Anda di halaman 1dari 122

Perencanaan Gording

Data Perencanaan :
jenis atap = Genteng
berat genteng = 50 kg/m2
jarak antar gording = 1.75 m
jarak antar kuda-kuda = 3.7 m
bentang kuda-kuda = 22 m
tinggi kuda-kuda = 13.5 m
berat penggantung = 18 kg/m2
kemiringan atap (a) = 45
BJ 37 fy = 240
Dicoba Profil = C 150.65.20.2,3

Data :
h = 150 mm
b = 65 mm
c = 20 mm
t = 2.3 mm
Ix = 246 cm4
Iy = 41 cm4
W = 5.5 kg/m

Perencanaan Gording
Panjang Batang Miring = 19.5 m
Jarak gording rencana = 2m
Jumlah medan = 9.75 10

Jarak gording aktual = 1.95 m


Jumlah Gording = 11 buah gording

1. Tinjauan Beban
Tinjauan Beban Mati Gording
a). Beban Mati (D)
Berat Gording =
Berat Penutup Atap x jarak antar gording =
Total =
Berat Sambungan (10%) =
D total =

b). Tinjauan sumbu x-x dan y-y akibat beban mati

qx = D.cos a =
qy = D . Sin a =

c). Tinjauan momen akibat beban mati


pada arah sumbu lemah dipasang trekstang pada tengah bentang sehingga
ly = 0,5 x jarak kuda-kuda

Mx = 1/8 .qx.lx2 =
My = 1/8. qy.Iy2 =
Tinjauan Beban Hidup Gording
a). Bebam Hidup (La)
Beban hidup gording ditetapkan

b). Tinjauan sumbu x-x- dan y-y akibat beban hidup


px = P.Cos a =
py = P.Sin a =

c). Tinjauan momen akibat beban hidup


Mx = 1/4.px.lx =
My = 1/4.py.ly =

Tinjauan Beban Angin Gording


a). Beban Angin (W)
Beban Angin = 25 kg/m2

b). Tinjauan akibat angin


koefisien angin tiup dan hisap menurut PPIUG 1983
koefisien angin tekan =
koefisien angin hisap =
Wt = Ct . W . Jarak gording
Wh = Ch. W . Jarak gording

c). Tinjauan momen akibat beban angin


karena beban angin bekerja tegak lurus sumbu x sehingga hanya ada MX
angin tekan (Mx) =
angin hisap (Mx) =

Kombinasi Pembebanan
kombinasi pembebanan menurut SNI 1727-2013 2.2.2 Hal 11

Besarnya Momen Berfaktor Kombinasi (Mu)


(SNI 1727-2013 2.3.2 hal. 11)
→ Mu = (1,4 x MD)
→ Mu = (1,2 x MD) + (1,6 x ML) + (0,5 x MR)
→ Mu = (1,2 x MD) + (1,6 x ML) + (0,5 x MW)
→ Mu = (1,2 x MD) + (1,0 x MW) + (1,0 x ML) +(0,5
→ Mu = (1,2 x MD) + (1,0 x ME) + (1,0 x ML) + (0,2
→ Mu = (0,9 x MD) + (1,0 x MW)
→ Mu = (0,9 x MD) + (1,0 x ME)

Tabel hasil perhitungan momen berfaktor


No Kombinasi Beban
1 (1,4 x MD)
2 (1,2 x MD) + (1,6 x ML) + (0,5 x MR)
3 (1,2 x MD) + (1,6 x ML) + (0,5 x MW)
4 (1,2 x MD) + (1,0 x MW) + (1,0 x ML) +(0,5 x MR
5 (1,2 x MD) + (1,0 x ME) + (1,0 x ML) + (0,2 x MS
6 (0,9 x MD) + (1,0 x MW)
7 (0,9 x MD) + (1,0 x ME)

Kontrol Gording
1). Kontrol terhadap penampang profil
U/ Sayap 14.13

≤ 𝑏/2𝑡 ≤170/√240
u/ badan 65.22

Asumsikan penampang kompak ≤ ℎ/𝑡 ≤1680/√𝑓𝑦


Maka penampang kompak Mnx = Mpx

2). Kontrol terhadap lateral buckling


Jarak bagut pengikat Lb = 600 mm
Lp = 1.76 x iy x √(E/fy)
Lp > Lb bentang pendek Mnx = Mpx
3). Persamaan Interaksi
dimana 0.9
penampang kompak
Mnx = Zx . Fy =
Φ𝑏=
Mny = Zy . Fy =
Mux = 271.91 kgm
Muy = 89.46 kgm

0.381471210283599 0.4420230116
+ ≤1
Untuk mengatasi masalah puntiran maka MnY dapat dibagi 2
+
4). Kontrol lendutan pofil
lendutan ijin (f) =

lendutan yang terjadi


fx =

fy =

fx2 =

fy2 =
Jadi f =

≤𝑓
Perencanaan Penggantung Gording
Data :
Jarak antar kuda-kuda = 3.7 m
Jumlah penggantung = 2 buah
Jumlah gording = 11 buah
Jarak penggantung = 100 cm
panjang miring gording = 175 cm

Pembebanan
Beban Mati
Berat Gording = 5.5 kg/m
Berat Penutup atap = 50 kg/m x jarak antar gording = 87.5 kg/m
berat pengikat dan penggantung (10% total beban mati) = 9.3 kg/m
beban mati total (qD) 102.3 kg/m

sehinggan RD = qD x sin a x L/2


= 133.82
beban Hidup
qL = 100 kg
sehingga RL = qL x sin a x L/2
= 130.81

perhitungan Gaya
Penggantung Gording tipe A
RA = 1.2 RD + 1.6 RL
RA total = RA x jumlah Gording

penggnatung gording tipe B


arc tan β =

β = 43 °
(𝑃𝑎𝑛𝑗𝑎𝑛𝑔 𝑚𝑖𝑟𝑖𝑛𝑔 𝑔𝑜𝑟𝑑𝑖𝑛𝑔)/(𝐿/2)
RB x β = RA
= 5920.8537

Perencanaan batang Tarik


Pu = 5920.85 kg
BJ = BJ 37
fy = 240 mPa
fu = 370

untuk leleh
Pu = f x fu x 0.75 x Ag
maka Ag perlu = 4.39

untuk batas putus


Pu = f xfu x 0.75 x Ag
Ag perlu = 2.67

Ag = ¼ x π x d2
d = 3.40 cm
d perlu = 1.84 cm
d pakai = 22 mm

Perencanaan Ikatan Angin


1). Data Perencanaan Ikatan Angin
Tekanan Angin (W) = 25 kg/m2
Koefisien Angin tekan (Ct) = 0.5
Koefisien Angin hisap (Ch) = 0.4
a = 45
panjang batang 1 ( jarak antar kuda-kuda) = 3.7 m
panjang batang 2 (1/2 bentang kuda-kuda) = 9.6 m
panjang batang 3 =
= 10.29 m
2). Mencari sudut ɸ
tan ɸ =

= 2.5945945946
ɸ = 68.92
Perhitungan Gaya yang Bekerja
R = 1 x
2
R1 = 1 x
2
= 111.00 kg
R total = 777.00 kg

Menghitung Gaya Normal


N = Ch x
Ct
= 0.4 x
0.5
= 621.60 kg

Menghitung Gaya Batang


Pada titik buhul A
ΣV = 0
R total + S1 = 0
S1 = -R total
S1 = -777.00 kg
Pada titik buhul B
ΣV = 0
R1 + S1 + S3 cos ф = 0
111.00 + -777.00 +

Perencanaan Batang Tarik


Pu = 1851.90 x
= 2222.28 kg

Kontrol Leleh
Mutu Baja = BJ 37
Fu = 370 Mpa (N/mm2)
Fy = 240 Mpa (N/mm2)

Pu = ф x
2222.28 = 0.90 x
2222.28 = 2160.00 x
Ag = 1.03 cm2

Kontrol Putus
Pu = ф x
2222.28 = 0.80 x
2222.28 = 2220.00 x
Ag = 1.00 cm2

Ag = 1/4 x
1.00 = 0.25 x
d2 = 1.00
0.79
d2 = 1.27 cm
d = 1.129 cm
d = 11.29 mm
pakai d = 24 mm

Kontrol Kelangsingan
Jarak kuda-kuda = 400
Panjang miring penggantung = 10.29

d > Panjang miring pengga


500
24 > 10288.34
500
24 > 21
(PPIUG hal 12)

Zx = 33 cm3
Zy = 9.37 cm3
rx = 5.94 cm
ry = 2.42 cm
medan

uah gording

5.5 kg/m
87.5 kg/m
93 kg/m
9.3 kg/m
102.3 kg/m

72.34 Kg/m cos 45 = 0.71 0.7233702372


72.34 Kg/m sin 45 = 0.71 0.7233702372

= 1.85 m

123.79 kgm
30.95 kgm
P (PPIUG-1983) = 100 Kg/m2

70.7 kg/m 0.70710678 kg/cm


70.7 kg/m 0.70710678 kg/cm

65.41 kgm
32.70 kgm

(0.02 . a - 0.4) = 0.5


-0.4 = -0.4
= 21.875 kg/m
= -17.5 kg/m

1/8 . Wt .lx2 = 37.4335938 kgm


1/8 . Wh .lx2 = -29.946875 kgm

MD = Momen akibat beban mati


x ML) + (0,5 x MR) ML = Momen akibat beban hidup
x ML) + (0,5 x MW) MR = Momen akibat beban hujan
x MW) + (1,0 x ML) +(0,5 x MR) MS = Momen akibay beban salju
x ME) + (1,0 x ML) + (0,2 x MS) MW = Momen akibat beban angin
ME = Momen akibat beban gempa

nasi Beban Arah x Arah y


173.30 43.33
L) + (0,5 x MR) 253.20 89.46
L) + (0,5 x MW) 271.91 74.49
W) + (1,0 x ML) +(0,5 x MR) 251.39 39.89
E) + (1,0 x ML) + (0,2 x MS) 213.95 69.84
148.84 -2.09
111.41 27.85

16.14 kompak

108.44 kompak

= 122.95 cm

7,128,000 Nmm
2,023,920 Nmm
2,719,127 Nmm
894,619 Nmm

0.823494222

= 2.06 cm

0.45 + 4.7907E-06 0.445533

0.045079 + 3.1938E-06 0.045082


0.448 < 2.22 OK

= 369.8918
= 4068.81

= 0.945946

0.687199854
𝑔𝑜𝑟𝑑𝑖𝑛𝑔)/(𝐿/2)

(f= 0.75 faktor reduksi leleh)


( f= 0.8 faktor reduksi leleh)

18.43 mm

W x C x A

25 x 0.5 x 18

R total

777.00 kg

(TEKAN)
S3 x 0.36 = 0
S3 x 0.36 = 666.00
S3 = 1851.90 kg

1.6 x 0.75

Mpa (N/mm2) = 3700 kg/cm2


Mpa (N/mm2) = 2400 kg/cm2

fy x Ag
2400 x Ag
Ag

fu x Ag x 0.75
3700 x Ag x 0.75
Ag
(OK)

π x d2
3.14 x d2

cm
m = 10288.34 mm

Panjang miring penggantung


500
(OK)
kg/cm
kg/cm
Perencanaan kuda-kuda
Data :
Bentang kuda-kuda = 19.2 m
Tinggi kolom = 8 m
jarak gording = 1.75 m
jarak antar kuda-kuda = 3.7 m
kemiringan atap = 45 °
mutu baja BJ 37 fy 240 Mpa
fu 370 Mpa
Jumlah Gording = 11 buah
Berat Gording = 5.5 kg/m
Berat atap genteng = 50 kg/m2
3.7 Perencanaan Kapstang
1) Data dari hasil perhitungan STAAD Pro diperoleh :
Mu= 11,353 kgm
Vu= 4,731 kg Ini hitung aps
Nu= 1,183 kgm
2) Data Profil kapstang
Dicoba profil = WF 300.200.9.14

