Data Perencanaan :
jenis atap = Genteng
berat genteng = 50 kg/m2
jarak antar gording = 1.75 m
jarak antar kuda-kuda = 3.7 m
bentang kuda-kuda = 22 m
tinggi kuda-kuda = 13.5 m
berat penggantung = 18 kg/m2
kemiringan atap (a) = 45
BJ 37 fy = 240
Dicoba Profil = C 150.65.20.2,3
Data :
h = 150 mm
b = 65 mm
c = 20 mm
t = 2.3 mm
Ix = 246 cm4
Iy = 41 cm4
W = 5.5 kg/m
Perencanaan Gording
Panjang Batang Miring = 19.5 m
Jarak gording rencana = 2m
Jumlah medan = 9.75 10
1. Tinjauan Beban
Tinjauan Beban Mati Gording
a). Beban Mati (D)
Berat Gording =
Berat Penutup Atap x jarak antar gording =
Total =
Berat Sambungan (10%) =
D total =
qx = D.cos a =
qy = D . Sin a =
Mx = 1/8 .qx.lx2 =
My = 1/8. qy.Iy2 =
Tinjauan Beban Hidup Gording
a). Bebam Hidup (La)
Beban hidup gording ditetapkan
Kombinasi Pembebanan
kombinasi pembebanan menurut SNI 1727-2013 2.2.2 Hal 11
Kontrol Gording
1). Kontrol terhadap penampang profil
U/ Sayap 14.13
≤ 𝑏/2𝑡 ≤170/√240
u/ badan 65.22
0.381471210283599 0.4420230116
+ ≤1
Untuk mengatasi masalah puntiran maka MnY dapat dibagi 2
+
4). Kontrol lendutan pofil
lendutan ijin (f) =
fy =
fx2 =
fy2 =
Jadi f =
≤𝑓
Perencanaan Penggantung Gording
Data :
Jarak antar kuda-kuda = 3.7 m
Jumlah penggantung = 2 buah
Jumlah gording = 11 buah
Jarak penggantung = 100 cm
panjang miring gording = 175 cm
Pembebanan
Beban Mati
Berat Gording = 5.5 kg/m
Berat Penutup atap = 50 kg/m x jarak antar gording = 87.5 kg/m
berat pengikat dan penggantung (10% total beban mati) = 9.3 kg/m
beban mati total (qD) 102.3 kg/m
perhitungan Gaya
Penggantung Gording tipe A
RA = 1.2 RD + 1.6 RL
RA total = RA x jumlah Gording
β = 43 °
(𝑃𝑎𝑛𝑗𝑎𝑛𝑔 𝑚𝑖𝑟𝑖𝑛𝑔 𝑔𝑜𝑟𝑑𝑖𝑛𝑔)/(𝐿/2)
RB x β = RA
= 5920.8537
untuk leleh
Pu = f x fu x 0.75 x Ag
maka Ag perlu = 4.39
Ag = ¼ x π x d2
d = 3.40 cm
d perlu = 1.84 cm
d pakai = 22 mm
= 2.5945945946
ɸ = 68.92
Perhitungan Gaya yang Bekerja
R = 1 x
2
R1 = 1 x
2
= 111.00 kg
R total = 777.00 kg
Kontrol Leleh
Mutu Baja = BJ 37
Fu = 370 Mpa (N/mm2)
Fy = 240 Mpa (N/mm2)
Pu = ф x
2222.28 = 0.90 x
2222.28 = 2160.00 x
Ag = 1.03 cm2
Kontrol Putus
Pu = ф x
2222.28 = 0.80 x
2222.28 = 2220.00 x
Ag = 1.00 cm2
Ag = 1/4 x
1.00 = 0.25 x
d2 = 1.00
0.79
d2 = 1.27 cm
d = 1.129 cm
d = 11.29 mm
pakai d = 24 mm
Kontrol Kelangsingan
Jarak kuda-kuda = 400
