R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 22,510,880.37

II PEKERJAAN PONDASI 32,560,133.33

III PEKERJAAN STRUKTUR BETON 83,095,296.95

IV PEKERJAAN DINDING & ATAP 218,271,305.03

V PEKERJAAN PINTU, JENDELA DAN VENTILASI 127,019,009.61

VI PEKERJAAN LANTAI & PLAFOND 171,893,592.08

VII PEKERJAAN INSTALASI AIR DAN SANITASI 73,326,000.00

VIII PEKERJAAN INSTALASI LISTRIK 22,222,000.00

IX PEKERJAAN LAIN-LAIN 31,000,000.00

X PERKERASAN JALAN DENGAN SIRTU, CANSTEIN & CONBLOCK 37,819,782.63

A TOTAL BIAYA 819,718,000.00

B PPN 10 % 81,971,800.00

C JUMLAH ( A + B ) 901,689,800.00
Terbilang : Sembilan Ratus Satu Juta Enam Ratus Delapan Puluh Sembilan Ribu Delapan Ratus Rupiah

Pematang Siantar, 27 Agustus 2010

Diajukan Oleh : Dibuat Oleh :


CV. KERJASAMA CV. KERJASAMA

ELLY REVINA PURBA JANHOT A. GIRSANG


Direktris Tenaga Teknis

1
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR


1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 3,100,000.00 3,100,000.00
2 Pembongkaran Bangunan yang ada (BPP.Silimakuta) Ls 1.00 lot 1,000,000.00 1,000,000.00
3 Galian Tanah & Perataan Lahan ( Silimakuta ) GTBT-M 896.00 m3 14,841.20 13,297,715.20
4 Pembersihan Lokasi, Buang Kelapa Sawit (Jawa Maraja) Ls 1.00 lot 1,300,000.00 1,300,000.00
5 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 520,000.00 1,040,000.00
6 Pembuatan Papan Nama Proyek Ls 2.00 lot 310,000.00 620,000.00
7 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 1,000,000.00 1,000,000.00
8 Pembersihan Akhir Ls 1.00 lot 1,153,165.17 1,153,165.17

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 22,510,880.37


II PEKERJAAN PONDASI
1 Galian Tanah untuk Pondasi GTB-1 75.61 m3 46,744.50 3,534,445.13
2 Pasir Urug untuk Pondasi URG-P 5.42 m3 83,377.80 452,241.19
3 Pasangan Batu Padas untuk Pondasi PADAS-14 51.43 m3 549,948.30 28,281,091.33
4 Urugan Kembali Tanah Galian Pondasi UKTHG 18.76 m3 15,581.50 292,355.68

SUB TOTAL II : PEKERJAAN PONDASI 32,560,133.33


III PEKERJAAN STRUKTUR BETON
1 Bekisting Sloof --- 15 cm' x 20 cm' BKT-PRK 36.72 m2 226,210.38 8,306,445.15
2 Tulangan Sloof --- 15 cm' x 20 cm' BESI-01 826.20 kg 12,009.03 9,921,860.59
3 Beton Cor Sloof --- 15 cm' x 20 cm' K-200 6.12 m3 881,471.74 5,394,607.05
4 Bekisting Kolom Praktis --- 11 cm' x 11 cm' BKT-PRK 6.94 m2 226,210.38 1,569,900.04
5 Tulangan Kolom Praktis --- 11 cm' x 11 cm' BESI-01 577.64 kg 12,009.03 6,936,896.09
6 Beton Cor Kolom Praktis --- 11 cm' x 11 cm' K-200 2.30 m3 881,471.74 2,027,385.00
7 Bekisting Kolom Entrans --- 20 cm' x 20 cm' BKT-PRK 25.20 m2 226,210.38 5,700,501.58
8 Tulangan Kolom Entrans --- 20 cm' x 20 cm' BESI-01 315.14 kg 12,009.03 3,784,525.71
9 Beton Cor Kolom Entrans --- 20 cm' x 20 cm' K-200 2.52 m3 881,471.74 2,221,308.78
10 Bekisting Ring Balok --- 15 cm' x 20 cm' BKT-PRK 67.92 m2 226,210.38 15,364,209.01
11 Tulangan Ring Balok --- 15 cm' x 20 cm' BESI-01 1,146.14 kg 12,009.03 13,764,029.64
12 Beton Cor Ring Balok --- 15 cm' x 20 cm' K-200 8.48 m3 881,471.74 7,474,880.36
13 Bekisting Plat Beton Meja Dapur BKT-PRK 1.42 m2 226,210.38 321,218.74
14 Tulangan Plat Beton Meja Dapur BESI-01 9.46 kg 12,009.03 113,605.42
15 Beton Cor Plat Beton Meja Dapur K-200 0.22 m3 881,471.74 193,923.78

SUB TOTAL III : PEKERJAAN STRUKTUR BETON 83,095,296.95


IV PEKERJAAN DINDING & ATAP
1 Rangka Atap Baja Ringan Supersteell RNK-BJR 546.28 m2 143,963.60 78,644,435.41
2 Atap Genteng Metal ATP-GM 546.28 m2 85,775.14 46,857,243.48
3 Rabung Genteng Metal RB-GM 97.00 m' 34,223.42 3,319,671.74
4 Lisplank Kayu kelas II LP-20 - II 81.00 m' 97,361.88 7,886,312.28
5 Cat Kilat Lisplank CAT-K-3 16.20 m2 51,520.59 834,633.56
6 Pekerjaan Flashing / Plat Seng Layar Ls 8.00 m2 15,000.00 120,000.00
7 Pasangan Batu Bata 1 : 4 BATA ½ -14 437.78 m2 91,334.21 39,984,290.45
8 Plesteran 1 : 4 PLESTER-14 951.06 m2 42,715.20 40,624,718.11

SUB TOTAL IV : PEKERJAAN DINDING & ATAP 218,271,305.03

2
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

V PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Kosen pintu/ Jendela KUSEN - II 2.92 m3 9,240,491.70 26,982,235.76
2 Pintu Panel PINTU - II 38.64 m2 606,938.20 23,452,092.05
3 Jendela Kaca JKC - II 80.64 m2 505,183.03 40,737,959.54
4 Engsel Pintu Ls 84.00 unit 13,000.00 1,092,000.00
5 Grendel Pintu Ls 36.00 unit 10,000.00 360,000.00
6 Kunci Tanam Ls 8.00 unit 52,000.00 416,000.00
7 Engsel Jendela Ls 192.00 unit 10,000.00 1,920,000.00
8 Grendel Jendela Ls 96.00 unit 10,000.00 960,000.00
9 Hak Angin Ls 192.00 unit 10,000.00 1,920,000.00
10 Cat Kilat 3 x CAT-K-3 177.38 m2 51,520.59 9,138,722.25
11 Kaca Bening t = 5 mm Ls 3.20 m2 150,000.00 480,000.00
12 Jerajak Jendela 70 x 120 Ls 96.00 unit 200,000.00 19,200,000.00
13 Pintu PVC Ls 2.00 unit 180,000.00 360,000.00

SUB TOTAL V : PEKERJAAN PINTU, JENDELA DAN VENTILASI 127,019,009.61


VI PEKERJAAN LANTAI & PLAFOND
1 Urugan Tanah di Bawah Lantai URG-T 28.64 m3 90,637.80 2,595,866.59
2 Urugan Pasir di Bawah Lantai URG-P 14.32 m3 83,377.80 1,193,970.10
3 Lantai Keramik 40 x 40 cm LK - 4040 286.40 m2 99,489.17 28,493,698.29
4 Lantai Keramik 20 x 20 cm LK - 2020 8.00 m2 99,654.50 797,236.00
5 Dinding Keramik 20 x 25 cm DK - 2025 36.06 m2 168,077.80 6,060,885.47
6 Batu Alam 10 x 20 cm pd dinding & pot bunga BT-ALM 103.52 m2 269,833.30 27,933,143.22
7 Rangka Plafon Celling furlin 40.40.4 RNK-F-HL 433.24 m2 48,512.42 21,017,520.84
8 Plafon Glass Reinforced Cement Board 5 mm GIPSUM 433.24 m2 69,475.78 30,099,686.93
9 List Profil Gypsum 50.70 mm Ls 446.00 m' 8,800.00 3,924,800.00
10 Pengecatan Dinding CAT-T-3 847.54 m2 38,864.43 32,939,159.00
11 Pengecatan Cat Plafond CAT-T-3 433.24 m2 38,864.43 16,837,625.65

SUB TOTAL VI : PEKERJAAN LANTAI & PLAFOND 171,893,592.08


VII PEKERJAAN INSTALASI AIR DAN SANITASI
1 Sumur Bor Dalam Submersibel + Tanki air 1000 ltr Ls 1.00 unit 32,800,000.00 32,800,000.00
2 Pembuatan sumur Bor Dangkal - Zet Pump Ls 1.00 unit 9,300,000.00 9,300,000.00
3 Pipa PVC untuk air bersih dia1/2" Ls 1.00 lot 52,000.00 52,000.00
4 Pipa PVC untuk air Kotor dan air padat dia 3" Ls 1.00 lot 310,000.00 310,000.00
5 Kran Air Ls 6.00 Bh 18,000.00 108,000.00
6 Clozet Jongkok Ls 2.00 Bh 100,000.00 200,000.00
7 Wastafell cuci piring 1 lobang Ls 2.00 Bh 200,000.00 400,000.00
8 Floor Drain Ls 2.00 Bh 10,000.00 20,000.00
9 Saringan Air Ls 2.00 Bh 18,000.00 36,000.00
10 Parit terbuka Ls 166.00 M' 150,000.00 24,900,000.00
11 Septictank dan resapan Ls 2.00 unit 2,600,000.00 5,200,000.00

SUB TOTAL VII : PEKERJAAN INSTALASI AIR DAN SANITASI 73,326,000.00


VIII PEKERJAAN INSTALASI LISTRIK
1 Izin Pemasangan arus Listrik 1300 watt Ls 2.00 unit 3,100,000.00 6,200,000.00
2 Tiang Listrik Besi dia 3" (Lokasi Kec.Jawa Maraja) Ls 3.00 unit 780,000.00 2,340,000.00
3 Kabel Utama DX 2 x 10 sqmm antar tiang gawang Ls 120.00 m' 36,000.00 4,320,000.00
Titi
4 Instalasi titik api dan conduit Ls 74.00 41,000.00 3,034,000.00
k
5 Lampu TL 2 x 36 W + assesories Ls 24.00 Bh 140,000.00 3,360,000.00
6 Lamp SL 18 W+Fitting Ls 18.00 Bh 96,000.00 1,728,000.00
7 Stop Kontak Ls 14.00 Bh 34,000.00 476,000.00
8 Saklar Tunggal Ls 4.00 Bh 28,000.00 112,000.00
9 Saklar Ganda Ls 14.00 Bh 34,000.00 476,000.00
10 Panel Box + assesories Ls 2.00 Bh 88,000.00 176,000.00

SUB TOTAL VIII : PEKERJAAN INSTALASI LISTRIK 22,222,000.00

3
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

IX PEKERJAAN LAIN-LAIN
1 Pembuatan pot bunga type I Ls 10.00 bh 150,000.00 1,500,000.00
2 Pembuatan pot bunga type II Ls 4.00 bh 260,000.00 1,040,000.00
3 Tiang bendera Ls 2.00 unit 1,500,000.00 3,000,000.00
4 Pek.Plat Beton jalan masuk Ls 1.00 unit 3,100,000.00 3,100,000.00
5 Papan nama BPP Ls 2.00 unit 5,000,000.00 10,000,000.00
6 Pekejaan penangkal petir Ls 2.00 unit 780,000.00 1,560,000.00
7 Pek.Ornamen/gorga simalungun ditombak layar Ls 8.00 m2 180,000.00 1,440,000.00
8 Pek.Ornamen pada Kolom 20 x 20 Selasar Ls 36.00 m2 180,000.00 6,480,000.00
9 Pek.Ornamen /Kepala kerbau ditombak layar Ls 4.00 bh 720,000.00 2,880,000.00

