#REF!
DAFTAR HARGA SATUAN
4. PEKERJAAN SIPIL
4.1. Upah Pekerjaan Sipil/Bangunan
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
1 Buruh Semi Terlatih OH 60,000
2 Buruh Tak terlatih OH 58,500
3 Buruh Terlatih OH 65,000
4 Kepala Pemasak Aspal OH 90,000
5 Kepala Penganyam Bronjong OH 90,000
6 Kepala Tukang OH 90,000
7 Mandor OH 95,000
8 Mekanik OH 79,000
9 Operator Kurang Terlatih OH 65,000
10 Operator Terlatih OH 87,500
11 Pekerja OH 66,000
12 Pemasak Aspal/Tukang Aspal OH 65,000
13 Pembantu Sopir OH 58,500
14 Pembantu Mekanik OH 72,500
15 Pembantu Operator OH 60,000
16 Pemecah Batu OH 58,500
17 Penganyam Bronjong OH 75,000
18 Penggergaji OH 58,500
19 Penggosok Tegel OH 60,000
20 Penjaga Malam OH 75,000
21 Sopir OH 70,500
22 Tukang Aluminium/Kaca OH 75,000
23 Tukang Batu OH 85,000
24 Tukang Besi OH 85,000
25 Tukang Bor OH 85,000
26 Tukang Cat OH 85,000
27 Rapat dan sejenisnya OH 70,000
28 Tukang Kayu OH 90,000
29 Tukang Las OH 85,000
30 Tukang Listrik OH 75,000
31 Tukang Pipa OH 72,500
32 Tukang Politur OH 85,000
33 Tukang Ukur OH 85,000
-2-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
11 Batu Pecah 3-5 cm m3 250,200
12 Batu Pecah 5-7 cm m3 225,000
2
13 Gebalan Rumput m 11,700
14 Kapur Gamping/Labur m3 621,000
15 Kapur Pasang m3 262,800
3
16 Kerikil Alam - Royalti m 161,100
17 Kerikil Beton (maks. 30 mm) m3 290,000
3
18 Kerikil Sungai m 261,000
19 Pasir Galian m3 117,000
3
20 Pasir Pasang m 100,625
3
21 Pasir Beton m 166,000
22 Pasir Urug m3 100,000
23 PC (50 kg ) zak 72,500 72,500
24 Semen Merah m3 170,100
25 Semen Warna kg 11,250
26 Sirtu m3 124,200
27 Tanah Liat m3 135,000
3
28 Tanah Urug Biasa m 89,100
3
29 Tanah Urug Pilihan m 94,500
-3-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
22 Bubungan Asbes Gelombang Besar (60 x 108 cm) lembar 65,700
23 Bubungan Genteng Beton bh 5,400
24 Bubungan Genteng Decrabond m' 89,640
25 Bubungan Genteng Keramik bh 12,870
26 Bubungan Genteng Kodok bh 3,465
27 Bubungan Genteng Lokal bh 2,250
28 Bubungan Genteng Mantili Besar bh 5,850
29 Bubungan Genteng Mantili Kecil m' 4,950
30 Bubungan Genteng Pres Pejaten bh 3,465
31 Bubungan Karang Pilang Type Keramik bh 7,740
32 Bubungan Metal Roof (Tanpa Lapis Butiran) m' 79,200
33 Bubungan Metal Roof Lapis Butiran m' 89,100
34 Bubungan Trimdeck.35 TCT m' 37,800
35 Bubungan Trimdeck.40 TCT m' 84,600
36 Genteng Beton (sudah dicat) Efektif 20 x 25 cm bh 6,075
37 Genteng Beton (sudah dicat) Efektif 20 x 30 cm bh 6,750
38 Genteng Beton (sudah dicat) Efektif 25 x 36 cm bh 11,043
39 Genteng Beton (sudah dicat) Efektif 27 x 42 cm bh 13,500
2
40 Genteng Decrabond m 199,800
41 Genteng Flat bh 6,480
42 Genteng Kaca bh 13,365
43 Genteng Karang Pilang Type Keramik bh 5,400
44 Genteng Keramik bh 13,500
45 Genteng Kodok bh 2,160
46 Genteng Lokal bh 1,980
47 Genteng Mantili Besar bh 2,160
48 Genteng Mantili Kecil bh 1,980
49 Genteng Pejaten (sudah dicat) Efektif 18x22 cm bh 2,430
50 Genteng Pejaten (sudah dicat) Efektif 20x25 cm bh 2,250
51 Genteng Pejaten (sudah dicat) Efektif 20x30 cm bh 3,375
52 Genteng Pejaten (sudah dicat) Efektif 22x38 cm bh 5,063
53 Ijuk kg 19,800
54 Nok genteng beton bh 11,700
55 Penutup Atap Trimdeck.35 TCT m2 65,700
2
56 Penutup Atap Trimdeck.40 TCT m 210,600
57 Polycarbonate 210 x 118 cm Tebal 4 mm lembar 1,125,000
58 Polycarbonate 210 x 118 cm Tebal 5 mm lembar 1,620,000
59 Polycarbonate 210 x 118 cm Tebal 6 mm lembar 1,980,000
60 Polycarbonate 210 x 118 cm Tebal 10 mm lembar 3,150,000
61 Roof Light Fibreglass 180 x 90 cm Tebal 3 mm lembar 109,350
62 Seng Gelombang BJLS 20 lembar 47,700
63 Seng Gelombang BJLS 25 lembar 65,700
64 Seng Gelombang BJLS 30 lembar 74,700
65 Seng Plat BJLS 18 L 90 cm lembar 22,500
-4-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
66 Seng Plat BJLS 20 L 90 cm lembar 29,700
67 Seng Plat BJLS 25 L 90 cm lembar 44,550
68 Seng Plat BJLS 28 L 90 cm lembar 53,100
69 Seng Plat BJLS 30 L 90 cm lembar 64,350
70 Seng Talang BJLS 30 L 30 m' 11,700
71 Seng Talang BJLS 30 L 50 m' 21,600
72 Sirap Kalimantan bh 1,935
73 Spandek 0,30 mm L 70 cm m' 33,750
74 Spandek 0,35 mm L 70 cm m' 40,500
75 Spandek 0,40 mm L 70 cm m' 54,000
76 Spandek 0,45 mm L 70 cm m' 58,500
-5-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
17 Keramik Lantai KW I 20 x 20 m2 36,000
18 Keramik Lantai KW I 30 x 30 m2 43,650
2
19 Keramik Lantai KW I 40 x 40 m 71,500
20 Keramik Lantai KW I 60 x 60 m2 79,200
2
21 Keramik Lantai KW II 30 x 30 m 39,150
2
22 Keramik Lantai KW II 40 x 40 m 56,700
23 Keramik Lantai KW II 60 x 60 m2 74,700
24 Keramik Artistik 10/20 m² 137,250
25 Keramik Artistik 5/20 m² 261,900
26 Marmer 100 x 100 cm m² 288,000
27 Mozaik 30/30 m² 30,600
28 Parquet m² 117,900
29 Plint Internal Cove artistik 5 x 5/20 m² 20,700
30 Plint Keramik artistik 10/10 m² 229,500
31 Plint Keramik artistik 10/20 m² 137,700
32 Plint Keramik artistik 5/20 m² 98,100
33 Plint Ubin Abu-abu 10/40 m² 38,700
34 Plint Ubin Abu-abu 15/20 m² 26,100
35 Plint Ubin Abu-abu 15/30 m² 26,100
36 Plint Ubin Granit 10/30 m² 171,900
37 Plint Ubin Granit 10/40 m² 171,900
38 Plint Ubin Teralux Kerang 10/30 m² 186,300
39 Plint Ubin Teralux Kerang 10/40 m² 185,400
40 Plint Ubin Teralux Marmer 10/30 m² 243,000
41 Plint Ubin Teralux Marmer 10/40 m² 264,600
42 Plint Ubin Teralux Marmer 10/60 m² 221,400
43 Plint Ubin Teraso 10/30 m² 54,900
44 Plint Ubin Teraso 10/40 m² 54,900
45 Plint Ubin Warna 10/20 m² 45,900
46 Plint Ubin Warna 10/30 m² 45,000
47 Plint Ubin Warna 10/40 m² 22,500
48 Porselin 10/20 m² 59,400
49 Porselin 11/11 m² 59,400
