Log Bor Litbang
Log Bor Litbang
Lokasi Titik Bor (BH), Titik Sondir (S) dan Pengambilan Contoh Tanah (TP; Test Pit) di
Kecamatan Wonokero, Pekalongan
2) BH 2 : 6°51´10.1” S
109°37´19.1” E
3) BH 3 : 6°51´44.51” S
109°36´51.10” E
Hasil pengeboran 3 (tiga) titik bor BH-1 s/d BH-3 digambarkan dalam
log bor sebagai berikut :
LOG BOR
LOKASI Koor dinat NO. BOR : SKALA
Penyelidikan Geologi Teknik
PROYEK Wonoke r to 60 51'35.43" S BH - 1 1 : 100
Desain Ta nggul Pe k alongan 1090 38'45.74" E
S IM B O L T A N A H / B A T U A N
Kem ir ingan : Vertikal
Tgl. M ulai : 20-09-2016 M es in Pom pa : Sanchin lubang bor : 76 mm Tgl. Pemotretan : 23-24 Sept 2016
M U K A A IR T A N A H ( M )
Tgl. Sele s ai : 24-09-2016 Jur u Bor : Edi Sriyyono Pem e r ian Ole h : Sutanto Contoh Dis im pan di : Pus air
P a n ja n g L a p is a n ( M )
M e s in Bor : Acker M etoda : Putar Dipe riks a Ole h : Iw an Prasetya Ele vas i : -
INTI Y ANG AIR PEMERIAN HASIL PENGUJIAN LAPANGA N
K E D A L A M A N (M )
PMB ( RQ D ) %
TERA MBIL PEMBILA S Tanah berkohesi:, nama, w arna, konsistensi, TEST AIR S PT GRAFIK
P A N J A N G (M )
L U B A N G ( c m )
Y G KELUAR kelulusan JUMLA H
N (N 2 +N 3)
K ( c m /d e t)
BO R ( cm )
Tanah tak berkohes i, Nama, Warna, kebundaran TUMBUKA N SPT (N2+N3)
TAN G G AL
L u ( l/ m / m in
keterpilahan,kepadatan relatif , kelulusan
W ARN A
N -1
N -2
N -3
Batu, Nama, Warna,Besar Butir,Teks tur, Pelapukan
C AR A
( % )
( % )
( % )
Diskontinuitas, kekuatan,kelulus an
10
20
30
40
50
60
0
0 .0 0 0.5 Tanah penutup, lunak
1 100
1.0 0
4 .3 2 E - 0 4
1 100
2 .0 0
0 .4
100
UDS 2.73
3 .0 0
SP T 5.3 Lempung, abu-abu kecoklatan, lunak 1 1 1 2
2 0 -0 4 9 -2 0 1 6
100
0 .6
4 .0 0
1 100
5 .0 0
1 100
6 .0 0
SP T 3 3 2 5
3 .1 3 E - 0 4
100
0 .6
7 .0 0
1 100
8 .0 0
1 100
9 .0 0
SP T 1 1 2 3
100
UDS
10 .0 0 Pasir lempungan, abu-abu, uk. butir pasir
9.0
1 100 halus
11.0 0
3 .2 4 .E - 0 5
1 100
12 .0 0
SP T 4 5 5 10
100
0 .6
13 .0 0
1 100
14 .0 0
2 1-0 9-20 1 6
1 100
15 .0 0
SP T 1 1 1 2
100
0 .6
16 .0 0
2 .4 2 E 1 0 - 3
10 0 100
17 .0 0
10 0 100
18 .0 0
SP T 3 4 4 8
100
0 .6
19 .0 0
1 100
21.0 0
SP T 1 1 2 3
3 .4 E 1 0 - 3
100
0 .6
2 2 .00 P
u
1 100
t
C
2 3 .00 i O
1 100 h N
S
2 4 .00 T
SP T K 8 14 18 32
A
100 e
7 .6
7 .3
0 .6 N
2 2 -0 9 -2 0 1 6
2 5 .00
c D
o
1 100 k H
E
2 6 .00 l A
2 .8 7 .E - 0 3
1 100 a D
t
2 7 .00 a
SP T 8 16 19 35
100 n
0 .6
2 8 .00
1 100
2 9 .00 8.00 Pasir tufaan, coklat, urai
DS
100
50
3 0 .00
SP T 7 18 19 37
100
0 .6
31.0 0
2 .0 5 .E - 0 4
1 100
3 2 .00
1 100
3 3 .00
SP T 8 17 18 35
100
0 .6
3 4 .00
2 3 -0 9 -2 0 1 6
1 100
3 5 .00 5.0 Lanau, abu-abu tua, padat
1 100
3 6 .00
SP T 8 17 18 35
2 .8 7 .E - 0 4
100
0 .6
3 7 .00
1 100
3 8 .00
