PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT KODE ANALISA JUMLAH TOTAL (Rp.)
(Rp.)
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Dinding
2 Pekerjaan Pintu
2 Pekerjaan Pintu
58,038,320.00
TOTAL SUB III
IV
PEKERJAAN PEMASANGAN KUSEN DAN PINTU GESER
134,332,444.86
A.4.4.2.27 Pemasangan 1 m2 acian
A TENAGA
Pekerja L.01 OH 0.200 144,000.00
Tukang batu L.03 OH 0.100 144,000.00
Kepala tukang L.03 OH 0.010 156,000.00
Mandor L.04 OH 0.010 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250 2,050.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.350 144,000.00
Tukang batu L.02 OH 0.150 144,000.00
Kepala tukang L.03 OH 0.015 156,000.00
Mandor L.04 OH 0.018 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batako 20/40/7 (cetak mesin) Bh 12.500 3,750.00
Semen Portland Kg 7.500 2,050.00
Pasir pasang m³ 0.027 137,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 144,000.00
Tukang batu L.03 OH 0.150 144,000.00
Kepala tukang L.03 OH 0.015 156,000.00
Mandor L.04 OH 0.015 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 15.504 2,050.00
PP m3 0.016 137,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.700 144,000.00
Tukang batu L.02 OH 0.350 144,000.00
Kepala tukang L.03 OH 0.035 156,000.00
Mandor L.04 OH 0.035 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu templek hitam Buah 1.100 135,000.00
Semen portland Kg 11.750 2,050.00
pasir pasang m3 0.035 137,500.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.800 144,000.00
Tukang Las L.02 OH 0.500 144,000.00
Kepala tukang L.03 OH 0.050 156,000.00
Mandor L.04 OH 0.025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ranka Hollow Buah 1.000 125,000.00
Ring Atap Hollow m1 1.000 34,000.00
Seng Spandek lbr 1.000 65,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.020 144,000.00
Tukang cat L.02 OH 0.200 144,000.00
Kepala tukang L.03 OH 0.020 156,000.00
Mandor L.04 OH 0.0025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
cat stone care propan Kg 0.100 105,000.00
Kwas Lbr 0.010 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D (maksimum)
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
Pekerja L.01 OH 0.020 144,000.00
Tukang cat L.02 OH 0.200 144,000.00
Kepala tukang L.03 OH 0.020 156,000.00
Mandor L.04 OH 0.0025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100 45,000.00
Kwas Lbr 0.010 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.1.1 Membuat 1m3 beton mutu f'c = 7,4 Mpa ( K 100), slump (12 ± 2) cm ,w/c =0,87
A TENAGA
Pekerja L.01 OH 1.650 144,000.00
Tukang batu L.02 OH 0.275 144,000.00
Kepala tukang L.03 OH 0.028 156,000.00
Mandor L.04 OH 0.083 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 247.000 2,050.00
Pasir beton Kg 869.000 137.50
Kerikil (maks 30 mm) Kg 999.000 330.00
Air Liter 215.000 63
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.020 144,000.00
Tukang cat L.02 OH 0.200 144,000.00
Kepala tukang L.03 OH 0.020 156,000.00
Mandor L.04 OH 0.0025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100 37,500.00
Kwas Lbr 0.010 Err:509
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.800 144,000.00
Tukang Las L.02 OH 0.500 144,000.00
Kepala tukang L.03 OH 0.050 156,000.00
Mandor L.04 OH 0.025 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ranka Hollow Buah 1.000 240,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.700 144,000.00
Tukang batu L.02 OH 0.350 144,000.00
Kepala tukang L.03 OH 0.035 156,000.00
Mandor L.04 OH 0.035 180,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 60x60 cm Unpolished Bh 1.050 481,250.00
Semen portland Kg 8.190 2,050.00
Pasir pasang m3 0.045 137,500.00
Semen warna Kg 0.500 14,000.00
JUMLAH HARGA BAHAN
C PERALATAN
28,800.00
14,400.00
1,560.00
1,800.00
46,560.00
6,662.50
6,662.50
53,222.50
7,983.38
61,205.88
50,400.00
21,600.00
2,340.00
3,240.00
77,580.00
46,875.00
15,375.00
3,712.50
65,962.50
-
-
143,542.50
21,531.38
165,073.88
Jumlah Harga (Rp.)