50 Porselin 20/20 m² 63,000
51 Roster Bali m2 227,700
52 Tegel Abu-abu 20/20 cm m2 38,700
2
53 Tegel Teraso Klas I 30/30 cm m 47,700
2
54 Tegel Teraso Klas II 30/30 cm m 45,900
55 Tegel Wapel 20/20 cm m2 40,500
2
56 Tegel Warna 20/20 cm m 38,700
57 Tegel Warna Wapel 20/20 cm m2 41,400
58 Teraso Cor m³ 618,300
59 Ubin Abu-abu 20/20 m² 38,700
60 Ubin Abu-abu 30/30 m² 38,700
61 Ubin Abu-abu 40/40 m² 38,700
62 Ubin Granit 30/30 m² 171,900
63 Ubin Granit 40/40 m² 171,900
64 Ubin Keramik 10/33 m² 64,800
65 Ubin Keramik 20/20 m² 55,800
66 Ubin Keramik 30/30 m² 55,800
67 Ubin Keramik 33/33 m² 38,700
68 Ubin Keramik 40/40 m² 58,500
-6-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
69 Ubin Keramik artistik 10/10 m² 72,000
70 Ubin Keramik artistik 10/20 m² 36,000
71 Ubin Teralux Kerang 30/30 m² 185,400
72 Ubin Teralux Kerang 40/40 m² 185,400
73 Ubin Teralux Marmer 30/30 m² 199,800
74 Ubin Teralux Marmer 40/40 m² 199,800
75 Ubin Teralux Marmer 60/60 m² 199,800
76 Ubin Teraso 30/30 m² 54,900
77 Ubin Teraso 40/40 m² 54,900
78 Ubin Warna 20/20 m² 45,000
79 Ubin Warna 30/30 m² 45,000
80 Ubin Warna 40/40 m² 45,000
81 Underlayer / rubber corrugated m² 91,800
82 Vinyl 30/30 m² 98,100
83 Vinyl karet 30/30 m² 181,800
84 Wall Paper m' 31,500
-7-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
33 CSP 10 - 16 X 16 HGS bh 1,170
34 CTEKS 12-14 X 45 HGS bh 1,350
35 Jaring kawat baja dilas kg 1,170
36 Kawat Berduri kg 23,400
37 Kawat Bronjong 3 mm kg 27,450
38 Kawat Bronjong 4 mm kg 27,450
63 Kawat Harmonika Gas (HG) m2 34,200
64 Kawat Ikat Beton kg 21,600
65 Kawat las kg 30,600
66 Kawat Nyamuk Alumunium m2 24,750
67 Kawat Nyamuk Plastik m2 17,100
68 Klip-Lok MTEKS 10-16 X WAF bh 630
69 Kontra Mur Ø 12 mm bh 38,610
70 Nok Zingkalum T=0,35 mm Color m' 117,000
71 Paku 1 - 3 cm kg 16,200
72 Paku 4 - 6 cm kg 16,200
73 Paku 7 - 12 cm kg 16,200
74 Paku Asbes kg 23,400
75 Paku Eternit kg 27,000
76 Paku Kait Bh 1,800
77 Paku Sekrup 10 cm kg 18,900 189
78 Paku Sekrup 5 cm kg 18,900
79 Paku Seng kg 26,730
80 Paku Sumbat kg 16,650
81 Paku Tahan Karat kg 29,700
82 Paku Tripleks kg 18,000
83 Plat Strip Klem talang 4 mm bh 25,740
84 Sekrup Fixer Bh 14,850
85 Sekrup/Piles 1,5 cm kotak 9,000
86 Sekrup/Piles 2 cm kotak 13,200
87 Screw Spandek 7 cm bh 630
88 Screw Fixer/Ripeat bh 135
89 Topspan C75 Hi-Ten Tebal 0.6 TCT m' 10,350
90 Zilcalume C75 Hi-Ten Tebal 0.8 TCT m' 13,500
91 Zilcalume C75 Hi-Ten Tebal 1.05 TCT m' 13,500
92 Zingkalum 0,30 mm Color L. 0,75M m' 73,800
93 Zingkalum 0,35 mm Color L. 0,75M m' 76,500
94 Zingkalum 0,40 mm Color L. 0,75M m' 90,000
95 Zingkalum 0,45 mm Color L. 0,75M m' 99,000
96 Besi hollow 40 x 40 x 0.30 mm m' 23,000
97 Baja Ringan Mutu G 550 kg 12,500
98 Paku Secrew 5 cm bh 750
-8-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
9 Gypsum Board 120 x 240 x 9 mm lembar 55,800
10 Lem Kayu kg 48,150
11 List Gypsum C7 m' 8,500
12 Plywood 120 x 240 x 3 mm lembar 109,800
13 Teak Block 120 x 240 x 12 mm lembar 189,000
14 Teak Block 120 x 240 x 18 mm lembar 234,900
15 Teak Block 120 x 240 x 6 mm lembar 85,500
16 Teak Block 120 x 240 x 9 mm lembar 146,700
17 Teakwoods 210 x 240 x 2 mm lembar 172,800
18 Teakwoods 90 x 210 x 3 mm lembar 105,300
19 Tepung Gypsum kg 4,050
20 Tripleks 120 x 240 x 12 mm lembar 191,700
21 Tripleks 120 x 240 x 18 mm lembar 264,600
22 Tripleks 120 x 240 x 2 mm lembar 54,900
23 Tripleks 120 x 240 x 3 mm lembar 58,500
24 Tripleks 120 x 240 x 6 mm lembar 91,800
25 Tripleks 120 x 240 x 9 mm lembar 138,150
26 Tripleks lapis alumunium lembar 127,800
27 Wood Plank 1/20 lembar 64,800
28 Wood Plank 1/30 lembar 152,000
-9-
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
4.3.10. Bahan Cat dan Finishing
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
1 Alkali Liter 62,100
2 Ampelas lembar 4,050
3 Aqua Proof kg 49,050
4 Cairan Pengeras Cat (Hardner) kg 161,100
5 Cairan Pengupas Cat kg 174,600
6 Cat Besi kg 54,000
7 Cat Corak Batu kg 72,000
8 Cat Genteng kg 34,200
9 Cat Halus kg 129,600
10 Cat Kayu Mutu Menengah kg 55,000
11 Cat Kayu Mutu Tinggi kg 85,000
12 Cat Marka Jalan Biasa kg 58,500
13 Cat Marka Jalan Scalato kg 79,200
14 Cat Tembok Mutu Menengah kg 65,000
15 Cat Tembok Mutu Tinggi kg 100,000
16 Dempul Isamo kg 26,100
17 Dempul Kayu kg 27,900
18 Kapek bh 5,400
19 Kuas bh 13,500
20 Melamin lembar 70,650
21 Meni Besi kg 28,800
22 Meni Kayu kg 26,100
23 Minyak Cat/Abtiner Liter 20,520
24 Plamir Kayu kg 22,500
25 Plamir Tembok kg 8,100
26 Politur Liter 68,400
27 Residu Liter 20,520
28 Roll Cat bh 22,500
29 Sabun Kg 6,750
30 Sikat Baja bh 15,120
31 Spirtus Liter 15,300
32 Sprayer bh 199,800
33 Teak Oil Liter 31,050
34 Teer kg 6,840
35 Tiner A Spesial kg 34,200
36 Vernis Liter 42,300
37 Wood Filler Liter 22,500
- 10 -
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
12 Lampu Pijar bh 5,850
13 Lampu SL bh 50,400
14 Lampu Tanam SL bh 75,600
15 Lampu TL bh 38,700
16 Saklar Engkel Inbow bh 13,050
17 Saklar Engkel Outbow bh 12,600
18 Saklar Engkel Stop Inbow bh 18,450
19 Saklar Engkel Stop Outbow bh 17,550
20 Saklar Seri Inbow bh 16,650
21 Saklar Seri Outbow bh 16,650
22 Spot Light Halogen set 153,000
23 Stop Contack + Instalasi bh 101,700
24 Stop Kontak Inbow bh 13,050
25 Stop Kontak Outbow bh 13,050
26 Titik Lampu Pijar + Instalasi bh 111,600
27 Titik Lampu TL bh 230,400
28 MCB 3 fasa bh 180,000
29 Box Panel bh 400,000
30 Kabel NYM 4 x 2,5 mm2 m 17,000
- 11 -
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
4.3.15. Bahan Lain - Lain
NO. URAIAN SATUAN HARGA KET.
