Anda di halaman 1dari 16

REKAPITULASI BIAYA

ENGINEER ESTIMATE (EE)


SATUAN KERJA : DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN LINGKUNGAN HIDUP
KABUPATEN KETAPANG
PEKERJAAN : DED TAMAN KOTA KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
LOKASI : KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
SUMBER DANA : APBD
THN ANGGARAN : 2019

NO. URAIAN PEKERJAAN HARGA

1 PEKERJAAN PENDAHULUAN Rp 1,250,000


Pontianak,
2 PEKERJAAN ARSITEKTUR Rp Desember 2019 31,600,000
3 PEKERJAAN PERKERASAN PEDESTRIAL Rp 179,015,628.91
4 PEKERJAAN
DiperiksaSANITASI
Oleh: AIR Rp oleh :
Dibuat 20,587,485.81
Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan
5 PEKERJAAN MEKANIKAL
DINAS PERUMAHAN RAKYAT KAWASAN ELEKTRIKAL Rp Perencana 72,096,300.00
CV. DW KREASI KONSULTAN
6 PEKERJAAN
PERMUKIMAN TANAMAN HIDUP
DAN LINGKUNGAN Rp 50,629,000.00
7 PEKERJAAN
KABUPATEN LAIN-LAIN
KETAPANG Rp 411,197,526.48

TOTAL Rp 766,375,941.21
Wahyu Ramadhan, ST
DIDIN MALADIN PPN 10% Rp
Direktur 76,637,594.12
NIP. 19700518 200701 1 027 JUMLAH TOTAL Rp 843,013,535.33
DIBULATKAN Rp 843,000,000.00

Terbilang : Delapan Ratus Empat Puluh Tiga Juta Ribu Rupiah

Disetujui Oleh:
KEPALA BIDANG PERUMAHAN RAKYAT DAN KAWASAN PEMUKIMAN
DINAS PERUMAHAN RAKYAT KAWASAN PERMUKIMAN DAN
LINGKUNGAN HIDUP KABUPATEN KETAPANG

SUTIADI, ST., MT
NIP. 19650312 198703 1 020
DAFTAR KUANTITAS DAN HARGA

SATUAN KERJA : DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN LINGKUNGAN HIDUP KABUPATEN KETAPANG
PEKERJAAN : DED TAMAN KOTA KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
LOKASI : KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
SUMBER DANA : APBD
TAHUN ANGGARAN : 2019

HARGA SATUAN JUMLAH TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
(Rp.) (Rp.)

1 2 3 4 6 7
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Pembersihan Lokasi 1.00 Lsm 1,000,000.00 1,000,000.00
2 Papan plang nama proyek 1.00 Lsm 250,000.00 250,000.00
TOTAL SUB I 1,250,000.00
II PEKERJAAN ARSITEKTUR ###
1 Pengadaan Tugu Burung Enggang include Pondasi Tapak 1.00 Ls 25,000,000.00 25,000,000.00
2 Pengecatan Dudukan Tugu Burung Enggang 3.18 m2

3 Pemasangan Tiang Arsitektural Area Tugu include Pondasi Tapak 22.00 Unit 300,000.00 6,600,000.00

4 Pengecatan Tiang Arsitektural Area Tugu 1.89 m2


5 Pengecatan Dudukan Tiang Arsitektural Area Tugu 2.80 m2 -
TOTAL SUB II 31,600,000.00
III PEKERJAAN PERKERASAN PEDESTRIAL
1 Pekerjaan Taman Barat Cor Padat t=15cm 63.74 m3 2,808,749.18 179,015,628.91
TOTAL SUB III 179,015,628.91
IV PEKERJAAN SANITASI AIR
1 Pekerjaan Saluran Drainase 236.95 m1 86,885.36 20,587,485.81
TOTAL SUB IV 20,587,485.81
V PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Pekerjaan lampu sorot Tanam 68.00 Unit 561,600.00 38,188,800.00
2 Pekerjaan lampu sorot + tiang beserta pondasi 4.00 Unit 4,140,000.00 16,560,000.00
3 Pekerjaan box panel 1.00 ls 144,000.00 144,000.00
4 Pekerjaan instalasi kabel NYFG 225.00 m 26,460.00 5,953,500.00
5 Pekerjaan switch timer otomatis PJU 1.00 ls 1,250,000.00 1,250,000.00
6 Pekerjaan pasang sambungan baru PLN 1.00 ls 10,000,000.00 10,000,000.00
TOTAL SUB V 72,096,300.00
VI PEKERJAAN TANAMAN
1 Penanaman aglonema (Aglonema Sp) 168.00 bag 65,000.00 10,920,000.00
2 Penanaman Kamboja Hias 224.00 btg 30,000.00 6,720,000.00
4 Penanaman kana merah & kuning (Cana indica) 263.00 bag 120,000.00 31,560,000.00
5 Pupuk Kandang/Kompos 25.00 krg 6,600.00 165,000.00
6 Tanah Subur 4.00 m3 266,000.00 1,064,000.00
8 Pekerjaan Penanaman 1.00 ls 200,000.00 200,000.00
TOTAL SUB VI 50,629,000.00
VII PEKERJAAN LAIN-LAIN
1 Pekerjaan Pengecoran Area Parkir Cor Beton t=25cm 141.57 m3 2,455,253.28 347,577,930.15
2 Bangku Taman 16.00 buah 1,500,000.00 24,000,000.00
3 Pekerjaan Tiang Arsitektural Pendukung Taman 35.00 unit 405,318.83 14,186,158.95
4 Pekerjaan Pengecatan Tiang Arsitektural Pendukung Taman 76.56 m2
5 Pengadaan Tulisan Arsitektural Taman Rangge Sentap 1.00 Ls 1,500,000.00 1,500,000.00
6 Pekerjaan Kansteen Uk 40x10x20 160.15 m1 149,443.88 23,933,437.38
TOTAL SUB VII 411,197,526.48
TOTAL SUB PEKERJAAN 766,375,941.21
PPn 10% 76,637,594.12
TOTAL 843,013,535.33
RENCANA ANGGARAN BIAYA (RAB) RABAT BETON

SATUAN KERJA : DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN LINGKUNGAN HIDUP KABUPATEN KETAPANG
PEKERJAAN : DED TAMAN KOTA KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
LOKASI : KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
SUMBER DANA : APBD
TAHUN ANGGARAN : 2019

RENCANA ANGGARAN BIAYA (RAB) PEDESTRIAN


NO ITEM PEKERJAAN ANALISA KUANTITAS HARGA SATUAN JUMLAH HARGA PEKERJAAN
PEKERJAAN
1 2 3 4 5 6

A PEKERJAAN PERSIAPAN
1 Pekerjaan Galian Tanah < 1 m A.2.3.1.1 63.735 m3 Rp 83,113.57 Rp 5,297,243.17
2 Pekerjaan Urugan Pasir t=2cm A.2.3.1.11 5.85 m3 Rp 280,265.43 Rp 1,639,552.75
SUBTOTAL A Rp 6,936,795.92
B PEKERJAAN BETON
1 Bekisting A.4.1.1.21.a 191.205 m2 Rp 127,878.82 24,451,070.24
2 Cor Beton T=0.15 K175 A.4.1.1.5 63.74 m3 Rp 1,283,836.85 Rp 81,825,341.56
3 Pekerjaan acian A.4.4.2.27 248.34 M2 Rp 40,407.13 Rp 10,034,706.25
SUBTOTAL B Rp 116,311,118.05
TOTAL PEKERJAAN (A-B) Rp 123,247,913.97
Harga Per M2 Rp 2,808,749.18

