(BQ)
PEKANBARU
Tahun : 2011
DISIAPKAN OLEH
PROYEK
RENOVASI MDS SKA - PEKANBARU
DI
PEKANBARU
BILL OF QUANTITY
PEKERJAAN MEKANIKAL dan ELEKTRIKAL
Harga Jumlah
No. Uraian Jenis Pekerjaan Sat. Vol. Satuan Harga
(Rp.) (Rp.)
Pembongkaran
Saluran udara suplai/kembali (supply/return air duct), isolasi luar
Sub Total Pek. Pembongkaran Mek. Selling Area lantai Ground ( A ) #REF!
Pembongkaran
Saluran udara suplai/kembali (supply/return air duct), isolasi luar
HARGA HARGA
No. Jenis Pekerjaan SAT. VOL SATUAN TOTAL
Rp Rp
Sub Total Pek. Bongkaran Inst. Listrik Lt. Ground ( A.1 ) 4,247,500
Bongkaran Kabel NYMHY 2 x 1.5 mm2 di dalam counduit 20 mm Instalasi SOUND SYSTEM
( Line Tidak Dibongkar )
1 Ceilling Speaker ttk 20 8,000 160,000
HARGA HARGA
No. Jenis Pekerjaan SAT. VOL SATUAN TOTAL
Rp Rp
3 Stop kontak kolom / dinding bh 20 4,000 80,000
4 Stop kontak lantai bh 0 4,000 -
5 Stop kontak kassa bh 12 4,000 48,000
Bongkaran Kabel NYMHY 2 x 1.5 mm2 di dalam counduit 20 mm Instalasi SOUND SYSTEM
( Line Tidak Dibongkar )
1 Ceiling Speaker ttk 8 8,000 64,000
UMUM
Lingkup pekerjaan yang tercantum di dalam BQ ini adalah untuk pengadaan
dan pemasangan Instalasi Tata udara dan Plambing lengkap dengan segala
kelengkapan dan perlengkapan yang diperlukan baik yang disebutkan
maupun yang tidak disebutkan dalam uraian pekerjaan. Note
VOLUME
Semua volume yang tercantum dalam BQ adalah volume pekerjaan bersih
dan dihitung menerus termasuk sambungan - sambungan pipa, terminal
dan perlengkapan lainnya. Note
Harga satuan pekerjaan harus juga mencakup faktor-faktor dibawah ini: Note
- Persiapan permukaan / lahan.
- Contoh-contoh.
- Perlindungan pekerjaan dari cuaca dan operasional bangunan.
- Pembersihan setelah pelaksanaan.
- Angkur-angkur, plat, besi sambungan, ganjalan dan segala
perlengkapan lainnya yang harus ditanam ke dinding atau struktur
bangunan yang diperlukan.
- Pengadaan dan pemasangan accessories yang diperlukan.
- Pemotongan, pemasangan dan perbaikan struktur / penyelesaian
disekitar instalasi.
- Pengisian, pengecoran lubang di sekitar pipa, conduits dan lain-lain.
- Pengujian instalasi.
- Pengecatan dan penamaan instalasi.
- Untuk pipa galvanis dan PVC sampai dengan dia. 2 inch harus
termasuk sambungan (fitting) pipa.
NOTE:
Dalam pengisian B O Q ini, pihak Pemborong diminta untuk mempelajari Gambar,
Spesifikasi teknik dan Risalah Aanwijzing dengan baik, adalah resiko dari pihak
Pemborong sendiri, apabila tidak teliti mempelajarinya yang berakibat kesalahan
dalam pengisian Harga Satuan. Tidak ada tuntutan yang disahkan untuk kekeliruan
ini. Demikian pula apabila ada item pekerjaan yang tidak diisi oleh pihak Pembo-
rong, maka hal tersebut dianggap sudah termasuk dalam kontrak.
Harga Satuan pekerjaan sudah termasuk semua bahan, upah, waste, perbaikan
pekerjaan, assessories dan persiapan pekerjaan untuk mencapai kesempurnaan
Pengadaan dan pemasangan Supply Air Diffuser ( SAD ), Allumunium Powder coating
dengan sesuai spesifikasi teknis dari PT. MDS
8 Ukuran Ø 300 ( 12 ") L/d box + spengot/sock damper, warna Powder Coating bh 10 #REF! 444,000 #REF!
Sub Total Pek. Instalasi Tata Udara & Ventilasi Lt. Ground ( A.1 ) #REF!
9 Pengurasan dan pengisian air kembali pipa sprinkler ( termasuk material Bantu) lot 1 #REF! 1,750,000 #REF!
Sub Total Pek. Instalasi Fire Sprinkler Lt. Ground - A.2 #REF!
SUB TOTAL PEK. MEK. SELLING AREA LT. Ground - I. A ( A.1 s/d A.2 ) #REF!
1 PENGADAAN dan PEMASANGAN BLS 50 - ISOLASI LUAR m2 #REF! 163,968 163,968 #REF!
2 PENGADAAN dan PEMASANGAN BLS 60 - ISOLASI LUAR m2 #REF! 189,344 189,344 #REF!
Sub Total Pek. Instalasi Tata Udara & Ventilasi Gudang Area Lt. Ground ( A.1 ) #REF!
Sub Total Pek. Instalasi Fire Sprinkler Gudang Area Lt. Ground - A.2 #REF!
SUB TOTAL PEK. MEK. GUDANG AREA LT. Ground - II. A ( A.1 s/d A.2 ) #REF!
Pekerjaan Instalasi
Pengadaan dan Pemasangan
Saluran udara suplai/kembali (supply/return air duct), glasswool isolasi luar
tebal 1 inch, density 24 kg/m3, thermal cond. 0,26 Btu/h, lengkap dengan
aluminium foil dua sisi tahan api, gantungan, dudukan dan lain-lain sesuai
spesifikasi.
1 PENGADAAN dan PEMASANGAN BLS 50 - ISOLASI LUAR m2 #REF! 163,968 163,968 #REF!
2 PENGADAAN dan PEMASANGAN BLS 60 - ISOLASI LUAR m2 #REF! 189,344 189,344 #REF!
3 PENGADAAN dan PEMASANGAN BLS 80 - ISOLASI LUAR m2 #REF! 234,875 234,875 #REF!
Pengadaan dan pemasangan Supply Air Diffuser ( SAD ), Allumunium Powder coating
dengan sesuai spesifikasi teknis dari PT. MDS
9 Ukuran Ø 300 ( 12 ") L/d box + spengot/sock damper, warna Powder Coating bh 10 #REF! 444,000 #REF!
Sub Total Pek. Instalasi Tata Udara & Ventilasi Lt. 1 ( A.1 ) #REF!
10 Pengurasan dan pengisian air kembali pipa sprinkler ( termasuk material Bantu) lot 1 #REF! 1,750,000 #REF!
SUB TOTAL PEK. MEK. SELLING AREA LT. 1 - III. A ( A.1 s/d A.2 ) #REF!
Sub Total Pek. Instalasi Tata Udara & Ventilasi Gudang Area Lt. 1 ( A.1 ) #REF!
SUB TOTAL PEK. MEK. GUDANG AREA LT. 1 - IV. A ( A.1 ) #REF!
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN klarifikasi
OE Rp
NOTE:
UMUM
Lingkup pekerjaan yang tercantum didalam BQ ini adalah untuk pengadaan dan
pemasangan pekerjaan elektrikal lengkap dengan segala assesories yang diper-
lukan baik yang disebutkan maupun yang tidak disebutkan dalam uraian pekerjaan
Beberapa pokok pekerjaan (secara khusus) disebutkan hanya pemasangan saja,
dalam hal ini pengadaan barangnya akan dilaksanakan oleh pihak lain / Pemberi
Tugas (PT. MDS Tbk.).
Volume
Semua Volume yang tercantum dalam BQ adalah volume pekerjaan bersih
Harga satuan yang tercantum dalam BQ akan digunakan untuk penilaian pekerjaan
variasi yang terjadi selama masa kontrak.
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN klarifikasi
OE Rp
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN klarifikasi
OE Rp
Sub. Total Pekerjaan ReGrouping, Rewiring Panel PLP- Lt. Ground ( B.1 )
Sub. Total Pekerjaan ReGrouping, Rewiring Panel Kassa - Lt. Ground ( B.2 )
SUB. TOTAL PEKERJAAN PANEL LISTRIK, LANTAI GROUND - B ( B.1 s/d B.2 )
Instalasi titik tata suara lengkap dengan peralatan bantu dan asesoris sesuai
gambar dan spesifikasi teknik PT.MDS (Relokasi)
2 Kabel NYMHy 2 x 1.5 mm2 didalam pipa conduit 20 mm2 , instalasi untuk titik ceiling speaker ttk 20 69,000 69,000
Pemasangan saja peralatan utama fire alarm berikut kelengkapannya merek Nohmi
1 Smoke detector (Relokasi) bh 0 15,000 15,000
2 Smoke detector, Termasuk Pengadaan Armature bh 3 465,000 465,000
3 ROR ( Relokasi ) bh 0 15,000 15,000
4 Alarm bell, (Relokasi) bh 0 7,500 7,500
5 Indikator lamp, (Relokasi) bh 0 7,500 7,500
6 Manual Push Button c/w Jack phone, (Relokasi) bh 0 7,500 7,500
Instalasi titik Fire Alarm Kabel NYA 2 x 1,5 mm2 didalam pipa konduit + flexible
conduit 20mm2 Instalasi Baru lengkap dengan peralatan bantu dan aksesories,
sesuai dengan gambar dan spesifikasi teknik dari PT.MDS
1 Smoke detector (Relokasi) ttk 3 51,520 51,520
2 Smoke detector ttk 0 107,860 107,860
3 ROR ( Relokasi ) ttk 0 51,520 51,520
4 Alarm bell, (Relokasi) ttk 0 58,900 58,900
5 Indikator lamp, (Relokasi) ttk 0 58,900 58,900
6 Manual Push Button, (Relokasi) ttk 0 58,900 58,900
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN klarifikasi
OE Rp
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN klarifikasi
OE Rp
Instalasi titik tata suara lengkap dengan peralatan bantu dan asesoris sesuai
gambar dan spesifikasi teknik PT.MDS ( Relokasi )
1 Kabel NYMHy 2 x 1.5 mm2 didalam pipa conduit 20 mm2 , instalasi untuk titik ceiling speaker ttk 8 69,000 69,000
Pemasangan saja peralatan utama fire alarm berikut kelengkapannya merek Nohmi
1 Smoke detector (Relokasi) bh 0 15,000 15,000
2 Smoke detector, Termasuk Pengadaan Armature bh 3 465,000 465,000
3 ROR ( Relokasi ) bh 0 15,000 15,000
4 Alarm bell, (Relokasi) bh 0 7,500 7,500
5 Indikator lamp, (Relokasi) bh 0 7,500 7,500
6 Manual Push Button c/w Jack phone, (Relokasi) bh 0 7,500 7,500
Instalasi titik Fire Alarm Kabel NYA 2 x 1,5 mm2 didalam pipa konduit + flexible
conduit 20mm2 Instalasi Baru lengkap dengan peralatan bantu dan aksesories,
sesuai dengan gambar dan spesifikasi teknik dari PT.MDS
1 Smoke detector (Relokasi) bh 3 51,520 51,520
2 Smoke detector, Termasuk Pengadaan Armature bh 0 107,860 107,860
3 ROR ( Relokasi ) bh 0 51,520 51,520
4 Alarm bell, (Relokasi) bh 0 58,900 58,900
5 Indikator lamp, (Relokasi) bh 0 58,900 58,900
6 Manual Push Button c/w Jack phone, (Relokasi) bh 0 58,900 58,900
1 Testing commisioning + test merger pekerjaan listrik ( sebelum & sesudah pembongkaran ) lot 1 2,000,000 2,000,000
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN klarifikasi
OE Rp
2 Testing commisioning + test impedensi pekerjaan tata suara lot 1 1,000,000 1,000,000
3 Testing commisioning + test merger pekerjaan fire alarm lot 1 1,000,000 1,000,000
4 Testing infrared panel semua lantai sampai indikasi hijau lot 1 6,000,000 6,000,000
SUB TOTAL PEKERJAAN LAIN - LAIN ( V )
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,928,000
#REF!