1 2 3 4 5
1 Air Liter 14
2 Alat Bantu Bina Marga set 270,000
3 Angkutan Lokal GIP keg. 900
4 Angkutan Lokal PVC keg. 450
5 Aspal Buton kg 1,800
6 Aspal Emulsi kg 9,900
7 Aspal (Aspal Concrete/AC) kg 11,700
8 Elastomer bh 675,000
9 Filler/Kapur kg 9,450
10 Floor Hardener kg 17,100
11 Flux Oil Liter 5,760
12 HCL/Pembersih Lantai Liter 13,500
13 Karung Plastik lembar 4,050
14 Kayu Bakar m3 74,700
15 Minyak Tanah Liter 13,500
16 Minyak Rem Liter 49,500
17 Modifier Liter 4,140
18 Olie SAE 140 Liter 36,000
19 Olie SAE 90 Liter 33,300
20 Olie SAE 40 Liter 31,500
21 Olie SAE 10 (Hydraulic) Liter 27,000
22 Premium Liter 11,070
23 Soda Api kg 28,800
24 Solar Liter 12,420
25 Strorox-100 kg 28,800
26 Waterstop PVC lebar 150 mm m' 18,900
27 Waterstop PVC lebar 200 mm m' 21,600
28 Waterstop PVC lebar 230 mm - 320 mm m' 24,300
29 Roda Pintu Dorong R 10 cm bh 67,500
30 Engsel 1,5" (Bubut) bh 22,500
- 12 -
1. PEKERJAAN PERSIAPAN
5.27. 1 m2 Acian
5.27.a. 1 m2 Acian 1 PC : 2 Mill
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Bahan PC ( 50 kg ) kg 1.083 1,450.00 1,570.83
Mill kg 2.167 1,000.00 2,166.67
Pekerja OH 0.200 66,000.00 13,200.00
Tukang batu OH 0.100 85,000.00 8,500.00
Tenaga kerja
Kepala tukang OH 0.010 90,000.00 900.00
Mandor OH 0.010 95,000.00 950.00
Jumlah Harga per Satuan Pekerjaan 27,287.50
6. PEKERJAAN KAYU
6.2.a.1. Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Balok Kayu Kelas II m3 1.050 5,000,000.00 5,250,000.00
Bahan Paku 7 - 12 cm kg 1.250 16,200.00 20,250.00
Lem Kayu kg 1.000 48,150.00 48,150.00
Pekerja OH 6.000 66,000.00 396,000.00
Tukang kayu OH 18.000 90,000.00 1,620,000.00
Tenaga kerja
Kepala tukang OH 1.800 90,000.00 162,000.00
Mandor OH 0.300 95,000.00 28,500.00
Jumlah Harga per Satuan Pekerjaan 7,524,900.00
6.6.a. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I
6.6.b. Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas II
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Papan Kayu Kelas II m3 0.024 5,000,000.00 120,000.00
Bahan
Lem kayu kg 0.300 48,150.00 14,445.00
Pekerja OH 0.800 66,000.00 52,800.00
Tukang kayu OH 2.400 90,000.00 216,000.00
Tenaga kerja
Kepala tukang OH 0.240 90,000.00 21,600.00
Mandor OH 0.040 95,000.00 3,800.00
Jumlah Harga per Satuan Pekerjaan 428,645.00
Dimensi Panjang Diameter Tulangan Berat Tulangan Per-Meter Jrk begel Panjang Jumlah Tulangan Berat Total Tulangan Kebutuhan
NO. JENIS BETON bxh Per - m3 Pokok Ekstra Begel Pokok Ekstra Begel Rata@ Begel / bh Pokok Ekstra Begel Pokok Ekstra Begel Tulangan Beton Begisting Plesteran
(CM) (M) (MM) (MM) (MM) (KG/M) (KG/M) (KG/M) (CM) (M) (BH) (BH) (BH) (KG) (KG) (KG) (KG) (M3) (M2) (M2)
KOLOM
1 Kolom Praktis 10/10 10 x 10 100.00 10.00 - 6.00 0.616 0.000 0.222 15.00 0.20 4.00 - 668.00 246.243 0.000 29.608 275.851 0.9648 40.0000 20.0000
2 Kolom Struktur 20/20 20 x 20 25.00 10.00 - 6.00 0.616 0.000 0.222 15.00 0.60 4.00 - 168.00 61.561 0.000 22.339 83.900 0.9893 20.0000 10.0000
3 Kolom Struktur 15/15 15 x 15 44.44 10.00 - 6.00 0.616 0.000 0.222 15.00 0.40 4.00 - 298.00 109.441 0.000 26.417 135.858 0.9827 13.3333 13.3333
SLOOF
1 Sloof 15/20 15 x 20 33.33 10.00 - 6.00 0.616 0.000 0.222 15.00 0.50 4.00 - 224.00 82.081 0.000 24.821 106.902 0.9864 13.3333 13.3333
BALOK
1 Ring Balok 12/15 12 x 15 55.56 10.00 - 6.00 0.616 0.000 0.222 15.00 0.34 4.00 - 372.00 136.802 0.000 28.030 164.832 0.9790 16.6667 23.3333
2 Balok Selasar 12/15 12 x 15 55.56 10.00 - 6.00 0.616 0.000 0.222 15.00 0.34 4.00 - 372.00 136.802 0.000 28.030 164.832 0.9790 28.6667 23.3333
3 Balok Geuvel 10/15 10 x 15 66.67 10.00 - 6.00 0.616 0.000 0.222 15.00 0.30 4.00 - 446.00 164.162 0.000 29.653 193.814 0.9753 20.0000 26.6667
2 Balok Latei 10/15 10 x 15 66.67 10.00 - 6.00 0.616 0.000 0.222 15.00 0.30 4.00 - 446.00 164.162 0.000 29.653 193.814 0.9753 20.0000 20.0000
Dimensi Panjang Diameter Arah X Diameter Arah Y Berat Tul. X Berat Tul. Y Jarak Tulangan Panjang Tul X Panjang Tul Y Jumlah tulangan
No. Jenis Beton
b x l x h Per - m3 Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi Pokok Bagi
(CM) (M3) (MM) (MM) (MM) (MM) (KG/M) (KG/M) (KG/M) (KG/M) (CM) (CM) (CM) (CM) (CM) (CM) (BH) (BH)
PLAT
1 Plat Kanopi T. 6 cm 100 x 100 x 10 0.10 10 8 0.616 0.394 0.000 0.000 15.0 15.0 100 100 100 100 15 15
2 Plat Deker T. 10 cm (SEP) 100 x 100 x 10 0.10 10 8 0.616 0.394 0.000 0.000 15.0 25.0 100 100 100 100 15 10
3 Plat Deker T. 15 cm 400 x 150 x 15 0.90 10 8 0.617 0.395 0.000 0.000 15.0 25.0 400 150 400 150 55 14
Tabel 2 - 2
BESI KONSTRUKSI
DIMENSI BETON BERAT BESI TOTAL BERAT BESI
Total Berat Tulangan pokok Beugel / Sengkang
Besi
NO JENIS KONSTRUKSI Konstruksi Lebar/ Penam- Panjang Panjang Panjang/m Panjang Panjang Tulangan Besi Besi
/ m3 Beton Panjang Jlh Dia. Jarak Jlh Dia Sengkang
tinggi pang (beton) (besi) 3 /bh total Pokok Polos Ulir
SLOOF
1 S1 15x20 110.88 110.880 -
uk. 15x20 B. Polos 0.15 0.20 0.03 33.33 4 10 133.33 0.15 222 6 0.58 128.89 0.617 82.267 0.222 28.613 110.880
15x20 B. Ulir 0.15 0.20 0.03 33.33 - - - - - 0.58 - - - - - -