RENCANA ANGGARAN BIAYA (RAB) AREA PARKIR


NO ITEM PEKERJAAN ANALISA KUANTITAS HARGA SATUAN JUMLAH HARGA PEKERJAAN
PEKERJAAN
1 2 3 4 5 6

A PEKERJAAN PERSIAPAN
1 Pekerjaan Galian Tanah < 1 m A.2.3.1.1 56.464 m3 Rp 83,113.57 Rp 4,692,924.43
2 Pekerjaan Urugan Pasir t=2cm A.2.3.1.11 11.2928 m3 Rp 280,265.43 Rp 3,164,981.41
SUBTOTAL A Rp 7,857,905.84
B PEKERJAAN BETON
1 Bekisting A.4.1.1.21.a 56.464 m2 Rp 127,878.82 7,220,549.83
2 Cor Beton T=25CM K175 A.4.1.1.5 141.16 m3 Rp 1,283,836.85 Rp 181,226,409.58
SUBTOTAL B Rp 188,446,959.41
TOTAL PEKERJAAN (A-B) Rp 196,304,865.25
Harga Per M2 Rp 2,455,253.28

RENCANA ANGGARAN BIAYA (RAB) KANSTEEN


HARGA SATUAN
NO ITEM PEKERJAAN ANALISA KUANTITAS PEKERJAAN JUMLAH HARGA PEKERJAAN

1 2 3 4 5 6

A PEKERJAAN PERSIAPAN
1 Pekerjaan Kerb A.4.3.9 160.15 m3 Rp 149,443.88 Rp 23,933,437.38
SUBTOTAL A Rp 23,933,437.38
TOTAL PEKERJAAN (A-B) Rp 23,933,437.38
Harga Per M2 Rp 149,443.88

RENCANA ANGGARAN BIAYA (RAB) TIANG


NO ITEM PEKERJAAN ANALISA KUANTITAS HARGA SATUAN JUMLAH HARGA PEKERJAAN
PEKERJAAN
1 2 3 4 5 6

A PEKERJAAN BETON
1 Bekisting A.4.3.9 0.3675 m2 Rp 149,443.88 54,920.63
2 Cor Beton K175 A.4.4.1.17 0.12 m3 Rp 1,283,836.85 Rp 157,270.01
3 Pekerjaan acian A.4.4.2.27 1.40 M2 Rp 40,407.13 Rp 56,569.98
4 Tulangan Pokok D10 A.4.4.1.17 4.84 kg Rp 18,906.58 Rp 91,507.83
5 Tulangan Begel A.4.1.1.19 7.15 kg Rp 28,971.88 Rp 207,177.91
SUBTOTAL B Rp 567,446.36
TOTAL PEKERJAAN (A-B) Rp 567,446.36
Harga Per M2 Rp 405,318.83
PERHITUNGAN VOLUME
KEGIATAN :
PEKERJAAN : DED TAMAN KOTA KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
LOKASI : KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
SUMBER DANA : APBD
TAHUN ANGGARAN : 2019

RENCANA ANGGARAN BIAYA (RAB) PEDESTRIAN


BANYAKNY PANJANG LEBAR TINGGI
NO. ITEM PEKERJAAN A X X X X URAIAN KUANTITAS
PERHITUNGAN
N P L T
1 2 3 4 5 6 8 9
A. PEKERJAAN GALIAN TANAH & URUGAN
1 Pekerjaan Galian tanah 1.00 145.76 1.50 0.50 =NxPxLxT 109.32 M3
2 Pekerjaan pasir urug 1.00 145.76 1.50 0.05 =NxPxLxT 10.93 M3
3 Pekerjaan timbun tanah kembali 1.00 145.76 1.20 0.05 =NxPxLxT 7.95 M3

B. PEKERJAAN PASANGAN BATU BELAH


1 Pembuatan lantai kerja beton rabat 1.00 145.76 0.50 0.10 =NxPxLxT 7.29 M3
0.35 (L bawah)
C. PEKERJAAN PLASTERAN+ACIAN
1 Pekerjaan plasteran siar 2.00 145.76 0.60 =NxPxL 174.91 M2
2 Pekerjaan plasteran+acian atas pasangan batu belah 2.00 145.76 0.45 =NxPxT 131.18 M2
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN DRAINASE
KEGIATAN :
PEKERJAAN : DED TAMAN KOTA KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
LOKASI : KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
SUMBER DANA : APBD
TAHUN ANGGAR : 2019
NO ITEM PEKERJAAN ANALISA KUANTITAS HARGA SATUAN JUMLAH HARGA
PEKERJAAN PEKERJAAN
1 2 3 4 5 6
A. PEKERJAAN GALIAN TANAH & URUGAN
1 Pekerjaan Galian tanah A.2.3.1.1. 55.87 M3 Rp 83,113.57 Rp 4,643,721.20
2 Pekerjaan pasir urug A.2.3.1.11. 4.66 M3 Rp 280,265.43 Rp 1,304,915.83
3
3 Pekerjaan timbun tanah kembali A.2.3.1.9. 4.23 M Rp 59,231.13 Rp 250,782.34
SUBTOTAL A Rp 6,199,419.36
B. PEKERJAAN PENGECORAN
1 Pembuatan lantai kerja beton rabat B.03.b 3.88 M3 Rp 1,283,836.85 Rp 4,981,286.97
SUBTOTAL B Rp 4,981,286.97
C. PEKERJAAN PLASTERAN+ACIAN
1 Pekerjaan plasteran siar A.4.4.2.5. 93.12 M2 Rp 40,407.13 Rp 3,762,711.79
2 Pekerjaan plasteran lining A.4.4.2.5. 69.84 M2 Rp 40,407.13 Rp 2,822,033.84
3 Pekerjaan acian lining A.4.4.2.27. 69.84 M2 Rp 40,407.13 Rp 2,822,033.84
SUBTOTAL C Rp 9,406,779.48
JUMLAH (A-C) Rp 20,587,485.81
Harga Per M1 Rp 86,885.36
PERHITUNGAN VOLUME DRAINASE
KEGIATAN :
PEKERJAAN : DED TAMAN KOTA KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
LOKASI : KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
SUMBER DANA : APBD
TAHUN ANGGARAN : 2019
BANYAKNY PANJANG LEBAR TINGGI JARI-JARI
NO. ITEM PEKERJAAN A X X X X X URAIAN PERHITUNGAN KUANTITAS
N P L T r
1 2 3 4 5 6 7 8 9
A. PEKERJAAN GALIAN TANAH & URUGAN
1 Pekerjaan Galian tanah 1.00 236.95 0.50 0.50 =NxPxLxT 59.24 M3
2 Pekerjaan pasir urug 1.00 236.95 0.50 0.05 =NxPxLxT 5.92 M3
3 Pekerjaan timbun tanah kembali 1.00 236.95 1.20 0.05 =NxPxLxT 12.93 M3

B. PEKERJAAN PASANGAN BATU BELAH


1 Pembuatan lantai kerja beton rabat 1.00 236.95 0.50 0.10 =NxPxLxT 11.85 M3
0.35 (L bawah)
C. PEKERJAAN PLASTERAN+ACIAN
1 Pekerjaan plasteran siar 2.00 236.95 0.60 =NxPxL 284.34 M2
2 Pekerjaan plasteran+acian atas pasangan batu belah 2.00 236.95 0.45 =NxPxT 213.26 M2
ANALISA HARGA UPAH DAN BAHAN
KEGIATAN
PEKERJAAN DED TAMAN KOTA KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
LOKASI KOMPLEK PASAR RANGGE SENTAP KEC. DELTA PAWAN
SUMBER DANA APBD
TAHUN ANGGARAN 2019

1m2 Pemasangan Paving Block


NO Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A BAHAN
Paving blok t 8cm m2 1.010 Rp 115,000.00 Rp 116,150.00
Abu batu m3 0.008 Rp 810,000.00 Rp 6,480.00
Jumlah Tenaga Kerja Rp 122,630.00
B UPAH
Tukang org/hr 0.125 Rp 135,000.00 Rp 16,875.00
Kepala tukang org/hr 0.350 Rp 160,000.00 Rp 56,000.00
Pekerja org/hr 0.700 Rp 105,000.00 Rp 73,500.00
Mandor org/hr 0.035 Rp 165,000.00 Rp 5,775.00
Jumlah Harga Upah Rp 152,150.00
C PERALATAN

