Anda di halaman 1dari 22

SATUAN KERJA :

PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT KODE ANALISA JUMLAH TOTAL (Rp.)
(Rp.)

1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN

1 Pekerjaan Mobilisasi 1.00 lsm 1,500,000.00 1,500,000.00

TOTAL SUB I 1,500,000.00

II PEKERJAAN BANGUNAN POS SATPAM

A. Pos Satpam Kedatangan

1 Pekerjaan Dinding

- Pekerjaan Pemasangan Batako 8.69 m2 A.4.4.1.17.b 165,073.88 1,434,491.97

- Pekerjaan Plesteran 8.69 m2 A.4.4.2.1 119,396.68 1,037,557.15

- Pekerjaan Pemasangan Batu Templek 8.69 m2 391,414.00 3,401,387.66

- Pekerjaan Pengecatan Dinding Batu Templek 8.69 m2 52,854.00 459,301.26

2 Pekerjaan Pintu

- Pekerjaan Pintu Besi 2.00 Unit 3,100,000.00 6,200,000.00

3 Pekerjaan Lantai Pos Satpam

- Pekerjaan Acian 2.56 m2 A.4.4.2.27 61,205.88 156,381.01

- Pekerjaan Cor Lantai 1.10 m3 A.4.1.1.1 1,455,394.58 1,600,934.03

- Pekerjaan Pemasangan Keramik 3.10 m2 A.4.4.3.34.b 802,986.93 2,489,259.47


4 Pekerjaan Pemasangan Kanopi

- Pekerjaan Kanopi 10.70 m2 710,000.00 7,593,450.00

- Pekerjaan Pengecatan Besi 10.70 m2 A.4.7.1.16 45,954.00 491,478.03

Total Pos Satpam Netral 24,864,240.58

B. Pos Satpam Netral


1 Pekerjaan Pemasangan Batako 10.59 m2 165,073.88 1,748,132.34
- Pekerjaan Plesteran 10.59 m2 119,396.68 1,264,410.84
- Pekerjaan Pemasangan Batu Templek 10.59 m2 391,414.00 4,145,074.26

- Pekerjaan Pengecatan Dinding Batu Templek 10.59 m2 52,854.00 559,723.86

2 Pekerjaan Pintu

- Pekerjaan Pintu Besi 2.00 Unit 3,100,000.00 6,200,000.00


3 Pekerjaan Lantai Pos Satpam
- Pekerjaan Acian 2.56 m2 A.4.4.2.27 61,205.88 156,381.01
- Pekerjaan Cor Lantai 1.10 m3 A.4.1.1.1 1,455,394.58 1,600,934.03
- Pekerjaan Pemasangan Keramik 3.10 m2 A.4.4.3.34.b 802,986.93 2,489,259.47

4 Pekerjaan Pemasangan Kanopi

1 Pekerjaan Kanopi 10.70 m2 710,000.00 7,593,450.00


2 Pekerjaan Pengecatan Besi 10.70 m2 A.4.7.1.16 45,954.00 491,478.03

Total Pos Satpam Kedatangan 26,248,843.84

TOTAL SUB II 51,113,084.42

III PEKERJAAN PEMASANGAN PAGAR PIPA STAINLES

1 Pipa Stainles 2,5" 56.70 Btg 780,000.00 44,226,000.00


2 Mahkota Stainles 56.70 bh 80,000.00 4,536,000.00

3 Rantai 80.00 m 70,000.00 5,600,000.00

4 Pengecatan Rantai 80.00 m A.4.7.1.16 45,954.00 3,676,320.00

58,038,320.00
TOTAL SUB III

IV
PEKERJAAN PEMASANGAN KUSEN DAN PINTU GESER

- Pekerjaan Kusen Pintu 18.40 m2 170,000.00 3,128,000.00

- Pemasangan Pintu Geser 2.00 Unit 3,800,000.00 7,600,000.00

- Pemasangan Kaca 1.5 mm 3.12 m2 237,500.00 741,000.00

TOTAL SUB IV 11,469,000.00

TOTAL SUB PEKERJAAN 122,120,404.42

PPn 10% 12,212,040.44

134,332,444.86
A.4.4.2.27 Pemasangan 1 m2 acian

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.200 144,000.00
Tukang batu L.03 OH 0.100 144,000.00
Kepala tukang L.03 OH 0.010 156,000.00
Mandor L.04 OH 0.010 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 2,050.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.1.17.bPemasangan 1 m² dinding batako uk. 20/40/7

