Anda di halaman 1dari 17

REKAPITULASI INVOICE

Pekerjaan : Supervisi Pembangunan Infrastruktur Permukiman Kumuh Kawasan Gampong Lhok Banie Kota Langsa Nomor DIPA Revisi 1 : 033.05.1.486479/2015
No. Kontrak : HK.02.03/98.12/PKP-15/PKP/KONT/V/2015 Tanggal : 16 April 2015
Tanggal Kontrak : 25 Mei 2015 Kode Satker : 486479
Nilai Kontrak : Rp. 383.100.000,- Tahun Anggaran : 2015
Sumber Dana : APBN Murni Invoice No : 07
Lokasi : Kota Langsa Periode : 22 Nop s/d 20 Des 2015

INVOICE S/D INVOICE INVOICE S/D BOBOT


BIAYA KONTRAK
NO. URAIAN BULAN LALU BULAN INI BULAN INI PEKERJAAN
(Rp)
(RP) (RP) (RP) (%)

A. BIAYA LANGSUNG PERSONIL 272,300,000.00 233,400,000.00 38,900,000.00 272,300,000.00 78.18

B. BIAYA LANGSUNG NON PERSONIL 76,000,000.00 64,200,000.00 11,800,000.00 76,000,000.00 21.82

C Jumlah Rekapitulasi Biaya Invoice 348,300,000.00 297,600,000.00 50,700,000.00 348,300,000.00 100.00


D Pajak Pertambahan Nilai (PPN 10 %) 34,830,000.00 29,760,000.00 5,070,000.00 34,830,000.00
E Jumlah Bruto Invoice s/d Bulan Ini (C + D) 383,130,000.00 327,360,000.00 55,770,000.00 383,130,000.00
F Dibulatkan 383,100,000.00 327,360,000.00 55,770,000.00 383,100,000.00
POTONGAN
G Jumlah Invoice s/d Bulan Lalu (Komulatif) 327,360,000.00
H Pengembalian Uang Muka (20% x F) 11,154,000.00
I Jumlah Potongan Invoice Bulan ini (G + H ) 338,514,000.00
J Jumlah Bersih Invoice Bulan ini (F - I) 44,586,000.00

Terbilang : Empat Puluh Empat Juta Lima Ratus Delapan Puluh Lima Ribu Sembilan Ratus Sembilan Puluh Sembilan Rupiah

Sampai dengan bulan ini 100.00


Persentase Realisasi Sampai dengan bulan lalu 85.44
Bulan ini 14.56

Disetujui Oeh : Diajukan Oleh :


Pejabat Pembuat Komitmen CV. CEUDAH CONSULTANT
Pengembangan Kawasan Permukiman
Satker Pengembangan Kawasan Permukiman
Dan Penataan Bangunan Provinsi Aceh

T. DAVIS F. HAMID, ST., MT M. ZANIR, ST


Nip. 19771106 200701 1 002 Direktur
SUPERVISI PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN KUMUH KAWASAN GAMPONG LHOK BANIE, KOTA LANGSA

I. BIAYA LANGSUNG PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. NAMA POSISI VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. TENAGA AHLI
1 Idris, ST Site Engineer 1.00 x 7.00 Org/Bln 12,000,000.00 84,000,000.00 6.00 72,000,000.00 1.00 12,000,000.00 7.00 84,000,000.00
2 Sabuddin Rahmatullah, ST Chief Inspector 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 6.00 51,000,000.00 1.00 8,500,000.00 7.00 59,500,000.00
3 Teuku Yafisham, ST Quality Engineer 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 6.00 51,000,000.00 1.00 8,500,000.00 7.00 59,500,000.00

B. TENAGA SUB PROFESIONAL


1 Muhammad Herka, ST Inspector 1 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 6.00 22,200,000.00 1.00 3,700,000.00 7.00 25,900,000.00
2 Miksalmina, ST Inspector 2 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 6.00 22,200,000.00 1.00 3,700,000.00 7.00 25,900,000.00

C. TENAGA PENDUKUNG
1 Fitriah, ST Adm/Op. Komputer 1.00 x 7.00 Org/Bln 2,500,000.00 17,500,000.00 6.00 15,000,000.00 1.00 2,500,000.00 7.00 17,500,000.00

TOTAL BIAYA LANGSUNG PERSONIL 272,300,000 233,400,000 38,900,000 272,300,000

II. BIAYA LANGSUNG NON PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. BIAYA LAPANGAN
1 Sewa Roda 2 + BBM 1 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 6.00 5,400,000.00 1.00 900,000.00 7.00 6,300,000.00
2 Sewa Roda 2 + BBM 2 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 6.00 5,400,000.00 1.00 900,000.00 7.00 6,300,000.00
3 Sewa Roda 4 + BBM 1.00 x 7.00 Unit/Bln 5,500,000.00 38,500,000.00 6.00 33,000,000.00 1.00 5,500,000.00 7.00 38,500,000.00

B. BIAYA OPERASIONAL KANTOR


1 ATK, Suplies Komputer dan Fotocopy 7.00 Bln 1,500,000.00 10,500,000.00 6.00 9,000,000.00 1.00 1,500,000.00 7.00 10,500,000.00
2 Biaya Komunikasi 7.00 Bln 500,000.00 3,500,000.00 6.00 3,000,000.00 1.00 500,000.00 7.00 3,500,000.00

C. BIAYA PEMBUATAN LAPORAN


1 Laporan Mingguan 5.0 x 28.0 Exp/Mgg 40,000.00 5,600,000.00 120.00 4,800,000.00 20.00 800,000.00 140.00 5,600,000.00
2 Laporan Bulanan 5.0 x 7.0 Exp/Bln 120,000.00 4,200,000.00 30.00 3,600,000.00 5.00 600,000.00 35.00 4,200,000.00
3 Laporan Akhir (0%, 50%, 100%) 5.00 Exp 200,000.00 1,000,000.00 - - 5.00 1,000,000.00 5.00 1,000,000.00
4 CD Dokumentasi 5.00 Keping 20,000.00 100,000.00 - - 5.00 100,000.00 5.00 100,000.00