Panjang miring penggantung = 10.29
Zx = 33 cm3
Zy = 9.37 cm3
rx = 5.94 cm
ry = 2.42 cm
medan
uah gording
5.5 kg/m
87.5 kg/m
93 kg/m
9.3 kg/m
102.3 kg/m
= 1.85 m
123.79 kgm
30.95 kgm
P (PPIUG-1983) = 100 Kg/m2
65.41 kgm
32.70 kgm
16.14 kompak
108.44 kompak
= 122.95 cm
7,128,000 Nmm
2,023,920 Nmm
2,719,127 Nmm
894,619 Nmm
0.823494222
= 2.06 cm
= 369.8918
= 4068.81
= 0.945946
0.687199854
𝑔𝑜𝑟𝑑𝑖𝑛𝑔)/(𝐿/2)
18.43 mm
W x C x A
25 x 0.5 x 18
R total
777.00 kg
(TEKAN)
S3 x 0.36 = 0
S3 x 0.36 = 666.00
S3 = 1851.90 kg
1.6 x 0.75
fy x Ag
2400 x Ag
Ag
fu x Ag x 0.75
3700 x Ag x 0.75
Ag
(OK)
π x d2
3.14 x d2
cm
m = 10288.34 mm
3) Data material
Mutu baja : BJ 37 Fy= 240 MPa
Fu= 370 MPa
Modulus Elastisitas = 200,000 MPa
Periksa Kelangsingan
Flens = = 6.9444444
= 16.137431
< OK
Web = 41.666667
= 42.925565
< OK
λcx = = 0.6615947
ωx = 1.236
Nn = Ag . fcr = Ag . 165.34215
Nn = 0.731 ton 0
= 0.190 <1 OK
λcy = = 1.65
ωy = 3.3869
Nn = Ag . fcr = Ag .
Nn = 0.267 ton
= 0.521 <1 OK
Kontrol Geser
menurut persamaan 5.21 LRFD hal 94
Cek persamaan
ℎ/𝑡𝑤< 1100/√𝑓𝑦
𝐽=Σ (1/3.𝑏.𝑡^3)
59537.33 mm4
t = tebal sayap, b = lebar, +(h= tinggi -(2.tf) + tw 3
𝐶𝑤=ℎ^2 .𝐼𝑦/4 426895350 388531 x 104
4
untuk Iy dikali 10
𝜆=√((𝐺.𝐽)/(𝐸.𝐶𝑤))
0.0118
Untuk mencegah leleh dari web, maka panjang tumpuan ditentukan oleh :
𝜙.𝑃𝑛= 𝜙 . 𝑓𝑦. 𝑡𝑤 .(𝑁+2,5𝑘)
𝑁=𝑃𝑢/𝜙𝑥𝑓𝑦𝑥𝑡𝑤−2,5𝑘
34.802
periksa terhadap kuat tekuk dukung kapstang
𝜃.𝑃𝑛=0,75 𝑥 0,39 . 〖𝑡𝑤〗 ^2 (1+3𝑁/𝑑 (𝑡𝑤/𝑡𝑓)^1,5.√((𝐸.𝑓𝑦.𝑡𝑓)/𝑡𝑤)
Dengan
Pu = 47306.02 N
d= 250 mm
tf = 9 mm
tw = 6 mm
Maka diperoleh N = 34.802
karena N/d = 0.139 < 0.2
maka harus diperiksa dengan persamaan
𝜃.𝑃𝑛=0,75 𝑥 0,39 . 〖𝑡𝑤〗 ^2 (1+(4 𝑥 𝑁/𝑑 〖− 0,2(𝑡𝑤/𝑡𝑓) 〗 ^1,5.√((𝐸.𝑓𝑦.𝑡𝑓)/𝑡𝑤)
= 106704.79
Pn 142,273 > 47,306 OK
tebal pengaku diambil sebesar 8 mm, sehingga ukuran las efektif maksimum dapat ditentukan sebagai berikut
0,707 𝑥 (𝑓𝑢.𝑡𝑠)/(𝑓𝑢 𝑙𝑎𝑠)
a maks efektif = = 3.269875 mm
= 3 mm
panjang las yang diperlukan (L) ditentukan dengan persamaan
𝑅= 𝑃𝑢/(2,4 .𝐿^2 )=√(16𝑥 〖𝑒𝑠〗 ^2+ 𝐿^2 )
cm3
cm3
mm
mm
cm4
mm2
20.35 kg
323.75 kg
51.8 kg
395.9 kg
39.59 kg
435.49 kg
45.363542 kg/m
kg
kg/m
25 kg/m2
0.5
-0.4
100 kg/m
-80 kg/m
70.711 kg/m
-56.569 kg/m
100 kg/m
-80 kg/m
dapat ditentukan sebagai berikut :
PERHITUNGAN PLAT L
1.1.b Beban mati dengan beban kamar mandi(WD ) ; PPIUG 1983 hal.11
