Anda di halaman 1dari 1

GORDING CNP,100*50*3.

2 DINAS PERUMAHAN DAN


BOLTNUT @8 M10*40 KAWASAN PEMUKIMAN
BOLTNUT @8 M10*40 KABUPATEN JOMBANG
GUSSET PL,230*90*6T
GORDING CNP,100*50*3.2
230
50 30 50 70 50 30
30 20 PEKERJAAN

~ ~ PENINGKATAN KUALITAS

25

25
RUANG PUBLIK

60
PEMBANGUNAN TPS 3R

40

40
90

90

90
LOKASI

30

25

25
DESA TAPEN
KECAMATAN KUDU
KABUPATEN JOMBANG

150

150
MENGESAHKAN/MENYETUJUI

TAMPAK SAMPING TAMPAK DEPAN SAIFUL, ST, MT


NIP.

KONSULTAN PERENCANA

DETAIL GUSSET GORDING DIREKTUR


Skala 1:7

IKATAN GORDING RB Ø8 (DOUBLE NUT)


1.200

GORDING CNP,100*50*3.2
TEAM LEADER
GORDING CNP,100*50*3.2

IKATAN GORDING RB Ø8 (DOUBLE NUT)

50

TAMPAK SAMPING TAMPAK DEPAN


JUDUL GAMBAR SKALA

GORDING CNP,100*50*3.2
50

50

IKATAN GORDING RB Ø8 (DOUBLE NUT)

1.200

TAMPAK ATAS

DETAIL IKATAN GORDING


Skala 1:7
No.LBR KODE TGL

Anda mungkin juga menyukai