
e 0.2208
r
(
12.4488
K 0.00
g/ 0.4079
0.00 1.00 2.00 3.00 4.00 5.00 6.00
C
m Teg. Normal (Kg/Cm2)
2
)
LABORATORIUM MEKANIKA TANAH
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS NEGERI MALANG
Alamat : Gedung D9 Lantai 2 Kampus UM Jl. Semarang 5 Malang 65145 Telp. (0341) 587 082
0 0
1 1 3.00 1 2.5826
Chart Title
2 2 2 4.3530
T
3 3
e
4 g. 4
2.00
5 5
G
1 0.7913
e
Column B 2 1.1765
s 1.00
e 0.2781
r
(
15.5350
K 0.00
g/ 0.2891
0.00 1.00 2.00 3.00 4.00 5.00 6.00
C
m Teg. Normal (Kg/Cm2)
2
)
LABORATORIUM MEKANIKA TANAH
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS NEGERI MALANG
Alamat : Gedung D9 Lantai 2 Kampus UM Jl. Semarang 5 Malang 65145 Telp. (0341) 587 082
0 0
1 1 1 2.5826
2 2
3.00 Chart Title 2 4.4182
T
3 3
e
4 g. 4
2.00
5 5
G 1 0.7913
e
Column B 2 1.2091
s 1.00
e 0.2947
r
( 16.4130
K 0.00
g/ 0.2611
0.00 1.00 2.00 3.00 4.00 5.00 6.00
C
m Teg. Normal (Kg/Cm2)
2
)
LABORATORIUM MEKANIKA TANAH
JURUSAN TEKNIK SIPIL - FAKULTAS TEKNIK
UNIVERSITAS NEGERI MALANG
Alamat: Gedung D2 Lantai 2 Kampus UM Jl. Semarang 5 Malang Telp./Fax (0341) 587082
Data Mould 1 2 3
1 Diameter Mould (Ø) cm 10.5 10.5 10.5 10.5 10.5 10.5
2 Tinggi Mould (h) cm 11.9 11.9 11.9 11.5 11.5 11.5
3 Volume Mould (Vm) cc 1029.9 1029.9 1029.9 1029.9 1029.9 1029.9
Kesimpulan Uji
1 Kepadatan / Berat Isi Tanah kering Maks. (gr/cc) 1.67
2 Kadar Air Optimum Pemadatan (%) 27.50
K epa da ta n T nh (g r/cc)
Titik Uji
No. Uraian / Data Uji
1 2
1 Berat Nampan (W7) 95 95
2 Berat Tanah Galian Lubang + Nampan (W8) 2,403 2,563
3 Berat Tanah Galian Lubang (W9) 2308 2468.2
4 Berat botol + kerucut + pasir sebelum pengujian (W10) 7,700 7,400
5 Berat botol + kerucut + pasir setelah pengujian (W11) 4,280 3,450
6 Berat Pasir dalam Kerucut (Wc = W4-W5) 1,760 1,760
7 Volume Lubang (V = W10 - W11 - Wc)/γ sand rerata) 1145.67 1511.45
4 Volume Botol Uji = Berat Air dlm Botol Uji (W3-W1) 4,700 4,700
5 Berat Pasir dalam Botol Uji (W2 - W1) 6,810 6,810
: 19 Desember 2010
: Wawan dan E. Suwarno
Diperiksa Oleh : E. Suwarno
Titik Uji
3 4 5 6
95 95 95 95
1,335 1,184 1,184 1,184 2,700 2,880 1,500 1,330 1,330
1240 2450 2430 2000
7,040 7,600 6,820 6,240
4,300 3,680 3,320 3,050
1,760 1,760 1,760 1,760
676.36 1490.75 1200.88 986.93
Cb 03 Catatan
700
7,510
5,400
4,700
6,810
7,510
5,750
1,760
1.45
1.45
1,330
93.61
LABORATORIUM MEKANIKA TANAH
JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK
UNIVERSITAS NEGERI MALANG
Gedung D2 Lt 2 Kampus UM Jl. Surabaya 6 Malang Telp/Fax: (0341) 587 082 Ext. 205
Def. Read
Waktu Beban (Menit) √t (menit) Dial Read (Div)
(mm)
8.00
0
0 0.00 8.00 0.00 0
0.25 0.50 7.25 0.75
1.00 1.00 6.85 1.15
0.25
2.25 1.50 6.70 1.30
4.00 2.00 6.61 1.39
0.5
6.25 2.50 6.55 1.45
9.00 3.00 6.50 1.50
12.25 3.50 6.46 1.54 0.75
m
m
1
D
P
e
b
a
a
a
n
e
f.