TOTAL BIAYA LANGSUNG NON PERSONIL 76,000,000 64,200,000 11,800,000 76,000,000


REKAPITULASI INVOICE

Pekerjaan : Supervisi Pembangunan Infrastruktur Permukiman Kumuh Kawasan Gampong Lhok Banie Kota Langsa Nomor DIPA Revisi 1 : 033.05.1.486479/2015
No. Kontrak : HK.02.03/98.12/PKP-15/PKP/KONT/V/2015 Tanggal : 16 April 2015
Tanggal Kontrak : 25 Mei 2015 Kode Satker : 486479
Nilai Kontrak : Rp. 383.100.000,- Tahun Anggaran : 2015
Sumber Dana : APBN Murni Invoice No : 06
Lokasi : Kota Langsa Periode : 23 Okt s/d 21 Nop 2015

INVOICE S/D INVOICE INVOICE S/D BOBOT


BIAYA KONTRAK
NO. URAIAN BULAN LALU BULAN INI BULAN INI PEKERJAAN
(Rp)
(RP) (RP) (RP) (%)

A. BIAYA LANGSUNG PERSONIL 272,300,000.00 194,500,000.00 38,900,000.00 233,400,000.00 67.01

B. BIAYA LANGSUNG NON PERSONIL 76,000,000.00 53,500,000.00 10,700,000.00 64,200,000.00 18.43

C Jumlah Rekapitulasi Biaya Invoice 348,300,000.00 248,000,000.00 49,600,000.00 297,600,000.00 85.44


D Pajak Pertambahan Nilai (PPN 10 %) 34,830,000.00 24,800,000.00 4,960,000.00 29,760,000.00
E Jumlah Bruto Invoice s/d Bulan Ini (C + D) 383,130,000.00 272,800,000.00 54,560,000.00 327,360,000.00
F Dibulatkan 383,100,000.00 272,800,000.00 54,560,000.00 327,360,000.00
POTONGAN
G Jumlah Invoice s/d Bulan Lalu (Komulatif) 272,800,000.00
H Pengembalian Uang Muka (20% x F) 10,912,000.00
I Jumlah Potongan Invoice Bulan ini (G + H ) 283,712,000.00
J Jumlah Bersih Invoice Bulan ini (F - I) 43,648,000.00

Terbilang : Empat Puluh Tiga Juta Enam Ratus Empat Puluh Delapan Ribu Rupiah

Sampai dengan bulan ini 85.44


Persentase Realisasi Sampai dengan bulan lalu 71.20
Bulan ini 14.24

Disetujui Oeh : Diajukan Oleh :


Pejabat Pembuat Komitmen CV. CEUDAH CONSULTANT
Pengembangan Kawasan Permukiman
Satker Pengembangan Kawasan Permukiman
Dan Penataan Bangunan Provinsi Aceh

T. DAVIS F. HAMID, ST., MT M. ZANIR, ST


Nip. 19771106 200701 1 002 Direktur
SUPERVISI PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN KUMUH KAWASAN GAMPONG LHOK BANIE, KOTA LANGSA

I. BIAYA LANGSUNG PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. NAMA POSISI VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. TENAGA AHLI
1 Idris, ST Site Engineer 1.00 x 7.00 Org/Bln 12,000,000.00 84,000,000.00 5.00 60,000,000.00 1.00 12,000,000.00 6.00 72,000,000.00
2 Sabuddin Rahmatullah, ST Chief Inspector 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 5.00 42,500,000.00 1.00 8,500,000.00 6.00 51,000,000.00
3 Teuku Yafisham, ST Quality Engineer 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 5.00 42,500,000.00 1.00 8,500,000.00 6.00 51,000,000.00

B. TENAGA SUB PROFESIONAL


1 Muhammad Herka, ST Inspector 1 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 5.00 18,500,000.00 1.00 3,700,000.00 6.00 22,200,000.00
2 Miksalmina, ST Inspector 2 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 5.00 18,500,000.00 1.00 3,700,000.00 6.00 22,200,000.00

C. TENAGA PENDUKUNG
1 Fitriah, ST Adm/Op. Komputer 1.00 x 7.00 Org/Bln 2,500,000.00 17,500,000.00 5.00 12,500,000.00 1.00 2,500,000.00 6.00 15,000,000.00

TOTAL BIAYA LANGSUNG PERSONIL 272,300,000 194,500,000 38,900,000 233,400,000

II. BIAYA LANGSUNG NON PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. BIAYA LAPANGAN
1 Sewa Roda 2 + BBM 1 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 5.00 4,500,000.00 1.00 900,000.00 6.00 5,400,000.00
2 Sewa Roda 2 + BBM 2 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 5.00 4,500,000.00 1.00 900,000.00 6.00 5,400,000.00
3 Sewa Roda 4 + BBM 1.00 x 7.00 Unit/Bln 5,500,000.00 38,500,000.00 5.00 27,500,000.00 1.00 5,500,000.00 6.00 33,000,000.00

B. BIAYA OPERASIONAL KANTOR


1 ATK, Suplies Komputer dan Fotocopy 7.00 Bln 1,500,000.00 10,500,000.00 5.00 7,500,000.00 1.00 1,500,000.00 6.00 9,000,000.00
2 Biaya Komunikasi 7.00 Bln 500,000.00 3,500,000.00 5.00 2,500,000.00 1.00 500,000.00 6.00 3,000,000.00