Jumlah Harga Alat


D Jumlah (A+B+C) Rp 274,780.00
E
F Overhead / Profit 15% 41,217.00
G Harga Satuan Pekerjaan 315,997.00

A.4.3.9 Pemasangan m1 Kanstin / kerb Ukuran 40 x 20 x 10


NO Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A BAHAN
Kanstin / Kerb Ukuran 40 x 25 x 13 m1 1.660 Rp 50,000.00 Rp 83,000.00
Semen 50 kg Sak 0.120 Rp 83,033.33 Rp 9,964.00
Pasir m3 0.008 Rp 179,000.00 Rp 1,432.00
Jumlah Harga Bahan Rp 94,396.00
B UPAH
Tukang org/hr 0.200 Rp 93,040.00 Rp 18,608.00
Kepala tukang org/hr 0.020 Rp 99,706.67 Rp 1,994.13
Pekerja org/hr 0.150 Rp 93,040.00 Rp 13,956.00
Mandor org/hr 0.010 Rp 99,706.67 Rp 997.07
Jumlah Harga Upah Rp 35,555.20
C PERALATAN

Jumlah Harga Alat


D Jumlah (A+B+C) Rp 129,951.20
E
F Overhead / Profit 15% 19,492.68
G Harga Satuan Pekerjaan 149,443.88

A.4.1.1.5 Membuat 1m3 beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm ,w/c = 0,66

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 1.650 93,040.00 153,516.00
Tukang batu OH 0.275 91,373.33 25,127.67
Kepala tukang OH 0.028 99,706.67 2,791.79
Mandor OH 0.083 99,706.67 8,275.65
JUMLAH TENAGA KERJA 189,711.11
B BAHAN
Semen Portland Kg 326.000 1,660.67 541,377.33
Pasir beton Kg 760.000 127.86 97,171.43
Besi Beton Kg 1029.000 280.00 288,120.00
Air Liter 215.000 -
JUMLAH HARGA BAHAN 926,668.76
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 1,116,379.87
E Overhead & Provit 15% x D 167,456.98
F Harga Satuan Pekerjaan ( D + E ) 1,283,836.85
A.4.4.2.27 Pemasangan 1 m2 acian

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.200 93,040.00 18,608.00
Tukang batu OH 0.100 91,373.33 9,137.33
Kepala tukang OH 0.010 99,706.67 997.07
Mandor OH 0.010 99,706.67 997.07
JUMLAH TENAGA KERJA 29,739.47
B BAHAN
Semen PC Kg 3.250 1,660.67 5,397.17
JUMLAH HARGA BAHAN 5,397.17
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 35,136.63
E Overhead & Provit 15% x D 5,270.50
F Harga Satuan Pekerjaan ( D + E ) 40,407.13

A.2.3.1.1 Penggalian 1m3 tanah biasa sedalam 1m

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.750 93,040.00 69,780.00
Mandor OH 0.025 99,706.67 2,492.67
JUMLAH TENAGA KERJA 72,272.67
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 72,272.67
E Overhead & Provit 15% x D 10,840.90
F Harga Satuan Pekerjaan ( D + E ) 83,113.57

A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.500 93,040.00 46,520.00
Mandor OH 0.050 99,706.67 4,985.33
JUMLAH TENAGA KERJA 51,505.33
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 51,505.33
E Overhead & Provit 15% x D 7,725.80
F Harga Satuan Pekerjaan ( D + E ) 59,231.13

A.4.1.1.21.aPemasangan 1m2 bekisting (papan mal)

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.520 93,040.00 48,380.80
Tukang kayu OH 0.260 91,373.33 23,757.07
Kepala tukang OH 0.026 99,706.67 2,592.37
Mandor OH 0.026 99,706.67 2,592.37
JUMLAH TENAGA KERJA 77,322.61
B BAHAN
Papan Mal kelas III m³ 0.013 1,991,000.00 25,883.00
Paku 5 - 10 cm Kg 0.300 22,047.32 6,614.20
Cerucuk ф 6-8 cm - panj 4 m Btg 0.125 11,033.33 1,379.17
JUMLAH HARGA BAHAN 33,876.36
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 111,198.98
E Overhead & Provit 15% x D 16,679.85
F Harga Satuan Pekerjaan ( D + E ) 127,878.82
A.4.2.1.1 Pemasangan 1 kg besi profil

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.060 93,040.00 5,582.40
Tukang las konstruksi OH 0.060 91,373.33 5,482.40
Kepala tukang OH 0.006 99,706.67 598.24
Mandor OH 0.003 99,706.67 299.12
JUMLAH TENAGA KERJA 11,962.16
B BAHAN
Besi profil Kg 1.150 18,591.50 21,380.23
JUMLAH HARGA BAHAN 21,380.23
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A + B + C) 33,342.39
E Overhead & Provit 15% x D 5,001.36
F Harga Satuan Pekerjaan ( D + E ) 38,343.74

A.4.7.1.10.d1m2 Pengecatan tembok baru Exterior (setara Dulux)

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.020 93,040.00 1,860.80
Tukang cat OH 0.063 91,373.33 5,756.52
Kepala tukang OH 0.0063 99,706.67 628.15
Mandor OH 0.003 99,706.67 299.12
JUMLAH TENAGA KERJA 8,544.59
B BAHAN
Plamuur Kg 0.100 50,154.04 5,015.40
Cat dasar Kg 0.100 39,154.04 3,915.40
Cat penutup (setara dulux) Kg 0.260 62,113.75 16,149.58
JUMLAH HARGA BAHAN 25,080.38
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A + B + C) 33,624.97
E Overhead & Provit 15% x D (maksimum) 5,043.75
F Harga Satuan Pekerjaan ( D + E ) 38,668.72

A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.300 93,040.00 27,912.00
Mandor OH 0.010 99,706.67 997.07
JUMLAH TENAGA KERJA 28,909.07
B BAHAN
Pasir urug 1.200 179,000.00 214,800.00
JUMLAH HARGA BAHAN 214,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 243,709.07
E Overhead & Provit 15% x D 36,556.36
F Harga Satuan Pekerjaan ( D + E ) 280,265.43

Penanaman rumput gajah

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.032 93,040.00 2,949.37
Mandor OH 0.008 99,706.67 787.68
JUMLAH HARGA UPAH 3,737.05
B BAHAN
Pupuk kandang Krg 0.440 - 2,420.00
Rumput Gajah mini m2 0.040 - 1,000.00
JUMLAH HARGA BAHAN 3,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C) 6,937.05
E Overhead & Provit 15% x D 1,040.56
F Harga Satuan Pekerjaan ( D + E ) 7,977.61
A.4.1.1.17. Pembesian 10 Kg dengan besi polos atau besi ulir

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja OH 0.0700 93,040.00 6,512.80
Tukang Besi OH 0.0700 94,706.67 6,629.47
Kepala Tukang OH 0.0070 99,706.67 697.95
Mandor OH 0.0040 99,706.67 398.83
JUMLAH TENAGA KERJA 14,239.04

B. BAHAN
Besi Beton KG 10.500 14,007.73 147,081.12
Kawat beton KG 0.150 20,565.72 3,084.86
JUMLAH HARGA BAHAN 150,165.97

C PERALATAN
JUMLAH HARGA PERALATAN -

D JUMLAH (A+B+C) 164,405.01


E OVERHEAD & PROFIT (15% X D) 24,660.75
F HARGA SATUAN PEKERJAAN (D+E) 189,065.77
G HARGA PER - KG 18,906.58

A.4.1.1.17. Pembesian 10 Kg dengan besi polos atau besi ulir

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja OH 0.0700 93,040.00 6,512.80
Tukang Besi OH 0.0700 94,706.67 6,629.47
Kepala Tukang OH 0.0070 99,706.67 697.95
Mandor OH 0.0040 99,706.67 398.83
JUMLAH TENAGA KERJA 14,239.04