15x20 0.15 0.20 0.03 33.33 - - - - - 0.58 - - - - - -
2 S2 20x30 97.82 97.822 -
uk. 20x30 B. Polos 0.20 0.30 0.06 16.67 4 12 66.67 0.15 111 8 0.88 97.78 0.888 59.200 0.395 38.622 97.822
20x30 B. Ulir 0.20 0.30 0.06 16.67 - - - - - 0.88 - - - - - -
20x30 0.20 0.30 0.06 16.67 - - - - - 0.88 - - - - - -
3 S1a 20x35 87.61 87.610 -
uk. 20x35 B. Polos 0.20 0.35 0.07 14.29 4 12 57.14 0.15 95 8 0.98 93.33 0.888 50.743 0.395 36.867 87.610
20x35 B. Ulir 0.20 0.35 0.07 14.29 - - - - - 0.98 - - - - - -
20x35 0.20 0.35 0.07 14.29 - - - - - 0.98 - - - - - -
3 S3a 15x15 141.26 141.262 -
uk. 15x15 B. Polos 0.15 0.15 0.02 44.44 4 10 177.78 0.15 296 6 0.48 142.22 0.617 109.689 0.222 31.573 141.262
15x15 B. Ulir 0.15 0.15 0.02 44.44 - - - - - 0.48 - - - - - -
15x15 0.15 0.15 0.02 44.44 - - - - - 0.48 - - - - - -
4 S3 15x20 120.45 120.450 -
uk. 15x20 B. Polos 0.15 0.20 0.03 33.33 4 10 133.33 0.20 167 8 0.58 96.67 0.617 82.267 0.395 38.183 120.450
15x20 B. Ulir 0.15 0.20 0.03 33.33 - - - - - 0.58 - - - - - -
15x20 0.15 0.20 0.03 33.33 - - - - - 0.58 - - - - - -
5 S3 15x25 92.65 92.651 -
uk. 15x25 B. Polos 0.15 0.25 0.04 26.67 4 10 106.67 0.15 178 6 0.68 120.89 0.617 65.813 0.222 26.837 92.651
15x25 B. Ulir 0.15 0.25 0.04 26.67 - - - - - 0.68 - - - - - -
15x25 0.15 0.25 0.04 26.67 - - - - - 0.68 - - - - - -
5 S3 15x30 144.31 144.311 -
uk. 15x30 B. Polos 0.15 0.30 0.05 22.22 5 12 111.11 0.15 148 8 0.78 115.56 0.888 98.667 0.395 45.644 144.311
15x30 B. Ulir 0.15 0.30 0.05 22.22 - - - - - 0.78 - - - - - -
15x30 0.15 0.30 0.05 22.22 - - - - - 0.78 - - - - - -
BALOK
1 B1 ( Ring Balok ) 10X13 252.46 252.462 -
uk. 10X13 B. Polos 0.10 0.13 0.01 76.92 4 10 307.69 0.15 513 6 0.55 282.05 0.617 189.846 0.222 62.615 252.462
10X13 B. Ulir 0.10 0.13 0.01 76.92 - - - - - - - - - - - -
10X13 0.10 0.13 0.01 76.92 - - - - - - - - - - - -
2 B2 ( Geuvel ) 10x10 314.88 314.880 -
uk. 10x10 B. Polos 0.10 0.10 0.01 100.00 4 10 400.00 0.15 667 6 0.46 306.67 0.617 246.800 0.222 68.080 314.880
10x10 B. Ulir 0.10 0.10 0.01 100.00 - - - - - - - - - - - -
KOLOM
1 K1 15x15 145.21 44.44444 145.209 -
uk. 15x15 B. Polos 0.15 0.15 0.02 44.44 44.44 4 10 177.78 0.150 296 6 0.54 160.00 0.617 109.689 0.222 35.520 145.209
15x15 B. Ulir 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
15x15 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
1 K1a ( Selasar ) 15x15 193.39 44.44444 193.387 -
uk. 15x15 B. Polos 0.15 0.15 0.02 44.44 44.44 4 12 177.78 0.150 296 6 0.54 160.00 0.888 157.867 0.222 35.520 193.387
15x15 B. Ulir 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
15x15 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
2 K2 ( praktis ) 10X10 297.12 100 297.120 -
uk. 10X10 B. Polos 0.10 0.10 0.01 100.00 100.00 4 10 400.00 0.150 667 6 0.34 226.67 0.617 246.800 0.222 50.320 297.120
10X10 B. Ulir 0.10 0.10 0.01 100.00 100.00 - - - - - - - - - - - - -
3 K3 15x20 142.08 33.33333 142.080 -
uk. 15x20 B. Polos 0.15 0.20 0.03 33.33 33.33 4 12 133.33 0.200 167 6 0.64 106.67 0.888 118.400 0.222 23.680 142.080
15x20 B. Ulir 0.15 0.20 0.03 33.33 33.33 - - - - - - - - - - - - -
15x20 0.15 0.20 0.03 33.33 33.33 - - - - - - - - - - - - -
1 K3a 20x20 82.24 25 82.235 -
uk. 20x20 B. Polos 0.20 0.20 0.04 25.00 25.00 4 10 100.00 0.200 125 6 0.74 92.50 0.617 61.700 0.222 20.535 82.235
20x20 B. Ulir 0.20 0.20 0.04 25.00 25.00 - - - - - - - - - - - - -
20x20 0.20 0.20 0.04 25.00 25.00 - - - - - - - - - - - - -
4 K1a 35x35 196.47 8.163265 67.492 128.980
uk. 35x35 B. Polos 0.35 0.35 0.12 8.16 8.16 - - - 0.100 82 10 1.34 109.39 - - 0.617 67.492 67.492
35x35 B. Ulir 0.35 0.35 0.12 8.16 8.16 10 16 81.63 - - - - - 1.580 128.980 - - 128.980
35x35 0.35 0.35 0.12 8.16 8.16 - - - - - - - - - - - - -
5 K2a 25x25 173.07 16 173.072 -
uk. 25x25 B. Polos 0.25 0.25 0.06 16.00 16.00 8 12 128.00 0.100 160 8 0.94 150.40 0.888 113.664 0.395 59.408 173.072
25x25 B. Ulir 0.25 0.25 0.06 16.00 16.00 - - - - - - - - - - -
25x25 0.25 0.25 0.06 16.00 16.00 - - - - - - - - - - - - -
6 K15/20 15x20 149.97 33.33333 31.573 118.400
uk. 15x20 B. Polos 0.15 0.20 0.03 33.33 33.33 - 0.150 222 6 0.64 142.22 - - 0.222 31.573 31.573
15x20 B. Ulir 0.15 0.20 0.03 33.33 33.33 4 12 133.33 - - - - - 0.888 118.400 - - 118.400
15x20 0.15 0.20 0.03 33.33 33.33 - - - - - - - - - - - - -
6 K15/15 15x15 193.39 44.44444 193.387 -
uk. 15x15 B. Polos 0.15 0.15 0.02 44.44 44.44 4 12 177.78 0.150 296 6 0.54 160.00 0.888 157.867 0.222 35.520 193.387
15x15 B. Ulir 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
15x15 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
7 KP 11/11 10x10 276.99 100 276.992 -
uk. 10x10 B. Polos 0.10 0.10 0.01 100.00 100.00 4 10 400.00 0.250 400 6 0.34 136.00 0.617 246.800 0.222 30.192 276.992
10x10 B. Ulir 0.10 0.10 0.01 100.00 100.00 - - - - - - - - - - - - -
10x10 0.10 0.10 0.01 100.00 100.00 - - - - - - - - - - - - -
PLAT
1 Plat Lantai t=12 - 50.115
t=12 50.11 B. Polos (x) 0.12 8.33 2.89 3.14 - 10 - 0.25 13 10 3.24 40.61 0.617 - 0.617 25.057 25.057
t=12 50.11 B. Polos (y) 0.12 8.33 2.89 3.14 - 10 - 0.25 13 10 3.24 40.61 0.617 - 0.617 25.057 25.057
