Anda di halaman 1dari 3

KEBUTUHAN ANGGARAN PEKERJAAN MOBIL

CAT / DICO MOBIL (Casis + Body Luar + Body Dalam) 15,000,000


LAS 4,000,000
GANTI ATAP 3,000,000
GANTI PINTU BELAKANG 2,000,000
BIAYA TAK TERDUGA 4,000,000
TOTAL 28,000,000

PENGELUARAN TRANSFER DP

TANGGAL 4 FEBRUARI 2019


TRANSFER DP 10,000,000
TANGGAL 5 FEBRUARI 2019
TRANSFER DP 4,000,000
TANGGAL 30 APRIL 2019
TRANSFER DP 3,000,000
TANGGAL 12 SEPTEMBER 2019
TRANSFER DP 2,500,000
TOTAL 19,500,000

TOTAL TRANSFER DP 19,500,000


TOTAL PENGELUARAN PEMILIK 6,485,000 +
JUMLAH 25,985,000

TOTAL BIAYA 28,000,000


TOTAL PEMBAYARAN 25,985,000 -
SISA PEMBAYARAN 2,015,000

YANG KURANG :
KACA SPION DALAM ……………
BRACKET LAMPU SOROT ……………
DOORTRIM PINTU BELAKANG ……………
TALANG AIR HUJAN ……………
STEL KAKI-KAKI ……………
TANGGAL 23 JULI 2019
1 LEMBAR TERPAL 4X6 170,000
1 ROL TALI RAFIA 15,000
5 LEMBAR AMPLAS 220 30,000
TANGGAL 29 JULI 2019
2 METER AMPLAS 150 20,000
TANGGAL 31 JULI 2019
1 PASANG LEM FILIPIN 170,000
5 LEMBAR AMPLAS 360 30,000
1 BUAH ISOLASI 10,000
PANJAR BAPAK ASWAD 500,000
TANGGAL 2 AGUSTUS 2019
1 KALENG CAT DANAGLOS 130,000
TANGGAL 22 AGUSTUS 2019
2 SET CLEAR BLINKEN HS 750,000
1 KALENG HUMERTONE 70,000
2 LITER CAT GALAXY 900,000
1 KALENG PP PRIMER 120,000
1 KALENG CAT DANAGLOS 110,000
TANGGAL 24 AGUSTUS 2019
PANJAR BAPAK ASWAD 500,000
TANGGAL 26 AGUSTUS 2019
1 KALENG DEMPUL 125,000
2 METER AMPLAS 50 32,000
2 METER AMPLAS 150 32,000
5 LEMBAR AMPLAS 320 30,000
TANGGAL 23 SEPTEMBER 2019
2 METER AMPLAS 180 14,000
TANGGAL 28 SEPTEMBER 2019
1 KALENG CAT DANAGLOS 130,000
TANGGAL 29 SEPTEMBER 2019
1 KALENG THINER A 5 LITER 125,000
3 KALENG THINER A 1 LITER 91,500
ADI PANJAR 500,000
TANGGAL 30 SEPTEMBER 2019
3 LEMBAR AMPLAS 360 24,000
1 KALENG THINER SUPER 3,75 LITER 129,500
1 KALENG THINER A 5 LITER 132,000
TANGGAL 02 OKTOBER 2019
4 BUAH ISOLASI DICO 20,000
TANGGAL 05 OKTOBER 2019
1 KALENG LUX CLEAR DOP 50,000
5 LEMBAR AMPLAS 2000 25,000
TANGGAL 07 OKTOBER 2019
ONGKOS KERJA ADI 1,500,000
TOTAL 6,485,000

Anda mungkin juga menyukai