I PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Bowplank m1 345.50 55,001.10 19,002,880.05
2 Sewa Direksi Keet minimal 40 m2 bln 14.00 1,439,790.00 20,157,060.00
3 Sewa Gudang Material minimal 24 m2 bln 14.00 1,032,487.50 14,454,825.00
4 Sewa Bedeng Pekerja minimal 48 m2 bln 14.00 1,032,487.50 14,454,825.00
5 Listrik bln 14.00 2,500,000.00 35,000,000.00
6 Kerja
Pekerjaan Air Kerja bln 14.00 2,500,000.00 35,000,000.00
7 Sewa Pagar Proyek bln 14.00 151,852.00 2,125,928.00
8 Foto dokumentasi,asbuilt drawing dan pelaporan ls 1.00 4,500,000.00 4,500,000.00
9 Biaya Penyelenggaraan Sistem Manajemen Keselamantan dan ls 1.00 7,500,000.00 7,500,000.00
Kesehatan
Meliputi Kerja Konstruksi
Penyiapan (SMK3)
RK3K, Sosialisasi dan Promosi -
10 SewaK3,Alat
TowerPelindung
Crane, Keja, Alatpondasi+angkur,
termasuk peindung diri, Asuransi
operator, bln 14.00 5,305,345.71 74,274,840.00
dan Perijinan,
11 asuransi
Safety netalat, Fasilitas
ex polynet supersarana kesehatan, Personil K3,
mobilisasi, ls 1.00 1,326,336.43 1,326,336.43
Rambu- disnaker biaya erection & dismantling, biaya listrik
perizinan
Rambu sub jumlah 227,796,694.48
untuk TCK3 dll
TOTAL PEK. PERSIAPAN 227,796,694.48
II PEKERJAAN STRUKTUR
A STRUKTUR LANTAI 1
I Pekerjaan Pondasi
I.1 Pondasi Tiang Pancang Diameter 40 x 40
- Penyediaan Tiang Pancang 40 x 40 A.4.1.1.36.a m1 3,770.00 954,700.00 3,599,219,000.00
- Pemancangan Tiang Pancanng 40 x 40 wb
A.4.1.1.36.at m1 3,770.00 1,288,845.00 4,858,945,650.00
- Pemotongan Tiang Pancang 40 x 40 A.4.1.1.36.au bh 377.00 47,735.00 17,996,095.00
I.2 Pilecap PC 1
Pek. Galian Tanah Biasa Max Kedalaman 2 m' A.2.3.1.2 m3 6.53 73,342.50 478,926.53
Pek. Urugan Pasir (Pasir urug) A.2.3.1.11 m3 0.38 280,137.00 106,452.06
Pek. Lantai Kerja Beton Mutu fc = 7,4 Mpa (K 100), Slump A.4.1.1.4 m3 0.19 966,001.41 183,540.27
(3-6) cm, w/c =untuk
Pas. Bekisting 0,87 Sloof 2 X Pakai A.4.1.1.21 m2 19.20 98,481.90 1,890,852.48
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 819.83 13,362.80 10,955,224.32
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 5.76 1,145,972.52 6,600,801.72
B STRUKTUR LANTAI 2
I Balok
I.1 Balok B2
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 100.31
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,055.51
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 9.63
I.2 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 14.04
I.3 Balok B4
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 43.58
II Kolom
II. Kolom struktur K1 30X60
1 Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 1.44
351,382.90 35,247,218.70
13,450.80 27,648,253.91
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,450.80 41,135,102.05
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,450.80 136,601,886.04
1,145,972.52 49,941,482.42
sub jumlah 428,103,619.85
153,174.45 2,205,712.08
13,450.80 6,149,167.73
1,145,972.52 1,650,200.43
153,174.45 4,901,582.40
13,450.80 16,114,192.91
1,145,972.52 3,850,467.67
153,174.45 2,450,791.20
13,450.80 7,463,041.87
1,145,972.52 2,291,945.04
153,174.45 22,057,120.80
13,450.80 74,117,136.19
1,145,972.52 24,753,006.43
153,174.45 5,881,898.88
13,450.80 18,516,640.30
1,145,972.52 8,801,068.95
sub jumlah 201,203,972.88
412,542.90 228,771,539.77
13,450.80 175,806,529.27
1,145,972.52 62,398,203.71
sub jumlah 466,976,272.75
412,542.90 2,846,546.01
13,450.80 33,201,551.20
1,145,972.52 9,649,088.62
sub jumlah 45,697,185.82
jumlah lantai 2 1,141,981,051.30 -
KODE
NO URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 2 3 4 5
C STRUKTUR LANTAI 3
I Balok
I.1 Balok B1
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 100.31
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,055.51
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 9.63
I.2 Balok B2
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 14.04
I.3 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 43.58