SUB TOTAL IX : PEKERJAAN LAIN-LAIN 31,000,000.00


X PERKERASAN JALAN DENGAN SIRTU, CANSTEIN & CONBLOCK
1 Penyiapan Lokasi Untuk halaman Ls 431.60 M2 1,500.00 647,400.00
2 Galian tanah untuk Canstein GTB-1 3.18 m3 46,744.50 148,647.51
3 Cor Rabat Beton RABAT 1.59 m3 601,035.38 955,646.25
4 Pasangan batu bata 1 : 4 BATA ½ -14 83.50 m2 91,334.21 7,626,406.54
5 Plesteran 1 : 4 PLESTER-14 135.23 m2 42,715.20 5,776,376.50
6 Perkerasan jalan dengan sirtu SIRTU-M 50.88 m3 272,493.54 13,864,471.32
7 Conblock pada Lokasi Upacara CON-BLK 69.84 m2 126,014.24 8,800,834.52

SUB TOTAL X : PERKERASAN JALAN DENGAN SIRTU, CANSTEIN & CONBLOCK 37,819,782.63

4
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR


1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 3,100,000.00 3,100,000.00 0.38 3,100,000.00 3,100,000.00 0.38
2 Pembongkaran Bangunan yang ada (BPP.Silimakuta) Ls 1.00 lot 1,000,000.00 1,000,000.00 0.12 1,000,000.00 1,000,000.00 0.12
3 Galian Tanah & Perataan Lahan ( Silimakuta ) GTBT-M 896.00 m3 14,841.20 13,297,715.20 1.62 13,297,715.20 13,297,715.20 1.62
4 Pembersihan Lokasi, Buang Kelapa Sawit (Jawa Maraja) Ls 1.00 lot 1,300,000.00 1,300,000.00 0.16 1,300,000.00 1,300,000.00 0.16
5 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 520,000.00 1,040,000.00 0.13 1,040,000.00 1,040,000.00 0.13
6 Pembuatan Papan Nama Proyek Ls 2.00 lot 310,000.00 620,000.00 0.08 620,000.00 620,000.00 0.08
7 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 1,000,000.00 1,000,000.00 0.12 333,333.33 333,333.33 0.04
8 Pembersihan Akhir Ls 1.00 lot 1,153,165.17 1,153,165.17 0.14 -
II PEKERJAAN PONDASI
1 Galian Tanah untuk Pondasi GTB-1 75.61 m3 46,744.50 3,534,445.13 0.43 3,534,445.13 3,534,445.13 0.43
2 Pasir Urug untuk Pondasi URG-P 5.42 m3 83,377.80 452,241.19 0.06 452,241.19 452,241.19 0.06
3 Pasangan Batu Padas untuk Pondasi PADAS-14 51.43 m3 550,001.77 28,283,841.07 3.45 28,283,841.07 28,283,841.07 3.45
4 Urugan Kembali Tanah Galian Pondasi UKTHG 18.76 m3 15,434.95 289,605.94 0.04 289,605.94 289,605.94 0.04
III PEKERJAAN STRUKTUR BETON
1 Bekisting Sloof --- 15 cm' x 20 cm' BKT-PRK 36.72 m2 226,210.38 8,306,445.15 1.01 8,306,445.15 8,306,445.15 1.01
2 Tulangan Sloof --- 15 cm' x 20 cm' BESI-01 826.20 kg 12,009.03 9,921,860.59 1.21 9,921,860.59 9,921,860.59 1.21
3 Beton Cor Sloof --- 15 cm' x 20 cm' K-200 6.12 m3 881,471.74 5,394,607.05 0.66 5,394,607.05 5,394,607.05 0.66
4 Bekisting Kolom Praktis --- 11 cm' x 11 cm' BKT-PRK 6.94 m2 226,210.38 1,569,900.04 0.19 1,569,900.04 1,569,900.04 0.19
5 Tulangan Kolom Praktis --- 11 cm' x 11 cm' BESI-01 577.64 kg 12,009.03 6,936,896.09 0.85 6,936,896.09 6,936,896.09 0.85
6 Beton Cor Kolom Praktis --- 11 cm' x 11 cm' K-200 2.30 m3 881,471.74 2,027,385.00 0.25 2,027,385.00 2,027,385.00 0.25
5
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

7 Bekisting Kolom Entrans --- 20 cm' x 20 cm' BKT-PRK 25.20 m2 226,210.38 5,700,501.58 0.70 5,700,501.58 5,700,501.58 0.70

6
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

8 Tulangan Kolom Entrans --- 20 cm' x 20 cm' BESI-01 315.14 kg 12,009.03 3,784,525.71 0.46 3,784,525.71 3,784,525.71 0.46
9 Beton Cor Kolom Entrans --- 20 cm' x 20 cm' K-200 2.52 m3 881,471.74 2,221,308.78 0.27 2,221,308.78 2,221,308.78 0.27
10 Bekisting Ring Balok --- 15 cm' x 20 cm' BKT-PRK 67.92 m2 226,210.38 15,364,209.01 1.87 15,364,209.01 15,364,209.01 1.87
11 Tulangan Ring Balok --- 15 cm' x 20 cm' BESI-01 1,146.14 kg 12,009.03 13,764,029.64 1.68 13,764,029.64 13,764,029.64 1.68
12 Beton Cor Ring Balok --- 15 cm' x 20 cm' K-200 8.48 m3 881,471.74 7,474,880.36 0.91 7,474,880.36 7,474,880.36 0.91
13 Bekisting Plat Beton Meja Dapur BKT-PRK 1.42 m2 226,210.38 321,218.74 0.04 321,218.74 321,218.74 0.04
14 Tulangan Plat Beton Meja Dapur BESI-01 9.46 kg 12,009.03 113,605.42 0.01 113,605.42 113,605.42 0.01
15 Beton Cor Plat Beton Meja Dapur K-200 0.22 m3 881,471.74 193,923.78 0.02 193,923.78 193,923.78 0.02
IV PEKERJAAN DINDING & ATAP 0.00
1 Rangka Atap Baja Ringan Supersteell RNK-BJR 546.28 m2 143,963.60 78,644,435.41 9.59 47,186,661.24 47,186,661.24 5.76
2 Atap Genteng Metal ATP-GM 546.28 m2 85,775.14 46,857,243.48 5.72 23,428,621.74 23,428,621.74 2.86
3 Rabung Genteng Metal RB-GM 97.00 m' 34,223.42 3,319,671.74 0.40 1,659,835.87 1,659,835.87 0.20
4 Lisplank Kayu kelas II LP-20 - II 81.00 m' 97,361.88 7,886,312.28 0.96 3,943,156.14 3,943,156.14 0.48
5 Cat Kilat Lisplank CAT-K-3 16.20 m2 51,520.59 834,633.56 0.10 - - -
6 Pekerjaan Flashing / Plat Seng Layar Ls 8.00 m2 15,000.00 120,000.00 0.01 60,000.00 60,000.00 0.01
7 Pasangan Batu Bata 1 : 4 BATA ½ -14 437.78 m2 91,334.21 39,984,290.45 4.88 39,984,290.45 39,984,290.45 4.88
8 Plesteran 1 : 4 PLESTER-14 951.06 m2 42,715.20 40,624,718.11 4.96 40,624,718.11 40,624,718.11 4.96
V PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Kosen pintu/ Jendela KUSEN - II 2.92 m3 9,240,491.70 26,982,235.76 3.29 26,982,235.76 26,982,235.76 3.29
2 Pintu Panel PINTU - II 38.64 m2 606,938.20 23,452,092.05 2.86 7,531,504.76 7,531,504.76 0.92
3 Jendela Kaca JKC - II 80.64 m2 505,183.03 40,737,959.54 4.97 - - -
7
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

4 Engsel Pintu Ls 84.00 unit 13,000.00 1,092,000.00 0.13 -

8
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

5 Grendel Pintu Ls 36.00 unit 10,000.00 360,000.00 0.04 -


6 Kunci Tanam Ls 8.00 unit 52,000.00 416,000.00 0.05 -
7 Engsel Jendela Ls 192.00 unit 10,000.00 1,920,000.00 0.23 -
8 Grendel Jendela Ls 96.00 unit 10,000.00 960,000.00 0.12 -
9 Hak Angin Ls 192.00 unit 10,000.00 1,920,000.00 0.23 -
10 Cat Kilat 3 x CAT-K-3 177.38 m2 51,520.59 9,138,722.25 1.11 -
11 Kaca Bening t = 5 mm Ls 3.20 m2 150,000.00 480,000.00 0.06 -
12 Jerajak Jendela 70 x 120 Ls 96.00 unit 200,000.00 19,200,000.00 2.34 -
13 Pintu PVC Ls 2.00 unit 180,000.00 360,000.00 0.04 -
VI PEKERJAAN LANTAI & PLAFOND
1 Urugan Tanah di Bawah Lantai URG-T 28.64 m3 90,637.80 2,595,866.59 0.32 2,595,866.59 2,595,866.59 0.32
2 Urugan Pasir di Bawah Lantai URG-P 14.32 m3 83,377.80 1,193,970.10 0.15 1,193,970.10 1,193,970.10 0.15
3 Lantai Keramik 40 x 40 cm LK - 4040 286.40 m2 99,489.17 28,493,698.29 3.48 -
4 Lantai Keramik 20 x 20 cm LK - 2020 8.00 m2 99,654.50 797,236.00 0.10 -
5 Dinding Keramik 20 x 25 cm DK - 2025 36.06 m2 168,077.80 6,060,885.47 0.74 -
6 Batu Alam 10 x 20 cm pd dinding & pot bunga BT-ALM 103.52 m2 269,833.30 27,933,143.22 3.41 -
7 Rangka Plafon Celling furlin 40.40.4 RNK-F-HL 433.24 m2 48,512.42 21,017,520.84 2.56 10,508,760.42 10,508,760.42 1.28
8 Plafon Glass Reinforced Cement Board 5 mm GIPSUM 433.24 m2 69,475.78 30,099,686.93 3.67 -
9 List Profil Gypsum 50.70 mm Ls 446.00 m' 8,800.00 3,924,800.00 0.48 -
10 Pengecatan Dinding CAT-T-3 847.54 m2 38,864.43 32,939,159.00 4.02 -
11 Pengecatan Cat Plafond CAT-T-3 433.24 m2 38,864.43 16,837,625.65 2.05 -
9
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