B. BAHAN
Besi Beton KG 10.500 22,507.73 236,331.12
Kawat beton KG 0.150 9,061.52 1,359.23
JUMLAH HARGA BAHAN 237,690.34

C PERALATAN
JUMLAH HARGA PERALATAN -

D JUMLAH (A+B+C) 251,929.38


E OVERHEAD & PROFIT (15% X D) 37,789.41
F HARGA SATUAN PEKERJAAN (D+E) 289,718.79
G HARGA PER - KG 28,971.88

A.4.7.1.10.b1m2 Pengecatan tembok baru Exterior

No Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja OH 0.020 93,040.00 1,860.80
Tukang cat OH 0.063 89,706.67 5,651.52
Kepala tukang OH 0.0063 99,706.67 628.15
Mandor OH 0.003 99,706.67 299.12
JUMLAH TENAGA KERJA 8,439.59
B BAHAN
Plamuur Kg 0.100 50,154.04 5,015.40
Cat dasar (setara mowilex) Kg 0.100 39,154.04 3,915.40
Cat penutup (setara mowilex) Kg 0.260 62,113.75 16,149.58
JUMLAH HARGA BAHAN 25,080.38
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A + B + C) 33,519.97
E Overhead & Provit 15% x D (maksimum) 5,028.00
F Harga Satuan Pekerjaan ( D + E ) 38,547.97
DAFTAR HARGA DASAR SATUAN BAHAN TAHUN ANGGARAN 2019
KECAMATAN DELTA PAWAN
Harga Paja Mineral Jumlah Ongkos Angkutan Keterangan
Ke Desa (sesuai Jumlah Total
NO. NAMA BARANG SATUAN Dasar Bkn Logam Harga Kg / M¹
dengan desa)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 = (15% x 4) 6 = (4+5) 7 8=6+7 9
A. BAHAN PENGISI
1 Tanah Urug ( Timb. Biasa ) M³ 150,000.00 150,000.00 91,000.00 241,000.00 141.76
2 Tanah Urug ( laterit / gravel ) M³ 175,000.00 175,000.00 91,000.00 266,000.00 156.47
3 Pasir Beton M³ 88,000.00 88,000.00 91,000.00 179,000.00 127.86
4 Batu Balok M³ 315,000.00 315,000.00 91,000.00 406,000.00 280.00
5 Batu Pecah 20-25 Cm M³ 310,000.00 310,000.00 91,000.00 401,000.00 276.55
6 Batu Pecah 15-20 Cm M³ 345,000.00 345,000.00 91,000.00 436,000.00 300.69
7 Batu Pecah 10-15 Cm M³ 385,000.00 385,000.00 91,000.00 476,000.00 328.28
8 Batu Pecah 5-7 Cm M³ 400,000.00 400,000.00 91,000.00 491,000.00 338.62
9 Batu Pecah 3-5 Cm M³ 435,000.00 435,000.00 91,000.00 526,000.00 362.76
10 Batu Pecah 2-3 cm M³ 470,000.00 470,000.00 91,000.00 561,000.00 386.90
11 Batu Pecah 1-2 cm M³ 525,000.00 525,000.00 91,000.00 616,000.00 424.83
12 Batu Pecah 0,5-1 Cm M³ 600,000.00 600,000.00 91,000.00 691,000.00 476.55
13 Debu Batu ( Stone Dust ) M³ 650,000.00 650,000.00 91,000.00 741,000.00 511.03
14 Semen (1 Zak @ 50 kg) Kg 1,600.00 1,600.00 60.67 1,660.67 83,033
15 Semen Putih Kg 2,600.00 2,600.00 60.67 2,660.67
16 Semen MU - 380 ( 40 Kg /Zak) Kg 4,700.00 4,700.00 75.83 4,775.83
17 Aspal Penetrasi 60/70 (Netto 155 Kg) Kg 16,129.03 16,129.03 63.60 16,192.63
B. BAHAN KAYU
1 Balok Belian Ketam M³ 7,350,000.00 7,350,000.00 91,000.00 7,441,000.00
2 Balok Belian Tidak Ketam M³ 7,150,000.00 7,150,000.00 91,000.00 7,241,000.00
3 Balok Belian Untuk Jembatan M³ 7,750,000.00 7,750,000.00 91,000.00 7,841,000.00
4 Papan Kayu Belian Ketam M³ 8,350,000.00 8,350,000.00 91,000.00 8,441,000.00
5 Papan Kayu Belian Tidak Ketam M³ 7,950,000.00 7,950,000.00 91,000.00 8,041,000.00
6 Balok Kayu Klas II Ketam M³ 3,000,000.00 3,000,000.00 91,000.00 3,091,000.00
7 Balok Kayu Klas II Tidak Ketam M³ 2,700,000.00 2,700,000.00 91,000.00 2,791,000.00
8 Papan Kayu Klas II Ketam M³ 3,250,000.00 3,250,000.00 91,000.00 3,341,000.00
9 Papan Kayu Klas II Tidak Ketam M³ 2,850,000.00 2,850,000.00 91,000.00 2,941,000.00
10 Papan Kayu Camp. ( Klas III ) M³ 1,900,000.00 1,900,000.00 91,000.00 1,991,000.00
11 Kayu Bulat Ø 8 - 12 Cm / 4 M' Btg 12,000.00 12,000.00 3,033.33 15,033.33
12 Kayu Bulat Ø 6 - 8 Cm / 4 M' Btg 8,000.00 8,000.00 3,033.33 11,033.33
13 Kayu Bakar M³ 360,000.00 360,000.00 91,000.00 451,000.00
D. BAHAN FINISHING CAT
1 Cat Kilat Kg 57,500.00 57,500.00 154.04 57,654.04
2 Cat Tembok Kg 62,000.00 62,000.00 113.75 62,113.75
3 Cat Dasar Kg 39,000.00 39,000.00 154.04 39,154.04
4 Cat Meni Besi Kg 145,000.00 145,000.00 154.04 145,154.04
5 Cat Meni Kayu Kg 137,000.00 137,000.00 154.04 137,154.04
6 Pelamur Kayu Kg 130,000.00 130,000.00 154.04 130,154.04
7 Pelamur Air Kg 50,000.00 50,000.00 154.04 50,154.04
8 Teer Ltr 15,000.00 15,000.00 154.04 15,154.04
9 Tineer Ltr 18,000.00 18,000.00 154.04 18,154.04
E. BAHAN BAKAR
1 Solar Industri Ltr 13,500.00 13,500.00 49.29 13,549.29
2 Minyak Tanah Ltr 15,000.00 15,000.00 49.29 15,049.29
3 Premium Industri Ltr 12,000.00 12,000.00 49.29 12,049.29
4 Pelumas SAE 10 Ltr 60,000.00 60,000.00 49.29 60,049.29
5 Pelumas SAE 30 Ltr 55,000.00 55,000.00 49.29 55,049.29
6 Pelumas SAE 40 Ltr 60,000.00 60,000.00 49.29 60,049.29
7 Oli 2T Ltr 55,000.00 55,000.00 49.29 55,049.29
8 Oli SAE 140 ( Oli Gardan ) Ltr 50,000.00 50,000.00 49.29 50,049.29
9 Oli SAE 90 Ltr 45,000.00 45,000.00 49.29 45,049.29
10 Oli SAE 20w-50 ( Bensin ) Ltr 55,000.00 55,000.00 49.29 55,049.29
11 Minyak Gemuk Ltr 70,000.00 70,000.00 49.29 70,049.29
12 Flux Oil Ltr 65,000.00 65,000.00 49.29 65,049.29
F. BAHAN PENUTUP LANTAI
1 Paving 20x20 Keping 2,000.00 2,000.00 308.07 2,308.07
2 Paving 18x18 Keping 2,000.00 2,000.00 308.07 2,308.07
3 Bataco 8x15x30 Keping 2,000.00 2,000.00 369.69 2,369.69
4 Bataco 7x15x30 Keping 1,500.00 1,500.00 369.69 1,869.69
5 Bataco 6x15x30 Keping 1,200.00 1,200.00 369.69 1,569.69
6 Keramik Anti Gores 60x60 ( Motif ) M2 (Ktk) 345,000.00 345,000.00 328.61 345,328.61
7 Keramik Anti Gores 60x60 ( Polos ) M2 (Ktk) 230,000.00 230,000.00 328.61 230,328.61
8 Keramik 40x40 M2 (Ktk) 133,000.00 133,000.00 328.61 133,328.61
9 Keramik 30x30 ( Polos ) M2 (Ktk) 99,900.00 99,900.00 328.61 100,228.61
