DETAIL A
Not to Scale

Cor Beton, t = 20 cm

45

20

DETAIL PEMASANGAN PENYANGGA Variabel


Not to Scale

Timbunan Pilihan, t = Variabel

DETAIL SAMBUNGAN DOWEL


Skala. 1 : 10

PAKET PEKERJAAN DI BUAT OLEH DI PERIKSA DI SETUJUI NAMA GAMBAR SKALA NO. LEMBAR
PPTK PENINGKATAN JALAN BTS. KOTA MERAUKE -
PENINGKATAN JALAN KUMBE - BIAN - OKABA
II - 03
BTS. KOTA MERAUKE - KUMBE - PENULANGAN 1 : 10
BIAN - OKABA JML. LEMBAR
DOWEL Nts
YOHANIS MOMOT, ST. MT
TAHUN 2019 Ir. ALFIAL LAYNERA DJUANDA DULI, ST.
Penata Tk. (III d) 03
Site Manager Site Engineer
NIP. 19720626 200502 1 008