#REF!
#REF!
26,576,800
4,422,000
15,285,600
3,396,800
1,459,000
772,000
10,240,000
630,400
3,560,000
1,474,000
6,577,200
2,192,400
589,600
589,600
243,600
191,200
573,600
47,000
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
200,000
1,380,000
1,580,000
-
1,395,000
-
-
-
-
154,560
-
-
-
-
-
1,549,560
#REF!
#REF!
#REF!
#REF!
#REF!
478,000
147,400
145,900
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,928,000
#REF!
#REF!
29,158,000
3,832,400
14,976,800
1,621,200
1,750,800
10,240,000
3,152,000
3,560,000
1,474,000
1,096,200
2,192,400
884,400
243,600
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
80,000
552,000
632,000
-
1,395,000
-
-
-
-
154,560
-
-
-
-
-
1,549,560
#REF!
#REF!
478,000
145,900
#REF!
#REF!
2,000,000
1,000,000
1,000,000
6,000,000
10,000,000
#REF!
Harga Jumlah
No. Uraian Jenis Pekerjaan Sat. Vol. Satuan Harga
(Rp.) (Rp.)
I. PEKERJAAN PEMBELIAN EX BONGKARAN MEKANIKAL LT. GROUND & LT 1
Pembelian ex bongkaran
Saluran udara suplai/kembali (supply/return air duct), isolasi luar
Sub Total Pek. Pembelian Ex Bongkaran Mek. Selling & Gudang Area lantai Ground ( A ) 984,000
Pembelian ex bongkaran
Saluran udara suplai/kembali (supply/return air duct), isolasi luar
1 BJLS 50 m2 20.00 2,000 40,000
2 BJLS 60 m2 10.00 2,000 20,000
Sub Total Pek. Pembelian Ex Bongkaran Mek. Selling & Gudang Area lantai 1 ( B ) 1,108,750
HARGA HARGA
No. Jenis Pekerjaan SAT. VOL SATUAN TOTAL
Rp Rp
II PEKERJAAN PEMBELIAN EX BONGKARAN ELEKTRIKAL LT. GROUND & LT 1
Sub Total Pek. Pembelian Inst. Listrik Lt. Ground ( A.1 ) 12,858,500
1 Ceiling Speaker bh 0 -
Pembelian Kabel NYMHY 2 x 1.5 mm2 di dalam counduit 20 mm Instalasi SOUND SYSTEM
( Line Tidak Dibongkar )
1 Ceilling Speaker ttk 20 3,000 60,000
Sub Total Pekerjaan Pembelian Sound system Lt. Ground ( A.2 ) 60,000
1 Alarm bell bh -
2 Manual Push Button bh -
3 Indicator Lamp bh -
4 Smoke detektor bh -
HARGA HARGA
No. Jenis Pekerjaan SAT. VOL SATUAN TOTAL
Rp Rp
B.1 Pekerjaan Pembelian Instalasi Listrik LT. 1
Pekerjaan Pembelian Armatur Lampu
1 Lampu General bh 500 10,000 5,000,000
2 Lampu Spot bh 50 10,000 500,000
3 Lampu Indirect dipasang over laving 10 cm bh 200 10,000 2,000,000
1 Ceiling Speaker bh 0 - -
Pembelian Kabel NYMHY 2 x 1.5 mm2 di dalam counduit 20 mm Instalasi SOUND SYSTEM
( Line Tidak Dibongkar )
1 Ceiling Speaker ttk 8 3,000 24,000
1 Alarm bell bh - -
2 Manual Push Button bh - -
3 Indicator Lamp bh - -
4 Smoke detektor bh - -
Harga Jumlah
No Uraian Jenis Pekerjaan Sat. Vol. Satuan Harga
(Rp.) (Rp.)
V. PEKERJAAN PERSIAPAN
Catatan:
Nilai pekerjaan ini mencakup keseluruhan paket pek. Mek & Elek interior
Proyek Renovasi MDS SKA - PEKANBARU dengan (luas area = 6.300 m2)
Jika kontraktor tidak memasukkan harga pada bagian ini dianggap sudah
termasuk didalam harga penawaran kontraktor. Jadi selama tidak ada perubahan
gambar, kontraktor tidak berhak mengajukan pekerjaan tambah item baru.
4 Pelindung lantai dengan multiplek 3 mm sesuai tahapan pekerjaan lbr - By Kontraktor Sipil
12 Pembuatan gambar kerja dan gambar terlaksana (As built drawing) Ls 1 Include
Harga Harga
No Uraian Jenis Pekerjaan Sat. Vol. Satuan KLARIFIKASI
(Rp.) (Rp.)
6 Pembersihan lapangan diatas plafond dan lantai selama pekerjaan bln 3 1,200,000 1,500,000
berlangsung ( 1 orang pekerja )
7 Pembuatan gambar kerja dan gambar terlaksana ( As Built drawing ) Ls 1 3,000,000 2,000,000
Catatan
13,500,000 12,000,000
10,500,000 9,000,000
9,000,000 7,500,000
9,000,000 7,500,000
1,500,000 1,500,000
43,500,000 37,500,000
6,000,000 6,000,000
6,000,000 6,000,000
6,000,000 6,000,000
12,000,000 12,000,000
3,000,000 1,500,000
8,000,000 8,000,000
15,000,000 12,500,000
600,000 600,000
7,000,000 7,000,000
25,000,000 20,000,000
76,600,000 67,600,000
1,000,000 1,000,000
1,000,000 1,000,000
3,600,000 4,500,000
3,000,000 2,000,000
- -
134,700,000 119,600,000
B. Jumlah biaya upah kerja ( Rp./ m² ) 29,568 34,144 46,975 56,190 63,520
B. Jumlah biaya Upah kerja ( Rp./ m² ) 30,668 35,244 48,225 57,440 64,770
B. Jumlah biaya Upah kerja ( Rp./ m² ) 40,348 44,924 59,225 68,440 75,770
B. Jumlah biaya Upah kerja ( Rp./ m² ) 26,400 30,976 43,375 52,590 59,920
B. Jumlah biaya upah kerja ( Rp./ m² ) 4,840 4,840 4,840 4,840 4,840
Upah Pembongkaran Duct + mat bantu 7,392 8,536 10,335 12,362 13,974
Upah Pemasangan Duct + mat Bantu 14,784 17,072 20,669 24,724 27,949
Upah ReLevelling Duct + mat bantu 22,175 25,609 31,004 37,086 41,923
A PEKERJAAN DUCTING
LANTAI 2
1 Ducting supply air dengan isolasi luar dan dalam tebal 1"
- BJLS 120 m2 317 452,900
LANTAI 2
LANTAI 3
1 Supply Air Jet Diffuser ( SAJD )
- SAJD-60 : Uk. 12 " ( NS ) , 14 " ( FS) , Cap.1.500 Cfm bh 4 2,737,000
IV PEKERJAAN PEMIPAAN
(UNTUK PELAYANAN AHU DI BANGUNAN TERMINAL)
A PEKERJAAN PIPA
LANTAI-3
1 Pipa Chilled Water Supply/ Return Black Steel Pipe Sch. 40
lengkap dengan isolasi dan jacketng dengan alumunium sheet
t = 0.6 mm (untuk Fix bridge lantai 3)
- diameter 2" m 462 270,500
- diameter 1 1/2" m 303 209,000
- diameter 1" m 395 126,200
LANTAI-4
B PEKERJAAN ACCESSORIES
(ALAT BANTU PERALATAN)
5 Strainer 10K
- diameter 4" bh 3 3,155,100
9 Thermometer bh 6 318,110
4 Strainer
- diameter 1" bh 75 265,460
- diameter 3/4" bh 46 179,270
A SISTEM KONTROL
1 Pressure Differesnsial Controler c/w pressure sensor dan wiring set 18 20,250,000
untuk Pressurised Fan
B PANEL-PANEL LISTRIK
C KABEL FEEDER
A PERALATAN UTAMA
Outdoor Unit
1 Outdoor Unit (OU.PAC-SV.1-1A & B) Unit 2 487,500,000
- Type : Vertical Discharge
- Cooling Cap. : 35 KW
- Power Input : ... KW Total)
- Electrical : 380V/3PH/50Hz
Indoor Unit
1 Indoor Unit (IU.PAC-SV.1-1A & B) Unit 2 termasuk
- Type : Up-Flow, Double Compressor
- Cooling Cap. : 35 KW
- Refrigerant : R407C
- Power Input : 12 KW Total)
- Electrical : 380V/3PH/50Hz
- Refrigerant : R407C
- Power Input : 10 KW (Total)
- Electrical : 380V/3PH/50Hz
B PEKERJAAN PEMIPAAN
Penyediaan dan pemasangan Pipa, fitting-fitting, support & hanger dan
semua material bantu yang diperlukannya sesuai petunjuk dari pabrik dan
spesifikasi teknis maupun seperti terlihat dalam gambar perencanaan dengan
data sebagai berikut :
1 Pipa Refrigerant Copper Tube lengkap dengan Isolasi,
- Gas dia. 3/4" PAC-SV.1-1A&B m 102 102,000
- Liquid dia. 5/8" PAC-SV.1-1A&B m 102 84,450
HARGA TOTAL
143,569,300
-
178,974,000
20,640,000
200,104,800
569,194,800
134,365,000
193,275,200
96,272,500
14,988,000
174,018,000
307,320
1,843,920
322,790
507,260
1,075,880
537,940
1,106,820
1,168,180
3,689,400
968,370
1,152,840
2,075,190
770,120
6,258,330
1,214,850
965,250
2,501,850
754,780
575,250
HARGA TOTAL
1,271,790
3,656,770
176,670
340,340
671,580
954,330
1,007,370
318,110
1,437,280
2,827,760
