LAPORAN PENGELUARAN DOOSAN 340LCV

-ongkos bubut shap idler(ajuster),,,650.000


-ongkos buat tutup busing roler,,350.000
-Stater motor,,,2.500.000
-fius kotak,,,75.000
-clam pipa,,,50.000
-valve spring priming,,,60.000
-priming pump,,,95.000
-majun,,,50.000
-nepel gris 10pc,,,50.000
-filter solar 2pc,,,170.000(1 stok)
-ring kuningan line solar 10pc,,,30.000
-bayar org harian,,350.000(2hari pasang treck+macul stater 100+opertor
bonus 50)
-kepala aki 4pc,,,70.000
-isi bensin pinjam mobil,,,100.000(bawa idler k bubut)
-pinjaman operator,,,500.000
Jumlah:5.100.000
*Blm kosumsi Operasional dll gx ingat lagi(-+500.000)

Uang kas masuk K tempat saya


*Tgl 03 april(kes),,500.000
*Tgl 04 april(transfer),,3.000.000
*Tgl 06 april(transfer),,500.000
*Tgl 09 april(1.000.000)
#jumlah 5.000.000
...