VII PEKERJAAN INSTALASI AIR DAN SANITASI


1 Sumur Bor Dalam Submersibel + Tanki air 1000 ltr Ls 1.00 unit 32,800,000.00 32,800,000.00 4.00 -
2 Pembuatan sumur Bor Dangkal - Zet Pump Ls 1.00 unit 9,300,000.00 9,300,000.00 1.13 -
3 Pipa PVC untuk air bersih dia1/2" Ls 1.00 lot 52,000.00 52,000.00 0.01 -
4 Pipa PVC untuk air Kotor dan air padat dia 3" Ls 1.00 lot 310,000.00 310,000.00 0.04 -
5 Kran Air Ls 6.00 Bh 18,000.00 108,000.00 0.01 -
6 Clozet Jongkok Ls 2.00 Bh 100,000.00 200,000.00 0.02 -
7 Wastafell cuci piring 1 lobang Ls 2.00 Bh 200,000.00 400,000.00 0.05 -
8 Floor Drain Ls 2.00 Bh 10,000.00 20,000.00 0.00 -
9 Saringan Air Ls 2.00 Bh 18,000.00 36,000.00 0.00 -
10 Parit terbuka Ls 166.00 M' 150,000.00 24,900,000.00 3.04 12,450,000.00 12,450,000.00 1.52
11 Septictank dan resapan Ls 2.00 unit 2,600,000.00 5,200,000.00 0.63 -
VIII PEKERJAAN INSTALASI LISTRIK
1 Izin Pemasangan arus Listrik 1300 watt Ls 2.00 unit 3,100,000.00 6,200,000.00 0.76 6,200,000.00 6,200,000.00 0.76
2 Tiang Listrik Besi dia 3" (Lokasi Kec.Jawa Maraja) Ls 3.00 unit 780,000.00 2,340,000.00 0.29 2,340,000.00 2,340,000.00 0.29
3 Kabel Utama DX 2 x 10 sqmm antar tiang gawang Ls 120.00 m' 36,000.00 4,320,000.00 0.53 4,320,000.00 4,320,000.00 0.53
Titi
4 Instalasi titik api dan conduit Ls 74.00 41,000.00 3,034,000.00 0.37 1,517,000.00 1,517,000.00 0.19
k
5 Lampu TL 2 x 36 W + assesories Ls 24.00 Bh 140,000.00 3,360,000.00 0.41 -
6 Lamp SL 18 W+Fitting Ls 18.00 Bh 96,000.00 1,728,000.00 0.21 -
7 Stop Kontak Ls 14.00 Bh 34,000.00 476,000.00 0.06 -
8 Saklar Tunggal Ls 4.00 Bh 28,000.00 112,000.00 0.01 -
10
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

9 Saklar Ganda Ls 14.00 Bh 34,000.00 476,000.00 0.06 -


10 Panel Box + assesories Ls 2.00 Bh 88,000.00 176,000.00 0.02 -
IX PEKERJAAN LAIN-LAIN
1 Pembuatan pot bunga type I Ls 10.00 bh 150,000.00 1,500,000.00 0.18 -
2 Pembuatan pot bunga type II Ls 4.00 bh 260,000.00 1,040,000.00 0.13 -
3 Tiang bendera Ls 2.00 unit 1,500,000.00 3,000,000.00 0.37 -
4 Pek.Plat Beton jalan masuk Ls 1.00 unit 3,100,000.00 3,100,000.00 0.38 -
5 Papan nama BPP Ls 2.00 unit 5,000,000.00 10,000,000.00 1.22 -
6 Pekejaan penangkal petir Ls 2.00 unit 780,000.00 1,560,000.00 0.19 -
7 Pek.Ornamen/gorga simalungun ditombak layar Ls 8.00 m2 180,000.00 1,440,000.00 0.18 -
8 Pek.Ornamen pada Kolom 20 x 20 Selasar Ls 36.00 m2 180,000.00 6,480,000.00 0.79 -
9 Pek.Ornamen /Kepala kerbau ditombak layar Ls 4.00 bh 720,000.00 2,880,000.00 0.35 -
X PERKERASAN JALAN DENGAN SIRTU, CANSTEIN & CONBLOCK 0.00
1 Penyiapan Lokasi Untuk halaman Ls 431.60 M2 1,500.00 647,400.00 0.08 -
2 Galian tanah untuk Canstein GTB-1 3.18 m3 46,744.50 148,647.51 0.02 -
3 Cor Rabat Beton RABAT 1.59 m3 601,035.38 955,646.25 0.12 -
4 Pasangan batu bata 1 : 4 BATA ½ -14 83.50 m2 91,334.21 7,626,406.54 0.93 -
5 Plesteran 1 : 4 PLESTER-14 135.23 m2 42,715.20 5,776,376.50 0.70 -

11
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

6 Perkerasan jalan dengan sirtu SIRTU-M 50.88 m3 272,493.54 13,864,471.32 1.69 -


7 Conblock pada Lokasi Upacara CON-BLK 69.84 m2 126,014.24 8,800,834.52 1.07 -

A JUMLAH 819,718,000.00 100.00 - 368,873,100.00 368,873,100.00 45.00


B PPn 10% 81,971,800.00
C TOTAL ( A + B ) 901,689,800.00
D JUMLAH KOMULATIF PELAKSANAAN S/D BULAN INI 368,873,100.00

E JUMLAH KOMULATIF PELAKSANAAN S/D BULAN LALU -

F JUMLAH PELAKSANAAN BULAN INI (F = D - E) 368,873,100.00 45.00

G POTONGAN ( h = h1 + h2 ),dimana : 18,443,655.00

h1 = RETENSI 5% (h1=5% X F) 18,443,655.00 -

h2 = PENGEMBALIAN UANG MUKA 30% (h2= 30% x F) - -

H SERTIFIKAT BULAN INI ( H = F - G ) 368,873,100.00


I PAJAK PERTAMBAHAN NILAI (PPN) 10 % x H 350,429,445.00

J JUMLAH SERTIFIKAT BULAN INI termasuk PPn ( J = H + I ) 35,042,944.50

TOTAL 385,472,389.50

DIBULATKAN 385,472,194.00

Terbilang = Tiga Ratus Delapan Puluh Lima Juta Empat Ratus Enam Puluh Tiga Ribu Rupiah

12
PEMERINTAH KABUPATEN SIMALUNGUN

BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN DAN KETAHANAN PANGAN

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN GEDUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. SILIMAKUTA
BOBOT BIAYA PELAKSANAAN REALISASI
HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME FISIK BULAN FISIK BULAN FISIK S/D BULAN INI BOBOT S/D
(Rp.) (Rp.) (%)
LALU (Rp) INI (Rp) (Rp) BULAN INI (%)

1 2 3 4 5 6 7 8 9 10 11

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR
CV.MANUNGGAL RIAMERTA CONSULTANT CV.KERJA SAMA

IR.MANAOR HUTAPEA PEMBER PANGGABEAN ELLY REVINA PURBA


Nip : 196004241981011003 Site Engginering Direktris

13
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 3,978,374.40

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN 131,602,335.46

III PEKERJAAN PLAT BETON & PAGAR BRC 24,697,290.14

A TOTAL BIAYA 160,278,000.00

B PPN 10 % 16,027,800.00

C JUMLAH ( A + B ) 176,305,800.00

Terbilang : Seratus Tujuh Puluh Enam Juta Tiga Ratus Lima Ribu Delapan Ratus Rupiah

Panei Tongah, 27 Agustus 2010

Diajukan Oleh : Dibuat Oleh :


CV. PUTRA SIMBODU MAJU CV. PUTRA SIMBODU MAJU

MARS AFRIANTO SITANGGANG ERWIN MARUDUT T SIREGAR


Direktur Tenaga Teknis

Page 14 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR
HARGA
JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME SATUAN
(Rp.)
(Rp.)
I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 1,000,000.00 1,000,000.00

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 540,000.00 1,080,000.00

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 320,000.00 640,000.00

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 1,000,000.00 1,000,000.00

5 Pembersihan Akhir Ls 1.00 lot 258,374.40 258,374.40

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 3,978,374.40

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN

1 Timbunan tanah pilihan (Lokasi Kec.Bah jambi) URG-T 240.00 m3 93,680.73 22,483,375.20

2 Galian tanah utk Canstein GTB-1 5.76 m3 45,143.34 260,025.64

3 Rabat Beton Cor utk Canstein RABAT 1.08 m3 624,453.28 674,409.54

4 Pasangan Batu bata 1 : 4 utk Canstein BATA ½ -14 50.40 m2 94,375.82 4,756,541.33

5 Plesteran 1 : 4 utk Canstein PLESTER-14 79.20 m2 42,142.10 3,337,654.32

Pek.Tembok Penahan ( Lokasi Kec.Bah Jambi)

6 Galian tanah utk Temb. penahan GTB-1 2.45 m3 45,143.34 110,601.18

7 Pas. Batu padas 1 : 4 utk Temb. Penahan PADAS-14 6.30 m3 564,882.34 3,558,758.74

8 Plesteran 1 : 4 utk Temb. Penahan PLESTER-14 15.00 m2 42,142.10 632,131.50

9 Urugan tanah kembali utk Temb. Penahan UKTHG 0.61 m3 15,026.77 9,166.33

10 Pek.telford Lantai jemur t = 15 cm' TELFORD 800.00 m2 50,304.87 40,243,896.00

11 Pek.Rabat Beton Cor Lantai Jemur , tebal= 7 cm RABAT 56.00 m3 624,453.28 34,969,383.68

12 Pelapisan Lantai Jemur dengan Acian semen ACIAN - SB 800.00 m2 25,707.99 20,566,392.00

SUB TOTAL II : PEKERJAAN TANAH, PASANGAN DAN PERKERASAN 131,602,335.46

III PEKERJAAN PLAT BETON & PAGAR BRC

1 Galian tanah GTB-1 1.68 m3 45,143.34 75,840.81

2 Pasangan Batu padas 1 :4 PADAS-14 6.88 m3 564,882.34 3,886,390.50

3 Bekisting Plat Beton BKT-PRK 15.48 m2 234,291.86 3,626,837.99

4 Tulangan Plat Beton BESI-01 322.50 kg 12,538.79 4,043,759.78

5 Beton Cor Plat Beton K-200 2.58 m3 937,267.37 2,418,149.81

6 Urugan tanah kembali UKTHG 0.42 m3 15,026.77 6,311.24

7 Pagar BRC tinggi 1.2 meter(Lokasi Kec.Pem.Bandar) Ls 56.00 m' 190,000.00 10,640,000.00

SUB TOTAL III : PEKERJAAN PLAT BETON & PAGAR BRC 24,697,290.14

Page 15 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

NOMOR URAIAN PEKERJAAN

1 2

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR


II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR BETON
IV PEKERJAAN DINDING & ATAP
V PEKERJAAN PINTU, JENDELA DAN VENTILASI
VI PEKERJAAN LANTAI & PLAFOND
VII PEKERJAAN INSTALASI LISTRIK
VIII PEKERJAAN LAIN-LAIN

A TOTAL BIAYA

B PPN 10 %

C JUMLAH ( A + B )
Terbilang : Lima Ratus Lima Puluh Dua Juta Enam Ratus Empat Puluh Delapan Ribu Delapan Ratus Rupiah

Pematang Siantar, 27

Diajukan Oleh : Dibuat Oleh :