353,470
7,211,230
742,300
434,850
453,830
2,333,240
1,838,200
1,484,730
2,333,370
1,966,640
1,002,300
946,660
967,200
107,510
235,170
2,090,400
10,948,000
3,381,560
1,804,690,600
124,889,850
63,337,450
49,874,240
118,032,750
12,523,945
42,701,360
45,745,920
46,241,250
49,272,795
23,691,290
HARGA TOTAL
33,795,870
4,702,500
1,045,000
5,784,075
12,186,600
9,157,050
28,103,090
1,548,310
7,096,500
22,454,250
2,394,210
1,018,680
40,708,980
39,803,790
9,465,300
5,490,420
4,274,790
2,489,760
1,908,660
323,218,350
51,697,100
41,086,760
190,817,250
93,628,860
265,356,000
122,063,760
HARGA TOTAL
19,909,500
8,246,420
42,747,900
99,590,400
76,346,400
2,144,447,385
364,500,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
HARGA TOTAL
929,250
1,194,750
1,460,250
1,725,750
1,062,000
1,327,500
1,593,000
1,858,500
4,164,000
12,672,000
4,164,000
19,008,000
4,164,000
9,792,000
4,164,000
16,128,000
4,164,000
6,912,000
4,164,000
13,248,000
4,164,000
4,896,000
4,164,000
10,080,000
4,164,000
14,400,000
4,164,000
19,584,000
4,164,000
10,944,000
4,164,000
16,128,000
4,164,000
7,488,000
HARGA TOTAL
4,164,000
12,672,000
4,164,000
4,608,000
4,164,000
8,640,000
4,164,000
8,064,000
4,164,000
12,096,000
1,197,963,000
975,000,000
900,000,000
900,000,000
975,000,000
HARGA TOTAL
10,404,000
8,613,900
9,180,000
7,600,500
14,484,000
11,991,900
9,180,000
7,600,500
3,948,000
785,700
6,615,000
782,400
1,567,200
11,250,000
6,459,750
6,459,750
7,177,500
7,177,500
8,613,000
8,613,000
10,048,500
10,048,500
2,708,100
HARGA TOTAL
2,389,500
3,770,100
2,389,500
3,929,857,800
9,076,958,785
Harga Jumlah
No. Uraian Jenis Pekerjaan Sat. Vol. Satuan Harga
(Rp.) (Rp.)
1. Pipa Black Steel ( BS ), Sch. 40. 52,930 72,800 86,075 115,700 187,750 235,230 336,900 453,900 587,100
2. Fittings, BS, Sch. 40 17,800 26,650 33,120 46,920 66,500 75,600 96,500 227,500 375,800
3. Support / hangers. 4,250 4,500 4,500 4,700 4,700 4,800 5,500 6,200 6,700
4. Pengecatan. 2,200 2,700 3,100 3,900 4,300 5,800 7,400 9,300 10,800
5. Material bantu & alat bantu. 2,500 2,800 3,100 3,600 4,500 5,900 7,800 10,000 12,500
A. Jumlah biaya material ( Rp. / m' ) 79,680 109,450 129,895 174,820 267,750 327,330 454,100 706,900 992,900
C. Jumlah biaya Keseluruhan ( Rp. / m' ) 87,680 120,450 143,095 192,520 289,750 353,830 489,400 751,000 1,045,900
1 Pipa G I P ( Galvanis medium class ). 31,650 41,550 64,000 83,500 95,220 131,450 164,900 213,700 307,700 385,000
2 Fittings G I P ( dia < 60 mm ). 4,700 8,625 9,650 15,450 19,320 30,360 57,900 66,500 75,600 105,000
3 Support / hangers. 2,500 3,000 4,100 5,000 6,000 7,585 8,000 9,200 10,500 12,500
4 Material bantu (cat arah air, tali, dll) & alat bantu 1,500 2,000 3,000 3,711 4,000 6,000 6,615 7,500 9,700 11,700
A. Jumlah biaya material ( Rp./meter ) 40,350 55,175 80,750 107,661 124,540 175,395 237,415 296,900 403,500 514,200
C. Jumlah biaya keseluruhan ( Rp./ meter ) 45,350 61,125 90,775 118,311 137,040 195,395 262,415 324,400 436,000 552,700
PT.MDS. Tbk
7 OF 173 PLB GIP
DAFTAR HARGA SATUAN
B. METERAN AIR:
7. Floor drain dia. 2" (Stainless steel) bh 1.00 167,600 21,400 189,000
8. Corring :
Corring Ø 200 mm, u/ pipa Ø 6" bh 1.00 - 285,800 285,800
Corring Ø 150 mm, u/ pipa Ø 4" bh 1.00 - 214,400 214,400
Corring Ø 125 mm, u/ pipa Ø 4" bh 1.00 - 178,600 178,600
Corring Ø 100 mm, u/ pipa Ø 3" bh 1.00 - 142,900 142,900
Corring Ø 80 mm, u/ pipa Ø 2" & 2½" bh 1.00 - 107,200 107,200
Corring Ø 65 mm, u/ pipa Ø 1½" bh 1.00 - 89,300 89,300
Corring Ø 50 mm, u/ pipa Ø 1¼" bh 1.00 - 71,500 71,500
Corring Ø 40 mm bh 1.00 - 53,600 53,600
Corring Ø 32 mm bh 1.00 - 44,700 44,700
Corring Ø 25 mm bh 1.00 - 35,700 35,700
D. FITTING GALVANIZED
MALLEABLE IRON PIPES
F. GREASE TRAP :
1. Grease trap uk. 600 x 400 x 300 mm,
bahan stainless steel ( komplit ). bh 1.00 3,572,900 35,700 3,608,600
G. SPRINKLER HEAD
1. Sprinkler head pendant type Ø 15 mm bh 1.00 42,900 10,700 53,600
( Termasuk ring )
2 Sprinkler head upright type Ø 15 mm bh 1.00 42,900 10,700 53,600
( Termasuk ring )
3 Ring head sprinkler
Ø 15 mm bh 1.00 2,500 - 2,500
H. HYDRANT BOX
1. Indoor Hydrant box Type B, lengkap bh 1.00 4,126,200 214,400 4,340,600
dengan accessories
2 Diffuser type bujur sangkar ( bahan alluminium ) natural bh 1.00 15,700 17,900 N/A
Diffuser type bujur sangkar ( bahan alluminium ) powder coating bh 1.00 18,900 17,900 N/A
3 Diffuser type bulat ( bahan alluminium ) natural bh 1.00 24,300 17,900 N/A
Diffuser type bulat ( bahan alluminium ) powder coating bh 1.00 29,200 17,900 N/A
4 Return Air Grille ( bahan alluminium ) natural bh 1.00 8,600 17,900 N/A
Return Air Grille ( bahan alluminium ) powder coating bh 1.00 10,300 17,900 N/A
5 Return Air Grille type bar grille( bahan Alluminium ) natural bh 1.00 12,900 17,900 N/A
Return Air Grille type bar grille( bahan Alluminium ) powder coating bh 1.00 15,400 17,900 N/A
6 Return Air Grille type bar grille pancing( bahan Alluminium ) natural bh 1.00 12,900 17,900 N/A
RAG type bar grille pancing ( bahan Alluminium ) powder coating bh 1.00 15,400 17,900 N/A
7 Return Air Grille type vertical ( bahan besi ) natural bh 1.00 26,800 17,900 N/A
Return Air Grille type vertical ( bahan besi ) powder coating bh 1.00 32,100 17,900 N/A
8 Exhaust Air Grille ( bahan alluminium ) natural bh 1.00 8,600 17,900 N/A
Exhaust Air Grille ( bahan alluminium ) powder coating bh 1.00 10,300 17,900 N/A
9 Intake Air Grille ( bahan alluminium ) natural bh 1.00 11,100 17,900 N/A
Intake Air Grille ( bahan alluminium ) powder coating bh 1.00 13,400 17,900 N/A
10 Fresh Air Louvre ( bahan alluminium ) natural bh 1.00 22,300 17,900 N/A
Fresh Air Louvre ( bahan alluminium ) powder coating bh 1.00 26,800 17,900 N/A
11 Exhaust Air Louvre ( bahan alluminium ) natural bh 1.00 22,300 17,900 N/A
Exhaust Air Louvre ( bahan alluminium ) powder coating bh 1.00 26,800 17,900 N/A
14 Return Air Grille / saringan udara dengan Screen bh 1.00 22,300 21,400 N/A
bahan tralis besi Ø 10 ( 20 x 20cm ) dan wiremess 10 x 10 mm
lengkap dengan flandes besi siku 40 x 40 x 4 mm
15 Return Air Grille / saringan udara dengan Screen bh 1.00 18,600 21,400 N/A
wiremess 10 x 10 mm lengkap dengan flandes
besi siku 40 x 40 x 4 mm
18 Material bantu :
Neck Box, ( satuan inch ). bh 1.00 10,700 21,400 N/A
Sock Bulat c/w damper, ( satuan inch ). bh 1.00 7,100 7,100 N/A
( Tanpa isolasi 24 kg / m³ )
6 Flexible ducting dia. 6" m' 1.00 -
7 Flexible ducting dia. 8" m' 1.00 -
8 Flexible terpal + siku 25 x 25 x 3 mm,
( satuan dalam inch² ). bh 1.00 51,800 35,700 N/A
C. PLENUM
( Sesuai gambar )
Plenum, uk. 4,000 x 2,500 x 700 mm, bh 1.00 -
glasswool 1", 24 kg / m³, styrophor 1", density
24 kg / m³, lengkap berikut alat bantu.
