DAFTAR HARGA SATUAN

BAHAN DAN UPAH TAHUN 2012


A. DAFTAR HARGA SATUAN BAHAN/PERALATAN

NO. JENIS BAHAN BANGUNAN SATUAN HARGA (Rp.)

1 Semen PC 50 Kg Zak 93,225.00


Semen PC 50 Kg Kg 1,864.50
Semen PC 50 Kg Tong 326,287.50
2 Semen Putih Kg 11,526.00
3 Semen Warna Kg 17,176.00
4 Pasir Urug/Timbunan M³ 84,750.00
5 Pasir Pasang M³ 84,750.00
6 Pasir Beton M³ 84,750.00
7 Tanah Timbunan M³ 70,625.00
8 Kerikil Bersih/Koral M³ 339,000.00
9 Kerikil Halus (½ -1 cm) M³ 339,000.00
10 Batu Pecah (1 - 2 cm) M³ 339,000.00
11 Batu Pecah (2 - 3 cm) M³ 282,500.00
12 Batu Pecah (3 - 5 cm) M³ 282,500.00
13 Batu Pecah (5 - 7 cm) M³ 282,500.00
14 Batu Pecah (10 - 15 cm) M³ 141,250.00
15 Batu Gunung M³ 113,000.00
16 Batu Kali M³ 113,000.00
17 Batu Kali Ø15 cm M³ 113,000.00
18 Kawat Beton (Bendrat) Kg 28,476.00
19 Minyak Bekisting Ltr 6,500.00
20 Besi Beton Polos < Ø12 mm Kg 16,500.00
21 Besi Beton Polos > Ø12 mm Kg 16,500.00
22 Tegel Keramik Kasar 40 x 40 cm Bh 20,000.00
23 Cat Kayu Kg 47,335.50
24 Cat Tembok Dalam Dulux Kg 82,435.50
25 Cat Tembok Luar Dulux Kg 82,435.50
26 Cat Meni Kg 35,559.00
27 Cat Besi Kg 35,559.00
28 Cat Dasar Kg 35,559.00
29 Kalkarium Klg 43,000.00
30 Minyak Cat Ltr 29,607.00
31 Dempul Kg 35,559.00
32 Plamur Kg 31,437.00
33 Amplas/Kertas Gosok Lbr 4,197.00
34 Residu/Colter Kg 3,250.00
35 Politur/Vernis Klg 25,600.00
36 Teak Oil Kg 36600
37 Cat Atap Kg 25000
NO. JENIS BAHAN BANGUNAN SATUAN HARGA (Rp.)

23 Balok Kls. I M³ 3,390,000.00


24 Papan Kls. I M³ 2,599,000.00
25 Balok Kls. II M³ 1,638,500.00
26 Papan Kls. II M³ 1,638,500.00
27 Balok Kls. III M³ 1,525,500.00
28 Papan Kls. III M³ 1,525,500.00
29 Kayu Dolken Ø 8 cm Btg 12,500.00
30 Plywood t = 9 mm Lbr 149,500.00
31 Paku Campuran 5, 7, 10, 12 cm Kg 18,419.00
B. DAFTAR UPAH PEKERJAAN

NO. URAIAN SATUAN HARGA (Rp.)

1 Pekerja Org/Hari 57,850.00


2 Tukang Kayu Org/Hari 77,975.00
3 Tukang Batu Org/Hari 77,975.00
4 Tukang Cat Org/Hari 77,975.00
5 Tukang Besi Org/Hari 77,975.00
6 Tukang Listrik Org/Hari 77,975.00
7 Tukang Pipa Org/Hari 77,975.00
8 Tukang Las Org/Hari 77,975.00
9 Kepala Tukang Org/Hari 88,250.00
10 Mandor Org/Hari 68,050.00
11 Operator Org/Hari 57,850.00
12 Pembantu Operator Org/Hari 52,300.00
13 Supir Org/Hari 57,850.00
ANALISA HARGA SATUAN

Pekerjaan : Pembuatan Taman Kota


Jenis Pekerjaan : Pek. Pohon : PALM RAJA
Satuan Pembayaran : ph

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)


NO. URAIAN SAT VOL.
1 2 3 4 5 6

a Mobilisasi ( Manado - Tobelo ) phn 1 150,000 150,000

b Upah tanam ( galian ) phn 1 50,000 50,000

c Palem raja + Pemeliharaan phn 1 300,000 300,000

Jumlah Harga 500,000


ANALISA HARGA SATUAN PEKERJAAN

4. Menggali 1 m3 tanah biasa sedalam 1 meter (SNI 6.1)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I TENAGA
1 Pekerja Oh 0.7500 57,850.00 43,387.50
2 Mandor Oh 0.0250 68,050.00 1,701.25

