Anda di halaman 1dari 3

Tabung/Kedalaman Diameter

kelompok Interval pemboran (m)


(m) (cm)
0m-5m Gt.01/3,05 -3,35 m 30
5m-10m Gt.01/ 8,45-8,75 m 30
7 10m-15m Gt.01/13,04-13,34 m 30
15m-20m Gt.01/17,35-17,65 m 30
20m-30m Gt.01/21,35-21,65 30

kelompok

7
Bobot Isi (γ)
Kohesi (kg/cm2)  Sudut Geser Φ (o)
g/cm3
1.817 0.094 26o22’53,08” 26 22 53.08
2.353 0.076 24 22’13,89”°
o
24 22 13.89
1.843 0.07 28o8’48,41” 28 8 48.41
2.133 0.062 31o37’59,05” 31 37 59.05
1.53 0.052 28o38’4,34” 28 38 4.34

Interval Tabung/Kedalaman Diameter Bobot Isi Kohesi  Sudut Geser


pemboran (m) (m) (cm) (γ) kN/m3 (kN/m2) Φ (o)
0m-5m Gt.01/3,05 -3,35 m 30 17.819319 9.21858 26.381411111
5m-10m Gt.01/ 8,45-8,75 m 30 23.075871 7.45332 24.370525
10m-15m Gt.01/13,04-13,34 m 30 18.074301 6.8649 28.146780556
15m-20m Gt.01/17,35-17,65 m 30 20.918331 6.08034 31.633069444
20m-30m Gt.01/21,35-21,65 30 15.00471 5.09964 28.634538889