CV. YUDHITCHIO 1
1 201,347,000.00 0.96965
#REF!
1 201,418,000.00 0.96967
TERBILANG : DUA RATUS SATU JUTA EMPAT RATUS DELAPAN BELAS RIBU RUPIAH
1 200,170,000.00 0.96969
TERBILANG : DUA RATUS JUTA SERATUS TUJUH PULUH RIBU RUPIAH
0.96754
EE
#REF! OE #REF!
200,978,333.33
#REF! PASSING
1 2 3
a b c
I PERSIAPAN 25,750,000.00
A JUMLAH 750,571,383.46
B PPN 10 % 75,057,138.35
C JUMLAH TOTAL ( A + B ) 825,628,521.80
D DIBULATKAN 825,628,000.00
TERBILANG:
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
.............................................................
NIP: .....................................................
DAFTAR HARGA DAN KUANTITAS
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
a b c d e f
I PERSIAPAN
IV PEKERJAAN BETON
1 Pek. Kusen Pintu, Jendela, dan Ventilasi Kayu Kelas I (balok kayu 8/12) 0.78 M³ 5,591,000.00 4,365,810.62
2 Pas. Pasang Daun Pintu Panel Kayu Papan Kelas I 6.03 M² 215,300.00 1,297,483.92
3 Pas. Bingkai Jendela dan Vetilasi Kayu Papan Kelas I 8.43 M² 100,000.00 842,800.00
4 Pek. Kuda-Kuda Kayu Kelas I (kayu balok 8/12) 2.35 M³ 5,514,400.00 12,938,105.86
5 Pek. Gording Kayu Kelas II (kayu balok 5/10) 0.94 M³ 4,587,500.00 4,289,312.50
6 Pek. Atap Seng Gelombang BJLS 0.30 132.00 M² 130,700.00 17,252,400.00
7 Pek. Bubungan Seng Plat BJLS 0.25 12.50 M1 42,100.00 526,250.00
8 Pek. Lesplank Kayu kls II A (papan 2/20) 70.00 M1 50,400.00 3,528,000.00
9 Pek. Langit-Langit (plafon tripleks 3 mm dan rangka plafon kayu kelas II) 270.25 M² 150,200.00 40,591,550.00
10 Lis/Bilah Papan Profil 5 cm 163.00 M1 36,400.00 5,933,200.00
11 Mur / Baut / Beugel / Angker 45.00 Kg 28,800.00 1,296,000.00
VI PEKERJAAN PENGECATAN
1 Pek. Cat Dinding (1 Plamir), 1 Lapis Cat Dasar, 2 Kali Cat Penutup 922.58 M² 25,100.00 23,156,798.16
2 Pek. Cat Plafond dan List (1 Plamir), 1 Lapis Cat Dasar, 2 Kali Cat Penutup 270.25 M² 25,100.00 6,783,275.00
3 Pek. Cat Pintu, Jendela, Kosen, Ventilasi, Lysplank, dan Lis Profil (1 Plamir), 1 263.47 M² 34,400.00 9,063,386.16
Lapis Cat Dasar, 2 Kali Cat Penutup
1 Pas. Kaca Jendela dan Ventilasi (kaca bening 5 mm) 41.48 M² 196,800.00 8,163,736.32
2 Pas. Kunci Pintu Tanam 2 Slaag Kualitas Baik 2.00 Bh 324,300.00 648,600.00
3 Pas. Engsel Pintu Kuningan Kualitas Baik 12.00 Bh 44,100.00 529,200.00
4 Pas. Engsel Jendela Kuningan Kualitas Baik 68.00 Bh 25,800.00 1,754,400.00
5 Pas. Grendel Pintu Kuningan Kualitas Baik 2.00 Bh 16,200.00 32,400.00
6 Pas. Grendel Jendela Kuningan Kualitas Baik 22.00 Bh 16,200.00 356,400.00
7 Pas. Kait Angin Kualitas Baik 68.00 Bh 15,600.00 1,060,800.00
8 Pas. Pegangan Pintu/Door Holder 4.00 Bh 292,300.00 1,169,200.00
IX PEKERJAAN SANITASI
1 Kran Air Untuk Wudu Kualitas Baik 1/2" 5.00 Bh 53,500.00 267,500.00
2 Floor Drain 2.00 Bh 11,300.00 22,600.00
3 Pipa Pembuangan 3" PVC 11.00 M¹ 62,800.00 690,800.00
4 Pipa instalasi air bersih 1/2" PVC 15.00 M¹ 11,200.00 168,000.00
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Pekerja 0.750 Oh 25,000.00 18,750.00
Tenaga Kerja
Mandor 0.025 Oh 30,000.00 750.00
Jumlah Harga Per Satuan Pekerjaan 19,500.00
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 19,500.00
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Pekerja 0.250 Oh 25,000.00 6,250.00
Tenaga Kerja
Mandor 0.008 Oh 30,000.00 250.00
Jumlah Harga Per Satuan Pekerjaan 6,500.00
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 6,500.00
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Bahan Pasir Urug 1.200 M3 458,600.00 550,320.00
Pekerja 0.300 Oh 25,000.00 7,500.00
Tenaga Kerja
Mandor 0.010 Oh 30,000.00 300.00
Jumlah Harga Per Satuan Pekerjaan 558,120.00
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 558,100.00
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Bahan Tanah Urug/Timbunan 1.200 M3 280,200.00 336,240.00
Pekerja 0.250 Oh 25,000.00 6,250.00
Tenaga Kerja
Mandor 0.025 Oh 30,000.00 750.00
Jumlah Harga Per Satuan Pekerjaan 343,240.00
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 343,200.00
PEKERJAAN PONDASI
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Batu Belah 15 / 20 cm 1.200 M3 456,000.00 547,200.00
Bahan Portland Cemen 136.000 Kg 2,750.00 374,000.00
Pasir pasang 0.544 M3 458,600.00 249,478.40
Pekerja 1.500 Oh 25,000.00 37,500.00
Tukang Batu 0.600 Oh 31,800.00 19,080.00
Tenaga Kerja
Kepala Tukang 0.060 Oh 37,500.00 2,250.00
Mandor 0.075 Oh 30,000.00 2,250.00
Jumlah Harga Per Satuan Pekerjaan 1,231,758.40
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 1,231,700.00
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Batu Belah 15 / 20 cm 1.200 M3 456,000.00 547,200.00
Bahan
Pasir Urug 0.432 M3 458,600.00 198,115.20
Pekerja 0.780 Oh 25,000.00 19,500.00
Tukang Batu 0.390 Oh 31,800.00 12,402.00
Tenaga Kerja
Kepala Tukang 0.039 Oh 37,500.00 1,462.50
Mandor 0.039 Oh 30,000.00 1,170.00
Jumlah Harga Per Satuan Pekerjaan 779,849.70
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 779,800.00
PEKERJAAN DINDING
1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5 PP
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Batu Bata 33.000 Bh 2,750.00 90,750.00
Bahan Portland Cemen 22.200 Kg 2,750.00 61,050.00
Pasir pasang 0.102 M3 458,600.00 46,777.20
Pekerja 0.600 Oh 25,000.00 15,000.00
Tukang Batu 0.200 Oh 31,800.00 6,360.00
Tenaga Kerja
Kepala Tukang 0.020 Oh 37,500.00 750.00
Mandor 0.030 Oh 30,000.00 900.00
Jumlah Harga Per Satuan Pekerjaan 221,587.20
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 221,500.00
PEKERJAAN PLESTERAN
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Portland Cemen 5.184 Kg 2,750.00 14,256.00
Bahan
Pasir pasang 0.026 M 3
458,600.00 11,923.60
Pekerja 0.200 Oh 25,000.00 5,000.00
Tukang Batu 0.150 Oh 31,800.00 4,770.00
Tenaga Kerja
Kepala Tukang 0.015 Oh 37,500.00 562.50
Mandor 0.010 Oh 30,000.00 300.00
Jumlah Harga Per Satuan Pekerjaan 36,812.10
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 36,800.00
PEKERJAAN KAYU
1. Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu Kelas I
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Balok kayu 1.100 m3 4,275,000.00 4,702,500.00
Bahan Paku 10 cm 1.250 Kg 33,660.00 42,075.00
Lem Kayu 1.000 Kg 12,500.00 12,500.00
Pekerja 6.000 Oh 25,000.00 150,000.00
Tukang kayu 20.000 Oh 30,000.00 600,000.00
Tenaga Kerja
Kepala Tukang 2.000 Oh 37,500.00 75,000.00
Mandor 0.300 Oh 30,000.00 9,000.00
Jumlah Harga Per Satuan Pekerjaan 5,591,075.00
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 5,591,000.00
Harga Satuan
Jumlah Harga
Kebutuhan Indeks Satuan Bahan / Upah
(Rp) (Rp)
Papan kayu 0.040 m3 2,612,500.00 104,500.00
Bahan
Lem Kayu 0.500 kg - -
Pekerja 1.000 Oh 25,000.00 25,000.00
Tukang kayu 2.500 Oh 30,000.00 75,000.00
Tenaga Kerja
Kepala Tukang 0.250 Oh 37,500.00 9,375.00
Mandor 0.050 Oh 30,000.00 1,500.00
Jumlah Harga Per Satuan Pekerjaan 215,375.00
Jumlah Harga Per Satuan Pekerjaan Yang Dibulatkan 215,300.00
BAHAN FABRIKASI
.............................................................
