Anda di halaman 1dari 32

KAYU AGUNG - PALEMBANG - BETUNG TOLL ROAD PROJECT

SECTION 2A STA. 39+785 - STA. 41+520


INTERCHANGE PALINDRA

PEKERJAAN : PRIME COAT


MATERIAL : Aspal Emulsi
TANGGAL : 19 November 2019

PRIME COAT

SPGR PRIME COAT : 0.983 Gr /cc

Berat Paper Sebelum Berat Paper Sesudah


Berat Aspal
Penyemprotan Penyemprotan
STA. R/L
(Gram) (Gram) (Gram)

39 + 800 L2 27.5 113.0 85.5

39 + 850 L2 26.0 117.0 91.0

39 + 900 L2 27.0 101.0 74.0

39 + 950 L2 26.5 99.0 72.5

40 + 000 L2 27.0 106.0 79.0

40 + 000 L1 27.0 102.0 75.0

39 + 950 L1 27.5 110.0 82.5

39 + 900 L1 27.0 105.0 78.0

39 + 850 L1 27.0 96.0 69.0

39 + 800 L1 26.5 94.5 68.0

RATA-RATA 77.5

Keterangan : STA 39+775 - 40 +053 L

Paper Area = 0.25 x 0.25 = 0.0625 m2

1
1 m2 = = 16 Bagian
0.0625
DIKETAHUI OLEH DIPERIKSA DAN DIKERJAKAN OLEH
PEMBERI TUGAS 77.45 x 16 SUB PENYEDIA JASA
Volume = DISETUJUI = KONTRAKTOR
1.239 Kg/m2
PT. WASKITA SRIWIJAYA ASPHALT MIXING PLANT
KONSULTAN1000SUPERVISI PELAKSANA
TOL PT. HAKAASTON
PT. PERENTJANA DJAJA PT. WASKITA KARYA

(.......................................) (.......................................) (.......................................) (.......................................)


KAYU AGUNG - PALEMBANG - BETUNG TOLL ROAD PROJECT
SECTION 2A STA. 39+785 - STA. 41+520
INTERCHANGE PALINDRA

PEKERJAAN : PRIME COAT


MATERIAL :
TANGGAL :

PRIME COAT

SPGR PRIME COAT : Gr /cc

Berat Paper Sebelum Berat Paper Sesudah


Berat Aspal
Penyemprotan Penyemprotan
STA. R/L
(Gram) (Gram) (Gram)

39 + 775 L1 27.5 113.0 85.5

39 + 775 L2 26.0 117.0 91.0

39 + 800 L2 27.0 101.0 74.0

39 + 850 L2 26.5 99.0 72.5

39 + 850 L2 27.0 106.0 79.0

39 + 900 L1 27.0 102.0 75.0

RATA-RATA 79.5

Keterangan :

Paper Area = 0.25 x 0.25 = 0.0625 m2

1
1 M2 = = 16 Bagian
0.0625
79.5 x 16
Volume = = 1.272 Kg/M2
1000

DIKETAHUI OLEH DIPERIKSA DAN DIKERJAKAN OLEH


PEMBERI TUGAS SUB PENYEDIA JASA
DISETUJUI KONTRAKTOR
PT. WASKITA SRIWIJAYA ASPHALT MIXING PLANT
KONSULTAN SUPERVISI PELAKSANA
TOL PT. HAKAASTON
PT. PERENTJANA DJAJA PT. WASKITA KARYA

(.......................................) (.......................................) (.......................................) (.......................................)


KAYU AGUNG - PALEMBANG - BETUNG TOLL ROAD PROJECT
SECTION 2A STA. 39+785 - STA. 41+520
INTERCHANGE PALINDRA

PEKERJAAN : PRIME COAT


MATERIAL : Aspal Emulsi
TANGGAL : 04 Desember 2020

PRIME COAT

SPGR PRIME COAT : 0.983 Gr /cc

Berat Paper Sebelum Berat Paper Sesudah


Berat Aspal
Penyemprotan Penyemprotan
STA. R/L
(Gram) (Gram) (Gram)

39 + 800 L2 34.0 117.0 83.0

39 + 850 L2 34.1 121.0 86.9

39 + 900 L2 34.4 106.0 71.6

39 + 950 L2 33.1 115.0 81.9

40 + 000 L2 33.5 98.0 64.5

39 + 800 L1 33.3 102.0 68.7

39 + 900 L1 34.1 93.0 58.9

40 + 000 L2 33.7 110.0 76.3

RATA-RATA 74.0

Keterangan : STA 39+775 - 40 +053 R

Paper Area = 0.25 x 0.25 = 0.0625 m2

1
1 m2 = = 16 Bagian
0.0625
73.975 x 16
Volume = = 1.184 Kg/M2
1000

DIKETAHUI OLEH DIPERIKSA DAN DIKERJAKAN OLEH


PEMBERI TUGAS SUB PENYEDIA JASA
DISETUJUI KONTRAKTOR
PT. WASKITA SRIWIJAYA ASPHALT MIXING PLANT
KONSULTAN SUPERVISI PELAKSANA
TOL PT. HAKAASTON
PT. PERENTJANA DJAJA PT. WASKITA KARYA

(.......................................) (.......................................) (.......................................) (.......................................)


