DAFTAR QUANTITAS DAN HARGA

Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 4 Oktober s/d 2 November
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN I (PERTAMA)
Tanggal Kontrak : Monday, September 30, 2019 2019

KONTRAK KEMAJUAN PEKERJAAN

ORIGINAL KONTRAK MASA PELAKSANAAN


JUMLAH HARGA
No : Item Uraian Pekerjaan Sat. Harga Jumlah Bobot S/D BULAN LALU BULAN INI S/D BULAN INI
Satuan Volume Harga (%) (Rp)
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(Rupiah) (Rp) (Rupiah)

PEKERJAAN PEMBANGUNAN JALAN 1,619,964,341.79 94.19% 0.00% 45.14% 45.14% Rp 776,374,917.36

I DIVISI 1. UMUM 24,925,000.00 1.45% 0.00% 0.72% 0.72% Rp 12,462,500.00


1.2 Mobilisasi LS Rp 24,925,000.00 1.00 24,925,000.00 1.45% 0.00 0.00% 0.50 0.72% 0.50 0.72% 12,462,500.00

II DIVISI 2. DRAINASE 83,229,486.72 4.84% 0.00% 4.84% 4.84% Rp 83,229,486.72


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 20,765.84 4,008.0 83,229,486.72 4.84% 0.00 0.00% 4,008.00 4.84% 4,008.00 4.84% 83,229,486.72

III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 0.00% 39.58% 39.58% Rp 680,682,930.64
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 0.00 0.00% 1,950.00 15.68% 1,950.00 15.68% 269,665,168.50
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 0.00 0.00% 2,195.00 23.01% 2,195.00 23.01% 395,656,915.40
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 0.00 0.00% 18,950.00 0.89% 18,950.00 0.89% 15,360,846.74

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 0.00% 0.00%

VII DIVISI 7. STRUKTUR 52,469,702.47 3.05% 0.00% 0.00% 0.00% ###

7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 3.6 4,164,662.58 0.24% 0.00 0.00% 0.00% 0.00% ###

7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.8 3,279,671.78 0.19% 0.00 0.00% 0.00% 0.00%
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 2.4 2,776,441.72 0.16% 0.00 0.00% 0.00% 0.00%
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 230.4 3,113,435.20 0.18% 0.00 0.00% 0.00% 0.00%
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 823.6 12,012,922.32 0.70% 0.00 0.00% 0.00% 0.00%
7.9.(1) Pasangan Batu M3 Rp 966,844.88 27.0 26,104,814.56 1.52% 0.00 0.00% 0.00% 0.00%
7.10.(2) Pasangan Batu Kosong M3 Rp 565,419.06 1.8 1,017,754.31 0.06% 0.00 0.00% 0.00% 0.00%

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.00% 0.00% 0.00% ###

III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.00% 0.00% 0.00%


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 0.00 0.00% 0.00% - 0.00%

VII DIVISI 7. STRUKTUR 23,465,401.96 1.36% 0.00% 0.00% 0.00%


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 1.8 2,082,331.29 0.12% 0.00 0.00% 0.00% - 0.00%
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.2 2,576,884.97 0.15% 0.00 0.00% 0.00% - 0.00%
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 1.2 1,388,220.86 0.08% 0.00 0.00% 0.00% 0.00%
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 203.7 2,752,300.71 0.16% 0.00 0.00% 0.00% 0.00%
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 601.0 8,766,359.23 0.51% 0.00 0.00% 0.00% 0.00%
7.9.(1) Pasangan Batu M3 Rp 565,419.06 8.6 4,885,220.70 0.28% 0.00 0.00% 0.00% 0.00%
7.10.(2) Pasangan Batu Kosong M3 Rp 704,225.14 1.4 1,014,084.20 0.06% 0.00 0.00% 0.00% 0.00%

1,719,844,687.63 100% 0.00% 45.14% 45.14% Rp 776,374,917.36

Disetujui Oleh, Diketahui Oleh, Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Koordinator Kec. Topoyo Konsultan Pengawas KONTRAKTOR PELAKSANA
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang CV.MATTAMPA KONSULTAN CV.AWANI CIPTA SARANA
Kab. Mamuju Tengah Kab. Mamuju Tengah