CV. HASORUAN CV. HASORUAN

3 3 3

Ir. DARWIN W. PURBA Ir. DARWIN W. PURBA


Direktur Tenaga Teknis

Page 16 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

P.BANDAR JAWA MARAJA

NO. ITEM PEKERJAAN ANALISA VOLUME VOLUME VOLUME

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 1.00 lot 1.00 lot

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 2.00 lot 2.00 lot

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 2.00 lot 2.00 lot

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 1.00 lot 1.00 lot

5 Pembersihan Akhir Ls 1.00 lot 1.00 lot 1.00 lot

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

II PEKERJAAN PONDASI

1 Galian Tanah untuk Pondasi Tapak GTB-1 29.16 m3 14.58 m3 14.58 m3

2 Pasir Urug untuk Pondasi Tapak URG-P 1.44 m3 0.72 m3 0.72 m3

3 Lantai Kerja untuk Pondasi Tapak RABAT 1.44 m3 0.72 m3 0.72 m3

4 Beksiting untuk Pondasi Tapak BKT-PRK 22.98 m2 11.49 m2 11.49 m2

5 Tulangan untuk Pondasi Tapak BESI-01 413.64 kg 206.82 kg 206.82 kg

6 Beton Cor untuk Pondasi Tapak K-200 4.58 m3 2.29 m3 2.29 m3

7 Beksiting untuk Kolom Tapak BKT-PRK 20.94 m2 10.47 m2 10.47 m2

8 Tulangan untuk Kolom Tapak BESI-01 264.32 kg 132.16 kg 132.16 kg

9 Beton Cor untuk kolom Tapak K-200 2.08 m3 1.04 m3 1.04 m3

10 Pas. Batu Padas untuk Tapak PADAS-14 8.12 m3 4.06 m3 4.06 m3

11 Urugan Kembali Tanah Galian utk Tapak UKTHG 11.42 m3 5.71 m3 5.71 m3

12 Galian Tanah untuk Pondasi Menerus GTB-1 48.08 m3 24.04 m3 24.04 m3

13 Pasir Urug untuk Pondasi Menerus URG-P 3.20 m3 1.60 m3 1.60 m3

14 Pasangan Batu Padas untuk Pondasi Menerus PADAS-14 32.06 m3 16.03 m3 16.03 m3

15 Urugan Kembali Tanah Galian Pondasi Menerus UKTHG 12.82 m3 6.41 m3 6.41 m3

SUB TOTAL II : PEKERJAAN PONDASI

III PEKERJAAN STRUKTUR BETON

1 Bekisting Sloof --- 20 cm' x 20 cm' BKT-PRK 29.28 m2 14.64 m2 14.64 m2

2 Tulangan Sloof --- 20 cm' x 20 cm' BESI-01 512.40 kg 256.20 kg 256.20 kg

3 Beton Cor Sloof --- 20 cm' x 20 cm' K-200 4.88 m3 2.44 m3 2.44 m3

4 Bekisting Kolom Entrans --- 25 cm' x 25 cm' BKT-PRK 12.00 m2 6.00 m2 6.00 m2

5 Tulangan Kolom Entrans --- 25 cm' x 25 cm' BESI-01 89.60 kg 44.80 kg 44.80 kg

6 Beton Cor Kolom Entrans --- 25 cm' x 25 cm' K-200 1.20 m3 0.60 m3 0.60 m3

7 Bekisting Kolom Type 2 --- 20 cm' x 20 cm' BKT-PRK 61.44 m2 30.72 m2 30.72 m2

8 Tulangan Kolom Type 2 --- 20 cm' x 20 cm' BESI-01 690.04 kg 345.02 kg 345.02 kg

9 Beton Cor Kolom Type 2 --- 20 cm' x 20 cm' K-200 6.14 m3 3.07 m3 3.07 m3

10 Bekisting Ring Balok --- 20 cm' x 20 cm' BKT-PRK 39.04 m2 19.52 m2 19.52 m2

11 Tulangan Ring Balok --- 20 cm' x 20 cm' BESI-01 512.40 kg 256.20 kg 256.20 kg

12 Beton Cor Ring Balok --- 20 cm' x 20 cm' K-200 4.88 m3 2.44 m3 2.44 m3

SUB TOTAL III : PEKERJAAN STRUKTUR BETON

IV PEKERJAAN DINDING & ATAP

1 Rangka Atap Baja Ringan Supersteell RNK-BJR 532.36 m2 266.18 m2 266.18 m2

2 Atap Genteng Metal ATP-GM 532.36 m2 266.18 m2 266.18 m2

3 Rabung Genteng Metal RB-GM 54.00 m' 27.00 m' 27.00 m'

4 Lisplank Kayu kelas II LP-20 - III 86.00 m' 43.00 m' 43.00 m'

5 Cat Kilat Lisplank CAT-K-3 17.20 m2 8.60 m2 8.60 m2

6 Pasangan Batu Bata 1 : 4 BATA ½ -14 385.78 m2 192.89 m2 192.89 m2

7 Plesteran 1 : 4 PLESTER-14 771.56 m2 385.78 m2 385.78 m2

SUB TOTAL IV : PEKERJAAN DINDING & ATAP

Page 17 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

P.BANDAR JAWA MARAJA

NO. ITEM PEKERJAAN ANALISA VOLUME VOLUME VOLUME

V PEKERJAAN PINTU, JENDELA DAN VENTILASI

1 Pintu Utama / Pintu besi uk 2,8 x 2,5 m' + Grendel Ls 2.00 unit 1.00 unit 1.00 unit

2 Kosen pintu/ Jendela/Ventilasi KUSEN - II 0.88 m3 0.44 m3 0.44 m3

3 Pintu Panel PINTU - II 4.20 m2 2.10 m2 2.10 m2

4 Engsel Pintu Ls 6.00 unit 3.00 unit 3.00 unit

5 Grendel Pintu Ls 4.00 unit 2.00 unit 2.00 unit

6 Kunci Tanam Ls 2.00 unit 1.00 unit 1.00 unit

7 Cat Kilat 3 x CAT-K-3 71.68 m2 35.84 m2 35.84 m2

SUB TOTAL V : PEKERJAAN PINTU, JENDELA DAN VENTILASI

VI PEKERJAAN LANTAI & PLAFOND

1 Urugan Tanah di Bawah Lantai URG-T 24.90 m3 12.45 m3 12.45 m3

2 Urugan Pasir di Bawah Lantai URG-P 15.56 m3 7.78 m3 7.78 m3

3 Lantai rabat Beton t = 7 cm' RABAT 21.78 m3 10.89 m3 10.89 m3

4 Rangka Plafon Asbes RNK-F-KY 419.50 m2 209.75 m2 209.75 m2

5 Plafon Asbes ASBES 419.50 m2 209.75 m2 209.75 m2

6 Pengecatan Dinding CAT-T-3 771.56 m2 385.78 m2 385.78 m2

7 Pengecatan Cat Plafond CAT-T-3 419.50 m2 209.75 m2 209.75 m2

SUB TOTAL VI : PEKERJAAN LANTAI & PLAFOND

VII PEKERJAAN INSTALASI LISTRIK

1 Pengadaan Genset 1500 VA Jenis bensin Ls 2.00 unit 1.00 unit 1.00 unit

2 Pek.instalasi titik api dan conduit Ls 20.00 Titik 10.00 Titik 10.00 Titik

3 Lampu TL 1 x 36 W + assesories Ls 12.00 Bh 6.00 Bh 6.00 Bh

4 Lamp SL 18 W+Fitting Ls 2.00 Bh 1.00 Bh 1.00 Bh

5 Stop Kontak Ls 2.00 Bh 1.00 Bh 1.00 Bh

6 Saklar Ganda Ls 2.00 Bh 1.00 Bh 1.00 Bh

7 Panel Box + assesories Ls 2.00 Bh 1.00 Bh 1.00 Bh

SUB TOTAL VII : PEKERJAAN INSTALASI LISTRIK

VIII PEKERJAAN LAIN-LAIN

1 Pekejaan penangkal petir Ls 2.00 unit 1.00 unit 1.00 unit

2 Pek.Ornamen Simalungun ditombak layar Ls 6.00 m2 3.00 m2 3.00 m2

3 Pek.Ornamen Simalungun dikolom entrans Ls 6.00 m2 3.00 m2 3.00 m2

4 Pek.Ornamen Kepala kerbau di Entrans Ls 2.00 bh 1.00 bh 1.00 bh

5 Pek.Ornamen Ulu Paung pada Kolom Entrans Ls 4.00 bh 2.00 bh 2.00 bh

6 Pek.Tembok Penahan (Lokasi kec.Jawa Maraja) Ls 40.00 m' m'

7 Pek.Pagar BRC tinggi 1.2 mtr (Lokasi kec.Jawa Maraja) Ls 120.00 m' 120.00 m'

SUB TOTAL VIII : PEKERJAAN LAIN-LAIN

Page 18 of 40
S I

ARGA

ERTANIAN PERIKANAN KEHUTANAN


AJA BAH JAMBI & KEC. PAM. BANDAR

JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.)

3 3 3

4,364,703.90 2,182,351.95 2,182,351.95

51,667,638.44 25,833,819.22 25,833,819.22

69,863,874.80 34,931,937.40 34,931,937.40

200,084,376.16 100,042,188.08 100,042,188.08

27,275,294.63 13,637,647.31 13,637,647.31

104,964,112.08 52,482,056.04 52,482,056.04

5,788,000.00 2,894,000.00 2,894,000.00

38,400,000.00 4,200,000.00 25,800,000.00

502,408,000.00 236,204,000.00 257,804,000.00

50,240,800.00 23,620,400.00 25,780,400.00

552,648,800.00 259,824,400.00 283,584,400.00


Rupiah

Pematang Siantar, 27 Agustus 2010

Dibuat Oleh :
CV. HASORUAN

Ir. DARWIN W. PURBA


Tenaga Teknis

Page 19 of 40
ANIAN PERIKANAN KEHUTANAN
BAH JAMBI & KEC. PAM. BANDAR

GABUNGAN P.BANDAR JAWA MARAJA

HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

1,500,000.00 1,500,000.00 750,000.00 750,000.00 750,000.00 750,000.00

520,000.00 1,040,000.00 260,000.00 520,000.00 260,000.00 520,000.00

310,000.00 620,000.00 155,000.00 310,000.00 155,000.00 310,000.00

1,000,000.00 1,000,000.00 500,000.00 500,000.00 500,000.00 500,000.00

204,703.90 204,703.90 102,351.95 102,351.95 102,351.95 102,351.95

B TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 4,364,703.90 2,182,351.95 2,182,351.95

