Anda di halaman 1dari 6

Sheet Pile Precast

Ditanya:
1. D (Dalam Pemasangan) = …?
2. F (Material Angker) = …?
3. S (Material Turap) =…?
4. X (Panjang Angker) = …?
5. Las Angker = …?
6. Jenis Penahan Angker = …?
Penyelesaian:
 Langkah 1:
❑ 10
Ka1 = tan2 (45 - 2 ¿ = tan2 (45 - ¿
2
= 0.70
❑ 20
Ka2 = tan2 (45 - 2 ¿ = tan2 (45 - ¿
2
= 0.49
❑ 10
Kp1 = tan2 (45 + 2 ¿ = tan2 (45 + ¿
2
= 1.42
❑ 20
Kp2 = tan2 (45 + 2 ¿ = tan2 (45 + ¿
2
=2

 Langkah 2:
P1 = ϒ1 x ka1 x L1 = 1.5 x 0.70 x 2
= 2.1 T/m2

P2 = ϒ1 x L1 x Ka2 x L2 = 1.5 x 2 x 0.49 x 2


= 2.94 T/m2

P3 = (1/2 x (ϒsat2 – ϒw) x Ka2 x L2) = ((1/2(1.7 – 1 ) x 0.49 x 2)


= 0.343 T/m2

P4 = (ϒ1 x L1 x Ka2) + (ϒsat2 – ϒw) x L2 x Ka2 x L3/2 x 2/3)


= (1.5 x 2 x 0.49) + (1.7 –1) x 2 x 0.49 x 2.78/2 x 2/3)
= 1.47 + 0.63
= 2.1 T/m2

P5 = (1/2ϒw x L2) = (0.5 x 1 x 2)


= 1 T/m2

P6 = q x ka1 x L1 = 2 x 0.70 x 2
= 2.8 T/m2

P7 = q x ka2 x L2 = 2 x 0.49 x 2
= 1.96 T/m2

 Langkah 3:
P2 2.94
L3 = =
ϒ ' (kp 2−ka 2) 0.7(2−0,49)
= 2.78 m

 Langkah 4:
P = P1 + P2 + P3 + P4 + P5 + P6 + P7
= 13.243 T/m2

 Langkah 5:
Ž=

1 1 1 1 2 1 1
P[ 3 2 ( ) (
3 3 ) ( ) (
P 1( L1+ L 2+ L3)+ P 2 L2+ L 3 + P 3 L2+ L 3 + P 4 L 3 + P5 L2+ L 3 + P6 L1
3 2 ) (
=

1 1 1 1 2 1 1
13.243 [ ( ) ( ) ( ) (
2.1( 2+2+2.78)+2.94 2+ 2.78 + 0.343 2+2.78 +2.1 2.78 +1 2+2.78 +2.8 2
3 2 3 3 3 2 ) (
1
= [ 12.138+11.1132+1.18+3.892+3.446+ 16.184+8.388 ]
13.243
= 4.25 m

Penyelesaian:
1. D = ?
L4 (asumsi)
D = L3 + L4
= 2.78 m + 1 m
= 3.78 m
2. F = ?
F = P – ½ x (ϒ’ x (Kp1 – Ka1)) x L42
= 13.243 – (0.5 x (0.7 x (1.42 – 0.70) x 12
= 12.991 Ton

3. Material Turap = ?
Luas Penampang Anchor
Pt = 1 x f
= 1 x 12.991= 12.992
a = ½ Ka1 ϒ’
= ½ x 0.70 x 0.7
= 0.24
b = 2.1
c = ½ P1 L1 – F
= ½ 2.1 x 2 – 12.991
= -10.891

1/2PL1 – F + P1 (Z - L1) + ½ Ka1 ϒ (Z – L1)2


= ½ x 2.1 x 2 – 12.991 + 2.1 (Z – 2) + ½ 0.7 x 0.7 (Z – 2)2
= 2.1 – 12.991 + 2.1x + 0.245x2
= x2 +8.57x - 44.45

−8.57 ± √8.57 2−4 x 1 x −45.63


X 1,2=
2
= 3.71 m
Jadi
1/2PL1 – F + P1 (Z - L1) + ½ Ka1 ϒ (Z – L1)2
= ½ x 2.1 x 2 – 12.991 + 2.1 (Z – 2) + ½ 0.7 x 0.7 (Z – 2)2
= 2.1 – 12.991 + 2.1x + 0.245x2
= 15.38 ton

Material Ancor = ?
D = √4 π / A
Pakai U41
P total/41kg/cm2
13243/4100 = 3.21 cm2
D = √4 π / A
= √ 4 π /2.75
= 1.97 ̴ 2 digunakan 2Ø10 mm

4. Material Turap
Pakai Fc = 3000 kg/cm2
M max 15380 kg
S= =
T ijin 3000 kg/cm 2
= 5 cm2
Sheet Pile yg diambil 800 mm, Precast Concrete Sheet Pile

6. Konstruksi Penahan Anchor


Jadi konstruksi penahan Anchor adalah baja dengan mutu 41 Mpa
7. X = ?
Tan 30O = x/10
X = 5.77