HARWIJAYA, ST.M.S.P RUSDI HUSEN, ST.,M.Si PURWADI, ST. DARMAWAN. A.Md


NIP. 19700081 200312 1 006 NIP. 197790507 200903 1 002 Site Engineer Pelaksana Lapangan
DAFTAR QUANTITAS DAN HARGA

Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 3 November sd 2 Desember
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN II (KEDUA)
Tanggal Kontrak : Monday, September 30, 2019 2019

KONTRAK KEMAJUAN PEKERJAAN


ORIGINAL KONTRAK MASA PELAKSANAAN
JUMLAH HARGA
No : Item Uraian Pekerjaan Sat. Harga Jumlah Bobot S/D BULAN LALU BULAN INI S/D BULAN INI
Satuan Volume Harga (%) (Rp)
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(Rupiah) (Rp)

PEKERJAAN PEMBANGUNAN JALAN 1,619,964,341.79 94.19% 45.14% 34.71% 79.85% Rp 1,373,259,103.27

I DIVISI 1. UMUM 24,925,000.00 1.45% 0.72% 0.43% 1.16% Rp 19,940,000.00


1.2 Mobilisasi LS Rp 24,925,000.00 1.00 24,925,000.00 1.45% 0.50 0.72% 0.30 0.43% 0.80 1.16% 19,940,000.00

II DIVISI 2. DRAINASE 83,229,486.72 4.84% 4.84% 0.00% 4.84% Rp 83,229,486.72


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 20,765.84 4,008.0 83,229,486.72 4.84% 4008.00 4.84% 0.00% 4,008.00 4.84% 83,229,486.72

III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 39.58% 34.27% 73.85% Rp 1,270,089,616.55
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 1950.00 15.68% 1,461.00 11.75% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 2195.00 23.01% 2,149.00 22.52% 4,344.00 45.53% 783,022,159.68
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 0.00% 0.00%

VII DIVISI 7. STRUKTUR 52,469,702.47 3.05% 0.00% 0.00% 0.00%


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 3.6 4,164,662.58 0.24% 0.00 0.00% 0.00% 0.00%
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.8 3,279,671.78 0.19% 0.00 0.00% 0.00% 0.00%
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 2.4 2,776,441.72 0.16% 0.00 0.00% 0.00% 0.00%
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 230.4 3,113,435.20 0.18% 0.00 0.00% 0.00% 0.00%
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 823.6 12,012,922.32 0.70% 0.00 0.00% 0.00% 0.00%
7.9.(1) Pasangan Batu M3 Rp 966,844.88 27.0 26,104,814.56 1.52% 0.00 0.00% 0.00% 0.00%
7.10.(2) Pasangan Batu Kosong M3 Rp 565,419.06 1.8 1,017,754.31 0.06% 0.00 0.00% 0.00% 0.00%

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.00% 0.01% 0.01% Rp 239,919.72

III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.00% 0.01% 0.01% Rp 119,959.86
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 0.00 0.00% 6.00 0.01% 6.00 0.01% 119,959.86

VII DIVISI 7. STRUKTUR 23,465,401.96 1.36% 0.00% 0.00% 0.00%


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 1.8 2,082,331.29 0.12% 0.00 0.00% 0.00% - 0.00%
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.2 2,576,884.97 0.15% 0.00 0.00% 0.00% - 0.00%
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 1.2 1,388,220.86 0.08% 0.00 0.00% 0.00% 0.00%
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 203.7 2,752,300.71 0.16% 0.00 0.00% 0.00% 0.00%
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 601.0 8,766,359.23 0.51% 0.00 0.00% 0.00% 0.00%
7.9.(1) Pasangan Batu M3 Rp 565,419.06 8.6 4,885,220.70 0.28% 0.00 0.00% 0.00% 0.00%
7.10.(2) Pasangan Batu Kosong M3 Rp 704,225.14 1.4 1,014,084.20 0.06% 0.00 0.00% 0.00% 0.00%

1,719,844,687.63 100% 45.14% 34.72% 79.86% Rp 1,373,499,022.99

Disetujui Oleh, Diketahui Oleh, Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Koordinator Kec. Topoyo Konsultan Pengawas KONTRAKTOR PELAKSANA
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang CV.MATTAMPA KONSULTAN CV.AWANI CIPTA SARANA
Kab. Mamuju Tengah Kab. Mamuju Tengah