45,529.99 1,327,654.51 45,529.99 663,827.25 45,529.99 663,827.25

83,962.23 120,905.61 83,962.23 60,452.81 83,962.23 60,452.81

607,046.66 874,147.19 607,046.66 437,073.60 607,046.66 437,073.60

227,872.92 5,236,519.70 227,872.92 2,618,259.85 227,872.92 2,618,259.85

12,263.57 5,072,703.09 12,263.57 2,536,351.55 12,263.57 2,536,351.55

902,440.55 4,133,177.72 902,440.55 2,066,588.86 902,440.55 2,066,588.86

227,872.92 4,771,658.94 227,872.92 2,385,829.47 227,872.92 2,385,829.47

12,263.57 3,241,506.82 12,263.57 1,620,753.41 12,263.57 1,620,753.41

902,440.55 1,877,076.34 902,440.55 938,538.17 902,440.55 938,538.17

552,158.86 4,483,529.94 552,158.86 2,241,764.97 552,158.86 2,241,764.97

15,213.88 173,742.51 15,213.88 86,871.25 15,213.88 86,871.25

45,529.99 2,189,081.92 45,529.99 1,094,540.96 45,529.99 1,094,540.96

83,962.23 268,679.14 83,962.23 134,339.57 83,962.23 134,339.57

552,158.86 17,702,213.05 552,158.86 8,851,106.53 552,158.86 8,851,106.53

15,213.88 195,041.94 15,213.88 97,520.97 15,213.88 97,520.97

SUB TOTAL II : PEKERJAAN PONDASI 51,667,638.44 25,833,819.22 25,833,819.22

227,872.92 6,672,119.10 227,872.92 3,336,059.55 227,872.92 3,336,059.55

12,263.57 6,283,853.27 12,263.57 3,141,926.63 12,263.57 3,141,926.63

902,440.55 4,403,909.88 902,440.55 2,201,954.94 902,440.55 2,201,954.94

227,872.92 2,734,475.04 227,872.92 1,367,237.52 227,872.92 1,367,237.52

12,263.57 1,098,815.87 12,263.57 549,407.94 12,263.57 549,407.94

902,440.55 1,082,928.66 902,440.55 541,464.33 902,440.55 541,464.33

227,872.92 14,000,512.20 227,872.92 7,000,256.10 227,872.92 7,000,256.10

12,263.57 8,462,353.84 12,263.57 4,231,176.92 12,263.57 4,231,176.92

902,440.55 5,540,984.98 902,440.55 2,770,492.49 902,440.55 2,770,492.49

227,872.92 8,896,158.80 227,872.92 4,448,079.40 227,872.92 4,448,079.40

12,263.57 6,283,853.27 12,263.57 3,141,926.63 12,263.57 3,141,926.63

902,440.55 4,403,909.88 902,440.55 2,201,954.94 902,440.55 2,201,954.94

SUB TOTAL III : PEKERJAAN STRUKTUR BETON 69,863,874.80 34,931,937.40 34,931,937.40

143,585.09 76,438,958.51 143,585.09 38,219,479.26 143,585.09 38,219,479.26

86,437.01 46,015,606.64 86,437.01 23,007,803.32 86,437.01 23,007,803.32

34,662.43 1,871,771.22 34,662.43 935,885.61 34,662.43 935,885.61

81,136.99 6,977,781.14 81,136.99 3,488,890.57 81,136.99 3,488,890.57

51,131.19 879,456.47 51,131.19 439,728.23 51,131.19 439,728.23

91,719.43 35,383,521.71 91,719.43 17,691,760.85 91,719.43 17,691,760.85

42,144.85 32,517,280.47 42,144.85 16,258,640.23 42,144.85 16,258,640.23

SUB TOTAL IV : PEKERJAAN DINDING & ATAP 200,084,376.16 100,042,188.08 100,042,188.08

Page 20 of 40
ANIAN PERIKANAN KEHUTANAN
BAH JAMBI & KEC. PAM. BANDAR

GABUNGAN P.BANDAR JAWA MARAJA

HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

6,300,000.00 12,600,000.00 6,300,000.00 6,300,000.00 6,300,000.00 6,300,000.00

9,308,731.30 8,191,683.54 9,308,731.30 4,095,841.77 9,308,731.30 4,095,841.77

602,506.52 2,530,527.38 602,506.52 1,265,263.69 602,506.52 1,265,263.69

10,000.00 60,000.00 10,000.00 30,000.00 10,000.00 30,000.00

52,000.00 208,000.00 52,000.00 104,000.00 52,000.00 104,000.00

10,000.00 20,000.00 10,000.00 10,000.00 10,000.00 10,000.00

51,131.19 3,665,083.70 51,131.19 1,832,541.85 51,131.19 1,832,541.85

SUB TOTAL V : PEKERJAAN PINTU, JENDELA DAN VENTILASI 27,275,294.63 13,637,647.31 13,637,647.31

91,354.23 2,274,354.91 91,354.23 1,137,177.46 91,354.23 1,137,177.46

83,962.23 1,306,452.30 83,962.23 653,226.15 83,962.23 653,226.15

607,046.66 13,223,904.44 607,046.66 6,611,952.22 607,046.66 6,611,952.22

52,355.71 21,963,220.35 52,355.71 10,981,610.17 52,355.71 10,981,610.17

49,086.51 20,591,790.95 49,086.51 10,295,895.47 49,086.51 10,295,895.47

38,288.91 29,542,191.40 38,288.91 14,771,095.70 38,288.91 14,771,095.70

38,288.91 16,062,197.75 38,288.91 8,031,098.87 38,288.91 8,031,098.87

SUB TOTAL VI : PEKERJAAN LANTAI & PLAFOND 104,964,112.08 52,482,056.04 52,482,056.04

1,500,000.00 3,000,000.00 1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00

36,000.00 720,000.00 36,000.00 360,000.00 36,000.00 360,000.00

130,000.00 1,560,000.00 130,000.00 780,000.00 130,000.00 780,000.00

97,000.00 194,000.00 97,000.00 97,000.00 97,000.00 97,000.00

34,000.00 68,000.00 34,000.00 34,000.00 34,000.00 34,000.00

34,000.00 68,000.00 34,000.00 34,000.00 34,000.00 34,000.00

89,000.00 178,000.00 89,000.00 89,000.00 89,000.00 89,000.00

SUB TOTAL VII : PEKERJAAN INSTALASI LISTRIK 5,788,000.00 2,894,000.00 2,894,000.00

780,000.00 1,560,000.00 780,000.00 780,000.00 780,000.00 780,000.00

180,000.00 1,080,000.00 180,000.00 540,000.00 180,000.00 540,000.00

180,000.00 1,080,000.00 180,000.00 540,000.00 180,000.00 540,000.00

780,000.00 1,560,000.00 780,000.00 780,000.00 780,000.00 780,000.00

780,000.00 3,120,000.00 780,000.00 1,560,000.00 780,000.00 1,560,000.00

210,000.00 8,400,000.00 210,000.00 - 210,000.00 -

180,000.00 21,600,000.00 180,000.00 - 180,000.00 21,600,000.00

SUB TOTAL VIII : PEKERJAAN LAIN-LAIN 38,400,000.00 4,200,000.00 25,800,000.00

Page 21 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 2,182,351.95


II PEKERJAAN PONDASI 25,833,819.22
III PEKERJAAN STRUKTUR BETON 34,931,937.40
IV PEKERJAAN DINDING & ATAP 100,042,188.08
V PEKERJAAN PINTU, JENDELA DAN VENTILASI 13,637,647.31
VI PEKERJAAN LANTAI & PLAFOND 52,482,056.04
VII PEKERJAAN INSTALASI LISTRIK 2,894,000.00
VIII PEKERJAAN LAIN-LAIN 34,200,000.00

A TOTAL BIAYA 266,204,000.00

B PPN 10 % 26,620,400.00

C JUMLAH ( A + B ) 292,824,400.00

Terbilang : Dua Ratus Delapan Puluh Tiga Juta Lima Ratus Delapan Puluh Empat Ribu Empat Ratus Rupiah

Page 22 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 750,000.00 750,000.00

