KONTRAK
SATUAN
NO URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA
VOLUME
(Rp) (Rp)
1 2 3 4 5 6
11,250,000 0.0449
22,500,000 0.0897
22,500,000 0.0897
3,000,000 0.0120
8,000,000 0.0319
1,500,000 0.0060
- 0.0000
- 0.0000 797.90 97,345 77,671,568 0.3098
- 0.0000 - 0.0000 -
- 0.0000
- 0.0000
0.1362
0.0062
0.0013
0.0000
0.0101
0.0284
0.0187
0.0000
0.0139
0.0250
0.0326
0.3310
0.0000
0.0576
0.2498
0.0236
0.0321
0.0049
0.0200
0.0072
0.8863
0.1045
0.6930
0.0889
0.0906
0.0174
0.0557
0.0174
0.3310
0.0576
0.2498
0.0236
1.8072 0.0000
0.4927 0.0000
0.4114 0.0000
0.0813 0.0000
5.7582 0.0000
2.6001 0.0000
3.1581 0.0000
2.1626 0.0000
0.2978 0.0000
1.8349 0.0000
0.0299 0.0000
1.0884 0.0000
1.0884 0.0000
9.5018 0.0000
RANG TOTAL
BOBOT BOBOT
REMARK
TERHADAP TERHADAP
HARGA JUMLAH HARGA
KONTRAK VOLUME KONTRAK
SATUAN (Rp) (Rp)
AWAL AWAL
(%) (%)
1079.72 - - 0.0000
1079.72 4,153 4,483,537 0.0179 TAMBAH
134.40 - - 0.0000
524.00 1,158,617 607,115,203 2.4212 TAMBAH
847.66 579,308 491,056,558 1.9583 TAMBAH
0.00 - - 0.0000
797.90 97,345 77,671,568 0.3098 TAMBAH
TAMBAH
0.0000 79,500,000 0.3170
Rp 25,075,177,214
9.00 2,500,000 22,500,000 0.0897 TAMBAH
1.00 - - 0.0000
2.00 - - 0.0000
0.00 - - 0.0000
25.00 - - 0.0000
150.00 20,000 3,000,000 0.0120 TAMBAH
3.00
17.00
150.00
12.00
3.00
19.60
797.90
PEKERJAAN STRUKTUR
REMARK
TERHADAP TERHADAP TERHADAP
SATUAN
NO URAIAN PEKERJAAN HARGA SATUAN JUMLAH HARGA BOBOT HARGA JUMLAH HARGA HARGA JUMLAH HARGA HARGA JUMLAH HARGA
VOLUME VOLUME KONTRAK VOLUME KONTRAK VOLUME KONTRAK
(Rp) (Rp) (%) SATUAN (Rp) (Rp) SATUAN (Rp) (Rp) SATUAN (Rp) (Rp)
AWAL AWAL AWAL
(%) (%) (%)
1 2 3 4 5 6 7
II.1.1 PEKERJAAN PONDASI 1,563,531,535 6.2354 531,218,281 2.1185 27,337,330 0.1090 2,067,412,486 8.2449 TAMBAH
2.1.1.1 Pekerjaan Menggali tanah biasa sedalam 3-4 m M3 910.05 93,478 85,069,654 0.3393 985.16 93,478 92,090,892 0.3673 0.00 1895.21 93,478 177,160,546 0.7065 TAMBAH
2.1.1.2 Pekerjaan Pengurugan 1 M3 dengan tanah M3 644.00 68,650 44,210,600 0.1763 670.34 68,650 46,018,541 0.1835 0.00 1314.34 68,650 90,229,141 0.3598 TAMBAH
2.1.1.3 Pekerjaan (K3) Pemadatan tanah 1 M3 tanah ( per 20 cm ) M3 644.00 100,951 65,012,698 0.2593 670.34 100,951 67,671,316 0.2699 0.00 1314.34 100,951 132,684,013 0.5291 TAMBAH
2.1.1.4 Membuat 1 M3 beton mutu f'c =7,4 Mpa ( K100 ) slum (12+2)cm M3 17.93 1,081,972 19,399,765 0.0774 2.19 1,081,972 2,368,438 0.0094 0.00 20.12 1,081,972 21,768,202 0.0868 TAMBAH
Pekerjaan Pasir Urug M3 0.00 357,940 - 0.0000 40.24 357,940 14,402,790 0.0574 40.24 357,940 14,402,790 0.0574 TAMBAH
2.1.1.5 Pekerjaan Beton Pondasi setempat
a Pekerjaan beton mutu f'c = 21,7 Mpa ( K250 ) M3 131.20 1,284,039 168,465,927 0.6718 15.17 1,284,039 19,472,453 0.0777 0.00 146.37 1,284,039 187,938,380 0.7495 TAMBAH
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 15938.45 21,160 337,251,227 1.3450 5977.36 21,160 126,478,572 0.5044 0.00 21915.81 21,160 463,729,799 1.8494 TAMBAH
c Pekerjaan Pemasangan bekisting untuk pondasi M2 347.20 300,227 104,238,953 0.4157 0.00 76.90 300,227 23,087,487 0.0921 270.30 300,227 81,151,466 0.3236 KURANG
2.1.1.6 Pekerjaan Beton Sloof 15/20
a Pekerjaan beton mutu f'c = 21,7 Mpa ( K250 ) M3 106.06 1,284,039 136,185,185 0.5431 21.52 1,284,039 27,631,323 0.1102 0.00 127.58 1,284,039 163,816,508 0.6533 TAMBAH
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 11514.77 21,160 243,647,927 0.9717 3735.22 21,160 79,035,739 0.3152 0.00 15249.99 21,160 322,683,666 1.2869 TAMBAH
c Pekerjaan Pemasangan bekisting untuk sloof M2 1060.59 326,462 346,242,757 1.3808 171.68 326,462 56,048,219 0.2235 0.00 1232.27 326,462 402,290,976 1.6043 TAMBAH
2.1.1.7 Pekerjaan Pengurugan kembali galian tanah M3 654.87 21,083 13,806,843 0.0551 0.00 201.57 21,083 4,249,843 0.0169 453.30 21,083 9,557,000 0.0381 KURANG
II.1.2 PEKERJAAN KOLOM BETON 355,918,638 1.4194 1,105,966,776 4.4106 - 0.0000 1,461,885,415 5.8300 TAMBAH
2.1.2.1 Pekerjaan Kolom Beton Lantai 1 0.0000 0.0000
a Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 30.70 1,284,039 39,420,000 0.1572 75.50 1,284,039 96,946,690 0.3866 0.00 106.20 1,284,039 136,366,690 0.5438 TAMBAH
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 5953.28 21,160 125,969,023 0.5024 30039.67 21,160 635,627,392 2.5349 0.00 35992.95 21,160 761,596,416 3.0373 TAMBAH
c Pekerjaan Pemasangan bekisting untuk kolom M2 101.65 373,794 37,996,191 0.1515 998.93 373,794 373,392,694 1.4891 0.00 1100.58 373,794 411,388,885 1.6406 TAMBAH
2.1.2.2 Pekerjaan Kolom Beton Lantai 2 0.00 0.00
a Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 23.02 1,284,039 29,558,580 0.1179 0.00 0.00 23.02 1,284,039 29,558,580 0.1179
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 4464.96 21,160 94,476,768 0.3768 0.00 0.00 4464.96 21,160 94,476,768 0.3768
c Pekerjaan Pemasangan bekisting untuk kolom M2 76.24 373,794 28,498,077 0.1137 0.00 0.00 76.24 373,794 28,498,077 0.1137
II.1.3 PEKERJAAN BALOK BETON 1,727,972,501 6.8912 - 0.0000 - 0.0000 1,727,972,501 6.8912
2.1.3.1 Pekerjaan Balok Beton Lantai 1 0.0000 0.0000
a Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 158.04 1,284,039 202,929,536 0.8093 0.00 0.00 158.04 1,284,039 202,929,536 0.8093
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 21538.91 21,160 455,754,720 1.8176 0.00 0.00 21538.91 21,160 455,754,720 1.8176
c Pekerjaan Pemasangan bekisting untuk balok M2 531.91 385,971 205,301,994 0.8187 0.00 0.00 531.91 385,971 205,301,994 0.8187
2.1.3.2 Pekerjaan Balok Beton Lantai 2 0.0000
a Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 158.04 1,284,039 202,929,536 0.8093 0.00 0.00 158.04 1,284,039 202,929,536 0.8093
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 21538.91 21,160 455,754,720 1.8176 0.00 0.00 21538.91 21,160 455,754,720 1.8176
c Pekerjaan Pemasangan bekisting untuk balok M2 531.91 385,971 205,301,994 0.8187 0.00 0.00 531.91 385,971 205,301,994 0.8187
II.1.4 PEKERJAAN TANGGA BETON 570,540,536 2.2753 - 0.0000 - 0.0000 570,540,536 2.2753
2.1.4.1 Pekerjaan Tangga Beton 0.0000 0.0000
a Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 17.90 1,284,039 22,984,300 0.0917 0.00 0.00 17.90 1,284,039 22,984,300 0.0917
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 22508.12 21,160 476,262,816 1.8993 0.00 0.00 22508.12 21,160 476,262,816 1.8993
c Pekerjaan Pemasangan bekisting untuk tangga M2 121.65 586,054 71,293,420 0.2843 0.00 0.00 121.65 586,054 71,293,420 0.2843
480757882.xlsx STRUKTUR 18 of 57
II.1.5 PEKERJAAN PLAT BETON 1,417,238,288 5.6520 770,478,178 3.0727 54,380,605 0.2169 2,133,335,861 8.5078 TAMBAH
2.1.5.1 Pekerjaan Plat Beton Lantai 1 ( Plat Lantai ) 0.0000 0.0000
a Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 160.54 1,284,039 206,139,634 0.8221 26.09 1,284,039 33,505,672 0.1336 0.00 186.63 1,284,039 239,645,306 0.9557 TAMBAH
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 28094.43 21,160 594,466,901 2.3707 4693.29 21,160 99,308,174 0.3960 0.00 32787.72 21,160 693,775,075 2.7668 TAMBAH
c Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 445.94 472,794 210,837,890 0.8408 0.00 115.02 472,794 54,380,605 0.2169 330.92 472,794 156,457,285 0.6240 KURANG
- Pekerjaan Sirtu tebal 10cm di padatakan M3 0.00 1,251,503 - 0.0000 122.53 1,251,503 153,344,299 0.6115 0.00 122.53 1,251,503 153,344,299 0.6115 TAMBAH
- Pekerjaan Hampar Plastik Cor M2 0.00 - 0.0000 1225.28 - - 0.0000 0.00 1225.28 - - 0.0000
2.1.5.2 5.2 Pekerjaan Plat Beton Lantai 2 ( Dak / Atap )
a Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 64.41 1,284,039 82,704,957 0.3298 85.08 1,284,039 109,242,132 0.4357 0.00 149.49 1,284,039 191,947,089 0.7655 TAMBAH
b Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 11271.54 21,160 238,501,278 0.9511 15136.08 21,160 320,273,449 1.2773 0.00 26407.62 21,160 558,774,727 2.2284 TAMBAH
c Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 178.91 472,794 84,587,628 0.3373 115.92 472,794 54,804,452 0.2186 0.00 294.83 472,794 139,392,080 0.5559 TAMBAH
480757882.xlsx STRUKTUR 19 of 57
Volume MC-0
No Jenis Barang/Jasa Satuan REMARK
Kontrak Tambah Kurang Total
B PEKERJAAN STRUKTUR
PEKERJAAN PEMBANGUNAN GEDUNG GOA BATU CERMIN
I Pekerjaan Pondasi
I.1 Pekerjaan Menggali tanah biasa sedalam 3-4 m M3 910.05 985.16 1895.21 TAMBAH
I.2 Pekerjaan Pengurugan 1 M3 dengan tanah M3 644.00 670.34 1314.34 TAMBAH
I.3 Pekerjaan (K3) Pemadatan tanah 1 M3 tanah ( per 20 cm ) M3 644.00 670.34 1314.34 TAMBAH
I.4 Membuat 1 M3 beton mutu f'c =7,4 Mpa ( K100 ) slum (12+2)cm M3 17.93 2.19 0.00 20.12 TAMBAH
Pekerjaan Pasir Urug M3 0.00 40.24 0.00 40.24 TAMBAH
I.5 Pekerjaan Beton Pondasi setempat 0.00 0.00 0.00
- Pekerjaan beton mutu f'c = 21,7 Mpa ( K250 ) M3 131.20 15.17 0.00 146.37 TAMBAH
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 15938.45 5977.36 0.00 21915.81 TAMBAH
- Pekerjaan Pemasangan bekisting untuk pondasi M2 347.20 0.00 76.90 270.30 KURANG
I.5 Pekerjaan Beton Sloof 15/20 0.00
- Pekerjaan beton mutu f'c = 21,7 Mpa ( K250 ) M3 106.06 21.52 127.58 TAMBAH
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 11514.77 3735.22 15249.99 TAMBAH