Gambar 3.11 Penampang profil wide flange

h= 250 mm Zx= 324


b= 125 mm Zy= 47
t1(tw)= 6 mm rx= 104
t2(tf)= 9 mm ry= 41.8
Ix= 4050 cm4 Iy= 294
W= 29.6 kg/m Ag= 37.66

Perhitungan Pembebanan dan mekanika


direncanakan Kapstang ukuran 300.200.9.14
a. Beban Mati
Berat sendiri gording (berat gording x jarak kuda-kuda) =
Berat penutup atap (berat atap x L antar gording x L antar kuda-kuda) =
Berat sendiri kapstang (berat WF x jarak gording) =
Total =
Berat smabungan (10%) =
D total =

b. Beban mati merata pada kapstang asumsi pada 1/2 bentang


DΣ𝑃/(0,5
= 𝐿) =
c. Tinjauan Beban hidup (La)
Beban Hidup (La)
Beban hidup gording ditetapkan P = 100
Beban hidup merata
LaΣ𝑃/(0,5
= 𝐿) = 10.42

d Tinjauan beban angin


W angin =
Koefisien angin tekan (0,02 . 𝛼 −0,4) =
Koefisien angin hisap =

pembebanan pada atap


Wt = koef. Angin tekan x jarak portal x W =
Wh = Koef. Angin hisap x jarak portal x W =
Sehingga =
Q = Wt x cos a cos 45 0.71 =
Q = Wh x cos a =

Pembebanan pada kolom tepi


Wt = koefisien angin tekan x jarak portal x W =
Wh = koef angin hisap x jarak portal x W =

e Kombinasi pembebanan pada kuda-kuda


menurut SNI 03-1729-2002 pasal 6.2.2.
Kombinasi Pembebanan Arah X
Kombinasi Beban Arah X (kg/m)
𝑈_1=1,4 𝐷 609.69
𝑈_2=1,2. 𝐷+0,5.𝐿𝑎 572.59
𝑈_3=1,2 𝐷+1,6.𝐿𝑎 682.59
𝑈_4=1,2 𝐷+1,6 𝐿𝑎+0,8.𝑊 739.16
𝑈_5=1,2 𝐷+1,3 𝑊+0,5 𝐿𝑎 664.51
𝑈_6=0,9.𝐷+1,3 𝑊 483.86

Sehingga dipilih U max 739.16

3) Data material
Mutu baja : BJ 37 Fy= 240 MPa
Fu= 370 MPa
Modulus Elastisitas = 200,000 MPa
Periksa Kelangsingan
Flens = = 6.9444444

= 16.137431

< OK

Web = 41.666667
= 42.925565

< OK

penampang dinyatakan kompak

Periksa tegangan kritis daerah elastis


Tumpuan jepit-jepit k= 0.65
Faktor reduksi ϕr = 0.85
Arah sumbu kuat (sumbu x)
λx = = 60

λcx = = 0.6615947

0,25 < λcx < 1,2 ωx =

ωx = 1.236
Nn = Ag . fcr = Ag . 165.34215
Nn = 0.731 ton 0
= 0.190 <1 OK

Arah sumbu kuat (sumbu y)


λy = = 149.28

λcy = = 1.65

λcy > 1,2 ωy = 1.25 λcy2

ωy = 3.3869
Nn = Ag . fcr = Ag .
Nn = 0.267 ton
= 0.521 <1 OK

Kontrol Geser
menurut persamaan 5.21 LRFD hal 94
Cek persamaan
ℎ/𝑡𝑤< 1100/√𝑓𝑦

41.67 < 71.00 OK


persaamaan terpenuhi maka :
syarat kuat geser rencana : 𝜙𝑉𝑛 ≥𝑉𝑢
Dimana :
Vn = 0,60 x fy c Aw Vn = 0,60 x fy x h x tw 216000
Vu = 0,9 x Vn = 194400
Sehingga kuat geser rencana harus memeuhi persamaan
𝑉𝑛/∅ ≥𝑉𝑢
𝜙= 0.9
240000 ≥ 194,400 OK
Torsi Wwarping
T = 10 x 0,05 = 0.5 ton.m
𝐸/𝐺=(2𝐸(1+𝑉))/𝐸 untuk V = 0,3

𝐽=Σ (1/3.𝑏.𝑡^3)
59537.33 mm4
t = tebal sayap, b = lebar, +(h= tinggi -(2.tf) + tw 3
𝐶𝑤=ℎ^2 .𝐼𝑦/4 426895350 388531 x 104
4
untuk Iy dikali 10
𝜆=√((𝐺.𝐽)/(𝐸.𝐶𝑤))

0.0118

Jadi profil IWF 150.75.5.7 aman untuk digunakan

3.7.1 Sambungan Antar Kapstang Puncak


1) Data Teknis
Gaya geser (Vu) = 4730.6 kg
b plat = 250 mm
t plat = 6 mm
Plat BJ 37 Fy = 240 MPa 2400
Fu = 370 MPa
Baut rencana A307 = 1/2'' = 13 mm
F ub = 60 MPa
Ab = 132.665 mm2
Mutu las fu 480 MPa

Perhitungan sambungan diperkaku


menggunakan kapstang profil WF 300.200.14.9
d= 250 mm
tf = 9 mm
tw = 6 mm
k= 3.6 mm

Untuk mencegah leleh dari web, maka panjang tumpuan ditentukan oleh :
𝜙.𝑃𝑛= 𝜙 . 𝑓𝑦. 𝑡𝑤 .(𝑁+2,5𝑘)
𝑁=𝑃𝑢/𝜙𝑥𝑓𝑦𝑥𝑡𝑤−2,5𝑘
34.802
periksa terhadap kuat tekuk dukung kapstang
𝜃.𝑃𝑛=0,75 𝑥 0,39 . 〖𝑡𝑤〗 ^2 (1+3𝑁/𝑑 (𝑡𝑤/𝑡𝑓)^1,5.√((𝐸.𝑓𝑦.𝑡𝑓)/𝑡𝑤)

Dengan
Pu = 47306.02 N
d= 250 mm
tf = 9 mm
tw = 6 mm
Maka diperoleh N = 34.802
karena N/d = 0.139 < 0.2
maka harus diperiksa dengan persamaan
𝜃.𝑃𝑛=0,75 𝑥 0,39 . 〖𝑡𝑤〗 ^2 (1+(4 𝑥 𝑁/𝑑 〖− 0,2(𝑡𝑤/𝑡𝑓) 〗 ^1,5.√((𝐸.𝑓𝑦.𝑡𝑓)/𝑡𝑤)

= 106704.79
Pn 142,273 > 47,306 OK

untuk seat plate digunakan pelat dengan ketebalan 11 mm


ukuran las minimum 6 mm

W perlu = N + set back = 40.802 mm


ketebalan pengaku (ts) ditentukan sebagai berikut :
𝑇𝑠 ≥𝑡𝑤 = 6 mm
𝑡𝑠 ≥ 𝑤/(250 . √𝑓𝑦)
= 2.5283994 mm
𝑒𝑠=𝑊 −𝑁/2
= 23.400935 mm
𝑡𝑠 ≥ (𝑃𝑢.(6.𝑒𝑠−2𝑊))/(𝜙.(1.8.𝑓𝑦).𝑊^2 )
= 5.1570626 mm
6 ≥ 5.1570626 OK

tebal pengaku diambil sebesar 8 mm, sehingga ukuran las efektif maksimum dapat ditentukan sebagai berikut
0,707 𝑥 (𝑓𝑢.𝑡𝑠)/(𝑓𝑢 𝑙𝑎𝑠)
a maks efektif = = 3.269875 mm
= 3 mm
panjang las yang diperlukan (L) ditentukan dengan persamaan
𝑅= 𝑃𝑢/(2,4 .𝐿^2 )=√(16𝑥 〖𝑒𝑠〗 ^2+ 𝐿^2 )

untuk desain LFRD maka :


𝑅= 𝜙.𝑅𝑛 = 𝜙(0.707.𝛼)(0,6 𝑥 𝑓𝑢 𝑙𝑎𝑠) = 458.136 N/m
Sehingga panjang las sekarang dapat dihitung sebagai berikut
𝑅= 𝑃𝑢/(2.4𝑥𝐿^2 )=√(16 𝑥 〖𝑒𝑠〗 ^2+𝐿^2 )

L= 48,8 0.054023 8761.6598


0.0024831
jadi digunakan las ukuran 5 mm dengan panjang 5 cm
19200 mm
8000

cm3
cm3
mm
mm
cm4
mm2

20.35 kg
323.75 kg
51.8 kg
395.9 kg
39.59 kg
435.49 kg

45.363542 kg/m
kg

kg/m

25 kg/m2
0.5
-0.4

100 kg/m
-80 kg/m

70.711 kg/m
-56.569 kg/m

100 kg/m
-80 kg/m
dapat ditentukan sebagai berikut :
PERHITUNGAN PLAT L

1. Pembebanan pelat lantai 1-8


Fy = 400 Mpa
Fc' = 35 Mpa
BJ Beton bertulang = 2400 kg/m3
Berat Spesi Lantai (1 cm) = 21 kg/m2
Berat Penutup Lantai (1 cm) = 24 kg/m2
Berat Tembok 1/2 bata = 250 kg/m2
Berat Plafond + penggantung = 18 kg/m2
Berat Pasir = 18 kg/m2
Instalasi ME = 40 kg/m2
Beban Hidup Lantai Gedung = 250 kg/m2

1.1.a Beban mati (WD ) ; PPIUG 1983 hal.11


Berat sendiri pelat (tebal 15 cm) = 15
Berat spesi lantai (2 cm) = 3
Beban penutup lantai (1 cm) = 1
Beban pasir (5 cm) = 5
Beban plafond + penggantung
Instalasi ME

1.1.b Beban mati dengan beban kamar mandi(WD ) ; PPIUG 1983 hal.11
Berat sendiri pelat (tebal 12 cm) = 15
Berat spesi lantai (2 cm) = 3
Beban penutup lantai (1 cm) = 1
Beban pasir (1 cm) = 1
Beban plafond + penggantung
Instalasi ME
Beban bak mandi
- Beban dasar bak
- Beban dinding bak
- Berat air

1.2 Beban hidup ( WL ) ; PPIUG 1983 hal.17


Beban hidup untuk bangunan perkuliahan =

1.3 Beban Ultimate (WU) ......SNI 2847-2013 pa


WU = 1.2 WD + 1.6 WL
= 1.2 8.56 + 1.6 2.5
= 14.3 kN/m2

2. Tebal Efektif Plat


Perhitungan dimensi plat dua arah berdasarkan SNI 2847-2013 Ps.9.5(3(3)), bagi tebal plat sebagai berikut :
a. Untuk αm ≤ 0,2, menggunakan pasal 9.5.(3(2))
b. Untuk 0,2 < αm < 0,2, ketebalan minimum plat harus memenuhi Dan tidak boleh kurang dari 125mm
c. Untuk αm ≥ 0,2, ketebalan minimum plat harus memenuhi Dan tidak boleh kurang dari 90 mm

tebal pelat rencana = 15 cm


lebar balok (bw) = 35 cm
tinggi balok (hw) = 60 cm
panjang balok = 700 cm

lebar efektif balok tengah (be)


be 1 = L = 700 = 175 cm
4 4
be 2 = bw + 16 x hf
= 35 + 16 x 15
= 275 cm
be 3 = 1 x Lb - bw
2
= 1 x 700 - 35
2
= 332.5 cm

Lebar efektif balok tepi (be)


be 1 = bw + L
12
= 35 + 700
12
= 93.333333 cm
be 2 = bw + 6 x hf
= 35 + 6 x 15
= 125 cm
be 3 = bw + 1 x Lb
2
= 35 + 1 x 700
2
= 385 cm
be pakai = 93.333333 cm ......(be yang terkecil)