C. BIAYA PEMBUATAN LAPORAN


1 Laporan Mingguan 5.0 x 28.0 Exp/Mgg 40,000.00 5,600,000.00 100.00 4,000,000.00 20.00 800,000.00 120.00 4,800,000.00
2 Laporan Bulanan 5.0 x 7.0 Exp/Bln 120,000.00 4,200,000.00 25.00 3,000,000.00 5.00 600,000.00 30.00 3,600,000.00
3 Laporan Akhir (0%, 50%, 100%) 5.00 Exp 200,000.00 1,000,000.00 - - - - - -
4 CD Dokumentasi 5.00 Keping 20,000.00 100,000.00 - - - - - -

TOTAL BIAYA LANGSUNG NON PERSONIL 76,000,000 53,500,000 10,700,000 64,200,000


REKAPITULASI INVOICE

Pekerjaan : Supervisi Pembangunan Infrastruktur Permukiman Kumuh Kawasan Gampong Lhok Banie Kota Langsa Nomor DIPA Revisi 1 : 033.05.1.486479/2015
No. Kontrak : HK.02.03/98.12/PKP-15/PKP/KONT/V/2015 Tanggal : 16 April 2015
Tanggal Kontrak : 25 Mei 2015 Kode Satker : 486479
Nilai Kontrak : Rp. 383.100.000,- Tahun Anggaran : 2015
Sumber Dana : APBN Murni Invoice No : 05
Lokasi : Kota Langsa Periode : 23 Sep s/d 22 Okt 2015

INVOICE S/D INVOICE INVOICE S/D BOBOT


BIAYA KONTRAK
NO. URAIAN BULAN LALU BULAN INI BULAN INI PEKERJAAN
(Rp)
(RP) (RP) (RP) (%)

A. BIAYA LANGSUNG PERSONIL 272,300,000.00 155,600,000.00 38,900,000.00 194,500,000.00 55.84

B. BIAYA LANGSUNG NON PERSONIL 76,000,000.00 42,800,000.00 10,700,000.00 53,500,000.00 15.36

C Jumlah Rekapitulasi Biaya Invoice 348,300,000.00 198,400,000.00 49,600,000.00 248,000,000.00 71.20


D Pajak Pertambahan Nilai (PPN 10 %) 34,830,000.00 19,840,000.00 4,960,000.00 24,800,000.00
E Jumlah Bruto Invoice s/d Bulan Ini (C + D) 383,130,000.00 218,240,000.00 54,560,000.00 272,800,000.00
F Dibulatkan 383,100,000.00 218,240,000.00 54,560,000.00 272,800,000.00
POTONGAN
G Jumlah Invoice s/d Bulan Lalu (Komulatif) 218,240,000.00
H Pengembalian Uang Muka (20% x F) 10,912,000.00
I Jumlah Potongan Invoice Bulan ini (G + H ) 229,152,000.00
J Jumlah Bersih Invoice Bulan ini (F - I) 43,648,000.00

Terbilang : Empat Puluh Tiga Juta Enam Ratus Empat Puluh Delapan Ribu Rupiah

Sampai dengan bulan ini 71.20


Persentase Realisasi Sampai dengan bulan lalu 56.96
Bulan ini 14.24

Disetujui Oeh : Diajukan Oleh :


Pejabat Pembuat Komitmen CV. CEUDAH CONSULTANT
Pengembangan Kawasan Permukiman
Satker Pengembangan Kawasan Permukiman
Dan Penataan Bangunan Provinsi Aceh

T. DAVIS F. HAMID, ST., MT M. ZANIR, ST


Nip. 19771106 200701 1 002 Direktur
SUPERVISI PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN KUMUH KAWASAN GAMPONG LHOK BANIE, KOTA LANGSA

I. BIAYA LANGSUNG PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. NAMA POSISI VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. TENAGA AHLI
1 Idris, ST Site Engineer 1.00 x 7.00 Org/Bln 12,000,000.00 84,000,000.00 4.00 48,000,000.00 1.00 12,000,000.00 5.00 60,000,000.00
2 Sabuddin Rahmatullah, ST Chief Inspector 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 4.00 34,000,000.00 1.00 8,500,000.00 5.00 42,500,000.00
3 Teuku Yafisham, ST Quality Engineer 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 4.00 34,000,000.00 1.00 8,500,000.00 5.00 42,500,000.00

B. TENAGA SUB PROFESIONAL


1 Muhammad Herka, ST Inspector 1 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 4.00 14,800,000.00 1.00 3,700,000.00 5.00 18,500,000.00
2 Miksalmina, ST Inspector 2 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 4.00 14,800,000.00 1.00 3,700,000.00 5.00 18,500,000.00

C. TENAGA PENDUKUNG
1 Fitriah, ST Adm/Op. Komputer 1.00 x 7.00 Org/Bln 2,500,000.00 17,500,000.00 4.00 10,000,000.00 1.00 2,500,000.00 5.00 12,500,000.00

TOTAL BIAYA LANGSUNG PERSONIL 272,300,000 155,600,000 38,900,000 194,500,000

II. BIAYA LANGSUNG NON PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. BIAYA LAPANGAN
1 Sewa Roda 2 + BBM 1 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 4.00 3,600,000.00 1.00 900,000.00 5.00 4,500,000.00
2 Sewa Roda 2 + BBM 2 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 4.00 3,600,000.00 1.00 900,000.00 5.00 4,500,000.00
3 Sewa Roda 4 + BBM 1.00 x 7.00 Unit/Bln 5,500,000.00 38,500,000.00 4.00 22,000,000.00 1.00 5,500,000.00 5.00 27,500,000.00

B. BIAYA OPERASIONAL KANTOR


1 ATK, Suplies Komputer dan Fotocopy 7.00 Bln 1,500,000.00 10,500,000.00 4.00 6,000,000.00 1.00 1,500,000.00 5.00 7,500,000.00
2 Biaya Komunikasi 7.00 Bln 500,000.00 3,500,000.00 4.00 2,000,000.00 1.00 500,000.00 5.00 2,500,000.00