- Pekerjaan Pemasangan bekisting untuk sloof M2 1060.59 171.68 1232.27 TAMBAH
I.6 Pekerjaan Pengurugan kembali galian tanah M3 654.87 201.57 453.30 KURANG
II PEKERJAAN KOLOM BETON 0.00
II.1 Pekerjaan Kolom Beton Lantai 1 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 30.70 75.50 106.20 TAMBAH
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 5953.28 30039.67 35992.95 TAMBAH
- Pekerjaan Pemasangan bekisting untuk kolom M2 101.65 998.93 1100.58 TAMBAH
II.2 Pekerjaan Kolom Beton Lantai 2 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 23.02 23.02
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 4464.96 4464.96
- Pekerjaan Pemasangan bekisting untuk kolom M2 76.24 76.24
III PEKERJAAN BALOK BETON 0.00
III.1 Pekerjaan Balok Beton Lantai 1 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 158.04 158.04
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 21538.91 21538.91
- Pekerjaan Pemasangan bekisting untuk balok M2 531.91 531.91
III.2 Pekerjaan Balok Beton Lantai 2 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 158.04 158.04
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 21538.91 21538.91
- Pekerjaan Pemasangan bekisting untuk balok M2 531.91 531.91
IV PEKERJAAN TANGGA BETON 0.00
IV.1 Pekerjaan Tangga Beton 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 17.90 17.90
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 22508.12 22508.12
- Pekerjaan Pemasangan bekisting untuk tangga M2 121.65 121.65
V PEKERJAAN PLAT BETON 0.00
V.1 Pekerjaan Plat Beton Lantai 1 ( Plat Lantai ) 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 160.54 26.09 186.63 TAMBAH
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 28094.43 4693.29 32787.72 TAMBAH
- Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 445.94 115.02 330.92 KURANG
- Pekerjaan Sirtu tebal 10cm di padatakan M3 0.00 122.53 122.53 TAMBAH
- Pekerjaan Hampar Plastik Cor M2 0.00 1225.28 1225.28 TAMBAH
V.2 5.2 Pekerjaan Plat Beton Lantai 2 ( Dak / Atap ) 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 64.41 85.08 149.49 TAMBAH
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 11271.54 15136.08 26407.62 TAMBAH
- Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 178.91 115.92 294.83 TAMBAH
PEKERJAAN PEMBANGUNAN GWT GOA BATU CERMIN 0.00
I PEKERJAAN PONDASI 0.00
I.1 Pekerjaan Menggali tanah biasa sedalam 3-4 m M3 16.70 16.70
I.2 Pekerjaan Membuat beton mutu f'c =7,4 Mpa ( K100 M3 0.30 0.30
I.3 Pekerjaan Beton Pondasi setempat 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 1.98 1.98
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 336.42 336.42
- Pekerjaan Pemasangan bekisting untuk pondasi M2 15.60 15.60
I.4 Pekerjaan Beton Sloof 20/40 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 2.72 2.72
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 296.18 296.18
- Pekerjaan Pemasangan bekisting untuk sloof M2 27.20 27.20
II PEKERJAAN PLAT BETON 0.00
II.1 Pekerjaan Plat Beton 0.00
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 11.25 11.25
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 2960.59 2960.59
- Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 12.50 12.50
III PEKERJAAN KOLOM BETON 0.00
3.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 0.96 0.96
3.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 237.00 237.00
3.3 Pekerjaan Pemasangan bekisting untuk kolom M2 4.80 4.80
IV PEKERJAAN DINDING BETON 0.00
4.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 20.40 20.40
4.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 8212.22 8212.22
4.3 Pekerjaan Pemasangan bekisting untuk dinding M2 45.33 45.33
V PEKERJAAN BALOK BETON 0.00
5.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 3.40 3.40
5.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 660.65 660.65
5.3 Pekerjaan Pemasangan bekisting untuk balok M2 11.33 11.33
VI PEKERJAAN PLAT TUTUP BETON 0.00
6.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 11.25 11.25
6.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 2960.59 2960.59
6.3 Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 12.50 12.50
PEKERJAAN JALAN 0.00
I PEKERJAAN TANAH 0.00
II.1 Galian Struktur dengan kedalaman 0 - 2 meter M3 1215.55 1215.55
II.2 Timbunan Pilihan dari sumber galian M3 53.05 53.05
II PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 0.00
II.1 Lapis Pondasi Agregat Kelas A M3 520.95 520.95
II.2 Lapis Pondasi Agregat Kelas B M3 694.60 694.60
III PERKERASAN ASPAL 0.00
III.1 Lapis Resap Pengikat - Aspal Cair Liter 3473.00 3473.00
III.2 Laston Lapis Aus (AC-WC) Ton 399.40 399.40
III.3 Bahan Anti Pengelupasan Kg 64.70 64.70
IV STRUKTUR 0.00
Beton mutu rendah, fc’7,4 MPa M3 252.23 252.23
Volume MC-0
No Jenis Barang/Jasa Satuan
Kontrak
A PEKERJAAN PERSIAPAN
I.1 SEWA TEMPAT DIREKSI TEKNIS (LUASAN 50 M2)
I.1 Pekerjaan Menggali tanah biasa sedalam 3-4 m M3 910.05
I.2 Pekerjaan Pengurugan 1 M3 dengan tanah M3 644.00
I.3 Pekerjaan (K3) Pemadatan tanah 1 M3 tanah ( per 20 cm ) M3 644.00
I.4 Membuat 1 M3 beton mutu f'c =7,4 Mpa ( K100 ) slum (12+2)cm M3 17.93
Pekerjaan Pasir Urug M3 0.00
I.5 Pekerjaan Beton Pondasi setempat
- Pekerjaan beton mutu f'c = 21,7 Mpa ( K250 ) M3 131.20
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 15938.45
- Pekerjaan Pemasangan bekisting untuk pondasi M2 347.20
I.5 Pekerjaan Beton Sloof 15/20
- Pekerjaan beton mutu f'c = 21,7 Mpa ( K250 ) M3 106.06
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 11514.77
- Pekerjaan Pemasangan bekisting untuk sloof M2 1060.59
I.6 Pekerjaan Pengurugan kembali galian tanah M3 654.87
II PEKERJAAN KOLOM BETON
II.1 Pekerjaan Kolom Beton Lantai 1
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 30.70
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 5953.28
- Pekerjaan Pemasangan bekisting untuk kolom M2 101.65
II.2 Pekerjaan Kolom Beton Lantai 2
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 23.02
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 4464.96
- Pekerjaan Pemasangan bekisting untuk kolom M2 76.24
III PEKERJAAN BALOK BETON
III.1 Pekerjaan Balok Beton Lantai 1
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 158.04
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 21538.91
- Pekerjaan Pemasangan bekisting untuk balok M2 531.91
III.2 Pekerjaan Balok Beton Lantai 2
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 158.04
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 21538.91
- Pekerjaan Pemasangan bekisting untuk balok M2 531.91
IV PEKERJAAN TANGGA BETON
IV.1 Pekerjaan Tangga Beton
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 17.90
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 22508.12
- Pekerjaan Pemasangan bekisting untuk tangga M2 121.65
V PEKERJAAN PLAT BETON
V.1 Pekerjaan Plat Beton Lantai 1 ( Plat Lantai )
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 160.54
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 28094.43
- Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 445.94
- Pekerjaan Sirtu tebal 10cm di padatakan M3 0.00
- Pekerjaan Hampar Plastik Cor M2 0.00
V.2 5.2 Pekerjaan Plat Beton Lantai 2 ( Dak / Atap )
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 64.41
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 11271.54
- Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 178.91
PEKERJAAN PEMBANGUNAN GWT GOA BATU CERMIN
I PEKERJAAN PONDASI
I.1 Pekerjaan Menggali tanah biasa sedalam 3-4 m M3 16.70
I.2 Pekerjaan Membuat beton mutu f'c =7,4 Mpa ( K100 M3 0.30
I.3 Pekerjaan Beton Pondasi setempat
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 1.98
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 336.42
- Pekerjaan Pemasangan bekisting untuk pondasi M2 15.60
I.4 Pekerjaan Beton Sloof 20/40
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 2.72
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 296.18
- Pekerjaan Pemasangan bekisting untuk sloof M2 27.20
II PEKERJAAN PLAT BETON
II.1 Pekerjaan Plat Beton
- Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 11.25
- Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 2960.59
- Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 12.50
III PEKERJAAN KOLOM BETON
3.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 0.96
3.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 237.00
3.3 Pekerjaan Pemasangan bekisting untuk kolom M2 4.80
IV PEKERJAAN DINDING BETON
4.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 20.40
4.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 8212.22
4.3 Pekerjaan Pemasangan bekisting untuk dinding M2 45.33
V PEKERJAAN BALOK BETON
5.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 3.40
5.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 660.65
5.3 Pekerjaan Pemasangan bekisting untuk balok M2 11.33
VI PEKERJAAN PLAT TUTUP BETON
6.1 Membuat 1 M3 beton mutu f'c =21.7 Mpa ( K250 ) slum (12+2)cm M3 11.25
6.2 Pekerjaan Pembesian dengan besi polos atau besi ulir Kg 2960.59
6.3 Pekerjaan Pemasangan bekisting untuk Plat Lantai M2 12.50
PEKERJAAN JALAN
I PEKERJAAN TANAH
II.1 Galian Struktur dengan kedalaman 0 - 2 meter M3 1215.55