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.350 144,000.00
Tukang batu L.02 OH 0.150 144,000.00
Kepala tukang L.03 OH 0.015 156,000.00
Mandor L.04 OH 0.018 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batako 20/40/7 (cetak mesin) Bh 12.500 3,750.00
Semen Portland Kg 7.500 2,050.00
Pasir pasang m³ 0.027 137,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.2.1 Pemasangan 1 m2 plesteran 1SP : 1 PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.300 144,000.00
Tukang batu L.03 OH 0.150 144,000.00
Kepala tukang L.03 OH 0.015 156,000.00
Mandor L.04 OH 0.015 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 15.504 2,050.00
PP m3 0.016 137,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.58 Pemasangan 1 m2 dinding batu templek

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.700 144,000.00
Tukang batu L.02 OH 0.350 144,000.00
Kepala tukang L.03 OH 0.035 156,000.00
Mandor L.04 OH 0.035 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu templek hitam Buah 1.100 135,000.00
Semen portland Kg 11.750 2,050.00
pasir pasang m3 0.035 137,500.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

Pembuatan Kanopi Rangka Besi Hollow 3x3

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.800 144,000.00
Tukang Las L.02 OH 0.500 144,000.00
Kepala tukang L.03 OH 0.050 156,000.00
Mandor L.04 OH 0.025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ranka Hollow Buah 1.000 125,000.00
Ring Atap Hollow m1 1.000 34,000.00
Seng Spandek lbr 1.000 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

Pengecatan 1m2 permukaan dinding batu

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 144,000.00
Tukang cat L.02 OH 0.200 144,000.00
Kepala tukang L.03 OH 0.020 156,000.00
Mandor L.04 OH 0.0025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
cat stone care propan Kg 0.100 105,000.00
Kwas Lbr 0.010 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.16 Pengecatan 1m2 permukaan baja dengan menie besi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 144,000.00
Tukang cat L.02 OH 0.200 144,000.00
Kepala tukang L.03 OH 0.020 156,000.00
Mandor L.04 OH 0.0025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100 45,000.00
Kwas Lbr 0.010 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.1 Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 1.650 144,000.00
Tukang batu L.02 OH 0.275 144,000.00
Kepala tukang L.03 OH 0.028 156,000.00
Mandor L.04 OH 0.083 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 247.000 2,050.00
Pasir beton Kg 869.000 137.50
Kerikil (maks 30 mm) Kg 999.000 330.00
Air Liter 215.000 63
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.7.1.16 Pengecatan 1m2 permukaan baja dengan menie besi

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.020 144,000.00
Tukang cat L.02 OH 0.200 144,000.00
Kepala tukang L.03 OH 0.020 156,000.00
Mandor L.04 OH 0.0025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100 37,500.00
Kwas Lbr 0.010 Err:509
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )

Pembuatan Kanopi Rangka Besi Hollow 4X6

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.800 144,000.00
Tukang Las L.02 OH 0.500 144,000.00
Kepala tukang L.03 OH 0.050 156,000.00
Mandor L.04 OH 0.025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ranka Hollow Buah 1.000 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.4.3.34.bPemasangan 1 m2 lantai keramik ukuran 60 x 60 cm Unpolish

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)

A TENAGA
Pekerja L.01 OH 0.700 144,000.00
Tukang batu L.02 OH 0.350 144,000.00
Kepala tukang L.03 OH 0.035 156,000.00
Mandor L.04 OH 0.035 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Unpolished Bh 1.050 481,250.00
Semen portland Kg 8.190 2,050.00
Pasir pasang m3 0.045 137,500.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga (Rp.)

28,800.00
14,400.00
1,560.00
1,800.00
46,560.00

6,662.50
6,662.50

53,222.50
7,983.38
61,205.88

Jumlah Harga (Rp.)

50,400.00
21,600.00
2,340.00
3,240.00
77,580.00

46,875.00
15,375.00
3,712.50
65,962.50

-
-
143,542.50
21,531.38
165,073.88
Jumlah Harga (Rp.)

43,200.00
21,600.00
2,340.00
2,700.00
69,840.00

31,783.20
2,200.00
33,983.20

103,823.20
15,573.48
119,396.68

Jumlah Harga (Rp.)

100,800.00
50,400.00
5,460.00
6,300.00
162,960.00

148,500.00
24,087.50
4,812.50
177,400.00

340,360.00
51,054.00
391,414.00

Jumlah Harga (Rp.)