II Kolom
II.1 Kolom struktur K1 30X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 1.44
D STRUKTUR LANTAI 4
I Balok
I.1 Balok B1
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 100.31
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,055.51
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 9.63
I.2 Balok B2
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 14.04
I.3 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 43.58
II Kolom
II.1 Kolom struktur K1 30X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 1.44
E STRUKTUR LANTAI 5
I Balok
I.1 Balok B1
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 100.31
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,055.51
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 9.63
I.2 Balok B2
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 14.04
I.3 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 43.58
II Kolom
II.1 Kolom struktur K1 30X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 1.44
F STRUKTUR LANTAI 6
I Balok
I.1 Balok B2
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 100.31
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,055.51
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 9.63
I.2 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 14.04
I.3 Balok B4
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 43.58
II Kolom
II.1 Kolom struktur K1 30X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 1.44
351,382.90 35,247,218.70
13,362.80 27,467,369.03
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,362.80 40,865,981.33
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,362.80 135,708,187.08
1,145,972.52 49,941,482.42
sub jumlah 426,759,915.29
153,174.45 2,205,712.08
13,362.80 6,108,937.65
1,145,972.52 1,650,200.43
153,174.45 4,901,582.40
13,362.80 16,008,768.03
1,145,972.52 3,850,467.67
153,174.45 2,450,791.20
13,362.80 7,414,215.95
1,145,972.52 2,291,945.04
153,174.45 22,057,120.80
13,362.80 73,632,235.07
1,145,972.52 24,753,006.43
153,174.45 5,881,898.88
13,362.80 18,395,497.74
1,145,972.52 8,801,068.95
sub jumlah 200,403,448.32
412,542.90 228,771,539.77
13,362.80 174,656,339.35
1,145,972.52 62,398,203.71
sub jumlah 465,826,082.83
412,542.90 2,846,546.01
13,362.80 32,984,334.64
1,145,972.52 9,649,088.62
sub jumlah 45,479,969.26
jumlah lantai 3 1,138,469,415.70
351,382.90 35,247,218.70
13,362.80 27,467,369.03
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,362.80 40,865,981.33
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,362.80 135,708,187.08
1,145,972.52 49,941,482.42
sub jumlah 426,759,915.29 -
153,174.45 2,205,712.08
13,362.80 6,108,937.65
1,145,972.52 1,650,200.43
153,174.45 4,901,582.40
13,362.80 16,008,768.03
1,145,972.52 3,850,467.67
153,174.45 2,450,791.20
13,362.80 7,414,215.95
1,145,972.52 2,291,945.04
153,174.45 22,057,120.80
13,362.80 73,632,235.07
1,145,972.52 24,753,006.43
153,174.45 5,881,898.88
13,362.80 18,395,497.74
1,145,972.52 8,801,068.95
sub jumlah 200,403,448.32
412,542.90 228,771,539.77
13,362.80 174,656,339.35
1,145,972.52 62,398,203.71
412,542.90 2,846,546.01
13,362.80 32,984,334.64
1,145,972.52 9,649,088.62
sub jumlah 511,306,052.10
jumlah lantai 4 1,138,469,415.70
351,382.90 35,247,218.70
13,362.80 27,467,369.03
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,362.80 40,865,981.33
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,362.80 135,708,187.08
1,145,972.52 49,941,482.42
sub jumlah 426,759,915.29 -
153,174.45 2,205,712.08
13,362.80 6,108,937.65
1,145,972.52 1,650,200.43
153,174.45 4,901,582.40
13,362.80 16,008,768.03
1,145,972.52 3,850,467.67
153,174.45 2,450,791.20
13,362.80 7,414,215.95
1,145,972.52 2,291,945.04
153,174.45 22,057,120.80
13,362.80 73,632,235.07
1,145,972.52 24,753,006.43
153,174.45 5,881,898.88
13,362.80 18,395,497.74