II.2 Timbunan Pilihan dari sumber galian M3 53.05
II PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
II.1 Lapis Pondasi Agregat Kelas A M3 520.95
II.2 Lapis Pondasi Agregat Kelas B M3 694.60
III PERKERASAN ASPAL
III.1 Lapis Resap Pengikat - Aspal Cair Liter 3473.00
III.2 Laston Lapis Aus (AC-WC) Ton 399.40
III.3 Bahan Anti Pengelupasan Kg 64.70
IV STRUKTUR
Beton mutu rendah, fc’7,4 MPa M3 252.23
Volume MC-0
REMARK
Tambah Kurang Total
TIPE
NO. LOKASI UTAMA VERTIKAL HORIZONTAL
(M') (M') (M') (M') (M') (M') (M3) (M2) BERAT BERAT BERAT BERAT (KG)
X Y (1) (2) (3) = {(1) + (2)} x 2 (5) (6) = (4) x (5) (7) = (3) x (5) kg kg kg kg (8)
1 819211.74 9061463.43 K1 TOILET + 53.000 + 59.93 0.300 0.500 1.600 6.930 1.040 11.088 246.708 65.596 24.598 24.598 361.501
2 819213.42 9061465.28 K1 TOILET + 53.000 + 59.93 0.300 0.500 1.600 6.930 1.040 11.088 246.708 65.596 24.598 24.598 361.501
3 819211.69 9061468.59 K1 TOILET + 53.000 + 59.93 0.300 0.500 1.600 6.930 1.040 11.088 246.708 65.596 24.598 24.598 361.501
4 819209.79 9061471.74 K1 TOILET + 53.000 + 59.93 0.300 0.500 1.600 6.930 1.040 11.088 246.708 65.596 24.598 24.598 361.501
5 819206.53 9061469.77 K1 TOILET + 53.000 + 59.93 0.300 0.500 1.600 6.930 1.040 11.088 246.708 65.596 24.598 24.598 361.501
6 819207.66 9061464.67 K2 TOILET + 53.000 + 59.93 0.300 0.700 2.000 6.930 1.455 13.860 352.440 82.858 33.229 33.229 501.757
7 819215.90 9061466.93 K1 R. GENSET + 53.000 + 59.95 0.300 0.500 1.600 6.950 1.043 11.120 247.331 66.533 24.950 24.950 363.764
8 819217.51 9061466.60 K1 R. GENSET + 53.000 + 59.95 0.300 0.500 1.600 6.950 1.043 11.120 247.331 66.533 24.950 24.950 363.764
9 819218.93 9061472.40 K2 R. GENSET + 53.000 + 59.95 0.300 0.700 2.000 6.950 1.460 13.900 353.331 84.041 33.704 33.704 504.780
10 819219.60 9061475.92 K1 R. GENSET + 53.000 + 59.95 0.300 0.500 1.600 6.950 1.043 11.120 247.331 66.533 24.950 24.950 363.764
11 819216.80 9061476.85 K1 R. GENSET + 53.000 + 59.95 0.300 0.500 1.600 6.950 1.043 11.120 247.331 66.533 24.950 24.950 363.764
12 819213.82 9061470.60 K1 R. GENSET + 53.000 + 59.95 0.300 0.500 1.600 6.950 1.043 11.120 247.331 66.533 24.950 24.950 363.764
13 819211.94 9061473.91 K2 R. GENSET + 53.000 + 59.95 0.300 0.700 2.000 6.950 1.460 13.900 353.331 84.041 33.704 33.704 504.780
14 819210.01 9061475.47 K1 R. SERVIS + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
15 819204.39 9061472.34 K1 R. SERVIS + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
16 819201.58 9061473.98 K1 R. SERVIS + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
17 819197.63 9061476.52 K1 R. SERVIS + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
18 819199.64 9061479.46 K1 R. SERVIS + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
19 819204.67 9061478.74 K1 R. SERVIS + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
20 819208.44 9061478.20 K1 R. SERVIS + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
21 819199.75 9061482.25 K2 KANTOR + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
22 819199.44 9061489.98 K2 KANTOR + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
23 819207.07 9061480.97 K1 KANTOR + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
24 819205.66 9061485.11 K1 KANTOR + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
25 819209.50 9061487.34 K1 KANTOR + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
26 819205.62 9061488.37 K1 KANTOR + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
27 819204.01 9061493.96 K1 KANTOR + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
28 819210.89 9061482.09 K3' SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
29 819216.23 9061481.71 K5 TANGGA 3 + 53.000 + 57.8 0.200 0.400 1.200 4.800 0.384 5.760 71.109 33.834 0.000 0.000 104.943
30 819215.94 9061487.47 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
31 819213.29 9061488.50 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
32 819208.71 9061490.36 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
33 819211.50 9061490.71 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
34 819214.37 9061492.34 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
35 819217.81 9061490.14 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
36 819215.29 9061497.36 K3' SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
37 819210.77 9061496.45 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
ELEVASI DIMENSI QUANTITY
TULANGAN PENGIKAT
AS BAWAH ATAS PANJANG LEBAR KELILING TINGGI BETON FORMWORK SENGKANG BESI
TIPE
NO. LOKASI UTAMA VERTIKAL HORIZONTAL
(M') (M') (M') (M') (M') (M') (M3) (M2) BERAT BERAT BERAT BERAT (KG)
X Y (1) (2) (3) = {(1) + (2)} x 2 (5) (6) = (4) x (5) (7) = (3) x (5) kg kg kg kg (8)
38 819209.52 9061498.00 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
39 819209.21 9061500.90 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
40 819215.87 9061501.45 K3 SELASAR + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
41 819201.76 9061495.42 K1 R. GANTI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
42 819199.16 9061497.01 K1 R. GANTI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
43 819196.17 9061499.14 K1 R. GANTI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
44 819205.37 9061498.34 K1 R. GANTI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
45 819201.71 9061500.83 K1 R. GANTI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
46 819199.87 9061505.03 K1 R. GANTI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
47 819205.05 9061503.77 K1 R. GANTI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
48 819202.25 9061506.69 K1 TICKETING + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
49 819205.76 9061505.61 K1 TICKETING + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
50 819212.53 9061503.78 K1 TICKETING + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
51 819216.94 9061504.29 K1 TICKETING + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
52 819201.96 9061511.25 K1 TICKETING + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
53 819207.60 9061511.58 K1 TICKETING + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
54 819212.57 9061507.71 K2 TICKETING + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
55 819213.31 9061514.84 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
56 819209.70 9061517.65 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
57 819214.75 9061521.33 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
58 819211.14 9061524.13 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
59 819206.82 9061526.39 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
60 819203.92 9061527.76 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
61 819212.58 9061530.62 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
62 819214.33 9061533.85 K2 P.INFORMASI + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
63 819221.29 9061535.96 K2 P.INFORMASI + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
64 819210.14 9061540.86 K1 P.INFORMASI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
65 819214.38 9061542.47 K4 P.INFORMASI + 53.000 + 60.00 0.400 0.400 1.600 7.000 1.120 11.200 284.445 66.533 41.145 41.145 433.268
66 819220.13 9061541.84 K4 P.INFORMASI + 53.000 + 60.00 0.400 0.400 1.600 7.000 1.120 11.200 284.445 66.533 41.145 41.145 433.268
67 819221.91 9061541.65 K1 P.INFORMASI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
68 819222.29 9061546.22 K1 P.INFORMASI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
69 819218.47 9061547.03 K1 P.INFORMASI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
70 819214.13 9061547.82 K1 P.INFORMASI + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
71 819225.41 9061535.51 K2 AUDITORIUM + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
72 819230.11 9061534.79 K2 AUDITORIUM + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
73 819233.94 9061534.37 K1 AUDITORIUM + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
74 819234.31 9061537.66 K1 AUDITORIUM + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
ELEVASI DIMENSI QUANTITY
TULANGAN PENGIKAT
AS BAWAH ATAS PANJANG LEBAR KELILING TINGGI BETON FORMWORK SENGKANG BESI
TIPE
NO. LOKASI UTAMA VERTIKAL HORIZONTAL
(M') (M') (M') (M') (M') (M') (M3) (M2) BERAT BERAT BERAT BERAT (KG)
X Y (1) (2) (3) = {(1) + (2)} x 2 (5) (6) = (4) x (5) (7) = (3) x (5) kg kg kg kg (8)
75 819237.98 9061539.86 K1 AUDITORIUM + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
76 819226.01 9061541.00 K2 AUDITORIUM + 53.000 + 60.00 0.300 0.700 2.000 7.000 1.470 14.000 355.556 84.041 33.704 33.704 507.006
77 819226.77 9061540.63 K1 AUDITORIUM + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
78 819229.16 9061541.94 K1 AUDITORIUM + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
79 819231.12 9061543.09 K1 AUDITORIUM + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
80 819233.86 9061544.62 K1 AUDITORIUM + 53.000 + 60.00 0.300 0.500 1.600 7.000 1.050 11.200 248.889 66.533 24.950 24.950 365.322
81 819230.94 9061528.58 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