Jumlah 45,088.75
Total Jumlah 45,088.75

12. Urugan Kembali (SNI 6.9)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I TENAGA
1 Pekerja Oh 0.1920 57,850.00 11,107.20
2 Mandor Oh 0.0190 68,050.00 1,292.95

Jumlah 12,400.15
Total Jumlah 12,400.15

15. Mengurug 1 m3 pasir urug


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Pasir Urug M³ 1.2000 84,750.00 101,700.00

II TENAGA
1 Pekerja Oh 0.3000 57,850.00 17,355.00
2 Mandor Oh 0.0100 68,050.00 680.50

Jumlah 119,735.50
Total Jumlah 119,735.50
ANALISA HARGA SATUAN PEKERJAAN
1 M³ Urugan Tanah (SNI 6.11)
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Tanah Timbunan M³ 1.2000 70,625.00 84,750.00

II TENAGA
1 Pekerja Oh 0.2500 57,850.00 14,462.50
2 Mandor Oh 0.0250 68,050.00 1,701.25

Jumlah 100,913.75
Total Jumlah 100,913.75

20. Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP (SNI 6.2)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Batu Gunung M³ 1.2000 113,000.00 135,600.00
2 Semen Portland Kg 163.0000 1,864.50 303,913.50
3 Pasir Pasang M³ 0.5200 84,750.00 44,070.00

II TENAGA
1 Pekerja Oh 1.5000 57,850.00 86,775.00
2 Tukang Batu Oh 0.6000 77,975.00 46,785.00
3 Kepala Tukang Oh 0.0600 88,250.00 5,295.00
4 Mandor Oh 0.0750 68,050.00 5,103.75

Jumlah 627,542.25
Total Jumlah 627,542.25

Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP (SNI 6.3)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Batu Gunung M³ 1.2000 113,000.00 135,600.00
2 Semen Portland Kg 136.0000 1,864.50 253,572.00
3 Pasir Pasang M³ 0.5440 84,750.00 46,104.00

II TENAGA
1 Pekerja Oh 1.5000 57,850.00 86,775.00
2 Tukang Batu Oh 0.6000 77,975.00 46,785.00
3 Kepala Tukang Oh 0.0600 88,250.00 5,295.00
4 Mandor Oh 0.0750 68,050.00 5,103.75

Jumlah 579,234.75
Total Jumlah 579,234.75
ANALISA HARGA SATUAN PEKERJAAN

32. Memasang 1 M² Plesteran 1 Pc : 4 Ps t = 1,5 cm (SNI 6.4)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Semen Portland Kg 6.2400 1,864.50 11,634.48
2 Pasir Pasang M³ 0.0240 84,750.00 2,034.00

II TENAGA
1 Pekerja Oh 0.2000 57,850.00 11,570.00
2 Tukang Batu Oh 0.1500 77,975.00 11,696.25
3 Kepala Tukang Oh 0.0150 88,250.00 1,323.75
4 Mandor Oh 0.0100 68,050.00 680.50

Jumlah 38,938.98
Total Jumlah 38,938.98

1 M2 Pengecatan tembok baru luar (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Plamir Kg 0.1000 31,437.00 3,143.70
2 Cat Dasar Kg 0.1000 35,559.00 3,555.90
3 Cat Penutup 2 X Kg 0.2600 82,435.50 21,433.23

II TENAGA
1 Pekerja Oh 0.0200 57,850.00 1,157.00
2 Tukang Cat Oh 0.0630 77,975.00 4,912.43
3 Kepala Tukang Oh 0.0630 88,250.00 5,559.75
4 Mandor Oh 0.0025 68,050.00 170.13

Jumlah 39,932.13

35. 1 M³ Pekerjaan Rabat Beton 1 Pc : 3 Ps : 5 Kr (SNI 6.1)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Semen Portland Kg 218.0000 1,864.50 406,461.00
2 Pasir Beton M³ 0.5200 84,750.00 44,070.00
3 Batu Pecah (2 - 3 cm) M³ 0.8700 282,500.00 245,775.00
ANALISA HARGA SATUAN PEKERJAAN
II TENAGA
1 Pekerja Oh 1.6500 57,850.00 95,452.50
2 Tukang Batu Oh 0.2500 77,975.00 19,493.75
3 Kepala Tukang Oh 0.0250 88,250.00 2,206.25
4 Mandor Oh 0.0800 68,050.00 5,444.00