KAYU AGUNG - PALEMBANG - BETUNG TOLL ROAD PROJECT
SECTION 2A STA. 39+785 - STA. 41+520
INTERCHANGE PALINDRA

PEKERJAAN : PRIME COAT


MATERIAL : Aspal Emulsi
TANGGAL : 07 Desember 2020

PRIME COAT

SPGR PRIME COAT : 0.983 Gr /cc

Berat Paper Sebelum Berat Paper Sesudah


Berat Aspal
Penyemprotan Penyemprotan
STA. R/L
(Gram) (Gram) (Gram)

39 + 800 L2 34.0 117.0 83.0

39 + 850 L2 34.1 121.0 86.9

39 + 900 L2 34.4 106.0 71.6

39 + 950 L2 33.1 115.0 81.9

40 + 000 L2 33.5 98.0 64.5

39 + 800 L1 33.3 102.0 68.7

RATA-RATA 76.1

Keterangan : STA 39+665 - 39+870 L

Paper Area = 0.25 x 0.25 = 0.0625 m2

1
1 M2 = = 16 Bagian
0.0625
76.1 x 16
Volume = = 1.218 Kg/M2
1000

DIKETAHUI OLEH DIPERIKSA DAN DIKERJAKAN OLEH


PEMBERI TUGAS SUB PENYEDIA JASA
DISETUJUI KONTRAKTOR
PT. WASKITA SRIWIJAYA ASPHALT MIXING PLANT
KONSULTAN SUPERVISI PELAKSANA
TOL PT. HAKAASTON
PT. PERENTJANA DJAJA PT. WASKITA KARYA

(.......................................) (.......................................) (.......................................) (.......................................)


KAYU AGUNG - PALEMBANG - BETUNG TOLL ROAD PROJECT
SECTION 2A STA. 39+785 - STA. 41+520
INTERCHANGE PALINDRA

PEKERJAAN : PRIME COAT


MATERIAL :
TANGGAL :

PRIME COAT

SPGR PRIME COAT : Gr /cc

Berat Paper Sebelum Berat Paper Sesudah


Berat Aspal
Penyemprotan Penyemprotan
STA. R/L
(Gram) (Gram) (Gram)

1 + 155 R/S 12.2 78.6 66.4

1 + 200 R/S 12.4 77.5 65.1

1 + 250 R/S 12.3 79.8 67.5

RATA-RATA

Keterangan :

Paper Area = 0.25 x 0.25 = 0.0625 m2

1
1 M2 = = 16 Bagian
0.0625
0 x 16
Volume = = 0.000 Kg/M2
1000

DIKETAHUI OLEH DIPERIKSA DAN DIKERJAKAN OLEH


PEMBERI TUGAS SUB PENYEDIA JASA
DISETUJUI KONTRAKTOR
PT. WASKITA SRIWIJAYA ASPHALT MIXING PLANT
KONSULTAN SUPERVISI PELAKSANA
TOL PT. HAKAASTON
PT. PERENTJANA DJAJA PT. WASKITA KARYA

(.......................................) (.......................................) (.......................................) (.......................................)


KAYU AGUNG - PALEMBANG - BETUNG TOLL ROAD PROJECT
SECTION 2A STA. 39+785 - STA. 41+520
INTERCHANGE PALINDRA

REKAPITULASI PRIME COAT

REAL
NO STATIONING R/L LAPORAN
Layer 1 Layer 2 Total

1 39 + 800 + 40 + 053 L 0.697 0.882 1.579 1.239

39 + 775 + 39 + 800 L
2 0.775 0.817 1.592 1.272
39 + 771 + 39 + 875 R

4 40 + 665 + 40 + 875 R 0.839 0.731 1.570 1.318

5 39 + 875 + 40 + 053 R 0.817 0.817 1.281

6 40 + 875 + 41 + 125 R 0.463 0.738 1.201 1.360

7 40 + 925 + 41 + 125 L1 0.482 0.530 1.012 1.334

8 40 + 925 + 41 + 125 L2 0.400 0.530 0.930 1.248

9 40 + 780 + 40 + 925 L 0.707 0.614 1.321 1.293

10 40 + 665 + 40 + 780 L 0.614 1.186 1.800 1.380

Rata - Rata 1.314 1.303