82 819233.81 9061530.21 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
83 819233.22 9061524.27 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
84 819235.35 9061525.52 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
85 819235.29 9061522.57 K3' PLAZA + 53.000 + 59.95 0.450 0.450 1.413 6.950 1.105 9.820 282.665 102.573 0.000 0.000 385.237
86 819237.24 9061517.83 K1' PLAZA + 53.000 + 59.95 0.300 0.500 1.600 6.950 1.043 11.120 247.331 66.533 24.950 24.950 363.764
87 819222.64 9061540.71 KC3 RAMP + 53.000 + 55.99 0.300 0.300 0.942 2.990 0.211 2.817 36.192 17.462 0.000 0.000 53.654
88 819223.18 9061545.72 KC3 RAMP + 53.000 + 56.44 0.300 0.300 0.942 3.440 0.243 3.240 40.453 20.090 0.000 0.000 60.543
89 819226.60 9061547.73 KC3 RAMP + 53.000 + 56.79 0.300 0.300 0.942 3.790 0.268 3.570 43.768 22.134 0.000 0.000 65.902
90 819230.00 9061549.73 KC3 RAMP + 53.000 + 57.14 0.300 0.300 0.942 4.140 0.292 3.900 47.082 24.178 0.000 0.000 71.260
91 819233.42 9061551.74 KC3 RAMP + 53.000 + 57.49 0.300 0.300 0.942 4.490 0.317 4.230 50.396 26.222 0.000 0.000 76.618
92 819236.83 9061553.74 KC3 RAMP + 53.000 + 57.84 0.300 0.300 0.942 4.840 0.342 4.559 53.711 28.266 0.000 0.000 81.977
93 819240.16 9061549.76 KC3 RAMP + 53.000 + 58.3 0.300 0.300 0.942 5.300 0.374 4.993 58.067 30.952 0.000 0.000 89.019
94 819243.50 9061545.78 KC3 RAMP + 53.000 + 58.76 0.300 0.300 0.942 5.760 0.407 5.426 62.423 33.639 0.000 0.000 96.061
95 819241.08 9061542.48 KC3 RAMP + 53.000 + 59.13 0.300 0.300 0.942 6.130 0.433 5.774 65.926 35.800 0.000 0.000 101.726
96 819237.95 9061538.22 KC3 RAMP + 53.000 + 59.608 0.300 0.300 0.942 6.608 0.467 6.225 70.453 38.591 0.000 0.000 109.044
97 819235.18 9061534.43 KC3 RAMP + 53.000 + 59.95 0.300 0.300 0.942 6.950 0.491 6.547 73.691 40.588 0.000 0.000 114.280
98 819252.09 9061530.54 KC2 SUPIR + 53.000 + 57.95 0.400 0.400 1.256 4.950 0.622 6.217 91.254 38.450 0.000 0.000 129.704
99 819253.34 9061528.39 KC2 SUPIR + 53.000 + 57.95 0.400 0.400 1.256 4.950 0.622 6.217 91.254 38.450 0.000 0.000 129.704
100 819256.84 9061528.94 KC2 SUPIR + 53.000 + 57.95 0.400 0.400 1.256 4.950 0.622 6.217 91.254 38.450 0.000 0.000 129.704
101 819257.71 9061531.44 KC2 SUPIR + 53.000 + 57.95 0.400 0.400 1.256 4.950 0.622 6.217 91.254 38.450 0.000 0.000 129.704
102 819226.46 9061474.89 KC1 BUDAYA + 53.000 + 57.7 0.300 0.300 0.942 4.700 0.332 4.427 52.385 27.448 0.000 0.000 79.833
103 819224.10 9061477.29 KC1 BUDAYA + 53.000 + 57.7 0.300 0.300 0.942 4.700 0.332 4.427 52.385 27.448 0.000 0.000 79.833
104 819224.34 9061480.51 KC1 BUDAYA + 53.000 + 57.7 0.300 0.300 0.942 4.700 0.332 4.427 52.385 27.448 0.000 0.000 79.833
105 819228.13 9061482.62 KC1 BUDAYA + 53.000 + 57.7 0.300 0.300 0.942 4.700 0.332 4.427 52.385 27.448 0.000 0.000 79.833
106 819231.00 9061481.13 KC1 BUDAYA + 53.000 + 57.7 0.300 0.300 0.942 4.700 0.332 4.427 52.385 27.448 0.000 0.000 79.833
107 819231.80 9061477.86 KC1 BUDAYA + 53.000 + 57.7 0.300 0.300 0.942 4.700 0.332 4.427 52.385 27.448 0.000 0.000 79.833
108 819229.82 9061475.13 KC1 BUDAYA + 53.000 + 57.7 0.300 0.300 0.942 4.700 0.332 4.427 52.385 27.448 0.000 0.000 79.833
109 K1A3 SAMPAH + 53.000 + 58.485 0.150 0.300 0.900 5.485 0.247 4.937 59.818 28.310 0.000 0.000 88.128
110 K1A3 SAMPAH + 53.000 + 58.485 0.150 0.300 0.900 5.485 0.247 4.937 59.818 28.310 0.000 0.000 88.128
111 K1A3 SAMPAH + 53.000 + 58.485 0.150 0.300 0.900 5.485 0.247 4.937 59.818 28.310 0.000 0.000 88.128
ELEVASI DIMENSI QUANTITY
TULANGAN PENGIKAT
AS BAWAH ATAS PANJANG LEBAR KELILING TINGGI BETON FORMWORK SENGKANG BESI
TIPE
NO. LOKASI UTAMA VERTIKAL HORIZONTAL
(M') (M') (M') (M') (M') (M') (M3) (M2) BERAT BERAT BERAT BERAT (KG)
X Y (1) (2) (3) = {(1) + (2)} x 2 (5) (6) = (4) x (5) (7) = (3) x (5) kg kg kg kg (8)
112 K1A3 SAMPAH + 53.000 + 58.485 0.150 0.300 0.900 5.485 0.247 4.937 59.818 28.310 0.000 0.000 88.128
113 K1A3 SATPAM + 53.000 + 58.45 0.150 0.300 0.900 5.450 0.245 4.905 59.487 28.310 0.000 0.000 87.797
114 K1A3 SATPAM + 53.000 + 58.45 0.150 0.300 0.900 5.450 0.245 4.905 59.487 28.310 0.000 0.000 87.797
115 K1A3 SATPAM + 53.000 + 58.45 0.150 0.300 0.900 5.450 0.245 4.905 59.487 28.310 0.000 0.000 87.797
116 K1A3 SATPAM + 53.000 + 58.45 0.150 0.300 0.900 5.450 0.245 4.905 59.487 28.310 0.000 0.000 87.797
Volume
Area Side
Panjang
Tinggi
Lebar
Lokasi Form Total Berat
Type Sloof Berat Berat Berat Berat Berat Berat
M' M M M2 M3 kg kg kg kg kg kg kg
1 Sloof R. Genset S250X500 5.740 0.25 0.5 6.888 0.718 30.209 1.576 38.258 2.101 33.239 1.576 106.959
2 Sloof R. Genset S250X500 1.364 0.25 0.5 1.637 0.171 7.907 0.420 10.764 0.735 7.907 0.420 28.153
3 Sloof R. Genset S250X500 4.443 0.25 0.5 5.331 0.555 12.033 1.261 25.552 1.261 18.064 1.261 59.431
4 Sloof R. Genset S250X500 3.717 0.25 0.5 4.461 0.465 18.911 1.051 19.116 1.366 21.689 1.051 63.183
5 Sloof R. Genset S250X600 7.046 0.25 0.6 9.865 1.057 33.360 2.157 63.942 2.157 36.137 2.157 139.910
6 Sloof R. Genset S250X500 3.209 0.25 0.5 3.850 0.401 16.704 0.945 16.707 0.945 21.252 0.945 57.499
7 Sloof R. Genset S250X500 5.283 0.25 0.5 6.340 0.660 16.360 1.471 30.952 1.891 18.127 1.471 70.271
8 Sloof R. Genset S250X500 3.336 0.25 0.5 4.003 0.417 18.823 0.945 31.586 1.786 18.823 0.945 72.909
9 Sloof R. Genset S250X500 2.648 0.25 0.5 3.177 0.331 7.784 0.735 12.537 1.471 7.784 0.735 31.046
10 Sloof Toilet S250X500 2.269 0.25 0.5 2.723 0.284 9.183 0.630 14.326 1.261 9.183 0.630 35.214
11 Sloof Toilet S250X500 3.536 0.25 0.5 4.243 0.442 9.885 0.945 16.741 1.891 9.885 0.945 40.294
12 Sloof Toilet S250X500 3.988 0.25 0.5 4.786 0.499 18.261 1.051 20.398 1.471 20.786 1.051 63.015
13 Sloof Toilet S250X500 5.365 0.25 0.5 6.438 0.671 21.324 1.471 31.402 1.471 20.974 1.471 78.113
14 Sloof Toilet S250X500 4.627 0.25 0.5 5.552 0.578 22.859 1.261 23.422 1.261 27.967 1.261 78.031
15 Sloof Toilet S250X500 3.275 0.25 0.5 3.930 0.409 9.269 0.945 15.508 1.786 9.269 0.945 37.723
16 Sloof Toilet S250X500 3.629 0.25 0.5 4.355 0.454 13.475 1.051 22.910 1.996 13.475 1.051 53.958
17 Sloof Selasar S250X500 2.634 0.25 0.5 3.161 0.329 10.334 0.735 16.627 1.471 10.334 0.735 40.236
18 Sloof Selasar S250X500 2.623 0.25 0.5 3.148 0.328 10.301 0.735 16.561 1.471 10.301 0.735 40.104
19 Sloof Selasar S250X500 2.740 0.25 0.5 3.289 0.343 14.672 0.735 23.788 1.471 14.672 0.735 56.072
20 Sloof Selasar S250X500 2.848 0.25 0.5 3.417 0.356 8.257 0.840 13.483 1.576 8.257 0.840 33.253
21 Sloof Selasar S250X500 2.955 0.25 0.5 3.546 0.369 9.930 0.840 16.324 1.576 9.930 0.840 39.441
22 Sloof Selasar S250X500 2.212 0.25 0.5 2.654 0.277 7.877 0.630 12.219 1.261 7.877 0.630 30.495
22 Sloof Selasar S250X500 1.969 0.25 0.5 2.363 0.246 12.354 0.525 18.647 1.051 12.354 0.525 45.456
23 Sloof Selasar S250X500 4.125 0.25 0.5 4.950 0.516 28.201 1.156 48.827 2.206 28.201 1.156 109.746
24 Sloof Selasar S250X500 4.126 0.25 0.5 4.951 0.516 15.043 1.156 26.046 2.206 15.043 1.156 60.649
25 Sloof Selasar S250X400 2.053 0.25 0.4 2.053 0.205 6.376 0.361 9.722 0.632 6.376 0.361 23.829
26 Sloof R. Servis S250X600 5.930 0.25 0.6 8.302 0.890 31.108 1.798 54.253 2.397 42.673 1.798 134.026
27 Sloof R. Servis S250X500 2.966 0.25 0.5 3.559 0.371 9.959 0.840 16.382 1.576 9.959 0.840 39.556
28 Sloof R. Servis S250X500 2.549 0.25 0.5 3.059 0.319 10.066 0.735 16.091 1.366 10.066 0.735 39.060
29 Sloof R. Servis S250X500 3.308 0.25 0.5 3.970 0.414 12.462 0.945 20.884 1.786 12.462 0.945 49.484
29 Sloof R. Servis S250X500 5.024 0.25 0.5 6.028 0.628 20.112 1.366 35.679 2.731 20.112 1.366 81.366
30 Sloof R. Servis S250X500 5.465 0.25 0.5 6.557 0.683 19.269 1.471 31.953 1.471 21.289 1.471 76.923
31 Sloof R. Servis S250X500 4.578 0.25 0.5 5.494 0.572 16.471 1.261 22.433 1.261 17.733 1.261 60.419
32 Sloof R. Servis S250X500 3.013 0.25 0.5 3.615 0.377 11.530 0.840 19.020 1.681 11.530 0.840 45.441
33 Sloof R. Servis S250X500 4.203 0.25 0.5 5.043 0.525 15.287 1.156 20.657 1.156 16.549 1.156 55.960
34 Sloof R. Servis S250X500 3.446 0.25 0.5 4.135 0.431 11.284 0.945 17.072 0.945 12.294 0.945 43.487
35 Sloof Selasar S250X500 2.249 0.25 0.5 2.699 0.281 6.839 0.420 10.648 0.840 6.839 0.420 26.008
36 Sloof Selasar S250X500 2.249 0.25 0.5 2.699 0.281 12.539 0.630 19.522 1.261 12.539 0.630 47.120
37 Sloof Selasar S250X500 2.853 0.25 0.5 3.424 0.357 9.647 0.840 15.760 1.576 9.647 0.840 38.311
38 Sloof Selasar S250X500 4.178 0.25 0.5 5.013 0.522 15.207 1.156 26.374 2.206 15.207 1.156 61.306
39 Sloof Selasar S250X500 2.752 0.25 0.5 3.302 0.344 10.707 0.525 17.373 1.051 10.707 0.525 40.888
40 Sloof Selasar S250X500 0.825 0.25 0.5 0.990 0.103 5.202 0.210 5.858 0.315 5.202 0.210 16.997
41 Sloof Selasar S250X400 6.596 0.25 0.4 6.596 0.660 17.131 0.993 31.232 1.986 17.131 0.993 69.465
42 Sloof Selasar S250X500 4.857 0.25 0.5 5.829 0.607 13.014 1.366 22.999 2.626 13.014 1.366 54.385
43 Sloof Selasar S250X600 6.469 0.25 0.6 9.057 0.970 19.635 2.037 35.735 3.955 19.635 2.037 83.035
44 Sloof Selasar S250X500 2.563 0.25 0.5 3.076 0.320 8.846 0.735 14.157 1.366 8.846 0.735 34.686
45 Sloof Selasar S250X500 3.781 0.25 0.5 4.537 0.473 12.210 1.051 20.885 1.996 12.210 1.051 49.403