Berat sendiri pelat (tebal 12 cm) = 15
Berat spesi lantai (2 cm) = 3
Beban penutup lantai (1 cm) = 1
Beban pasir (1 cm) = 1
Beban plafond + penggantung
Instalasi ME
Beban bak mandi
- Beban dasar bak
- Beban dinding bak
- Berat air
Tebal pelat = 15 cm
Tebal selimut beton = 3 cm
Tul Utama = 10 mm
Tul bagi = 10 mm
Dx = 115 mm
Dy = 105 mm
β = Ly = 6 = 1.5 ≤
Lx 4
Menentukan momen
Mlx = 0,001 x WU x Lx² x X1
= 0.001 x 14.3 x 4 2
x
= 8.2 kN.m
Kontrol → Rn
Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul
Kontrol → ɸMn
Kontrol → Rn
Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul
Kontrol → ɸMn
Kontrol → Rn
Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul
Kontrol → ɸMn
Kontrol → Rn
Karena ρ ρ min
Luas tulangan yang digunakan
Digunakan tulangan ɸ 10
Jumlah tulangan
Jarak tulangan dalam 1 m,
Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul
Kontrol → ɸMn
Nb. Untuk penulangan plat lantai type 2-10 dianggap sama dengan penulangan type 1
Mutu beton,
Modulus Elastisitas Beton,
Modulus Elastisitas Baja,
Beban merata (tak terfaktor) pada plat,
Panjang bentang plat,
Batas lendutan maksimum yang diijinkan,
Momen inersia brutto penampang plat,
Modulus keruntuhan lentur beton,
Nilai perbandingan modulus elastis,
Jarak garis netral terhadap sisi atas beton,
Momen retak :
Momen maksimum akibat beban (tanpa faktor beban) :
= 29.7 kg/m2
= 182.8571 kg/m2
= 120.000 kg/m2 +
= 855.56 kg/m2 332.56
= 8.56 kN/m 2
3.3256
13 Ps.9.5(3(3))
(memenuhi) ok
6 m
4 m
17
76
57
β1 = 0.85
β1 = 0,85 - 0,05*(fc' - 28)/7 = 0.80
Jadi dipakai, β1 = 0.80
600 = 0.036
600 + 400
(0,85*fc')]
0.75 0.0357 400 / 0.85 35
= 0.027
= 0.004
0.8
1000 mm
agai berikut:
150 ≤ 3 x tebal plat = 450 (OK)
As timbul = n * As tulangan = 628.3 mm > As OK
ɸ 10 - 150 (Tabel 13a. Gideon Jilid 1 hal. 82)
agai berikut:
agai berikut:
agai berikut:
an penulangan type 1
fc' = 35 MPa
Ec = 4700 √(𝒇𝒄 = 27805.6 MPa (SNI 2847-2013 ps. 8.5.1 hal. 61)
′)
Es = 200000 MPa
Q = QD + QL = 46.056 kN/m2 4.606 N/mm
Lx = 4000 mm
Lx / 240 = 16.667 mm (SNI 2847-2013 Tabel 9.5(b) hal. 71)
Ig = 1/12*b*h³ = 281250000〖 mm 〗 ^4
fr = 0.7√ fc' = 4.141 MPa
n = Es / Ec = 7.19
c = n * As / b = 3.597 mm
n dihitung sbb. :
Icr = 1/3 * b * c³ + n * A * ( d - c )² = 44654465.481045
〖 mm 〗 ^4