C. BIAYA PEMBUATAN LAPORAN


1 Laporan Mingguan 5.0 x 28.0 Exp/Mgg 40,000.00 5,600,000.00 80.00 3,200,000.00 20.00 800,000.00 100.00 4,000,000.00
2 Laporan Bulanan 5.0 x 7.0 Exp/Bln 120,000.00 4,200,000.00 20.00 2,400,000.00 5.00 600,000.00 25.00 3,000,000.00
3 Laporan Akhir (0%, 50%, 100%) 5.00 Exp 200,000.00 1,000,000.00 - - - - - -
4 CD Dokumentasi 5.00 Keping 20,000.00 100,000.00 - - - - - -

TOTAL BIAYA LANGSUNG NON PERSONIL 76,000,000 42,800,000 10,700,000 53,500,000


REKAPITULASI INVOICE

Pekerjaan : Supervisi Pembangunan Infrastruktur Permukiman Kumuh Kawasan Gampong Lhok Banie Kota Langsa Nomor DIPA Revisi 1 : 033.05.1.486479/2015
No. Kontrak : HK.02.03/98.12/PKP-15/PKP/KONT/V/2015 Tanggal : 16 April 2015
Tanggal Kontrak : 25 Mei 2015 Kode Satker : 486479
Nilai Kontrak : Rp. 383.100.000,- Tahun Anggaran : 2015
Sumber Dana : APBN Murni Invoice No : 04
Lokasi : Kota Langsa Periode : 23 Agus s/d 22 Sep 2015

INVOICE S/D INVOICE INVOICE S/D BOBOT


BIAYA KONTRAK
NO. URAIAN BULAN LALU BULAN INI BULAN INI PEKERJAAN
(Rp)
(RP) (RP) (RP) (%)

A. BIAYA LANGSUNG PERSONIL 272,300,000.00 116,700,000.00 38,900,000.00 155,600,000.00 44.67

B. BIAYA LANGSUNG NON PERSONIL 76,000,000.00 32,100,000.00 10,700,000.00 42,800,000.00 12.29

C Jumlah Rekapitulasi Biaya Invoice 348,300,000.00 148,800,000.00 49,600,000.00 198,400,000.00 56.96


D Pajak Pertambahan Nilai (PPN 10 %) 34,830,000.00 14,880,000.00 4,960,000.00 19,840,000.00
E Jumlah Bruto Invoice s/d Bulan Ini (C + D) 383,130,000.00 163,680,000.00 54,560,000.00 218,240,000.00
F Dibulatkan 383,100,000.00 163,680,000.00 54,560,000.00 218,240,000.00
POTONGAN
G Jumlah Invoice s/d Bulan Lalu (Komulatif) 163,680,000.00
H Pengembalian Uang Muka (20% x F) 10,912,000.00
I Jumlah Potongan Invoice Bulan ini (G + H ) 174,592,000.00
J Jumlah Bersih Invoice Bulan ini (F - I) 43,648,000.00

Terbilang : Empat Puluh Tiga Juta Enam Ratus Empat Puluh Delapan Ribu Rupiah

Sampai dengan bulan ini 56.96


Persentase Realisasi Sampai dengan bulan lalu 42.72
Bulan ini 14.24

Disetujui Oeh : Diajukan Oleh :


Pejabat Pembuat Komitmen CV. CEUDAH CONSULTANT
Pengembangan Kawasan Permukiman
Satker Pengembangan Kawasan Permukiman
Dan Penataan Bangunan Provinsi Aceh

T. DAVIS F. HAMID, ST., MT M. ZANIR, ST


Nip. 19771106 200701 1 002 Direktur
SUPERVISI PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN KUMUH KAWASAN GAMPONG LHOK BANIE, KOTA LANGSA

I. BIAYA LANGSUNG PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. NAMA POSISI VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. TENAGA AHLI
1 Idris, ST Site Engineer 1.00 x 7.00 Org/Bln 12,000,000.00 84,000,000.00 3.00 36,000,000.00 1.00 12,000,000.00 4.00 48,000,000.00
2 Sabuddin Rahmatullah, ST Chief Inspector 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 3.00 25,500,000.00 1.00 8,500,000.00 4.00 34,000,000.00
3 Teuku Yafisham, ST Quality Engineer 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 3.00 25,500,000.00 1.00 8,500,000.00 4.00 34,000,000.00

B. TENAGA SUB PROFESIONAL


1 Muhammad Herka, ST Inspector 1 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 3.00 11,100,000.00 1.00 3,700,000.00 4.00 14,800,000.00
2 Miksalmina, ST Inspector 2 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 3.00 11,100,000.00 1.00 3,700,000.00 4.00 14,800,000.00

C. TENAGA PENDUKUNG
1 Fitriah, ST Adm/Op. Komputer 1.00 x 7.00 Org/Bln 2,500,000.00 17,500,000.00 3.00 7,500,000.00 1.00 2,500,000.00 4.00 10,000,000.00

TOTAL BIAYA LANGSUNG PERSONIL 272,300,000 116,700,000 38,900,000 155,600,000

II. BIAYA LANGSUNG NON PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. BIAYA LAPANGAN
1 Sewa Roda 2 + BBM 1 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 3.00 2,700,000.00 1.00 900,000.00 4.00 3,600,000.00
2 Sewa Roda 2 + BBM 2 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 3.00 2,700,000.00 1.00 900,000.00 4.00 3,600,000.00
3 Sewa Roda 4 + BBM 1.00 x 7.00 Unit/Bln 5,500,000.00 38,500,000.00 3.00 16,500,000.00 1.00 5,500,000.00 4.00 22,000,000.00