46 Sloof Selasar S250X500 2.483 0.25 0.5 2.980 0.310 8.627 0.735 13.718 1.366 8.627 0.735 33.807
47 Sloof Selasar S250X400 1.330 0.25 0.4 1.330 0.133 3.110 0.271 4.199 0.451 3.110 0.271 11.412
48 Sloof Selasar S250X500 2.473 0.25 0.5 2.967 0.309 8.597 0.525 13.660 0.945 8.597 0.525 32.850
Dimensi Pembesian
Tumpuan Kiri Lapangan Tumpuan Kanan
Nomor Lokasi
Volume
Area Side
Panjang
Tinggi
Lebar
Lokasi Form Total Berat
Type Sloof Berat Berat Berat Berat Berat Berat
M' M M M2 M3 kg kg kg kg kg kg kg
49 Sloof Selasar S250X500 1.312 0.25 0.5 1.574 0.164 5.390 0.315 7.245 0.525 5.390 0.315 19.180
50 Sloof Selasar S250X500 2.479 0.25 0.5 2.974 0.310 12.305 0.735 19.560 1.366 12.305 0.735 47.007
51 Sloof Selasar S250X500 3.625 0.25 0.5 4.350 0.453 16.827 1.051 28.604 1.996 16.827 1.051 66.356
52 Sloof Selasar S250X500 2.883 0.25 0.5 3.459 0.360 9.729 0.840 15.923 1.576 9.729 0.840 38.638
53 Sloof Selasar S250X400 2.757 0.25 0.4 2.757 0.276 5.362 0.451 8.704 0.903 5.362 0.451 21.233
54 Sloof Selasar S250X500 1.222 0.25 0.5 1.467 0.153 5.143 0.420 6.751 0.735 5.143 0.420 18.613
55 Sloof Selasar S250X500 2.439 0.25 0.5 2.927 0.305 8.504 0.735 13.473 1.366 8.504 0.735 33.317
56 Sloof Selasar S250X500 2.937 0.25 0.5 3.524 0.367 9.878 0.840 16.221 1.576 9.878 0.840 39.234
57 Sloof Selasar S250X500 3.713 0.25 0.5 4.455 0.464 12.022 0.735 20.508 1.366 12.022 0.735 47.388
58 Sloof Selasar S250X500 0.993 0.25 0.5 1.192 0.124 4.512 0.210 5.488 0.420 4.512 0.210 15.351
59 Sloof Selasar S250X400 1.067 0.25 0.4 1.067 0.107 2.695 0.181 3.369 0.361 2.695 0.181 9.480
60 Sloof Selasar S250X500 1.000 0.25 0.5 1.200 0.125 4.528 0.315 5.522 0.525 4.528 0.315 15.734
61 Sloof Selasar S250X500 6.018 0.25 0.5 7.222 0.752 13.135 1.156 23.745 2.206 13.135 1.156 54.532
62 Sloof Selasar S250X500 4.727 0.25 0.5 5.672 0.591 12.705 1.261 22.380 2.521 12.705 1.261 52.832
63 Sloof Selasar S250X400 5.010 0.25 0.4 5.010 0.501 11.146 0.812 19.767 1.534 11.146 0.812 45.219
64 Sloof Selasar S250X500 5.061 0.25 0.5 6.074 0.633 13.497 1.366 23.964 2.731 13.497 1.366 56.421
65 Sloof Selasar S250X500 6.061 0.25 0.5 7.273 0.758 23.794 1.681 45.316 2.206 26.067 1.681 100.745
66 Sloof Selasar S250X500 5.367 0.25 0.5 6.440 0.671 18.961 0.945 40.389 1.471 20.981 0.945 83.692
67 Sloof Selasar S250X500 4.274 0.25 0.5 5.129 0.534 13.572 1.156 23.608 2.311 13.572 1.156 55.373
68 Sloof Selasar S250X500 2.250 0.25 0.5 2.700 0.281 6.842 0.420 10.654 0.840 6.842 0.420 26.019
69 Sloof Selasar S250X500 4.016 0.25 0.5 4.819 0.502 12.860 1.156 22.184 2.206 12.860 1.156 52.421
70 Sloof Selasar S250X500 1.623 0.25 0.5 1.947 0.203 6.249 0.525 8.964 0.945 6.249 0.525 23.458
71 Sloof Selasar S250X500 4.244 0.25 0.5 5.092 0.530 15.415 0.840 26.790 1.576 15.415 0.840 60.877
72 Sloof Selasar S250X500 1.919 0.25 0.5 2.303 0.240 8.077 0.420 12.115 0.735 8.077 0.420 29.845
73 Sloof Selasar S250X500 3.758 0.25 0.5 4.510 0.470 10.413 1.051 17.795 1.996 10.413 1.051 42.718
74 Sloof Selasar S250X400 1.880 0.25 0.4 1.880 0.188 4.972 0.361 7.418 0.632 4.972 0.361 18.716
75 Sloof Selasar S250X400 2.109 0.25 0.4 2.109 0.211 5.424 0.361 8.323 0.722 5.424 0.361 20.615
76 Sloof Selasar S250X500 6.767 0.25 0.5 8.121 0.846 20.458 0.945 37.381 1.786 20.458 0.945 81.974
77 Sloof Selasar S250X500 2.551 0.25 0.5 3.061 0.319 10.071 0.735 16.102 1.366 10.071 0.735 39.081
78 Sloof Selasar S250X500 4.194 0.25 0.5 5.033 0.524 11.444 1.156 19.858 2.206 11.444 1.156 47.264
79 Sloof Selasar S250X500 6.307 0.25 0.5 7.569 0.788 19.188 1.681 30.621 2.311 20.198 1.681 75.681
80 Sloof Selasar S250X500 1.915 0.25 0.5 2.298 0.239 6.048 0.420 9.065 0.735 6.048 0.420 22.736
81 Sloof Selasar S250X400 3.261 0.25 0.4 3.261 0.326 7.695 0.542 12.865 0.993 7.695 0.542 30.331
82 Sloof Selasar S250X500 2.262 0.25 0.5 2.715 0.283 8.016 0.630 12.496 1.261 8.016 0.630 31.048
83 Sloof Selasar S250X500 2.370 0.25 0.5 2.844 0.296 8.312 0.420 13.090 0.840 8.312 0.420 31.395
84 Sloof Selasar S250X500 3.668 0.25 0.5 4.402 0.459 11.899 0.735 20.263 1.366 11.899 0.735 46.898
85 Sloof Selasar S250X500 1.652 0.25 0.5 1.982 0.206 8.138 0.525 11.731 0.945 8.138 0.525 30.003
86 Sloof Selasar S250X500 1.650 0.25 0.5 1.980 0.206 8.132 0.525 11.718 0.945 8.132 0.525 29.978
87 Sloof Kantor S250X500 7.262 0.25 0.5 8.715 0.908 31.179 1.996 46.857 2.626 26.964 1.996 111.618
88 Sloof Kantor S250X500 6.913 0.25 0.5 8.296 0.864 20.861 1.891 39.955 2.521 22.629 1.891 89.747
89 Sloof Kantor S250X500 4.145 0.25 0.5 4.974 0.518 13.217 0.735 22.898 1.471 13.217 0.735 52.273
90 Sloof Kantor S250X500 2.707 0.25 0.5 3.248 0.338 10.565 0.525 17.089 1.051 10.565 0.525 40.319
91 Sloof Kantor S250X500 6.347 0.25 0.5 7.616 0.793 22.053 1.681 30.808 1.681 16.540 1.681 74.444
92 Sloof Kantor S250X700 7.039 0.25 0.7 11.263 1.232 36.359 2.424 52.265 3.231 39.389 2.424 136.092
93 Sloof Kantor S250X500 5.829 0.25 0.5 6.995 0.729 15.314 1.576 38.061 1.576 16.072 1.576 74.174
94 Sloof Kantor S250X500 2.726 0.25 0.5 3.271 0.341 14.609 0.735 23.663 1.471 14.609 0.735 55.822
95 Sloof Kantor S250X500 6.156 0.25 0.5 7.388 0.770 18.771 1.681 29.907 1.681 19.781 1.681 73.502
96 Sloof Kantor S250X500 3.828 0.25 0.5 4.594 0.479 12.341 1.051 21.148 2.101 12.341 1.051 50.033
97 Sloof Kantor S250X700 8.203 0.25 0.7 13.125 1.436 34.891 2.828 52.795 3.770 36.406 2.828 133.517
98 Sloof Kantor S250X500 5.347 0.25 0.5 6.417 0.668 18.899 1.471 33.758 2.836 18.899 1.471 77.335
Dimensi Pembesian
Tumpuan Kiri Lapangan Tumpuan Kanan
Nomor Lokasi
Volume
Area Side
Panjang
Tinggi
Lebar
Lokasi Form Total Berat
Type Sloof Berat Berat Berat Berat Berat Berat
M' M M M2 M3 kg kg kg kg kg kg kg
99 Sloof Kantor S250X600 5.726 0.25 0.6 8.016 0.859 20.094 1.798 27.868 2.397 21.356 1.798 75.310
100 Sloof R. Ganti S250X500 4.134 0.25 0.5 4.961 0.517 15.070 1.156 20.333 2.206 16.333 1.156 56.253
101 Sloof R. Ganti S250X500 2.866 0.25 0.5 3.439 0.358 9.683 0.840 15.831 1.576 9.683 0.840 38.453
102 Sloof R. Ganti S250X500 3.260 0.25 0.5 3.912 0.407 10.770 0.945 18.005 1.786 10.770 0.945 43.223
103 Sloof R. Ganti S250X500 4.194 0.25 0.5 5.033 0.524 15.258 1.156 20.615 1.156 18.681 1.156 58.021
104 Sloof R. Ganti S250X500 4.200 0.25 0.5 5.040 0.525 15.276 1.156 26.512 2.206 15.276 1.156 61.582
105 Sloof R. Ganti S250X500 3.501 0.25 0.5 4.201 0.438 13.070 0.945 22.100 1.891 13.070 0.945 52.022
106 Sloof R. Ganti S250X700 6.465 0.25 0.7 10.344 1.131 22.427 2.289 40.814 2.962 22.427 2.289 93.209
107 Sloof R. Ganti S250X500 4.088 0.25 0.5 4.906 0.511 16.790 1.156 20.114 1.156 14.069 1.156 54.439
108 Sloof R. Ganti S250X500 4.695 0.25 0.5 5.634 0.587 14.735 1.261 25.935 2.521 14.735 1.261 60.448
109 Sloof R. Ganti S250X500 5.144 0.25 0.5 6.172 0.643 13.692 1.366 24.353 1.891 13.692 1.366 56.359
110 Sloof Ticketing S250X500 4.335 0.25 0.5 5.202 0.542 11.778 0.840 20.526 1.576 11.778 0.840 47.339
111 Sloof Ticketing S250X600 6.519 0.25 0.6 9.127 0.978 42.370 2.037 53.968 2.637 46.158 2.037 149.207
112 Sloof Ticketing S250X600 3.475 0.25 0.6 4.865 0.521 17.859 0.719 30.163 1.438 17.859 0.719 68.757
113 Sloof Ticketing S250X500 4.067 0.25 0.5 4.881 0.508 16.715 1.156 20.014 1.156 18.230 1.156 58.426
114 Sloof Ticketing S250X500 5.208 0.25 0.5 6.249 0.651 13.843 1.471 29.776 1.471 14.601 1.471 62.632
115 Sloof Ticketing S250X500 5.974 0.25 0.5 7.168 0.747 23.486 1.576 34.766 1.576 25.758 1.576 88.737
116 Sloof Ticketing S250X500 4.909 0.25 0.5 5.891 0.614 13.136 1.366 23.242 1.786 16.335 1.366 57.230
117 Sloof Ticketing S250X500 3.671 0.25 0.5 4.405 0.459 13.607 1.051 23.174 1.996 13.607 1.051 54.485
118 Sloof Ticketing S250X500 4.946 0.25 0.5 5.935 0.618 19.836 1.366 24.175 1.786 24.565 1.366 73.093
119 Sloof Ticketing S250X600 5.700 0.25 0.6 7.980 0.855 37.522 1.798 47.504 2.277 41.309 1.798 132.207
120 Sloof Ticketing S250X500 5.303 0.25 0.5 6.364 0.663 25.795 1.471 30.052 1.891 14.827 1.471 75.507
121 Sloof Ticketing S250X500 3.866 0.25 0.5 4.639 0.483 12.445 1.051 36.335 1.366 14.213 1.051 66.460
122 Sloof Plaza S250X400 1.796 0.25 0.4 1.796 0.180 6.727 0.451 9.919 0.812 6.727 0.451 25.089
123 Sloof Plaza S250X400 4.158 0.25 0.4 4.158 0.416 13.251 0.993 22.966 1.895 13.251 0.993 53.349
124 Sloof Plaza S250X400 2.581 0.25 0.4 2.581 0.258 7.626 0.632 12.221 1.173 7.626 0.632 29.909
124 Sloof Plaza S250X500 2.856 0.25 0.5 3.427 0.357 11.034 0.525 18.028 1.051 11.034 0.525 42.198
125 Sloof Plaza S250X500 3.334 0.25 0.5 4.001 0.417 18.817 0.945 31.573 1.786 18.817 0.945 72.883
126 Sloof Plaza S250X600 6.139 0.25 0.6 8.595 0.921 40.123 1.918 50.972 2.517 35.128 1.918 132.574
127 Sloof Plaza S250X600 6.273 0.25 0.6 8.782 0.941 32.731 1.918 52.027 2.517 35.761 1.918 126.871
128 Sloof Plaza S250X500 2.533 0.25 0.5 3.040 0.317 10.017 0.525 15.993 0.945 10.017 0.525 38.022
129 Sloof Plaza S250X600 4.197 0.25 0.6 5.876 0.630 28.629 1.318 35.646 1.678 25.933 1.318 94.522
130 Sloof Plaza S250X500 2.009 0.25 0.5 2.410 0.251 6.270 0.420 9.510 0.735 6.270 0.420 23.627
131 Sloof Plaza S250X500 2.009 0.25 0.5 2.411 0.251 6.271 0.420 9.512 0.735 6.271 0.420 23.630
