Anda di halaman 1dari 1

TABEL KONVESI PENYALURAN DANA BOS KE PERENCANAAN / PENGGANGGARAN

Unitcost 900,000 SD
Jumlah PD 62
BOS 55,800,000

Penyaluran Perencanaan / Pengganggaran


Bulan Alokasi Salur
Jumlah Per TW Persen Keterangan
% Jml. Salur Per Bulan
JANUARI 5,580,000
FEBRUARI 30% 16,740,000 5,580,000 16,740,000 30.00 Tw I Pencairan Tahap I
MARET 5,580,000
APRIL 4,464,000 Paling Cepat Pencairan Tahap II
MEI 4,464,000 13,392,000 24.00 Tw II
JUNI 40% 22,320,000 4,464,000
JULI 4,464,000
AGUSTUS 4,464,000 13,113,000 23.50 Tw III
SEPTEMBER 4,185,000 Paling Cepat Pencairan Tahap III
OKTOBER 4,185,000
30% 16,740,000
NOVEMBER 4,185,000 12,555,000 22.50 Tw I V
DESEMBER 4,185,000
Jumlah : 55,800,000 55,800,000 100.00

Anda mungkin juga menyukai