115,200.00
72,000.00
7,800.00
4,500.00
199,500.00

125,000.00
34,000.00
65,000.00
224,000.00

423,500.00
63,525.00
487,025.00

Jumlah Harga (Rp.)

2,880.00
28,800.00
3,120.00
450.00
35,250.00

10,500.00
210.00
10,710.00
-
45,960.00
6,894.00
52,854.00

Jumlah Harga (Rp.)

2,880.00
28,800.00
3,120.00
450.00
35,250.00

4,500.00
210.00
4,710.00

-
39,960.00
5,994.00
45,954.00

Jumlah Harga (Rp.)

237,600.00
39,600.00
4,368.00
14,940.00
296,508.00

506,350.00
119,487.50
329,670.00
13,545.00
969,052.50

1,265,560.50
189,834.08
1,455,394.58

Jumlah Harga (Rp.)

2,880.00
28,800.00
3,120.00
450.00
35,250.00

3,750.00
Err:509
Err:509

-
Err:509
Err:509
Err:509

Jumlah Harga (Rp.)

115,200.00
72,000.00
7,800.00
4,500.00
199,500.00
240,000.00
240,000.00

439,500.00
65,925.00
505,425.00

Jumlah Harga (Rp.)

100,800.00
50,400.00
5,460.00
6,300.00
162,960.00

505,312.50
16,789.50
6,187.50
7,000.00
535,289.50

698,249.50
104,737.43
802,986.93
X. UPAH KERJA

1 Pekerja Org / Hari 144000


2 Mandor Org / Hari 180000
3 Kepala Tukang Org / Hari 156000

4 Tukang Kayu Org / Hari Rp 144.000,00

5 Tukang Semen Org / Hari Rp 144.000,00

6 Tukang Batu Org / Hari 144000

7 Tukang Besi Org / Hari Rp 144.000,00

8 Tukang Pipa Org / Hari Rp 144.000,00

9 Tukang Cat Org / Hari Rp 144.000,00

10 Mandor lapangan Org / Hari Rp 180.000,00

11 Mekanik Org / Hari Rp 168.000,00

12 Mekanik Pembantu Org / Hari Rp 144.000,00

13 Tukang kepala Org / Hari Rp 156.000,00

14 Tukang Org / Hari Rp 144.000,00

15 Operator terlatih Org / Hari Rp 168.000,00

16 Operator kurang terlatih Org / Hari Rp 144.000,00

17 Pembantu operator Org / Hari Rp 96.000,00

18 Supir material / truck Org / Hari Rp 168.000,00

19 Supir personil Org / Hari Rp 144.000,00

20 Pembantu supir / kernet Org / Hari Rp 96.000,00

21 Buruh lapangan tak terlatih Org / Hari Rp 96.000,00

22 Buruh lapangan agak terlatih Org / Hari Rp 120.000,00

23 Buruh lapangan terlatih Org / Hari Rp 144.000,00

XVI. HARGA SATUAN BARANG/MATERIAL BANGUNAN DAN UPAH KERJA

Na
ma Spesifikasi, Merk, Tipe dan
No Satuan
Bar Ukuran
ang
### 1 3 4
Bahan Pasir, Batu, air dan
A. Tanah dan Bahan Konstruksi

1 Batu Gunung atau Quarry M3


2 Batu Quarry - Royalti M3
3 Kerikil Galian - Royalti M3

4 Kerikil Sungai - Royalti (Gravel) M3

5 Batu Belah 10 - 15 CM M3
6 Batu Pecah 3 - 5 CM M3
7 Batu Pecah 2 - 3 CM M3
8 Batu Pecah 1 - 2 CM M3
9 Batu Pecah 0,5 - 1 CM M3
10 Stone Dust M3

11 Gorong - Gorong Beton Diameter 40 CM M1

12 Gorong - Gorong Beton Diameter 60 CM M1

13 Gorong - Gorong Beton Diameter 80 CM M1

14 Gorong - Gorong Beton Diameter 100 CM M1

15 Pasir Urug / Timbun M3


16 Pasir Ayak Untuk Beton M3
17 Sirtu ( Tak Ayak ) M3
18 Sirtu - Royalti M3
19 Timbunan Pilihan M3
20 Aspal Bitumen KG
21 Minyak Aspal LT
22 Minyak Tanah LT
23 Kayu Bakar M3
24 Kapur Bakar M3
25 Cat Jembatan KG
26 Baja Teralis KG
27 Terpal Uk. 4 x 3 buah
K. ( 2 m X 1 m X 0,5 m ) Tebal
28 Bronjong (kawat) buah
kawat 3 m
29 Plastik untuk cor beton 1 KG
30 Baut Baja BH
31 Besi propil KG
Baja Konstruksi / Profil
32 (Galvanisir untuk Jembatan) KG