E balok (4700 * √fc) = 27805.6 kg/cm2


E plat (4700 * √fc) = 27805.6 kg/cm2
I Balok = 1 x x bw x hw3
12
= 1 x 1 x 35 x 216000.000
12
= 630000.0 cm4
I Pelat = 1 x bs x hf3
12
= 1 x 700 x 3375
12
= 196875 cm4
α = E balok x I balok
E pelat x I pelat
= 27805.57 x 630000.0
27805.57 x 196875
= 3.20

Untuk α > 2, ketebalan minimum harus memenuhi .....SNI 2847-2013 Ps.9.5(3(3))


h = Ln x 0.8 + fy
1400
36 + 9β
= 665 x 0.8 + 400
1400
36 + 9
= 16 cm ≥ 15 cm (memenuhi)
Jadi rencana penggunaan pelat tebal 16 = sudah memenuhi

Tebal pelat = 15 cm
Tebal selimut beton = 3 cm
Tul Utama = 10 mm
Tul bagi = 10 mm
Dx = 115 mm
Dy = 105 mm

3. Perhitungan momen dan penulangan pelat


3.1 Perhitungan pelat
Bentang balok memanjang rencana (Ly) =
Bentang balok memendek rencana (Lx) =

β = Ly = 6 = 1.5 ≤
Lx 4

Untuk nilai X1 -X4 (PBI - 1971 tabel 13.3.1 hal.202)


Ditentukan seluruh sudut plat terjepit penuh/terjepit sempurna :
x1 = 36
x2 = 17
x3 = 76
x4 = 57

Menentukan momen
Mlx = 0,001 x WU x Lx² x X1
= 0.001 x 14.3 x 4 2
x
= 8.2 kN.m

Mly = 0,001 x WU x Lx² x X2


= 0.001 x 14.3 x 4 2
x
= 3.9 kN.m

Mtx = -0,001 x WU x Lx² x X3


= -0.001 x 14.3 x 4 2
x
= -17.3 kN.m

Mty = -0,001 x WU x Lx² x X4


= -0.001 x 14.3 x 4 2
x
= -13.0 kN.m

Menurut SNI 2847-2013 Pasal 10.2.7.3 hal. 74)


Faktor bentuk distribusi tegangan beton,
Untuk:17 Mpa < fc' ≤ 28 Mpa,
Untuk:fc' > 28 MPa, β1 = 0,85 - 0,05*(fc'
Menurut SNI-03-2847-2002 Pasal 8.4.3 hal 61
Rasio tulangan pada kondisi balance,
ρb = β1 * 0,85* fc'/fy * 600 / (600+fy)
= 0.8 x 0.85 x 35 x
400

Rasio tahanan momen maksimum,


Rmax = 0,75 * ρb * fy * [1-1/2 * 0,75 * ρb * fy / (0,85*fc')]
= 0.75 0.0357 400 1 - 0.5
= 8.8

Rasio tulangan maksimum,


ρ max = 0,75 *ρb = 0.75 x 0.036

Rasio tulangan minium,


ρ min = 1.4 / fy = 1.4 / 400

Menurut SNI 2847-2013 Pasal 9.3.2.1 hal. 67


faktor reduksi kekuatan ɸ lentur tanpa beban aksial sebesar 0,80
Faktor reduksi kekuatan lentur, ɸ =
Dintinjau plat lantai selebar 1 m, b =

3.2 Perhitungan Tulangan Plat


a. Penulangan lapangan arah X
Momen lapangan arah X
Momen nomimal rencana
Faktor tahanan momen

Kontrol → Rn

Rasio tulangan yang diperlukan ρ = 1/m * {1 - √ 1 - [(


Jadi, ρ < ρ min < ρ max
0.0025 < 0.004 < 0.027

Karena ρ < ρ min, ma


Luas tulangan yang digunakan
Digunakan tulangan ɸ 10
Jumlah tulangan
Jarak tulangan dalam 1 m,

Menurut SNI 2847-2013 pasal 10.5.4 hal 76 disebutkan sebagai berikut:


Jarak tulangan ≤ 3 x tebal plat
Jarak tulangan
Luas tulangan yang timbul,
Dipakai tulangan

Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul

Kontrol → ɸMn

b. Penulangan lapangan arah Y


Momen lapangan arah Y
Momen nomimal rencana
Faktor tahanan momen

Kontrol → Rn

Rasio tulangan yang diperlukan ρ = 1/m * {1 - √ 1 - [(


Jadi, ρ < ρ min < ρ max
0.0014 < 0.004 < 0.026775

Karena ρ < ρ min, ma


Luas tulangan yang digunakan
Digunakan tulangan ɸ 10
Jumlah tulangan
Jarak tulangan dalam 1 m,

Menurut SNI 2847-2013 pasal 10.5.4 hal 76 disebutkan sebagai berikut:


Jarak tulangan ≤ 3 x tebal plat
Jarak tulangan
Luas tulangan yang timbul,
Dipakai tulangan

Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul

Kontrol → ɸMn

c. Penulangan tumpuan arah X


Momen tumpuan arah X
Momen nomimal rencana
Faktor tahanan momen

Kontrol → Rn

Rasio tulangan yang diperlukan ρ = 1/m * {1 - √ 1 - [(


Jadi, ρ > ρ min < ρ max
0.0053 > 0.004 < 0.026775

Karena ρ > ρ min


Luas tulangan yang digunakan
Digunakan tulangan ɸ 10
Jumlah tulangan
Jarak tulangan dalam 1 m,

Menurut SNI 2847-2013 pasal 10.5.4 hal 76 disebutkan sebagai berikut:


Jarak tulangan ≤ 3 x tebal plat
Jarak tulangan
Luas tulangan yang timbul,
Dipakai tulangan

Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul

Kontrol → ɸMn

d. Penulangan tumpuan arah Y


Momen tumpuan arah Y
Momen nomimal rencana
Faktor tahanan momen

Kontrol → Rn

Rasio tulangan yang diperlukan ρ = 1/m * {1 - √ 1 - [(


Jadi, ρ > ρ min < ρ max
0.0048 > 0.004 < 0.026775

Karena ρ ρ min
Luas tulangan yang digunakan
Digunakan tulangan ɸ 10
Jumlah tulangan
Jarak tulangan dalam 1 m,

Menurut SNI 2847-2013 pasal 10.5.4 hal 76 disebutkan sebagai berikut:


Jarak tulangan ≤ 3 x tebal plat
Jarak tulangan
Luas tulangan yang timbul,
Dipakai tulangan

Kontrol kekuatan :
Mencari nilai (a) a = (As timbul x fy
Menghitung momen nominal Mn = As timb
Menghitung momen yang timbul

Kontrol → ɸMn

REKAPITULASI HASIL PERHITUNGAN PELAT LANTA

TIPE PELAT JENIS TULANGAN TULANGAN


Tulangan Lapangan Arah X ɸ10 - 150
Tulangan Lapangan Arah Y ɸ10 - 150
P1
Tulangan Tumpuan Arah X ɸ10 - 200
Tulangan Tumpuan Arah Y ɸ10 - 200

Nb. Untuk penulangan plat lantai type 2-10 dianggap sama dengan penulangan type 1

3.3 Kontrol Lendutan Pelat

Mutu beton,
Modulus Elastisitas Beton,
Modulus Elastisitas Baja,
Beban merata (tak terfaktor) pada plat,
Panjang bentang plat,
Batas lendutan maksimum yang diijinkan,
Momen inersia brutto penampang plat,
Modulus keruntuhan lentur beton,
Nilai perbandingan modulus elastis,
Jarak garis netral terhadap sisi atas beton,

Momen inersia penampang retak yang ditransformasikan ke beton dihitung sbb. :


Icr = 1/3 * b * c³ +

Momen retak :
Momen maksimum akibat beban (tanpa faktor beban) :

Inersia efektif untuk perhitungan lendutan,


Ie = ( Mcr / Ma )³ * Ig + [ 1 - ( M
Lendutan elastis seketika akibat beban mati dan beban hidup :
δe = 5 / 384 * Q *
Rasio tulangan slab lantai :
Faktor ketergantungan waktu untuk beban mati (jangka waktu > 5 tahun), nilai :

Lendutan jangka panjang akibat rangkak dan susut :


δg = l * 5 / 384 * Q *
Lendutan total,

Syarat : 𝛅_𝐭𝐨𝐭 ≤ Lx / 240


12.381167973873 < 16.667

3.4 Gambar Penulangan Plat Lantai


Gambar Detail Penul

Gambar Potongan A-A P


Gambar Detail Penul

Gambar Potongan A-A P


ITUNGAN PLAT LANTAI

Gedung perkuliahan PPIUBG tabel 3-1 hal 17

x 2400 = 360 kg/m2


x 21 = 63 kg/m2
x 24 = 24 kg/m2
x 18 = 90 kg/m2
= 18 kg/m2
= 40 kg/m2 +
= 595 kg/m2
= 5.95 kN/m2

x 2400 = 360 kg/m2


x 21 = 63 kg/m2
x 24 = 24 kg/m2
x 18 = 18 kg/m2
= 18 kg/m2
= 40 kg/m2

= 29.7 kg/m2
= 182.8571 kg/m2
= 120.000 kg/m2 +
= 855.56 kg/m2 332.56
= 8.56 kN/m 2
3.3256

250 kg/m2 = 2.5 kN/m2

......SNI 2847-2013 pasal 9.2.1 hal. 65


al plat sebagai berikut :

kurang dari 125mm


dari 90 mm
216000.000

13 Ps.9.5(3(3))

(memenuhi) ok

6 m
4 m

2 ......( pelat 2 arah)


36

17

76

57

β1 = 0.85
β1 = 0,85 - 0,05*(fc' - 28)/7 = 0.80
Jadi dipakai, β1 = 0.80

600 = 0.036
600 + 400

(0,85*fc')]
0.75 0.0357 400 / 0.85 35

= 0.027

= 0.004

0.8
1000 mm

Mlx = 821.8 kg.m 8,217,611 Nmm


Mn = Mlx / ɸ = 10272013.71429 Nmm
Rn = Mn / (ɸ*b*dx2) = 0.97
m = fy / (0,85*fc') = 13.45

ntrol → Rn < Rmax → (OK)

ρ = 1/m * {1 - √ 1 - [(2 * m * Rn) / fy]} = 0.0025

Karena ρ < ρ min, maka dipakai ρ min = 0.002


As = ρ pakai * b * dx = 283.84 mm2
As tulangan = 1/4 * π * ɸ^2 = 78.54 mm2
n = As / As tulangan = 3.61 → 8 buah
S=b/n= 150 mm

agai berikut:
150 ≤ 3 x tebal plat = 450 (OK)
As timbul = n * As tulangan = 628.3 mm > As OK
ɸ 10 - 150 (Tabel 13a. Gideon Jilid 1 hal. 82)

a = (As timbul x fy) / (0,85 * f'c * b) = 8.45


Mn = As timbul * fy * (d - a/2) = 27,841,048 N.mm
ɸMn = 0,8 x Mn = 22,272,838 N.mm

rol → ɸMn > Mu → (OK)

Mly = 388.1 kg.m 3,880,539 Nmm


Mn = Mlx / ɸ = 4850673 Nmm
Rn = Mn / (ɸ*b*dx2) = 0.55
m = fy / (0,85*fc') = 13.45

ntrol → Rn < Rmax → (OK)

ρ = 1/m * {1 - √ 1 - [(2 * m * Rn) / fy]} = 0.00139

Karena ρ < ρ min, maka dipakai ρ min = 0.001


As = ρ pakai * b * dx = 145.72 mm2
As tulangan = 1/4 * π * ɸ^2 = 78.54 mm2
n = As / As tulangan = 1.86 → 8 buah
S=b/n= 150 mm

agai berikut:

150 ≤ 3 x tebal plat = 450 (OK)