NIP: .....................................................
BAHAN MATERIAL ALAMI
1 2 3
.............................................................
NIP: .....................................................
DAFTAR UPAH KERJA
.............................................................
NIP: .....................................................
DAFTAR ISIAN
PEKRJAAN URUGAN
URUGAN PASIR
1 URUGAN PASIR DI BAWAH PONDASI : - Lebar =
- Tebal =
- Panjang =
URUGAN TANAH
1 URUGAN TANAH DI BAWAH LANTAI : - Tebal =
PEKERJAAN PLESTRAN
22 PLESTERAN PONDASI : - Tinggi Kanan 1 =
CAMPURAN 1:3 - Tinggi Kanan 2 =
- Panjang S. Kan =
- Tinggi S. Kiri 1 =
- Tinggi S. Kiri 2 =
- Panjang S. Kiri =
- Tinggi Depan 1 =
- Tinggi Depan 2 =
- Panjang Depan =
- Tinggi Belk. 1 =
- Tinggi Belk 2 =
- Panjang Belk =
KOLOM BETON
23 - Kolom 8 x 8 : - Lebar =
- Panjang =
- Tinggi =
- Jumlah Klm =
- Besi 10 =
SLOFF BETON
27 - Sloof 12/15 : - Lebar =
- Tinggi =
- Panjang =
- Besi 12 =
PEKERJAAN KAYU
KOLOM KAYU
1 Kolom Kayu - Tinggi Kolom =
- Jumlah Kolom =
KUDA-KUDA KAYU
1 Kuda Kuda - Tinggi Kayu =
Type 1 - Lebar kayu =
Beugel 9 Apabila L KK >700 - Panjang Kayu =
Beugel 3 Apabila L KK 400<700 - Jml Kuda-Kuda =
Angker 3 Apbila L KK >700
Angker 2 Apbila L KK 400 <700 - Jml Mur Baut =
beugel - Jml Angker Baut =
1 - Jml Begel =
GORDING 5/10
1 - Gording - Lebar Atas =
Type 1 - Lebar Bawah =
- Tinggi =
- Lebar Kayu =
- Tinggi Kayu =
- Jumlah =
KASAU 5/7
1 Kasau 5/7 - Lebar Atas =
Type 1 - Lebar Bawah =
- Tinggi =
- Lebar Kayu =
- Tinggi Kayu =
- Jumlah =
RENG 3/5
1 Reng 3/5 - Lebar Atas =
Type 1 - Lebar Bawah =
- Tinggi =
- Lebar Kayu =
- Tinggi Kayu =
- Jumlah =
LISPLANK KAYU
1 Lisplank Kayu - Panjang Samp. Kanan =
Type 1 - Panjang Samp. Kiri =
- Panjang Depan =
- Panjang Belakang =
- Lebar =
- Lapisan =
ATAP SENG
1 Atap Seng Gel. BJLS 0.20-0.30mm - Lebar Atas =
Type 1 - Lebar Bawah =
Sama dengan Atap Genteng - Tinggi =
- Jumlah =
PEKERJAAN PLAFOND
1 TYPE PLAFOND 1 : Panjang =
Lebar =
LANTAI KERAMIK
CAT ATAP
ATAP GENTENG
ATAP SENG
ASARANA PERKANTORAN
NTERIAN AGAMA KOTA TIDORE KEPULAUAN
143.00 M2
20.00 M1
23.00 M1
22.00 M1
45.00 M1
8.00 M1
- M1
- M1
- M1
0.10 M1
0.05 M1
7.00 M1 2 LT
- M1
64.00 M1 2 LT 64.00
- M1
10.00 M1
2.00 M2 0.0125
1.60 M1 nanti di sesuaikan kembali dimensi galiannya apabila biaya melebihi pagu
1.10 M1
0.80 M1
45.00 M1
0.80 M1
0.80 M1
0.80 M1
8.00 M1
1.50 M1 nanti di sesuaikan kembali dimensi galiannya apabila biaya melebihi pagu
1.50 M1
1.50 M1
1.50 M1
10.00 Bh
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
1.10 M1
0.10 M1
45.00 M1
1.50 M1
0.10 M1
1.50 M1
10.00 Bh
0.80 M1
0.10 M1
8.00 M1
- M1
0.10 M1
- M1
9.50 M1
10.00 M1
0.05 M1
4.00 M1
2.00 M1
0.40 M1
8.00 M1
0.40 M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
2.00 M1
4.00 M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
0.45 M1
0.90 M1
0.90 M1
0.20 M1
45.00 M1
0.30 M1 nanti di sesuaikan kembali dimensi galiannya apabila biaya melebihi pagu
0.70 M1
0.80 M1
45.00 M1
0.30 M1
0.60 M1
0.80 M1
8.00 M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1 -
- M1
- M1
- M2
7.00 M1
64.00 M1
35.03 M2
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1 -
- M1
- M1
- M1
45.00 M1
35.03 M2
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
- M1
0.40 M1
0.40 M1
3.50 M1
10.00 Bh
43.00
0.20 M1
0.20 M1
3.50 M1
10.00 Bh
39.00
- M1
- M1
- M1
- Bh
-
- M1
- M1
- M1
- Bh
-
- M1
- M1
- M1
- Bh
-
- M1
- M1
- M1
- Bh
-
- M1
- M1
- M1
- Bh
-
0.10 M1
0.10 M1
3.50 M1
2.00 Bh
4.00 Urat
0.40 M1
0.40 M1 1 - Kolom 10x10
5.65 M1 1 - Kolom 15x15
10.00 Bh 1 - Kolom 12x20
8.00 Urat 1 - Kolom 20x20
1 - Kolom 20x25
0.20 M1 1 - Kolom 25x25
0.20 M1 1 - Kolom 25x30
4.00 M1 1 - Kolom 30x40
10.00 Bh 1 - Kolom 30x40
6.00 Urat 1 - Kolom 30x50
1 - Kolom 40x40
0.12 M1 1 - Kolom 40x50
0.20 M1 1 - Kolom 40x60
- M1 1 - Kolom 50x50
- Bh 1 - Kolom 50x60
- Urat 1 - Kolom 60x60
- Balok 40x40
- M1 - Balok 40x50
- M1 - Balok 40x60
45.00 M1 - Balok 50x50
- Urat - Balok 50x60
- Balok 60x60
- M1
- M1
45.00 M1 #REF!
- Urat
0.20 M1
0.30 M1
45.00 M1
6.00 Urat
- M1
- M1
45.00 M1
4.00 Urat
4.00 Urat
- M1
- M1
45.00 M1
4.00 Urat
4.00 Urat
#REF!