1 100
3 9 .00
SP T 7 14 17 31
100
0 .6
4 0 .00
1 100
41.0 0
5 .3 8 .E - 0 4
1 100
4 2 .00
SP T 10.0 Batupasir sedang, abu-abu kecoklatan, urai 5 10 16 26
100
0 .6
4 3 .00
2 4 -0 9 -2 0 1 6
1 100
4 4 .00
1 100
4 5 .00
SP T 7 14 17 31
100
0 .6
4 6 .00
6 .1 5 .E - 0 4
1 100
4 7 .00
1 100
4 8 .00
SP T 6 7 9 16
0 .6
100 3.0 Batupasir kasar, abu-abu, urai
4 9 .00
1 100
5 0 .00
LOG BOR
LOKASI Koordinat NO. BOR SKALA
Penyelidikan Geologi T eknik Wonok er to 60 51’ 10.19" S 1 : 100
PROYEK Pek alongan 1090 37’ 19.1" E BH-2
De sain Tanggul
Kem iringan : V ertikal
S IM B O L T A N A H / B A T U A N
Tgl. Mulai :5/10/2016 M e sin Pom pa : Sanchin lubang bor : 76 mm Tgl. Pemotretan : 6 - 9 Ok t 2016
Tgl. Se le sai 9/10/2016 Juru Bor : Edi Sriyono Pem e r ian Oleh : Sutanto Contoh Disim pan di : Pus air
M U K A A IR T A N A H ( M )
M es in Bor : A cker M e toda : Putar Dipe rik sa Oleh : Iw an Prasetya Elevas i : -
P a n ja n g L a p is a n ( M )
INTI Y ANG A IR PEMERIAN HASIL PENGUJIA N LAPANGAN
K E D A LA M A N (M )
TERA MBIL PEMBILA S Tanah berkohesi:, nama, w arna, konsistensi, TEST AIR S PT GRA FIK
PM B ( R Q D ) %
P A N J A N G (M )
N (N 2+N 3)
TUMBUKA N
K ( c m /d e t)
Tanah tak berkohesi, Nama, Warna, kebundaran SPT (N2+N3)
BO R ( cm )
TANG G AL
L u ( l/ m / m in
LU B A N G
keterpilahan,kepadatan relatif , kelulusan
W ARNA
N -1
N -2
N -3
Batu, Nama, Warna,Besar Butir,Tekstur, Pelapukan
C AR A
( % )
( % )
( % )
Diskontinuitas, kekuatan,kelulusan
10
20
30
40
50
60
0
0 .00 Tanah penutup
10 0 100 1.00
lem pung,coklat,lunak
1.0 0
1 .5 5 E - 0 4
10 0 100
2 .00
50 100
UDS
100
3 .00 4.00 Lem pung lanauan, abu-abu kecoklatan, lunak
45 1 2 1 3
4 .00
15 5 100
5 .00
5 - O c t- 1 6
10 0 100
6 .00
SP T 45
Pas ir lanauan, abu-abu s am pai kecoklatan, 2 3 5 8
1 .4 7 E - 0 5
lunak
7 .00
15 5 100
8 .00
10 0 100
9 .00 0 0 1 1
SP T 45
55 100
10 .00
Lem pung lanauan, abu-abu lunak
15 0 100 11.70
11.00
3 .8 3 .E - 0 5
UDS 50
12 .00
SP T 45 2 3 3 6
13 .00
15 5 100
14 .00
10 0 100
A bu-abu
15 .00 0 1 2 3
SP T 45
16 .00
15 5 100
8 .0 3 .E - 0 5
0 6 O k to b e r 2 0 1 6
19 .00
15 5 100
20.0 0 0.90
10 0 100
2 1.00
SP T 45 3 4 8 12
22.0 0
15 5 100
23.0 0
10 0 100
7 .6
7 .3
24.0 0
SP T 45 2 4 8 12
55 100
25.0 0
10.50 Lanau, abu-abu, terdapat hum us (s is a kayu),
0 7 O k to b e r 2 0 1 6
10 0 100
27.0 0
SP T 45 9 16 24 40
28.0 0
15 5 100
29.0 0
10 0 100
30.0 0 10 18 24 40
SP T 45
7 - O c t- 1 6
3 1.00 2.1
15 5 100
1 .3 1 E - 0 4
32.0 0
10 0 100
33.0 0
SP T 45 50 >55
34.0 0 13 6 100
10 0 100
36.0 0 7.7
SP T 45 P 50 >55
6 .2 5 E - 0 5
u
37.0 0 13 6 100 t
i
h
38.0 0
15 0 100
K
e
39.0 0 SP T 45 14 20 32 52
c
55 100
o
40.0 0 k
l
10 0 100
a
4 1.00 t