As timbul = n * As tulangan = 628.3 mm > As OK
ɸ 10 - 150 (Tabel 13a. Gideon Jilid 1 hal. 82)

a = (As timbul x fy) / (0,85 * f'c * b) = 8.45


Mn = As timbul * fy * (d - a/2) = 25327774 N.mm
ɸMn = 0,8 x Mn = 20,262,219 N.mm

rol → ɸMn > Mu → (OK)

Mtx = 1734.8 kg.m 17,348,290 Nmm


Mn = Mlx / ɸ = 21685362 Nmm
Rn = Mn / (ɸ*b*dx2) = 2.05
m = fy / (0,85*fc') = 13.45

ntrol → Rn < Rmax → (OK)

ρ = 1/m * {1 - √ 1 - [(2 * m * Rn) / fy]} = 0.0053

Karena ρ > ρ min, maka dipakai ρ = 0.005


As = ρ pakai * b * dx = 611.11 mm2
As tulangan = 1/4 * π * ɸ^2 = 78.54 mm2
n = As / As tulangan = 7.78 → 16 buah
S=b/n= 200 mm

agai berikut:

200 ≤ 3 x tebal plat = 450 (OK)


As timbul = n * As tulangan = 1256.6 mm > As OK
ɸ 10 - 200 (Tabel 13a. Gideon Jilid 1 hal. 82)

a = (As timbul x fy) / (0,85 * f'c * b) = 16.90


Mn = As timbul * fy * (d - a/2) = 53558887 N.mm
ɸMn = 0,8 x Mn = 42,847,109 N.mm

rol → ɸMn > Mu → (OK)

Mty = 1301.1 kg.m 13,011,217 Nmm


Mn = Mlx / ɸ = 16264022 Nmm
Rn = Mn / (ɸ*b*dx2) = 1.84
m = fy / (0,85*fc') = 13.45

ntrol → Rn < Rmax → (OK)

ρ = 1/m * {1 - √ 1 - [(2 * m * Rn) / fy]} = 0.00476

Karena ρ ρ min, maka dipakai ρ = 0.005


As = ρ pakai * b * dx = 500.06 mm2
As tulangan = 1/4 * π * ɸ^2 = 78.54 mm2
n = As / As tulangan = 6.37 → 16 buah
S=b/n= 200 mm

agai berikut:

200 ≤ 3 x tebal plat = 450 (OK)


As timbul = n * As tulangan = 1256.6 mm > As OK
ɸ 10 - 200 (Tabel 13a. Gideon Jilid 1 hal. 82)

a = (As timbul x fy) / (0,85 * f'c * b) = 16.90


Mn = As timbul * fy * (d - a/2) = 48532339 N.mm
ɸMn = 0,8 x Mn = 38,825,871 N.mm

rol → ɸMn > Mu → (OK)

GAN PELAT LANTAI

TULANGAN LUAS (mm2)


ɸ10 - 150 628.32
ɸ10 - 150 628.32
ɸ10 - 200 1256.64
ɸ10 - 200 1256.64 500.06

an penulangan type 1

fc' = 35 MPa
Ec = 4700 √(𝒇𝒄 = 27805.6 MPa (SNI 2847-2013 ps. 8.5.1 hal. 61)
′)
Es = 200000 MPa
Q = QD + QL = 46.056 kN/m2 4.606 N/mm
Lx = 4000 mm
Lx / 240 = 16.667 mm (SNI 2847-2013 Tabel 9.5(b) hal. 71)
Ig = 1/12*b*h³ = 281250000〖 mm 〗 ^4
fr = 0.7√ fc' = 4.141 MPa
n = Es / Ec = 7.19
c = n * As / b = 3.597 mm

n dihitung sbb. :
Icr = 1/3 * b * c³ + n * A * ( d - c )² = 44654465.481045
〖 mm 〗 ^4
yt = h / 2 = 75 mm
Mcr = fr * Ig / yt = 15529709.430637 Nmm

Ma = 1 / 8 * Q * Lx² = 9211114.29 Nmm

r / Ma )³ * Ig + [ 1 - ( Mcr / Ma )³ ] * Icr = 1178515996.1316


〖 mm 〗 ^4

5 / 384 * Q * 〖 𝐋𝐱〗 ^𝟒/ (Ec * Ie) = 4.6848270070549 mm


ρ = As / ( b * d ) = 0.0043483339798
5 tahun), nilai :
z= 2.0
l = z / ( 1 + 50 * r ) = 1.6428228737642

〖 𝐋𝐱〗 ^𝟒/ ( Ec * Ie ) = 7.6963409668179 mm


𝛅_𝐭𝐨𝐭 = 𝛅_𝐞+ 𝛅_𝐠 = 12.381167973873 mm

AMAN
Gambar Detail Penulangan Plat Type 1 (P1)

mbar Potongan A-A Penulangan Plat Type 1 (P1)


Gambar Detail Penulangan Plat Type 2 (P2)

mbar Potongan A-A Penulangan Plat Type 2 (P2)


A. Data Perencanaan
Type bangunan =
Lokasi =
Mutu beton (f'c) =
Mutu baja (fy) =
Modulus Elastisitas =

Diketahaui :
Ukuran b (m)
Balok Anak 1 0.25
Balok anak 0.25
Tebal plat lantai (m) 0.15

Pembebanan Balok
Dari data perhitungan pembebanan plat didapat
qd = 8.56 kN/m2
ql = 2.5 kN/m2

Beban Segitiga = qeq = 1/3 x qa x Lx


Beban Trapsium = qeq = 1/2 x qa x Lx ( 1 -1/3 . Lx2/Ly2)

Lx = 8m
Ly = 7m

Beban Mati (qd)


Berat sendiri balok = 0.25 x 0.50
Beban mati plat = 2 x qeqtrapesium
Beban Partisi =

Beban Hidup (ql)


Beban hidup plat = 2 x qeqtrapesium

Beban terfaktor (Wu) = 1.2 qd + 1.6 ql


= ( 1.2 x 43.65 )
= 70.44 kN/m2

Momen Lapangan = 1/24 x Wu x l2


= 143.82 kNm

Momen Tumpuan = 1/12 x Wu x l2


= 287.64 kNm
Geser Ultimate = 1/2 x Wu x l
= 246.55 kN

1. Perencanaan penulangan balok


Nilai - nilaii kebutuhan rasio penulangan tetap berdasarkan mutu bahan yang digunakan
adalah sebagai berikut :

β₁ = 0.85 - 0.05

= 0.85 - 0.05

= 0.85 - 0.05
= 0.857

ρ balance = 0.85 x
fy
= 0.85 x
350
= 0.05620408 x
= 0.035

ρ maks = 0.75
= 0.75
= 0.0266

ρ min = fc'
4 fy
= 27
4 350
= 0.004

ρ min = 1.4
fy
= 1.4
350
= 0.004

ρ min yang menentukan =

m = fy
0.85 x fc'
= 350
0.85 x 27
= 15.25

Keterangan:
β₁ = 0.8 untuk fc' < 28 Mpa
ρ = kebutuhan tulangan
m = koefisien lawan

Data Perencanaan
Diameter tulangan
Luas tulangan
Diameter tulangan sengkang
luas tulangan sengkang
selimut beton
Balok Anak
Bentang = 700
h = 43.75
b = 25
Tinggi efektif
d = h - p - d tul sengkang - (0,5 x D tul pokok)
d = 435

1,4/𝑓𝑦 𝑥 𝑏𝑥𝑑
As min = =

Mu = 14,382

Penulangan daerah lapangan

be

d = h - decking - tul. Begel - 1/2 x diameter tulangan


d = 500 - 40
= 435 mm

Lebar efektif flens ......SNI 2847 - 2013 Pasal 8.12 .2

be1 ≤ L = 8000
4 4
be2 ≤ bw + 16t

di ambil nilai be yang terkecil


ᴓ = 0.8
Mn perlu = Mu

= 143820546
0.8
= 179775682.539683
Mn = Mu
Rn = Mn
b x d²
= 179,775,683
250 x 435
= 3.80 N/mm2

𝜌 = 1/𝑚 𝑥 (1−√(1−(2 𝑥 𝑅𝑛 𝑥
𝑚)/𝑓𝑦))

ρ = 1
x
15.3
= 0.066 x 1

= 0.066 x 1
= 0.0119

karena ρ min < ρ


0.004 < 0.012

maka di gunakan ρ =

Perhitugan Kebutuhan Tulangan Tarik

As = ρ x b
= 0.0119 x
= 1299.13 mm²
As tulangan = 380.00

maka diperoleh jumlah tulangan (n) =


di pasang 6 D 22

Perhitugan Kebutuhan Tulangan Tekan

As' = 0.5 x As
= 0.5 x 1299.13
= 649.6 mm²
maka diperoleh jumlah tulangan =
di pasang 4 D 22
Perhitungan kapasitas penampang
As (aktual) = 6
As' (aktual) = 4

a = As f y  As ' f y
0.85 f c ' b
= 2281 -
0.85 x
= 46.42

ФMn = 0.8 x As

= 0.8 x 2281

= 87747875.8664764 +
= 297854696
= 29,785 kgm

ФMn = 29,785 kgm

Tulangan Tumpuan
Mu = 28,764
d = h - d - ɸ tulangan begel - (1/2 x ɸ tulangan pokok)
d = 500
= 435 mm

ᴓ = 0.8
Mn perlu = Mu

= 287641092
0.8
= 359551365.079365
Mn = Mu
Rn = Mn
b x d²
= 359,551,365
250 x 435
= 7.60 N/mm2

𝜌 = 1/𝑚 𝑥 (1−√(1−(2 𝑥 𝑅𝑛 𝑥
𝑚)/𝑓𝑦))
ρ = 1
x
15.3

= 0.066 x 1

= 0.066 x 1
= 0.0275

karena ρ min < ρ


0.004 < 0.027

maka di gunakan ρ =

Perhitugan Kebutuhan Tulangan Tarik

As = ρ x b
= 0.027 x 250
= 2987.32 mm²
As tulangan = 380.00

maka diperoleh jumlah tulangan (n) =


di pasang 8 D 22

Perhitugan Kebutuhan Tulangan Tekan

As' = 0.5 x As
= 0.5 x 2987.32
= 1493.7 mm²
maka diperoleh jumlah tulangan =
di pasang 4 D 22

sehingga : Kapasitas penampang As dan As'

Perhitungan Kapasitas Penampang


As (aktual) = 8
As' (aktual) = 4

a = As f y  As ' f y
0.85 f c ' b
= 3041 -
0.85

= 532455.591036222
5737.5
= 92.8
ФMn = 0.8 x

= 0.8 x

= 165529215.385129
= 375,636,035
= 37,564

ФMn = 37,564

2. Penulangan Geser Balok


Berdasarkan SNI 2847-2013 Ps. 11.1.1 gaya geser dikerjakan dengan cara berikut :
Penulangan Geser Tumpuan
f'c = 27 MPa
fy = 350 MPa
b = 250 mm
h = 500 mm

Vu = 246.55 kN
= 246,550 N

1/6 𝑥 √𝑓𝑐 x b x d
Vc =

= 0.167 x 27
= 94,180 N

Vs = Vu
- Vc
ɸ

= 246549.51 - 94180.3
0.75

= 234,552 N

Vc + Vs > Vu
94180.3 + 234,552 > 246549.51
328,733 N > 246,550

Cek penulangan geser


Vu < 0,5 . ø Vc → tidak perlu tulangan geser
0,5 . ø Vc < Vu < ø Vc → cukup tulangan geser praktis
(Vu-øVc)< 0,67 b d → Hitung Vs
(Vu-øVc) > 0,67 b d →Perbesar penampang
Tidak Perlu Tulangan Geser Vu < 0,5 . ø V
246,550 <
246,550 >
Karena Vu > 0.5 . ɸ Vc perlu tulangan geser