- M1
- M1
45.00 M1
4.00 Urat
4.00 Urat
10.00 M1
0.12 M1
10.00 M1 7858
0.617 KG 10 0.005
0.617 KG 10 0.005
9.51 M1
0.12 M1
2.55 M1 7858
0.395 KG 8 0.004
0.395 KG 8 0.004
- M1
- M1
- M1
- M1
0.20 M1
0.06 M1 7858
0.395 KG 8 0.004
0.395 KG 8 0.004
- M1
- M1
- M1
- M1
0.20 M1
0.06 M1 7858
0.395 KG 8 0.004
0.395 KG 8 0.004
0.12 M1
7.20 M1
1.00 M1 7858
0.395 KG 8 0.004
0.395 KG 8 0.004
1.00 M1
0.30 M1
1.00 M1 7858
10.00 M1
0.888 KG 12 0.006
0.888 KG 12 0.006
- M1
- M1
- M1 7858
10.00 M1
0.888 KG 12 0.006
0.888 KG 12 0.006
2.50 M1
0.12 M1
0.60 M1 7858
0.617 KG 10 0.005
0.617 KG 10 0.005
12.000 bh
1.30 M1 7858
0.15 M1 10 0.005
- M1 10 0.005
0.617 KG
0.617 KG
- M1
- M1
45.00 M1
Jumlah Kayu
1.54 M1 1.34 1.00
4.66 M1 2.33 2.00
2.00 Bh
1.24 M1 0.10 (dikurangi lbr kusen)
2.43 M1 0.10 (ditambah tinggi kusen)
2.00 Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1 1.24 sama panjangnya dengan lbr daun pintu
- M2
- Bh
- Bh
6.24 M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - 2.00
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - 2.00
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - 2.00
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - 2.00
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
KUNCI JLH
12.00 2.00
72.00 36.00
44.00 22.00
Jumlah Kayu
- M1 - -
- M1 - -
36.00 Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
36.00 Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
1.00 Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - 2.00
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - 2.00
- Bh
(0.10) M1 0.10 (dikurangi lbr kusen)
0.10 M1 0.10 (ditambah tinggi kusen)
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
1.80 M1 0.70 2.00
3.76 M1 1.88 2.00
10.00 Bh
0.60 M1
1.88 M1
0.24 M2
10.00 Bh
0.50 M1
1.78 M1
0.89 M2
10.00 M2
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
10.00 Bh
- M1
- M1
- M2
10.00 Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
0.60 M1
- M2
28.00 Bh
48.00 Bh
13.16 M2
Jumlah Kayu
4.12 M1 1.86 2.00
5.56 M1 1.39 4.00
4.00 Bh
1.76 M1
1.39 M1
0.31 M2
12.00 Bh
1.66 M1
1.29 M1
2.14 M2
12.00 M2
- M1
- M1
- M2
12.00 Bh
- M1
- M1
- M2
12.00 Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
1.76 M1
- M2
- Bh
4.00 Bh
10.34 M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1
- M1
(0.02) M2
- Bh
(0.20) M1
(0.10) M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
2.00 Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1
- M1
(0.02) M2
- Bh
(0.20) M1
(0.10) M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1
- M1
(0.02) M2
- Bh
(0.20) M1
(0.10) M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1
- M1
(0.02) M2
- Bh
(0.20) M1
(0.10) M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1
- M1
(0.02) M2
- Bh
(0.20) M1
(0.10) M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
- M1
- M2
- Bh
- M1
(0.10) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
0.90 M1 0.25 2.00
0.80 M1 0.40 2.00
20.00 Bh
0.15 M1
0.40 M1
0.05 M2
- Bh
0.05 M1
0.30 M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
0.35 M1
- M2
10.00 Bh
- Bh
2.00 M2
Jumlah Kayu
3.82 M1 1.71 2.00
1.92 M1 0.48 4.00
4.00 Bh
1.61 M1
0.48 M1
0.20 M2
12.00 Bh
1.51 M1
0.38 M1
0.57 M2
12.00 M2
- M1
- M1
- M2
- Bh
- M1
0.43 M1
- M2
23.00 Bh
- Bh
3.28 M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1
- M1
(0.02) M2
- Bh
(0.20) M1
(0.10) M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
(0.05) M1
- M2
- Bh
- Bh
- M2
Jumlah Kayu
- M1 - -
- M1 - -
- Bh
(0.10) M1
- M1
(0.02) M2
- Bh
(0.20) M1
(0.10) M1
0.02 M2
- M2
- M1
- M1
- M2
- Bh
- M1
(0.05) M1
- M2
- Bh
- Bh
- M2
0.12 M1 <=400
0.08 M1
48.88 M1 1,000,000.00 1,000.00
5.00 Bh
100.00 Bh
100.00 Bh
5.00 Bh
0.12 M1 KK 400<700
0.08 M1
- M1
- Bh
- Bh
- Bh
- Bh
0.12 M1 KK >700
0.08 M1
- M1
- Bh
- Bh
- Bh
- Bh
0.12 M1
0.08 M1
- M1
- Bh
- Bh
- Bh
- Bh
0.12 M1
0.08 M1
- M1
- Bh
- Bh
- Bh
- Bh
11.00 M1
11.00 M1
6.00 M1
0.05 M1
0.10 M1
2.00 Bh
- M1
- M1
- M1
0.05 M1
0.10 M1
- Bh
- M1
- M1
- M1
0.05 M1
0.10 M1
- Bh
- M1
- M1
- M1
0.05 M1
0.10 M1
- Bh
- M1
- M1
- M1
0.05 M1
0.10 M1
- Bh
11.00 M1
11.00 M1
6.00 M1
0.07 M1
0.05 M1
2.00 Bh -
- M1
- M1
- M1
0.07 M1
0.05 M1
- Bh
- M1
- M1
- M1
0.07 M1
0.05 M1
- Bh
- M1
- M1
- M1
0.07 M1
0.05 M1
- Bh
- M1
- M1
- M1
0.07 M1
0.05 M1
- Bh
11.00 M1
11.00 M1
6.00 M1
0.03 M1
0.05 M1
2.00 Bh
- M1
- M1
- M1
0.03 M1
0.05 M1
- Bh
- M1
- M1
- M1
0.03 M1
0.05 M1
- Bh
- M1
- M1
- M1
0.03 M1
0.05 M1
- Bh
- M1
- M1
- M1
0.03 M1
0.05 M1
- Bh
0.10 M1
0.05 M1
20.00 Bh
5.00 Bh
0.10 M1
0.05 M1
- Bh
- Bh
0.10 M1
0.05 M1
- Bh
- Bh
0.10 M1
0.05 M1
- Bh
- Bh
11.00 M1
11.00 M1
13.00 M1
- M1
0.20 M1
2.00 Bh
- M1 4
- M1 4
- M1 6
- M1
0.20 M1
2.00 Bh
11.00 M1 946,000,000.00
11.00 M1 -
6.00 M1
2.00 Bh 946,000,000.00
- M1
- M1
- M1
- Bh
- M1
- M1 #REF! J443 #REF! #REF!
- M1 J444 #REF! #REF!
- Bh
- M1
- M1
- M1 #REF! J449 #REF! #REF!
- Bh J450 #REF! #REF!
J451 #REF! #REF!
- M1 J452 #REF! #REF!
- M1 J453 #REF! #REF!
- M1 #REF! J454 #REF! #REF!
- Bh J455 #REF! #REF!
J456 #REF! #REF!