D. AC WALL MOUNTED
Air Conditioning single Split Wall mounted,
( Termasuk remote, freon, breakdown installasi
unit ac indoor / outdoor, lengkap ).
F. FAN
1 Sesuaikan dengan Gambar yang ada !
( Usahakan Spec sudah jelas ).
G AIR CURTAIN
A. Jumlah biaya material ( Rp. / m' ) 16,500 16,000 16,500 19,000 24,500 32,000 12,300 16,000 17,000 22,500 28,000 32,500 50,000 56,500 81,500
Upah : Tukang plumbing ( Rp. / hari )
Pembantu tukang plumbing ( Rp. / hari ) inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m' inch / m'
3,300.00 3,950.00 6,775.00 7,600.00 4,200.00 5,700.00 2,440.00 5,850.00 8,600.00 8,350.00 10,550.00 12,700.00 17,550.00 10,900.00 15,900.00
B. Jumlah biaya Upah kerja ( Rp. / m' )
C. Jumlah biaya Keseluruhan ( Rp. / m' ) 19,800 19,950 23,275 26,600 28,700 37,700 14,740 21,850 25,600 30,850 38,550 45,200 67,550 67,400 97,400
19,800 19,950 23,275 26,600 28,700 37,700 14,740 21,850 25,600 30,850 38,550 45,200 67,550 67,400 97,400
I. UPAH
UPAH
No PEKERJA Sat. VOL
( Rp )
A ELEKTRIKAL
- Diesel Engine Genset, 1250 kVA Prime Rating termasuk 1,792,690,000.00 $ 181,080.00
battery & cable battery 1,623,690,000.00 $ 164,000.00
standard tool kit
flexible exhaust pipe
silencer/muffler
manual book
1 set 0.00
1 set 0.00
1 set 0.00
1 set 0.00
1 ls 0.00 0.00
TM IV. 4
JUMLAH : 552,527,500.00
552,527,500.00
TM. IV. 7 Tangki bahan bakar harian kapasitas, 1.000 liter dengan BBM
Bahan :
- tangki bahan bakar harian kapasitas, 1.000 liter 1 set 6,600,000.00 6,600,000.00
- peralatan bantu 1 ls 660,000.00 660,000.00
Upah :
- mandor 0.2 oh 70,000.00 14,000.00
- kepala tukang listrik 0.2 oh 85,000.00 17,000.00
- tukang listrik 2 oh 70,000.00 140,000.00
- pembantu tukang listrik 4 oh 60,000.00 240,000.00
JUMLAH : 7,671,000.00
7,671,000.00
TM IV.8 Tangki bahan bakar mingguan, kapasitas 10.000 liter dengan BBM
Bahan :
- tangki bahan bakar mingguan, kap. 10.000 liter 1 set 29,150,000.00 29,150,000.00
- peralatan bantu 1 ls 2,915,000.00 2,915,000.00
Upah :
- mandor 0.3 oh 70,000.00 21,000.00
- kepala tukang listrik 0.3 oh 85,000.00 25,500.00
- tukang listrik 3 oh 70,000.00 210,000.00
- pembantu tukang listrik 6 oh 60,000.00 360,000.00
JUMLAH : 32,111,500.00
32,111,500.00
0.00
I CABLE FEEDER
BAHAN UPAH
NO JENIS BAHAN SAT VOL
( Rp ) ( Rp )
C CABLE B C.
(Belum termasuk schoon, klem,
mur/ baut, alat bantu, dll ).
1 BC dia 70 mm² m' 1 43,200 1,100
2 BC dia 50 mm² m' 1 29,900 1,100
3 BC dia 35 mm² m' 1 21,400 1,100
4 BC dia 25 mm² m' 1 13,500 600
5 BC dia 16 mm² m' 1 9,400 600
6 BC dia 10 mm² m' 1 5,400 600
7 BC dia 6 mm² m' 1 3,600 600
8 BC dia 4 mm² m' 1 2,500 600
CABLE
1 NYA 1 x 95 mm² m' 1 113,700 7,000
2 NYA 1 x 70 mm² m' 1 83,300 6,000
3 NYA 1 x 50 mm² m' 1 58,000 5,000
4 NYA 1 x 35 mm² m' 1 42,500 4,000
5 NYA 1 x 25 mm² m' 1 35,700 3,000
6 NYA dia 10 mm² m' 1 10,540 3,000
7 NYA dia 6 mm² m' 1 6,290 1,500
TOTAL
( Rp )
333,650
102,600
30,400
589,600
462,800
365,500
294,200
224,500
180,900
147,600
119,100
269,400
336,900
243,200
228,100
161,900
116,400
81,300
65,000
13,350
16,150
48,900
61,800
1,164,200
928,900
708,400
568,600
463,700
374,700
276,700
197,300
156,760
115,300
78,500
59,700
49,100
28,600
16,600
1,877,300
1,535,700
1,503,700
1,204,200
920,000
735,000
601,400
482,600
353,500
252,600
192,700
141,600
91,100
71,700
47,100
34,600
23,900
1,516,400
1,218,200
932,200
752,300
616,600
499,300
370,200
268,800
210,100
159,400
107,000
76,000
47,100
41,600
31,900
44,300
31,000
22,500
14,100
10,000
6,000
4,200
3,100
120,700
89,300
63,000
46,500
38,700
13,540
7,790
###
1. Kabel NYY 3 x 2½ mm2 m' 9 15,200 136,800 6 15,200 91,200 15 15,200 228,000 12 15,200 182,400 15 15,200 228,000 20 15,200 304,000 30 15,200 456,000
6. P V C konduit Ø 20 mm2 m' 8 3,200 25,600 5 3,200 16,000 14 3,200 44,800 11 3,200 35,200 14 3,200 44,800 19 3,200 60,800 29 3,200 92,800
7. Contrugated Conduit Ø 20 mm2 m' 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200
8. Junction box, 3 way round, 20 mm2 bh 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500
A. Jumlah biaya material ( Rp./titik ) Lampu 175,100 Lampu 119,900 lampu - 285,500 Lampu T5 230,300 spotligt 285,500 Stop Kontak 377,500 Stop Kontak 561,500
( General ) ( Menerus ) emergency ( 1 ) Ambalan Sepatu dinding selling Lantai
Upah : Tukang Listrik ( Rp./ hari ) Hari 0.2 75,000 16,500 0.18 75,000 13,500 0.2 75,000 16,500 0.1 75,000 9,000 0.2 75,000 16,500 0.2 75,000 15,000 0.2 75,000 16,500
Pembantu tukang Listrik Hari 0.2 60,000 13,200 0.15 60,000 9,000 0.2 60,000 13,200 0.1 60,000 6,000 0.2 60,000 13,200 0.2 60,000 12,000 0.2 60,000 13,200
( Rp./ hari )
B Jumlah Biaya Upah Kerja ( Rp./Titik ) 29,700 22,500 29,700 15,000 29,700 27,000 29,700
C Jumlah Biaya Keseluruhan ( Rp./ Titik ) 204,800 142,400 315,200 245,300 315,200 404,500 591,200
1. Kabel NYY 3 x 2½ mm2 m' 4 15,200 60,800 3 15,200 45,600 6 15,200 91,200 6 15,200 91,200 6 15,200 91,200 8 15,200 121,600
7. P V C konduit Ø 20 mm2 m' 3 3,200 9,600 2 3,200 6,400 5 3,200 16,000 5 3,200 16,000 5 3,200 16,000 3 3,200 9,600 7 3,200 22,400
8. Contrugated Conduit Ø 20 mm2 m' 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200
9. Junction box, 3 way round, 20 mm2 bh 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500
A. Jumlah biaya material ( Rp./titik ) Lampu (General) 82,100 Lampu (menerus) 63,700 lampu (emergency) 118,900 Stop Kontak kolom 118,900 spotlight 118,900 Speaker 55,500 Stop Kontak 155,700
Line Existing ( T-Dus ) Line existing Line existing Line Existing Line Existing Line Existing Lantai relokasi
Upah : Tukang Listrik ( Rp./ hari ) Hari 0.1 75,000 7,500 0.1 75,000 7,500 0.2 75,000 15,000 0.2 75,000 16,500 0.2 75,000 16,500 0.1 75,000 7,500 0.2 75,000 15,000
Pembantu tukang Listrik Hari 0.1 60,000 6,000 0.1 60,000 6,000 0.2 60,000 12,000 0.2 60,000 12,000 0.2 60,000 12,000 0.1 60,000 6,000 0.2 60,000 12,000
( Rp./ hari )
B Jumlah Biaya Upah Kerja ( Rp./Titik ) 13,500 13,500 27,000 28,500 28,500 13,500 27,000
C Jumlah Biaya Keseluruhan ( Rp./ Titik ) 95,600 77,200 145,900 147,400 147,400 69,000 182,700
6 Kabel monster
8 P V C konduit Ø 20 mm2 m' 9 3,200 28,800 19 3,200 60,800 8 3,200 25,600 3 3,200 9,600
9 Contrugated Conduit Ø 20 mm2 m' 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200
10 Junction box, 3 way round, 20 mm2 bh 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500
A. Jumlah biaya material ( Rp./titik ) Stop Kontak 193,500 Stop Kontak 521,900 Speaker 115,250 Volume control 47,380 - -
dinding office Kassa untuk speaker
Upah : Tukang Listrik ( Rp./ hari ) Hari 0.2 75,000 16,875 0.30 75,000 22,500 0.10 75,000 7,500 0.1 75,000 7,500
Pembantu tukang Listrik Hari 0.2 60,000 13,500 0.30 60,000 18,000 0.10 60,000 6,000 0.1 60,000 6,000
( Rp./ hari )
B Jumlah Biaya Upah Kerja ( Rp./Titik ) 30,375 40,500 13,500 13,500 - -
1 Kabel NYY 3 x 2½ mm2 m' 1 15,200 15,200 14 15,200 212,800 15 15,200 228,000 - 15,200 - 20 15,200 304,000
5 Kabel monster
7 P V C konduit Ø 20 mm2 m' 0.75 3,200 13 3,200 41,600 14 3,200 44,800 - 3,200 - 19 3,200 60,800
8 Contrugated Conduit Ø 20 mm2 m' 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200
9 Junction box, 3 way round, 20 mm2 bh 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500
A. Jumlah biaya material ( Rp./titik ) Power outlet Non 27,900 Power outlet 267,100 Stop Kontak 285,500 12,700 Power outlet 377,500
standart standart AC 16A Acc & kosmetik
Upah : Tukang Listrik ( Rp./ hari ) Hari 0.1 75,000 7,500 0.2 75,000 16,875 0.20 75,000 15,000 0.20 75,000 15,000 0.20 75,000 15,000
Pembantu tukang Listrik Hari 0.1 60,000 6,000 0.2 60,000 13,500 0.20 60,000 12,000 0.20 60,000 12,000 0.20 60,000 12,000
( Rp./ hari )
B Jumlah Biaya Upah Kerja ( Rp./Titik ) 13,500 30,375 27,000 27,000 27,000
C Jumlah Biaya Keseluruhan ( Rp./ Titik ) 41,400 297,475 312,500 39,700 404,500
###
6. P V C konduit Ø 20 mm2 m' 11 3,200 35,200 3 3,200 9,600 11 3,200 35,200 4 3,200 12,800 7 3,200 22,400 9 3,200 28,800
7. Contrugated Conduit Ø 20 mm2 m' 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200 1 3,200 3,200
8. Junction box, 3 way round, 20 mm2 bh 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500 1 4,500 4,500
A. Jumlah biaya material ( Rp./titik ) Detector Detector Phone jack Phone jack 2 x sparing 2 x sparing
97,060 38,020 90,580 42,700 27,100 33,500
( relokasi ) ( relokasi ) stk. Kassa sensormatic
Upah : Tukang Listrik ( Rp./ hari ) Hari 0.08 75,000 6,000 0.10 75,000 7,500 0.18 75,000 13,125 0.10 75,000 7,500 0.10 75,000 7,500 0.10 75,000 7,500
Pembantu tukang Listrik Hari 0.08 60,000 4,800 0.10 60,000 6,000 0.18 60,000 10,500 0.10 60,000 6,000 0.10 60,000 6,000 0.10 60,000 6,000
( Rp./ hari )
B Jumlah Biaya Upah Kerja ( Rp./Titik ) 10,800 13,500 23,625 13,500 13,500 13,500
C Jumlah Biaya Keseluruhan ( Rp./ Titik ) 107,860 51,520 114,205 56,200 40,600 47,000
9 Material bantu (lasdop, fittings, saddle, lot 1 4,000 4,000 1 4,000 4,000
paku dll.)