Dari syarat ketentuan di atas, didapatkan cukup tulangan geser

Perhitungan geser Tumpuan


Dipasang sengkang ɸ = 14
Av = 1/4 x π x d2
= 0.25
= 153.9

Mencari jarak sengkang (S)


Vs = Av
S
S = Av
Vs
= 153.9
234552.4
= 100

Syarat jarak tulangan geser tidak boleh melebihi syarat di bawah ini :

● d/2
● 10 x diameter tulangan lungitudinal
● 24 x diameter tulangan geser

Dicoba dipasang jarak (s) = 200 mm


Av min = bw x
3 x
= 250 x
3 x
= 47.6190476 mm2

Jadi, tulangan geser yang digunakan :


● Untuk daerah tumpuan (HBK)

Penulangan Geser Lapangan

f'c = 27 MPa
fy = 350 MPa
b = 250 mm
h = 500 mm
Vu = 246.55 kN
= 246,550 N
1/6 𝑥 √𝑓𝑐 x b x d
Vc =

= 0.167 x 27
= 94,180 N

Vs = Vu
- Vc
ɸ
= 246549.507482993
-94180.3
0.75
= 234552 N

ɸ x Vc = 0.75
= 70635.196996
disimpulkan
Vu > ɸ

Dari syarat ketentuan di atas, didapatkan cukup tulangan geser

Perhitungan geser
Dipasang sengkang ɸ
Av

Mencari jarak sengkang (S)


Vs

Dicoba dipasang jarak (s)


Av min = bw x
3 x
= 250 x
3 x
= 47.6190476 mm2

Jadi, tulangan geser yang digunakan :


● Untuk daerah tumpuan lapangan
3. Penulangan Torsi Balok

4. Rekapitulasi Tulangan yang digunakan


• Tulangan Lentur Tarik Bagian Lapangan
• Tulangan Lentur Tekan Bagian Lapangan
• Tulangan Lentur Tarik Bagian Tumpuan
• Tulangan Lentur Tekan Bagian Tumpuan
• Tulangan Geser Bagian Tumpuan
• Tulangan Geser Bagian Lapangan
PERHITUNGAN BALOK

Kampus Universitas Brawijaya


Malang, Jawa Timur
27 MPa
350 MPa
27805.5749805682 kg/cm2

h (m) L (m)
0.50 8
0.50 7

x qa x Lx ( 1 -1/3 . Lx2/Ly2)

x 24 = 3 kN/m2
qeqtrapesium = 38.65 kN/m2
= 2 kN/m2
qd total = 43.65 kN/m2

qeqtrapesium = 11.29 kN/m2

+ ( 1.6 x 11.29 )
n yang digunakan

fc' - 28 ... SNI 2847 - 2013 ps.10.2. (7(3))


7
27 - 28
7
x -0.142857143

fc' x β₁ x 600
fy 600 + fy
27 x 0.86 x 600
350 600 + 350
0.631578947368

x ρ balance
x 0.035

... SNI 2847 - 2013 ps.10.5.(1)

... SNI 2847 - 2012 ps.10.5.(1)

0.004 ... diambil nilai terbesar


= 22 mm
= 380 mm2
= 14 mm
= 154 mm2
= 40 mm

cm 7 m
= 50 cm
= 25 cm

= 450 - 40 -10 -(0,5 x 19)


mm

43.5000 mm2

14,382 kgm = 143,820,546 N.mm

fc =
fy =
b =
Ф begel =
d
Ф tulangan =
h =
decking (d") =
tebal plat (t) =

ter tulangan
- 14 - 0.5 22

SNI 2847 - 2013 Pasal 8.12 .2

= 2000 mm

= 250 + 16 150 = 2650

2000 mm
143820546
0.8
179775682.539683 N.mm

179,775,683
2

2x Rn x
1 - 1 -
fy
- 7.60050448 x 15.3
1 -
350
- 0.818

< ρ max
0.012 < 0.027

0.012

x d
250 x 435

3.418771500807
= 2281 mm² ......Ok!

1.709385750404
= 1520 mm² ......Ok!
D 22 = 2281 mm²
D 22 = 1520 mm²

1520 x 350
27 x 250

- As' x fy d - a
2

- 1519.8 x 350 435 - 46.42


2
210106820
Nmm

> Mu = 14,382 kgm

kgm = 287,641,092 Nmm


n begel - (1/2 x ɸ tulangan pokok)
- 40 - 14 - 11

287641092
0.8
359551365.079365 N.mm

359,551,365
2
2x Rn x
1 - 1 -
fy

- 15.20100896 x 15.3
1 -
350
- 0.581

< ρ max
0.027 < 0.027

0.027

x d
x 435

7.861364252418
= 3041 mm² ......Ok!

3.930682126209
= 1520 mm² ......Ok!

pang As dan As'

D 22 = 3041 mm²
D 22 = 1520 mm²

As ' f y
fc 'b
1520 x 350
x 27 x 250

mm
As - As' x fy d -

3041 - 1520 x 350 435 -

+ 210106820
375,636,035 Nmm
37,564 kgm

kgm > Mu = 28,764 kgm

cara berikut :

D tulangan lungitudinal = 22 mm
ɸ sengkang = 14 mm
ɸ (faktor reduksi geser) = 0.75
d = 435 mm
d" = 40 mm

…SNI 2847 -2013 Ps 11.2.1.2

x 250 x 435

N
N ......Ok!

an geser praktis
Vu < 0,5 . ø Vc
0.5 x 0.75 x 94,180
35,318

mm

x 3.14 x 196
mm 2

x fy x d
S
x fy x 435
Vs
x 350 x 435
234552.4
mm

…SK. SNI. 03.14.9 - 3.3B

= 217.5 mm
n lungitudinal = 220 mm
= 336 mm

s
fy
200
350
< Av pasang = 153.9 mm2

= ɸ 14 - 200 (sepanjang 1/4L balok mulai

D tulangan lungitudinal = 22 mm
ɸ sengkang = 14 mm
ɸ (faktor reduksi geser) = 0.75
d = 435 mm
d" = 40 mm
…SNI – 2847 -2012 Ps 11.2.1

x 250 x 435

…SNI – 2847 -2002 Ps 13.5.(6.(1))

80.3

x 94180.3
N

Vc

= 14 mm
= 1/4 x π x d2
= 0.25 x 3.14 x 196
= 153.9 mm 2

= Av x fy x d
S
= Av x fy x d
Vs
= 153.9 x 350 x 435
234552.4
= 100 mm

= 200 mm
s
fy
200
350
< Av pasang = 153.9 mm2 ......(memenuhi)

= ɸ 14 - 200 (dimulai dari akhir penulanga


= 6 D 22
= 4 D 22
= 8 D 22
= 4 D 22
= ɸ 14 -
= ɸ 14 -
013 ps.10.2. (7(3))

... SNI 2847 - 2013 Lampiran B hal 221


Bentang = 800 cm 8 m
h = 50.00 = 50 cm
b = 25 = 25 cm

N.mm

27 Mpa
350 Mpa
250 mm
14 mm
22 mm
500 mm
40 mm
150 mm

mm
m
+ As' x fy d - d'

+ 1520 x 350 435 - 40

......Ok!
m
a As' x fy d - d'
+
2

92.8 + 1520 x 350 435 - 40


2

......Ok!
(memenuhi)

sepanjang 1/4L balok mulai dari tumpuan)


....(memenuhi)

dimulai dari akhir penulangan geser tumpuan)


200 mm
200 mm
PENDIMENSIAN

A. Data Perencanaan
Type Bangunan = Rektorat
Letak Bangunan = Dataran Rendah
Lokasi Bangunan = Pasuruan
Zona Gempa = Zona 3
Mutu Beton (f'c) = 35 MPa
Mutu Baja (fy) = 400 MPa
Modulus Elastisitas (E) = 27805.6 N.mm

B. Dimensi Balok Memanjang dan Melintang


Penentuan dimensi balok minimum (hmin), dihitung berdasarkan SNI-2847-2013 Ps.9.5.2.2 Tabel 9.5a
- Untuk 2 tumpuan sederhana dipakai L/16
- Untuk 1 ujung menerus dipakai L/18,5
- Untuk fy selain 400 MPa, nilainya harus dikalikan (0,4 + fy/700)
# Maka, dipakai rumus L/18,5 untuk menentukan hmin balok

Dimensi Balok B1
Bentang Kolom ke Kolom = Panjang Balok Rencana
= 800 cm
Tinggi Balok Minimum = h min
= 1 x L
18.5
= 1 x 800 x 0.9714
18.5
= 42 cm
Tinggi Balok Pakai = h pakai
= 60 cm

Lebar Balok Minimum = 1 x h


2
= 1 x 60
2
= 30
Lebar Balok Pakai = b pakai
= 30 cm

Jadi Dimensi Balok yang dipakai adalah 30 / 60


Kekakuan balok (B1) = (E * I) / L
= 18,768,763 kg/cm

Dimensi Balok B2
Bentang Kolom ke Kolom = Panjang Balok Rencana
= 600 cm
Tinggi Balok Minimum = h min
= 1 x L
18.5
= 1 x 600 x 0.9714
18.5
= 32 cm
Tinggi Balok Pakai = h pakai
= 50 cm

Lebar Balok Minimum = 1 x h


2
= 1 x 50
2
= 25
Lebar Balok Pakai = b pakai
= 25 cm

Jadi Dimensi Balok yang dipakai adalah 25 / 50


Kekakuan balok (B2) = (E * I) / L
= 12068391.9186 kg/cm

Rekapitulasi Dimensi Balok


Balok b (cm) h (cm) Kekakuan (kg/cm)
B1 30 60 18768763
B2 25 50 12068392

# Note : untuk memudahkan dalam perhitungan dan pelaksanaan dilapangan, maka digunakan dimensi
balok (B1) untuk arah Ly dan balok (B2) untuk arah Lx

C. Dimensi Plat
Dalam pendimensian plat, digunakan luasan plat terbesar dengan bentang Lx dan Ly sebagai berikut :

Panjang Pelat = Ly = 800 cm


Lebar Pelat = Lx = 600 cm
Ukuran Kolom Rencana = 600 cm x 800 cm
Panjang Bersih Pelat (Ln) = Lnx - 2 * (1/2 * lebar balok induk)
= 600 - 30 + 30
2 2
= 570 cm

Lebar Bersih Pelat (Sn) = Lny - 2 * (1/2 * lebar balok induk)


= 800 - 30 + 30
2 2
= 770 cm
β = Ln
Sn
= 570
770
= 0.74026 < 2 (digunakan plat 2 arah) .....SNI-2847-2013 pasal 13.(3(6))

Rekapitulasi Penggunaan Tipe Plat


Lx adalah panjang arah memendek dan Ly adalah bentang arah memanjang
Jika (Ly/Lx > 2 maka diguanakn pelat 1 arah) dan jika (Ly/Lx ≤ 2 maka digunakan pelat 2 arah)

Type Pelat Ly (m) Lx (m) Ly/Lx Luas (m2) Jenis Pelat


A 8 6 1.333333333 48 2 Arah
B 6 6 1 36 2 Arah
C 3.6 3.6 1.00 12.96 2 Arah

Penentuan Tebal Pelat


Perhitungan dimensi plat dua arah berdasarkan SNI 2847-2013 Ps.9.5(3(3)), bagi tebal plat sebagai berikut :
a. Untuk αm ≤ 0,2, menggunakan pasal 9.5.(3(2))
b. Untuk 0,2 < αm < 0,2, ketebalan minimum plat harus memenuhi

 fy 
Ln   0 . 8  
Dan tidak boleh kurang dari 125mm
 1400 
h1 
36  5   m  0 . 2 
c. Untuk αm ≥ 0,2, ketebalan minimum plat harus memenuhi
 fy 
Ln   0 .8   Dan tidak boleh kurang dari 90 mm
 1400 
h2 
36  9 

a. Pelat Lantai
Tebal Pelat Rencana (hf) = 15 cm
Lebar Balok (bw) = 30 cm
Tinggi Balok (hw) = 60 cm
Panjang Balok (Lb) = 800 cm