B. BIAYA OPERASIONAL KANTOR


1 ATK, Suplies Komputer dan Fotocopy 7.00 Bln 1,500,000.00 10,500,000.00 3.00 4,500,000.00 1.00 1,500,000.00 4.00 6,000,000.00
2 Biaya Komunikasi 7.00 Bln 500,000.00 3,500,000.00 3.00 1,500,000.00 1.00 500,000.00 4.00 2,000,000.00

C. BIAYA PEMBUATAN LAPORAN


1 Laporan Mingguan 5.0 x 28.0 Exp/Mgg 40,000.00 5,600,000.00 60.00 2,400,000.00 20.00 800,000.00 80.00 3,200,000.00
2 Laporan Bulanan 5.0 x 7.0 Exp/Bln 120,000.00 4,200,000.00 15.00 1,800,000.00 5.00 600,000.00 20.00 2,400,000.00
3 Laporan Akhir (0%, 50%, 100%) 5.00 Exp 200,000.00 1,000,000.00 - - - - - -
4 CD Dokumentasi 5.00 Keping 20,000.00 100,000.00 - - - - - -

TOTAL BIAYA LANGSUNG NON PERSONIL 76,000,000 32,100,000 10,700,000 42,800,000


REKAPITULASI INVOICE

Pekerjaan : Supervisi Pembangunan Infrastruktur Permukiman Kumuh Kawasan Gampong Lhok Banie Kota Langsa Nomor DIPA Revisi 1 : 033.05.1.486479/2015
No. Kontrak : HK.02.03/98.12/PKP-15/PKP/KONT/V/2015 Tanggal : 16 April 2015
Tanggal Kontrak : 25 Mei 2015 Kode Satker : 486479
Nilai Kontrak : Rp. 383.100.000,- Tahun Anggaran : 2015
Sumber Dana : APBN Murni Invoice No : 03
Lokasi : Kota Langsa Periode : 24 Juli s/d 22 Agustus 2015

INVOICE S/D INVOICE INVOICE S/D BOBOT


BIAYA KONTRAK
NO. URAIAN BULAN LALU BULAN INI BULAN INI PEKERJAAN
(Rp)
(RP) (RP) (RP) (%)

A. BIAYA LANGSUNG PERSONIL 272,300,000.00 77,800,000.00 38,900,000.00 116,700,000.00 33.51

B. BIAYA LANGSUNG NON PERSONIL 76,000,000.00 21,400,000.00 10,700,000.00 32,100,000.00 9.22

C Jumlah Rekapitulasi Biaya Invoice 348,300,000.00 99,200,000.00 49,600,000.00 148,800,000.00 42.72


D Pajak Pertambahan Nilai (PPN 10 %) 34,830,000.00 9,920,000.00 4,960,000.00 14,880,000.00
E Jumlah Bruto Invoice s/d Bulan Ini (C + D) 383,130,000.00 109,120,000.00 54,560,000.00 163,680,000.00
F Dibulatkan 383,100,000.00 109,120,000.00 54,560,000.00 163,680,000.00
POTONGAN
G Jumlah Invoice s/d Bulan Lalu (Komulatif) 109,120,000.00
H Pengembalian Uang Muka (20% x F) 10,912,000.00
I Jumlah Potongan Invoice Bulan ini (G + H ) 120,032,000.00
J Jumlah Bersih Invoice Bulan ini (F - I) 43,648,000.00

Terbilang : Empat Puluh Tiga Juta Enam Ratus Empat Puluh Delapan Ribu Rupiah

Sampai dengan bulan ini 42.72


Persentase Realisasi Sampai dengan bulan lalu 28.48
Bulan ini 14.24

Disetujui Oeh : Diajukan Oleh :


Pejabat Pembuat Komitmen CV. CEUDAH CONSULTANT
Pengembangan Kawasan Permukiman
Satker Pengembangan Kawasan Permukiman
Dan Penataan Bangunan Provinsi Aceh

T. DAVIS F. HAMID, ST., MT M. ZANIR, ST


Nip. 19771106 200701 1 002 Direktur
SUPERVISI PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN KUMUH KAWASAN GAMPONG LHOK BANIE, KOTA LANGSA

I. BIAYA LANGSUNG PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. NAMA POSISI VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. TENAGA AHLI
1 Idris, ST Site Engineer 1.00 x 7.00 Org/Bln 12,000,000.00 84,000,000.00 2.00 24,000,000.00 1.000 12,000,000.00 3.000 36,000,000.00
2 Sabuddin Rahmatullah, ST Chief Inspector 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 2.00 17,000,000.00 1.000 8,500,000.00 3.000 25,500,000.00
3 Teuku Yafisham, ST Quality Engineer 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 2.00 17,000,000.00 1.000 8,500,000.00 3.000 25,500,000.00

B. TENAGA SUB PROFESIONAL


1 Muhammad Herka, ST Inspector 1 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 2.00 7,400,000.00 1.000 3,700,000.00 3.000 11,100,000.00
2 Miksalmina, ST Inspector 2 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 2.00 7,400,000.00 1.000 3,700,000.00 3.000 11,100,000.00

C. TENAGA PENDUKUNG
1 Fitriah, ST Adm/Op. Komputer 1.00 x 7.00 Org/Bln 2,500,000.00 17,500,000.00 2.00 5,000,000.00 1.000 2,500,000.00 3.000 7,500,000.00

TOTAL BIAYA LANGSUNG PERSONIL 272,300,000 77,800,000 38,900,000 116,700,000

II. BIAYA LANGSUNG NON PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. BIAYA LAPANGAN
1 Sewa Roda 2 + BBM 1 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 2.00 1,800,000.00 1.000 900,000.00 3.000 2,700,000.00
2 Sewa Roda 2 + BBM 2 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 2.00 1,800,000.00 1.000 900,000.00 3.000 2,700,000.00
3 Sewa Roda 4 + BBM 1.00 x 7.00 Unit/Bln 5,500,000.00 38,500,000.00 2.00 11,000,000.00 1.000 5,500,000.00 3.000 16,500,000.00