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 260,000.00 520,000.00

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 155,000.00 310,000.00

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 500,000.00 500,000.00

5 Pembersihan Akhir Ls 1.00 lot 102,351.95 102,351.95

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 2,182,351.95

II PEKERJAAN PONDASI

1 Galian Tanah untuk Pondasi Tapak GTB-1 14.58 m3 45,529.99 663,827.25

2 Pasir Urug untuk Pondasi Tapak URG-P 0.72 m3 83,962.23 60,452.81

3 Lantai Kerja untuk Pondasi Tapak RABAT 0.72 m3 607,046.66 437,073.60

4 Beksiting untuk Pondasi Tapak BKT-PRK 11.49 m2 227,872.92 2,618,259.85

5 Tulangan untuk Pondasi Tapak BESI-01 206.82 kg 12,263.57 2,536,351.55

6 Beton Cor untuk Pondasi Tapak K-200 2.29 m3 902,440.55 2,066,588.86

7 Beksiting untuk Kolom Tapak BKT-PRK 10.47 m2 227,872.92 2,385,829.47

8 Tulangan untuk Kolom Tapak BESI-01 132.16 kg 12,263.57 1,620,753.41

9 Beton Cor untuk kolom Tapak K-200 1.04 m3 902,440.55 938,538.17

10 Pas. Batu Padas untuk Tapak PADAS-14 4.06 m3 552,158.86 2,241,764.97

11 Urugan Kembali Tanah Galian utk Tapak UKTHG 5.71 m3 15,213.88 86,871.25

12 Galian Tanah untuk Pondasi Menerus GTB-1 24.04 m3 45,529.99 1,094,540.96

13 Pasir Urug untuk Pondasi Menerus URG-P 1.60 m3 83,962.23 134,339.57

14 Pasangan Batu Padas untuk Pondasi Menerus PADAS-14 16.03 m3 552,158.86 8,851,106.53

15 Urugan Kembali Tanah Galian Pondasi Menerus UKTHG 6.41 m3 15,213.88 97,520.97

SUB TOTAL II : PEKERJAAN PONDASI 25,833,819.22

III PEKERJAAN STRUKTUR BETON

1 Bekisting Sloof --- 20 cm' x 20 cm' BKT-PRK 14.64 m2 227,872.92 3,336,059.55

2 Tulangan Sloof --- 20 cm' x 20 cm' BESI-01 256.20 kg 12,263.57 3,141,926.63

3 Beton Cor Sloof --- 20 cm' x 20 cm' K-200 2.44 m3 902,440.55 2,201,954.94

4 Bekisting Kolom Entrans --- 25 cm' x 25 cm' BKT-PRK 6.00 m2 227,872.92 1,367,237.52

5 Tulangan Kolom Entrans --- 25 cm' x 25 cm' BESI-01 44.80 kg 12,263.57 549,407.94

6 Beton Cor Kolom Entrans --- 25 cm' x 25 cm' K-200 0.60 m3 902,440.55 541,464.33

7 Bekisting Kolom Type 2 --- 20 cm' x 20 cm' BKT-PRK 30.72 m2 227,872.92 7,000,256.10

8 Tulangan Kolom Type 2 --- 20 cm' x 20 cm' BESI-01 345.02 kg 12,263.57 4,231,176.92

9 Beton Cor Kolom Type 2 --- 20 cm' x 20 cm' K-200 3.07 m3 902,440.55 2,770,492.49

10 Bekisting Ring Balok --- 20 cm' x 20 cm' BKT-PRK 19.52 m2 227,872.92 4,448,079.40

11 Tulangan Ring Balok --- 20 cm' x 20 cm' BESI-01 256.20 kg 12,263.57 3,141,926.63

12 Beton Cor Ring Balok --- 20 cm' x 20 cm' K-200 2.44 m3 902,440.55 2,201,954.94

SUB TOTAL III : PEKERJAAN STRUKTUR BETON 34,931,937.40

IV PEKERJAAN DINDING & ATAP

1 Rangka Atap Baja Ringan Supersteell RNK-BJR 266.18 m2 143,585.09 38,219,479.26

2 Atap Genteng Metal ATP-GM 266.18 m2 86,437.01 23,007,803.32

3 Rabung Genteng Metal RB-GM 27.00 m' 34,662.43 935,885.61

4 Lisplank Kayu kelas II LP-20 - III 43.00 m' 81,136.99 3,488,890.57

5 Cat Kilat Lisplank CAT-K-3 8.60 m2 51,131.19 439,728.23

6 Pasangan Batu Bata 1 : 4 BATA ½ -14 192.89 m2 91,719.43 17,691,760.85

7 Plesteran 1 : 4 PLESTER-14 385.78 m2 42,144.85 16,258,640.23

SUB TOTAL IV : PEKERJAAN DINDING & ATAP 100,042,188.08

Page 23 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

V PEKERJAAN PINTU, JENDELA DAN VENTILASI

1 Pintu Utama / Pintu besi uk 2,8 x 2,5 m' + Grendel Ls 1.00 unit 6,300,000.00 6,300,000.00

2 Kosen pintu/ Jendela/Ventilasi KUSEN - II 0.44 m3 9,308,731.30 4,095,841.77

3 Pintu Panel PINTU - II 2.10 m2 602,506.52 1,265,263.69

4 Engsel Pintu Ls 3.00 unit 10,000.00 30,000.00

5 Grendel Pintu Ls 2.00 unit 52,000.00 104,000.00

6 Kunci Tanam Ls 1.00 unit 10,000.00 10,000.00

7 Cat Kilat 3 x CAT-K-3 35.84 m2 51,131.19 1,832,541.85

SUB TOTAL V : PEKERJAAN PINTU, JENDELA DAN VENTILASI 13,637,647.31

VI PEKERJAAN LANTAI & PLAFOND

1 Urugan Tanah di Bawah Lantai URG-T 12.45 m3 91,354.23 1,137,177.46

2 Urugan Pasir di Bawah Lantai URG-P 7.78 m3 83,962.23 653,226.15

3 Lantai rabat Beton t = 7 cm' RABAT 10.89 m3 607,046.66 6,611,952.22

4 Rangka Plafon Asbes RNK-F-KY 209.75 m2 52,355.71 10,981,610.17

5 Plafon Asbes ASBES 209.75 m2 49,086.51 10,295,895.47

6 Pengecatan Dinding CAT-T-3 385.78 m2 38,288.91 14,771,095.70

7 Pengecatan Cat Plafond CAT-T-3 209.75 m2 38,288.91 8,031,098.87

SUB TOTAL VI : PEKERJAAN LANTAI & PLAFOND 52,482,056.04

VII PEKERJAAN INSTALASI LISTRIK

1 Pengadaan Genset 1500 VA Jenis bensin Ls 1.00 unit 1,500,000.00 1,500,000.00

2 Pek.instalasi titik api dan conduit Ls 10.00 Titik 36,000.00 360,000.00

3 Lampu TL 1 x 36 W + assesories Ls 6.00 Bh 130,000.00 780,000.00

4 Lamp SL 18 W+Fitting Ls 1.00 Bh 97,000.00 97,000.00

5 Stop Kontak Ls 1.00 Bh 34,000.00 34,000.00

6 Saklar Ganda Ls 1.00 Bh 34,000.00 34,000.00

7 Panel Box + assesories Ls 1.00 Bh 89,000.00 89,000.00

SUB TOTAL VII : PEKERJAAN INSTALASI LISTRIK 2,894,000.00

VIII PEKERJAAN LAIN-LAIN

1 Pekejaan penangkal petir Ls 1.00 unit 780,000.00 780,000.00

2 Pek.Ornamen Simalungun ditombak layar Ls 3.00 m2 180,000.00 540,000.00

3 Pek.Ornamen Simalungun dikolom entrans Ls 3.00 m2 180,000.00 540,000.00

4 Pek.Ornamen Kepala kerbau di Entrans Ls 1.00 bh 780,000.00 780,000.00

5 Pek.Ornamen Ulu Paung pada Kolom Entrans Ls 2.00 bh 780,000.00 1,560,000.00

6 Pek.Tembok Penahan (Lokasi kec.Jawa Maraja) Ls 40.00 m' 210,000.00 8,400,000.00

7 Pek.Pagar BRC tinggi 1.2 mtr (Lokasi kec.Jawa Maraja) Ls 120.00 m' 180,000.00 21,600,000.00

SUB TOTAL VIII : PEKERJAAN LAIN-LAIN 34,200,000.00

Page 24 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 4,364,703.90


II PEKERJAAN PONDASI 51,667,638.44
III PEKERJAAN STRUKTUR BETON 69,863,874.80
IV PEKERJAAN DINDING & ATAP 200,084,376.16
V PEKERJAAN PINTU, JENDELA DAN VENTILASI 27,275,294.63
VI PEKERJAAN LANTAI & PLAFOND 104,964,112.08
VII PEKERJAAN INSTALASI LISTRIK 5,788,000.00
VIII PEKERJAAN LAIN-LAIN 38,400,000.00

A TOTAL BIAYA 502,408,000.00

B PPN 10 % 50,240,800.00

C JUMLAH ( A + B ) 552,648,800.00
Terbilang : Lima Ratus Lima Puluh Dua Juta Enam Ratus Empat Puluh Delapan Ribu Delapan Ratus Rupiah

Pematang Siantar, 27 Agustus 2010

Diajukan Oleh : Dibuat Oleh :


CV. HASORUAN CV. HASORUAN

Ir. DARWIN W. PURBA Ir. DARWIN W. PURBA


Direktur Tenaga Teknis

Page 25 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 1,500,000.00 1,500,000.00

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 520,000.00 1,040,000.00

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 310,000.00 620,000.00

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 1,000,000.00 1,000,000.00

5 Pembersihan Akhir Ls 1.00 lot 204,703.90 204,703.90

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 4,364,703.90

II PEKERJAAN PONDASI

1 Galian Tanah untuk Pondasi Tapak GTB-1 29.16 m3 45,529.99 1,327,654.51

2 Pasir Urug untuk Pondasi Tapak URG-P 1.44 m3 83,962.23 120,905.61

3 Lantai Kerja untuk Pondasi Tapak RABAT 1.44 m3 607,046.66 874,147.19

4 Beksiting untuk Pondasi Tapak BKT-PRK 22.98 m2 227,872.92 5,236,519.70

5 Tulangan untuk Pondasi Tapak BESI-01 413.64 kg 12,263.57 5,072,703.09

6 Beton Cor untuk Pondasi Tapak K-200 4.58 m3 902,440.55 4,133,177.72

7 Beksiting untuk Kolom Tapak BKT-PRK 20.94 m2 227,872.92 4,771,658.94

8 Tulangan untuk Kolom Tapak BESI-01 264.32 kg 12,263.57 3,241,506.82

9 Beton Cor untuk kolom Tapak K-200 2.08 m3 902,440.55 1,877,076.34

10 Pas. Batu Padas untuk Tapak PADAS-14 8.12 m3 552,158.86 4,483,529.94

11 Urugan Kembali Tanah Galian utk Tapak UKTHG 11.42 m3 15,213.88 173,742.51

12 Galian Tanah untuk Pondasi Menerus GTB-1 48.08 m3 45,529.99 2,189,081.92

13 Pasir Urug untuk Pondasi Menerus URG-P 3.20 m3 83,962.23 268,679.14

14 Pasangan Batu Padas untuk Pondasi Menerus PADAS-14 32.06 m3 552,158.86 17,702,213.05

15 Urugan Kembali Tanah Galian Pondasi Menerus UKTHG 12.82 m3 15,213.88 195,041.94

SUB TOTAL II : PEKERJAAN PONDASI 51,667,638.44

III PEKERJAAN STRUKTUR BETON

1 Bekisting Sloof --- 20 cm' x 20 cm' BKT-PRK 29.28 m2 227,872.92 6,672,119.10

2 Tulangan Sloof --- 20 cm' x 20 cm' BESI-01 512.40 kg 12,263.57 6,283,853.27

3 Beton Cor Sloof --- 20 cm' x 20 cm' K-200 4.88 m3 902,440.55 4,403,909.88

4 Bekisting Kolom Entrans --- 25 cm' x 25 cm' BKT-PRK 12.00 m2 227,872.92 2,734,475.04

5 Tulangan Kolom Entrans --- 25 cm' x 25 cm' BESI-01 89.60 kg 12,263.57 1,098,815.87

6 Beton Cor Kolom Entrans --- 25 cm' x 25 cm' K-200 1.20 m3 902,440.55 1,082,928.66

7 Bekisting Kolom Type 2 --- 20 cm' x 20 cm' BKT-PRK 61.44 m2 227,872.92 14,000,512.20

8 Tulangan Kolom Type 2 --- 20 cm' x 20 cm' BESI-01 690.04 kg 12,263.57 8,462,353.84

9 Beton Cor Kolom Type 2 --- 20 cm' x 20 cm' K-200 6.14 m3 902,440.55 5,540,984.98

10 Bekisting Ring Balok --- 20 cm' x 20 cm' BKT-PRK 39.04 m2 227,872.92 8,896,158.80

11 Tulangan Ring Balok --- 20 cm' x 20 cm' BESI-01 512.40 kg 12,263.57 6,283,853.27

12 Beton Cor Ring Balok --- 20 cm' x 20 cm' K-200 4.88 m3 902,440.55 4,403,909.88

SUB TOTAL III : PEKERJAAN STRUKTUR BETON 69,863,874.80

IV PEKERJAAN DINDING & ATAP

1 Rangka Atap Baja Ringan Supersteell RNK-BJR 532.36 m2 143,585.09 76,438,958.51

2 Atap Genteng Metal ATP-GM 532.36 m2 86,437.01 46,015,606.64

3 Rabung Genteng Metal RB-GM 54.00 m' 34,662.43 1,871,771.22

4 Lisplank Kayu kelas II LP-20 - III 86.00 m' 81,136.99 6,977,781.14

5 Cat Kilat Lisplank CAT-K-3 17.20 m2 51,131.19 879,456.47

6 Pasangan Batu Bata 1 : 4 BATA ½ -14 385.78 m2 91,719.43 35,383,521.71

7 Plesteran 1 : 4 PLESTER-14 771.56 m2 42,144.85 32,517,280.47

SUB TOTAL IV : PEKERJAAN DINDING & ATAP 200,084,376.16

Page 26 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

V PEKERJAAN PINTU, JENDELA DAN VENTILASI

1 Pintu Utama / Pintu besi uk 2,8 x 2,5 m' + Grendel Ls 2.00 unit 6,300,000.00 12,600,000.00

2 Kosen pintu/ Jendela/Ventilasi KUSEN - II 0.88 m3 9,308,731.30 8,191,683.54

3 Pintu Panel PINTU - II 4.20 m2 602,506.52 2,530,527.38

4 Engsel Pintu Ls 6.00 unit 10,000.00 60,000.00

5 Grendel Pintu Ls 4.00 unit 52,000.00 208,000.00

6 Kunci Tanam Ls 2.00 unit 10,000.00 20,000.00

7 Cat Kilat 3 x CAT-K-3 71.68 m2 51,131.19 3,665,083.70

SUB TOTAL V : PEKERJAAN PINTU, JENDELA DAN VENTILASI 27,275,294.63

VI PEKERJAAN LANTAI & PLAFOND

1 Urugan Tanah di Bawah Lantai URG-T 24.90 m3 91,354.23 2,274,354.91

2 Urugan Pasir di Bawah Lantai URG-P 15.56 m3 83,962.23 1,306,452.30

3 Lantai rabat Beton t = 7 cm' RABAT 21.78 m3 607,046.66 13,223,904.44

4 Rangka Plafon Asbes RNK-F-KY 419.50 m2 52,355.71 21,963,220.35

5 Plafon Asbes ASBES 419.50 m2 49,086.51 20,591,790.95

6 Pengecatan Dinding CAT-T-3 771.56 m2 38,288.91 29,542,191.40

7 Pengecatan Cat Plafond CAT-T-3 419.50 m2 38,288.91 16,062,197.75

SUB TOTAL VI : PEKERJAAN LANTAI & PLAFOND 104,964,112.08

VII PEKERJAAN INSTALASI LISTRIK

1 Pengadaan Genset 1500 VA Jenis bensin Ls 2.00 unit 1,500,000.00 3,000,000.00

2 Pek.instalasi titik api dan conduit Ls 20.00 Titik 36,000.00 720,000.00

3 Lampu TL 1 x 36 W + assesories Ls 12.00 Bh 130,000.00 1,560,000.00

4 Lamp SL 18 W+Fitting Ls 2.00 Bh 97,000.00 194,000.00

5 Stop Kontak Ls 2.00 Bh 34,000.00 68,000.00

6 Saklar Ganda Ls 2.00 Bh 34,000.00 68,000.00

7 Panel Box + assesories Ls 2.00 Bh 89,000.00 178,000.00

SUB TOTAL VII : PEKERJAAN INSTALASI LISTRIK 5,788,000.00

VIII PEKERJAAN LAIN-LAIN

1 Pekejaan penangkal petir Ls 2.00 unit 780,000.00 1,560,000.00

2 Pek.Ornamen Simalungun ditombak layar Ls 6.00 m2 180,000.00 1,080,000.00

3 Pek.Ornamen Simalungun dikolom entrans Ls 6.00 m2 180,000.00 1,080,000.00

4 Pek.Ornamen Kepala kerbau di Entrans Ls 2.00 bh 780,000.00 1,560,000.00

5 Pek.Ornamen Ulu Paung pada Kolom Entrans Ls 4.00 bh 780,000.00 3,120,000.00

6 Pek.Tembok Penahan (Lokasi kec.Jawa Maraja) Ls 40.00 m' 210,000.00 8,400,000.00

7 Pek.Pagar BRC tinggi 1.2 mtr (Lokasi kec.Jawa Maraja) Ls 120.00 m' 180,000.00 21,600,000.00

SUB TOTAL VIII : PEKERJAAN LAIN-LAIN 38,400,000.00

Page 27 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 3,978,374

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN 131,602,335

III PEKERJAAN PLAT BETON & PAGAR BRC 24,697,290

A TOTAL BIAYA 160,278,000

B PPN 10 % 16,027,800

C JUMLAH ( A + B ) 176,305,800

Terbilang : Seratus Tujuh Puluh Enam Juta Tiga Ratus Lima Ribu Delapan Ratus Rupiah

