Anda di halaman 1dari 1

Bobot

Mingu Ke Keterangan
No Uraian Pekerjaan Pekerjaan
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1.17
A PEKERJAAN PERSIAPAN 1.173 100.00
0.59
PEKERJAAN TANAH DAN 2.032 2.032 2.032 2.032 2.032 2.032
B 12.192
PONDASI 1.016 1.016 1.016 1.016 1.016 1.016
1.447 1.447 1.447 1.447 1.447
C PEKERJAAN STRUKTUR BETON 7.235 80.00
0.724 0.724 0.724 0.724 0.724
1.49 1.49 1.49 1.49
D PEKERJAAN LANTAI 5.954
0.74 0.74 0.74 0.74
PEKERJAAN DINDING DAN 3.11 3.11 3.11 3.11 3.11 3.11 3.11
3.11
E 24.840 60.00
PLAFOND 1.55 1.55 1.55 1.55 1.55 1.55 1.55
1.55
3.881 3.881 3.881 3.881 3.881 3.881
3.881 3.881 100.00
F PEKERJAAN ATAP 31.052
1.941 1.941 1.941 1.941 1.941 1.941
1.941 1.941
2.47 2.47 2.47
2.47 80.00
G PEKERJAAN KUSEN DAN PJV 9.864 40.00
1.23 1.23 1.23
1.23
1.76 1.76 1.76 60.00
H PEKERJAAN PENGECATAN 5.280
0.88 0.88 0.8799
0.455 0.46 0.46 40.00
I PEKERJAAN INSTALASI LISTRIK 1.366 20.00
0.228 0.228 0.228
20.00
0.522 0.522
J PEKERJAAN SANITAIR 1.044
0.261 0.261 0.00
Total 100.00 0.00
Persen Pekerjaan Mingguan 3.20 3.48 3.48 2.76 4.97 8.07 8.48 8.48 6.99 9.45 9.91 10.43 12.19 5.64 1.76
Persen Komulatif Mingguan 3.20 6.68 10.16 12.92 17.89 25.96 34.43 42.91 49.90 59.35 69.26 79.69 91.88 97.52 100.00
Persen Realisasi Mingguan 1.60 1.74 1.74 1.74 2.48 4.04 4.24 4.24 3.49 4.73 4.95 5.21 6.09 2.821 0.8799
Persen Realisasi Komulatif Mingguan 1.60 3.34 5.08 6.82 9.30 13.34 17.58 21.82 25.31 30.04 34.99 40.20 46.30 49.12 50.00