HARWIJAYA, ST.M.S.P RUSDI HUSEN, ST.,M.Si PURWADI, ST. DARMAWAN. A.Md


NIP. 19700081 200312 1 006 NIP. 197790507 200903 1 002 Site Engineer Pelaksana Lapangan
DAFTAR QUANTITAS DAN HARGA

Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 3 Desember s/d 31 Desember
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN III (KETIGA)
Tanggal Kontrak : Monday, September 30, 2019 2019

KONTRAK KEMAJUAN PEKERJAAN

ORIGINAL KONTRAK MASA PELAKSANAAN


JUMLAH HARGA
No : Item Uraian Pekerjaan Sat. Harga Jumlah Bobot S/D BULAN LALU BULAN INI S/D BULAN INI
Satuan Volume Harga (%) (Rp)
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(Rupiah) (Rp) (Rupiah)

PEKERJAAN PEMBANGUNAN JALAN 1,619,964,341.79 94.19% 79.85% 0.00% 79.85% Rp 1,373,259,103.27

I DIVISI 1. UMUM 24,925,000.00 1.45% 1.16% 0.00% 1.16% Rp 19,940,000.00


1.2 Mobilisasi LS Rp 24,925,000.00 1.00 24,925,000.00 1.45% 0.80 1.16% - 0.00% 0.80 1.16% 19,940,000.00

II DIVISI 2. DRAINASE 83,229,486.72 4.84% 4.84% 0.00% 4.84% Rp 83,229,486.72


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 20,765.84 4,008.0 83,229,486.72 4.84% 4008.00 4.84% 0.00% 4,008.00 4.84% 83,229,486.72

III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 73.85% 0.00% 73.85% Rp 1,270,089,616.55
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 3411.00 27.43% - 0.00% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 4344.00 45.53% - 0.00% 4,344.00 45.53% 783,022,159.68
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 0.00% 0.00% Rp -

VII DIVISI 7. STRUKTUR 52,469,702.47 3.05% 0.00% 0.00% 0.00% Rp -


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 3.6 4,164,662.58 0.24% 0.00 0.00% - 0.00% - 0.00% 0.00
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.8 3,279,671.78 0.19% 0.00 0.00% - 0.00% - 0.00% 0.00
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 2.4 2,776,441.72 0.16% 0.00 0.00% - 0.00% - 0.00% 0.00
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 230.4 3,113,435.20 0.18% 0.00 0.00% - 0.00% - 0.00% 0.00
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 823.6 12,012,922.32 0.70% 0.00 0.00% - 0.00% - 0.00% 0.00
7.9.(1) Pasangan Batu M3 Rp 966,844.88 27.0 26,104,814.56 1.52% 0.00 0.00% - 0.00% - 0.00% 0.00
7.10.(2) Pasangan Batu Kosong M3 Rp 565,419.06 1.8 1,017,754.31 0.06% 0.00 0.00% - 0.00% - 0.00% 0.00

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.01% 0.34% 0.36% Rp 6,139,224.62

III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.01% 0.00% 0.01% Rp 119,959.86
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 6.00 0.01% - 0.00% 6.00 0.01% 119,959.86

VII DIVISI 7. STRUKTUR 23,465,401.96 1.36% 0.00% 0.17% 0.17% Rp 2,949,652.45


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 1.8 2,082,331.29 0.12% 0.00 0.00% - 0.00% - 0.00% 0.00
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.2 2,576,884.97 0.15% 0.00 0.00% - 0.00% - 0.00% 0.00
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 1.2 1,388,220.86 0.08% 0.00 0.00% - 0.00% - 0.00% 0.00
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 203.7 2,752,300.71 0.16% 0.00 0.00% - 0.00% - 0.00% 0.00
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 601.0 8,766,359.23 0.51% 0.00 0.00% - 0.00% - 0.00% 0.00
7.9.(1) Pasangan Batu M3 Rp 565,419.06 8.6 4,885,220.70 0.28% 0.00 0.00% 4.32 0.14% 4.32 0.14% 2,442,610.35
7.10.(2) Pasangan Batu Kosong M3 Rp 704,225.14 1.4 1,014,084.20 0.06% 0.00 0.00% 0.72 0.03% 0.72 0.03% 507,042.10