Panei Tongah, 27 Agustus 2010

Diajukan Oleh : Dibuat Oleh :


CV. PUTRA SIMBODU MAJU CV. PUTRA SIMBODU MAJU

3 3 3

MARS AFRIANTO SITANGGANG ERWIN MARUDUT T SIREGAR


Direktur Tenaga Teknis

Page 28 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI & KEC. PAM. BANDAR

BAH JAMBI PAM.BDR


HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME VOLUME VOLUME SATUAN
(Rp.)
I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 1.00 lot 1.00 lot 1,000,000.00

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 2.00 lot 2.00 lot 540,000.00

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 2.00 lot 2.00 lot 320,000.00

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 1.00 lot 1.00 lot 1,000,000.00

5 Pembersihan Akhir Ls 1.00 lot 1.00 lot 1.00 lot 258,374.40

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN

1 Timbunan tanah pilihan (Lokasi Kec.Bah jambi) URG-T 240.00 m3 240.00 m3 m3 93,680.73

2 Galian tanah utk Canstein GTB-1 5.76 m3 2.88 m3 2.88 m3 45,143.34

3 Rabat Beton Cor utk Canstein RABAT 1.08 m3 0.54 m3 0.54 m3 624,453.28

4 Pasangan Batu bata 1 : 4 utk Canstein BATA ½ -14 50.40 m2 25.20 m2 25.20 m2 94,375.82

5 Plesteran 1 : 4 utk Canstein PLESTER-14 79.20 m2 39.60 m2 39.60 m2 42,142.10

Pek.Tembok Penahan ( Lokasi Kec.Bah Jambi)

6 Galian tanah utk Temb. Penahan GTB-1 2.45 m3 2.45 m3 m3 45,143.34

7 Pas. Batu padas 1 : 4 utk Temb. Penahan PADAS-14 6.30 m3 6.30 m3 m3 564,882.34

8 Plesteran 1 : 4 utk Temb. Penahan PLESTER-14 15.00 m2 15.00 m2 m2 42,142.10

9 Urugan tanah kembali utk Temb. Penahan UKTHG 0.61 m3 0.61 m3 m3 15,026.77

10 Pek.telford Lantai jemur t = 15 cm' TELFORD 800.00 m2 400.00 m2 400.00 m2 50,304.87

11 Pek.Rabat Beton Cor Lantai Jemur , tebal= 7 cm RABAT 56.00 m3 28.00 m3 28.00 m3 624,453.28

12 Pelapisan Lantai Jemur dengan Acian semen ACIAN - SB 800.00 m2 400.00 m2 400.00 m2 25,707.99

SUB TOTAL II : PEKERJAAN TANAH, PASANGAN DAN PERKERASAN

III PEKERJAAN PLAT BETON & PAGAR BRC

1 Galian tanah GTB-1 1.68 m3 1.68 m3 m3 45,143.34

2 Pasangan Batu padas 1 :4 PADAS-14 6.88 m3 6.88 m3 m3 564,882.34

3 Bekisting Plat Beton BKT-PRK 15.48 m2 15.48 m2 m2 234,291.86

4 Tulangan Plat Beton BESI-01 322.50 kg 322.50 kg kg 12,538.79

5 Beton Cor Plat Beton K-200 2.58 m3 2.58 m3 m3 937,267.37

6 Urugan tanah kembali UKTHG 0.42 m3 0.42 m3 m3 15,026.77

7 Pagar BRC tinggi 1.2 meter(Lokasi Kec.Pem.Bandar) Ls 56.00 m' m' 56.00 m' 190,000.00

SUB TOTAL III : PEKERJAAN PLAT BETON & PAGAR BRC

Page 29 of 40
ERTANIAN PERIKANAN KEHUTANAN
A BAH JAMBI & KEC. PAM. BANDAR

JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.)

3 3 3

3,978,374.40 1,989,187.20 1,989,187.20

131,602,335.46 79,198,184.21 52,404,151.25

24,697,290.14 14,057,290.14 10,640,000.00

160,278,000.00 95,244,661.55 65,033,338.45

16,027,800.00 9,524,466.15 6,503,333.85

176,305,800.00 104,769,127.70 71,536,672.30

Tongah, 27 Agustus 2010

Dibuat Oleh :
CV. PUTRA SIMBODU MAJU

RWIN MARUDUT T SIREGAR


Tenaga Teknis

Page 30 of 40
ERTANIAN PERIKANAN KEHUTANAN
A BAH JAMBI & KEC. PAM. BANDAR

HARGA HARGA
JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN SATUAN
(Rp.) (Rp.) (Rp.)
(Rp.) (Rp.)

1,000,000.00 500,000.00 500,000.00 500,000.00 500,000.00

1,080,000.00 270,000.00 540,000.00 270,000.00 540,000.00

640,000.00 160,000.00 320,000.00 160,000.00 320,000.00

1,000,000.00 500,000.00 500,000.00 500,000.00 500,000.00

258,374.40 129,187.20 129,187.20 129,187.20 129,187.20

3,978,374.40 1,989,187.20 1,989,187.20

22,483,375.20 93,680.73 22,483,375.20 93,680.73 -

260,025.64 45,143.34 130,012.82 45,143.34 130,012.82

674,409.54 624,453.28 337,204.77 624,453.28 337,204.77

4,756,541.33 94,375.82 2,378,270.66 94,375.82 2,378,270.66

3,337,654.32 42,142.10 1,668,827.16 42,142.10 1,668,827.16

110,601.18 45,143.34 110,601.18 45,143.34 -

3,558,758.74 564,882.34 3,558,758.74 564,882.34 -

632,131.50 42,142.10 632,131.50 42,142.10 -

9,166.33 15,026.77 9,166.33 15,026.77 -

40,243,896.00 50,304.87 20,121,948.00 50,304.87 20,121,948.00

34,969,383.68 624,453.28 17,484,691.84 624,453.28 17,484,691.84

20,566,392.00 25,707.99 10,283,196.00 25,707.99 10,283,196.00

131,602,335.46 79,198,184.21 52,404,151.25

75,840.81 45,143.34 75,840.81 45,143.34 -

3,886,390.50 564,882.34 3,886,390.50 564,882.34 -

3,626,837.99 234,291.86 3,626,837.99 234,291.86 -

4,043,759.78 12,538.79 4,043,759.78 12,538.79 -

2,418,149.81 937,267.37 2,418,149.81 937,267.37 -

6,311.24 15,026.77 6,311.24 15,026.77 -

10,640,000.00 190,000.00 - 190,000.00 10,640,000.00

24,697,290.14 14,057,290.14 10,640,000.00

Page 31 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 1,989,161.74

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN 79,198,184.21

III PEKERJAAN PLAT BETON 14,057,290.14

A TOTAL BIAYA 95,244,636.09

B PPN 10 % 9,524,463.61

C JUMLAH ( A + B ) 104,769,100.00

Terbilang : Seratus Empat Juta Tujuh Ratus Enam Puluh Sembilan Ribu Seratus Rupiah

Page 32 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI
HARGA
JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME SATUAN
(Rp.)
(Rp.)
I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 500,000.00 500,000.00

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 270,000.00 540,000.00

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 160,000.00 320,000.00

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 500,000.00 500,000.00

5 Pembersihan Akhir Ls 1.00 lot 129,161.74 129,161.74

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 1,989,161.74

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN

1 Timbunan tanah pilihan (Lokasi Kec.Bah jambi) URG-T 240.00 m3 93,680.73 22,483,375.20

2 Galian tanah utk Canstein GTB-1 2.88 m3 45,143.34 130,012.82

3 Rabat Beton Cor utk Canstein RABAT 0.54 m3 624,453.28 337,204.77

4 Pasangan Batu bata 1 : 4 utk Canstein BATA ½ -14 25.20 m2 94,375.82 2,378,270.66

5 Plesteran 1 : 4 utk Canstein PLESTER-14 39.60 m2 42,142.10 1,668,827.16

Pek.Tembok Penahan ( Lokasi Kec.Bah Jambi)

6 Galian tanah utk Temb. Penahan GTB-1 2.45 m3 45,143.34 110,601.18

7 Pas. Batu padas 1 : 4 utk Temb. Penahan PADAS-14 6.30 m3 564,882.34 3,558,758.74

8 Plesteran 1 : 4 utk Temb. Penahan PLESTER-14 15.00 m2 42,142.10 632,131.50

9 Urugan tanah kembali utk Temb. Penahan UKTHG 0.61 m3 15,026.77 9,166.33

10 Pek.telford Lantai jemur t = 15 cm' TELFORD 400.00 m2 50,304.87 20,121,948.00

11 Pek.Rabat Beton Cor Lantai Jemur , tebal= 7 cm RABAT 28.00 m3 624,453.28 17,484,691.84

12 Pelapisan Lantai Jemur dengan Acian semen ACIAN - SB 400.00 m2 25,707.99 10,283,196.00

SUB TOTAL II : PEKERJAAN TANAH, PASANGAN DAN PERKERASAN 79,198,184.21

III PEKERJAAN PLAT BETON

1 Galian tanah GTB-1 1.68 m3 45,143.34 75,840.81

2 Pasangan Batu padas 1 :4 PADAS-14 6.88 m3 564,882.34 3,886,390.50

3 Bekisting Plat Beton BKT-PRK 15.48 m2 234,291.86 3,626,837.99

4 Tulangan Plat Beton BESI-01 322.50 kg 12,538.79 4,043,759.78

5 Beton Cor Plat Beton K-200 2.58 m3 937,267.37 2,418,149.81

6 Urugan tanah kembali UKTHG 0.42 m3 15,026.77 6,311.24

SUB TOTAL III : PEKERJAAN PLAT BETON 14,057,290.14

Page 33 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. PAM. BANDAR

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 1,989,212.66

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN 52,404,151.25

III PEKERJAAN PAGAR BRC 10,640,000.00

A TOTAL BIAYA 65,033,363.91

B PPN 10 % 6,503,336.39

C JUMLAH ( A + B ) 71,536,700.00

Terbilang : Tujuh Puluh Satu Juta Lima Ratus Tiga Puluh Enam Ribu Tujuh Ratus Rupiah

Page 34 of 40
DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. PAM. BANDAR
HARGA
JUMLAH HARGA
NO. ITEM PEKERJAAN ANALISA VOLUME SATUAN
(Rp.)
(Rp.)
I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 500,000.00 500,000.00