10 Keramik 30x30 ( Motif ) M2 (Ktk) 122,100.00 122,100.00 328.61 122,428.61
11 Keramik 20x20 ( Polos ) M2 (Ktk) 87,500.00 87,500.00 82.15 87,582.15
12 Keramik 20x20 ( Motif ) M2 (Ktk) 97,500.00 97,500.00 82.15 97,582.15
13 Keramik 20x25 ( Polos ) M2 (Ktk) 90,000.00 90,000.00 82.15 90,082.15
14 Keramik 20x25 ( Motif ) M2 (Ktk) 110,000.00 110,000.00 82.15 110,082.15
G. BAHAN PENGGANTUNG
1 Paku Alumunium Kg 65,000.00 65,000.00 47.32 65,047.32
2 Paku Besi uk. 2" - 4 " Kg 16,000.00 16,000.00 47.32 16,047.32
3 Paku Sirap Kg 17,000.00 17,000.00 47.32 17,047.32
4 Paku Payung ( Utk Atap Seng ) Kg 26,000.00 26,000.00 47.32 26,047.32
5 Paku Tripleks Kg 22,000.00 22,000.00 47.32 22,047.32
6 Paku S Pcs 1,000.00 1,000.00 47.32 1,047.32
7 Kait Angin Jendela Bh 7,500.00 7,500.00 19.41 7,519.41
8 Gagang Pintu Bh 80,000.00 80,000.00 443.64 80,443.64
9 Kunci Tanam Biasa Bh 130,000.00 130,000.00 443.64 130,443.64
10 Kunci Tanam Besar Bh 150,000.00 150,000.00 443.64 150,443.64
11 Engsel Jendela Psg 8,000.00 8,000.00 22.18 8,022.18
12 Engsel Pintu Psg 10,000.00 10,000.00 22.18 10,022.18
13 Grendel 10" Bh 35,000.00 35,000.00 4.62 35,004.62
14 Grendel 3" Bh 9,000.00 9,000.00 4.62 9,004.62
15 Grendel 2" Bh 6,000.00 6,000.00 4.62 6,004.62
Harga Paja Mineral Jumlah Ongkos Angkutan Keterangan
Ke Desa (sesuai Jumlah Total
NO. NAMA BARANG SATUAN Dasar Bkn Logam Harga Kg / M¹
dengan desa)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 = (15% x 4) 6 = (4+5) 7 8=6+7 9
H. BAHAN LAIN - LAIN
1 Kloset duduk CW868NJ Bh 5,170,000.00 5,170,000.00 14,787.50 5,184,787.50
2 Kloset Jongkok CE9/TV150NWV12 Bh 3,443,000.00 3,443,000.00 14,787.50 3,457,787.50
3 Kloset Jongkok Bh 280,000.00 280,000.00 14,787.50 294,787.50
4 Wastafel LW242J/LW242HF Bh 1,648,900.00 1,648,900.00 14,787.50 1,663,687.50
5 Wastafel Bh 550,000.00 550,000.00 14,787.50 564,787.50
6 Wall Shower Bh 170,000.00 170,000.00 14,787.50 184,787.50
7 Kran Air RRC Uk. 3/4" Bh 17,500.00 17,500.00 273.84 17,773.84
8 Kran Air Biasa Uk. 3/4" Bh 8,000.00 8,000.00 273.84 8,273.84
9 Kran Air Kuningan Uk. 3/4" Bh 30,000.00 30,000.00 273.84 30,273.84
10 Floordrain Bh 15,000.00 15,000.00 91.00 15,091.00
11 ESL Bord Tebal 7,5 cm M2 260,000.00 260,000.00 985.83 260,985.83
12 Tripleks 2.5 mm Lbr 55,000.00 55,000.00 985.83 55,985.83
13 Multiplek 5 mm Lbr 95,000.00 95,000.00 1,971.67 96,971.67
14 Multiplek 9 mm Lbr 170,000.00 170,000.00 3,584.85 173,584.85
15 Multiplek 12 mm Lbr 235,000.00 235,000.00 4,732.00 239,732.00
16 Papan Gypsum ( 122 x 244 ) cm Lbr 75,000.00 75,000.00 4,732.00 79,732.00
17 Akustik 60 x 120 Lbr 90,000.00 90,000.00 4,732.00 94,732.00
18 Casting Jaya ( Tepung Gypsum ) Kg 6,000.00 6,000.00 4,732.00 10,732.00
19 Kaca 3 mm ( Polos ) M² 135,000.00 135,000.00 2,053.82 137,053.82
20 Kaca 5 mm ( Polos ) M² 160,000.00 160,000.00 2,053.82 162,053.82
21 Kaca Raiben 3 mm M² 155,000.00 155,000.00 2,053.82 157,053.82
22 Kaca Raiben 5 mm M² 185,000.00 185,000.00 2,053.82 187,053.82
23 Kaca Stopsol 8 mm Silver Green Ex. Asaimas M² 632,500.00 632,500.00 2,053.82 634,553.82
24 Pintu Tempered Polos 12 mm - Uk. 87 x 213,5 cm Unit 4,840,000.00 4,840,000.00 2,053.82 4,842,053.82
25 Baut Besi Uk. D = 1/2 - 10 cm Btg 3,000.00 3,000.00 12.66 3,012.66
26 Baut Besi Uk. D = 1/2 - 20 cm Btg 7,500.00 7,500.00 12.66 7,512.66
27 Baut Besi Uk. D = 1/2 - 30 cm Btg 15,000.00 15,000.00 12.66 15,012.66
28 Baut Besi Uk. D = 5/8 - 10 cm Btg 8,000.00 8,000.00 22.48 8,022.48
29 Baut Besi Uk. D = 5/8 - 20 cm Btg 15,000.00 15,000.00 22.48 15,022.48
30 Baut Besi Uk. D = 5/8 - 30 cm Btg 24,000.00 24,000.00 22.48 24,022.48
31 Baut Besi Uk. D = 3/4 - 10 cm Btg 11,000.00 11,000.00 31.71 11,031.71
32 Baut Besi Uk. D = 3/4 - 20 cm Btg 18,000.00 18,000.00 31.71 18,031.71
33 Baut Besi Uk. D = 3/4 - 30 cm Btg 26,000.00 26,000.00 31.71 26,031.71
34 Besi Beugel Bh 22,000.00 22,000.00 507.73 22,507.73
35 Besi Beton ulir Kg 18,000.00 18,000.00 591.50 18,591.50
36 Besi Beton polos Kg 13,500.00 13,500.00 507.73 14,007.73
37 Kawat Bendrat Kg 20,500.00 20,500.00 65.72 20,565.72
38 Kawat Simpai Kg 18,000.00 18,000.00 65.72 18,065.72
39 Kawat dia 4 mm Kg 16,000.00 16,000.00 65.72 16,065.72
40 Baja Profil Kg 35,000.00 35,000.00 70.08 35,070.08
41 Baja Struktur Kg 55,000.00 55,000.00 70.08 55,070.08
42 Baja Ringan Untuk Kuda Kuda M' 20,000.00 20,000.00 70.08 20,070.08
43 Baja Ringan Untuk Gording M' 10,000.00 10,000.00 70.08 10,070.08
44 Profil Allum " T " M' 12,500.00 12,500.00 70.08 12,570.08
45 Profil Kusen Aluminium YKK 3" M' 130,000.00 130,000.00 70.08 130,070.08
46 Profil Pintu Aluminium M' 70,000.00 70,000.00 70.08 70,070.08
47 Profil Kaca M' 45,000.00 45,000.00 70.08 45,070.08
48 Rangka Metal hollow 40.40.2 mm M' 26,000.00 26,000.00 70.08 26,070.08
49 Besi L ( untuk Jembatan) M' 60,000.00 60,000.00 70.08 60,070.08
50 Kabel Seling Ø 1/2" (Blue Strand/Full Baja) M' 80,000.00 80,000.00 15,773.33 95,773.33
51 Kabel Seling Ø 3/4" (Blue Strand/Full Baja) M' 140,000.00 140,000.00 7,535.03 147,535.03
52 Kabel Selling Ø 1,3/4" (Blue Strand/Full Baja) M' 175,000.00 175,000.00 175,000.00
53 Kabel Selling Ø 1" (Multi Strand Roof) M' 46,000.00 46,000.00 31,972.97 77,972.97
54 Kabel Selling Biasa Ø 1/2" M' 10,000.00 10,000.00 15,773.33 25,773.33
55 Kabel Selling Biasa Ø 3/4" M' 17,000.00 17,000.00 7,535.03 24,535.03
56 Jarum Keras 1,5"x24" Bh 165,000.00 165,000.00 61.52 165,061.52