0 .0 0 - 4 0 0 6 8 9
10 0 100 a
n
42.0 0
10 0 100
9 - O c t- 1 6
43.0 0
10 0 100
8.2 Batupas ir s elang-s eling batulanau, uk.butir
44.0 0
pas ir s edang, keras
10 0 100
45.0 0
10 0 100
46.0 0
10 0 100
47.0 0
10 0 100
48.0 0
LOG BOR
LOKASI Koordinat NO. BOR SKALA
Penyelidikan Geologi Teknik Wonok er to 60 51’ 44.51" S 1 : 100
PROYEK Pe kalongan 1090 36’ 51.1" E BH-3
Desain Tanggul
Ke m ir ingan : Vertikal
S IM B O L T A N A H / B A T U A N
Tgl. M ulai :27/10/2016 Me s in Pom pa : Sanchin lubang bor : 76 mm Tgl. Pemotretan : 28 Sept s/d 2 Okt 2016
Tgl. Sele s ai 10/3/2016 Jur u Bor : Edi Sriy ono Pe m er ian Oleh : Sutanto Contoh Disim pan di : PUSAIR
M U K A A IR T A N A H ( M )
Me s in Bor : acker Me toda : Putar Dipe rik sa Oleh : Iw an Prasetya Ele vasi : -
P a n ja n g L a p is a n ( M )
INTI YANG AIR PEMERIAN HASIL PENGUJIAN LAPANGAN
K E D A L A M A N (M )
TERAMBIL PEMBILAS Tanah berkohesi:, nama, w arna, konsistensi, TEST AIR S PT GRAFIK
PMB ( RQ D ) %
P A N J A N G (M )
N (N 2 + N 3 )
K ( c m / d e t)
Tanah tak berkohesi, Nama, Warna, kebundaran TUMBUKAN SPT (N2+N3)
BO R ( cm )
TANG G AL
L u ( l/m /m in
L U B A N G
keterpilahan,kepadatan relatif, kelulusan
W ARNA
N -2
N -1
N -3
Batu, Nama, Warna,Besar Butir,Tekstur, Pelapukan
C AR A
( % )
( % )
( % )
Diskontinuitas, kekuatan,kelulusan
10
20
30
40
50
60
0
0.00 Tanah penutup
100 100
lempung,coklat,lunak
1.00
1 .5 5 E - 0 3
100 100
2.00
50 100
5.00
UDS 50
3.00
SP T 45 2 6 2 8
2 7 -S e p -1 6
4.00
155 100
5.00
100 100
6.00
SP T 45 0 0 0 1
1 .4 7 E - 0 5
7.00
155 100
8.00
100 100
9.00 0 1 1 2
SP T 45
55 100
10.00
150 100
11.70
11.00
3 .8 3 .E - 0 5
UDS 50
12.00 0 1 1 2
SP T 45
13.00
155 100
Lanau pas iran, abu-abu, lunak, bagian baw ah
14.00 A terdapat sisa kayu
100 100 B
U
15.00 SP T 45
- 0 1 1 2
A
2 8 -S e p -1 6
B
16.00 U
155 100
8 .0 3 .E - 0 5
17.00
50 100
50 100
18.00 2.80
SP T 45 1 1 1 2
19.00
155 100
20.00 0.90
100 100
21.00
SP T 45 1 1 2 3
22.00
155 100
0 1 O k t o b e r 2 0 1 6 3 0 S e p te m b e r 2 0 1 6
23.00
100 100
24.00
SP T 45 5 8 13 21
55 100
25.00
10.50
155 100
26.00
100 100
8 .0 7 .E - 0 5
27.00
SP T 45 8 16 18 34
28.00
155 100
29.00
100 100
30.00
32.00
6 .4 6 E - 0 5
1 - O c t- 1 6
100 100
33.00
SP T 45
7 15 20 35
34.00
155 100
35.00
100 100
36.00
7.7
SP T 45
6 14 21 35
3 .2 3 E - 0 5
37.00
155 100 P
u
38.00 t Batupasir, abu-abu, uk.butir pasir halus - sedang,
i padat
100 100
h
39.00
SP T 45
K 7 15 23 38
55 100
40.00 e
c
100 100 o
41.00
k
100 100
l
a
4 .6 1 .E - 0 5
42.00
SP T 45 t
2 - O c t- 1 6
a 9 18 26 44
43.00 n
155 100
44.00 8.2
100 100
45.00
SP T 45
7 8 10 18
46.00
155 100
5 .0 5 .E - 0 5
47.00
100 100
48.00
100 100
49.00 2
100 100
50.00