yt = h / 2 = 75 mm
Mcr = fr * Ig / yt = 15529709.430637 Nmm
AMAN
Gambar Detail Penulangan Plat Type 1 (P1)
Diketahaui :
Ukuran b (m)
Balok Anak 1 0.25
Balok anak 0.25
Tebal plat lantai (m) 0.15
Pembebanan Balok
Dari data perhitungan pembebanan plat didapat
qd = 8.56 kN/m2
ql = 2.5 kN/m2
Lx = 8m
Ly = 7m
β₁ = 0.85 - 0.05
= 0.85 - 0.05
= 0.85 - 0.05
= 0.857
ρ balance = 0.85 x
fy
= 0.85 x
350
= 0.05620408 x
= 0.035
ρ maks = 0.75
= 0.75
= 0.0266
ρ min = fc'
4 fy
= 27
4 350
= 0.004
ρ min = 1.4
fy
= 1.4
350
= 0.004
m = fy
0.85 x fc'
= 350
0.85 x 27
= 15.25
Keterangan:
β₁ = 0.8 untuk fc' < 28 Mpa
ρ = kebutuhan tulangan
m = koefisien lawan
Data Perencanaan
Diameter tulangan
Luas tulangan
Diameter tulangan sengkang
luas tulangan sengkang
selimut beton
Balok Anak
Bentang = 700
h = 43.75
b = 25
Tinggi efektif
d = h - p - d tul sengkang - (0,5 x D tul pokok)
d = 435
1,4/𝑓𝑦 𝑥 𝑏𝑥𝑑
As min = =
Mu = 14,382
be
be1 ≤ L = 8000
4 4
be2 ≤ bw + 16t
𝜌 = 1/𝑚 𝑥 (1−√(1−(2 𝑥 𝑅𝑛 𝑥
𝑚)/𝑓𝑦))
ρ = 1
x
15.3
= 0.066 x 1
= 0.066 x 1
= 0.0119
maka di gunakan ρ =
As = ρ x b
= 0.0119 x
= 1299.13 mm²
As tulangan = 380.00
As' = 0.5 x As
= 0.5 x 1299.13
= 649.6 mm²
maka diperoleh jumlah tulangan =
di pasang 4 D 22
Perhitungan kapasitas penampang
As (aktual) = 6
As' (aktual) = 4
a = As f y As ' f y
0.85 f c ' b
= 2281 -
0.85 x
= 46.42
ФMn = 0.8 x As
= 0.8 x 2281
= 87747875.8664764 +
= 297854696
= 29,785 kgm
Tulangan Tumpuan
Mu = 28,764
d = h - d - ɸ tulangan begel - (1/2 x ɸ tulangan pokok)
d = 500
= 435 mm
ᴓ = 0.8
Mn perlu = Mu
ᴓ
= 287641092
0.8
= 359551365.079365
Mn = Mu
Rn = Mn
b x d²
= 359,551,365
250 x 435
= 7.60 N/mm2
𝜌 = 1/𝑚 𝑥 (1−√(1−(2 𝑥 𝑅𝑛 𝑥
𝑚)/𝑓𝑦))
ρ = 1
x
15.3
= 0.066 x 1
= 0.066 x 1
= 0.0275
maka di gunakan ρ =
As = ρ x b
= 0.027 x 250
= 2987.32 mm²
As tulangan = 380.00
As' = 0.5 x As
= 0.5 x 2987.32
= 1493.7 mm²
maka diperoleh jumlah tulangan =
di pasang 4 D 22
a = As f y As ' f y
0.85 f c ' b
= 3041 -
0.85
= 532455.591036222
5737.5
= 92.8
ФMn = 0.8 x
= 0.8 x
= 165529215.385129
= 375,636,035
= 37,564
ФMn = 37,564
Vu = 246.55 kN
= 246,550 N
1/6 𝑥 √𝑓𝑐 x b x d
Vc =
= 0.167 x 27
= 94,180 N
Vs = Vu
- Vc
ɸ
= 246549.51 - 94180.3
0.75
= 234,552 N
Vc + Vs > Vu
94180.3 + 234,552 > 246549.51
328,733 N > 246,550
Syarat jarak tulangan geser tidak boleh melebihi syarat di bawah ini :