33 Paku Jembatan 1 KG
34 Kawat Baja ( Binrat ) KG
35 Kayu Untuk Perancah BTG
36 Teer 1 LT
37 Beugel BTG
38 Besi Spoor Plank BH
39 Timbunan Pilihan Setempat M3
40 Baut BH
Kayu Pancang ( Dolken ) Dia
41 10/15 Panjang 2,5 M BTG

42 Kayu Cerucuk/dolken 6-8-pj.4 M BTG


43 Kayu Cerucuk/dolken 8-10-pj.4 M BTG
44 Bata Merah Buah
45 Batako Cetak Buah
46 Terawang / Rooster Batako Buah
47 Paving Block Buah
48 Air Liter

HARGA SATUAN BARANG/MATERIAN BANGUNAN


DAN UPAH KERJA

Na
ma Spesifikasi, Merk,
No Satuan
Bar Tipe dan Ukuran
ang
### 1 3 4

B. Bahan Semen (CEMENT)


1 Semen PC 50 Kg / Zak
2 Semen Warna / Oker 1 Kg

H. BAHAN CAT ( PAINT )


1 Amplas Kayu / Besi / Tembok Lembar
2 Dempul 3 Kg
3 Cat Dasar Tembok Kaleng/5kg
4 Cat Dasar Kayu Kg
5 Meni Besi Kg
6 Cat Kilat Kg
7 Plamur Kg
8 Cat Khusus Tembok Luar Kaleng/5ltr

BAHAN UBIN ( TILE, CERAMIC,


D. GRANITE, MARBLE )

20 x
1 Keramik Porselin 20 Kotak
Polo
20 x
2 Keramik Porselin 20 Kotak
War
uk. 20 x 20 Warna
3 Keramik Porselin Kotak
Anti Slip
20 x
4 Keramik Porselin 25 Kotak
War
40 x
5 Keramik Porselin 40 Kotak
Polo
40 x
6 Keramik Porselin 40 Kotak
War
uk. 40 x
7 Keramik Porselin 40 anti Kotak
slip
uk. 40 x 40 anti
8 Keramik Porselin Kotak
gores (KW1)
uk. 40 x 40 anti
9 Keramik Porselin Kotak
gores (KW2)
uk. 60 x 60 anti
10 Keramik Porselin Kotak
gores (KW1)
8
11 Lis dinding Keramik WC x BUAH
2
0
12 Lis dinding Keramik WC BUAH
x
30 x
13 Keramik Porselin 30 Kotak
Polo
30 x
14 Keramik Porselin 30 Kotak
War
uk. 30 x 30
15 Keramik Porselin Kotak
Polos Anti Slip
uk. 30 x 30 Warna
16 Keramik Porselin Kotak
Anti Slip
uk. 60 x 60
17 Keramik Porselin Kotak
unpolished
11 x
18 Porselin 11 M2
Putix
10
19 Porselin 10 M2
War
P
20 Batu alam M2
a
10 x
21 Batu alam Mammo 20 M2
crea
10 x
22 Batu alam Mammo 20 M2
abu-
Harga
5

Rp 225.000
Rp 225.000
Rp 225.000

330000
330
Rp 593.125
Rp 793.750
Rp 790.625
Rp 787.500
Rp 800.000
Rp 525.625

Rp 525.625

Rp 822.200

Rp 1.017.500

Rp 1.525.313

Rp 126.250
137500 137.5
Rp 137.813
Rp 133.750
Rp 68.750
Rp 24.063
Rp 1.875
Rp 18.750
Rp 68.750
Rp 7.500
Rp 268.750
Rp 151.875
Rp 150.000

Rp 494.063

Rp 27.500
Rp 15.000
Rp 26.875

Rp 51.875

Rp 31.250
Rp 31.250
Rp 7.500
Rp 100.000
Rp 30.000
Rp 30.000
Rp 29.375
Rp 10.000

Rp 39.375

Rp 10.375
Rp 11.875
Rp 3.750
3750
Rp 81.250
Rp 3.125
63

Harga

Rp 102.500 2050
Rp 18.750

Rp 3.750
Rp 62.500
Rp 162.500
Rp 50.000
Rp 37.500
Rp 77.500
Rp 37.500
Rp 281.250

Rp 75.000

Rp 81.250

Rp 100.000

Rp 100.000

Rp 87.500

Rp 100.000
Rp 110.000

Rp 118.750

Rp 106.250

Rp 456.250

Rp 18.750
Rp 6.250

Rp 62.500

Rp 87.500

Rp 87.500

Rp 93.750

Rp 481.250

Rp 68.251

Rp 87.500

Rp 275.313

Rp 236.250

Rp 275.625
SATUAN KERJA :
PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT KODE ANALISA JUMLAH TOTAL (Rp.)
(Rp.)