M1
M1
M1
Bh
12.00 M1
0.50 M1
1.00 Bh
M1
Bh -
M1
Bh
M1
Bh
11.00 M1
11.00 M1
6.00 M1
2.00 Bh
- M1
- M1
- M1
- Bh
- M1
- M1
- M1
- Bh
- M1
- M1
- M1
- Bh
- M1
- M1
- M1
- Bh
- M1
- M1
- M1
- Bh
- M1
- M1
- Bh
M1
Bh
M1
Bh
M1
Bh
9.50 M1
10.00 M1
9.50 M1
11.00 M1
2.00 M1
9.50 M1
- M1 2.50
- M1 20.70
- M1 1.25
- M1 11.65
- M1
- M1
- M1
- M1
- M1
- M1
2.00 M1
4.00 M1
- M1
- M1
- M1
- M1
35.00 M1
1.25 M1
- M1
0.03 M1
- M1
- M1
0.03 M1
- M1
- M1
- M1
- Bh
- M2
- M1
- M1
- Bh
- M2
- M1
- M1
- Bh
- M2
- M1
- M1
- M2
- M1
- M1
- M2
- M1
- M1
0 - -
- M1
- M1
0 - -
1
1
1
1
besi 12 besi 16 besi 19 besi 20
4
4
1,000,000,000.00
- Tinggi = - M1
- Panjang = - M1
- Lubang 0
DAFTAR PERHITUNGAN VOLUME
PEKERJAAN TANAH
1. GALIAN TANAH PONDASI
GALIAN PONDASI JALUR
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
1.60 M1 1.10 M1 0.80 M1 1.08 M2 45.00 M1 48.60 M3
GALIAN PONDASI TERAS
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.80 M1 0.80 M1 0.80 M1 0.64 M2 8.00 M1 5.12 M3
GALIAN PONDASI TELAPAK
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG JUMLAH VOLUME
1.50 M1 1.50 M1 1.50 M1 2.25 M2 1.50 M1 10.00 Bh 33.75 M3
GALIAN PONDASI RABAT
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M1 0 M2 0.00 M1 0.00 M3
GALIAN SALURAN
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
GALIAN SALURAN
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
- M1 - M1 - M1 0.00 M2 - 0.00 M3
87.47 M3
3. URUGAN TANAH
URUGAN TANAH DIBAWAH LANTAI
LUAS. LT TYPE 1 LUAS. LT TYPE 2 LUAS. LT TYPE 3 LUAS. LT TYPE 4 LUAS. LT TYPE 5 Tebal Urugan JUMLAH
95.00 M2 8.00 M2 3.20 M2 0.00 M2 0.00 M2 0.45 M1 47.79 M3
URUGAN TANAH DIBAWAH LANTAI KM/WC URUGAN TANAH DIBAWAH LANTAI TERAS
LUAS. LT TYPE 1 LUAS. LT TYPE 2 LUAS. LT TYPE 3 LUAS. LT TYPE 1 LUAS. LT TYPE 2 LUAS. LT TYPE 3 JUMLAH
0.00 M2 0.00 M2 0.00 M2 8.00 M2 0.00 M2 0.00 M2 3.60 M3
URUGAN TANAH DIBAWAH LANTAI RABAT KELILING
LUAS. LT TYPE 1 JUMLAH
0.00 M2 0.00 M2
51.39 M3
PEKERJAAN PASANGAN BATU & BATA
1. PASANGAN BATU KOSONG
PAS. BATU KOSONG
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.90 M1 0.90 M1 0.20 M1 0.18 M2 45.00 M1 8.1 M3
PAS. BATU KALI
4. PLESTERAN
PLESTERAN PONDASI
TING. RATA-2 PANJANG VOLUME
0.00 M1 0 M1 0 M2
PLESTERAN BETON
- Plesteran Kolom 10x10 - Plesteran Kolom 15x15 - Plesteran Kolom 12x20 - Plesteran Kolom 20x20 - Plesteran Kolom 25x25 - Plesteran Kolom 30x40 VOLUME
43.00 M2 39.00 M2 0.00 M2 0.00 M2 0.00 M2 0.00 M2 82.00 M2
PLESTERAN LISTPLANK BETON
LEBAR SATUAN lebar LUAS PANJANG TINGGI LUAS VOLUME
1.00 M1 7.20 M1 7.20 M2 1.00 M1 0.12 M1 0.12 14.64 M3
96.64
PEKERJAAN BETON
1. SLOOF
- Sloof 12/15
LEBAR TINGGI LUAS PANJANG VOLUME
- M1 - M1 - M2 45.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! KG #DIV/0! KG
- Sloof 15/20
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 45.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! KG #DIV/0! KG
- Sloof 20/30
LEBAR TINGGI LUAS PANJANG VOLUME
0.20 M1 0.30 M1 0.06 M2 45.00 M1 2.70 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
16.67 83.33 0.9 82.50 18.32 6.00 100.00 89.80 108.12 KG 100.00 KG
VOLUME
2.70 M3
2. KOLOM
- Kolom 8 x 8
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.10 M1 0.10 M1 0.010 M2 3.50 M1 2.00 Bh 0.07 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
100.00 500.00 0.3 165.00 36.63 4.00 400.00 359.20 395.83 KG 390.00 KG
- Kolom 10x10
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.40 M1 0.40 M1 0.16 M2 5.65 M1 10.00 Bh 9.04 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
6.25 31.25 1.5 51.56 11.45 8.00 50.00 44.90 56.35 KG 50.00 KG
- Kolom 15x15
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.20 M1 0.20 M1 0.04 M2 4.00 M1 10.00 Bh 1.60 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
25.00 125.00 0.7 96.25 21.37 6.00 150.00 134.70 156.07 KG 150.00 KG
- Kolom 12x20
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.12 M1 0.20 M1 0.02 M2 0.00 M1 0.00 Bh 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
41.67 208.33 0.54 123.75 27.47 0.00 0.00 0.00 27.47 KG 20.00 KG
- Kolom 20x20
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.20 M1 0.20 M1 0.04 M2 0.00 M1 0.00 Bh 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
25.00 125.00 0.7 96.25 21.37 0.00 0.00 0.00 - 0.00 0.00 21.37 20.00 KG
- Kolom 25x25
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.25 M1 0.25 M1 0.06 M2 0.00 M1 0.00 Bh 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
16.00 80.00 0.9 79.20 31.28 0.00 0.00 0.00 - 0.00 0.00 31.28 30.00 KG
- Kolom 30x30
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.00 M1 0.00 M1 0.00 M2 3.50 M1 10.00 Bh 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 2.00 #DIV/0! #DIV/0! 8.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
- Kolom 30x40
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.30 M1 0.40 M1 0.12 M2 0.00 M1 0.00 Bh 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
8.33 41.67 1.3 59.58 23.54 0.00 0.00 0.00 - 0.00 0.00 23.54 20.00 KG
VOLUME
10.64 M3
3. BALOK
- Balok 12/15
LEBAR TINGGI LUAS PANJANG VOLUME
0.20 M1 0.30 M1 0.06 M2 29.00 M1 1.74 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
16.67 83.33 0.9 82.50 18.32 6.00 100.00 89.80 108.12 KG 100.00 KG
- Balok 15/20
LEBAR TINGGI LUAS PANJANG VOLUME
0.20 M1 0.20 M1 0.04 M2 8.00 M1 0.32 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
25.00 125.00 0.7 96.25 21.37 6.00 150.00 134.70 156.07 KG 150.00 KG
- Balok 20/30
LEBAR TINGGI LUAS PANJANG VOLUME
0.30 M1 0.40 M1 0.12 M2 58.00 M1 6.96 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
8.33 41.67 1.3 59.58 13.23 6.00 50.00 44.90 4.00 33.33 52.63 110.76 110.00 KG
- Balok 25/45
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 45.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 4.00 #DIV/0! #DIV/0! 4.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
- Balok 30/50
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 45.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 4.00 #DIV/0! #DIV/0! 4.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
- Balok 30/60
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 45.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 4.00 #DIV/0! #DIV/0! 4.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
VOLUME
9.02 M3
4. PLAT LANTAI
- Plat Lantai / Lantai Deck
LEBAR SATUAN TINGGI LUAS PANJANG LEBAR VOLUME
1.00 M1 0.12 M1 0.12 M2 10.00 M1 10.00 M1 12.00 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
8.33 123 123.32 0.62 76.07 16 131.39 0.62 81.0476303 157.12 150.00 KG
- Plat Duiker Parkir
LEBAR SATUAN TINGGI LUAS PANJANG LEBAR VOLUME
1.00 M1 0.12 M1 0.12 M2 2.55 M1 9.51 M1 2.91 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
8.33 123 123.32 0.39 48.69 16 131.39 0.39 51.87 100.56 100.00 KG
VOLUME
14.91 M3
5. LISPLANK BETON
Lisplank Beton Type 1
LEBAR SATUAN Tinggi Luas Panjang Rata2 Lebar VOLUME
1.00 M1 0.20 M1 0.20 M2 0.00 M1 0.06 M1 0.00 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
5.00 74 74 0.395 29.39 16 78.83 0.395 31.12 60.51 60.00 KG
Lisplank Beton Type 2
LEBAR SATUAN Tinggi Luas Panjang Rata2 Lebar VOLUME
1.00 M1 0.20 M1 0.20 M2 0.00 M1 0.06 M1 0.00 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
5.00 74 74 0.395 29.39 16 78.83 0.395 31.12 60.51 60.00 KG
6. MEJA BETON
- Meja Beton
LEBAR SATUAN lebar LUAS PANJANG LEBAR VOLUME
1.00 M1 7.20 M1 7.20 M2 1.00 M1 0.12 M1 0.86 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
0.14 3 3 0.395 1.24 16 2.19 0.395 0.86 2.10 0.00 KG
7. PONDASI TELAPAK
- Pondasi Telapak 100 X 100
LEBAR SATUAN Tinggi LUAS PANJANG LEBAR JUMLAH VOLUME