B. BIAYA OPERASIONAL KANTOR


1 ATK, Suplies Komputer dan Fotocopy 7.00 Bln 1,500,000.00 10,500,000.00 2.00 3,000,000.00 1.000 1,500,000.00 3.000 4,500,000.00
2 Biaya Komunikasi 7.00 Bln 500,000.00 3,500,000.00 2.00 1,000,000.00 1.000 500,000.00 3.000 1,500,000.00

C. BIAYA PEMBUATAN LAPORAN


1 Laporan Mingguan 5.0 x 28.0 Exp/Mgg 40,000.00 5,600,000.00 40.00 1,600,000.00 20.000 800,000.00 60.000 2,400,000.00
2 Laporan Bulanan 5.0 x 7.0 Exp/Bln 120,000.00 4,200,000.00 10.00 1,200,000.00 5.000 600,000.00 15.000 1,800,000.00
3 Laporan Akhir (0%, 50%, 100%) 5.00 Exp 200,000.00 1,000,000.00 - - - - - -
4 CD Dokumentasi 5.00 Keping 20,000.00 100,000.00 - - - - - -

TOTAL BIAYA LANGSUNG NON PERSONIL 76,000,000 21,400,000 10,700,000 32,100,000


REKAPITULASI INVOICE

Pekerjaan : Supervisi Pembangunan Infrastruktur Permukiman Kumuh Kawasan Gampong Lhok Banie Kota Langsa Nomor DIPA Revisi 1 : 033.05.1.486479/2015
No. Kontrak : HK.02.03/98.12/PKP-15/PKP/KONT/V/2015 Tanggal : 16 April 2015
Tanggal Kontrak : 25 Mei 2015 Kode Satker : 486479
Nilai Kontrak : Rp. 383.100.000,- Tahun Anggaran : 2015
Sumber Dana : APBN Murni Invoice No : 02
Lokasi : Kota Langsa Periode : 24 Juni s/d 23 Juli 2015

INVOICE S/D INVOICE INVOICE S/D BOBOT


BIAYA KONTRAK
NO. URAIAN BULAN LALU BULAN INI BULAN INI PEKERJAAN
(Rp)
(RP) (RP) (RP) (%)

A. BIAYA LANGSUNG PERSONIL 272,300,000.00 38,900,000.00 38,900,000.00 77,800,000.00 22.34

B. BIAYA LANGSUNG NON PERSONIL 76,000,000.00 10,700,000.00 10,700,000.00 21,400,000.00 6.14

C Jumlah Rekapitulasi Biaya Invoice 348,300,000.00 49,600,000.00 49,600,000.00 99,200,000.00 28.48


D Pajak Pertambahan Nilai (PPN 10 %) 34,830,000.00 4,960,000.00 4,960,000.00 9,920,000.00
E Jumlah Bruto Invoice s/d Bulan Ini (C + D) 383,130,000.00 54,560,000.00 54,560,000.00 109,120,000.00
F Dibulatkan 383,100,000.00 54,560,000.00 54,560,000.00 109,120,000.00
POTONGAN
G Jumlah Invoice s/d Bulan Lalu (Kumulatif) 54,560,000.00
H Pengembalian Uang Muka (20% x F) 10,912,000.00
I Jumlah Potongan Invoice Bulan ini (G + H ) 65,472,000.00
J Jumlah Bersih Invoice Bulan ini (F - I) 43,648,000.00

Terbilang : Empat Puluh Tiga Juta Enam Ratus Empat Puluh Delapan Ribu Rupiah

Sampai dengan bulan ini 28.48


Persentase Realisasi Sampai dengan bulan lalu 14.24
Bulan ini 14.24

Disetujui Oeh : Diajukan Oleh :


Pejabat Pembuat Komitmen CV. CEUDAH CONSULTANT
Pengembangan Kawasan Permukiman
Satker Pengembangan Kawasan Permukiman
Dan Penataan Bangunan Provinsi Aceh

T. DAVIS F. HAMID, ST., MT M. ZANIR, ST


Nip. 19771106 200701 1 002 Direktur
SUPERVISI PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN KUMUH KAWASAN GAMPONG LHOK BANIE, KOTA LANGSA

I. BIAYA LANGSUNG PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. NAMA POSISI VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. TENAGA AHLI
1 Idris, ST Site Engineer 1.00 x 7.00 Org/Bln 12,000,000.00 84,000,000.00 1.00 12,000,000.00 1.000 12,000,000.00 2.000 24,000,000.00
2 Sabuddin Rahmatullah, ST Chief Inspector 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 1.00 8,500,000.00 1.000 8,500,000.00 2.000 17,000,000.00
3 Teuku Yafisham, ST Quality Engineer 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 1.00 8,500,000.00 1.000 8,500,000.00 2.000 17,000,000.00

B. TENAGA SUB PROFESIONAL


1 Muhammad Herka, ST Inspector 1 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 1.00 3,700,000.00 1.000 3,700,000.00 2.000 7,400,000.00
2 Miksalmina, ST Inspector 2 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 1.00 3,700,000.00 1.000 3,700,000.00 2.000 7,400,000.00

C. TENAGA PENDUKUNG
1 Fitriah, ST Adm/Op. Komputer 1.00 x 7.00 Org/Bln 2,500,000.00 17,500,000.00 1.00 2,500,000.00 1.000 2,500,000.00 2.000 5,000,000.00