57 Jarum Keras 5/8"x12" Bh 145,000.00 145,000.00 61.52 145,061.52
58 Jarum Keras 1/2"x6" Bh 20,000.00 20,000.00 61.52 20,061.52
59 Jarum Keras M - 16 Bh 165,000.00 165,000.00 61.52 165,061.52
60 Klem Kabel Ukr. 1/2 Bh 9,000.00 9,000.00 61.52 9,061.52
61 Klem Label Uk. 1/2" Bh 9,000.00 9,000.00 61.52 9,061.52
62 Klem Label Uk. 3/4" Bh 11,235.00 11,235.00 61.52 11,296.52
63 Klem Label Uk. 1" Bh 16,000.00 16,000.00 61.52 16,061.52
64 Meteran Air Bersih Set 390,000.00 390,000.00 3,033.33 393,033.33
65 Sealtape Bh 5,000.00 5,000.00 61.52 5,061.52
66 Shower TX4235 Bh 710,000.00 710,000.00 61.52 710,061.52
67 Mesin Jet Pump Kap. 250 watt Bh 4,752,000.00 4,752,000.00 3,033.33 4,755,033.33
68 Septictank Biosel Kap. 6 m3 Unit 7,000,000.00 7,000,000.00 7,000,000.00
69 Alumunium Komposit + Rangka Besi M2 1,145,000.00 1,145,000.00 91,000.00 1,236,000.00
70 Curtain Wall Kaca green stopsol 8 mm ex. Asaimas M2 1,450,000.00 1,450,000.00 91,000.00 1,541,000.00
71 Ramset Bh 11,000.00 11,000.00 11,000.00
72 Skrup Fixer Bh 1,500.00 1,500.00 1,500.00
73 Sandblast M2 85,000.00 85,000.00 85,000.00
74 Sealant Kg 122,900.00 122,900.00 122,900.00
75 Lem Kayu Kg 25,000.00 25,000.00 25,000.00
76 Plywood 4 mm Lbr 60,300.00 60,300.00 985.83 61,285.83
77 Plywood 9 mm Lbr 262,000.00 262,000.00 3,584.85 265,584.85
78 Phenol film 12 mm Lbr 300,000.00 300,000.00 4,732.00 304,732.00
79 HPL 1,22 m x 2,44 m x 0,7 mm Lbr 450,000.00 450,000.00 4,732.00 454,732.00
80 List Metal stainless steel M' 100,000.00 100,000.00 3,584.85 103,584.85
81 Door Stoper Bh 250,000.00 250,000.00 250,000.00
82 Realing stainless steel Bh 600,000.00 600,000.00 600,000.00
83 Plafond Alumunium Strip Celing Rangka Metal Furing M2 1,160,000.00 1,160,000.00 1,160,000.00
84 Dinabolt dia 12 mm (10 - 15) cm Bh 5,000.00 5,000.00 5,000.00
85 Kuas Bh 20,000.00 20,000.00 20,000.00
86 Amplas Bh 3,000.00 3,000.00 3,000.00
87 Kawat Las Kg 35,000.00 35,000.00 35,000.00
88 Talang Paralon Type U Btg 70,000.00 70,000.00 1,095.37 71,095.37
89 Tutup Talang Bh 10,000.00 10,000.00 410.76 10,410.76
90 Corong Talang Bh 15,000.00 15,000.00 410.76 15,410.76
91 Kait Talang Bh 7,000.00 7,000.00 410.76 7,410.76
92 Kansteen Uk 40x10x20 Unit 50,000.00 50,000.00 50,000.00
Harga Paja Mineral Jumlah Ongkos Angkutan Keterangan
Ke Desa (sesuai Jumlah Total
NO. NAMA BARANG SATUAN Dasar Bkn Logam Harga Kg / M¹
dengan desa)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 = (15% x 4) 6 = (4+5) 7 8=6+7 9
I. PIPA PVC KLAS A (SNI. PRJ. S. 12.5 )
1 Pipa PVC Ø = 1/2" x 6 M' Btg 90,000.00 90,000.00 39.43 90,039.43 15,006.57
2 Pipa PVC Ø = 3/4" x 6 M' Btg 120,000.00 120,000.00 89.08 120,089.08 20,014.85
3 Pipa PVC Ø = 1" x 6 M' Btg 150,000.00 150,000.00 173.46 150,173.46 25,028.91
4 Pipa PVC Ø = 2" x 6 M' Btg 175,000.00 175,000.00 636.02 175,636.02 29,272.67
5 Pipa PVC Ø = 2½" x 6 M" Btg 225,000.00 225,000.00 1,183.00 226,183.00 37,697.17
6 Pipa PVC Ø = 3" x 6 M' Btg 350,000.00 350,000.00 1,478.75 351,478.75 58,579.79
7 Pipa PVC Ø = 4" x 6 M" Btg 550,000.00 550,000.00 2,628.89 552,628.89 92,104.81
8 Pipa PVC Ø = 6" x 6 M" Btg 1,300,000.00 1,300,000.00 5,915.00 1,305,915.00 217,652.50
9 Elbow PVC Ø 1/2" Bh 3,000.00 3,000.00 12.32 3,012.32
10 Elbow PVC Ø 3/4" Bh 3,500.00 3,500.00 12.32 3,512.32
11 Elbow PVC Ø 1" Bh 5,500.00 5,500.00 12.32 5,512.32
12 Elbow PVC Ø 2" Bh 14,000.00 14,000.00 14.79 14,014.79
13 Elbow PVC Ø 3" Bh 35,000.00 35,000.00 46.94 35,046.94
14 Elbow PVC Ø 4" Bh 60,000.00 60,000.00 65.72 60,065.72
15 All Socket Pipa PVC Ø 2" Bh 11,000.00 11,000.00 59.15 11,059.15
16 All Socket Pipa PVC Ø 3" Bh 25,000.00 25,000.00 157.73 25,157.73
17 All Socket Pipa PVC Ø 4" Bh 45,000.00 45,000.00 405.60 45,405.60
18 All Socket Tee PVC Ø 2" Bh 18,000.00 18,000.00 1,207.14 19,207.14
19 All Socket Tee PVC Ø 3" Bh 40,000.00 40,000.00 1,207.14 41,207.14
20 All Socket Tee PVC Ø 4" Bh 80,000.00 80,000.00 1,207.14 81,207.14
21 Pipa Galvanis Ø 1/2" - 6 M' Btg 95,000.00 95,000.00 346.41 95,346.41
22 Pipa Galvanis Ø 3/4" - 6 M' Btg 110,000.00 110,000.00 448.62 110,448.62
23 Pipa Galvanis Ø 1" - 6 M' Btg 240,000.00 240,000.00 333.24 240,333.24
24 Pipa Galvanis Ø 1,25" - 6 M' Btg 380,000.00 380,000.00 896.21 380,896.21
25 Pipa Galvanis Ø 1,5" - 6 M' Btg 350,000.00 350,000.00 1,028.70 351,028.70
26 Pipa Galvanis Medium Ø 2" - 6 M' Btg 470,000.00 470,000.00 1,460.49 471,460.49
27 Pipa Galvanis Medium Ø 2,5" - 6 M' Btg 600,000.00 600,000.00 1,848.44 601,848.44
28 Pipa Galvanis Medium Ø 3" - 6 M' Btg 900,000.00 900,000.00 2,414.29 902,414.29
29 Pipa Galvanis Medium Ø 6" - 6 M' Btg 1,550,000.00 1,550,000.00 5,633.33 1,555,633.33
30 Elbow Pipa Galvanis Ø 1/2" Bh 18,000.00 18,000.00 284.38 18,284.38
31 Elbow Pipa Galvanis Ø 3/4" Bh 21,000.00 21,000.00 284.38 21,284.38
32 Elbow Pipa Galvanis Ø 1" Bh 45,000.00 45,000.00 284.38 45,284.38
33 Elbow Pipa Galvanis Ø 1,25" Bh 16,000.00 16,000.00 284.38 16,284.38
34 Elbow Pipa Galvanis Ø 1,5" Bh 19,000.00 19,000.00 284.38 19,284.38
35 Elbow Pipa Galvanis Medium Ø 2" Bh 43,000.00 43,000.00 222.88 43,222.88
36 Elbow Pipa Galvanis Medium Ø 2,5" Bh 44,000.00 44,000.00 436.53 44,436.53
37 Elbow Pipa Galvanis Medium Ø 3" Bh 60,000.00 60,000.00 436.53 60,436.53
38 Elbow Pipa Galvanis Medium Ø 4" Bh 90,000.00 90,000.00 758.33 90,758.33
39 Flange Pipa GIV Ø 2" Bh 147,000.00 147,000.00 142.02 147,142.02