Jumlah 818,902.50
Total Jumlah 818,902.50
ANALISA HARGA SATUAN PEKERJAAN
1 m3 Membuat Plat beton bertulang (100 Kg besi + Bekesting) (SNI 6,32)
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Kayu Kelas III M³ 0.3200 1,525,500.00 488,160.00
2 Paku Campuran Kg 3.2000 18,419.00 58,940.80
3 Minyak Bekisting Ltr 1.6000 6,500.00 10,400.00
4 Besi Beton Polos Kg 107.0000 16,500.00 1,765,500.00
5 Kawat Beton Kg 2.2500 28,476.00 64,071.00
6 Semen Portland Kg 336.0000 1,864.50 626,472.00
7 Pasir Beton M³ 0.54000 84,750.00 45,765.00
8 Batu Pecah (2 - 3 cm) M³ 0.81000 282,500.00 228,825.00
9 Kayu Balok III M³ 0.12000 1,525,500.00 183,060.00
10 Plywood 9 mm Lbr 2.00000 149,500.00 299,000.00
11 Dolken Ø 8 cm - 4 m Btg 16.00000 12,500.00 200,000.00

II TENAGA
1 Pekerja Oh 5.3000 57,850.00 306,605.00
2 Tukang Batu Oh 0.2750 77,975.00 21,443.13
3 Tukang Kayu Oh 1.3000 77,975.00 101,367.50
4 Tukang Besi Oh 1.0500 77,975.00 81,873.75
5 Kepala Tukang Oh 0.2650 88,250.00 23,386.25
6 Mandor Oh 0.2650 68,050.00 18,033.25

Jumlah 4,522,902.68
Total Jumlah 4,522,902.68

50. 1 M² Pekerjaan Lantai Keramik 40 x 40 cm (SNI 6.10)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Keramik Kasar Bh 6.6300 20,000.00 132,600.00
2 Semen Portland Kg 9.8000 1,864.50 18,272.10
3 Pasir Pasang M³ 0.0450 84,750.00 3,813.75
4 Semen Warna Kg 1.3000 17,176.00 22,328.80

II TENAGA
1 Pekerja Oh 0.2500 57,850.00 14,462.50
2 Tukang Batu Oh 0.1250 77,975.00 9,746.88
3 Kepala Tukang Oh 0.0130 88,250.00 1,147.25
4 Mandor Oh 0.0130 68,050.00 884.65

Jumlah 203,255.93
Total Jumlah 203,255.93
DAFTAR KUANTITAS DAN HARGA
HARGA PERKIRAAN SENDIRI (HPS)
KEGIATAN : PENGADAAN SARANA DAN PRASARANA DALAM RANGKA ADAPTASI
DAN MITIGASI PERUBAHAN IKLIM
PAKET : PEMBUATAN TAMAN HIJAU
LOKASI : KAWASAN PEMERINTAHAN PEMDA HALMAHERA UTARA
TAHUN ANGGARAN : 2013