1,719,844,687.63 100% 79.86% 0.34% 80.20% Rp 1,379,398,327.89

Disetujui Oleh, Diketahui Oleh, Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Koordinator Kec. Topoyo Konsultan Pengawas KONTRAKTOR PELAKSANA
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang CV.MATTAMPA KONSULTAN CV.AWANI CIPTA SARANA
Kab. Mamuju Tengah Kab. Mamuju Tengah

HARWIJAYA, ST.M.S.P RUSDI HUSEN, ST.,M.Si PURWADI, ST. DARMAWAN. A.Md


NIP. 19700081 200312 1 006 NIP. 197790507 200903 1 002 Site Engineer Pelaksana Lapangan
DAFTAR QUANTITAS DAN HARGA

Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 1 Januari s/d 30 Januari
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN IV (KEEMPAT)
Tanggal Kontrak : Monday, September 30, 2019 2020

KONTRAK KEMAJUAN PEKERJAAN

ORIGINAL KONTRAK MASA PELAKSANAAN


JUMLAH HARGA
No : Item Uraian Pekerjaan Sat. Harga Jumlah Bobot S/D BULAN LALU BULAN INI S/D BULAN INI
Satuan Volume Harga (%) (Rp)
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(Rupiah) (Rp) (Rupiah)

PEKERJAAN PEMBANGUNAN JALAN 1,619,964,341.79 94.19% 79.85% 14.34% 94.19% Rp 1,619,964,341.79

I DIVISI 1. UMUM 24,925,000.00 1.45% 1.16% 0.29% 1.45% Rp 24,925,000.00


1.2 Mobilisasi LS Rp 24,925,000.00 1.00 24,925,000.00 1.45% 0.80 1.16% 0.20 0.29% 1.00 1.45% 24,925,000.00

II DIVISI 2. DRAINASE 83,229,486.72 4.84% 4.84% 0.00% 4.84% Rp 83,229,486.72


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 20,765.84 4,008.0 83,229,486.72 4.84% 4008.00 4.84% 0.00% 4,008.00 4.84% 83,229,486.72

III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 73.85% 14.05% 87.90% Rp 1,511,809,855.07
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 3411.00 27.43% 0.00% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 4344.00 45.53% 1,341.00 14.05% 5,685.00 59.58% 1,024,742,398.20
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 0.00% 1.97% 1.97% Rp 33,798,030.00

VII DIVISI 7. STRUKTUR 52,469,702.47 3.05% 0.00% 1.97% 1.97% Rp 33,798,030.00


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 3.6 4,164,662.58 0.24% 0.00 0.00% 1.80 0.12% 1.80 0.12% 2,082,331.29
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.8 3,279,671.78 0.19% 0.00 0.00% 1.42 0.10% 1.42 0.10% 1,639,835.89
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 2.4 2,776,441.72 0.16% 0.00 0.00% 1.20 0.08% 1.20 0.08% 1,388,220.86
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 230.4 3,113,435.20 0.18% 0.00 0.00% 230.44 0.18% 230.44 0.18% 3,113,435.20
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 823.6 12,012,922.32 0.70% 0.00 0.00% 823.58 0.70% 823.58 0.70% 12,012,922.32
7.9.(1) Pasangan Batu M3 Rp 966,844.88 27.0 26,104,814.56 1.52% 0.00 0.00% 13.50 0.76% 13.50 0.76% 13,052,407.28
7.10.(2) Pasangan Batu Kosong M3 Rp 565,419.06 1.8 1,017,754.31 0.06% 0.00 0.00% 0.90 0.03% 0.90 0.03% 508,877.16

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 0.36% 1.71% 2.06% Rp 35,463,901.34

III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.01% 0.01% 0.01% Rp 239,919.72
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 6.00 0.01% 6.00 0.01% 12.00 0.01% 239,919.72