TOTAL BIAYA LANGSUNG PERSONIL 272,300,000 38,900,000 38,900,000 77,800,000

II. BIAYA LANGSUNG NON PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. BIAYA LAPANGAN
1 Sewa Roda 2 + BBM 1 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 1.00 900,000.00 1.000 900,000.00 2.000 1,800,000.00
2 Sewa Roda 2 + BBM 2 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 1.00 900,000.00 1.000 900,000.00 2.000 1,800,000.00
3 Sewa Roda 4 + BBM 1.00 x 7.00 Unit/Bln 5,500,000.00 38,500,000.00 1.00 5,500,000.00 1.000 5,500,000.00 2.000 11,000,000.00

B. BIAYA OPERASIONAL KANTOR


1 ATK, Suplies Komputer dan Fotocopy 7.00 Bln 1,500,000.00 10,500,000.00 1.00 1,500,000.00 1.000 1,500,000.00 2.000 3,000,000.00
2 Biaya Komunikasi 7.00 Bln 500,000.00 3,500,000.00 1.00 500,000.00 1.000 500,000.00 2.000 1,000,000.00

C. BIAYA PEMBUATAN LAPORAN


1 Laporan Mingguan 5.0 x 28.0 Exp/Mgg 40,000.00 5,600,000.00 20.00 800,000.00 20.000 800,000.00 40.000 1,600,000.00
2 Laporan Bulanan 5.0 x 7.0 Exp/Bln 120,000.00 4,200,000.00 5.00 600,000.00 5.000 600,000.00 10.000 1,200,000.00
3 Laporan Akhir (0%, 50%, 100%) 5.00 Exp 200,000.00 1,000,000.00 - - - - - -
4 CD Dokumentasi 5.00 Keping 20,000.00 100,000.00 - - - - - -

TOTAL BIAYA LANGSUNG NON PERSONIL 76,000,000 10,700,000 10,700,000 21,400,000


REKAPITULASI INVOICE

Pekerjaan : Supervisi Pembangunan Infrastruktur Permukiman Kumuh Kawasan Gampong Lhok Banie Kota Langsa Nomor DIPA Revisi 1 : 033.05.1.486479/2015
No. Kontrak : HK.02.03/98.12/PKP-15/PKP/KONT/V/2015 Tanggal : 16 April 2015
Tanggal Kontrak : 25 Mei 2015 Kode Satker : 486479
Nilai Kontrak : Rp. 383.100.000,- Tahun Anggaran : 2015
Sumber Dana : APBN Murni Invoice No : 01
Lokasi : Kota Langsa Periode : 25 Mei s/d 23 Juni 2015

INVOICE S/D INVOICE INVOICE S/D BOBOT


BIAYA KONTRAK
NO. URAIAN BULAN LALU BULAN INI BULAN INI PEKERJAAN
(Rp)
(RP) (RP) (RP) (%)

A. BIAYA LANGSUNG PERSONIL 272,300,000.00 - 38,900,000.00 38,900,000.00 11.17

B. BIAYA LANGSUNG NON PERSONIL 76,000,000.00 - 10,700,000.00 10,700,000.00 3.07

C Jumlah Rekapitulasi Biaya Invoice 348,300,000.00 - 49,600,000.00 49,600,000.00 14.24


D Pajak Pertambahan Nilai (PPN 10 %) 34,830,000.00 - 4,960,000.00 4,960,000.00
E Jumlah Bruto Invoice s/d Bulan Ini (C + D) 383,130,000.00 - 54,560,000.00 54,560,000.00
F Dibulatkan 383,100,000.00 - 54,560,000.00 54,560,000.00
POTONGAN
G Jumlah Invoice s/d Bulan Lalu (Kumulatif) -
H Pengembalian Uang Muka (20% x F) 10,912,000.00
I Jumlah Potongan Invoice Bulan ini (G + H ) 10,912,000.00
J Jumlah Bersih Invoice Bulan ini (F - I) 43,648,000.00

Terbilang : Empat Puluh Tiga Juta Enam Ratus Empat Puluh Delapan Ribu Rupiah

Sampai dengan bulan ini 14.24


Persentase Realisasi Sampai dengan bulan lalu -
Bulan ini 14.24

Disetujui Oeh : Diajukan Oleh :


Pejabat Pembuat Komitmen CV. CEUDAH CONSULTANT
Pengembangan Kawasan Permukiman
Satker Pengembangan Kawasan Permukiman
Dan Penataan Bangunan Provinsi Aceh

T. DAVIS F. HAMID, ST., MT M. ZANIR, ST


Nip. 19771106 200701 1 002 Direktur
SUPERVISI PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN KUMUH KAWASAN GAMPONG LHOK BANIE, KOTA LANGSA

I. BIAYA LANGSUNG PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. NAMA POSISI VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. TENAGA AHLI
1 Idris, ST Site Engineer 1.00 x 7.00 Org/Bln 12,000,000.00 84,000,000.00 - - 1.000 12,000,000.00 1.000 12,000,000.00
2 Sabuddin Rahmatullah, ST Chief Inspector 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 - - 1.000 8,500,000.00 1.000 8,500,000.00
3 Teuku Yafisham, ST Quality Engineer 1.00 x 7.00 Org/Bln 8,500,000.00 59,500,000.00 - - 1.000 8,500,000.00 1.000 8,500,000.00

B. TENAGA SUB PROFESIONAL


1 Muhammad Herka, ST Inspector 1 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 - - 1.000 3,700,000.00 1.000 3,700,000.00
2 Miksalmina, ST Inspector 2 1.00 x 7.00 Org/Bln 3,700,000.00 25,900,000.00 - - 1.000 3,700,000.00 1.000 3,700,000.00

C. TENAGA PENDUKUNG
1 Fitriah, ST Adm/Op. Komputer 1.00 x 7.00 Org/Bln 2,500,000.00 17,500,000.00 - - 1.000 2,500,000.00 1.000 2,500,000.00

