HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
A BIAYA PERSIAPAN
1 Mobilisasi
Pantai Tiberias dan Poigar Ls 1 - -
Pantai Nonapan Ls 1 - -
Pantai Bolaang Ls 1 - -
Pantai Ambang Ls 1 - -
Pantai Sampiro Ls 1 - -
2 Demobilisasi
Pantai Tiberias dan Poigar Ls 1 - -
Pantai Nonapan Ls 1 - -
Pantai Bolaang Ls 1 - -
Pantai Ambang Ls 1 - -
Pantai Sampiro Ls 1 - -
B BIAYA KONSTRUKSI
PANTAI TIBERIAS DAN POIGAR
1 Galian Tanah m3 6,006.62 - -
2 Buis Beton Segi Delapan -
2.1.Pencetakan Buis Beton K-225 + Cetakan -
H = 0.50 m Bh 5,520.00 - -
2.2. Pemasangan Buis Beton -
H = 0.50 m Bh 5,520.00 - -
3 Anker Diam. 16mm -
a. Horizontal Bh 8,824.00 - -
b. Vertical Bh 13,232.00 - -
4 BetonCyclop ( 60 % Beton 1 : 2 : 3 Dan 40 % Batu Belah ) m3 1,631.72 - -
5 Pasangan Batu 200 kg - 500 kg ( Void Maximum 32% ) m3 5,234.84 - -
6 Pasangan Batu 30 kg - 50 kg ( Void Maximum 25% ) m3 742.50 - -
7 Geotextil m2 4,400.00 - -
8 Plesteran 1 : 3 m2 2,083.52 - -
9 Urugan m3 - - -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
PANTAI NONAPAN
1 Galian Tanah m3 5,460.56 - -
2 Buis Beton Segi Delapan - -
2.1.Pencetakan Buis Beton K-225 + Cetakan - -
H = 0.50 m Bh 5,020.00 - -
2.2. Pemasangan Buis Beton - -
H = 0.50 m Bh 5,020.00 - -
3 Anker Diam. 16mm - -
a. Horizontal Bh 8,024.00 - -
b. Vertical Bh 12,032.00 - -
4 BetonCyclop ( 60 % Beton 1 : 2 : 3 Dan 40 % Batu Belah ) m3 1,483.77 - -
5 Pasangan Batu 200 kg - 500 kg ( Void Maximum 32% ) m3 2,228.43 - -
6 Pasangan Batu 30 kg - 50 kg ( Void Maximum 25% ) m3 675.00 - -
7 Geotextil m2 3,565.00 - -
8 Plesteran 1 : 3 m2 1,894.26 - -
9 Urugan m3 1,391.44 - -
PANTAI BOLAANG
1 Galian Tanah m3 1,638.17 - -
2 Buis Beton Segi Delapan - -
2.1.Pencetakan Buis Beton K-225 + Cetakan - -
H = 0.50 m Bh 1,520.00 - -
2.2. Pemasangan Buis Beton - -
H = 0.50 m Bh 1,520.00 - -
3 Anker Diam. 16mm - -
a. Horizontal Bh 2,424.00 - -
b. Vertical Bh 3,632.00 - -
4 BetonCyclop ( 60 % Beton 1 : 2 : 3 Dan 40 % Batu Belah ) m3 448.12 - -
5 Pasangan Batu 200 kg - 500 kg ( Void Maximum 32% ) m3 1,441.00 - -
6 Pasangan Batu 30 kg - 50 kg ( Void Maximum 25% ) m3 202.50 - -
7 Geotextil m2 1,200.00 - -
8 Plesteran 1 : 3 m2 569.44 - -
9 Urugan m3 - - -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
PANTAI AMBANG
1 Galian Tanah m3 3,276.34 - -
2 Buis Beton Segi Delapan - -
2.1.Pencetakan Buis Beton K-225 + Cetakan - -
H = 0.50 m Bh 3,020.00 - -
2.2. Pemasangan Buis Beton - -
H = 0.50 m Bh 3,020.00 - -
3 Anker Diam. 16mm - -
a. Horizontal Bh 4,824.00 - -
b. Vertical Bh 7,232.00 - -
4 BetonCyclop ( 60 % Beton 1 : 2 : 3 Dan 40 % Batu Belah ) m3 891.97 - -
5 Pasangan Batu 200 kg - 500 kg ( Void Maximum 32% ) m3 2,845.38 - -
6 Pasangan Batu 30 kg - 50 kg ( Void Maximum 25% ) m3 405.00 - -
7 Geotextil m2 2,400.00 - -
8 Plesteran 1 : 3 m2 1,137.22 - -
9 Urugan m3 - - -
B. BIAYA SMK3
I. Alat pelindung Diri terdiri atas:
1 Topi Pelindung (Safety Helmet); Bh 150.00 - -
2 Pelindung Mata (Goggles, Spectacles); Psg 150.00 - -
3 Pelindung Pernafasan dan Mulut (Masker); Bh 150.00 - -
4 Sarung Tangan (Safety Gloves); Psg 150.00 - -
5 Sepatu Keselamatan (Safety Shoes); Psg 150.00 - -
6 Rompi Keselamatan (Safety Vest); Bh 150.00 - -
7 Jas Hujan (Rain Coat) Bh 25.00 - -
II. Fasilitas Sarana Kesehatan -
1 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dan Obat Lainnya)Ls 5.00 - -
III. Rambu - Rambu -
1 Rambu Petunjuk Bh 25.00 - -
2 Rambu Larangan Bh 25.00 - -
3 Rambu Pekerjaan Sementara Bh 25.00 - -
ALFIANUS PALISUNGAN, ST
NIP. 197509292006041005