c
2
4320.00 65.73
183.75
Def. Read
Waktu Beban (Menit) √t (menit) Dial Read (Div)
(mm)
6.36
0 0.00 6.36 0.00 0.00 5.00
0.00
0.25 0.50 6.28 0.08
1.00 1.00 6.23 0.13
2.25 1.50 6.20 0.16
4.00 2.00 6.18 0.18 0.10
6.25 2.50 6.16 0.20
9.00 3.00 6.14 0.22
12.25 3.50 6.13 0.23
0.20
16.00 4.00 6.12 0.24
mb
Pe
De
(m
m)
aa
ac
0.40
0.30
1 2 3 4 5 6
√ t (menit)
0 5 10 15 20
0
0.25
0.5
0.75
m
m
1
D
a
a
n
e
f.
c
1.25
1.5
24
1.75
2
1.75
ON TEST)
√ t (menit)
0.10
0.20
De
(m
m)
f.
0.30
0.40
0.30
0.40
0.50
ON TEST)
7 8 9
1 1
Kedalaman Penetrasi (m)
2 2
3 3
4 4
5 5
4 4
5 5
6 6
7 7
8 8
: TS 01
: + 0.00 M
: Lanau berlempung
Ratio Gesekan
(FR)'= (HP/PK)x100
(%)
0.00 0.00
10.00 2.50
10.00 5.00
10.00 7.50
10.00 10.00
10.00 12.50
10.00 15.00
10.00 17.50
10.00 20.00
5.00 22.50
3.33 25.00
10.00 35.00
6.00 42.50
5.00 47.50
5.00 50.00
10.00 52.50
10.00 55.00
5.00 57.50
5.00 60.00
5.00 62.50
3.33 65.00
3.33 67.50
3.33 70.00
6.67 75.00
6.67 80.00
6.67 85.00
6.67 90.00
5.00 95.00
10.00 112.50
6.67 162.50
6.67 212.50
AI
: TS 01
: + 0.00 M
: Lanau berlempung
10 15 20
CONSOLIDATION DATA SHEET
UJI INDEKS TANAH LUMPUR LAPINDO 2018 APRIL 07
Load Time (Mnt) √t (menit) Dial Read (Div) Load Time (Mnt) √t (menit) Dial Read (Div)
800.00
0 0.00 0 0.00
0.25 0.50 0.25 0.50
1.00 1.00 1.00 1.00
2.25 1.50 2.25 1.50
4.00 2.00 4.00 2.00
6.25 2.50 6.25 2.50
9.00 3.00 9.00 3.00
12.25 3.50 12.25 3.50
16.00 4.00 16.00 4.00
20.25 4.50 20.25 4.50
25.00 5.00 25.00 5.00
36.00 6.00 36.00 6.00
60.00 7.75 60.00 7.75
120.00 10.95 120.00 10.95
240.00 15.49 240.00 15.49
480.00 21.91 480.00 21.91
1440.00 37.95 1440.00 37.95
2880.00 53.67 2880.00 53.67
4320.00 65.73 4320.00 65.73
Final Dial Read Perub. Tinggi Tinggi Akhir Tinggi Pori Angka Pori
Tekanan (kg/cm2)
(Div) Specimen (mm) Specimen (mm) (mm) Akhir e
1 2 3 4 5 6