Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 4 Oktober s/d 2 November
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN I (PERTAMA)
Tanggal Kontrak : Monday, September 30, 2019 2019
III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 0.00% 39.58% 39.58% Rp 680,682,930.64
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 0.00 0.00% 1,950.00 15.68% 1,950.00 15.68% 269,665,168.50
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 0.00 0.00% 2,195.00 23.01% 2,195.00 23.01% 395,656,915.40
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 0.00 0.00% 18,950.00 0.89% 18,950.00 0.89% 15,360,846.74
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 0.00% 0.00%
7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 3.6 4,164,662.58 0.24% 0.00 0.00% 0.00% 0.00% ###
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.8 3,279,671.78 0.19% 0.00 0.00% 0.00% 0.00%
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 2.4 2,776,441.72 0.16% 0.00 0.00% 0.00% 0.00%
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 230.4 3,113,435.20 0.18% 0.00 0.00% 0.00% 0.00%
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 823.6 12,012,922.32 0.70% 0.00 0.00% 0.00% 0.00%
7.9.(1) Pasangan Batu M3 Rp 966,844.88 27.0 26,104,814.56 1.52% 0.00 0.00% 0.00% 0.00%
7.10.(2) Pasangan Batu Kosong M3 Rp 565,419.06 1.8 1,017,754.31 0.06% 0.00 0.00% 0.00% 0.00%
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.00% 0.00% 0.00% ###
Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 3 November sd 2 Desember
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN II (KEDUA)
Tanggal Kontrak : Monday, September 30, 2019 2019
III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 39.58% 34.27% 73.85% Rp 1,270,089,616.55
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 1950.00 15.68% 1,461.00 11.75% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 2195.00 23.01% 2,149.00 22.52% 4,344.00 45.53% 783,022,159.68
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 0.00% 0.00%
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.00% 0.01% 0.01% Rp 239,919.72
III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.00% 0.01% 0.01% Rp 119,959.86
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 0.00 0.00% 6.00 0.01% 6.00 0.01% 119,959.86
Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 3 Desember s/d 31 Desember
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN III (KETIGA)
Tanggal Kontrak : Monday, September 30, 2019 2019
III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 73.85% 0.00% 73.85% Rp 1,270,089,616.55
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 3411.00 27.43% - 0.00% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 4344.00 45.53% - 0.00% 4,344.00 45.53% 783,022,159.68
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 0.00% 0.00% Rp -
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.01% 0.34% 0.36% Rp 6,139,224.62
III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.01% 0.00% 0.01% Rp 119,959.86
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 6.00 0.01% - 0.00% 6.00 0.01% 119,959.86
Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 1 Januari s/d 30 Januari
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN IV (KEEMPAT)
Tanggal Kontrak : Monday, September 30, 2019 2020
III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 73.85% 14.05% 87.90% Rp 1,511,809,855.07
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 3411.00 27.43% 0.00% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 4344.00 45.53% 1,341.00 14.05% 5,685.00 59.58% 1,024,742,398.20
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 1.97% 1.97% Rp 33,798,030.00
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.36% 1.71% 2.06% Rp 35,463,901.34
III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.01% 0.01% 0.01% Rp 239,919.72
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 6.00 0.01% 6.00 0.01% 12.00 0.01% 239,919.72
MUH. ARSYAD JURADI, S.Ip RUSDI HUSEN, ST.,M.Si PURWADI, ST. DARMAWAN. A.Md
NIP. 19840914 2001101 1 015 NIP. 197790507 200903 1 002 Site Engineer Pelaksana Lapangan
DAFTAR QUANTITAS DAN HARGA
Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 31 Januari s/d 9 Februari
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN V (KELIMA)
Tanggal Kontrak : Monday, September 30, 2019 2020
III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 87.90% 0.00% 87.90% Rp 1,511,809,855.07
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 3411.00 27.43% 0.00% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 5685.00 59.58% 0.00% 5,685.00 59.58% 1,024,742,398.20
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 1.97% 1.09% 3.05% Rp 52,469,702.47
PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 2.06% 0.69% 2.76% Rp 47,410,643.37
III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.01% 0.00% 0.01% Rp 239,919.72
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 12.00 0.01% 0.00% 12.00 0.01% 239,919.72
MUH. ARSYAD JURADI, S.Ip RUSDI HUSEN, ST.,M.Si PURWADI, ST. DARMAWAN. A.Md
NIP. 19840914 2001101 1 015 NIP. 197790507 200903 1 002 Site Engineer Pelaksana Lapangan