VII DIVISI 7. STRUKTUR 23,465,401.96 1.36% 0.17% 0.85% 1.02% Rp 17,492,030.95


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 1.8 2,082,331.29 0.12% 0.00 0.00% 0.90 0.06% 0.90 0.06% 1,041,165.64
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.2 2,576,884.97 0.15% 0.00 0.00% 1.11 0.07% 1.11 0.07% 1,288,442.48
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 1.2 1,388,220.86 0.08% 0.00 0.00% 0.60 0.04% 0.60 0.04% 694,110.43
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 203.7 2,752,300.71 0.16% 0.00 0.00% 203.71 0.16% 203.71 0.16% 2,752,300.71
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 601.0 8,766,359.23 0.51% 0.00 0.00% 601.00 0.51% 601.00 0.51% 8,766,359.23
7.9.(1) Pasangan Batu M3 Rp 565,419.06 8.6 4,885,220.70 0.28% 4.32 0.14% - 0.00% 4.32 0.14% 2,442,610.35
7.10.(2) Pasangan Batu Kosong M3 Rp 704,225.14 1.4 1,014,084.20 0.06% 0.72 0.03% - 0.00% 0.72 0.03% 507,042.10

1,719,844,687.63 100% 80.20% 18.01% 98.22% Rp 1,689,226,273.13

Disetujui Oleh, Diketahui Oleh, Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Koordinator Kec. Topoyo Konsultan Pengawas KONTRAKTOR PELAKSANA
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang CV.MATTAMPA KONSULTAN CV.AWANI CIPTA SARANA
Kab. Mamuju Tengah Kab. Mamuju Tengah

MUH. ARSYAD JURADI, S.Ip RUSDI HUSEN, ST.,M.Si PURWADI, ST. DARMAWAN. A.Md
NIP. 19840914 2001101 1 015 NIP. 197790507 200903 1 002 Site Engineer Pelaksana Lapangan
DAFTAR QUANTITAS DAN HARGA

Nama Paket : Pembangunan Ruas Jalan Pangalloang - Patulana (BKK) 31 Januari s/d 9 Februari
Nomor Kontrak : 600/220/622.4/BKK/BM/IX/2019 LAPORAN BULAN V (KELIMA)
Tanggal Kontrak : Monday, September 30, 2019 2020

KONTRAK KEMAJUAN PEKERJAAN

ORIGINAL KONTRAK MASA PELAKSANAAN


JUMLAH HARGA
No : Item Uraian Pekerjaan Sat. Harga Jumlah Bobot S/D BULAN LALU BULAN INI S/D BULAN INI
Satuan Volume Harga (%) (Rp)
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(Rupiah) (Rp) (Rupiah)

PEKERJAAN PEMBANGUNAN JALAN 1,619,964,341.79 94.19% 94.19% 0.00% 94.19% Rp 1,619,964,341.79

I DIVISI 1. UMUM 24,925,000.00 1.45% 1.45% 0.00% 1.45% Rp 24,925,000.00


1.2 Mobilisasi LS Rp 24,925,000.00 1.00 24,925,000.00 1.45% 1.00 1.45% 0.00% 1.00 1.45% 24,925,000.00

II DIVISI 2. DRAINASE 83,229,486.72 4.84% 4.84% 0.00% 4.84% Rp 83,229,486.72


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 20,765.84 4,008.0 83,229,486.72 4.84% 4008.00 4.84% 0.00% 4,008.00 4.84% 83,229,486.72

III DIVISI 3. PEKERJAAN TANAH 1,511,809,855.07 87.90% 87.90% 0.00% 87.90% Rp 1,511,809,855.07
3.1.(1a) Timbunan Biasa M3 Rp 138,289.83 3,411.0 471,706,610.13 27.43% 3411.00 27.43% 0.00% 3,411.00 27.43% 471,706,610.13
3.2.(1b) Timbunan Pilihan dari Galian M3 Rp 180,253.72 5685.0 1,024,742,398.20 59.58% 5685.00 59.58% 0.00% 5,685.00 59.58% 1,024,742,398.20
3.2(2a) Timbunan Pilihan (Badan Jalan yang Berlubang) M2 Rp 810.60 18950.00 15,360,846.74 0.89% 18950.00 0.89% 0.00% 18,950.00 0.89% 15,360,846.74