###
217,000
A. Jumlah biaya material (Rp./titik) ttk stop kontak=
Upah : tukang listrik ( Rp./ hari ) hari 0.200 75,000 15,000
pembantu tukang listrik ( Rp./ hari ) hari 0.200 60,000 12,000
B.
Jumlah biaya upah kerja ( Rp./ titik ) ttk stop kontak= 27,000
PEKERJAAN : BAHAN & UPAH INSTALASI LISTRIK TITIK PENTANAHAN U/ REGISTER KASSA
0
###
2 NYA 50 mm² ( dari pantekan ke panel listrik EDP 25.00 m' 58,000 1,450,000
3 Pipa GIP dia. 1 ½" ( medium class ). 12.00 m' 82,000.00 984,000
4 Earth steel cooper rod 5/8", 1,500 mm / length 1.00 bh 400,000.00 400,000
A.
Jumlah biaya Material ( Rp./ titik ) Pentanahan Register Kassa 3,500,000
Upah : Tukang Listrik ( Rp./ hari ) 1.00 lot 75,000 75,000
Pembantu tukang Listrik ( Rp./ hari ) 1.00 lot 60,000 60,000
Pantekan sumur 12.00 m' -
B Jumlah Biaya Upah Kerja ( Rp./ Titik ) 135,000
b. Fixtures :
1. Smoke Detector bh 1.00 455,000 10,000 465,000.00
2. Rate of Rise / end of line devices. bh 1.00 320,000 10,000 330,000.00
3. Fixed Temperature Detector bh 1.00 320,000 10,000 330,000.00
4. Manual Push Buttom, c/w phone jack. bh 1.00 0.00
5. Alarm Bell, FBB - 1501. bh 1.00 5,000 5,000.00
6. Manual Break glass, WR - 2001. bh 1.00 5,000 5,000.00
7. Indicator Lamp, SL - 401. bh 1.00 5,000 5,000.00
NO / KODE URAIAN
PEKERJAAN ELEKTRIKAL
SISTEM PENERANGAN
DUST PROOF IP 65
- GMS HUGO 1x18 W 1 bh 396,300.00
- GMS HUGO 1x36 W 1 bh 556,000.00
- GMS HUGO 2x36 W 1 bh 710,000.00
FLOOD LIGHT IP 65
- HUGO AMAR E40 HPIT - 250 W 1 bh. 1,100,800.00
- HUGO AMAR E40 HPIT - 400 W 1 bh. 1,155,300.00
- HUGO AMAC E27 MHNTD - 70 W 1 bh. 889,500.00
- HUGO AMAC E27 MHNTD - 150 W 1 bh. 949,100.00
NO / KODE URAIAN
NO / KODE URAIAN
LAMPU JALAN
- RL 01P HPLN - 250 W 1 bh. 1,183,000.00
- RL 01P HPLN - 400 W 1 bh. 1,251,500.00
- RL 01P SONT - 250 W 1 bh. 1,366,000.00
- RL 01P SONT - 400 W 1 bh. 1,536,100.00
- RL 01P HPLT - 250 W 1 bh. 1,345,300.00
- RL 01P HPLT - 400 W 1 bh. 1,393,800.00
- lampu down light SMD 150 Essential 1x18 W, E27 (bulat 1 bh. 199,400.00
- lampu down light SMQ 5 Essential 1x14 W, E27 (kotak) 1 bh. 163,400.00
- lampu down light RD 175 horizontal PRS, 2x18 W 1 bh. 219,625.00
- lampu RM 300 ML 2x36 W 1 bh. 443,598.00
- lampu RMOT 2x36 W 1 bh. 533,800.00
- lampu RMOT 1x36 W 1 bh. 363,200.00
- Lampu TK 1x36 W 1 bh. 220,700.00
NO / KODE URAIAN
NO / KODE URAIAN
HARGA
(Rp.)
59,100.00
61,500.00
73,320.00
81,720.00
82,560.00
78,960.00
90,060.00
97,680.00
106,500.00
76,140.00
96,120.00
96,120.00
51,540.00
92,400.00
88,620.00
108,000.00
129,420.00
108,900.00
133,260.00
26,940.00
52,500.00
30,900.00
38,700.00
237,780.00
333,600.00
426,000.00
660,480.00
693,180.00
533,700.00
569,460.00
284,160.00
153,900.00
200,940.00
298,620.00
346,380.00
212,400.00
HARGA
(Rp.)
325,920.00
235,740.00
358,980.00
406,020.00
236,340.00
389,160.00
205,260.00
304,140.00
348,900.00
227,100.00
328,800.00
249,600.00
370,200.00
415,620.00
245,400.00
394,140.00
184,080.00
292,560.00
317,760.00
222,300.00
281,340.00
194,880.00
306,660.00
331,860.00
231,720.00
295,500.00
174,600.00
266,820.00
357,240.00
183,540.00
255,240.00
88,159.80
120,840.00
198,900.00
213,720.00
115,080.00
176,940.00
99,240.00
HARGA
(Rp.)
127,200.00
197,100.00
221,220.00
129,000.00
186,300.00
81,240.00
112,200.00
103,440.00
152,400.00
72,180.00
82,200.00
86,100.00
103,380.00
106,380.00
150,480.00
118,320.00
164,520.00
214,200.00
709,800.00
750,900.00
819,600.00
921,660.00
807,180.00
836,280.00
708,900.00
738,000.00
806,700.00
908,760.00
794,280.00
823,380.00
119,640.00
98,040.00
131,775.00
266,158.80
320,280.00
217,920.00
132,420.00
HARGA
(Rp.)
166,620.00
83,415.00
79,920.00
125,820.00
89,790.00
457,920.00
237,780.00
161,640.00
221,820.00
169,020.00
325,350.00
3,128,760.00
3,728,760.00
1,087,320.00
93,000.00
332,364.00
526,110.00
125,940.00
12,197,400.00
8,250,000.00
409,050.00
502,800.00
788,400.00
1,054,200.00
16,539,000.00
12,120.00
20,220.00
30,480.00
16,320.00
26,580.00
126,540.00
227,160.00
263,760.00
68,400.00
31,380.00
75,000.00
0.00
1,003.20
1,511.40
1,471.80
2,125.20
5,768.40
12,896.40
1,690.00
HARGA
(Rp.)