40 Flange Pipa GIV Ø 3" Bh 242,000.00 242,000.00 142.02 242,142.02
41 Flange Pipa GIV Ø 4" Bh 333,000.00 333,000.00 142.02 333,142.02
42 Flange Pipa GIV Ø 5" Bh 345,000.00 345,000.00 142.02 345,142.02
43 Pakin Karet Ø 2" Bh 5,500.00 5,500.00 616.15 6,116.15
44 Pakin Karet Ø 3" Bh 6,500.00 6,500.00 616.15 7,116.15
45 Pakin Karet GIV Ø 4" Bh 7,500.00 7,500.00 616.15 8,116.15
46 Reducer 3" - 2 " Bh 115,500.00 115,500.00 1,556.58 117,056.58
47 Reducer 4" - 3 " Bh 133,000.00 133,000.00 1,556.58 134,556.58
48 Filter Pipa GIV Ø 3" Bh 150,000.00 150,000.00 1,556.58 151,556.58
49 Filter Pipa GIV Ø 4" Bh 200,000.00 200,000.00 1,556.58 201,556.58
50 Pipa GIV Ø 2" - 6 Btg 741,500.00 741,500.00 2,414.29 743,914.29
51 Pipa GIV Ø 4" - 6 Btg 2,200,000.00 2,200,000.00 3,479.41 2,203,479.41
52 Pipa GIV Ø 5" - 6 Btg 2,264,000.00 2,264,000.00 4,732.00 2,268,732.00
53 Pipa GIV Ø 6" - 6 Btg 3,000,000.00 3,000,000.00 284.38 3,000,284.38
54 Pipa HDPE Ø 2" x 6 Btg 580,000.00 580,000.00 105.06 580,105.06
55 Pipa HDPE Ø 2,5" x 6 Btg 660,000.00 660,000.00 161.83 660,161.83
56 Pipa HDPE Ø 3" x 6 Btg 1,128,000.00 1,128,000.00 230.16 1,128,230.16
57 Pipa HDPE Ø 4" x 6 Btg 1,600,000.00 1,600,000.00 307.27 1,600,307.27
58 Pipa HDPE Ø 6" x 6 Btg 3,000,000.00 3,000,000.00 1,183.00 3,001,183.00
J. PIPA PVC KLAS B ( STANDARD AW )
1 Pipa PVC Ø = 1/2" x 4 M' Btg 25,000.00 25,000.00 39.43 25,039.43 6,259.86
2 Pipa PVC Ø = 3/4" x 4 M' Btg 30,000.00 30,000.00 89.08 30,089.08 7,522.27
3 Pipa PVC Ø = 1" x 4 M' Btg 35,000.00 35,000.00 173.46 35,173.46 8,793.37
4 Pipa PVC Ø = 2" x 4 M' Btg 80,000.00 80,000.00 636.02 80,636.02 20,159.01
5 Pipa PVC Ø = 2½" x 4 M' Btg 112,500.00 112,500.00 1,183.00 113,683.00 28,420.75
6 Pipa PVC Ø = 3" x 4 M' Btg 150,000.00 150,000.00 1,478.75 151,478.75 37,869.69
7 Pipa PVC Ø = 4" x 4 M' Btg 240,000.00 240,000.00 2,628.89 242,628.89 60,657.22
8 Elbow PVC Ø 1/2" Bh 3,000.00 3,000.00 12.32 3,012.32
9 Elbow PVC Ø 3/4" Bh 3,000.00 3,000.00 12.32 3,012.32
10 Elbow PVC Ø 1" Bh 5,000.00 5,000.00 12.32 5,012.32
11 Elbow PVC Ø 2" Bh 15,000.00 15,000.00 14.79 15,014.79
12 Elbow PVC Ø 3" Bh 18,000.00 18,000.00 46.94 18,046.94
13 Elbow PVC Ø 4" Bh 30,000.00 30,000.00 65.72 30,065.72
14 All Socket Pipa PVC Ø 2" Bh 13,000.00 13,000.00 59.15 13,059.15
15 All Socket Pipa PVC Ø 3" Bh 18,000.00 18,000.00 157.73 18,157.73
16 All Socket Pipa PVC Ø 4" Bh 24,000.00 24,000.00 405.60 24,405.60
17 All Socket Tee PVC Ø 2" Bh 17,000.00 17,000.00 1,207.14 18,207.14
18 All Socket Tee PVC Ø 3" Bh 21,000.00 21,000.00 1,207.14 22,207.14
19 All Socket Tee PVC Ø 4" Bh 38,000.00 38,000.00 1,207.14 39,207.14
Harga Paja Mineral Jumlah Ongkos Angkutan Keterangan
Ke Desa (sesuai Jumlah Total
NO. NAMA BARANG SATUAN Dasar Bkn Logam Harga Kg / M¹
dengan desa)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 = (15% x 4) 6 = (4+5) 7 8=6+7 9
K. PIPA PVC KLAS C ( STANDARD C )
1 Pipa PVC Ø = 1/2" x 4 M' Btg 13,000.00 13,000.00 39.43 13,039.43 3,259.86
2 Pipa PVC Ø = 3/4" x 4 M' Btg 17,000.00 17,000.00 89.08 17,089.08 4,272.27
3 Pipa PVC Ø = 1" x 4 M' Btg 22,500.00 22,500.00 173.46 22,673.46 5,668.37
4 Pipa PVC Ø = 2" x 4 M' Btg 32,000.00 32,000.00 636.02 32,636.02 8,159.01
5 Pipa PVC Ø = 2½" x 4 M' Btg 45,000.00 45,000.00 1,183.00 46,183.00 11,545.75
6 Pipa PVC Ø = 3" x 4 M' Btg 60,000.00 60,000.00 1,478.75 61,478.75 15,369.69
7 Pipa PVC Ø = 4" x 4 M' Btg 80,000.00 80,000.00 2,628.89 82,628.89 20,657.22
8 Pipa PVC Ø = 8" x 4 M' Btg 230,000.00 230,000.00 8,450.00 238,450.00 59,612.50
9 Elbow PVC Ø 1/2" Bh 3,000.00 3,000.00 12.32 3,012.32
10 Elbow PVC Ø 3/4" Bh 3,500.00 3,500.00 12.32 3,512.32
11 Elbow PVC Ø 1" Bh 7,000.00 7,000.00 12.32 7,012.32
12 Elbow PVC Ø 2" Bh 12,500.00 12,500.00 14.79 12,514.79
13 Elbow PVC Ø 3" Bh 27,000.00 27,000.00 46.94 27,046.94
14 Elbow PVC Ø 4" Bh 32,000.00 32,000.00 65.72 32,065.72
15 All Socket Pipa PVC Ø 2" Bh 12,500.00 12,500.00 59.15 12,559.15
16 All Socket Pipa PVC Ø 3" Bh 27,000.00 27,000.00 157.73 27,157.73
17 All Socket Pipa PVC Ø 4" Bh 32,000.00 32,000.00 405.60 32,405.60
18 All Socket Tee PVC Ø 2" Bh 5,500.00 5,500.00 1,207.14 6,707.14
19 All Socket Tee PVC Ø 3" Bh 16,000.00 16,000.00 1,207.14 17,207.14
20 All Socket Tee PVC Ø 4" Bh 28,000.00 28,000.00 1,207.14 29,207.14
21 Alat Bantu (@ 3 set) Set 150,000.00 150,000.00 2,500.00 152,500.00
L. TONG AIR FIBER
1 Tong Air Vol. 1 M³ Bh 1,650,000.00 1,650,000.00 59,150.00 1,709,150.00
2 Tong Air Vol. 1,6 M³ Bh 2,300,000.00 2,300,000.00 59,150.00 2,359,150.00
3 Tong Air Vol. 2 M³ Bh 2,950,000.00 2,950,000.00 59,150.00 3,009,150.00
4 Bak Air Fiber Sudut ( Untuk WC) Bh 650,000.00 650,000.00 19,716.67 669,716.67
M. INSTALASI LISTRIK
1 Kabel NY 4 x 2.5 mm Rol 1,100,000.00 1,100,000.00 295.75 1,100,295.75
2 Kabel NY 3 x 2.5 mm Rol 850,000.00 850,000.00 295.75 850,295.75
3 Kabel NY 2 x 2.5 mm Rol 675,000.00 675,000.00 295.75 675,295.75
4 Kabel NY 1 x 2.5 mm Rol 580,000.00 580,000.00 295.75 580,295.75
5 Kabel NY 3 x 1.5 mm Rol 600,000.00 600,000.00 295.75 600,295.75
6 Kabel NY 2 x 1.5 mm Rol 500,000.00 500,000.00 295.75 500,295.75
7 Kabel NY 1 x 1.5 mm Rol 400,000.00 400,000.00 295.75 400,295.75
8 Lampu sorot Bh 468,000.00 468,000.00 468,000.00 Harga Brosur
9 Tiang Listrik 7 meter + Lampu sorot Bh 3,450,000.00 3,450,000.00 3,450,000.00 Harga Brosur
10 Box Panel 30x 40 Unit 120,000.00 120,000.00 120,000.00 Harga Brosur