1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN

1 Pekerjaan Mobilisasi 1.00 lsm 1,500,000.00 1,500,000.00

TOTAL SUB I 1,500,000.00

II PEKERJAAN BANGUNAN POS SATPAM

A. Pos Satpam Kedatangan

1 Pekerjaan Dinding

- Pekerjaan Pemasangan Batako 8.69 m2 A.4.4.1.17.b 165,073.88 1,434,491.97

- Pekerjaan Plesteran 8.69 m2 A.4.4.2.1 119,396.68 1,037,557.15

- Pekerjaan Pemasangan Batu Templek 8.69 m2 391,414.00 3,401,387.66

- Pekerjaan Pengecatan Dinding Batu Templek 8.69 m2 52,854.00 459,301.26

2 Pekerjaan Pintu

- Pekerjaan Pintu Besi 2.00 Unit 3,100,000.00 6,200,000.00

3 Pekerjaan Lantai Pos Satpam

- Pekerjaan Acian 2.56 m2 A.4.4.2.27 61,205.88 156,381.01

- Pekerjaan Cor Lantai 1.10 m3 A.4.1.1.1 1,455,394.58 1,600,934.03

- Pekerjaan Pemasangan Keramik 3.10 m2 A.4.4.3.34.b 802,986.93 2,489,259.47


4 Pekerjaan Pemasangan Kanopi

- Pekerjaan Kanopi 10.70 m2 710,000.00 7,593,450.00

- Pekerjaan Pengecatan Besi 10.70 m2 A.4.7.1.16 45,954.00 491,478.03

Total Pos Satpam Netral 24,864,240.58

B. Pos Satpam Netral


1 Pekerjaan Pemasangan Batako 10.59 m2 165,073.88 1,748,132.34
- Pekerjaan Plesteran 10.59 m2 119,396.68 1,264,410.84
- Pekerjaan Pemasangan Batu Templek 10.59 m2 391,414.00 4,145,074.26

- Pekerjaan Pengecatan Dinding Batu Templek 10.59 m2 52,854.00 559,723.86

2 Pekerjaan Pintu

- Pekerjaan Pintu Besi 2.00 Unit 3,100,000.00 6,200,000.00


3 Pekerjaan Lantai Pos Satpam
- Pekerjaan Acian 2.56 m2 A.4.4.2.27 61,205.88 156,381.01
- Pekerjaan Cor Lantai 1.10 m3 A.4.1.1.1 1,455,394.58 1,600,934.03
- Pekerjaan Pemasangan Keramik 3.10 m2 A.4.4.3.34.b 802,986.93 2,489,259.47

4 Pekerjaan Pemasangan Kanopi

1 Pekerjaan Kanopi 10.70 m2 710,000.00 7,593,450.00


2 Pekerjaan Pengecatan Besi 10.70 m2 A.4.7.1.16 45,954.00 491,478.03

Total Pos Satpam Kedatangan 26,248,843.84

TOTAL SUB II 51,113,084.42

III PEKERJAAN PEMASANGAN PAGAR PIPA STAINLES

1 Pipa Stainles 2,5" 56.70 Btg 782,000.00 44,339,400.00


2 Mahkota Stainles 56.70 bh 80,000.00 4,536,000.00

3 Rantai 80.00 m 70,000.00 5,600,000.00

4 Pengecatan Rantai 80.00 m A.4.7.1.16 45,954.00 3,676,320.00

58,151,720.00
TOTAL SUB III

IV
PEKERJAAN PEMASANGAN KUSEN DAN PINTU GESER

- Pekerjaan Kusen Pintu 18.40 m2 170,000.00 3,128,000.00

- Pemasangan Pintu Geser 2.00 Unit 3,800,000.00 7,600,000.00

- Pemasangan Kaca 1.5 mm 3.12 m2 237,500.00 741,000.00

TOTAL SUB IV 11,469,000.00

TOTAL SUB PEKERJAAN 122,233,804.42

PPn 10% 12,223,380.44

134,457,184.86