I. PEKERJAAN PERSIAPAN/PEMBERSIHAN
1 Pek. Pemberishan, Pematangan Lahan 1 Ls Rp. 10,000,000.00 Rp. 10,000,000.00
2 Pemasangan Bowplank 1 Ls Rp. 5,000,000.00 Rp. 5,000,000.00
3 Papan Nama Proyek 1 Ls Rp. 500,000.00 Rp. 500,000.00
4 Dokumentasi dan Pelaporan 1 Ls Rp. 5,000,000.00 Rp. 5,000,000.00
Rp. 20,500,000.00
II. PEKERJAAN PAGAR KELILING
1 Pekerjaan Galian Tanah 73.09 M3 Rp. 45,088.75 Rp. 3,295,536.74
2 Urugan Tanah Kembali 18.27 M3 Rp. 12,400.15 Rp. 226,581.74
3 Urugan Pasir di bawah 4.87 M3 Rp. 119,735.50 Rp. 583,111.89
4 Timbunan Tanah 250.00 M3 Rp. 100,913.75 Rp. 25,228,437.50
6 Pas. Batu Untuk Drainase 1 PC : 5 PP 103.55 M3 Rp. 579,234.75 Rp. 59,979,758.36
7 Pek. Plesteran Drainase 1 PC : 4 PP 182.74 M2 Rp. 38,938.98 Rp. 7,115,709.21
8 Pek. Sloof Beton 12.18 M3 Rp. 4,522,902.68 Rp. 55,088,954.58
9 Pek. Kolom Beton 7.62 M3 Rp. 4,522,902.68 Rp. 34,446,426.77
10 Pek. Pagar Besi Hollow 406.00 M2 Rp. 500,000.00 Rp. 203,000,000.00
11 Pekerjaan Pengecatan 182.74 M2 39,932.13 Rp. 7,297,197.44
Rp. 396,261,714.22
III. PEKERJAAN PENDESTRIAN DAN PELATARAN
1 Pekerjaan Galian Tanah 72.27 M3 Rp. 45,088.75 Rp. 3,258,563.96
2 Urugan Tanah Kembali 18.07 M3 Rp. 12,400.15 Rp. 224,039.71
3 Urugan Pasir di bawah 7.25 M3 Rp. 119,735.50 Rp. 868,082.38
4 Pas. Batu Untuk Drainase 1 PC : 5 PP 161.27 M3 Rp. 579,234.75 Rp. 93,413,188.13
5 Pek. Plesteran Drainase 1 PC : 4 PP 559.21 M2 Rp. 38,938.98 Rp. 21,775,067.01
3 Pek. Rabat Beton 63.00 M3 Rp. 818,902.50 Rp. 51,590,857.50
4 Pas. Keramik Kasar 40 X 40 1,360.48 M2 Rp. 203,255.93 Rp. 276,525,620.84
Rp. 447,655,419.53
IV. PEKERJAAN TAMAN
1 Pemasangan Rumput 800.00 M2 Rp. 25,000.00 Rp. 20,000,000.00
2 Pohom Palm Raja 85.00 Phn Rp. 500,000.00 Rp. 42,500,000.00
3 Pohon Palm Ekor Tupai 60.00 Phn Rp. 400,000.00 Rp. 24,000,000.00
4 Pohon Sepatu Dea 4.00 Phn Rp. 400,000.00 Rp. 1,600,000.00
5 Pohon Tiara Payung 35.00 Phn Rp. 300,000.00 Rp. 10,500,000.00
6 Pohon Pucuk Merah 20.00 Phn Rp. 150,000.00 Rp. 3,000,000.00
7 Bunga Pangkas 1,200.00 M1 Rp. 25,000.00 Rp. 30,000,000.00
8 Bunga Tri Color 200.00 Phn Rp. 75,000.00 Rp. 15,000,000.00
Rp. 146,600,000.00
V. PEKERJAAN LAIN-LAIN
1 Lampu Taman + Panel + Kabel 20.00 Bh Rp. 2,000,000.00 Rp. 40,000,000.00
3 Pembuatan Peresapan 1.00 ls Rp. 5,000,000.00 Rp. 5,000,000.00
4 Penyambungan PDAM 1.00 ls Rp. 1,700,000.00 Rp. 1,700,000.00
5 Penyambungan Listrik 1.00 ls Rp. 3,500,000.00 Rp. 3,500,000.00
Rp. 50,200,000.00
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
KEGIATAN PROYEK : PENGADAAN SARANA DAN PRASARANA DALAM RANGKA ADAPTASI
DAN MITIGASI PERUBAHAN IKLIM
PAKET PEKERJAAN : PEMBUATAN TAMAN HIJAU
LOKASI : KAWASAN PEMERINTAHAN PEMDA HALMAHERA UTARA
TAHUN ANGGARAN : 2013

I. PEKERJAAN PERSIAPAN/PEMBERSIHAN Rp. 20,500,000.00

II. PEKERJAAN PAGAR KELILING Rp. 396,261,714.22

III. PEKERJAAN PENDESTRIAN DAN PELATARAN Rp. 447,655,419.53

IV. PEKERJAAN TAMAN Rp. 146,600,000.00

V PEKERJAAN LAIN-LAIN Rp. 50,200,000.00

REAL COST Rp. 1,061,217,133.75


PPN 10 % x REAL COST Rp. 106,121,713.38
JUMLAH TOTAL Rp. 1,167,338,847.13
DIBULATKAN Rp. 1,167,300,000.00

Tebilang : Satu Milyar Seratus Enam Puluh Tujuh Juta Tiga Ratus Ribu Rupiah

Pejabat Pembuat Komitmen


Badan lingkungan Hidup
Kab. Halmahera Utara

....................
.........................
p 900 Type 1 m

galian la lb
1.2 1.25

1.5
1350
1350

pasangan batu
1.15
1.15
0.8
panjang 3.1
tebal 0.2 0.62 558

pasir urug
0.08
72
plesteran
1.02
1.02
0.6
2.64
2376

Plat
0.168
151.2 m3
keramik
1.4 1260 m2

rabat 0.07 63 m3

cansten 2 1800 m1

griil 0.64
bh 36 23.04 m2