2 Plat lantai t=10 - 59.157
t=10 59.16 B. Polos (x) 0.10 10.00 3.16 3.41 - 10 - 0.25 14 10 3.51 47.94 0.617 - 0.617 29.579 29.579
t=10 59.16 B. Polos (y) 0.10 10.00 3.16 3.41 - 10 - 0.25 14 10 3.51 47.94 0.617 - 0.617 29.579 29.579
3 Plat Atap t=08 - 75.420
t=08 75.42 B. Polos (x) 0.08 12.50 3.54 3.79 - 8 - 0.15 25 8 3.89 95.47 0.395 - 0.395 37.710 37.710
t=08 75.42 B. Polos (y) 0.08 12.50 3.54 3.79 - 8 - 0.15 25 8 3.89 95.47 0.395 - 0.395 37.710 37.710
4 Plat lantai tribun t=08 - 72.603
t=08 72.60 B. Polos (x) 0.08 12.50 3.54 3.79 - 10 - 0.25 15 10 3.89 58.84 0.617 - 0.617 36.301 36.301
t=08 72.60 B. Polos (y) 0.08 12.50 3.54 3.79 - 10 - 0.25 15 10 3.89 58.84 0.617 - 0.617 36.301 36.301
5 Plat dinding t=5 c t=05 - 112.397
t=05 112.40 B. Polos (x) 0.05 20.00 4.47 4.72 - 10 - 0.25 19 10 4.82 91.08 0.617 - 0.617 56.198 56.198
t=05 112.40 B. Polos (y) 0.05 20.00 4.47 4.72 - 10 - 0.25 19 10 4.82 91.08 0.617 - 0.617 56.198 56.198
5 Plat meja t=01 - 356.030
t=01 188.41 B. Polos (x) 0.01 100.00 10.00 10.25 - 8 - 0.25 41 6 10.35 424.35 0.395 - 0.222 94.206 94.206
t=01 523.65 B. Polos (y) 0.01 100.00 10.00 10.25 - 10 - 0.25 41 10 10.35 424.35 0.617 - 0.617 261.824 261.824
6 Plat dinding t=15 - 139.657
t=15 139.66 B. Polos (x) 0.15 6.67 2.58 2.83 - 16 - 0.10 27 12 2.93 78.64 1.578 - 0.888 69.828 69.828
t=15 139.66 B. Polos (y) 0.15 6.67 2.58 2.83 - 16 - 0.10 27 12 2.93 78.64 1.578 - 0.888 69.828 69.828
FOOT PLAT
1 FP1 250x250x33 151.10 49.593 101.503
Uk. 250x250x33 B. Polos 2.50 - - - - - 0.15 18 12 3.26 57.59 - - 0.888 51.143 51.143
B.Ulir 2.50 - - 18 16 44.17 0.15 - - 3.26 - 1.580 69.783 - - 69.783
250x250x33 B. Polos 2.50 - - - - - 0.15 18 12 3.26 57.59 - - 0.888 51.143 51.143
B.Ulir 2.50 - - 35 16 88.33 0.15 - - 3.26 - 1.580 139.567 - - 139.567
2 FP2 120x120x30 188.65 70.300 118.350
Uk. 120x120x30 B. Polos 1.20 - - - - - 0.15 9 12 1.90 17.10 - - 0.888 15.185 15.185
B.Ulir 1.20 - - 9 16 10.80 0.15 - - 1.90 - 1.578 17.042 - - 17.042
120x120x30 B. Polos 1.20 - - - - - 0.15 9 12 1.90 17.10 - - 0.888 15.185 15.185
B.Ulir 1.20 - - 18 16 21.60 0.15 - - 1.90 - 1.578 34.085 - - 34.085
3 FP2 100x100x20 207.12 207.115 -
Uk. 100x100x20 B. Polos 1.00 - - 15 12 15.33 0.15 8 10 1.50 11.50 0.888 13.616 0.617 7.096 20.712
B.Ulir 1.00 - - - - - 0.15 - - 1.50 - - - - - -
100x100x20 B. Polos 1.00 - - 15 12 15.33 0.15 8 10 1.50 11.50 0.888 13.616 0.617 7.096 20.712
B.Ulir 1.00 - - - - - 0.15 - - 1.50 - - - - - -
7.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
PC ( 50 kg ) kg 247.000 1,450.00 358,150.00
Pasir Beton m3 0.621 166,000.00 103,038.57
Bahan
Kerikil Beton (maks. 30 mm) m3 0.740 290,000.00 214,600.00
Air liter 215.000 13.50 2,902.50
Pekerja OH 1.650 66,000.00 108,900.00
Tukang batu OH 0.275 85,000.00 23,375.00
Tenaga kerja
Kepala tukang OH 0.028 90,000.00 2,520.00
Mandor OH 0.083 95,000.00 7,885.00
Jumlah Harga per Satuan Pekerjaan 821,371.07
7.2. Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
PC ( 50 kg ) kg 276.000 1,450.00 400,200.00
Pasir Beton m3 0.591 166,000.00 98,177.14
Bahan
Kerikil Beton (maks. 30 mm) m3 0.750 290,000.00 217,392.59
Air liter 215.000 13.50 2,902.50
Pekerja OH 1.650 66,000.00 108,900.00
Tukang batu OH 0.275 85,000.00 23,375.00
Tenaga kerja
Kepala tukang OH 0.028 90,000.00 2,520.00
Mandor OH 0.083 95,000.00 7,885.00
Jumlah Harga per Satuan Pekerjaan 861,352.24
7.2.c.1. Membuat 1 m3 Kolom praktis 10 x 10 cm dengan beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K125 m3 1.000 861,352.24 861,352.24
Bahan Begisting Kolom m2 40.000 113,340.00 4,533,600.00
Pembesian dengan Besi Beton Polos kg 275.851 14,538.00 4,010,323.27
Jumlah Harga per Satuan Pekerjaan 9,405,275.50
7.2.e.1. Membuat 1 m3 Plat Meja dengan beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K125 m3 1.000 861,352.24 861,352.24
Bahan Begisting Plat Lantai m2 1.300 225,992.25 293,789.93
Pembesian dengan Besi Beton Polos kg 81.466 14,538.00 1,184,354.30
Jumlah Harga per Satuan Pekerjaan 2,339,496.46
7.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K100), slump (3-6) cm, w/c = 0,87
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
PC ( 50 kg ) kg 230.000 1,450.00 333,500.00
Pasir Beton m3 0.638 166,000.00 105,884.29
Bahan
Kerikil Beton (maks. 30 mm) m3 0.761 290,000.00 220,614.81
Air liter 200.000 13.50 2,700.00
Pekerja OH 1.200 66,000.00 79,200.00
Tukang batu OH 0.200 85,000.00 17,000.00
Tenaga kerja
Kepala tukang OH 0.020 90,000.00 1,800.00
Mandor OH 0.060 95,000.00 5,700.00
Jumlah Harga per Satuan Pekerjaan 766,399.10
7.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
PC ( 50 kg ) kg 326.000 1,450.00 472,700.00
Pasir Beton m3 0.543 166,000.00 90,114.29
Bahan
Kerikil Beton (maks. 30 mm) m3 0.762 290,000.00 221,044.44
Air liter 215.000 13.50 2,902.50
Pekerja OH 1.650 66,000.00 108,900.00
Tukang batu OH 0.275 85,000.00 23,375.00
Tenaga kerja
Kepala tukang OH 0.028 90,000.00 2,520.00
Mandor OH 0.083 95,000.00 7,885.00
Jumlah Harga per Satuan Pekerjaan 929,441.23
