KOP PERUSAHAAN

DAFTAR KUANTITAS DAN HARGA


PEKERJAAN : BELANJA BAHAN BAKU BANGUNAN
KEGIATAN : PEMBERIAN STIMULAN PEMBANGUNAN DESA

HARGA SATUAN JUMLAH HARGA


No. URAIAN VOLUME SATUAN
(Rp) (Rp)

DESA MADUREJO KEC. PURING

I TENAGA
-
JUMLAH TENAGA -
II MATERIAL/BAHAN
1 Sirtu 162.25 m3 -
2 Batu Kali 360.88 m3 -
3 Semen (PC) 50 kg 1,086.00 zak -
4 Pasir Pasang (Sedang) 156.91 m3 -

JUMLAH MATERIAL/BAHAN -
III PERALATAN
-
JUMLAH PERALATAN -
JUMLAH TOTAL DESA MADUREJO -
DESA SIDOMUKTI KEC. KUWARASAN

I TENAGA
-
JUMLAH TENAGA -
II MATERIAL/BAHAN
1 Semen (PC) 50 kg 1,682.00 zak -
2 Pasir Beton (Kasar) 130.16 m3 -
3 Agregat Kasar 233.68 m3 -

JUMLAH MATERIAL/BAHAN -
III PERALATAN
-
JUMLAH PERALATAN -
JUMLAH TOTAL DESA SIDOMUKTI -
DESA SAMPANG KEC. SEMPOR

I TENAGA
-
JUMLAH TENAGA -
II MATERIAL/BAHAN
1 Semen (PC) 50 kg 1,283.00 zak -
2 Pasir Pasang (Sedang) 94.95 m3 -
3 Agregat Kasar 254.39 m3 -
4 Agregat Halus 15.00 m3 -
5 Baja Tulangan Polos U 24 1,804.00 kg -
6 Kawat Beton/Bendrat 8.00 kg -
7 Kayu Perancah 3.00 m3 -
8 Paku 94.60 kg -

JUMLAH MATERIAL/BAHAN -
III PERALATAN
1 Conc. Mixer - Jam -
2 Ember cor 160.00 bh -
JUMLAH PERALATAN -
JUMLAH TOTAL DESA SAMPANG -
TOTAL JUMLAH DESA MADUREJO+SIDOMUKTI+SAMPANG -
PAJAK (PPN) 10% -
JUMLAH TOTAL -
DIBULATKAN -

...................., .......................... 2018

Penawar,
PT / CV ..................................................

Tanda Tangan dan Cap Perusahaan

.......................................................
HARGA SATUAN JUMLAH HARGA
No. URAIAN VOLUME SATUAN
(Rp) (Rp)

Direktur / Direktris
KOP PERUSAHAAN

DAFTAR KUANTITAS DAN HARGA

KEGIATAN : Kegiatan Pembangunan Baru Rumah Layak Huni Prioritas di Kabupaten Gunung Kidul
PEKERJAAN : Belanja Bahan Bangunan Pembangunan Baru Rumah Layak Huni Prioritas di Kabupaten Gunung Kidul
TAHUN ANGGARAN : 2020

HARGA SATUAN
No. URAIAN VOLUME SATUAN
(Rp)

I MATERIAL/BAHAN
1 Pasir Progo/Merapi 2,343.00 M3 245,000
2 Split 371.00 M3 250,000
3 Semen 40 Kg 9,934.00 zak 44,000
4 Batako 329,440.00 bh 2,500
5 Batu Bata 8,000.00 bh 750
6 Besi 12 1,732.00 btg 110,000
7 Besi 10 6,934.00 btg 85,000
8 Besi 6 351.00 btg 45,000
9 Begel 4,134.00 kg 21,000
10 Bendrat 1,927.00 kg 21,000
11 Paku Usuk 1,685.46 kg 21,000
12 Paku Reng Kayu 1,718.01 kg 20,000
13 Benang 516.00 rol 15,000
14 Papan Begesting 2,446.00 lbr 8,000
15 Kayu Gording 8cmx12cmx4m Glugu Super 909.00 btg 60,000
16 Kayu (6cmx12cmx2m) Glugu Super 65.00 btg 55,000
17 Kayu Reng Kruing 2/3 10,600.00 m 9,500
18 Kayu Usuk Kruing 5/7 14,626.00 m 9,500
19 Genteng Godean 324,325.00 bh 1,900
20 Bubungan Tanah Liat 5,290.00 bh 4,500
21 Kusen Pintu Akasia 80x200 110.00 bh 550,000
22 Kusen Jendela Akasia 120x50 96.00 bh 450,000
23 Daun Pintu Akasia 102.00 bh 550,000
24 Daun Jendela Akasia 87.00 bh 450,000
JUMLAH MATERIAL
PAJAK (PPN) 10%
JUMLAH TOTAL
DIBULATKAN
Terbilang : Empat Milyar Empat Ratus Sembilan puluh Sembilan Juta Dua Ratus Sembilan Puluh Ribu Rupiah

KEDIRI, 24 Juni 2020

Penawar,
CV BANGUN CIPTA SARANA

HERU PRASETYO HADI


Direktur
abupaten Gunung Kidul
uni Prioritas di Kabupaten Gunung Kidul

JUMLAH HARGA (Rp)

574,035,000.00
92,750,000.00
437,096,000.00
823,600,000.00
6,000,000.00
190,520,000.00
589,390,000.00
15,795,000.00
86,814,000.00
40,467,000.00
35,394,660.00
34,360,200.00
7,740,000.00
19,568,000.00
54,540,000.00
3,575,000.00
100,700,000.00
138,947,000.00
616,217,500.00
23,805,000.00
60,500,000.00
43,200,000.00
56,100,000.00
39,150,000.00
4,090,264,360.00
409,026,436.00
4,499,290,796.00
4,499,290,000.00
Puluh Ribu Rupiah

, 24 Juni 2020

UN CIPTA SARANA

RASETYO HADI