● d/2
● 10 x diameter tulangan lungitudinal
● 24 x diameter tulangan geser
f'c = 27 MPa
fy = 350 MPa
b = 250 mm
h = 500 mm
Vu = 246.55 kN
= 246,550 N
1/6 𝑥 √𝑓𝑐 x b x d
Vc =
= 0.167 x 27
= 94,180 N
Vs = Vu
- Vc
ɸ
= 246549.507482993
-94180.3
0.75
= 234552 N
ɸ x Vc = 0.75
= 70635.196996
disimpulkan
Vu > ɸ
Perhitungan geser
Dipasang sengkang ɸ
Av
h (m) L (m)
0.50 8
0.50 7
x qa x Lx ( 1 -1/3 . Lx2/Ly2)
x 24 = 3 kN/m2
qeqtrapesium = 38.65 kN/m2
= 2 kN/m2
qd total = 43.65 kN/m2
+ ( 1.6 x 11.29 )
n yang digunakan
fc' x β₁ x 600
fy 600 + fy
27 x 0.86 x 600
350 600 + 350
0.631578947368
x ρ balance
x 0.035
cm 7 m
= 50 cm
= 25 cm
43.5000 mm2
fc =
fy =
b =
Ф begel =
d
Ф tulangan =
h =
decking (d") =
tebal plat (t) =
ter tulangan
- 14 - 0.5 22
= 2000 mm
2000 mm
143820546
0.8
179775682.539683 N.mm
179,775,683
2
2x Rn x
1 - 1 -
fy
- 7.60050448 x 15.3
1 -
350
- 0.818
< ρ max
0.012 < 0.027
0.012
x d
250 x 435
3.418771500807
= 2281 mm² ......Ok!
1.709385750404
= 1520 mm² ......Ok!
D 22 = 2281 mm²
D 22 = 1520 mm²
1520 x 350
27 x 250
- As' x fy d - a
2
287641092
0.8
359551365.079365 N.mm
359,551,365
2
2x Rn x
1 - 1 -
fy
- 15.20100896 x 15.3
1 -
350
- 0.581
< ρ max
0.027 < 0.027
0.027
x d
x 435
7.861364252418
= 3041 mm² ......Ok!
3.930682126209
= 1520 mm² ......Ok!
D 22 = 3041 mm²
D 22 = 1520 mm²
As ' f y
fc 'b
1520 x 350
x 27 x 250
mm
As - As' x fy d -
+ 210106820
375,636,035 Nmm
37,564 kgm
cara berikut :
D tulangan lungitudinal = 22 mm
ɸ sengkang = 14 mm
ɸ (faktor reduksi geser) = 0.75
d = 435 mm
d" = 40 mm
x 250 x 435
N
N ......Ok!
an geser praktis
Vu < 0,5 . ø Vc
0.5 x 0.75 x 94,180
35,318
mm
x 3.14 x 196
mm 2
x fy x d
S
x fy x 435
Vs
x 350 x 435
234552.4
mm
= 217.5 mm
n lungitudinal = 220 mm
= 336 mm
s
fy
200
350
< Av pasang = 153.9 mm2
D tulangan lungitudinal = 22 mm
ɸ sengkang = 14 mm
ɸ (faktor reduksi geser) = 0.75
d = 435 mm
d" = 40 mm
…SNI – 2847 -2012 Ps 11.2.1
x 250 x 435
80.3
x 94180.3
N
Vc
= 14 mm
= 1/4 x π x d2
= 0.25 x 3.14 x 196
= 153.9 mm 2
= Av x fy x d
S
= Av x fy x d
Vs
= 153.9 x 350 x 435
234552.4
= 100 mm
= 200 mm
s
fy
200
350
< Av pasang = 153.9 mm2 ......(memenuhi)
N.mm
27 Mpa
350 Mpa
250 mm
14 mm
22 mm
500 mm
40 mm
150 mm
mm
m
+ As' x fy d - d'
......Ok!
m
a As' x fy d - d'
+
2
......Ok!