Lebar efektif balok tengah (be)


be 1 = L = 800 = 200 cm
4 4
be 2 = bw + 16 x hf
= 30 + 16 x 15
= 270 cm
be 3 = 1 x Lb - bw
2
= 1 x 800 - 30
2
= 385 cm

Lebar efektif balok tepi (be)


be 1 = bw + L
12
= 30 + 800
12
= 96.66667 cm
be 2 = bw + 6 x hf
= 30 + 6 x 15
= 120 cm
be 3 = bw + 1 x Lb
2
= 30 + 1 x 800
2
= 430 cm
be pakai = 96.66667 cm ......(be yang terkecil)

  hf     hf  
2 3
 be  hf   hf   be
K = 1  
 1 x   x  4  6
    4
   
 
 1 x   

 bw   hw     hw   hw   bw   hw   
K 
 be  h
  f  
1   1 x 
= 1.637401  bw   hw  
E balok (4700 * √fc) = 27805.6 kg/cm2
E plat (4700 * √fc) = 27805.6 kg/cm2
I Balok = 1 x K x bw x hw3
12
= 1 x 1.637 x 30 x 216000
12
= 884196.4 cm4
I Pelat = 1 x bs x hf3
12
= 1 x 800 x 3375
12
= 225000 cm4
α = E balok x I balok
E pelat x I pelat
= 27805.57 x 884196.4
27805.57 x 225000
= 3.93

Untuk α > 2, ketebalan minimum harus memenuhi .....SNI 2847-2013 Ps.9.5(3(3))


h = Ln x 0.8 + fy
1400
36 + 9β
= 570 x 0.8 + 400
1400
36 + 6.662
= 15 cm ≤ 15 cm (memenuhi)

Jadi rencana penggunaan pelat tebal 15 cm sudah memenuhi

b. Pelat Atap
Tebal Pelat Rencana (hf) = 10 cm
Lebar Balok (bw) = 30 cm
Tinggi Balok (hw) = 60 cm
Panjang Balok (Lb) = 360 cm

Lebar efektif balok tengah (be)


be 1 = L = 360 = 90 cm
4 4
be 2 = bw + 16 x hf
= 30 + 16 x 10
= 190 cm
be 3 = 1 x Lb - bw
2
= 1 x 360 - 30
2
= 165 cm

Lebar efektif balok tepi (be)


be 1 = bw + L
12
= 30 + 360
12
= 60 cm
be 2 = bw + 6 x hf
= 30 + 6 x 10
= 90 cm
be 3 = bw + 1 x Lb
2
= 30 + 1 x 360
2
= 210 cm
be pakai = 60 cm ......(be yang terkecil)

  
2 3
 be   hf  hf   hf   be   hf 
K = 1   1 x   x  4  6    4  
 h    1 x   
 bw    hw

  
h 
 w   w   bw    hw

 

K 
 be   hf 
= 1.302249 1   1 x 
 

 bw   hw 
E balok (4700 * √fc) = 27805.6 kg/cm2
E plat (4700 * √fc) = 27805.6 kg/cm2
I Balok = 1 x K x bw x hw3
12
= 1 x 1.302 x 30 x 216000
12
= 703214.3 cm4
I Pelat = 1 x bs x hf3
12
= 1 x 360 x 1000
12
= 30000.0 cm4
α = E balok x I balok
E pelat x I pelat
= 27805.6 x 703214.3
27805.6 x 30000.0
= 23.44

Untuk α > 2, ketebalan minimum harus memenuhi .....SNI 2847-2013 Ps.9.5(3(3))


h = Ln x 0.8 + fy
1400
36 + 9β 1562500
= 570 x 0.8 + 400 28125000
1400 5303.3008589
36 + 6.662 72.8237657561
= 15 cm ≥ 10 cm (memenuhi) 53.3333333333
Perancangan Struktur Beton

Rencana Kolom = 0.6 x 0.8 m


Balok Induk = 0.30 x 0.60 m
Balok Anak = 0.25 x 0.50 m
Tinggi = 5 m
Tebal Plat = 15 m

Beban Mati (Dead Load)


Panjang Lebar (m) Tinggi Volume
Balok Jumlah
(m) (m) (m3)
Grid A
Balok Induk 6 0.30 0.60 4 4.32
Grid B
Balok Induk 6 0.30 0.60 3 3.24
Grid C
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 1 0.75
Grid D
Balok Induk 6 0.30 0.60 3 3.24
Grid E
Balok Induk 6 0.30 0.60 9 9.72
Grid F
Balok Induk 6 0.30 0.60 6 6.48
Grid G
Balok Induk 4 0.30 0.60 7 5.04
Grid H
Balok Induk 6 0.30 0.60 7 7.56
Grid I
Balok Induk 4 0.30 0.60 7 5.04
Grid J
Balok Induk 6 0.30 0.60 7 7.56
Grid K
Balok Induk 6 0.30 0.60 7 7.56
Grid 1
Balok Induk 6 0.30 0.60 4 4.32
Grid 2
Balok Induk 6 0.30 0.60 4 4.32
Grid 3
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 2 1.5
Grid 4
Balok Induk 4 0.30 0.60 4 2.88
Grid 5
Balok Induk 6 0.30 0.60 4 4.32
Grid 6
Balok Induk 6 0.30 0.60 9 9.72
Grid 7
Balok Induk 4 0.30 0.60 5 3.6
Grid 8
Balok Induk 6 0.30 0.60 6 6.48
Grid 9
Balok Induk 4 0.30 0.60 6 4.32
Grid 10
Balok Induk 6 0.30 0.60 6 6.48
Grid 11
Balok Induk 6 0.30 0.60 7 7.56
Jumlah Volume (m3) 117.09
Berat Jenis (kg/m3) 2400
Berat Total (kg) 281016

Panjang Lebar (m) Tinggi Volume


Kolom Jumlah
(m) (m) (m3)
Grid A 0.6 0.8 5 5 12
Grid B 0.6 0.8 5 5 12
Grid C 0.6 0.8 5 4 9.6
Grid D 0.6 0.8 5 6 14.4
Grid E 0.6 0.8 5 10 24
Grid F 0.6 0.8 5 10 24
Grid G 0.6 0.8 5 8 19.2
Grid H 0.6 0.8 5 8 19.2
Grid I 0.6 0.8 5 8 19.2
Grid J 0.6 0.8 5 8 19.2
Grid K 0.6 0.8 5 8 19.2
Jumlah Volume (m3) 192
Berat Jenis (kg/m3) 2400
Berat Total (kg) 460800

Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360

Beban Mati Tambahan


Berat Total
Keramik/Tegel Luas (m2) Berat Jenis (kg/m2)
(kg)
Keramik 1 cm 1176.00 24 28224

Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760

Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168

Panjang Lebar (m) Tinggi Luas


Dinding 1/2 Bata Jumlah
(m) (m) (m2)
Grid A 6 0.15 5 2 60
Grid C 6 0.15 5 2 60
6 0.15 5 1 30
Grid D
4 0.15 5 1 20
Grid F 6 0.15 5 3 90
Grid H 8 0.15 5 1 40
6 0.15 5 2 60
Grid J
4 0.15 5 1 20
8 0.15 5 1 40
Grid K 6 0.15 5 4 120
4 0.15 5 1 20
6 0.15 5 3 90
Grid 1
4 0.15 5 1 20
6 0.15 5 2 60
Grid 3
4 0.15 5 1 20
Grid 6 6 0.15 5 3 90
6 0.15 5 2 60
Grid 10
4 0.15 5 1 20
8 0.15 5 1 40
Grid 11 6 0.15 5 4 120
4 0.15 5 1 20
Jumlah Luas (m2) 1100
Berat Jenis (kg/m2) 250
Berat Total (kg) 275000

Beban Hidup (Live Load)


Berat
Beban Hidup Rektorat Luas (m2) Berat Jenis (kg/m2)
(kg)
Ruang kantor 1023.00 250 255750
Koridor 153.00 383 58599
Berat Total (kg) 314349
Reduksi Beban Hidup (30%) 94304.7

1,620,329
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton

Rencana Kolom = 0.6 x 0.8 m


Balok Induk = 0.30 x 0.60 m
Balok Anak = 0.25 x 0.50 m
Tinggi = 5 m
Tebal Plat = 15 m

Beban Mati (Dead Load)


Panjang Lebar (m) Tinggi Volume
Balok Jumlah
(m) (m) (m3)
Grid A
Balok Induk 6 0.30 0.60 4 4.32
Grid B
Balok Induk 6 0.30 0.60 4 4.32
Grid C
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 1 0.75
Grid D
Balok Induk 6 0.30 0.60 3 3.24
Grid E
Balok Induk 6 0.30 0.60 9 9.72
Grid F
Balok Induk 6 0.30 0.60 6 6.48
Grid G
Balok Induk 4 0.30 0.60 7 5.04
Grid H
Balok Induk 6 0.30 0.60 7 7.56
Grid I
Balok Induk 4 0.30 0.60 7 5.04
Grid J
Balok Induk 6 0.30 0.60 7 7.56
Grid K
Balok Induk 6 0.30 0.60 7 7.56
Grid 1
Balok Induk 6 0.30 0.60 4 4.32
Grid 2
Balok Induk 6 0.30 0.60 4 4.32
Grid 3
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 2 1.5
Grid 4
Balok Induk 4 0.30 0.60 4 2.88
Grid 5
Balok Induk 6 0.30 0.60 4 4.32
Grid 6
Balok Induk 6 0.30 0.60 9 9.72
Grid 7
Balok Induk 4 0.30 0.60 5 3.6
Grid 8
Balok Induk 6 0.30 0.60 6 6.48
Grid 9
Balok Induk 4 0.30 0.60 6 4.32
Grid 10
Balok Induk 6 0.30 0.60 6 6.48
Grid 11
Balok Induk 6 0.30 0.60 7 7.56
Jumlah Volume (m3) 118.17
Berat Jenis (kg/m3) 2400
Berat Total (kg) 283608

Panjang Lebar (m) Tinggi Volume


Kolom Jumlah
(m) (m) (m3)
Grid A 0.6 0.8 5 5 12
Grid B 0.6 0.8 5 5 12
Grid C 0.6 0.8 5 4 9.6
Grid D 0.6 0.8 5 6 14.4
Grid E 0.6 0.8 5 10 24
Grid F 0.6 0.8 5 10 24
Grid G 0.6 0.8 5 8 19.2
Grid H 0.6 0.8 5 8 19.2
Grid I 0.6 0.8 5 8 19.2
Grid J 0.6 0.8 5 8 19.2
Grid K 0.6 0.8 5 8 19.2
Jumlah Volume (m3) 192
Berat Jenis (kg/m3) 2400
Berat Total (kg) 460800

Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360

Beban Mati Tambahan


Berat Total
Keramik/Tegel Luas (m2) Berat Jenis (kg/m2)
(kg)
Keramik 1 cm 1176.00 24 28224

Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760

Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168

Panjang Lebar (m) Tinggi Luas


Dinding 1/2 Bata Jumlah
(m) (m) (m2)
6 0.15 5 3 90
Grid A
4 0.15 5 1 20
6 0.15 5 2 60
Grid C
4 0.15 5 1 20
6 0.15 5 1 30
Grid D
4 0.15 5 1 20
Grid F 6 0.15 5 3 90
Grid H 8 0.15 5 1 40
6 0.15 5 2 60
Grid J
4 0.15 5 2 40
8 0.15 5 1 40
Grid K
6 0.15 5 1 30
6 0.15 5 3 90
Grid 1
4 0.15 5 1 20
6 0.15 5 2 60
Grid 3
4 0.15 5 1 20
Grid 6 6 0.15 5 3 90
6 0.15 5 2 60
Grid 10
4 0.15 5 2 40
8 0.15 5 1 40
Grid 11
6 0.15 5 1 30
Jumlah Luas (m2) 990
Berat Jenis (kg/m2) 250
Berat Total (kg) 247500