TOTAL BIAYA LANGSUNG PERSONIL 272,300,000 - 38,900,000 38,900,000

II. BIAYA LANGSUNG NON PERSONIL


S/D BULAN LALU BULAN INI S/D BULAN INI
HARGA SATUAN JUMLAH HARGA
NO. URAIAN VOLUME SATUAN
(Rp) (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp) VOLUME BIAYA (Rp)

A. BIAYA LAPANGAN
1 Sewa Roda 2 + BBM 1 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 - - 1.000 900,000.00 1.000 900,000.00
2 Sewa Roda 2 + BBM 2 1.00 x 7.00 Unit/Bln 900,000.00 6,300,000.00 - - 1.000 900,000.00 1.000 900,000.00
3 Sewa Roda 4 + BBM 1.00 x 7.00 Unit/Bln 5,500,000.00 38,500,000.00 - - 1.000 5,500,000.00 1.000 5,500,000.00

B. BIAYA OPERASIONAL KANTOR


1 ATK, Suplies Komputer dan Fotocopy 7.00 Bln 1,500,000.00 10,500,000.00 - - 1.000 1,500,000.00 1.000 1,500,000.00
2 Biaya Komunikasi 7.00 Bln 500,000.00 3,500,000.00 - - 1.000 500,000.00 1.000 500,000.00

C. BIAYA PEMBUATAN LAPORAN


1 Laporan Mingguan 5.0 x 28.0 Exp/Mgg 40,000.00 5,600,000.00 - - 20.000 800,000.00 20.000 800,000.00
2 Laporan Bulanan 5.0 x 7.0 Exp/Bln 120,000.00 4,200,000.00 - - 5.000 600,000.00 5.000 600,000.00
3 Laporan Akhir (0%, 50%, 100%) 5.00 Exp 200,000.00 1,000,000.00 - - - - - -
4 CD Dokumentasi 5.00 Keping 20,000.00 100,000.00 - - - - - -

TOTAL BIAYA LANGSUNG NON PERSONIL 76,000,000 - 10,700,000 10,700,000


REKAPITULASI

Bidang : Program, Perencanaan dan Evaluasi Dinas Cipta Karya Aceh


Nama Paket : Pendataan dan Identifikasi Rumah Tidak Layak Huni (Rumah Dhuafa) Wilayah 3
Kode Paket : PR INFRA 224
Sumber Dana : APBA
Tahun Anggaran : 2014
Waktu : 1,0 Bulan

JUMLAH HARGA
NO. URAIAN
(Rp.)

A. BIAYA LANGSUNG PERSONIL 19,700,000.00

B. BIAYA LANGSUNG NON PERSONIL 7,390,000.00

TOTAL 27,090,000.00

PPN 2,709,000.00

TOTAL SELURUHNYA 29,799,000.00

DIBULATKAN 29,799,000.00

Terbilang : Dua puluh sembilan juta tujuh ratus sembilan puluh sembilan ribu rupiah

Banda Aceh, 22 Januari 2014


PT. KARYA PET KONSULTAN

NAZARUDDIN H, ST
Direktur
PENDATAAN DAN IDENTIFIKASI RUMAH TIDAK LAYAK HUNI (RUMAH DHUAFA) WILAYAH 3
( KODE PAKET PR INFRA 224 )

A. BIAYA LANGSUNG PERSONIL

HARGA JUMLAH
NO. NAMA JABATAN VOLUME SATUAN SATUAN HARGA
(RP) (RP)

I. BIAYA TENAGA AHLI


1 Aulia Rachman, ST Team Leader 1.00 x 1.00 OB 10,000,000.00 10,000,000.00

Sub Total I 10,000,000.00

II BIAYA TENAGA PENDUKUNG


1 …………………… Surveyor 1.00 x 0.70 OB 5,000,000.00 3,500,000.00
2 …………………… Pembantu Surveyor 1.00 x 0.70 OB 4,000,000.00 2,800,000.00
3 …………………… Operator Komputer 1.00 x 0.50 OB 3,400,000.00 1,700,000.00
4 …………………… Office Boy 1.00 x 1.00 OB 1,700,000.00 1,700,000.00

Sub Total II 9,700,000.00

TOTAL BIAYA LANGSUNG PERSONIL 19,700,000.00


PENDATAAN DAN IDENTIFIKASI RUMAH TIDAK LAYAK HUNI (RUMAH DHUAFA) WILAYAH 3
( KODE PAKET PR INFRA 224 )

B. BIAYA LANGSUNG NON PERSONIL

HARGA JUMLAH
NO. URAIAN VOLUME SATUAN SATUAN HARGA
(RP) (RP)

I BIAYA BAHAN KANTOR DAN KOMUNIKASI


1 Alat Tulis Kantor 1.00 Bln 800,000.00 800,000.00
2 Biaya Komunikasi 1.00 Bln 800,000.00 800,000.00

Sub Total I 1,600,000.00

II BIAYA TRANSPORTASI
1. Sewa Kenderaan Roda 4 1.00 x 0.50 UB 8,500,000.00 4,250,000.00

Sub Total II 4,250,000.00

III BIAYA SEWA PERALATAN KANTOR


1 Sewa Komputer + Printer 1.00 x 0.70 UB 900,000.00 630,000.00
2 Sewa GPS 1.00 x 1.00 UB 300,000.00 300,000.00
3 Sewa Kamera Digital 1.00 x 1.00 UB 250,000.00 250,000.00

Sub Total III 1,180,000.00

IV BIAYA LAPORAN
1 Laporan Daftar Identifikasi Penerima Rumah 3.00 Bk 100,000.00 300,000.00
2 CD 3.00 Keping 20,000.00 60,000.00

Sub Total IV 360,000.00

TOTAL BIAYA LANGSUNG NON PERSONIL 7,390,000.00

Anda mungkin juga menyukai