1.00 M1 0.30 M1 0.30 M2 1.00 M1 1.00 M1 10.00 3.00 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
3.33 50 50 0.888 44.40 23 77.00 0.888 68.40 112.80 110.00 KG
- Pondasi Telapak 120 X 120
LEBAR SATUAN Tinggi LUAS PANJANG LEBAR JUMLAH VOLUME
1.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M1 10.00 0.00 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! #DIV/0! 0.888 #DIV/0! 23 #DIV/0! 0.888 #DIV/0! #DIV/0! #DIV/0! KG
VOLUME
3.00 M3
8. TANGGA BETON
- Tangga Beton
LEBAR SATUAN Tinggi LUAS PANJANG LEBAR JUMLAH VOLUME
1.00 M1 0.12 M1 0.12 M2 0.60 M1 2.50 M1 12 2.16 M3
9. BAK BETON
- Bak Beton
LEBAR SATUAN Tinggi LUAS PANJANG LEBAR JUMLAH VOLUME
1.00 M1 0.15 M1 0.15 M2 0.00 M1 1.30 M1 #REF! #REF! M3
#REF! M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
8.33 123 123 0.617 76.07 16 131.39 0.617 81.05 157.12 150.00 KG
PEKERJAAN BINGKAI JENDELA, BINGKAI VENTILASI (PINTU), BINGKAI VENTILASI (JENDELA) & BINGKAI VENTILASI
BINGKAI JENDELA
Bingkai Jendela Kaca
JV 1 JV 2 JV 3 JV 4 JV 5
Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh)
0.24 10.00 2.38 0.31 12.00 3.66 (0.02) - - (0.02) - - (0.02) -
JV 6 JV 7 VOLUME
Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh) Volume Bingkai Jendela
(0.02) - - (0.02) - - 6.04 M2
BINGKAI VENTILASI
Bingkai Ventilasi Kaca
V1 V2 V3 V4 VOLUME
Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh) Volume Luas (M2) JML (Bh) Volume
0.05 - - 0.20 12.00 2.39 (0.02) - - (0.02) - - 2.39 M2
PEKERJAAN JALUSI VENTILASI PINTU, JALUSI VENTILASI JENDELA & JALUSI VENTILASI
JALUSI VENTILASI PINTU
Jalusi Ventilasi Pintu Panel
P, PV, PJV 1 P, PV, PJV 2 P, PV, PJV 3 P, PV, PJV 4 P, PV, PJV 5
Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh)
- - - - - - - - - - - - - -
P, PV, PJV 6 P, PV, PJV 7
Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen
- - - - - - VOLUME
Jalusi Ventilasi Pintu
Jalusi Ventilasi Pintu Tripleks (KM/WC) - M2
P, PV, PJV 1 P, PV, PJV 2 P, PV, PJV 3
Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen
- - 1.00 - - - - - -
JALUSI VENTILASI
Jalusi Ventilasi
V1 V2 V3 V4 VOLUME
Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen Luas (M2) JML (Bh) JML Kusen
- 10.00 - - 23.00 - - - - - - - - M2
PEKERJAAN KACA
KACA JENDELA
KACA JENDELA
JV 1 JV 2 JV 3 JV 4 JV 5 JV 6 JV 7
Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh)
0.89 10.00 2.14 12.00 0.02 - 0.02 - 0.02 - 0.02 - 0.02 -
KACA VENTILASI
KACA VENTILASI
V1 V2 V3 V4
Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh) Luas (M2) Jlh (Bh)
0.02 - 0.57 12.00 0.02 - 0.02 -
PEKERJAAN KUDA-KUDA
Type 1
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
0.12 M1 0.08 M1 0.01 M1 48.88 M1 5.00 Bh 2.35 M3
Type 2
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
0.12 M1 0.08 M1 0.01 M1 - M1 - Bh - M3
Type 3
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
0.12 M1 0.08 M1 0.01 M1 - M1 - Bh - M3
Type 4
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
0.12 M1 0.08 M1 0.01 M1 - M1 - Bh - M3
Type 5
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
0.12 M1 0.08 M1 0.01 M1 - M1 - Bh - M3
2.35 M3
PEKERJAAN GORDING
Type 1
Lebar Atas Lebar Bawah Panjang Rata-2 Tinggi Jumlah Gording Luas Kayu Jlh Jenis VOLUME
11.00 M1 11.00 M1 11.00 M1 6.00 M1 8.50 Bh 0.01 2.00 0.94 M3
Type 2
Lebar Atas Lebar Bawah Panjang Rata-2 Tinggi Jumlah Gording Luas Kayu Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 1.00 Bh 0.01 - - M3
Type 3
Lebar Atas Lebar Bawah Panjang Rata-2 Tinggi Jumlah Gording Luas Kayu Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 1.00 Bh 0.01 - - M3
Type 4
Lebar Atas Lebar Bawah Panjang Rata-2 Tinggi Jumlah Gording Luas Kayu Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 1.00 Bh 0.01 - - M3
Type 5
Lebar Atas Lebar Bawah Panjang Rata-2 Tinggi Jumlah Gording Luas Kayu Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 1.00 Bh 0.01 - - M3
0.94 M3
SKOR ANGIN
Type Vertikal
Tinggi Lebar Panjang Jumlah Luas Kayu VOLUME
0.10 M1 0.05 M1 20.00 M1 5.00 Bh 0.01 M2 0.50 M3
Type Horizontal
Tinggi Lebar Panjang Jumlah Luas Kayu VOLUME
0.10 M1 0.05 M1 - M1 - Bh 0.01 M2 - M3
Type 1
Tinggi Lebar Panjang Jumlah Luas Kayu VOLUME
0.10 M1 0.05 M1 - M1 - Bh 0.01 M2 - M3
Type 2
Tinggi Lebar Panjang Jumlah Luas Kayu VOLUME
0.10 M1 0.05 M1 - M1 - Bh 0.01 M2 - M3
0.50 M3
Volume Gording & Skor Angin 1.44 M3
KASAU
- KasauType 1
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Kasau Luas Kayu Dan Jlh Jenis VOLUME
11.00 M1 11.00 M1 11.00 M1 6.00 M1 22.00 Bh 0.00350 2.00 0.92 M3
- KasauType 2
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Kasau Luas Kayu Dan Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 - Bh 0.00350 - - M3
- KasauType 3
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Kasau Luas Kayu Dan Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 - Bh 0.00350 - - M3
- KasauType 4
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Kasau Luas Kayu Dan Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 - Bh 0.00350 - - M3
- KasauType 4
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Kasau Luas Kayu Dan Jlh Jenis VOLUME
0.07 M1 0.05 M1 0.06 M1 - M1 0.12 Bh - - - M3
0.92 M3
RENG
- Reng Type 1
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Reng Luas Kayu Dan Jlh Jenis VOLUME
11.00 M1 11.00 M1 11.00 M1 6.00 M1 17.14 Bh 0.00150 2.00 0.57 M3
- Reng Type 2
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Reng Luas Kayu Dan Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 - Bh 0.00150 - - M3
- Reng Type 3
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Reng Luas Kayu Dan Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 - Bh 0.00150 - - M3
- Reng Type 4
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Reng Luas Kayu Dan Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 - Bh 0.00150 - - M3
- Reng Type 4
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Reng Luas Kayu Dan Jlh Jenis VOLUME
0.03 M1 0.05 M1 0.04 M1 - M1 - Bh - - - M3
0.57 M3
LISPLANK KAYU
- Pekerjaan Lisplank Type 1
P.S.Ka (M) P.S.Ki (M) P.Blkg (M) P.Dpn (M) Lebar (M) Lapis (M) P. Total (M) Luas (2) VOLUME
11.00 11.00 - 13.00 0.20 2.00 35.00 14.00 14.00 M2
- Pekerjaan Lisplank Type 1
P.S.Ka (M) P.S.Ki (M) P.Blkg (M) P.Dpn (M) Lebar (M) Lapis (M) P. Total (M) Luas (2) VOLUME
- - - - 0.20 2.00 - - - M2
14.00 M3
PEKERJAAN PLAFOND
- Pek. Plafond dan Rangka kayu
Luas Plafond 1 Luas Plafond 2 Luas Plafond 3 Luas Plafond 4 Luas Plafond 5 Luas Plafond 6 Luas Plafond 7
95.00 M2 104.50 M2 19.00 M2 - M2 - M2 - M2 - M2
Luas Plafond 8 Luas Plafond 9 Luas Plafond 10 Luas Plafond 11 Luas Plafond 12 VOLUME
- M2 8.00 M2 - M2 - M2 43.75 M2 270.25 M2
- Pek. Mur-Baut
Lebar Kuda-kuda Jumlah Mur baut Jumlah Kuda_kuda Lebar KudaKuda Jumlah Mur baut Jumlah Kuda_kuda VOLUME
- M1 100.00 5.00 - - - 100.00 Bh
Lebar Kuda-kuda Jumlah Mur baut Jumlah Kuda_kuda
- M1 - -
- Pek. Angker-Baut
lLebar Kuda-kuda Jumlah Angker Jumlah Kuda_kuda Lebar KudaKuda Jumlah Angker Jumlah Kuda_kuda VOLUME
- M1 100.00 5.00 500.00 800.00 - - - 500.00 Bh
- Pek. Begel
lLebar Kuda-kuda Jumlah Beugel Lebar kuda-kuda Jumlah Beugel Lebar kuda-kuda Jumlah Beugel VOLUME
- M1 5.00 - - - - - 5.00 Bh
- Engsel Pintu
P, PV, PJV 1 P, PV, PJV 2 P, PV, PJV 3 P, PV, PJV 4 P, PV, PJV 5 P, PV, PJV 6 P, PV, PJV 7
2.00 Bh - Bh - Bh - Bh - Bh - Bh 2.00 Bh
- Engsel Pintu KM/WC
P, PV, 1 P, PV, 2 P, PV, 3 VOLUME
36.00 Bh - Bh - Bh 120.00 Bh
- Engsel Jendelah
JV 1 JV 2 JV 3 JV 4 JV 5 JV 6 JV 7
10.00 Bh 12.00 Bh - Bh - Bh - Bh - Bh - Bh
VULUME
44.00 Bh
VULUME
- Engsel Ventilasi
124.00 Bh
BIAYA (Rp.)