132 Sloof Plaza S250X600 6.429 0.25 0.6 9.001 0.964 16.736 2.037 30.441 2.637 20.535 2.037 74.424
133 Sloof Plaza S250X600 6.368 0.25 0.6 8.915 0.955 19.355 1.318 36.943 2.637 21.123 1.318 82.695
134 Sloof Plaza S250X500 3.010 0.25 0.5 3.612 0.376 10.082 0.630 16.628 1.156 10.082 0.630 39.208
135 Sloof Plaza S250X500 2.621 0.25 0.5 3.145 0.328 14.152 0.525 22.748 0.945 14.152 0.525 53.048
136 Sloof Plaza S250X600 4.197 0.25 0.6 5.876 0.630 28.629 1.318 39.211 1.678 21.611 1.318 93.765
137 Sloof Plaza S250X400 2.011 0.25 0.4 2.011 0.201 5.229 0.361 7.933 0.632 5.229 0.361 19.745
138 Sloof Plaza S250X400 2.008 0.25 0.4 2.008 0.201 5.225 0.361 7.924 0.632 5.225 0.361 19.727
139 Sloof Plaza S250X600 6.893 0.25 0.6 9.650 1.034 35.667 2.157 51.228 2.756 32.248 2.157 126.214
140 Sloof Plaza S250X600 6.273 0.25 0.6 8.782 0.941 27.276 1.918 46.824 2.517 43.439 1.918 123.891
141 Sloof Plaza S250X500 3.020 0.25 0.5 3.624 0.378 21.662 0.840 35.748 1.681 21.662 0.840 82.434
142 Sloof Plaza S250X500 3.610 0.25 0.5 4.332 0.451 13.415 0.735 22.790 1.366 13.415 0.735 52.457
143 Sloof Plaza S250X500 2.634 0.25 0.5 3.161 0.329 12.919 0.735 20.787 1.471 12.919 0.735 49.567
144 Sloof Plaza S250X500 2.861 0.25 0.5 3.433 0.358 20.721 0.840 33.867 1.576 20.721 0.840 78.566
145 Sloof Plaza S250X400 4.258 0.25 0.4 4.258 0.426 9.662 0.722 16.799 1.354 9.662 0.722 38.922
146 Sloof Plaza S250X400 3.130 0.25 0.4 3.130 0.313 7.437 0.542 12.350 0.993 7.437 0.542 29.300
147 Sloof Plaza S250X400 4.150 0.25 0.4 4.150 0.415 9.450 0.632 16.375 1.264 9.450 0.632 37.802
Dimensi Pembesian
Tumpuan Kiri Lapangan Tumpuan Kanan
Nomor Lokasi
Volume
Area Side
Panjang
Tinggi
Lebar
Lokasi Form Total Berat
Type Sloof Berat Berat Berat Berat Berat Berat
M' M M M2 M3 kg kg kg kg kg kg kg
148 Sloof Plaza S250X400 2.933 0.25 0.4 2.933 0.293 7.048 0.451 11.571 0.903 7.048 0.451 27.472
149 Sloof Plaza S250X400 4.061 0.25 0.4 4.061 0.406 9.275 0.632 16.024 1.264 9.275 0.632 37.101
150 Sloof Plaza S250X400 2.718 0.25 0.4 2.718 0.272 6.626 0.451 10.726 0.903 6.626 0.451 25.782
151 Sloof Plaza S250X400 4.941 0.25 0.4 4.941 0.494 11.010 0.812 19.494 1.534 11.010 0.812 44.672
152 Sloof Plaza S250X500 2.321 0.25 0.5 2.785 0.290 9.345 0.420 14.649 0.840 9.345 0.420 35.020
153 Sloof Plaza S250X500 2.834 0.25 0.5 3.401 0.354 13.707 0.525 22.363 1.051 13.707 0.525 51.877
154 Sloof Plaza S250X500 4.511 0.25 0.5 5.413 0.564 20.323 1.261 30.496 1.681 22.848 1.261 77.868
155 Sloof Plaza S250X400 1.378 0.25 0.4 1.378 0.138 4.778 0.271 6.527 0.451 4.778 0.271 17.076
156 Sloof Plaza S250X500 2.050 0.25 0.5 2.460 0.256 9.554 0.630 14.562 1.156 9.554 0.630 36.085
157 Sloof Plaza S250X500 2.100 0.25 0.5 2.519 0.262 9.728 0.630 14.911 1.156 9.728 0.630 36.784
158 Sloof Plaza S250X500 2.827 0.25 0.5 3.393 0.353 12.313 0.840 20.081 1.576 12.313 0.840 47.964
159 Sloof Plaza S250X500 3.126 0.25 0.5 3.751 0.391 13.372 0.840 22.198 1.681 13.372 0.840 52.303
160 Sloof Plaza S250X400 2.147 0.25 0.4 2.147 0.215 5.499 0.361 8.472 0.722 5.499 0.361 20.913
161 Sloof Plaza S250X400 2.888 0.25 0.4 2.888 0.289 6.961 0.451 11.396 0.903 6.961 0.451 27.122
162 Sloof Plaza S250X400 4.482 0.25 0.4 4.482 0.448 12.125 0.722 21.220 1.354 12.125 0.722 48.268
163 Sloof Plaza S250X600 6.276 0.25 0.6 8.786 0.941 32.744 1.918 52.049 2.517 35.775 1.918 126.920
164 Sloof Plaza S250X400 3.424 0.25 0.4 3.424 0.342 11.223 0.542 18.912 1.083 11.223 0.542 43.525
165 Sloof Plaza S250X400 3.191 0.25 0.4 3.191 0.319 13.603 0.542 22.660 0.993 13.603 0.542 51.941
166 Sloof Plaza S250X400 2.657 0.25 0.4 2.657 0.266 11.707 0.451 18.869 0.812 11.707 0.451 43.998
167 Sloof Plaza S250X400 3.853 0.25 0.4 3.853 0.385 19.502 0.632 33.448 1.173 19.502 0.632 74.888
168 Sloof Plaza S250X500 2.222 0.25 0.5 2.666 0.278 6.775 0.420 10.520 0.840 6.775 0.420 25.752
169 Sloof Plaza S250X500 2.428 0.25 0.5 2.913 0.303 8.473 0.525 13.410 0.945 8.473 0.525 32.352
170 Sloof Plaza S250X500 3.299 0.25 0.5 3.959 0.412 23.313 0.945 39.050 1.786 23.313 0.945 89.352
171 Sloof Plaza S250X500 3.244 0.25 0.5 3.892 0.405 12.259 0.945 20.477 1.786 12.259 0.945 48.671
172 Sloof Plaza S250X400 1.257 0.25 0.4 1.257 0.126 4.490 0.271 5.950 0.451 4.490 0.271 15.922
173 Sloof Plaza S250X500 3.108 0.25 0.5 3.730 0.389 17.746 0.840 29.432 1.681 17.746 0.840 68.286
174 Sloof Plaza S250X400 3.383 0.25 0.4 3.383 0.338 9.525 0.542 16.019 1.083 9.525 0.542 37.234
175 Sloof Plaza S250X500 3.388 0.25 0.5 4.066 0.424 14.305 0.945 24.064 1.786 14.305 0.945 56.351
176 Sloof Plaza S250X400 3.618 0.25 0.4 3.618 0.362 10.080 0.632 17.129 1.173 10.080 0.632 39.726
177 Sloof Plaza S250X500 3.108 0.25 0.5 3.730 0.389 17.748 0.840 29.435 1.681 17.748 0.840 68.291
178 Sloof Plaza S250X500 3.851 0.25 0.5 4.621 0.481 15.949 1.051 19.750 1.051 18.221 1.051 57.071
179 Sloof Plaza S250X500 3.851 0.25 0.5 4.621 0.481 15.949 1.051 18.992 1.051 15.439 1.051 53.531
180 Sloof Plaza S250X400 3.261 0.25 0.4 3.261 0.326 9.236 0.542 15.442 0.993 9.236 0.542 35.990
181 Sloof P. Informasi S250X700 8.221 0.25 0.7 13.153 1.439 52.442 2.828 80.876 3.770 56.229 2.828 198.972
182 Sloof P. Informasi S250X600 7.522 0.25 0.6 10.530 1.128 38.644 2.277 48.495 2.277 40.664 2.277 134.634
183 Sloof P. Informasi S250X500 1.916 0.25 0.5 2.300 0.240 7.060 0.420 10.586 0.735 7.060 0.420 26.282
184 Sloof P. Informasi S250X500 4.228 0.25 0.5 5.074 0.529 21.130 1.156 21.535 1.156 21.734 1.156 67.866
185 Sloof P. Informasi S250X600 8.286 0.25 0.6 11.601 1.243 42.263 2.517 61.122 3.356 45.294 2.517 157.069
186 Sloof P. Informasi S250X500 5.104 0.25 0.5 6.125 0.638 27.196 1.366 25.681 1.366 16.874 1.366 73.848
187 Sloof P. Informasi S250X700 6.936 0.25 0.7 11.098 1.214 53.808 2.424 85.892 3.231 77.804 2.424 225.583
188 Sloof P. Informasi S250X500 4.764 0.25 0.5 5.717 0.595 12.793 1.261 22.556 1.261 15.935 1.261 55.067
189 Sloof P. Informasi S250X500 5.382 0.25 0.5 6.458 0.673 28.513 1.471 26.998 1.471 28.914 1.471 88.837
190 Sloof P. Informasi S250X500 5.038 0.25 0.5 6.046 0.630 26.885 1.366 25.370 1.366 16.693 1.366 73.044
191 Sloof P. Informasi S250X500 6.646 0.25 0.5 7.976 0.831 25.874 1.786 38.481 2.416 28.147 1.786 98.491
192 Sloof P. Informasi S250X500 5.146 0.25 0.5 6.176 0.643 20.547 1.366 36.549 2.731 20.547 1.366 83.107
193 Sloof P. Informasi S250X600 5.895 0.25 0.6 8.253 0.884 30.941 1.798 29.426 2.397 21.890 1.798 88.249
194 Sloof P. Informasi S250X500 4.406 0.25 0.5 5.288 0.551 11.947 1.261 20.863 2.416 11.947 1.261 49.694
195 Sloof P. Informasi S250X600 5.101 0.25 0.6 7.141 0.765 27.182 1.558 25.667 2.157 19.384 1.558 77.506
196 Sloof P. Informasi S250X500 4.460 0.25 0.5 5.352 0.558 18.111 1.261 22.633 1.261 12.074 1.261 56.601
197 Sloof P. Informasi S250X500 4.224 0.25 0.5 5.069 0.528 23.030 1.156 21.515 1.156 21.717 1.156 69.728
Dimensi Pembesian
Tumpuan Kiri Lapangan Tumpuan Kanan
Nomor Lokasi
Volume
Area Side
Panjang
Tinggi
Lebar
Lokasi Form Total Berat
Type Sloof Berat Berat Berat Berat Berat Berat
M' M M M2 M3 kg kg kg kg kg kg kg
198 Sloof P. Informasi S250X500 3.413 0.25 0.5 4.095 0.427 19.189 0.945 17.674 0.945 22.219 0.945 61.918
199 Sloof Plaza S250X500 3.360 0.25 0.5 4.032 0.420 18.938 0.945 31.815 1.786 18.938 0.945 73.367
200 Sloof Plaza S250X400 2.588 0.25 0.4 2.588 0.259 7.641 0.451 12.252 0.812 7.641 0.451 29.250
201 Sloof Plaza S250X600 4.203 0.25 0.6 5.885 0.631 22.932 1.318 39.803 2.637 22.932 1.318 90.941
202 Sloof Plaza S250X400 3.841 0.25 0.4 3.841 0.384 10.609 0.451 18.187 0.903 10.609 0.451 41.209
203 Sloof Plaza S250X600 5.909 0.25 0.6 8.272 0.886 20.671 1.798 28.735 1.798 21.934 1.798 76.733
204 Sloof Plaza S250X500 3.854 0.25 0.5 4.625 0.482 14.186 1.051 24.331 2.101 14.186 1.051 56.905
205 Sloof Plaza S250X400 3.389 0.25 0.4 3.389 0.339 9.538 0.451 16.047 0.812 9.538 0.451 36.838
206 Sloof Plaza S250X500 1.317 0.25 0.5 1.580 0.165 10.038 0.420 13.511 0.735 10.038 0.420 35.164
207 Sloof Plaza S250X500 2.927 0.25 0.5 3.513 0.366 18.298 0.840 30.030 1.576 18.298 0.840 69.882
208 Sloof Plaza S250X500 3.248 0.25 0.5 3.897 0.406 19.941 0.945 33.317 1.786 19.941 0.945 76.877
209 Sloof Plaza S250X400 4.625 0.25 0.4 4.625 0.463 12.464 0.542 21.898 1.083 12.464 0.542 48.993
210 Sloof Plaza S250X600 4.510 0.25 0.6 6.315 0.677 16.257 1.438 22.113 1.438 17.520 1.438 60.205
211 Sloof Plaza S250X600 4.568 0.25 0.6 6.395 0.685 16.439 1.438 22.386 1.438 17.702 1.438 60.841
212 Sloof Plaza S250X400 3.659 0.25 0.4 3.659 0.366 10.177 0.451 17.323 0.903 10.177 0.451 39.481
213 Sloof Plaza S250X400 2.504 0.25 0.4 2.504 0.250 7.443 0.361 11.855 0.632 7.443 0.361 28.094
214 Sloof Plaza S250X500 1.117 0.25 0.5 1.340 0.140 6.931 0.315 8.812 0.630 6.931 0.315 23.936
215 Sloof Plaza S250X500 2.097 0.25 0.5 2.517 0.262 10.800 0.630 16.550 1.156 10.800 0.630 40.567
216 Sloof Plaza S250X500 1.190 0.25 0.5 1.428 0.149 7.221 0.315 9.392 0.630 7.221 0.315 25.094
217 Sloof Auditorium S250X600 4.826 0.25 0.6 6.756 0.724 25.879 1.558 27.415 2.037 23.081 1.558 81.529
218 Sloof Auditorium S250X500 4.251 0.25 0.5 5.102 0.531 23.160 1.156 21.645 1.156 24.007 1.156 72.278
