102

0+000
101
Existing ( Rigid ) = +100.23

0.15
100
Beton K - 225

99

ELEVASI (m)
Kedalam Dasar Lantai = +98.08
98

97

DATUM ELEV 96

100.03
100.23

100.04
100.13
100.28
ELEVASI TANAH ASLI

99.22
99.32
(m)
JARAK
8.94m 0.78m 0.76m 0.56m
(m) 0.43m 0.24m
JARAK TOTAL
(m) 11.71m

102
0+025
101 Existing ( Rigid ) = +100.57

0.15
100
Beton K - 225

99
ELEVASI (m)

Kedalam Dasar Lantai = +98.42

98

97

DATUM ELEV 96
100.57

100.29
100.63

100.31
ELEVASI TANAH ASLI

99.43
99.46
(m)
JARAK 8.48m 1.34m 0.88m0.27m
(m) 0.29m 0.13m
JARAK TOTAL 11.40m
(m)

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 100
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Cross Section KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
102
0+050
101 Existing ( Rigid ) = +100.68

0.15
100
Beton K - 225

99

ELEVASI (m)
Kedalam Dasar Lantai = +98.53

98

97

DATUM ELEV 96

100.55
100.68

100.14

100.86
100.70
ELEVASI TANAH ASLI

99.34
99.52
(m)
JARAK 8.94m 1.41m 0.67m 1.49m
(m) 0.18m 0.27m
JARAK TOTAL 12.96m
(m)

102
0+075
101
Existing ( Rigid ) = +99.85
100

0.15
99
ELEVASI (m)

Beton K - 225

98 Kedalam Dasar Lantai = +97.70

97

DATUM ELEV 96

100.13
ELEVASI TANAH ASLI

99.43
98.58
98.62
99.85

99.59
99.87
(m)
JARAK
8.94m 1.05m 0.61m 0.44m
(m) 0.26m 0.30m
JARAK TOTAL
11.60m
(m)

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 100
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Cross Section KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
102
0+100 Existing ( Rigid ) = +100.95
101

0.15
100 Beton K - 225

99 Kedalam Dasar Lantai = +98.80

ELEVASI (m)
98

97

DATUM ELEV 96

100.42
100.95

100.49
101.01
100.93
ELEVASI TANAH ASLI

99.81
99.86
(m)
JARAK
(m) 8.94m 0.85m 0.71m 0.93m
0.44m 0.29m
JARAK TOTAL
12.16m
(m)

102
0+125 Existing ( Rigid ) = +101.05
101

0.15
100 Beton K - 225

Kedalam Dasar Lantai = +98.90


99
ELEVASI (m)

98

97

DATUM ELEV 96

101.11
101.05

101.12
101.04
ELEVASI TANAH ASLI

99.83
99.75
(m)
JARAK 9.12m 0.85m 0.64m
(m) 0.57m 0.44m
JARAK TOTAL
11.61m
(m)

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 100
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Cross Section KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
102
0+150 Existing ( Rigid ) = +101.21

0.15
101
Beton K - 225

100
Kedalam Dasar Lantai = +99.06
99

ELEVASI (m)
98

97

DATUM ELEV 96

101.04

101.08
101.21

101.23
ELEVASI TANAH ASLI

99.77
99.86
(m)
JARAK
8.79m 1.04m 0.61m
(m) 0.65m 0.52m
JARAK TOTAL
(m)

0+164
Existing ( Rigid ) = +101.80
102

0.15
101 Beton K - 225

100 Kedalam Dasar Lantai = +99.65

99
ELEVASI (m)

98

97

DATUM ELEV 96

101.17
100.03
101.80

101.23
101.76

101.56
ELEVASI TANAH ASLI

99.95
(m)
JARAK 11.61m
6.75m 1.85m 0.67m 1.65m
(m) 0.13m 0.35m
JARAK TOTAL
11.40m
(m)

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 100
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Cross Section KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 1400
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN
LAYOUT KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
0+025 0+075
10 10 10 10

8 8 8 8

6 Existing Jalan Existing Median Existing Jalan


6 6 Existing Jalan Existing Median Existing Jalan
6
Galian Tanah Plat Pelayanan Galian Tanah Plat Pelayanan

Existing ( As ) = +4.30 Existing ( As ) = +4.29


4 4 4 4

1.90 M

1.90 M
2 2 2 2
Lantai dasar = +2.40 1 1 Lantai dasar = +2.39 1 1
2 2.50 M 2 2 2.50 M 2

Pancang Galam Ø 15 cm ,L = 3.75 m Pancang Galam Ø 15 cm ,L = 3.75 m


0 Beton K-225 0 0 Beton K-225 0
EXISTING ELEVATIONS EXISTING ELEVATIONS

OFFSET OFFSET

0+000 0+050
10 10 10 10

8 8 8 8

6 Existing Jalan Existing Median Existing Jalan


6 6 Existing Jalan Existing Median Existing Jalan
6
Plat Pelayanan Plat Pelayanan
Galian Tanah Galian Tanah

4 Existing ( As ) = +4.25 4 4 Existing ( As ) = +4.27 4


1.90 M

1.90 M
2 2 2 2
2 Lantai dasar = +2.35 1
2.50 M
1
2 2 Lantai dasar = +2.37 1
2.50 M
1
2

Pancang Galam Ø 15 cm ,L = 3.75 m Pancang Galam Ø 15 cm ,L = 3.75 m


0 Beton K-225 0 0 Beton K-225 0
EXISTING ELEVATIONS EXISTING ELEVATIONS

OFFSET OFFSET

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 200
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Cross Section KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
0+125 0+175
10 10 10 10