7.5.b.1. Membuat 1 m3 Sloof 15 x 20 cm dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Sloof m2 13.333 113,340.00 1,511,200.00
Pembesian dengan Besi Beton Polos kg 106.902 14,538.00 1,554,144.65
Jumlah Harga per Satuan Pekerjaan 3,994,785.88
7.5.c.1. Membuat 1 m3 Kolom 15 x 15 cm dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Kolom m2 13.333 113,340.00 1,511,200.00
Pembesian dengan Besi Beton Polos kg 145.209 14,538.00 2,111,046.83
Jumlah Harga per Satuan Pekerjaan 4,551,688.06
7.5.c.2. Membuat 1 m3 Kolom 15 x 20 cm dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Kolom m2 23.333 113,340.00 2,644,600.00
Pembesian dengan Besi Beton Polos kg 142.080 14,538.00 2,065,559.04
Jumlah Harga per Satuan Pekerjaan 5,639,600.27
7.5.d.1. Membuat 1 m3 Balok ring 10 x 13 cm dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Balok m2 20.000 113,340.00 2,266,800.00
Pembesian dengan Besi Beton Polos kg 252.462 14,538.00 3,670,285.85
Jumlah Harga per Satuan Pekerjaan 6,866,527.08
7.5.d.2. Membuat 1 m3 Balok selasar 12 x 15 cm dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
KEBUTUHAN HARGA SATUAN
JUMLAH
SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Balok m2 23.333 113,340.00 2,644,600.00
Pembesian dengan Besi Beton Polos kg 190.556 14,538.00 2,770,296.67
Jumlah Harga per Satuan Pekerjaan 6,344,337.90
7.5.d.3. Membuat 1 m3 Balok 10 x 15 cm dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Balok m2 20.000 113,340.00 2,266,800.00
Pembesian dengan Besi Beton Polos kg 314.880 14,538.00 4,577,725.44
Jumlah Harga per Satuan Pekerjaan 7,773,966.67
7.5.g.1. Membuat 1 m3 Tangga dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Tangga m2 1.00 x Koef.
Pembesian dengan Besi Beton Polos kg 1.00 x Koef.
Jumlah Harga per Satuan Pekerjaan
7.5.g.2. Membuat 1 m3 Tangga dengan beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Beton Mutu K175 m3 1.000 929,441.23 929,441.23
Bahan Begisting Tangga m2 1.00 x Koef.
Pembesian dengan Besi Beton Ulir kg 1.00 x Koef.
Jumlah Harga per Satuan Pekerjaan
8.1.2 1 m2 Pasang atap Genteng Pres Pejaten (Efektif 18 x 22 cm, Lokasi Khusus)
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Bahan Genteng Pres Pejaten bh 30.000 2,430.00 72,900.00
Pekerja OH 0.150 66,000.00 9,900.00
Tukang kayu OH 0.075 90,000.00 6,750.00
Tenaga kerja
Kepala tukang OH 0.008 90,000.00 720.00
Mandor OH 0.008 95,000.00 760.00
Jumlah Harga per Satuan Pekerjaan 91,030.00
9.7.1a.
Memasang 1 m2 langit-langit Calsiboard 120 x 240 x 3 mm + Rangka Metal Furing
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Calsiboard 120 x 240 x 3 mm lembar 0.368 67,825.00 24,925.69
Bahan Rangka Metal Furing m' 3.000 23,000.00 69,000.00
Paku Sekrup kg 0.110 13,200.00 1,452.00
Pekerja OH 0.100 66,000.00 6,600.00
Tukang kayu OH 0.050 90,000.00 4,500.00
Tenaga kerja
Kepala tukang OH 0.005 90,000.00 450.00
Mandor OH 0.005 95,000.00 475.00
Jumlah Harga per Satuan Pekerjaan 107,402.69
9.7.2.
Memasang 1 m2 langit-langit Calsiboard 120 x 240 x 6 mm (Lokasi Khusus)
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Calsiboard 120 x 240 x 6 mm lembar 0.420 94,500.00 39,690.00
Bahan
Paku Sekrup kg 0.110 18,900.00 2,079.00
Pekerja OH 0.100 66,000.00 6,600.00
Tukang kayu OH 0.050 90,000.00 4,500.00
Tenaga kerja
Kepala tukang OH 0.005 90,000.00 450.00
Mandor OH 0.005 95,000.00 475.00
Jumlah Harga per Satuan Pekerjaan 53,794.00
11.18.2. Memasang 1 m’ talang datar/ jurai seng bjls 30 lebar 90 cm (Lokasi Khusus)
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Seng Plat BJLS 30 L 90 cm m¹ 0.324 64,350.00 20,849.40
Bahan Paku 1 - 3 cm kg 0.015 16,200.00 243.00
Papan Kayu Kelas II. 3/20 m3 0.0072 5,000,000.00 36,000.00
Pekerja kg 0.3 66,000.00 19,800.00
Tukang Besi OH 0.04 85,000.00 3,400.00
Tenaga kerja
Kepala tukang OH 0.4 90,000.00 36,000.00
Mandor OH 0.025 95,000.00 2,375.00
Jumlah Harga per Satuan Pekerjaan 97,575.00
11.19.1. Memasang 1 m’ talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 50 cm
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Seng plat m 1.050 21,600.00 22,680.00
Bahan Paku 1 - 3 cm kg 0.010 16,200.00 162.00
Besi strip 30 x 3 mm kg 0.500 16,650.00 8,325.00
Pekerja OH 0.150 66,000.00 9,900.00
Tukang Besi OH 0.300 85,000.00 25,500.00
Tenaga kerja
Kepala tukang OH 0.030 90,000.00 2,700.00
Mandor OH 0.008 95,000.00 760.00
Jumlah Harga per Satuan Pekerjaan 70,027.00
11.19.2. Memasang 1 m’ talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 50 cm (Lokasi Khusus)
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Seng plat m 1.200 21,600.00 25,920.00
Bahan Paku 1 - 3 cm kg 0.010 16,200.00 162.00
Besi strip 30 x 3 mm kg 0.500 16,650.00 8,325.00
Pekerja OH 0.150 66,000.00 9,900.00
Tukang Besi OH 0.300 85,000.00 25,500.00
Tenaga kerja
Kepala tukang OH 0.030 90,000.00 2,700.00
Mandor OH 0.008 95,000.00 760.00
Jumlah Harga per Satuan Pekerjaan 73,267.00
14.6. 1 m2 Pengecatan langit-langit 2 lapis dengan cat tembok, menggunakan kuas termasuk plamir
HARGA SATUAN
JUMLAH
KEBUTUHAN SATUAN INDEKS BAHAN/ UPAH
(Rp.) (Rp.)