(memenuhi)
A. Data Perencanaan
Type Bangunan = Rektorat
Letak Bangunan = Dataran Rendah
Lokasi Bangunan = Pasuruan
Zona Gempa = Zona 3
Mutu Beton (f'c) = 35 MPa
Mutu Baja (fy) = 400 MPa
Modulus Elastisitas (E) = 27805.6 N.mm
Dimensi Balok B1
Bentang Kolom ke Kolom = Panjang Balok Rencana
= 800 cm
Tinggi Balok Minimum = h min
= 1 x L
18.5
= 1 x 800 x 0.9714
18.5
= 42 cm
Tinggi Balok Pakai = h pakai
= 60 cm
Dimensi Balok B2
Bentang Kolom ke Kolom = Panjang Balok Rencana
= 600 cm
Tinggi Balok Minimum = h min
= 1 x L
18.5
= 1 x 600 x 0.9714
18.5
= 32 cm
Tinggi Balok Pakai = h pakai
= 50 cm
# Note : untuk memudahkan dalam perhitungan dan pelaksanaan dilapangan, maka digunakan dimensi
balok (B1) untuk arah Ly dan balok (B2) untuk arah Lx
C. Dimensi Plat
Dalam pendimensian plat, digunakan luasan plat terbesar dengan bentang Lx dan Ly sebagai berikut :
fy
Ln 0 . 8
Dan tidak boleh kurang dari 125mm
1400
h1
36 5 m 0 . 2
c. Untuk αm ≥ 0,2, ketebalan minimum plat harus memenuhi
fy
Ln 0 .8 Dan tidak boleh kurang dari 90 mm
1400
h2
36 9
a. Pelat Lantai
Tebal Pelat Rencana (hf) = 15 cm
Lebar Balok (bw) = 30 cm
Tinggi Balok (hw) = 60 cm
Panjang Balok (Lb) = 800 cm
hf hf
2 3
be hf hf be
K = 1
1 x x 4 6
4
1 x
bw hw hw hw bw hw
K
be h
f
1 1 x
= 1.637401 bw hw
E balok (4700 * √fc) = 27805.6 kg/cm2
E plat (4700 * √fc) = 27805.6 kg/cm2
I Balok = 1 x K x bw x hw3
12
= 1 x 1.637 x 30 x 216000
12
= 884196.4 cm4
I Pelat = 1 x bs x hf3
12
= 1 x 800 x 3375
12
= 225000 cm4
α = E balok x I balok
E pelat x I pelat
= 27805.57 x 884196.4
27805.57 x 225000
= 3.93
b. Pelat Atap
Tebal Pelat Rencana (hf) = 10 cm
Lebar Balok (bw) = 30 cm
Tinggi Balok (hw) = 60 cm
Panjang Balok (Lb) = 360 cm
2 3
be hf hf hf be hf
K = 1 1 x x 4 6 4
h 1 x
bw hw
h
w w bw hw
K
be hf
= 1.302249 1 1 x
bw hw
E balok (4700 * √fc) = 27805.6 kg/cm2
E plat (4700 * √fc) = 27805.6 kg/cm2
I Balok = 1 x K x bw x hw3
12
= 1 x 1.302 x 30 x 216000
12
= 703214.3 cm4
I Pelat = 1 x bs x hf3
12
= 1 x 360 x 1000
12
= 30000.0 cm4
α = E balok x I balok
E pelat x I pelat
= 27805.6 x 703214.3
27805.6 x 30000.0
= 23.44
Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360
Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760
Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168
1,620,329
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton
Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360
Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760
Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168
1,595,421
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton
Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360
Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760
Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168
1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton
Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360
Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760
Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168
1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton
Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360
Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760
Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168
1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton
Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360
Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760
Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168
1,597,149
BERAT TOTAL LANTAI 1 (Kg)
0.801911 kn/m2
Perancangan Struktur Beton
Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360
Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760
Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168
1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Rangkuman Pembebanan Gedung Universitas 7 Lantai
Beban yang diterima pada Lantai 1
No Lantai Tinggi Berat (Kg) Momen (Kg.m)
1 7 33 1,597,149 52,705,907
2 6 25 1,597,149 39,928,718
3 5 20 1,597,149 31,942,974
4 4 15 1,597,149 23,957,231
5 3 10 1,597,149 15,971,487
6 2 5 1,595,421 7,977,104
7 1 0 1,620,329 -
(memenuhi)
dah memenuhi