Beban Hidup (Live Load)


Berat
Beban Hidup Rektorat Luas (m2) Berat Jenis (kg/m2)
(kg)
Ruang kantor 1023.00 250 255750
Koridor 153.00 383 58599
Berat Total (kg) 314349
Reduksi Beban Hidup (30%) 94304.7

1,595,421
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton

Rencana Kolom = 0.6 x 0.8 m


Balok Induk = 0.30 x 0.60 m
Balok Anak = 0.25 x 0.50 m
Tinggi = 5 m
Tebal Plat = 15 m

Beban Mati (Dead Load)


Panjang Lebar (m) Tinggi Volume
Balok Jumlah
(m) (m) (m3)
Grid A
Balok Induk 6 0.30 0.60 4 4.32
Grid B
Balok Induk 6 0.30 0.60 4 4.32
Grid C
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 1 0.75
Grid D
Balok Induk 6 0.30 0.60 5 5.4
Grid E
Balok Induk 6 0.30 0.60 9 9.72
Grid F
Balok Induk 6 0.30 0.60 9 9.72
Grid G
Balok Induk 4 0.30 0.60 6 4.32
Grid H
Balok Induk 6 0.30 0.60 6 6.48
Grid I
Balok Induk 4 0.30 0.60 6 4.32
Grid J
Balok Induk 6 0.30 0.60 6 6.48
Grid K
Balok Induk 6 0.30 0.60 2 2.16
Grid 1
Balok Induk 6 0.30 0.60 4 4.32
Grid 2
Balok Induk 6 0.30 0.60 4 4.32
Grid 3
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 2 1.5
Grid 4
Balok Induk 4 0.30 0.60 4 2.88
Grid 5
Balok Induk 6 0.30 0.60 8 8.64
Grid 6
Balok Induk 6 0.30 0.60 9 9.72
Grid 7
Balok Induk 4 0.30 0.60 5 3.6
Grid 8
Balok Induk 6 0.30 0.60 6 6.48
Grid 9
Balok Induk 4 0.30 0.60 6 4.32
Grid 10
Balok Induk 6 0.30 0.60 6 6.48
Grid 10
Balok Induk 6 0.30 0.60 2 2.16
Jumlah Volume (m3) 118.89
Berat Jenis (kg/m3) 2400
Berat Total (kg) 285336

Panjang Lebar (m) Tinggi Volume


Kolom Jumlah
(m) (m) (m3)
Grid A 0.6 0.8 5 5 12
Grid B 0.6 0.8 5 5 12
Grid C 0.6 0.8 5 4 9.6
Grid D 0.6 0.8 5 6 14.4
Grid E 0.6 0.8 5 10 24
Grid F 0.6 0.8 5 10 24
Grid G 0.6 0.8 5 8 19.2
Grid H 0.6 0.8 5 8 19.2
Grid I 0.6 0.8 5 8 19.2
Grid J 0.6 0.8 5 8 19.2
Grid K 0.6 0.8 5 8 19.2
Jumlah Volume (m3) 192
Berat Jenis (kg/m3) 2400
Berat Total (kg) 460800

Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360

Beban Mati Tambahan


Berat Total
Keramik/Tegel Luas (m2) Berat Jenis (kg/m2)
(kg)
Keramik 1 cm 1176.00 24 28224

Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760

Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168

Panjang Lebar (m) Tinggi Luas


Dinding 1/2 Bata Jumlah
(m) (m) (m2)
6 0.15 5 3 90
Grid A
4 0.15 5 1 20
6 0.15 5 2 60
Grid C
4 0.15 5 1 20
6 0.15 5 1 30
Grid D
4 0.15 5 1 20
Grid F 6 0.15 5 3 90
Grid H 8 0.15 5 1 40
6 0.15 5 2 60
Grid J
4 0.15 5 2 40
8 0.15 5 1 40
Grid K
6 0.15 5 1 30
6 0.15 5 3 90
Grid 1
4 0.15 5 1 20
6 0.15 5 2 60
Grid 3
4 0.15 5 1 20
Grid 6 6 0.15 5 3 90
6 0.15 5 2 60
Grid 10
4 0.15 5 2 40
8 0.15 5 1 40
Grid 11
6 0.15 5 1 30
Jumlah Luas (m2) 990
Berat Jenis (kg/m2) 250
Berat Total (kg) 247500

Beban Hidup (Live Load)


Berat
Beban Hidup Rektorat Luas (m2) Berat Jenis (kg/m2)
(kg)
Ruang kantor 1023.00 250 255750
Koridor 153.00 383 58599
Berat Total (kg) 314349
Reduksi Beban Hidup (30%) 94304.7

1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton

Rencana Kolom = 0.6 x 0.8 m


Balok Induk = 0.30 x 0.60 m
Balok Anak = 0.25 x 0.50 m
Tinggi = 5 m
Tebal Plat = 15 m

Beban Mati (Dead Load)


Panjang Lebar (m) Tinggi Volume
Balok Jumlah
(m) (m) (m3)
Grid A
Balok Induk 6 0.30 0.60 4 4.32
Grid B
Balok Induk 6 0.30 0.60 4 4.32
Grid C
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 1 0.75
Grid D
Balok Induk 6 0.30 0.60 5 5.4
Grid E
Balok Induk 6 0.30 0.60 9 9.72
Grid F
Balok Induk 6 0.30 0.60 9 9.72
Grid G
Balok Induk 4 0.30 0.60 6 4.32
Grid H
Balok Induk 6 0.30 0.60 6 6.48
Grid I
Balok Induk 4 0.30 0.60 6 4.32
Grid J
Balok Induk 6 0.30 0.60 6 6.48
Grid K
Balok Induk 6 0.30 0.60 2 2.16
Grid 1
Balok Induk 6 0.30 0.60 4 4.32
Grid 2
Balok Induk 6 0.30 0.60 4 4.32
Grid 3
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 2 1.5
Grid 4
Balok Induk 4 0.30 0.60 4 2.88
Grid 5
Balok Induk 6 0.30 0.60 8 8.64
Grid 6
Balok Induk 6 0.30 0.60 9 9.72
Grid 7
Balok Induk 4 0.30 0.60 5 3.6
Grid 8
Balok Induk 6 0.30 0.60 6 6.48
Grid 9
Balok Induk 4 0.30 0.60 6 4.32
Grid 10
Balok Induk 6 0.30 0.60 6 6.48
Grid 10
Balok Induk 6 0.30 0.60 2 2.16
Jumlah Volume (m3) 118.89
Berat Jenis (kg/m3) 2400
Berat Total (kg) 285336

Panjang Lebar (m) Tinggi Volume


Kolom Jumlah
(m) (m) (m3)
Grid A 0.6 0.8 5 5 12
Grid B 0.6 0.8 5 5 12
Grid C 0.6 0.8 5 4 9.6
Grid D 0.6 0.8 5 6 14.4
Grid E 0.6 0.8 5 10 24
Grid F 0.6 0.8 5 10 24
Grid G 0.6 0.8 5 8 19.2
Grid H 0.6 0.8 5 8 19.2
Grid I 0.6 0.8 5 8 19.2
Grid J 0.6 0.8 5 8 19.2
Grid K 0.6 0.8 5 8 19.2
Jumlah Volume (m3) 192
Berat Jenis (kg/m3) 2400
Berat Total (kg) 460800

Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360

Beban Mati Tambahan


Berat Total
Keramik/Tegel Luas (m2) Berat Jenis (kg/m2)
(kg)
Keramik 1 cm 1176.00 24 28224

Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760

Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168

Panjang Lebar (m) Tinggi Luas


Dinding 1/2 Bata Jumlah
(m) (m) (m2)
6 0.15 5 3 90
Grid A
4 0.15 5 1 20
6 0.15 5 2 60
Grid C
4 0.15 5 1 20
6 0.15 5 1 30
Grid D
4 0.15 5 1 20
Grid F 6 0.15 5 3 90
Grid H 8 0.15 5 1 40
6 0.15 5 2 60
Grid J
4 0.15 5 2 40
8 0.15 5 1 40
Grid K
6 0.15 5 1 30
6 0.15 5 3 90
Grid 1
4 0.15 5 1 20
6 0.15 5 2 60
Grid 3
4 0.15 5 1 20
Grid 6 6 0.15 5 3 90
6 0.15 5 2 60
Grid 10
4 0.15 5 2 40
8 0.15 5 1 40
Grid 11
6 0.15 5 1 30
Jumlah Luas (m2) 990
Berat Jenis (kg/m2) 250
Berat Total (kg) 247500

Beban Hidup (Live Load)


Berat
Beban Hidup Rektorat Luas (m2) Berat Jenis (kg/m2)
(kg)
Ruang kantor 1023.00 250 255750
Koridor 153.00 383 58599
Berat Total (kg) 314349
Reduksi Beban Hidup (30%) 94304.7

1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton

Rencana Kolom = 0.6 x 0.8 m


Balok Induk = 0.30 x 0.60 m
Balok Anak = 0.25 x 0.50 m
Tinggi = 5 m
Tebal Plat = 15 m

Beban Mati (Dead Load)


Panjang Lebar (m) Tinggi Volume
Balok Jumlah
(m) (m) (m3)
Grid A
Balok Induk 6 0.30 0.60 4 4.32
Grid B
Balok Induk 6 0.30 0.60 4 4.32
Grid C
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 1 0.75
Grid D
Balok Induk 6 0.30 0.60 5 5.4
Grid E
Balok Induk 6 0.30 0.60 9 9.72
Grid F
Balok Induk 6 0.30 0.60 9 9.72
Grid G
Balok Induk 4 0.30 0.60 6 4.32
Grid H
Balok Induk 6 0.30 0.60 6 6.48
Grid I
Balok Induk 4 0.30 0.60 6 4.32
Grid J
Balok Induk 6 0.30 0.60 6 6.48
Grid K
Balok Induk 6 0.30 0.60 2 2.16
Grid 1
Balok Induk 6 0.30 0.60 4 4.32
Grid 2
Balok Induk 6 0.30 0.60 4 4.32
Grid 3
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 2 1.5
Grid 4
Balok Induk 4 0.30 0.60 4 2.88
Grid 5
Balok Induk 6 0.30 0.60 8 8.64
Grid 6
Balok Induk 6 0.30 0.60 9 9.72
Grid 7
Balok Induk 4 0.30 0.60 5 3.6
Grid 8
Balok Induk 6 0.30 0.60 6 6.48
Grid 9
Balok Induk 4 0.30 0.60 6 4.32
Grid 10
Balok Induk 6 0.30 0.60 6 6.48
Grid 10
Balok Induk 6 0.30 0.60 2 2.16
Jumlah Volume (m3) 118.89
Berat Jenis (kg/m3) 2400
Berat Total (kg) 285336

Panjang Lebar (m) Tinggi Volume


Kolom Jumlah
(m) (m) (m3)
Grid A 0.6 0.8 5 5 12
Grid B 0.6 0.8 5 5 12
Grid C 0.6 0.8 5 4 9.6
Grid D 0.6 0.8 5 6 14.4
Grid E 0.6 0.8 5 10 24
Grid F 0.6 0.8 5 10 24
Grid G 0.6 0.8 5 8 19.2
Grid H 0.6 0.8 5 8 19.2
Grid I 0.6 0.8 5 8 19.2
Grid J 0.6 0.8 5 8 19.2
Grid K 0.6 0.8 5 8 19.2
Jumlah Volume (m3) 192
Berat Jenis (kg/m3) 2400
Berat Total (kg) 460800

Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360

Beban Mati Tambahan


Berat Total
Keramik/Tegel Luas (m2) Berat Jenis (kg/m2)
(kg)
Keramik 1 cm 1176.00 24 28224

Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760

Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168

Panjang Lebar (m) Tinggi Luas


Dinding 1/2 Bata Jumlah
(m) (m) (m2)
6 0.15 5 3 90
Grid A
4 0.15 5 1 20
6 0.15 5 2 60
Grid C
4 0.15 5 1 20
6 0.15 5 1 30
Grid D
4 0.15 5 1 20
Grid F 6 0.15 5 3 90
Grid H 8 0.15 5 1 40
6 0.15 5 2 60
Grid J
4 0.15 5 2 40
8 0.15 5 1 40
Grid K
6 0.15 5 1 30
6 0.15 5 3 90
Grid 1
4 0.15 5 1 20
6 0.15 5 2 60
Grid 3
4 0.15 5 1 20
Grid 6 6 0.15 5 3 90
6 0.15 5 2 60
Grid 10
4 0.15 5 2 40
8 0.15 5 1 40
Grid 11
6 0.15 5 1 30
Jumlah Luas (m2) 990
Berat Jenis (kg/m2) 250
Berat Total (kg) 247500

Beban Hidup (Live Load)


Berat
Beban Hidup Rektorat Luas (m2) Berat Jenis (kg/m2)
(kg)
Ruang kantor 1023.00 250 255750
Koridor 153.00 383 58599
Berat Total (kg) 314349
Reduksi Beban Hidup (30%) 94304.7

1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Perancangan Struktur Beton

Rencana Kolom = 0.6 x 0.8 m


Balok Induk = 0.30 x 0.60 m
Balok Anak = 0.25 x 0.50 m
Tinggi = 5 m
Tebal Plat = 15 m

Beban Mati (Dead Load)


Panjang Lebar (m) Tinggi Volume
Balok Jumlah
(m) (m) (m3)
Grid A
Balok Induk 6 0.30 0.60 4 4.32
Grid B
Balok Induk 6 0.30 0.60 4 4.32
Grid C
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 1 0.75
Grid D
Balok Induk 6 0.30 0.60 5 5.4
Grid E
Balok Induk 6 0.30 0.60 9 9.72
Grid F
Balok Induk 6 0.30 0.60 9 9.72
Grid G
Balok Induk 4 0.30 0.60 6 4.32
Grid H
Balok Induk 6 0.30 0.60 6 6.48
Grid I
Balok Induk 4 0.30 0.60 6 4.32
Grid J
Balok Induk 6 0.30 0.60 6 6.48
Grid K
Balok Induk 6 0.30 0.60 2 2.16
Grid 1
Balok Induk 6 0.30 0.60 4 4.32
Grid 2
Balok Induk 6 0.30 0.60 4 4.32
Grid 3
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 2 1.5
Grid 4
Balok Induk 4 0.30 0.60 4 2.88
Grid 5
Balok Induk 6 0.30 0.60 8 8.64
Grid 6
Balok Induk 6 0.30 0.60 9 9.72
Grid 7
Balok Induk 4 0.30 0.60 5 3.6
Grid 8
Balok Induk 6 0.30 0.60 6 6.48
Grid 9
Balok Induk 4 0.30 0.60 6 4.32
Grid 10
Balok Induk 6 0.30 0.60 6 6.48
Grid 10
Balok Induk 6 0.30 0.60 2 2.16
Jumlah Volume (m3) 118.89
Berat Jenis (kg/m3) 2400
Berat Total (kg) 285336

Panjang Lebar (m) Tinggi Volume


Kolom Jumlah
(m) (m) (m3)
Grid A 0.6 0.8 5 5 12
Grid B 0.6 0.8 5 5 12
Grid C 0.6 0.8 5 4 9.6
Grid D 0.6 0.8 5 6 14.4
Grid E 0.6 0.8 5 10 24
Grid F 0.6 0.8 5 10 24
Grid G 0.6 0.8 5 8 19.2
Grid H 0.6 0.8 5 8 19.2
Grid I 0.6 0.8 5 8 19.2
Grid J 0.6 0.8 5 8 19.2
Grid K 0.6 0.8 5 8 19.2
Jumlah Volume (m3) 192
Berat Jenis (kg/m3) 2400
Berat Total (kg) 460800

Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360

Beban Mati Tambahan


Berat Total
Keramik/Tegel Luas (m2) Berat Jenis (kg/m2)
(kg)
Keramik 1 cm 1176.00 24 28224

Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760

Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168

Panjang Lebar (m) Tinggi Luas


Dinding 1/2 Bata Jumlah
(m) (m) (m2)
6 0.15 5 3 90
Grid A
4 0.15 5 1 20
6 0.15 5 2 60
Grid C
4 0.15 5 1 20
6 0.15 5 1 30
Grid D
4 0.15 5 1 20
Grid F 6 0.15 5 3 90
Grid H 8 0.15 5 1 40
6 0.15 5 2 60
Grid J
4 0.15 5 2 40
8 0.15 5 1 40
Grid K
6 0.15 5 1 30
6 0.15 5 3 90
Grid 1
4 0.15 5 1 20
6 0.15 5 2 60
Grid 3
4 0.15 5 1 20
Grid 6 6 0.15 5 3 90
6 0.15 5 2 60
Grid 10
4 0.15 5 2 40
8 0.15 5 1 40
Grid 11
6 0.15 5 1 30
Jumlah Luas (m2) 990
Berat Jenis (kg/m2) 250
Berat Total (kg) 247500

Beban Hidup (Live Load)


Berat
Beban Hidup Rektorat Luas (m2) Berat Jenis (kg/m2)
(kg)
Ruang kantor 1023.00 250 255750
Koridor 153.00 383 58599
Berat Total (kg) 314349
Reduksi Beban Hidup (30%) 94304.7

1,597,149
BERAT TOTAL LANTAI 1 (Kg)
0.801911 kn/m2
Perancangan Struktur Beton

Rencana Kolom = 0.6 x 0.8 m


Balok Induk = 0.30 x 0.60 m
Balok Anak = 0.25 x 0.50 m
Tinggi = 5 m
Tebal Plat = 15 m

Beban Mati (Dead Load)


Panjang Lebar (m) Tinggi Volume
Balok Jumlah
(m) (m) (m3)
Grid A
Balok Induk 6 0.30 0.60 4 4.32
Grid B
Balok Induk 6 0.30 0.60 4 4.32
Grid C
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 1 0.75
Grid D
Balok Induk 6 0.30 0.60 5 5.4
Grid E
Balok Induk 6 0.30 0.60 9 9.72
Grid F
Balok Induk 6 0.30 0.60 9 9.72
Grid G
Balok Induk 4 0.30 0.60 6 4.32
Grid H
Balok Induk 6 0.30 0.60 6 6.48
Grid I
Balok Induk 4 0.30 0.60 6 4.32
Grid J
Balok Induk 6 0.30 0.60 6 6.48
Grid K
Balok Induk 6 0.30 0.60 2 2.16
Grid 1
Balok Induk 6 0.30 0.60 4 4.32
Grid 2
Balok Induk 6 0.30 0.60 4 4.32
Grid 3
Balok Induk 8 0.30 0.60 3 4.32
Balok Anak 6 0.25 0.50 2 1.5
Grid 4
Balok Induk 4 0.30 0.60 4 2.88
Grid 5
Balok Induk 6 0.30 0.60 8 8.64
Grid 6
Balok Induk 6 0.30 0.60 9 9.72
Grid 7
Balok Induk 4 0.30 0.60 5 3.6
Grid 8
Balok Induk 6 0.30 0.60 6 6.48
Grid 9
Balok Induk 4 0.30 0.60 6 4.32
Grid 10
Balok Induk 6 0.30 0.60 6 6.48
Grid 10
Balok Induk 6 0.30 0.60 2 2.16
Jumlah Volume (m3) 118.89
Berat Jenis (kg/m3) 2400
Berat Total (kg) 285336

Panjang Lebar (m) Tinggi Volume


Kolom Jumlah
(m) (m) (m3)
Grid A 0.6 0.8 5 5 12
Grid B 0.6 0.8 5 5 12
Grid C 0.6 0.8 5 4 9.6
Grid D 0.6 0.8 5 6 14.4
Grid E 0.6 0.8 5 10 24
Grid F 0.6 0.8 5 10 24
Grid G 0.6 0.8 5 8 19.2
Grid H 0.6 0.8 5 8 19.2
Grid I 0.6 0.8 5 8 19.2
Grid J 0.6 0.8 5 8 19.2
Grid K 0.6 0.8 5 8 19.2
Jumlah Volume (m3) 192
Berat Jenis (kg/m3) 2400
Berat Total (kg) 460800

Tinggi Volume
Plat Luas (m2) Jumlah
(m) (m3)
Pelat A (8x6) 48 0.15 2 14.4
Pelat B (6x6) 36 0.15 30 162
Jumlah Volume (m3) 176.4
Berat Jenis (kg/m3) 2400
Berat Total (kg) 423360

Beban Mati Tambahan


Berat Total
Keramik/Tegel Luas (m2) Berat Jenis (kg/m2)
(kg)
Keramik 1 cm 1176.00 24 28224

Berat Total
Spesi Luas (m2) Berat Jenis (kg/m2)
(kg)
Spesi 1 cm 1176.00 21 24696
Berat Total
MEP Luas (m2) Berat Jenis (kg/m2)
(kg)
Pipa & Ducting 1176.00 10 11760

Berat Total
Plafon Luas (m2) Berat Jenis (kg/m2)
(kg)
Plafon + Penggantung 1176.00 18 21168

Panjang Lebar (m) Tinggi Luas


Dinding 1/2 Bata Jumlah
(m) (m) (m2)
6 0.15 5 3 90
Grid A
4 0.15 5 1 20
6 0.15 5 2 60
Grid C
4 0.15 5 1 20
6 0.15 5 1 30
Grid D
4 0.15 5 1 20
Grid F 6 0.15 5 3 90
Grid H 8 0.15 5 1 40
6 0.15 5 2 60
Grid J
4 0.15 5 2 40
8 0.15 5 1 40
Grid K
6 0.15 5 1 30
6 0.15 5 3 90
Grid 1
4 0.15 5 1 20
6 0.15 5 2 60
Grid 3
4 0.15 5 1 20
Grid 6 6 0.15 5 3 90
6 0.15 5 2 60
Grid 10
4 0.15 5 2 40
8 0.15 5 1 40
Grid 11
6 0.15 5 1 30
Jumlah Luas (m2) 990
Berat Jenis (kg/m2) 250
Berat Total (kg) 247500

Beban Hidup (Live Load)


Berat
Beban Hidup Rektorat Luas (m2) Berat Jenis (kg/m2)
(kg)
Ruang kantor 1023.00 250 255750
Koridor 153.00 383 58599
Berat Total (kg) 314349
Reduksi Beban Hidup (30%) 94304.7

1,597,149
BERAT TOTAL LANTAI 1 (Kg)
Rangkuman Pembebanan Gedung Universitas 7 Lantai
Beban yang diterima pada Lantai 1
No Lantai Tinggi Berat (Kg) Momen (Kg.m)
1 7 33 1,597,149 52,705,907
2 6 25 1,597,149 39,928,718
3 5 20 1,597,149 31,942,974
4 4 15 1,597,149 23,957,231
5 3 10 1,597,149 15,971,487
6 2 5 1,595,421 7,977,104
7 1 0 1,620,329 -

BERAT TOTAL (Wt) 9,604,344 Kg

MOMEN TOTAL 172,483,420 Kgm


Mutu Beton (f'c) = 35 Mpa 1 Mpa =
= 350 kg/cm 2

Luas Penampang (A) = Wt


Jumlah kolom
ɸ x f'c
= 9604344.2
76
0.65 x 350
= 126373
105
= 1203.5519 cm2
Luas Penampang (A) = b2
= 1203.5519
b = 34.6922456 cm < 60 cm

Jadi Rencana Kolom = 60 x 60 cm sudah memenuhi


10 kg/cm2

dimana, W = Berat total bangunan (beban kombinasi)


ɸ = 0.3
A = Luas penampang kolom

(memenuhi)

dah memenuhi