1,145,972.52 8,801,068.95
sub jumlah 200,403,448.32
412,542.90 228,771,539.77
13,362.80 174,656,339.35
1,145,972.52 62,398,203.71
sub jumlah 465,826,082.83
412,542.90 2,846,546.01
13,362.80 32,984,334.64
1,145,972.52 9,649,088.62
sub jumlah 45,479,969.26
jumlah lantai 5 1,138,469,415.70
351,382.90 35,247,218.70
13,362.80 27,467,369.03
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,362.80 40,865,981.33
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,362.80 135,708,187.08
1,145,972.52 49,941,482.42
sub jumlah 426,759,915.29
153,174.45 2,205,712.08
13,362.80 6,108,937.65
1,145,972.52 1,650,200.43
153,174.45 4,901,582.40
13,362.80 16,008,768.03
1,145,972.52 3,850,467.67
153,174.45 2,450,791.20
13,362.80 7,414,215.95
1,145,972.52 2,291,945.04
153,174.45 22,057,120.80
13,362.80 73,632,235.07
1,145,972.52 24,753,006.43
153,174.45 5,881,898.88
13,362.80 18,395,497.74
1,145,972.52 8,801,068.95
sub jumlah 200,403,448.32
412,542.90 228,771,539.77
13,362.80 174,656,339.35
1,145,972.52 62,398,203.71
sub jumlah 465,826,082.83
412,542.90 2,846,546.01
13,362.80 32,984,334.64
1,145,972.52 9,649,088.62
sub jumlah 45,479,969.26
jumlah lantai 6 1,138,469,415.70
NO URAIAN PEKERJAAN KODE SATUAN VOLUM
ANALISA E
1 2 3 4 5
G STRUKTUR LANTAI 7
I Balok
I.1 Balok B2
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 100.31
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,055.51
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 9.63
rp
I.2 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 14.04
rp
I.3 Balok B4
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 43.58
rp
II Kolom
II.1 Kolom struktur K1 30X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 1.44
rp
II.2 Kolom struktur K2 30X70
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 32.00
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 1,198.01
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 3.36
rp
II.3 Kolom struktur K3 50X50
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 16.00
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 554.84
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 2.00
rp
II.4 Kolom struktur K4 60X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 144.00
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 5,510.24
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 21.60
rp
II.5 Kolom struktur K5 80X80
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 38.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 1,376.62
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 7.68
rp
III Plat Lantai T=10 CM
Pas. Bekisting untuk Lantai 2 X Pakai A.4.1.1.24 m2 554.54
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 13,070.34
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 54.45
rp
IV Membuat Tangga beton
Pas. Bekisting untuk Lantai 2 X Pakai A.4.1.1.24 m2 6.90
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,468.37
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 8.42
rp
jumlah lantai 7
H STRUKTUR LANTAI 8
I Balok
I.1 Balok B2
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 100.31
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 2,055.51
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 9.63
rp
I.2 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 14.04
rp
I.3 Balok B4
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 43.58
rp
II Kolom
II.1 Kolom struktur K1 30X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 1.44
rp
II.2 Kolom struktur K2 30X70
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 32.00
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 1,198.01
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 3.36
rp
II.3 Kolom struktur K3 50X50
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 16.00
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 554.84
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 2.00