219 Sloof Auditorium S250X600 6.418 0.25 0.6 8.985 0.963 22.279 2.037 37.220 2.037 24.299 2.037 89.909
220 Sloof Auditorium S250X600 0.825 0.25 0.6 1.155 0.124 3.468 0.360 3.906 0.599 3.468 0.360 12.161
221 Sloof Auditorium S250X500 3.250 0.25 0.5 3.900 0.406 23.024 0.945 16.904 1.786 23.237 0.945 66.842
222 Sloof Auditorium S250X500 6.913 0.25 0.5 8.296 0.864 23.841 1.891 39.954 1.891 24.851 1.891 94.319
223 Sloof Auditorium S250X500 6.052 0.25 0.5 7.263 0.757 18.484 1.681 35.201 1.681 20.252 1.681 78.979
224 Sloof Auditorium S250X600 6.000 0.25 0.6 8.400 0.900 20.959 1.798 34.911 1.798 22.979 1.798 84.242
225 Sloof Auditorium S250X500 4.651 0.25 0.5 5.581 0.581 25.053 1.261 44.045 2.521 25.053 1.261 99.192
226 Sloof Auditorium S250X500 3.912 0.25 0.5 4.695 0.489 21.555 1.051 37.049 2.101 21.555 1.051 84.360
227 Sloof Auditorium S250X500 1.777 0.25 0.5 2.132 0.222 11.443 0.525 16.826 0.945 11.443 0.525 41.709
228 Sloof Auditorium S250X500 1.777 0.25 0.5 2.132 0.222 11.443 0.525 16.826 0.945 11.443 0.525 41.709
229 Sloof Auditorium S250X500 1.777 0.25 0.5 2.132 0.222 11.443 0.525 16.826 0.945 11.443 0.525 41.709
230 Sloof Auditorium S250X500 5.801 0.25 0.5 6.962 0.725 30.498 1.576 32.804 1.576 32.518 1.576 100.548
231 Sloof Plaza S250X400 2.256 0.25 0.4 2.256 0.226 6.856 0.271 10.682 0.542 6.856 0.271 25.477
232 Sloof Plaza S250X600 2.299 0.25 0.6 3.219 0.345 9.278 0.719 14.516 1.438 9.278 0.719 35.948
233 Sloof Plaza S250X600 2.577 0.25 0.6 3.607 0.386 10.153 0.839 16.265 1.558 10.153 0.839 39.807
234 Sloof Plaza S250X400 2.331 0.25 0.4 2.331 0.233 7.033 0.271 11.036 0.542 7.033 0.271 26.185
235 Sloof Plaza S250X500 2.043 0.25 0.5 2.452 0.255 7.410 0.630 11.285 1.156 7.410 0.630 28.522
236 Sloof Plaza S250X500 2.090 0.25 0.5 2.508 0.261 7.541 0.630 11.546 1.156 7.541 0.630 29.044
237 Sloof Drop Off S250X400 4.843 0.25 0.4 4.843 0.484 12.979 0.632 22.929 1.173 12.979 0.632 51.325
238 Sloof Drop Off S250X600 5.093 0.25 0.6 7.130 0.764 18.096 1.558 29.900 2.037 20.116 1.558 73.265
239 Sloof Drop Off S250X400 5.014 0.25 0.4 5.014 0.501 13.384 0.632 23.739 1.173 13.384 0.632 52.945
240 Sloof Drop Off S250X500 1.467 0.25 0.5 1.761 0.183 4.989 0.420 6.948 0.840 4.989 0.420 18.607
241 Sloof Drop Off S250X500 1.478 0.25 0.5 1.773 0.185 5.014 0.420 6.997 0.840 5.014 0.420 18.706
242 Sloof R. Supir S250X500 2.178 0.25 0.5 2.614 0.272 8.895 0.630 13.750 1.156 8.895 0.630 33.956
243 Sloof R. Supir S250X500 2.327 0.25 0.5 2.792 0.291 9.365 0.630 14.689 1.261 9.365 0.630 35.939
244 Sloof R. Supir S250X500 3.229 0.25 0.5 3.875 0.404 12.214 0.945 20.387 1.786 12.214 0.945 48.492
245 Sloof R. Supir S250X500 5.381 0.25 0.5 6.457 0.673 19.005 1.471 33.970 2.836 19.005 1.471 77.758
246 Sloof R. Budaya S200X400 0.400 0.2 0.4 0.400 0.032 2.462 0.083 1.894 0.166 2.462 0.083 7.149
247 Sloof R. Budaya S200X400 0.400 0.2 0.4 0.400 0.032 2.462 0.083 1.894 0.166 2.462 0.083 7.149
Dimensi Pembesian
Tumpuan Kiri Lapangan Tumpuan Kanan
Nomor Lokasi
Volume
Area Side
Panjang
Tinggi
Lebar
Lokasi Form Total Berat
Type Sloof Berat Berat Berat Berat Berat Berat
M' M M M2 M3 kg kg kg kg kg kg kg
248 Sloof R. Budaya S200X400 0.400 0.2 0.4 0.400 0.032 2.462 0.083 1.894 0.166 2.462 0.083 7.149
249 Sloof R. Budaya S200X400 0.400 0.2 0.4 0.400 0.032 2.462 0.083 1.894 0.166 2.462 0.083 7.149
250 Sloof R. Budaya S200X400 0.400 0.2 0.4 0.400 0.032 2.462 0.083 1.894 0.166 2.462 0.083 7.149
251 Sloof R. Budaya S200X400 0.400 0.2 0.4 0.400 0.032 2.462 0.083 1.894 0.166 2.462 0.083 7.149
252 Sloof R. Budaya S200X400 0.400 0.2 0.4 0.400 0.032 2.462 0.083 1.894 0.166 2.462 0.083 7.149
253 Pos Satpam S150X300 2.700 0.15 0.3 2.160 0.122 7.907 0.303 12.784 0.546 7.907 0.303 29.750
254 Pos Satpam S150X300 2.700 0.15 0.3 2.160 0.122 7.907 0.303 12.784 0.546 7.907 0.303 29.750
255 Pos Satpam S150X300 1.850 0.15 0.3 1.480 0.083 5.895 0.243 8.759 0.425 5.895 0.243 21.459
256 Pos Satpam S150X300 1.850 0.15 0.3 1.480 0.083 5.895 0.243 8.759 0.425 5.895 0.243 21.459
257 Pos Satpam S150X300 1.850 0.15 0.3 1.480 0.083 5.895 0.243 8.759 0.425 5.895 0.243 21.459
258 Rumah Sampah S200X500 4.500 0.2 0.5 5.400 0.450 12.168 0.781 21.306 1.465 12.168 0.781 48.670
259 Rumah Sampah S200X500 4.500 0.2 0.5 5.400 0.450 14.196 0.781 26.625 1.465 15.964 0.781 59.812
260 Rumah Sampah S200X500 4.500 0.2 0.5 5.400 0.450 14.196 0.781 26.625 1.465 15.964 0.781 59.812
261 Rumah Sampah S200X500 2.550 0.2 0.5 3.060 0.255 8.811 0.488 15.853 0.879 10.578 0.488 37.098
262 Rumah Sampah S200X500 2.550 0.2 0.5 3.060 0.255 8.811 0.488 15.853 0.879 10.578 0.488 37.098
263 Rumah Sampah S200X500 2.550 0.2 0.5 3.060 0.255 8.811 0.488 15.853 0.879 10.578 0.488 37.098
264 Ramp S250X400 4.910 0.25 0.4 4.910 0.491 13.139 1.173 23.247 2.256 13.139 1.173 54.128
265 Ramp S250X400 5.046 0.25 0.4 5.046 0.505 13.461 1.173 23.891 2.347 13.461 1.173 55.506
266 Ramp S250X400 3.961 0.25 0.4 3.961 0.396 10.892 0.903 18.754 1.805 10.892 0.903 44.149
267 Ramp S250X400 3.961 0.25 0.4 3.961 0.396 10.892 0.903 18.754 1.805 10.892 0.903 44.149
268 Ramp S250X400 3.961 0.25 0.4 3.961 0.396 10.892 0.903 18.754 1.805 10.892 0.903 44.149
269 Ramp S250X400 3.961 0.25 0.4 3.961 0.396 10.892 0.903 18.754 1.805 10.892 0.903 44.149
270 Ramp S250X400 5.192 0.25 0.4 5.192 0.519 13.806 1.173 24.583 2.347 13.806 1.173 56.889
271 Ramp S250X400 5.192 0.25 0.4 5.192 0.519 13.806 1.173 24.583 2.347 13.806 1.173 56.889
272 Ramp S250X400 4.091 0.25 0.4 4.091 0.409 11.200 0.993 19.370 1.895 11.200 0.993 45.651
273 Ramp S250X400 5.291 0.25 0.4 5.291 0.529 14.041 1.264 25.051 2.437 14.041 1.264 58.097
274 Ramp S250X400 4.691 0.25 0.4 4.691 0.469 12.620 1.083 22.211 2.166 12.620 1.083 51.784
I. LANTAI 1
1 PLAT S1; 20cm (lantai) 1.000 1.000 0.200 1.00 1.000 0.200 0.200 36.61 - - 36.61
- Tul. Utama Exs 10 0.10 0.30 0.30 0.60 0.62 11.0 2.0 8.14
Beton :
0.20 Lx 10 0.10 0.08 0.95 0.08 1.10 0.62 1.0 2.0 1.36
Koef : Ly 10 0.10 0.08 0.94 0.08 1.09 0.62 1.0 2.0 1.34
183.04
2 PLAT S2; 15cm (lantai) 1.000 1.000 0.150 1.00 1.000 0.150 0.150 27.36 - - 27.36
- Tul. Utama Exs 10 0.15 0.30 0.30 0.60 0.62 8.0 2.0 5.92
Beton :
0.15 Lx 10 0.15 0.08 0.95 0.08 1.10 0.62 1.0 2.0 1.36
Koef : Ly 10 0.15 0.08 0.94 0.08 1.09 0.62 1.0 2.0 1.34
182.40
3 PLAT SOG; 12cm (lantai) 1.000 1.000 0.120 1.00 1.000 0.120 0.120 14.18 - - 14.18
- Tul. Utama Exs 13 0.30 0.30 0.30 0.60 1.04 4.0 2.0 5.00
Beton :
0.12
Koef :
118.20
4 PLAT S1A 13CM 1.000 1.000 0.120 1.00 1.000 0.120 0.120 32.55 - - 32.55
- Tul. Utama Exs 10 0.20 0.30 0.30 0.60 0.62 6.0 2.0 4.44
Beton :
0.12 Lx 10 0.20 - 0.95 - 0.95 0.62 6.0 2.0 7.03
271.26
5 PLAT S1A' 12cm (lantai) 1.000 1.000 0.120 1.00 1.000 0.120 0.120 43.40 - - 43.40
- Tul. Utama Exs 10 0.15 0.30 0.30 0.60 0.62 8.0 2.0 5.92
Beton :
0.12 Lx 10 0.15 - 0.95 - 0.95 0.62 8.0 2.0 9.37
361.68
6 PLAT S2A 15cm (lantai) 1.000 1.000 0.120 1.00 1.000 0.120 0.120 27.78 - - 27.78
- Tul. Utama Exs 8 0.15 0.30 0.30 0.60 0.39 8.0 2.0 3.79
Beton :
0.12 M8-150 Lx 8 0.15 - 0.95 - 0.95 0.39 8.0 2.0 6.00
231.48
DIMENSI QUANTITY
PANJANG LEBAR LUAS DASAR TINGGI TINGGI GALIAN BETON LC URUGAN PASIR GALIAN URUGAN TANAH KEMBALI
TIPE
(M') (M') (M2) (M') (M') (M3) (M3) (M3) (M3) (M3)
(1) (2) (3) = (1) x (2) (4) (5) = (4)+0,05+0,1+2 (6) (7) (8) (9) = (5) x {(1)+0,75} x {(2)+0,75} (10) = {{(5)-0,5} x {(1)+0,75} x {(2)+0,75}} - (6) - (7) - (8)
T1A 1.000 1.000 1.000 0.250 2.400 0.250 0.050 0.100 7.350 5.419
T1B 1.000 1.200 1.200 0.250 2.400 0.300 0.060 0.120 8.190 6.004
T1C 1.000 1.000 1.000 0.200 2.350 0.200 0.050 0.100 7.197 5.316
T1 1.500 1.500 2.250 0.300 2.450 0.675 0.113 0.225 12.403 8.859
T2 2.000 2.000 4.000 0.300 2.450 1.200 0.200 0.400 18.528 12.947
T3 2.500 2.500 6.250 0.400 2.550 2.500 0.313 0.625 26.934 18.216
T4 3.000 3.000 9.000 0.500 2.650 4.500 0.450 0.900 37.266 24.384
T5 4.500 2.000 9.000 0.400 2.550 3.600 0.450 0.900 36.816 24.647
T5A 9.780 0.500 2.650 4.890 0.489 0.978 38.876 29.828
T6 4.500 2.500 11.250 0.500 2.650 5.625 0.563 1.125 45.216 29.372
T7 2.000 3.000 6.000 0.400 2.550 2.400 0.300 0.600 26.297 17.841
DIMENSI QUANTITY
PANJANG LEBAR LUAS DASAR TINGGI GALIAN URUGAN KEMBALI
NO. TIPE LOKASI
(M') (M') (M2) (M') (M3) (M3)
(1) (2) (4) = (1) x (2) (5) (6) = (4) x (5) (10) = (4) x 0.1
1 T1 TOILET 1.500 1.500 2.250 0.300 12.403 8.859
2 T1 TOILET 1.500 1.500 2.250 0.300 12.403 8.859
3 T2 TOILET 2.000 2.000 4.000 0.300 18.528 12.947
4 T2 TOILET 2.000 2.000 4.000 0.300 18.528 12.947
5 T2 TOILET 2.000 2.000 4.000 0.300 18.528 12.947
6 T1 TOILET 1.500 1.500 2.250 0.300 12.403 8.859
7 RAFT GWT & RUANG POMPA
8 RAFT GWT & RUANG POMPA
9 RAFT GWT & RUANG POMPA
10 RAFT GWT & RUANG POMPA
11 RAFT GWT & RUANG POMPA
12 T2 RUANG SERVIS 2.000 2.000 4.000 0.300 18.528 12.947
13 T2 RUANG SERVIS 2.000 2.000 4.000 0.300 18.528 12.947
14 T3 RUANG SERVIS 2.500 2.500 6.250 0.400 26.934 18.216
15 T1 RUANG SERVIS 1.500 1.500 2.250 0.300 12.403 8.859
16 T1 RUANG SERVIS 1.500 1.500 2.250 0.300 12.403 8.859
17 T2 RUANG SERVIS 2.000 2.000 4.000 0.300 18.528 12.947
18 T5 SELASAR 4.500 2.000 9.000 0.400 36.816 24.647