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (1 UNIT) 3 X 6 52,469,702.47 3.05% 1.97% 1.09% 3.05% Rp 52,469,702.47

VII DIVISI 7. STRUKTUR 52,469,702.47 3.05% 1.97% 1.09% 3.05% Rp 52,469,702.47


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 3.6 4,164,662.58 0.24% 1.80 0.12% 1.80 0.12% 3.60 0.24% 4,164,662.58
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.8 3,279,671.78 0.19% 1.42 0.10% 1.42 0.10% 2.83 0.19% 3,279,671.78
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 2.4 2,776,441.72 0.16% 1.20 0.08% 1.20 0.08% 2.40 0.16% 2,776,441.72
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 230.4 3,113,435.20 0.18% 230.44 0.18% 0.00% 230.44 0.18% 3,113,435.20
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 823.6 12,012,922.32 0.70% 823.58 0.70% 0.00% 823.58 0.70% 12,012,922.32
7.9.(1) Pasangan Batu M3 Rp 966,844.88 27.0 26,104,814.56 1.52% 13.50 0.76% 13.50 0.76% 27.00 1.52% 26,104,814.56
7.10.(2) Pasangan Batu Kosong M3 Rp 565,419.06 1.8 1,017,754.31 0.06% 0.90 0.03% 0.90 0.03% 1.80 0.06% 1,017,754.31

PEKERJAAN PEMBUATAN PLAT DEKKER TIPE I (2UNIT) 1.5 X 6 47,410,643.37 2.76% 2.06% 0.69% 2.76% Rp 47,410,643.37

III DIVISI 3. PEKERJAAN TANAH 239,919.72 0.01% 0.01% 0.00% 0.01% Rp 239,919.72
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 Rp 19,993.31 12.0 239,919.72 0.01% 12.00 0.01% 0.00% 12.00 0.01% 239,919.72

VII DIVISI 7. STRUKTUR 23,465,401.96 1.36% 1.02% 0.35% 1.36% Rp 23,465,401.96


7.1.(8) Beton fc'15 Mpa untuk Lantai M3 Rp 1,156,850.72 1.8 2,082,331.29 0.12% 0.90 0.06% 0.90 0.06% 1.80 0.12% 2,082,331.29
7.1.(8) Beton fc'15 Mpa untuk Balok M3 Rp 1,156,850.72 2.2 2,576,884.97 0.15% 1.11 0.07% 1.11 0.07% 2.23 0.15% 2,576,884.97
7.1.(8) Beton fc'15 Mpa untuk Pengaman M3 Rp 1,156,850.72 1.2 1,388,220.86 0.08% 0.60 0.04% 0.60 0.04% 1.20 0.08% 1,388,220.86
7.3.(1) Baja Tulangan U 24 Polos Kg Rp 13,511.06 203.7 2,752,300.71 0.16% 203.71 0.16% 0.00% 203.71 0.16% 2,752,300.71
7.3.(3) Baja Tulangan U 32 Ulir Kg Rp 14,586.31 601.0 8,766,359.23 0.51% 601.00 0.51% 0.00% 601.00 0.51% 8,766,359.23
7.9.(1) Pasangan Batu M3 Rp 565,419.06 8.6 4,885,220.70 0.28% 4.32 0.14% 4.32 0.14% 8.64 0.28% 4,885,220.70
7.10.(2) Pasangan Batu Kosong M3 Rp 704,225.14 1.4 1,014,084.20 0.06% 0.72 0.03% 0.72 0.03% 1.44 0.06% 1,014,084.20

1,719,844,687.63 100% 98.22% 1.78% 100.00% Rp 1,719,844,687.63

Disetujui Oleh, Diketahui Oleh, Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Koordinator Kec. Topoyo Konsultan Pengawas KONTRAKTOR PELAKSANA
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang CV.MATTAMPA KONSULTAN CV.AWANI CIPTA SARANA
Kab. Mamuju Tengah Kab. Mamuju Tengah

MUH. ARSYAD JURADI, S.Ip RUSDI HUSEN, ST.,M.Si PURWADI, ST. DARMAWAN. A.Md
NIP. 19840914 2001101 1 015 NIP. 197790507 200903 1 002 Site Engineer Pelaksana Lapangan

Anda mungkin juga menyukai