rp
II.4 Kolom struktur K4 60X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 144.00
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 5,510.24
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 21.60
rp
II.5 Kolom struktur K5 80X80
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 38.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 1,376.62
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 7.68
rp
III Plat Lantai T=10 CM
Pas. Bekisting untuk Lantai 2 X Pakai A.4.1.1.24 m2 554.54
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 13,070.34
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36 m3 54.45
rp
351,382.90 35,247,218.70
13,362.80 27,467,369.03
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,362.80 40,865,981.33
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,362.80 135,708,187.08
1,145,972.52 49,941,482.42
sub jumlah 391,512,696.59
153,174.45 2,205,712.08
13,362.80 6,108,937.65
1,145,972.52 1,650,200.43
153,174.45 4,901,582.40
13,362.80 16,008,768.03
1,145,972.52 3,850,467.67
153,174.45 2,450,791.20
13,362.80 7,414,215.95
1,145,972.52 2,291,945.04
153,174.45 22,057,120.80
13,362.80 73,632,235.07
1,145,972.52 24,753,006.43
153,174.45 5,881,898.88
13,362.80 18,395,497.74
1,145,972.52 8,801,068.95
sub jumlah 200,403,448.32
412,542.90 228,771,539.77
13,362.80 174,656,339.35
1,145,972.52 62,398,203.71
sub jumlah 465,826,082.83
412,542.90 2,846,546.01
13,362.80 32,984,334.64
1,145,972.52 9,649,088.62
sub jumlah 45,479,969.26
jumlah lantai 7 902,818,748.68
351,382.90 35,247,218.70
13,362.80 27,467,369.03
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,362.80 40,865,981.33
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,362.80 135,708,187.08
1,145,972.52 49,941,482.42
sub jumlah 426,759,915.29
153,174.45 2,205,712.08
13,362.80 6,108,937.65
1,145,972.52 1,650,200.43
153,174.45 4,901,582.40
13,362.80 16,008,768.03
1,145,972.52 3,850,467.67
153,174.45 2,450,791.20
13,362.80 7,414,215.95
1,145,972.52 2,291,945.04
153,174.45 22,057,120.80
13,362.80 73,632,235.07
1,145,972.52 24,753,006.43
153,174.45 5,881,898.88
13,362.80 18,395,497.74
1,145,972.52 8,801,068.95
sub jumlah 200,403,448.32
412,542.90 228,771,539.77
13,362.80 174,656,339.35
1,145,972.52 62,398,203.71
sub jumlah 465,826,082.83
412,542.90 2,846,546.01
13,362.80 32,984,334.64
1,145,972.52 9,649,088.62
sub jumlah 45,479,969.26
jumlah lantai 8 938,065,967.38
KODE
NO URAIAN PEKERJAAN SATUAN VOLUME
ANALISA
1 2 3 4 5
I.2 Balok B3
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 132.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 3,058.19
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 14.04
I.3 Balok B4
Pas. Bekisting untuk Balok 2 X Pakai A.4.1.1.23 m2 181.60
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 10,155.67
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 43.58
II Kolom
II.1 Kolom struktur K1 30X60
Pas. Bekisting untuk Kolom 2 X Pakai A.4.1.1.22 m2 14.40
Pek. Pembesian dengan Besi Polos atau Besi Ulir A.4.1.1.17 kg 457.16
Pek. Beton mutu K-450 (ready mix), dengan pompa A.4.1.1.36rp m3 1.44
351,382.90 35,247,218.70
13,362.80 27,467,369.03
1,145,972.52 11,035,715.37
351,382.90 46,593,372.54
13,362.80 40,865,981.33
1,145,972.52 16,089,454.18
351,382.90 63,811,134.64
13,362.80 135,708,187.08
1,145,972.52 49,941,482.42
sub jumlah 426,759,915.29
153,174.45 2,205,712.08
13,362.80 6,108,937.65
1,145,972.52 1,650,200.43
153,174.45 2,205,712.08
13,362.80 16,008,768.03
1,145,972.52 3,850,467.67
153,174.45 2,205,712.08
13,362.80 7,414,215.95
1,145,972.52 2,291,945.04
153,174.45 2,205,712.08
13,362.80 49,761,864.55
1,145,972.52 13,980,864.74
sub jumlah 109,890,112.38
412,542.90 254,687,484.74
13,362.80 154,232,903.09
1,145,972.52 70,752,343.38
sub jumlah 479,672,731.22
jumlah lantai atap 1,016,322,758.88
19,873,050,131.79