1,874,760.00
2,376.00
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN TOTAL
Rp Rp
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN TOTAL
Rp Rp
- Panel box : 400 x 300 x 180 mm unit 1 1,050,000 1,050,000.00
- Upah Pasang Panel lot 1 200,000 200,000.00
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN TOTAL
Rp Rp
- MCB 10A, 3P, 10 KA bh 1 213,500 213,500.00
- MCB 10 A, 1P, 41/2 KA bh 5 41,500 207,500.00
- Terminal block bh 5 7,000 35,000.00
- Pilot lamp bh 3 39,500 118,500.00
- Fuse 2 - 4A bh 2 12,500 25,000.00
- Sub-material dan Busbar lot 1 29,975 29,975.00
- Panel box : 400 x 300 x 180 mm unit 1 1,050,000 1,050,000.00
- Upah Pasang Panel lot 1 200,000 200,000.00
HARGA HARGA
No. Jenis Pekerjaan Sat Vol SATUAN TOTAL
Rp Rp
- Pondasi panel (sesuai ukuran panel) memakai batu bata di finish lot 1 300,000 300,000.00
A. BREAKER : TYPE :
a. A C B, Merlin Gerin
1 ACB 3,200 A , 4 P , 65 KA NW 32 H14F 2AH. bh 1.00 61,000,000 100,000.00 61,100,000
2 ACB 2,500 A , 4 P , 65 KA NW 25 H14F 2AH. bh 1.00 49,000,000 100,000.00 49,100,000
3 ACB 2,000 A , 4 P , 65 KA NW 20 H14F 2AH. bh 1.00 38,500,000 100,000.00 38,600,000
4 ACB 1,600 A , 4 P , 65 KA NW 16 H14F 2AH. bh 1.00 32,500,000 100,000.00 32,600,000
5 ACB 1,250 A , 4 P , 65 KA NW 12 H14F 2AH. bh 1.00 25,500,000 100,000.00 25,600,000
6 ACB 1,600 A , 3 P , 65 KA NW 16 H13F 2AH. bh 1.00 -
b. M C C B, Merlin Gerin
2 MCCB 252 - 630 A , 3 P , 50 KA NS 630 bN, mic.2.0 bh 1.00 5,607,500 100,000.00 5,707,500
3 MCCB 252 - 630 A , 3 P , 45 KA NS 630 N, STR 23 SE bh 1.00 5,607,500 100,000.00 5,707,500
4 MCCB 160 - 400 A , 3 P , 45 KA NS 400 N, STR 23 SE bh 1.00 4,695,500 50,000.00 4,745,500
5 MCCB 200 - 250 A , 3 P , 36 KA NS 250 N, TM 250 D bh 1.00 1,676,000 50,000.00 1,726,000
6 MCCB 160 - 200 A , 3 P , 36 KA NS 250 N, TM 200 D bh 1.00 1,627,000 50,000.00 1,677,000
7 MCCB 100 - 250 A , 3 P , 36 KA NS 250 N, STR 22 SE bh 1.00 2,795,000 50,000.00 2,845,000
8 MCCB 125 - 160 A , 3 P , 36 KA NS 160 N, TM 160 D bh 1.00 2,449,000 50,000.00 2,499,000
9 MCCB 100 - 125 A , 3 P , 36 KA NS 160 N, TM 125 D bh 1.00 2,049,500 50,000.00 2,099,500
10 MCCB 80 - 100 A , 3 P, 25 KA NS 100 N, TM 100 D bh 1.00 800,500 30,000.00 830,500
11 MCCB 64 - 80 A , 3 P, 25 KA NS 100 N, TM 80 D bh 1.00 800,500 30,000.00 830,500
12 MCCB 50 - 63 A , 3 P, 25 KA NS 100 N, TM 63 D bh 1.00 800,500 30,000.00 830,500
13 MCCB 32 - 40 A , 3 P, 25 KA NS 100 N, TM 40 D bh 1.00 777,000 30,000.00 807,000
c. M C B, Merlin Gerin
1 MCB 40 A , 3 P , 16 - 25 KA NC 100L, 27648 bh 1.00 800,000 15,000.00 815,000
2 MCB 80 A , 3 P , 10 KA NC 100H bh 1.00 -
3 MCB 63 A , 3 P , 10 KA NC 100H, 27274 bh 1.00 583,500 15,000.00 598,500
4 MCB 50 A , 3 P , 10 KA NC 100H, 27273 bh 1.00 583,500 7,500.00 591,000
5 MCB 40 A , 3 P , 10 KA NC 100H, 27272 bh 1.00 522,000 7,500.00 529,500
6 MCB 32 A , 3 P , 10 KA NC 100H, 27271 bh 1.00 522,000 5,000.00 527,000
7 MCB 25 A , 3 P , 10 KA NC 100H bh 1.00 442,000 5,000.00 447,000
8 MCB 10 - 20 A , 3 P , 10 KA NC 100H bh 1.00 208,500 5,000.00 213,500
9 MCB 50 A , 1 P , 10 KA NC 100H, 27251 bh 1.00 143,500 7,500.00 151,000
10 MCB 40 A , 1 P , 10 KA NC 100H, 27250 bh 1.00 141,000 7,500.00 148,500
11 MCB 32 A , 1 P , 10 KA NC 100H, 27249 bh 1.00 135,000 7,500.00 142,500
12 MCB 10 - 20 A , 1 P , 10 KA NC 100H bh 1.00 141,750 7,500 149,250
13 MCB 40 A , 3 P , 8 KA IEC 947-2, 12084 bh 1.00 548,100 30,000 578,100
14 MCB 32 A , 3 P , 8 KA IEC 947-2, 12083 bh 1.00 548,100 30,000 578,100
15 MCB 25 A , 3 P , 8 KA IEC 947-2, 12082 bh 1.00 464,100 30,000 494,100
16 MCB 6 - 20 A , 3 P , 8 KA NC - 45 N bh 1.00 464,100 30,000 494,100
17 MCB 40 A , 1 P , 8 KA IEC 947-2, 12070 bh 1.00 150,675 15,000 165,675
18 MCB 32 A , 1 P , 8 KA IEC 947-2, 12069 bh 1.00 148,050 15,000 163,050
19 MCB 2 - 20 A , 1 P , 8 KA NC - 45 N bh 1.00 141,750 15,000 156,750
20 MCB 6 - 20 A , 3 P , 6 KA NC - 45 N bh 1.00 271,000 15,000.00 286,000
21 MCB 2 - 20 A , 1 P , 6 KA NC - 45 N bh 1.00 70,000 5,000.00 75,000
22 MCB 32 A , 3 P , 4½ ~ 5 KA IEC 898, 12055 bh 1.00 223,125 30,000 253,125
23 MCB 20 A , 3 P , 4½ ~ 5 KA IEC 898, 12053 bh 1.00 192,150 30,000 222,150
24 MCB 6 - 16 A , 3 P , 4½ ~ 5 KA NC - 45 Ad bh 1.00 46,725 15,000 61,725
25 MCB 32 A , 1 P , 4½ ~ 5 KA IEC 898, 12041 bh 1.00 46,725 15,000 61,725
26 MCB 6 - 16 A , 1 P , 4½ ~ 5 KA NC - 45 Ad bh 1.00 38,500 3,000.00 41,500
d. Others.
1. Timer Switch bh 1.00 522,500 10,000.00 532,500
2. Frequency Meter GAE 96 x 96 bh 1.00 275,000 10,000.00 285,000
3. Voltmeter ( 0 - 500 ) Volt. GAE 96 x 96 bh 1.00 210,000 5,000.00 215,000
4. Volt Selector Switch. bh 1.00 85,000 5,000.00 90,000
5. Cos phi meter bh 1.00 1,250,000 5,000.00 1,255,000
6. Pilot lamp bh 1.00 37,500 2,000.00 39,500
7. Fuse, 2 - 6 A. Local bh 1.00 10,500 2,000.00 12,500
8. Push button On / Off. bh 1.00 17,500 2,000.00 19,500
9. Terminal Blok GAE bh 1.00 5,000 2,000.00 7,000
10. A - O - M Selector Switch bh 1.00 110,000 2,000.00 112,000
11. Eart Fault Relay bh 1.00 2,750,000 25,000.00 2,775,000
12. Control Relay 220 VAC. bh 1.00 145,000 10,000.00 155,000
13. Demand Factor bh 1.00 525,000 25,000.00 550,000
14. Box Panel Panel maker
( tebal plat 2 mm, powder coating,
engsel, kunci (master), join ground
ing, besi siku, komplit )
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
NO / KODE URAIAN
PEKERJAAN ELEKTRIKAL
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
NO / KODE URAIAN
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
NO / KODE URAIAN
MAIN EQUIPMENT
A PABX NEC NEAX UNIVERAGE 2000 IPS 1 set 62,000,000.00
AC/DC - 27VDC power : single / single phasa
Universal port & modular port interface
Program stored : flash room
Installed capacity :
- 6 line central office trunk
- 60 line analog extention
- 8 line digital extention
- 1 attendant terminal ( 24D ) for operator console
- Internal SMDR interface
- Internal digital announcer
- Intenal modem for remote maintenance
- Intenal music on head
B JASA DAN MATERIAL LOCAL
- MDF LSA 2 x 100 pairs solderless 1 lot 2,000,000.00
- Lines lightning aresster for CO trunk 2 lot 300,000.00
- Cable PABX up to MDF 1 lot 1,500,000.00
- Instalation cost PABX up to MDF 1 lot 1,500,000.00
- testing, comisioning, programming, & training 1 lot 2,000,000.00
- Transportasi & accomodasi 1 lot by contractor
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
NO / KODE URAIAN
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
NO / KODE URAIAN
- UPS 1 set
- printer 1 set
- proteksi petir / arrester 40 kA 1 set
- pembumian 1 set
KABEL TANAH
- kabel telepon (STEL-K007) 10 x 2 x 0,6 mm² 1 m 15,500.00
- kabel telepon (STEL-K007) 20 x 2 x 0,6 mm² 1 m 24,200.00
- kabel telepon (STEL-K007) 30 x 2 x 0,6 mm² 1 m 33,100.00
- kabel telepon (STEL-K007) 40 x 2 x 0,6 mm² 1 m 46,800.00
- kabel telepon (STEL-K007) 50 x 2 x 0,6 mm² 1 m 49,800.00
- kabel telepon (STEL-K007) 60 x 2 x 0,6 mm² 1 m 59,100.00
- kabel telepon (STEL-K007) 80 x 2 x 0,6 mm² 1 m 75,900.00
- kabel telepon (STEL-K007) 100 x 4 x 0,6 mm² 1 m 93,000.00
- kabel telepon (STEL-K007) 120 x 4 x 0,6 mm² 1 m
- kabel telepon (STEL-K007) 150 x 4 x 0,6 mm² 1 m
- kabel telepon (STEL-K007) 200 x 4 x 0,6 mm² 1 m 195,300.00
- kabel telepon (STEL-K007) 300 x 4 x 0,6 mm² 1 m 291,900.00
- kabel telepon (STEL-K007) 400 x 4 x 0,6 mm² 1 m 386,300.00
- kabel telepon (STEL-K007) 500 x 4 x 0,6 mm² 1 m 474,300.00
- kabel telepon (STEL-K007) 600 x 4 x 0,6 mm² 1 m 580,400.00
- kabel telepon (STEL-K007) 800 x 4 x 0,6 mm² 1 m 755,500.00
- kabel telepon R-V(PE)V 2 x 2 x 0,6 mm² 1 m 1,591.00
KABEL INDOOR
- kabel telepon ITC (STELL-K011) 1 x 2 x 0,6 mm² 1 m 1,120.00
- kabel telepon ITC (STELL-K011) 2 x 2 x 0,6 mm² 1 m 1,815.00
- kabel telepon ITC (STELL-K011) 6 x 2 x 0,6 mm² 1 m 5,850.00
- kabel telepon ITC (STELL-K011) 10 x 2 x 0,6 mm² 1 m 10,700.00
- kabel telepon ITC (STELL-K011) 20 x 2 x 0,6 mm² 1 m 20,300.00
- kabel telepon ITC (STELL-K011) 30 x 2 x 0,6 mm² 1 m 20,100.00