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 270,000.00 540,000.00

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 160,000.00 320,000.00

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 500,000.00 500,000.00

5 Pembersihan Akhir Ls 1.00 lot 129,212.66 129,212.66

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 1,989,212.66

II PEKERJAAN TANAH, PASANGAN DAN PERKERASAN

1 Galian tanah utk Canstein GTB-1 2.88 m3 45,143.34 130,012.82

2 Rabat Beton Cor utk Canstein RABAT 0.54 m3 624,453.28 337,204.77

3 Pasangan Batu bata 1 : 4 utk Canstein BATA ½ -14 25.20 m2 94,375.82 2,378,270.66

4 Plesteran 1 : 4 utk Canstein PLESTER-14 39.60 m2 42,142.10 1,668,827.16

6 Pek.telford Lantai jemur t = 15 cm' TELFORD 400.00 m2 50,304.87 20,121,948.00

7 Pek.Rabat Beton Cor Lantai Jemur , tebal= 7 cm RABAT 28.00 m3 624,453.28 17,484,691.84

8 Pelapisan Lantai Jemur dengan Acian semen ACIAN - SB 400.00 m2 25,707.99 10,283,196.00

SUB TOTAL II : PEKERJAAN TANAH, PASANGAN DAN PERKERASAN 52,404,151.25

III PEKERJAAN PAGAR BRC

1 Pagar BRC tinggi 1.2 meter(Lokasi Kec.Pem.Bandar) Ls 56.00 m' 190,000.00 10,640,000.00

SUB TOTAL III : PEKERJAAN PAGAR BRC 10,640,000.00

Page 35 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN


DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. PAM. BANDAR

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 2,182,351.95


II PEKERJAAN PONDASI 25,833,819.22
III PEKERJAAN STRUKTUR BETON 34,931,937.40
IV PEKERJAAN DINDING & ATAP 100,042,188.08
V PEKERJAAN PINTU, JENDELA DAN VENTILASI 13,637,647.31
VI PEKERJAAN LANTAI & PLAFOND 52,482,056.04
VII PEKERJAAN INSTALASI LISTRIK 2,894,000.00
VIII PEKERJAAN LAIN-LAIN 4,200,000.00

A TOTAL BIAYA 236,204,000.00

B PPN 10 % 23,620,400.00

C JUMLAH ( A + B ) 259,824,400.00

Terbilang : Dua Ratus Lima Puluh Sembilan Juta Delapan Ratus Dua Puluh Empat Ribu Empat Ratus Rupiah

Page 36 of 40
DAFTAR KUANTITAS DAN HARGA
PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN
DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. PAM. BANDAR

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

I PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR

1 Mobilisasi, Transportasi Material & Demobilisasi Ls 1.00 lot 750,000.00 750,000.00

2 Pengukuran Patok-Patok dan Bowplank Ls 2.00 lot 260,000.00 520,000.00

3 Pembuatan Papan Nama Proyek Ls 2.00 lot 155,000.00 310,000.00

4 Laporan Pelaksanaan / Administrasi Kegiatan Ls 1.00 lot 500,000.00 500,000.00

5 Pembersihan Akhir Ls 1.00 lot 102,351.95 102,351.95

SUB TOTAL I : PEKERJAAN PERSIAPAN, PENDAHULUAN, AKHIR 2,182,351.95

II PEKERJAAN PONDASI

1 Galian Tanah untuk Pondasi Tapak GTB-1 14.58 m3 45,529.99 663,827.25

2 Pasir Urug untuk Pondasi Tapak URG-P 0.72 m3 83,962.23 60,452.81

3 Lantai Kerja untuk Pondasi Tapak RABAT 0.72 m3 607,046.66 437,073.60

4 Beksiting untuk Pondasi Tapak BKT-PRK 11.49 m2 227,872.92 2,618,259.85

5 Tulangan untuk Pondasi Tapak BESI-01 206.82 kg 12,263.57 2,536,351.55

6 Beton Cor untuk Pondasi Tapak K-200 2.29 m3 902,440.55 2,066,588.86

7 Beksiting untuk Kolom Tapak BKT-PRK 10.47 m2 227,872.92 2,385,829.47

8 Tulangan untuk Kolom Tapak BESI-01 132.16 kg 12,263.57 1,620,753.41

9 Beton Cor untuk kolom Tapak K-200 1.04 m3 902,440.55 938,538.17

10 Pas. Batu Padas untuk Tapak PADAS-14 4.06 m3 552,158.86 2,241,764.97

11 Urugan Kembali Tanah Galian utk Tapak UKTHG 5.71 m3 15,213.88 86,871.25

12 Galian Tanah untuk Pondasi Menerus GTB-1 24.04 m3 45,529.99 1,094,540.96

13 Pasir Urug untuk Pondasi Menerus URG-P 1.60 m3 83,962.23 134,339.57

14 Pasangan Batu Padas untuk Pondasi Menerus PADAS-14 16.03 m3 552,158.86 8,851,106.53

15 Urugan Kembali Tanah Galian Pondasi Menerus UKTHG 6.41 m3 15,213.88 97,520.97

SUB TOTAL II : PEKERJAAN PONDASI 25,833,819.22

III PEKERJAAN STRUKTUR BETON

1 Bekisting Sloof --- 20 cm' x 20 cm' BKT-PRK 14.64 m2 227,872.92 3,336,059.55

2 Tulangan Sloof --- 20 cm' x 20 cm' BESI-01 256.20 kg 12,263.57 3,141,926.63

3 Beton Cor Sloof --- 20 cm' x 20 cm' K-200 2.44 m3 902,440.55 2,201,954.94

4 Bekisting Kolom Entrans --- 25 cm' x 25 cm' BKT-PRK 6.00 m2 227,872.92 1,367,237.52

5 Tulangan Kolom Entrans --- 25 cm' x 25 cm' BESI-01 44.80 kg 12,263.57 549,407.94

6 Beton Cor Kolom Entrans --- 25 cm' x 25 cm' K-200 0.60 m3 902,440.55 541,464.33

7 Bekisting Kolom Type 2 --- 20 cm' x 20 cm' BKT-PRK 30.72 m2 227,872.92 7,000,256.10

8 Tulangan Kolom Type 2 --- 20 cm' x 20 cm' BESI-01 345.02 kg 12,263.57 4,231,176.92

9 Beton Cor Kolom Type 2 --- 20 cm' x 20 cm' K-200 3.07 m3 902,440.55 2,770,492.49

10 Bekisting Ring Balok --- 20 cm' x 20 cm' BKT-PRK 19.52 m2 227,872.92 4,448,079.40

11 Tulangan Ring Balok --- 20 cm' x 20 cm' BESI-01 256.20 kg 12,263.57 3,141,926.63

12 Beton Cor Ring Balok --- 20 cm' x 20 cm' K-200 2.44 m3 902,440.55 2,201,954.94

SUB TOTAL III : PEKERJAAN STRUKTUR BETON 34,931,937.40

Page 37 of 40
DAFTAR KUANTITAS DAN HARGA
PEMBANGUNAN LUMBUNG BADAN PELAKSANA PENYULUHAN PERTANIAN PERIKANAN KEHUTANAN
DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. PAM. BANDAR

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN ANALISA VOLUME
(Rp.) (Rp.)

IV PEKERJAAN DINDING & ATAP

1 Rangka Atap Baja Ringan Supersteell RNK-BJR 266.18 m2 143,585.09 38,219,479.26

2 Atap Genteng Metal ATP-GM 266.18 m2 86,437.01 23,007,803.32

3 Rabung Genteng Metal RB-GM 27.00 m' 34,662.43 935,885.61

4 Lisplank Kayu kelas II LP-20 - III 43.00 m' 81,136.99 3,488,890.57

5 Cat Kilat Lisplank CAT-K-3 8.60 m2 51,131.19 439,728.23

6 Pasangan Batu Bata 1 : 4 BATA ½ -14 192.89 m2 91,719.43 17,691,760.85

7 Plesteran 1 : 4 PLESTER-14 385.78 m2 42,144.85 16,258,640.23

SUB TOTAL IV : PEKERJAAN DINDING & ATAP 100,042,188.08

V PEKERJAAN PINTU, JENDELA DAN VENTILASI

1 Pintu Utama / Pintu besi uk 2,8 x 2,5 m' + Grendel Ls 1.00 unit 6,300,000.00 6,300,000.00

2 Kosen pintu/ Jendela/Ventilasi KUSEN - II 0.44 m3 9,308,731.30 4,095,841.77

3 Pintu Panel PINTU - II 2.10 m2 602,506.52 1,265,263.69

4 Engsel Pintu Ls 3.00 unit 10,000.00 30,000.00

5 Grendel Pintu Ls 2.00 unit 52,000.00 104,000.00

6 Kunci Tanam Ls 1.00 unit 10,000.00 10,000.00

7 Cat Kilat 3 x CAT-K-3 35.84 m2 51,131.19 1,832,541.85

SUB TOTAL V : PEKERJAAN PINTU, JENDELA DAN VENTILASI 13,637,647.31

VI PEKERJAAN LANTAI & PLAFOND

1 Urugan Tanah di Bawah Lantai URG-T 12.45 m3 91,354.23 1,137,177.46

2 Urugan Pasir di Bawah Lantai URG-P 7.78 m3 83,962.23 653,226.15

3 Lantai rabat Beton t = 7 cm' RABAT 10.89 m3 607,046.66 6,611,952.22

4 Rangka Plafon Asbes RNK-F-KY 209.75 m2 52,355.71 10,981,610.17

5 Plafon Asbes ASBES 209.75 m2 49,086.51 10,295,895.47

6 Pengecatan Dinding CAT-T-3 385.78 m2 38,288.91 14,771,095.70

7 Pengecatan Cat Plafond CAT-T-3 209.75 m2 38,288.91 8,031,098.87

SUB TOTAL VI : PEKERJAAN LANTAI & PLAFOND 52,482,056.04

VII PEKERJAAN INSTALASI LISTRIK

1 Pengadaan Genset 1500 VA Jenis bensin Ls 1.00 unit 1,500,000.00 1,500,000.00

2 Pek.instalasi titik api dan conduit Ls 10.00 Titik 36,000.00 360,000.00

3 Lampu TL 1 x 36 W + assesories Ls 6.00 Bh 130,000.00 780,000.00

4 Lamp SL 18 W+Fitting Ls 1.00 Bh 97,000.00 97,000.00

5 Stop Kontak Ls 1.00 Bh 34,000.00 34,000.00

6 Saklar Ganda Ls 1.00 Bh 34,000.00 34,000.00

7 Panel Box + assesories Ls 1.00 Bh 89,000.00 89,000.00

SUB TOTAL VII : PEKERJAAN INSTALASI LISTRIK 2,894,000.00

VIII PEKERJAAN LAIN-LAIN

1 Pekejaan penangkal petir Ls 1.00 unit 780,000.00 780,000.00

2 Pek.Ornamen Simalungun ditombak layar Ls 3.00 m2 180,000.00 540,000.00

3 Pek.Ornamen Simalungun dikolom entrans Ls 3.00 m2 180,000.00 540,000.00

4 Pek.Ornamen Kepala kerbau di Entrans Ls 1.00 bh 780,000.00 780,000.00

5 Pek.Ornamen Ulu Paung pada Kolom Entrans Ls 2.00 bh 780,000.00 1,560,000.00

SUB TOTAL VIII : PEKERJAAN LAIN-LAIN 4,200,000.00

Page 38 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG & LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN


PERIKANAN KEHUTANAN
DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. JAWA MARAJA BAH JAMBI

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEMBANGUNAN LUMBUNG 266,204,000.00

II PEMBANGUNAN LANTAI JEMUR 95,244,636.09

A TOTAL BIAYA 361,448,636.09

B PPN 10 % 36,144,863.61

C JUMLAH ( A + B ) 397,593,500.00

Terbilang : Tiga Ratus Sembilan Puluh Tujuh Juta Lima Ratus Sembilan Puluh Tiga Ribu Lima Ratus Rupiah

Page 39 of 40
R E K A P I T U L A S I

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN LUMBUNG & LANTAI JEMUR BADAN PELAKSANA PENYULUHAN PERTANIAN


PERIKANAN KEHUTANAN
DAN KETAHANAN PANGAN KAB. SIMALUNGUN DI KEC. PAM.BANDAR

NOMOR URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I PEMBANGUNAN LUMBUNG 236,204,000.00

II PEMBANGUNAN LANTAI JEMUR 65,033,363.91

A TOTAL BIAYA 301,237,363.91

B PPN 10 % 30,123,736.39

C JUMLAH ( A + B ) 331,361,100.00

Terbilang : Tiga Ratus Tiga Puluh Satu Juta Tiga Ratus Enam Puluh Satu Ribu Seratus Rupiah