Plamir tembok kg 0.100 8,100.00 810.00
Cat Tembok Mutu Tinggi kg 0.240 100,000.00 24,000.00
Bahan Ampelas Lembar 0.500 4,050.00 2,025.00
Kuas bh 0.015 13,500.00 202.50
Kapek bh 0.050 5,400.00 270.00
Pekerja OH 0.080 66,000.00 5,280.00
Tukang Cat OH 0.060 85,000.00 5,100.00
Tenaga kerja
Kepala tukang OH 0.006 90,000.00 540.00
Mandor OH 0.004 95,000.00 380.00
Jumlah Harga per Satuan Pekerjaan 38,607.50
PERHITUNGAN
No URAIAN VOLUME KET
P x L x T x n
I. PEKERJAAN PERSIAPAN
Pengukuran dan Pemasangan Bowplank 81.00 m' 81.00 x 1.00 x 1.00 x 1
Papan Nama Proyek 2.00 m2 2.00 x 1.00 x 1.00 x 1
Pekerjaan Balok
Pekerjaan Beton Balok Ring 10 x 13 cm 0.96 m3 74.00 x 0.10 x 0.13 x 1
Pekerjaan Beton Balok Geuvel 10 x 10 cm 0.18 m3 9.00 x 0.10 x 0.10 x 2
3
Pekerjaan Beton Balok Selasar 15 x 15 cm - m 14.00 x 0.10 x 0.13 x 0
Pekerjaan Beton Balok Latei 10 x 15 - m3 21.00 x 0.10 x 0.12 x 0
3
Pekerjaan Rabat Lantai 5.40 m 18.00 10.00 x 0.03 x 1
Pekerjaan Meja Beton Tempat Praktek
Pekerjaan Plat Meja Beton - m3 7.88 x 0.60 x 0.10 x 0
Pekerjaan Dinding Meja Beton - m3 0.60 x 0.80 x 0.12 x 0
Melapis Meni Kayu Kusen Pintu dan Jendela 9.54 m2 4.77 x 1.00 x 1.00 x 2
Cat Kusen Pintu dan Jendela 2 lapis 9.54 m2 4.77 x 1.00 x 1.00 x 2
Melapis Meni Kayu Daun Pintu 1 11.68 m 2
2.92 x 1.00 x 1.00 x 4
Melapis Meni Kayu Daun Pintu 2 - m2 1.68 x 1.00 x 1.00 x 0
Melapis Meni Kayu Daun Jendela 5.80 m 2
0.29 x 1.00 x 1.00 x 20
Cat Daun Pintu type 1- 2 lapis 11.68 m 2
2.92 x 1.00 x 1.00 x 4
Cat Daun Pintu type 2 - 2 lapis - m2 1.68 x 1.00 x 1.00 x 0
Cat Daun Jendela 2 lapis 5.80 m 2
0.29 x 1.00 x 1.00 x 20
Cat Calsiplang (Listplank) 19.20 m2 64.00 x 0.30 x 1.00 x 1
BESI KONSTRUKSI
DIMENSI BETON BERAT BESI TOTAL BERAT BESI
Tulangan pokok Beugel / Sengkang
NO JENIS KONSTRUKSI Lebar/ Penam- Panjang Panjang Panjang/m Panjang Panjang Tulangan Besi Besi
Panjang Jlh Dia. Jarak Jlh Dia Sengkang
tinggi pang (beton) (besi) 3 /bh total Pokok Polos Ulir
SLOOF
1 S1 20x40 124.350 -
uk. 20x40 B. Polos 0.20 0.40 0.08 12.50 8 12 100.00 0.15 83 8 1.08 90.00 0.888 88.800 0.395 35.550 124.350
20x40 B. Ulir 0.20 0.40 0.08 12.50 - - - - - 1.08 - - - - - -
20x40 0.20 0.40 0.08 12.50 - - - - - 1.08 - - - - - -
2 S2 20x30 97.822 -
uk. 20x30 B. Polos 0.20 0.30 0.06 16.67 4 12 66.67 0.15 111 8 0.88 97.78 0.888 59.200 0.395 38.622 97.822
20x30 B. Ulir 0.20 0.30 0.06 16.67 - - - - - 0.88 - - - - - -
20x30 0.20 0.30 0.06 16.67 - - - - - 0.88 - - - - - -
3 S1a 20x35 87.610 -
uk. 20x35 B. Polos 0.20 0.35 0.07 14.29 4 12 57.14 0.15 95 8 0.98 93.33 0.888 50.743 0.395 36.867 87.610
20x35 B. Ulir 0.20 0.35 0.07 14.29 - - - - - 0.98 - - - - - -
20x35 0.20 0.35 0.07 14.29 - - - - - 0.98 - - - - - -
3 S3a 15x15 141.262 -
uk. 15x15 B. Polos 0.15 0.15 0.02 44.44 4 10 177.78 0.15 296 6 0.48 142.22 0.617 109.689 0.222 31.573 141.262
15x15 B. Ulir 0.15 0.15 0.02 44.44 - - - - - 0.48 - - - - - -
15x15 0.15 0.15 0.02 44.44 - - - - - 0.48 - - - - - -
4 S3 15x20 110.880 -
uk. 15x20 B. Polos 0.15 0.20 0.03 33.33 4 10 133.33 0.15 222 6 0.58 128.89 0.617 82.267 0.222 28.613 110.880
15x20 B. Ulir 0.15 0.20 0.03 33.33 - - - - - 0.58 - - - - - -
15x20 0.15 0.20 0.03 33.33 - - - - - 0.58 - - - - - -
5 S3 15x25 92.651 -
uk. 15x25 B. Polos 0.15 0.25 0.04 26.67 4 10 106.67 0.15 178 6 0.68 120.89 0.617 65.813 0.222 26.837 92.651
15x25 B. Ulir 0.15 0.25 0.04 26.67 - - - - - 0.68 - - - - - -
15x25 0.15 0.25 0.04 26.67 - - - - - 0.68 - - - - - -
5 S3 15x30 144.311 -
uk. 15x30 B. Polos 0.15 0.30 0.05 22.22 5 12 111.11 0.15 148 8 0.78 115.56 0.888 98.667 0.395 45.644 144.311
15x30 B. Ulir 0.15 0.30 0.05 22.22 - - - - - 0.78 - - - - - -
15x30 0.15 0.30 0.05 22.22 - - - - - 0.78 - - - - - -
BALOK
1 B1 30X75 61.645 78.987
uk. 30X75 B. Polos 0.30 0.75 0.23 4.44 - - - 0.13 36 10 2.81 99.91 - - 0.617 61.645 61.645
30X75 B. Ulir 0.30 0.75 0.23 4.44 9 16 40.00 - - - - 1.580 63.200 - - 63.200
30X75 0.30 0.75 0.23 4.44 4 12 17.78 - - - - 0.888 15.787 - - 15.787
uk. 10x20 B. Polos 0.10 0.20 0.02 50.00 - - - 0.15 333 8 0.54 180.00 - - 0.395 71.100 71.100
10x20 B. Ulir 0.10 0.20 0.02 50.00 4 12 200.00 - - - - 0.888 177.600 - - 177.600
10x20 0.10 0.20 0.02 50.00 - - - - - - - - - - - -
12 B 13/30 13x30 46.300 159.385
uk. 13x30 B. Polos 0.13 0.30 0.04 25.64 - - - 0.18 147 8 0.80 117.22 - - 0.395 46.300 46.300
13x30 B. Ulir 0.13 0.30 0.04 25.64 7 12 179.49 - - - - 0.888 159.385 - - 159.385
13x30 0.13 0.30 0.04 25.64 - - - - - - - - - - - -
13 B 15/25 15x25 210.301 -
uk. 15x25 B. Polos 0.15 0.25 0.04 26.67 7 12 186.67 0.18 152 8 0.74 112.76 0.888 165.760 0.395 44.541 210.301
15x25 B. Ulir 0.15 0.25 0.04 26.67 - - - - - - - - - - - -
15x25 0.15 0.25 0.04 26.67 - - - - - - - - - - - -
13 B 15/30 15x30 180.267 -
uk. 15x30 B. Polos 0.15 0.30 0.05 22.22 7 12 155.56 0.18 127 8 0.84 106.67 0.888 138.133 0.395 42.133 180.267
15x30 B. Ulir 0.15 0.30 0.05 22.22 - - - - - - - - - - - -
15x30 0.15 0.30 0.05 22.22 - - - - - - - - - - - -
13 B 12/15 12x15 176.578 246.667