11 Kabel NYFG m 22,050.00 22,050.00 22,050.00 Harga Brosur

N. SAKLAR
1 Saklar Tunggal Bh 20,000.00 20,000.00 18.53 20,018.53
2 Saklar Ganda Bh 25,000.00 25,000.00 18.53 25,018.53
3 Saklar Triple Bh 35,000.00 35,000.00 18.53 35,018.53
O. STOP KONTAK
1 Stop Kontak Bh 17,500.00 17,500.00 37.06 17,537.06
2 Fitting lampu Bh 12,500.00 12,500.00 37.06 12,537.06
3 Bola Lampu Uk. 9 - 11 W Bh 40,000.00 40,000.00 164.31 40,164.31
4 Bola Lampu Uk. 15 - 25 W Bh 55,000.00 55,000.00 164.31 55,164.31
5 Down Light Ø 2,5 " Bh 45,000.00 45,000.00 164.31 45,164.31
6 Down Light Ø 3,5 " Bh 55,000.00 55,000.00 164.31 55,164.31
7 Down Light Ø 4 " Bh 68,000.00 68,000.00 164.31 68,164.31
P. MCB ( STUD )
1 MCB 2 A + BOX Bh 35,000.00 35,000.00 37.06 35,037.06
2 MCB 4 A + BOX Bh 35,000.00 35,000.00 37.06 35,037.06
3 MCB 6 A + BOX Bh 35,000.00 35,000.00 37.06 35,037.06
4 MCB 10 A + BOX Bh 35,000.00 35,000.00 37.06 35,037.06
5 MCB 16 A + BOX Bh 40,000.00 40,000.00 37.06 40,037.06
Q. PAKU SADEL DLL
1 Paku Sadel Beton Bh 12,000.00 12,000.00 7.58 12,007.58
2 Paku Sadel Biasa Bh 5,000.00 5,000.00 7.58 5,007.58
3 Isolasi Bungkus 7,000.00 7,000.00 7.58 7,007.58
4 T - Dus Bh 12,500.00 12,500.00 18.53 12,518.53
5 Klem Sadel Beton Bh 12,000.00 12,000.00 18.53 12,018.53
Harga Paja Mineral Jumlah Ongkos Angkutan Keterangan
Ke Desa (sesuai Jumlah Total
NO. NAMA BARANG SATUAN Dasar Bkn Logam Harga Kg / M¹
dengan desa)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 = (15% x 4) 6 = (4+5) 7 8=6+7 9

NO TENAGA KERJA SATUAN BIAYA UPAH / HARI BIAYA UPAH / JAM KETERANGAN

1 Pekerja Orang / Hari Rp. 93,040.00 13,291.43


2 Tukang Orang / Hari Rp. 93,040.00 13,291.43
3 Tukang gali Orang / Hari Rp. 91,373.00 13,053.29
4 tukang batu Orang / Hari Rp. 91,373.33 13,053.33
5 tukang kayu Orang / Hari Rp. 96,373.33 13,767.62
6 tukang besi/beton Orang / Hari Rp. 94,706.67 13,529.52
7 tukang cat/pelitur Orang / Hari Rp. 89,706.67 12,815.24
8 tukang pipa/operator pompa Orang / Hari Rp. 91,373.33 13,053.33
9 tukang pengayam bronjong Orang / Hari Rp. 96,373.33 13,767.62
10 tukang tebas Orang / Hari Rp. 88,040.00 12,577.14
11 tukang las Orang / Hari Rp. 96,373.33 13,767.62
12 Kepala Tukang Orang / Hari Rp. 99,706.67 14,243.81
13 Mandor Orang / Hari Rp. 99,706.67 14,243.81
14 Operator alat berat Orang / Hari Rp. 98,040.00 14,005.71
15 Pembantu Operator Orang / Hari Rp. 91,373.33 13,053.33
16 Ahli alat berat (Mekanik) Orang / Hari Rp. 103,040.00 14,720.00
17 Pembantu Mekanik Orang / Hari Rp. 91,373.33 13,053.33
18 Supir Personil Orang / Hari Rp. 94,706.67 13,529.52
19 Supir Truck Orang / Hari Rp. 94,706.67 13,529.52
20 Pembantu Supir Orang / Hari Rp. 91,373.33 13,053.33
21 Penjaga Malam Orang / Hari Rp. 83,040.00 11,862.86
22 Juru ukur Orang / Hari Rp. 114,706.67 16,386.67
23 Pembantu juru ukur Orang / Hari Rp. 103,040.00 14,720.00
24 Juru Gambar (drafter) Orang / Hari Rp. 114,706.67 16,386.67
25 Design Engineer Orang / Hari Rp. 134,706.67 19,243.81
26 operator printer/ploter Orang / Hari Rp. 96,373.33 13,767.62