NO URAIAN JENIS PEKERJAAN KETERANGAN
BAHAN TENAGA TOTAL
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN BETON
E PEKERJAAN SANITASI
F PEKERJAAN PENGECATAN
H PEKERJAAN PLESTERAN
I PEKERJAAN KAYU
L PEKERJAAN ATAP
1 #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF!
9 #REF! #REF! #REF! #REF!
10 #REF! #REF! #REF! #REF!
11 #REF! #REF! #REF! #REF!
12 #REF! #REF! #REF! #REF!
13 #REF! #REF! #REF! #REF!
14 #REF! #REF! #REF! #REF!
15 #REF! #REF! #REF! #REF!
16 #REF! #REF! #REF! #REF!
17 #REF! #REF! #REF! #REF!
18 #REF! #REF! #REF! #REF!
19 #REF! #REF! #REF! #REF!
20 #REF! #REF! #REF! #REF!
21 #REF! #REF! #REF! #REF!
22 #REF! #REF! #REF! #REF!
23 #REF! #REF! #REF! #REF!
24 #REF! #REF! #REF! #REF!
25 #REF! #REF! #REF! #REF!
26 #REF! #REF! #REF! #REF!
27 #REF! #REF! #REF! #REF!
28 #REF! #REF! #REF! #REF!
29 #REF! #REF! #REF! #REF!
30 #REF! #REF! #REF! #REF!
31 #REF! #REF! #REF! #REF!
32 #REF! #REF! #REF! #REF!
33 #REF! #REF! #REF! #REF!
34 #REF! #REF! #REF! #REF!
35 #REF! #REF! #REF! #REF!
36 #REF! #REF! #REF! #REF!
J PEKERJAAN LANTAI
SPESIFIKASI
NO JENIS BAHAN MERK / MOFDEL SATUAN
UKURAN
1 2 3 4
1 Semen (PC) 50 kg Zak
Kg
2 Semen warna Kg
3 Kawat Beton Kg
4 Kawat Bronjong Kg
5 Kawat Duri Kg
6 Kapur Padam M3
BESI BETON
6 Besi Beton Dia. 6 mm Staf
7 Besi Beton Dia. 8 mm Staf
8 Besi Beton Dia. 10 mm Staf
9 Besi Beton Dia. 12 mm Staf
10 Besi Beton Dia. 14 mm Staf
11 Besi Beton Dia. 16 mm Staf
12 Besi Beton Dia. 19 mm Staf
13 Besi Beton Dia. 22 mm Staf
14 Besi Beton Dia. 25 mm Staf
15 Besi Beton Dia. 32 mm Staf
PAKU
16 Paku Campuran Kg
17 Paku Tripleks Kg
18 Paku Seng Kg
19 Paku Beton Kg
PIPA
26 Pipa Galvanis Medium B Uk. 1/2 " M1
27 Pipa Galvanis Medium B Uk. 3/4 " M1
28 Pipa Galvanis Medium B Uk. 1 " M1
29 Pipa Galvanis Medium B Uk. 11/4 " M1
BESI SIKU
51 Besi Siku Uk. 30.30.3 M'
52 Besi Siku Uk. 40.40.4 M'
53 Besi Siku Uk. 50.50.5 M'
ATAP DAN TEGEL
54 Seng Gelombang BJLS 0.20 mm Lbr
55 Seng Gelombang BJLS 0.25 mm Lbr
56 Seng Gelombang BJLS 0.30 mm Lbr
57 Seng Pelat Bubungan BJLS 0.20 mm Lbr
58 Seng Pelat Bubungan BJLS 0.30 mm Lbr
59 Multi Roof Bh
60 Bubungan Multi Roof Bh
61 Sakura Roof Bh
62 Bubungan Sakura roof Bh
63 Atap Asbes Gelombang Lbr
64 Genteng Semen (Beton) Bh
65 Tegel Keramik 20 x 20 cm M2
66 Tegel Keramik 30 x 30 cm M2
67 Tegel Keramik 40 x 40 cm M2
68 Tegel Keramik 60 x 60 cm M2
69 Tegel Keramik Granito 60 x 60 cm Buah
70 Tegel Keramik Platinum 60 x 60 cm Buah
71 Plint Tegel Keramik Platinum 10 x 60 cm Buah
72 Tegel Keramik 30 x 30 cm M2
73 Tegel Keramik 40 x 40 cm M2
74 Batu Alam M2
CAT
Aquaproof Kg
Cat Kayu/Besi Alvian Kg
Cat Kayu/Besi Glotex Kg
Cat Tembok Metrolite 1 Kg
Cat Tembok Metrolite 5 Kg
Cat Tembok (exterior) Dulux Wathersield 1 Kg
Cat Tembok (Interior) Dulux Wathersield 1 Kg
Cat Meni Kayu Altex 1 Kg
Cat Meni Besi Altex 1 Kg
Wood Filler 1 Kg
Wood Stain 1 Kg
Sending 1 Kg
Clear 1 Kg
Minyak Cat Tiner Ltr
Minyak Cat Avduner Ltr
Dumpul Kayu Altex Kg
Plamir Tembok 5 Kg Kaleng
Plamir Tembok 1 Kg Kaleng
Kuas Bh
Kertas Ampelas Lbr
Residu Ltr
Lem Kayu 1 Ltr
Vernis 1 Ltr
KACA
81 Kaca Rayban 3 mm M2
82 Kaca Rayban 5 mm M2
83 Kaca Bening 2 mm M2
84 Kaca Bening 3 mm M2
85 Kaca Bening 5 mm M2
Jendela Nako 5 mm Bh
Dudukan Nako Bh
SANITAIR
86 Kran (Kualitas Baik) Bh
87 Avour / Saringan Air Kotor Bh
88 Floor Drain Bh
89 Kloset Jongkok INA Bh
90 Kloset Jongkok TOTO Bh
91 Kloset Duduk / Lengkap INA Bh
92 Kloset Duduk / Lengkap TOTO Bh
93 Wastafel INA / TOTO Bh
92 Urinoir TOTO Bh
IJUK Kg
LISITRIK
103 Box Sekring 1 Group Bh
104 Box Sekring 2 Group Bh
-
16,000.00 750.00 1,675.00 92.13 18,425.00
32,500.00 750.00 3,325.00 182.88 36,575.00
42,500.00 750.00 4,325.00 237.88 47,575.00
55,000.00 750.00 5,575.00 306.63 61,325.00
95,000.00 1,000.00 9,600.00 528.00 105,600.00
115,000.00 1,000.00 11,600.00 638.00 127,600.00
145,000.00 1,000.00 14,600.00 803.00 160,600.00
255,000.00 1,300.00 25,630.00 1,409.65 281,930.00
310,000.00 1,300.00 31,130.00 1,712.15 342,430.00
486,000.00 1,600.00 48,760.00 2,681.80 536,360.00
-
50,050.00 250.00 5,030.00 276.65 55,330.00
25,000.00 250.00 2,525.00 138.88 27,775.00
27,500.00 250.00 2,775.00 152.63 30,525.00
137,500.00 250.00 13,775.00 757.63 151,525.00
-
25,000.00 250.00 2,525.00 138.88 27,775.00
25,000.00 250.00 2,525.00 138.88 27,775.00
13,700.00 250.00 1,395.00 76.73 15,345.00
13,700.00 250.00 1,395.00 76.73 15,345.00
35,000.00 250.00 3,525.00 193.88 38,775.00
16,500.00 250.00 1,675.00 92.13 18,425.00
25,000.00 1,250.00 2,625.00 144.38 28,875.00
5,500.00 200.00 570.00 31.35 6,270.00
15,000.00 250.00 1,525.00 83.88 16,775.00
-
26,100.00 200.00 2,630.00 144.65 28,930.00
15,800.00 200.00 1,600.00 88.00 17,600.00
6,600.00 200.00 680.00 37.40 7,480.00
225,000.00 500.00 22,550.00 1,240.25 248,050.00
225,000.00 500.00 22,550.00 1,240.25 248,050.00
1,815,000.00 1,000.00 181,600.00 9,988.00 1,997,600.00
1,815,000.00 1,000.00 181,600.00 9,988.00 1,997,600.00
1,500,000.00 750.00 150,075.00 8,254.13 1,650,825.00
455,000.00 1,000.00 45,600.00 2,508.00 501,600.00
10,000.00 200.00 1,020.00 56.10 11,220.00
-
60,500.00 200.00 6,070.00 333.85 66,770.00
252,500.00 200.00 25,270.00 1,389.85 277,970.00
17,450.00 200.00 1,765.00 97.08 19,415.00
46,450.00 200.00 4,665.00 256.58 51,315.00
8,000.00 200.00 820.00 45.10 9,020.00
9,100.00 200.00 930.00 51.15 10,230.00
20,000.00 200.00 2,020.00 111.10 22,220.00