uk. 12x15 B. Polos 0.12 0.15 0.02 55.56 4 10 222.22 0.15 370 6 0.48 177.78 0.617 137.111 0.222 39.467 176.578
12x15 B. Ulir 0.12 0.15 0.02 55.56 5 12 277.78 - - - - 0.888 246.667 - - 246.667
12x15 0.12 0.15 0.02 55.56 - - - - - - - - - - - -
14 B 10/15 10x15 207.947 -
uk. 10x15 B. Polos 0.10 0.15 0.02 66.67 4 10 266.67 0.15 444 6 0.44 195.56 0.617 164.533 0.222 43.413 207.947
10x15 B. Ulir 0.10 0.15 0.02 66.67 - - - - - - - - - - - -
10x15 0.10 0.15 0.02 66.67 - - - - - - - - - - - -
KOLOM
1 K1 15x15 44.44444 145.209 -
uk. 15x15 B. Polos 0.15 0.15 0.02 44.44 44.44 4 10 177.78 0.150 296 6 0.54 160.00 0.617 109.689 0.222 35.520 145.209
15x15 B. Ulir 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
15x15 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
1 K1a 10x10 100 297.120 -
uk. 10x10 B. Polos 0.10 0.10 0.01 100.00 100.00 4 10 400.00 0.150 667 6 0.34 226.67 0.617 246.800 0.222 50.320 297.120
10x10 B. Ulir 0.10 0.10 0.01 100.00 100.00 - - - - - - - - - - - - -
10x10 0.10 0.10 0.01 100.00 100.00 - - - - - - - - - - - - -
2 K2 30X30 11.11111 112.289 -
uk. 30X30 B. Polos 0.30 0.30 0.09 11.11 11.11 8 12 88.89 0.150 74 8 1.14 84.44 0.888 78.933 0.395 33.356 112.289
30X30 B. Ulir 0.30 0.30 0.09 11.11 11.11 - - - - - - - - - - - - -
3 K3 20x20 25 89.080 -
uk. 20x20 B. Polos 0.20 0.20 0.04 25.00 25.00 4 10 100.00 0.150 167 6 0.74 123.33 0.617 61.700 0.222 27.380 89.080
20x20 B. Ulir 0.20 0.20 0.04 25.00 25.00 - - - - - - - - - - - - -
20x20 0.20 0.20 0.04 25.00 25.00 - - - - - - - - - - - - -
1 K3a 12x12 69.44444 214.556 -
uk. 12x12 B. Polos 0.12 0.12 0.01 69.44 69.44 4 10 277.78 0.150 463 6 0.42 194.44 0.617 171.389 0.222 43.167 214.556
12x12 B. Ulir 0.12 0.12 0.01 69.44 69.44 - - - - - - - - - - - - -
12x12 0.12 0.12 0.01 69.44 69.44 - - - - - - - - - - - - -
4 K1a 35x35 8.163265 67.492 128.980
uk. 35x35 B. Polos 0.35 0.35 0.12 8.16 8.16 - - - 0.100 82 10 1.34 109.39 - - 0.617 67.492 67.492
35x35 B. Ulir 0.35 0.35 0.12 8.16 8.16 10 16 81.63 - - - - - 1.580 128.980 - - 128.980
35x35 0.35 0.35 0.12 8.16 8.16 - - - - - - - - - - - - -
5 K2a 25x25 16 173.072 -
uk. 25x25 B. Polos 0.25 0.25 0.06 16.00 16.00 8 12 128.00 0.100 160 8 0.94 150.40 0.888 113.664 0.395 59.408 173.072
25x25 B. Ulir 0.25 0.25 0.06 16.00 16.00 - - - - - - - - - - -
25x25 0.25 0.25 0.06 16.00 16.00 - - - - - - - - - - - - -
6 K15/20 15x20 33.33333 31.573 118.400
uk. 15x20 B. Polos 0.15 0.20 0.03 33.33 33.33 - 0.150 222 6 0.64 142.22 - - 0.222 31.573 31.573
15x20 B. Ulir 0.15 0.20 0.03 33.33 33.33 4 12 133.33 - - - - - 0.888 118.400 - - 118.400
15x20 0.15 0.20 0.03 33.33 33.33 - - - - - - - - - - - - -
6 K15/15 15x15 44.44444 193.387 -
uk. 15x15 B. Polos 0.15 0.15 0.02 44.44 44.44 4 12 177.78 0.150 296 6 0.54 160.00 0.888 157.867 0.222 35.520 193.387
15x15 B. Ulir 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
15x15 0.15 0.15 0.02 44.44 44.44 - - - - - - - - - - - - -
7 KP 11/11 10x10 100 276.992 -
uk. 10x10 B. Polos 0.10 0.10 0.01 100.00 100.00 4 10 400.00 0.250 400 6 0.34 136.00 0.617 246.800 0.222 30.192 276.992
10x10 B. Ulir 0.10 0.10 0.01 100.00 100.00 - - - - - - - - - - - - -
10x10 0.10 0.10 0.01 100.00 100.00 - - - - - - - - - - - - -
PLAT
1 Plat Lantai t=12 50.115
t=12 B. Polos (x) 0.12 8.33 2.89 3.14 - 10 - 0.25 13 10 3.24 40.61 0.617 - 0.617 25.057 25.057
t=12 B. Polos (y) 0.12 8.33 2.89 3.14 - 10 - 0.25 13 10 3.24 40.61 0.617 - 0.617 25.057 25.057
2 Plat lantai t=10 59.157
t=10 B. Polos (x) 0.10 10.00 3.16 3.41 - 10 - 0.25 14 10 3.51 47.94 0.617 - 0.617 29.579 29.579
t=10 B. Polos (y) 0.10 10.00 3.16 3.41 - 10 - 0.25 14 10 3.51 47.94 0.617 - 0.617 29.579 29.579
3 Plat Atap t=08 75.420
t=08 B. Polos (x) 0.08 12.50 3.54 3.79 - 8 - 0.15 25 8 3.89 95.47 0.395 - 0.395 37.710 37.710
t=08 B. Polos (y) 0.08 12.50 3.54 3.79 - 8 - 0.15 25 8 3.89 95.47 0.395 - 0.395 37.710 37.710
4 Plat lantai tribun t=08 72.603
t=08 B. Polos (x) 0.08 12.50 3.54 3.79 - 10 - 0.25 15 10 3.89 58.84 0.617 - 0.617 36.301 36.301
t=08 B. Polos (y) 0.08 12.50 3.54 3.79 - 10 - 0.25 15 10 3.89 58.84 0.617 - 0.617 36.301 36.301
5 Plat dinding t=5 c t=05 112.397
t=05 B. Polos (x) 0.05 20.00 4.47 4.72 - 10 - 0.25 19 10 4.82 91.08 0.617 - 0.617 56.198 56.198
t=05 B. Polos (y) 0.05 20.00 4.47 4.72 - 10 - 0.25 19 10 4.82 91.08 0.617 - 0.617 56.198 56.198
5 Plat meja t=07 82.140
t=07 B. Polos (x) 0.07 14.29 3.78 4.03 - 10 - 0.25 16 10 4.13 66.56 0.617 - 0.617 41.070 41.070
t=07 B. Polos (y) 0.07 14.29 3.78 4.03 - 10 - 0.25 16 10 4.13 66.56 0.617 - 0.617 41.070 41.070
6 Plat dinding t=15 139.657
t=15 B. Polos (x) 0.15 6.67 2.58 2.83 - 16 - 0.10 27 12 2.93 78.64 1.578 - 0.888 69.828 69.828
t=15 B. Polos (y) 0.15 6.67 2.58 2.83 - 16 - 0.10 27 12 2.93 78.64 1.578 - 0.888 69.828 69.828
FOOT PLAT
1 FP1 250x250x33 49.593 101.503
Uk. 250x250x33 B. Polos 2.50 - - - - - 0.15 18 12 3.26 57.59 - - 0.888 51.143 51.143
B.Ulir 2.50 - - 18 16 44.17 0.15 - - 3.26 - 1.580 69.783 - - 69.783
III PEKERJAAN PASANGAN DAN PLESTERAN 21.00 80 5.250 5.250 5.250 5.250