- kabel telepon ITC (STELL-K011) 40 x 2 x 0,6 mm² 1 m 38,200.00
- kabel telepon ITC (STELL-K011) 50 x 2 x 0,6 mm² 1 m 47,200.00
- kabel telepon ITC (STELL-K011) 60 x 2 x 0,6 mm² 1 m 56,400.00
- kabel telepon ITC (STELL-K011) 80 x 2 x 0,6 mm² 1 m 73,800.00
- kabel telepon ITC (STELL-K011) 100 x 2 x 0,6 mm² 1 m 92,400.00
- kabel telepon ITC 150 x 2 x 0,6 mm² 1 m 180,000.00
KABEL UDARA
- kabel telepon (STEL-K001) 10 x 2 x 0,6 mm² 1 m 9,700.00
- kabel telepon (STEL-K001) 20 x 2 x 0,6 mm² 1 m 16,700.00
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
NO / KODE URAIAN
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
NO / KODE URAIAN
HARGA
68,200,000.00
8,800,000.00
7,150,000.00
1,892,000.00
5,720,000.00
3,685,000.00
2,090,000.00
5,600,000.00
47,300,000.00
132,000.00
8,800,000.00
7,150,000.00
HARGA
1,892,000.00
6,292,000.00
3,685,000.00
2,090,000.00
5,600,000.00
75,185,000.00
2,871,000.00
1,023,000.00
3,608,000.00
21,725,000.00
275,000.00
7,150,000.00
3,300,000.00
7,260,000.00
58,344,000.00
2,871,000.00
1,023,000.00
3,608,000.00
21,725,000.00
275,000.00
7,150,000.00
3,300,000.00
HARGA
7,260,000.00
88,891,000.00
2,871,000.00
1,023,000.00
3,608,000.00
21,725,000.00
275,000.00
7,150,000.00
3,300,000.00
9,680,000.00
68,200,000.00
2,200,000.00
660,000.00
1,650,000.00
1,650,000.00
2,200,000.00
by contractor
HARGA
1,925,000.00
253,000.00
1,760,000.00
2,585,000.00
3,850,000.00
550,000.00
4,400,000.00
1,320,000.00
73,150,000.00
2,200,000.00
660,000.00
1,650,000.00
2,200,000.00
2,200,000.00
by contractor
1,925,000.00
253,000.00
1,760,000.00
2,585,000.00
3,850,000.00
HARGA
550,000.00
4,400,000.00
1,320,000.00
0.00
0.00
0.00
0.00
17,050.00
26,620.00
36,410.00
51,480.00
54,780.00
65,010.00
83,490.00
102,300.00
0.00
0.00
214,830.00
321,090.00
424,930.00
521,730.00
638,440.00
831,050.00
1,591.00
1,232.00
1,996.50
6,435.00
11,770.00
22,330.00
22,110.00
42,020.00
51,920.00
62,040.00
81,180.00
101,640.00
198,000.00
10,670.00
18,370.00
HARGA
26,180.00
33,550.00
41,250.00
50,380.00
65,340.00
80,520.00
1,064.80
825.00
302,500.00
63,800.00
275,000.00
605,000.00
715,000.00
1,045,000.00
1,815,000.00
3,080,000.00
275,000.00
HARGA
PEKERJAAN ELEKTRIKAL
Upah :
- mandor tukang listrik 0.3 oh 70,000.00
- kepala tukang listrik 0.3 oh 85,000.00
- tukang listrik 3 oh 70,000.00
- pembantu tukang listrik 6 oh 60,000.00
JUMLAH :
Dibulatkan
Upah :
- mandor tukang listrik 0.3 oh 70,000.00
- kepala tukang listrik 0.3 oh 85,000.00
- tukang listrik 3 oh 70,000.00
- pembantu tukang listrik 6 oh 60,000.00
JUMLAH :
Dibulatkan
PEKERJAAN ELEKTRIKAL
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
PEKERJAAN ELEKTRIKAL
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
PEKERJAAN ELEKTRIKAL
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.05 oh 70,000.00
- kepala tukang listrik 0.05 oh 85,000.00
- tukang listrik 0.5 oh 70,000.00
- pembantu tukang listrik 0.5 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
PEKERJAAN ELEKTRIKAL
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
PEKERJAAN ELEKTRIKAL
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.005 oh 70,000.00
- kepala tukang listrik 0.005 oh 85,000.00
- tukang listrik 0.05 oh 70,000.00
- pembantu tukang listrik 0.05 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
PEKERJAAN ELEKTRIKAL
Bahan :
- kabel telepon JAC 400 x 4 x 0,6 mm² 1 m 424,930.00
- kotak sambung & alat bantu lainnya 1 ls 42,493.00
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.05 oh 70,000.00
- kepala tukang listrik 0.05 oh 85,000.00
- tukang listrik 0.5 oh 70,000.00
- pembantu tukang listrik 0.5 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.05 oh 70,000.00
- kepala tukang listrik 0.05 oh 85,000.00
- tukang listrik 0.5 oh 70,000.00
- pembantu tukang listrik 0.5 oh 60,000.00
PEKERJAAN ELEKTRIKAL
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.05 oh 70,000.00
- kepala tukang listrik 0.05 oh 85,000.00
- tukang listrik 0.5 oh 70,000.00
- pembantu tukang listrik 0.5 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.05 oh 70,000.00
- kepala tukang listrik 0.05 oh 85,000.00
- tukang listrik 0.5 oh 70,000.00
- pembantu tukang listrik 0.5 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.1 oh 70,000.00
- kepala tukang listrik 0.1 oh 85,000.00
- tukang listrik 1 oh 70,000.00
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
PEKERJAAN ELEKTRIKAL
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Dibulatkan
HARGA
(Rp.)
68,200,000.00
21,000.00
25,500.00
210,000.00
360,000.00
68,816,500.00
68,816,500.00
58,344,000.00
21,000.00
25,500.00
210,000.00
360,000.00
58,960,500.00
58,960,500.00
HARGA
(Rp.)
8,800,000.00
880,000.00
700.00
850.00
7,000.00
6,000.00
9,694,550.00
9,694,550.00
7,150,000.00
715,000.00
700.00
850.00
7,000.00
6,000.00
7,879,550.00
7,879,550.00
1,892,000.00
189,200.00
700.00
850.00
7,000.00
6,000.00
2,095,750.00
HARGA
(Rp.)
2,095,750.00
5,720,000.00
572,000.00
700.00
850.00
7,000.00
6,000.00
6,306,550.00
6,306,550.00
3,685,000.00
368,500.00
700.00
850.00
7,000.00
6,000.00
4,068,050.00
4,068,050.00
2,090,000.00
209,000.00
700.00
850.00
7,000.00
6,000.00
HARGA
(Rp.)
2,313,550.00
2,313,550.00
715,000.00
71,500.00
3,500.00
4,250.00
35,000.00
30,000.00
859,250.00
859,250.00
11,770.00
1,177.00
350.00
425.00
3,500.00
3,000.00
20,222.00
20,220.00
22,330.00
2,233.00
350.00
425.00
HARGA
(Rp.)
3,500.00
3,000.00
31,838.00
31,840.00
22,110.00
2,211.00
350.00
425.00
3,500.00
3,000.00
31,596.00
31,600.00
42,020.00
4,202.00
350.00
425.00
3,500.00
3,000.00
53,497.00
53,500.00
51,920.00
5,192.00
HARGA
(Rp.)
350.00
425.00
3,500.00
3,000.00
64,387.00
64,390.00
62,040.00
6,204.00
350.00
425.00
3,500.00
3,000.00
75,519.00
75,520.00
81,180.00
8,118.00
350.00
425.00
3,500.00
3,000.00
96,573.00
96,570.00
101,640.00
10,164.00
HARGA
(Rp.)
350.00
425.00
3,500.00
3,000.00
119,079.00
119,080.00
198,000.00
19,800.00
350.00
425.00
3,500.00
3,000.00
225,075.00
225,080.00
17,050.00
1,705.00
700.00
850.00
7,000.00
6,000.00
33,305.00
33,310.00
26,620.00
2,662.00
HARGA
(Rp.)
700.00
850.00
7,000.00
6,000.00
43,832.00
43,830.00
36,410.00
3,641.00
700.00
850.00
7,000.00
6,000.00
54,601.00
54,600.00
51,480.00
5,148.00
700.00
850.00
7,000.00
6,000.00
71,178.00
71,180.00
54,780.00
5,478.00
HARGA
(Rp.)
700.00
850.00
7,000.00
6,000.00
74,808.00
74,810.00
65,010.00
6,501.00
700.00
850.00
7,000.00
6,000.00
86,061.00
86,060.00
83,490.00
8,349.00
700.00
850.00
7,000.00
6,000.00
106,389.00
106,390.00
102,300.00
HARGA
(Rp.)
10,230.00
700.00
850.00
7,000.00
6,000.00
127,080.00
127,080.00
0.00
0.00
700.00
850.00
7,000.00
6,000.00
14,550.00
14,550.00
6,435.00
643.50
700.00
850.00
7,000.00
6,000.00
21,628.50
21,630.00
HARGA
(Rp.)
214,830.00
21,483.00
700.00
850.00
7,000.00
6,000.00
250,863.00
250,860.00
22,330.00
2,233.00
700.00
850.00
7,000.00
6,000.00
39,113.00
39,110.00
321,090.00
32,109.00
700.00
850.00
7,000.00
6,000.00
367,749.00
367,750.00
HARGA
(Rp.)
424,930.00
42,493.00
700.00
850.00
7,000.00
6,000.00
481,973.00
481,970.00
521,730.00
52,173.00
700.00
850.00
7,000.00
6,000.00
588,453.00
588,450.00
638,440.00
63,844.00
700.00
850.00
7,000.00
6,000.00
716,834.00
716,830.00
HARGA
(Rp.)
831,050.00
83,105.00
700.00
850.00
7,000.00
6,000.00
928,705.00
928,710.00
275,000.00
27,500.00
3,500.00
4,250.00
35,000.00
30,000.00
375,250.00
375,250.00
605,000.00
60,500.00
3,500.00
4,250.00
35,000.00
30,000.00
HARGA
(Rp.)
738,250.00
738,250.00
715,000.00
71,500.00
3,500.00
4,250.00
35,000.00
30,000.00
859,250.00
859,250.00
1,045,000.00
104,500.00
3,500.00
4,250.00
35,000.00
30,000.00
1,222,250.00
1,222,250.00
1,815,000.00
181,500.00
7,000.00
8,500.00
70,000.00
HARGA
(Rp.)
60,000.00
2,142,000.00
2,142,000.00
63,800.00
6,380.00
700.00
850.00
7,000.00
6,000.00
84,730.00
84,730.00
275,000.00
27,500.00
700.00
850.00
7,000.00
6,000.00
317,050.00
317,050.00
39,775.00
42,250.00
8,202.50
700.00
HARGA
(Rp.)