19 T2 RUANG GENSET 2.000 2.000 4.000 0.300 18.528 12.947
20 T1 RUANG GENSET 1.500 1.500 2.250 0.300 12.403 8.859
21 T1 RUANG GENSET 1.500 1.500 2.250 0.300 12.403 8.859
22 T2 RUANG GENSET 2.000 2.000 4.000 0.300 18.528 12.947
23 T1 RUANG GENSET 1.500 1.500 2.250 0.300 12.403 8.859
24 T1 RUANG GENSET 1.500 1.500 2.250 0.300 12.403 8.859
25 T1 TANGGA 1.500 1.500 2.250 0.300 12.403 8.859
26 T2 SELASAR 2.000 2.000 4.000 0.300 18.528 12.947
27 T2 RUANG KANTOR 2.000 2.000 4.000 0.300 18.528 12.947
28 T3 SELASAR 2.500 2.500 6.250 0.400 26.934 18.216
29 T3 RUANG KANTOR 2.500 2.500 6.250 0.400 26.934 18.216
30 T3 SELASAR 2.500 2.500 6.250 0.400 26.934 18.216
31 T3 RUANG KANTOR 2.500 2.500 6.250 0.400 26.934 18.216
32 T3 SELASAR 2.500 2.500 6.250 0.400 26.934 18.216
33 T3 RUANG KANTOR 2.500 2.500 6.250 0.400 26.934 18.216
34 T2 SELASAR 2.000 2.000 4.000 0.300 18.528 12.947
35 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
36 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
37 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
38 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
39 T2 SELASAR 2.000 2.000 4.000 0.300 18.528 12.947
40 T2 RUANG GANTI 2.000 2.000 4.000 0.300 18.528 12.947
41 T2 RUANG GANTI 2.000 2.000 4.000 0.300 18.528 12.947
42 T1 RUANG GANTI 1.500 1.500 2.250 0.300 12.403 8.859
43 T3 RUANG GANTI 2.500 2.500 6.250 0.400 26.934 18.216
44 T3 RUANG GANTI 2.500 2.500 6.250 0.400 26.934 18.216
45 T2 RUANG GANTI 2.000 2.000 4.000 0.300 18.528 12.947
46 T2 TICKETING DAN CINDERAMATA 2.000 2.000 4.000 0.300 18.528 12.947
47 T2 TICKETING DAN CINDERAMATA 2.000 2.000 4.000 0.300 18.528 12.947
48 T4 TICKETING DAN CINDERAMATA 3.000 3.000 9.000 0.500 37.266 24.384
49 T3 TICKETING DAN CINDERAMATA 2.500 2.500 6.250 0.400 26.934 18.216
50 T1 TICKETING DAN CINDERAMATA 1.500 1.500 2.250 0.300 12.403 8.859
51 T2 TICKETING DAN CINDERAMATA 2.000 2.000 4.000 0.300 18.528 12.947
52 T6 SELASAR 4.500 2.500 11.250 0.500 45.216 29.372
53 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
54 T5 SELASAR 4.500 2.000 9.000 0.400 36.816 24.647
55 T2 SELASAR 2.000 2.000 4.000 0.300 18.528 12.947
56 T2 SELASAR 2.000 2.000 4.000 0.300 18.528 12.947
57 T3 PLAZA 2.500 2.500 6.250 0.400 26.934 18.216
58 T3 PLAZA 2.500 2.500 6.250 0.400 26.934 18.216
59 T4 PLAZA 3.000 3.000 9.000 0.500 37.266 24.384
60 T3 PLAZA 2.500 2.500 6.250 0.400 26.934 18.216
61 T2 PLAZA 2.000 2.000 4.000 0.300 18.528 12.947
DIMENSI QUANTITY
PANJANG LEBAR LUAS DASAR TINGGI GALIAN URUGAN KEMBALI
NO. TIPE LOKASI
(M') (M') (M2) (M') (M3) (M3)
(1) (2) (4) = (1) x (2) (5) (6) = (4) x (5) (10) = (4) x 0.1
62 T2 PLAZA 2.000 2.000 4.000 0.300 18.528 12.947
63 T3 PLAZA 2.500 2.500 6.250 0.400 26.934 18.216
64 T6 RUANG. PUSAT INFORMASI 4.500 2.500 11.250 0.500 45.216 29.372
65 T4 RUANG. PUSAT INFORMASI 3.000 3.000 9.000 0.500 37.266 24.384
66 T5A RUANG. PUSAT INFORMASI 9.780 0.500 38.876 29.828
67 T3 RUANG. PUSAT INFORMASI 2.500 2.500 6.250 0.400 26.934 18.216
68 T1 RUANG. PUSAT INFORMASI 1.500 1.500 2.250 0.300 12.403 8.859
69 T1 RUANG. PUSAT INFORMASI 1.500 1.500 2.250 0.300 12.403 8.859
70 T3 RUANG. PUSAT INFORMASI 2.500 2.500 6.250 0.400 26.934 18.216
71 T3 RUANG. PUSAT INFORMASI 2.500 2.500 6.250 0.400 26.934 18.216
72 T3 AUDITORIUM 2.500 2.500 6.250 0.400 26.934 18.216
73 T3 AUDITORIUM 2.500 2.500 6.250 0.400 26.934 18.216
74 T2 AUDITORIUM 2.000 2.000 4.000 0.300 18.528 12.947
75 T2 AUDITORIUM 2.000 2.000 4.000 0.300 18.528 12.947
76 T3 AUDITORIUM 2.500 2.500 6.250 0.400 26.934 18.216
77 T1 AUDITORIUM 1.500 1.500 2.250 0.300 12.403 8.859
78 T1 AUDITORIUM 1.500 1.500 2.250 0.300 12.403 8.859
79 T1 AUDITORIUM 1.500 1.500 2.250 0.300 12.403 8.859
80 T7 AUDITORIUM 2.000 3.000 6.000 0.400 26.297 17.841
81 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
82 T3 SELASAR 2.500 2.500 6.250 0.400 26.934 18.216
83 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
84 T1 SELASAR 1.500 1.500 2.250 0.300 12.403 8.859
85 T2 SELASAR 2.000 2.000 4.000 0.300 18.528 12.947
86 T2 SELASAR 2.000 2.000 4.000 0.300 18.528 12.947
87 RAMP
88 RAMP
89 T1C RAMP 1.000 1.000 1.000 0.200 7.197 5.316
90 T1C RAMP 1.000 1.000 1.000 0.200 7.197 5.316
91 T1C RAMP 1.000 1.000 1.000 0.200 7.197 5.316
92 T1C RAMP 1.000 1.000 1.000 0.200 7.197 5.316
93 T1C RAMP 1.000 1.000 1.000 0.200 7.197 5.316
94 T1C RAMP 1.000 1.000 1.000 0.200 7.197 5.316
95 T1C RAMP 1.000 1.000 1.000 0.200 7.197 5.316
96 RAMP
97 RAMP
98 T1B RUANG TUNGGU SUPIR 1.000 1.200 1.200 0.250 8.190 6.004
99 T1B RUANG TUNGGU SUPIR 1.000 1.200 1.200 0.250 8.190 6.004
100 T1B RUANG TUNGGU SUPIR 1.000 1.200 1.200 0.250 8.190 6.004
101 T1B RUANG TUNGGU SUPIR 1.000 1.200 1.200 0.250 8.190 6.004
102 T1A RUMAH BUDAYA 1.000 1.000 1.000 0.250 7.350 5.419
103 T1A RUMAH BUDAYA 1.000 1.000 1.000 0.250 7.350 5.419
104 T1A RUMAH BUDAYA 1.000 1.000 1.000 0.250 7.350 5.419
105 T1A RUMAH BUDAYA 1.000 1.000 1.000 0.250 7.350 5.419
106 T1A RUMAH BUDAYA 1.000 1.000 1.000 0.250 7.350 5.419
107 T1A RUMAH BUDAYA 1.000 1.000 1.000 0.250 7.350 5.419
108 T1A RUMAH BUDAYA 1.000 1.000 1.000 0.250 7.350 5.419
109 T1A POS SATPAM 1.000 1.000 1.000 0.250 7.350 5.419
110 T1A POS SATPAM 1.000 1.000 1.000 0.250 7.350 5.419
111 T1A POS SATPAM 1.000 1.000 1.000 0.250 7.350 5.419
112 T1A POS SATPAM 1.000 1.000 1.000 0.250 7.350 5.419
113 T1B RUMAH SAMPAH 1.000 1.200 1.200 0.250 8.190 6.004
114 T1B RUMAH SAMPAH 1.000 1.200 1.200 0.250 8.190 6.004
115 T1B RUMAH SAMPAH 1.000 1.200 1.200 0.250 8.190 6.004
116 T1B RUMAH SAMPAH 1.000 1.200 1.200 0.250 8.190 6.004
109 BM3
Pekerjaan
No./ Kode
Item
No. 1 lente Sisa / q(d10) q(d13) q(d16) q(d19) q(d22)
Gambar p l t ∑ Tulangan Dia Jrk Diagram Gambar (m) p(tot) q ∑ q(tot)
untuk lente Terpasang Terpasang Terpasang kebutuhan Terpasang kebutuhan Terpasang Terpasang
(m) (m) (m) (bh) Arah (mm) (m) 12d d(e)+"L" 12d (m) (kg/m) (bh) (bh) (m) (kg) (kg) (kg) Lente (kg) Lente (kg) (kg)
0.01 0.01
Bawah X 22 0.20 0.400 2.40 0.400 3.255 2.98 24.0 3 2.235 8 233.099
0.01 0.01
0.01 0.01
Y 22 0.10 0.400 4.40 0.400 5.255 2.98 26.0 2 1.490 13 407.685
0.01 0.01
2 T.5 - - 677.930 - - - - 677.930
0.01 0.01
Bawah X 16 0.10 0.300 1.90 0.300 2.540 1.58 46.0 4 1.840 184.402
0.01 0.01
0.01 0.01
Y 16 0.10 0.300 4.40 0.300 5.040 1.58 21.0 2 1.920 167.041
0.01 0.01
0.01 0.01
Bawah X 16 0.10 0.400 2.90 0.400 3.740 1.58 31.0 3 0.780 182.981
0.01 0.01
0.01 0.01
Y 16 0.10 0.400 2.90 0.400 3.740 1.58 31.0 3 0.780 182.981
0.01 0.01
0.01 0.01
Bawah X 16 0.10 0.300 2.40 0.300 3.040 1.58 26.0 3 2.880 124.744
Plat Page 54 of 57
Dimensi Pembesian Ket.
Pekerjaan
No./ Kode
Item
No. 1 lente Sisa / q(d10) q(d13) q(d16) q(d19) q(d22)
Gambar p l t ∑ Tulangan Dia Jrk Diagram Gambar (m) p(tot) q ∑ q(tot)
untuk lente Terpasang Terpasang Terpasang kebutuhan Terpasang kebutuhan Terpasang Terpasang
(m) (m) (m) (bh) Arah (mm) (m) 12d d(e)+"L" 12d (m) (kg/m) (bh) (bh) (m) (kg) (kg) (kg) Lente (kg) Lente (kg) (kg)
0.01 0.01
0.01 0.01
Y 16 0.10 0.300 2.40 0.300 3.040 1.58 26.0 3 2.880 124.744
0.01 0.01
Plat Page 55 of 57
Dimensi Pembesian Ket.
Pekerjaan
No./ Kode
Item
No. 1 lente Sisa / q(d10) q(d13) q(d16) q(d19) q(d22)
Gambar p l t ∑ Tulangan Dia Jrk Diagram Gambar (m) p(tot) q ∑ q(tot)
untuk lente Terpasang Terpasang Terpasang kebutuhan Terpasang kebutuhan Terpasang Terpasang
(m) (m) (m) (bh) Arah (mm) (m) 12d d(e)+"L" 12d (m) (kg/m) (bh) (bh) (m) (kg) (kg) (kg) Lente (kg) Lente (kg) (kg)
5 T.2 55.735 - 155.109 - - - - 210.844
0.01 0.01
Bawah X 16 0.10 0.200 1.90 0.200 2.340 1.58 21.0 5 0.300 77.555
0.01 0.01
0.01 0.01
Y 16 0.10 0.200 1.90 0.200 2.340 1.58 21.0 5 0.300 77.555
0.01 0.01
0.01 0.01
Bawah X 13 0.15 0.200 1.40 0.200 1.833 1.04 11.0 6 1.005 21.002
0.01 0.01
0.01 0.01
Y 13 0.15 0.200 1.40 0.200 1.833 1.04 11.0 6 1.005 21.002
0.01 0.01
0.01 0.01
Bawah X 13 0.10 0.150 0.90 0.150 1.233 1.04 13.0 9 0.908 16.694
0.01 0.01
0.01 0.01
Y 13 0.10 0.150 1.10 0.150 1.433 1.04 11.0 8 0.540 16.418
0.01 0.01
0.01 0.01
Bawah X 13 0.10 0.150 0.90 0.150 1.233 1.04 11.0 9 0.908 14.125
0.01 0.01
0.01 0.01
Y 13 0.10 0.150 0.90 0.150 1.233 1.04 11.0 9 0.908 14.125
0.01 0.01
Plat Page 56 of 57
Dimensi Pembesian Ket.
Pekerjaan
No./ Kode
Item
No. 1 lente Sisa / q(d10) q(d13) q(d16) q(d19) q(d22)
Gambar p l t ∑ Tulangan Dia Jrk Diagram Gambar (m) p(tot) q ∑ q(tot)
untuk lente Terpasang Terpasang Terpasang kebutuhan Terpasang kebutuhan Terpasang Terpasang
(m) (m) (m) (bh) Arah (mm) (m) 12d d(e)+"L" 12d (m) (kg/m) (bh) (bh) (m) (kg) (kg) (kg) Lente (kg) Lente (kg) (kg)
9 T.1C 30.347 - - - - - - 30.347
0.01 0.01
Bawah X 10 0.10 0.100 0.90 0.100 1.125 0.62 11.0 10 0.750 7.629
0.01 0.01
0.01 0.01
Y 10 0.10 0.100 0.90 0.100 1.125 0.62 11.0 10 0.750 7.629
0.01 0.01
0.01 0.01
Bawah X 16 0.10 0.300 1.90 0.300 2.540 1.58 31.0 4 1.840 124.271
0.01 0.01
0.01 0.01
Y 16 0.10 0.300 2.90 0.300 3.540 1.58 21.0 3 1.380 117.326
0.01 0.01
0.01 0.01
Bawah X 16 0.10 0.300 1.90 0.300 2.540 1.58 33.0 4 1.840 132.288
0.01 0.01
0.01 0.01
Y 16 0.10 0.300 4.40 0.300 5.040 1.58 21.0 2 1.920 167.041
0.01 0.01
X 16 0.10 0.300 2.50 0.300 3.140 1.58 14.0 3 2.580 69.379
0.01 0.01
Plat Page 57 of 57