8 8 8 8

6 Existing Jalan Existing Median Existing Jalan


6 6 Existing Jalan Existing Median Existing Jalan
6
Galian Tanah Plat Pelayanan Galian Tanah Plat Pelayanan

Existing ( As ) = +4.33 Existing ( As ) = +4.29


4 4 4 4

1.90 M

1.90 M
2 2 2 2
Lantai dasar = +2.43 1 1 Lantai dasar = +2.39 1 1
2 2.50 M 2 2 2.50 M 2

Pancang Galam Ø 15 cm ,L = 3.75 m Pancang Galam Ø 15 cm ,L = 3.75 m


0 Beton K-225 0 0 Beton K-225 0
EXISTING ELEVATIONS EXISTING ELEVATIONS

OFFSET OFFSET

0+100 0+150
10 10 10 10

8 8 8 8

6 Existing Jalan Existing Median Existing Jalan


6 6 Existing Jalan Existing Median Existing Jalan
6
Plat Pelayanan Plat Pelayanan
Galian Tanah Galian Tanah

4 Existing ( As ) = +4.26 4 4 Existing ( As ) = +4.25 4


1.90 M

1.90 M
2 2 2 2
2 Lantai dasar = +2.36 1
2.50 M
1
2 2 Lantai dasar = +2.35 1
2.50 M
1
2

Pancang Galam Ø 15 cm ,L = 3.75 m Pancang Galam Ø 15 cm ,L = 3.75 m


0 Beton K-225 0 0 Beton K-225 0
EXISTING ELEVATIONS EXISTING ELEVATIONS

OFFSET OFFSET

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 200
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Cross Section KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
0+225
10 10

8 8

6 Existing Jalan Existing Median Existing Jalan


6
Galian Tanah Plat Pelayanan

Existing ( As ) = +4.30
4 4

1.90 M
2 2
Lantai dasar = +2.40 1 1
2 2.50 M 2

Pancang Galam Ø 15 cm ,L = 3.75 m


0 Beton K-225 0
EXISTING ELEVATIONS

OFFSET

0+200 0+240
10 10 10 10

8 8 8 8

6 Existing Jalan Existing Median Existing Jalan


6 6 Existing Jalan Existing Median Existing Jalan
6
Plat Pelayanan Plat Pelayanan
Galian Tanah Galian Tanah

4 Existing ( As ) = +4.27 4 4 Existing ( As ) = +4.25 4


1.90 M

1.90 M
2 2 2 2
2 Lantai dasar = +2.37 1
2.50 M
1
2 2 Lantai dasar = +2.35 1
2.50 M
1
2

Pancang Galam Ø 15 cm ,L = 3.75 m Pancang Galam Ø 15 cm ,L = 3.75 m


0 Beton K-225 0 0 Beton K-225 0
EXISTING ELEVATIONS EXISTING ELEVATIONS

OFFSET OFFSET

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO 1 : 200
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Cross Section KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
6 D 10 - 150 (F)
0.60
D 13 - 150 (C) D 13 - 150 (C) D 13 - 150 (A)
1.30 1.30

Ø 10 - 200 (E)
Beton K-225 0.70

D 13 - 150 (D)
D 13 - 150 (B)
1 Ø 10 (E) Ø 10 - 200 (E)
0.20 0.20 0.20

0.25 0.25 0.25

0.25 0.20 1.60 0.20 0.25


0.25 0.20 1.60 0.20 0.25 D 13 - 150 (A)
2.50
2.50

SALURAN BENTANG 2.5 m PEMBESIAN SALURAN BENTANG 2.5 m

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM 1 : 20
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Type Precest KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
0.25 0.20 1.60 0.20 0.25

2.50

1.30
Beton K-225

0.20

0.25

Kayu Galam Ø 15 cm , L = 3.75 m

Pancang Kayu Galam Ø 15 cm , L = 3.75 m

1.13 1.13
TYPICAL SALURAN BENTANG 2.5 m

PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM 1 : 20
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Typecal Precest KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI
Beton K-225 / Pelat Pelayanan

Beton K-225 / Pelat Pelayanan

2.50
2.50 D 13 - 150
0.15
0.15
D 13 - 150

Ø 10 - 200

1.30
1.30

Beton K-225
Beton K-225

0.20
0.20

0.25
0.25

0.25 0.20 1.60 0.20 0.25


0.25 0.20 1.60 0.20 0.25
2.50
2.50

PEMBESIAN PLAT PELAYANAN

1.00

0.15 2.50

PLAT PELAYANAN
PROGRAM DIAJUKAN OLEH : DIPERIKSA OLEH : CATATAN : JUDUL GAMBAR SKALA NO. LEMBAR
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
PENGENDALIAN BANJIR SISTEM LOA JANAN DAN RAPAK DALAM 1 : 20
DINAS PEKERJAAN UMUM CV. ANQI JAYA PT. ARISTA GEMILANG KONSULINDO
PENATAAN RUANG DAN PERUMAHAN RAKYAT
PROVINSI KALIMANTAN TIMUR
BIDANG SUMBER DAYA AIR
KEGIATAN Plat Layanan KODE JUMLAH LEMBAR
KEGIATAN MENGENDALIKAN BANJIR PADA DAERAH
Jln. Tengkawang No. 01 Telp ( 0541 ) 275666-275777-276243 Fax.No. ( 0541 ) 275522-276243 TANGKAPAN PURNOMO RUSLAN, ST NASRUL HADI, ST
SITE MANAGER SITE ENGINEER SHOP DRAWING
AIR DAN BADAN-BADAN SUNGAI