35,000.00 200.00 3,520.00 193.60 38,720.00
-
150,000.00 200.00 15,020.00 826.10 165,220.00
200,000.00 200.00 20,020.00 1,101.10 220,220.00
-
15,000.00 200.00 1,520.00 83.60 16,720.00
15,000.00 200.00 1,520.00 83.60 16,720.00
15,000.00 200.00 1,520.00 83.60 16,720.00
15,000.00 200.00 1,520.00 83.60 16,720.00
-
30,000.00 200.00 3,020.00 166.10 33,220.00
50,000.00 200.00 5,020.00 276.10 55,220.00
30,000.00 200.00 3,020.00 166.10 33,220.00
50,000.00 200.00 5,020.00 276.10 55,220.00
30,000.00 200.00 3,020.00 166.10 33,220.00
30,000.00 200.00 3,020.00 166.10 33,220.00
40,000.00 200.00 4,020.00 221.10 44,220.00
-
-
1,750.00 200.00 195.00 10.73 2,145.00
3,250.00 200.00 345.00 18.98 3,795.00
3,500.00 200.00 370.00 20.35 4,070.00
4,500.00 200.00 470.00 25.85 5,170.00
5,300.00 200.00 550.00 30.25 6,050.00
5,300.00 200.00 550.00 30.25 6,050.00
60,000.00 200.00 6,020.00 331.10 66,220.00
110,000.00 200.00 11,020.00 606.10 121,220.00
42,000.00 1,000.00 4,300.00 236.50 47,300.00
67,400.00 1,000.00 6,840.00 376.20 75,240.00
-
75,000.00 200.00 7,520.00 413.60 82,720.00
132,000.00 500.00 13,250.00 728.75 145,750.00
2,500,000.00 500.00 250,050.00 13,752.75 2,750,550.00
22,000.00 200.00 2,220.00 122.10 24,420.00
16,000.00 200.00 1,620.00 89.10 17,820.00
2,500.00 200.00 270.00 14.85 2,970.00
16,000.00 200.00 1,620.00 89.10 17,820.00
2,500.00 200.00 270.00 14.85 2,970.00
1,500.00 200.00 170.00 9.35 1,870.00
12,000.00 200.00 1,220.00 67.10 13,420.00
8,000.00 200.00 820.00 45.10 9,020.00
-
65,000.00 200.00 6,520.00 358.60 71,720.00
140,000.00 200.00 14,020.00 771.10 154,220.00
160,000.00 200.00 16,020.00 881.10 176,220.00
320,000.00 200.00 32,020.00 1,761.10 352,220.00
512,000.00 200.00 51,220.00 2,817.10 563,420.00
22,500.00 200.00 2,270.00 124.85 24,970.00
26,000.00 200.00 2,620.00 144.10 28,820.00
16,000.00 200.00 1,620.00 89.10 17,820.00
52,000.00 200.00 5,220.00 287.10 57,420.00
120,000.00 500.00 12,050.00 662.75 132,550.00
92,000.00 1,000.00 9,300.00 511.50 102,300.00
22,000.00 200.00 2,220.00 122.10 24,420.00
120,000.00 200.00 12,020.00 661.10 132,220.00
PEMBULATAN
(Rp)
11
139,600.00 50
2,800.00
9,000.00
27,700.00
25,700.00
27,500.00
275,500.00
22,159 2,216 / kg
30,900.00
79,100.00
63,100.00
99,900.00
218,000.00
97,300.00
146,300.00
129,600.00
88,500.00
188,600.00
262,500.00
556,800.00
254,600.00
225,300.00
49,900.00
60,900.00
93,900.00
110,400.00
107,600.00
137,900.00
5,300.00
6,400.00
7,500.00
9,700.00
11,400.00
15,200.00
35,100.00
46,700.00
1,800.00
1,800.00
2,400.00
4,000.00
5,700.00
7,300.00
13,400.00
16,700.00
10,200.00
21,100.00
38,700.00
51,300.00
6,900.00
9,900.00
11,400.00
25,700.00
32,300.00
58,000.00
95,000.00
41,400.00
84,900.00
126,900.00
221,400.00
394,400.00
46,500.00
108,100.00
226,200.00
274,400.00
349,300.00
562,600.00
70,200.00
132,700.00
196,900.00
225,000.00
2,200.00
2,800.00
34,300.00
94,000.00
136,800.00
207,100.00
78,600.00
98,900.00
119,900.00
40,400.00
57,700.00
143,000.00
157,300.00
74,200.00
81,600.00
72,000.00
49,700.00
48,500.00
101,400.00
115,300.00
123,800.00
141,200.00
123,400.00
36,900.00
72,100.00
83,100.00
142,200.00
55,300.00
27,700.00
30,500.00
151,500.00
27,700.00
27,700.00
15,300.00
15,300.00
38,700.00
18,400.00
28,800.00 5 5,000 / kg
6,200.00
16,700.00
93,700.00
55,900.00
55,900.00
24,200.00
121,000.00
187,500.00
187,500.00
29,700.00
38,700.00
114,900.00
114,900.00
114,900.00
114,900.00
42,900.00
15,400.00
36,900.00
111,300.00
22,200.00
30,200.00
11,000.00
30,200.00
16,500.00
19,200.00
143,200.00
197,700.00
114,100.00
116,000.00
174,000.00
17,800.00
27,700.00
28,900.00
17,600.00
7,400.00
248,000.00
248,000.00
1,997,600.00
1,997,600.00
1,650,800.00
501,600.00
11,200.00
66,700.00
277,900.00
19,400.00
51,300.00
9,000.00
10,200.00
22,200.00
38,700.00
66,700.00
12,900.00
3,200.00
21,600.00
165,200.00
220,200.00
16,700.00
16,700.00
16,700.00
16,700.00
33,200.00
55,200.00
33,200.00
55,200.00
33,200.00
33,200.00
44,200.00
2,100.00
3,700.00
4,000.00
5,100.00
6,000.00
6,000.00
66,200.00
121,200.00
47,300.00
75,200.00
82,700.00
145,700.00
2,750,500.00
24,400.00
17,800.00
2,900.00
17,800.00
2,900.00
1,800.00
13,400.00
9,000.00
71,700.00
154,200.00
176,200.00
352,200.00
563,400.00
24,900.00
28,800.00
17,800.00
57,400.00
132,500.00
102,300.00
24,400.00
132,200.00
HARGA
NO NAMA PESERTA
PENAWARAN
MILYAR 0 0 0
8E+08 800 DELAPAN RATUS 100 SERATUS
JUTA 25000000 25 DUA PULUH LIMA 200 DUA RATUS
600000 600 ENAM RATUS 300 TIGA RATUS
RIBU 28000 28 DUA PULUH DELAPAN 400 EMPAT RATUS
0 0 500 LIMA RATUS
RUPIAH 0 0 600 ENAM RATUS
700 TUJUH RATUS
800 DELAPAN RATUS
900 SEMBILAN RATUS
4 5 6 7 8
MILYAR DELAPAN MILYAR DELAPAN R MILYAR DELAPAN RATUS DU MILYAR MILYAR DELAPAN RA
DELAPAN MILYAR DUA PULUH MILYAR DELAPAN RATUS JU MILYAR MILYAR DELAPAN RA
DUA PULUH LIMA JU MILYAR ENAM RATUS DUA P MILYAR MILYAR DELAPAN RA
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA J MILYAR MILYAR DELAPAN RA
WAH PAYAH NICH !! CUMA B MILYAR MILYAR DELAPAN RA
DUA PULUH LIMA JUTA ENAM MILYAR MILYAR DELAPAN RA
DELAPAN RATUS JUTA ENAM MILYAR MILYAR DELAPAN RA
DELAPAN RATUS DUA PULUH MILYAR MILYAR DELAPAN RA
WAH PAYAMILYAR RUPIAH
WAH PAYAMILYAR DUA PULUH
DUA PULU MILYAR ENAM RATUS
DUA PULU MILYAR ENAM RATUS
DELAPAN MILYAR DUA PULUH
DELAPAN MILYAR DUA PULUH
DELAPAN MILYAR DUA PULUH
DELAPAN MILYAR DUA PULUH
GOBLOK BANGET SIH,
WAH PAYAH NICH !!