43,200.00
21,600.00
2,340.00
2,700.00
69,840.00
31,783.20
2,200.00
33,983.20
103,823.20
15,573.48
119,396.68
100,800.00
50,400.00
5,460.00
6,300.00
162,960.00
148,500.00
24,087.50
4,812.50
177,400.00
340,360.00
51,054.00
391,414.00
115,200.00
72,000.00
7,800.00
4,500.00
199,500.00
125,000.00
34,000.00
65,000.00
224,000.00
423,500.00
63,525.00
487,025.00
2,880.00
28,800.00
3,120.00
450.00
35,250.00
10,500.00
210.00
10,710.00
-
45,960.00
6,894.00
52,854.00
2,880.00
28,800.00
3,120.00
450.00
35,250.00
4,500.00
210.00
4,710.00
-
39,960.00
5,994.00
45,954.00
237,600.00
39,600.00
4,368.00
14,940.00
296,508.00
506,350.00
119,487.50
329,670.00
13,545.00
969,052.50
1,265,560.50
189,834.08
1,455,394.58
2,880.00
28,800.00
3,120.00
450.00
35,250.00
3,750.00
Err:509
Err:509
-
Err:509
Err:509
Err:509
115,200.00
72,000.00
7,800.00
4,500.00
199,500.00
240,000.00
240,000.00
439,500.00
65,925.00
505,425.00
100,800.00
50,400.00
5,460.00
6,300.00
162,960.00
505,312.50
16,789.50
6,187.50
7,000.00
535,289.50
698,249.50
104,737.43
802,986.93
X. UPAH KERJA
Na
ma Spesifikasi, Merk, Tipe dan
No Satuan
Bar Ukuran
ang
### 1 3 4
Bahan Pasir, Batu, air dan
A. Tanah dan Bahan Konstruksi
5 Batu Belah 10 - 15 CM M3
6 Batu Pecah 3 - 5 CM M3
7 Batu Pecah 2 - 3 CM M3
8 Batu Pecah 1 - 2 CM M3
9 Batu Pecah 0,5 - 1 CM M3
10 Stone Dust M3
33 Paku Jembatan 1 KG
34 Kawat Baja ( Binrat ) KG
35 Kayu Untuk Perancah BTG
36 Teer 1 LT
37 Beugel BTG
38 Besi Spoor Plank BH
39 Timbunan Pilihan Setempat M3
40 Baut BH
Kayu Pancang ( Dolken ) Dia
41 10/15 Panjang 2,5 M BTG
Na
ma Spesifikasi, Merk,
No Satuan
Bar Tipe dan Ukuran
ang
### 1 3 4
20 x
1 Keramik Porselin 20 Kotak
Polo
20 x
2 Keramik Porselin 20 Kotak
War
uk. 20 x 20 Warna
3 Keramik Porselin Kotak
Anti Slip
20 x
4 Keramik Porselin 25 Kotak
War
40 x
5 Keramik Porselin 40 Kotak
Polo
40 x
6 Keramik Porselin 40 Kotak
War
uk. 40 x
7 Keramik Porselin 40 anti Kotak
slip
uk. 40 x 40 anti
8 Keramik Porselin Kotak
gores (KW1)
uk. 40 x 40 anti
9 Keramik Porselin Kotak
gores (KW2)
uk. 60 x 60 anti
10 Keramik Porselin Kotak
gores (KW1)
8
11 Lis dinding Keramik WC x BUAH
2
0
12 Lis dinding Keramik WC BUAH
x
30 x
13 Keramik Porselin 30 Kotak
Polo
30 x
14 Keramik Porselin 30 Kotak
War
uk. 30 x 30
15 Keramik Porselin Kotak
Polos Anti Slip
uk. 30 x 30 Warna
16 Keramik Porselin Kotak
Anti Slip
uk. 60 x 60
17 Keramik Porselin Kotak
unpolished
11 x
18 Porselin 11 M2
Putix
10
19 Porselin 10 M2
War
P
20 Batu alam M2
a
10 x
21 Batu alam Mammo 20 M2
crea
10 x
22 Batu alam Mammo 20 M2
abu-
Harga
5
Rp 225.000
Rp 225.000
Rp 225.000
330000
330
Rp 593.125
Rp 793.750
Rp 790.625
Rp 787.500
Rp 800.000
Rp 525.625
Rp 525.625
Rp 822.200
Rp 1.017.500
Rp 1.525.313
Rp 126.250
137500 137.5
Rp 137.813
Rp 133.750
Rp 68.750
Rp 24.063
Rp 1.875
Rp 18.750
Rp 68.750
Rp 7.500
Rp 268.750
Rp 151.875
Rp 150.000
Rp 494.063
Rp 27.500
Rp 15.000
Rp 26.875
Rp 51.875
Rp 31.250
Rp 31.250
Rp 7.500
Rp 100.000
Rp 30.000
Rp 30.000
Rp 29.375
Rp 10.000
Rp 39.375
Rp 10.375
Rp 11.875
Rp 3.750
3750
Rp 81.250
Rp 3.125
63
Harga
Rp 102.500 2050
Rp 18.750
Rp 3.750
Rp 62.500
Rp 162.500
Rp 50.000
Rp 37.500
Rp 77.500
Rp 37.500
Rp 281.250
Rp 75.000
Rp 81.250
Rp 100.000
Rp 100.000
Rp 87.500
Rp 100.000
Rp 110.000
Rp 118.750
Rp 106.250
Rp 456.250
Rp 18.750
Rp 6.250
Rp 62.500
Rp 87.500
Rp 87.500
Rp 93.750
Rp 481.250
Rp 68.251
Rp 87.500
Rp 275.313
Rp 236.250
Rp 275.625
SATUAN KERJA :
PEKERJAAN :
LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT KODE ANALISA JUMLAH TOTAL (Rp.)
(Rp.)
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Dinding
2 Pekerjaan Pintu
2 Pekerjaan Pintu
58,151,720.00
TOTAL SUB III
IV
PEKERJAAN PEMASANGAN KUSEN DAN PINTU GESER
134,457,184.86