850.00
7,000.00
6,000.00
104,777.50
104,780.00
0.00
0.00
700.00
850.00
7,000.00
6,000.00
14,550.00
14,550.00
NO / KODE URAIAN
PEKERJAAN ELEKTRIKAL
- terminal udara RA 215 lengkap dengan base mounting SD 105 1 buah 643,350.00
- pita tembaga ukuran 25 mm x 3 mm lengkap dengan klip pita DC pereka 1 m 214,450.00
- klem pita tembaga kotak ukuran 25 mm x 3 mm CT105 untuk sambunga 1 nos 77,202.00
- titik pengujian empat lubang PC110, lengkap dengan 1 buah pengelasa 1 set 814,910.00
dan bak kontrol
- pita tembaga ukuran 25 mm x 3 mm TC030, di pasang di kolom sebagai 1 m 154,404.00
pembumian ( down conductor)
- konektor batang baja stainless (di setiap interval 1,5 m) untukpenghan 1 nos 60,046.00
(down conductor)
- pengelasan exothermic untuk sambungan pita ke pita tipe BB7 untuk pe 1 nos 128,670.00
pembumian ( down conductor)
PEMBUMIAN PENGAMAN
- pengelasan exothermic pita tembaga ke sambungan awal pile cap BRE- 1 bh 128,670.00
- titik pengujian empat lubang PC110, lengkap dengan 1 buah pengelasa 1 bh 814,910.00
dan bak kontrol
- pita tembaga ukuran 25 mm x 3 mm tipe TC030 dari pile cap ke titik pen 1 bh 154,404.00
- pita tembaga ukuran 25 mm x 3 mm tipe TC030 interlinking ke semua pi 1 bh 154,404.00
- pengelasan exothermic untuk sambungan pita ke pita tipe BB7 /BB14 untu 1 bh 128,670.00
semua pile cap 1 bh 128,670.00
1 bh 128,670.00
NO / KODE URAIAN
NO / KODE URAIAN
HARGA
(Rp.)
707,685.00
235,895.00
84,922.20
896,401.00
169,844.40
66,050.60
141,537.00
141,537.00
896,401.00
169,844.40
169,844.40
141,537.00
15,708,000.00
23,100,000.00
17,600,000.00
15,950,000.00
14,850,000.00
12,100,000.00
8,800,000.00
11,000,000.00
36,000.00
4,950,000.00
1,100,000.00
770,000.00
159,500.00
11,000.00
22,000.00
HARGA
(Rp.)
308,000.00
99,000.00
220,000.00
1,500,000.00
27,500.00
330,000.00
165,000.00
3,300,000.00
1,430,000.00
330,000.00
440,000.00
385,000.00
330,000.00
330,000.00
1,349,319.40
306,663.50
94,358.00
147,387.20
245,330.80
377,432.00
HARGA
(Rp.)
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
HARGA SATUAN
NO / KODE URAIAN VOLUME SATUAN
(Rp.)
PEKERJAAN ELEKTRIKAL
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
PR VII. 2 - pita tembaga ukuran 25 mm x 3 mm lengkap dengan klip pita DC perekat GD015 di atap
Bahan :
- pita tembaga ukuran 25 mm x 3 mm lengkap dengan klip pita DC p 1 m 235,895.00
- peralatan bantu 1 ls. 23,589.50
- transport
Upah :
- mandor tukang listrik 0.2 oh 0.00
- kepala tukang listrik 0.2 oh 0.00
- tukang listrik 2 oh 0.00
- pembantu tukang listrik 4 oh 0.00
JUMLAH :
PR VII. 3 - klem pita tembaga kotak ukuran 25 mm x 3 mm CT105 untuk sambungan pita tembaga
Bahan :
- klem pita tembaga kotak ukuran 25 mm x 3 mm CT105 untuk samb 1 buah 84,922.20
- peralatan bantu 1 ls. 8,492.22
- transport
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
PR VII. 4 - titik pengujian empat lubang PC110, lengkap dengan 1 buah pengelasan exothermic
Bahan :
- titik pengujian empat lubang PC110, lengkap dengan 1 buah penge 1 buah 896,401.00
- peralatan bantu 1 ls. 89,640.10
PROTEKSI PETIR 507292529.xls Page._57 Of 173
ANALISA HARGA SATUAN PEKERJAAN
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
HARGA SATUAN
NO / KODE URAIAN VOLUME SATUAN
(Rp.)
- transport
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
PR VII. 6 - konektor batang baja stainless (di setiap interval 1,5 m) untukpenghantar pembumian
Bahan :
- konektor batang baja stainless (di setiap interval 1,5 m) untukpen 1 buah 66,050.60
- peralatan bantu 1 ls. 6,605.06
- transport
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
PR VII.7 - pengelasan exothermic untuk sambungan pita ke pita tipe BB7 untuk penghantar
Bahan :
- pengelasan exothermic untuk sambungan pita ke pita tipe BB7 unt 1 buah 141,537.00
- peralatan bantu 1 ls. 14,153.70
- transport
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
PROTEKSI PETIR 507292529.xls Page._58 Of 173
ANALISA HARGA SATUAN PEKERJAAN
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
HARGA SATUAN
NO / KODE URAIAN VOLUME SATUAN
(Rp.)
JUMLAH :
PEMBUMIAN PENGAMAN
PR VII. 8 - pengelasan exothermic pita tembaga ke sambungan awal pile cap BRE-73
Bahan :
- pengelasan exothermic pita tembaga ke sambungan awal pile cap 1 buah 141,537.00
- peralatan bantu 1 ls. 14,153.70
- transport
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
PR VII.9 - titik pengujian empat lubang PC110, lengkap dengan 1 buah pengelasan exothermic
Bahan :
- titik pengujian empat lubang PC110, lengkap dengan 1 buah penge 1 buah 896,401.00
- peralatan bantu 1 ls. 89,640.10
- transport
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
PR VII. 10 - pita tembaga ukuran 25 mm x 3 mm tipe TC030 dari pile cap ke titik pengujian
Bahan :
- pita tembaga ukuran 25 mm x 3 mm tipe TC030 dari pile cap ke titik 1 buah 169,844.40
- peralatan bantu 1 ls. 16,984.44
- transport
Upah :
- mandor tukang listrik 0.2 oh 70,000.00
- kepala tukang listrik 0.2 oh 85,000.00
- tukang listrik 2 oh 70,000.00
- pembantu tukang listrik 4 oh 60,000.00
JUMLAH :
PR VII. 11 - pita tembaga ukuran 25 mm x 3 mm tipe TC030 interlinking ke semua pile cap
Bahan :
- pita tembaga ukuran 25 mm x 3 mm tipe TC030 interlinking ke semu 1 meter 169,844.40
PROTEKSI PETIR 507292529.xls Page._59 Of 173
ANALISA HARGA SATUAN PEKERJAAN
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
HARGA SATUAN
NO / KODE URAIAN VOLUME SATUAN
(Rp.)
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
PR VII. 12 - pengelasan exothermic untuk sambungan pita ke pita tipe BB7 /BB14 untuk interlinking ke
Bahan :
- pengelasan exothermic untuk sambungan pita ke pita tipe BB7 /BB14 1 meter 141,537.00
- peralatan bantu 1 ls. 14,153.70
- transport
Upah :
- mandor tukang listrik 0.01 oh 70,000.00
- kepala tukang listrik 0.01 oh 85,000.00
- tukang listrik 0.1 oh 70,000.00
- pembantu tukang listrik 0.1 oh 60,000.00
JUMLAH :
Upah :
- mandor tukang listrik 0.1 oh 70,000.00
- kepala tukang listrik 0.1 oh 85,000.00
- tukang listrik 1 oh 70,000.00
- pembantu tukang listrik 2 oh 60,000.00
JUMLAH :
Upah :
- mandor tukang listrik 0.1 oh 70,000.00
- kepala tukang listrik 0.1 oh 85,000.00
- tukang listrik 1 oh 70,000.00
PROTEKSI PETIR 507292529.xls Page._60 Of 173
ANALISA HARGA SATUAN PEKERJAAN
0 0
0
0 0 LINGKUP PEKERJAAN : ELEKTRIKAL
HARGA SATUAN
NO / KODE URAIAN VOLUME SATUAN
(Rp.)
HARGA
(Rp.)
707,685.00
70,768.50
14,000.00
17,000.00
140,000.00
240,000.00
1,189,453.50
1,189,450.00
235,895.00
23,589.50
0.00
0.00
0.00
0.00
259,484.50
259,480.00
84,922.20
8,492.22
14,000.00
17,000.00
140,000.00
240,000.00
504,414.42
504,410.00
896,401.00
89,640.10
PROTEKSI PETIR 507292529.xls Page._62 Of 173
AAN
HARGA
(Rp.)
14,000.00
17,000.00
140,000.00
240,000.00
1,397,041.10
1,397,040.00
169,844.40
16,984.44
14,000.00
17,000.00
140,000.00
240,000.00
597,828.84
597,830.00
66,050.60
6,605.06
14,000.00
17,000.00
140,000.00
240,000.00
483,655.66
483,660.00
141,537.00
14,153.70
14,000.00
17,000.00
140,000.00
240,000.00
PROTEKSI PETIR 507292529.xls Page._63 Of 173
AAN
HARGA
(Rp.)
566,690.70
566,690.00
141,537.00
14,153.70
14,000.00
17,000.00
140,000.00
240,000.00
566,690.70
566,690.00
896,401.00
89,640.10
14,000.00
17,000.00
140,000.00
240,000.00
1,397,041.10
1,397,040.00
169,844.40
16,984.44
14,000.00
17,000.00
140,000.00
240,000.00
597,828.84
597,830.00
169,844.40
PROTEKSI PETIR 507292529.xls Page._64 Of 173
AAN
HARGA
(Rp.)
16,984.44
700.00
850.00
7,000.00
6,000.00
201,378.84
201,380.00
141,537.00
14,153.70
700.00
850.00
7,000.00
6,000.00
170,240.70
170,240.00
300,000.00
7,000.00
8,500.00
70,000.00
120,000.00
505,500.00
505,500.00
150,000.00
15,000.00
7,000.00
8,500.00
70,000.00
PROTEKSI PETIR 507292529.xls Page._65 Of 173
AAN
HARGA
(Rp.)
60,000.00
310,500.00
310,500.00
67
Harga Satuan Bahan ( Rp./ titik ) & Upah kerja ( Rp./titik )
No. JENIS BAHAN Sat Qty Harga Total Qty
Satuan ( Rp. )
68