WAH PAYAH NICH !!
WAH PAYAH NICH !!
DUA PULUH LIMA JUT
DUA PULUH LIMA JUT
DUA PULUH LIMA JUT
DUA PULUH LIMA JUT
DELAPAN RATUS JUT
DELAPAN RATUS JUT
DELAPAN RATUS JUT
DELAPAN RATUS JUT
DELAPAN RATUS DUA
DELAPAN RATUS DUA
DELAPAN RATUS DUA
DELAPAN RATUS DUA
A PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
0
1 SATU
2 DUA
3 TIGA
4 EMPAT
5 LIMA
6 ENAM
7 TUJUH
8 DELAPAN
9 SEMBILAN
10 SEPULUH
11 SEBELAS
12 DUA BELAS
13 TIGA BELAS
14 EMPAT BELAS
15 LIMA BELAS
16 ENAM BELAS
17 TUJUH BELAS
18 DELAPAN BELAS
19 SEMBILAN BELAS
20 DUA PULUH
21 DUA PULUH SATU
22 DUA PULUH DUA
23 DUA PULUH TIGA
24 DUA PULUH EMPAT
25 DUA PULUH LIMA
26 DUA PULUH ENAM
27 DUA PULUH TUJUH
28 DUA PULUH DELAPAN
29 DUA PULUH SEMBILAN
30 TIGA PULUH
31 TIGA PULUH SATU
32 TIGA PULUH DUA
33 TIGA PULUH TIGA
34 TIGA PULUH EMPAT
35 TIGA PULUH LIMA
36 TIGA PULUH ENAM
37 TIGA PULUH TUJUH
38 TIGA PULUH DELAPAN
39 TIGA PULUH SEMBILAN
40 EMPAT PULUH
41 EMPAT PULUH SATU
42 EMPAT PULUH DUA
43 EMPAT PULUH TIGA
44 EMPAT PULUH EMPAT
45 EMPAT PULUH LIMA
46 EMPAT PULUH ENAM
47 EMPAT PULUH TUJUH
48 EMPAT PULUH DELAPAN
49 EMPAT PULUH SEMBILAN
50 LIMA PULUH
51 LIMA PULUH SATU
52 LIMA PULUH DUA
53 LIMA PULUH TIGA
54 LIMA PULUH EMPAT
55 LIMA PULUH LIMA
56 LIMA PULUH ENAM
57 LIMA PULUH TUJUH
58 LIMA PULUH DELAPAN
59 LIMA PULUH SEMBILAN
60 ENAM PULUH
61 ENAM PULUH SATU
62 ENAM PULUH DUA
63 ENAM PULUH TIGA
64 ENAM PULUH EMPAT
65 ENAM PULUH LIMA
66 ENAM PULUH ENAM
67 ENAM PULUH TUJUH
68 ENAM PULUH DELAPAN
69 ENAM PULUH SEMBILAN
70 TUJUH PULUH
71 TUJUH PULUH SATU
72 TUJUH PULUH DUA
73 TUJUH PULUH TIGA
74 TUJUH PULUH EMPAT
75 TUJUH PULUH LIMA
76 TUJUH PULUH ENAM
77 TUJUH PULUH TUJUH
78 TUJUH PULUH DELAPAN
79 TUJUH PULUH SEMBILAN
80 DELAPAN PULUH
81 DELAPAN PULUH SATU
82 DELAPAN PULUH DUA
83 DELAPAN PULUH TIGA
84 DELAPAN PULUH EMPAT
85 DELAPAN PULUH LIMA
86 DELAPAN PULUH ENAM
87 DELAPAN PULUH TUJUH
88 DELAPAN PULUH DELAPAN
89 DELAPAN PULUH SEMBILAN
90 SEMBILAN PULUH
91 SEMBILAN PULUH SATU
92 SEMBILAN PULUH DUA
93 SEMBILAN PULUH TIGA
94 SEMBILAN PULUH EMPAT
95 SEMBILAN PULUH LIMA
96 SEMBILAN PULUH ENAM
97 SEMBILAN PULUH TUJUH
98 SEMBILAN PULUH DELAPAN
99 SEMBILAN PULUH SEMBILAN
9 10
MILYAR MILYAR MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RU
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU R
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RU
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RU
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR DELAPAN R MILYAR DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR RUPIAH MILYAR DELAPAN RATUS JUTA RUPIAH
MILYAR RUPIAH MILYAR DELAPAN RATUS JUTA RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA RUPIAH
MILYAR ENAM RATU MILYAR DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR ENAM RATU MILYAR DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR ENAM RATU MILYAR DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR ENAM RATU MILYAR DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
MILYAR DUA PULUH MILYAR DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
GOBLOK BANGET SIHMILYAR RUPIAH
GILE BENER !!! BUA MILYAR RUPIAH
WAH PAYAH NICH !! MILYAR RUPIAH
WAH PAYAH NICH !! MILYAR RUPIAH
WAH PAYAH NICH !! MILYAR DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! MILYAR DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! MILYAR DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! MILYAR DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JU MILYAR ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JU MILYAR DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS JUTMILYAR DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS JUTMILYAR DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS JUTMILYAR DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS JUTMILYAR DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTMILYAR DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JU MILYAR DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTMILYAR DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUAMILYAR DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
GOBLOK BANGET SIH, TAU BEKING RAB KA' NYANDA
BUSYETTT !!!!! LEBIH BAIK BUAT BELI KOREK KUPING, KALO KURANG LOE TAMBAH NECH !!!
GILE BENER !!! BUAT APAAN TUH DUIT SEGITU, NGAK ONGKOS BUAT BAPIKIR
LEBIH BAGUS TIDUR JOO !!! KALO MO URISIN DUIT CUMA SEGITU !!!
WAH PAYAH NICH !! CUMA BEKING LELA DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
WAH PAYAH NICH !! CUMA BEKING LELA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA RUPIAH
DUA PULUH LIMA JUTA RUPIAH
DUA PULUH LIMA JUTA RUPIAH
DUA PULUH LIMA JUTA RUPIAH
DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA RUPIAH
DELAPAN RATUS JUTA RUPIAH
DELAPAN RATUS JUTA RUPIAH
DELAPAN RATUS JUTA RUPIAH
DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
DELAPAN RATUS DUA PULUH LIMA JUTA ENAM RATUS DUA PULUH DELAPAN RIBU RUPIAH
ULUH DELAPAN RIBU RUPIAH
ULUH DELAPAN RIBU RUPIAH
ULUH DELAPAN RIBU RUPIAH
ULUH DELAPAN RIBU RUPIAH
N RIBU RUPIAH
N RIBU RUPIAH
N RIBU RUPIAH
N RIBU RUPIAH
BU RUPIAH
BU RUPIAH
BU RUPIAH
BU RUPIAH
BU RUPIAH
BU RUPIAH
BU RUPIAH
BU RUPIAH