REKAPITULASI KUANTITAS DAN HARGA PERHITUNGAN MC - 0

Instansi Dinas Pekerjaan Umum, Perumahan dan Kawasan Permukiman


Kegiatan PEMELIHARAAN JALAN DAN JEMBATAN
Pekerjaan PEMELIHARAAN TROTOAR JALAN C. SIMANJUNTAK (Sisi Barat Saja)
Lokasi Kelurahan Terban Kecamatan Gondokusuman
Tahun Anggaran 2017

NO. URAIAN PEKERJAAN KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG MC - 0

HARGA HARGA HARGA HARGA


JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
SATUAN SATUAN SATUAN SATUAN
VOLUME SAT VOLUME SAT VOLUME SAT VOLUME SAT
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

I. PERSIAPAN
1. Papan Nama Proyek 1.00 LS 509,058.00 509,058.00 0.00 LS 509,058.00 - 0.00 LS 509,058.00 - 1.00 LS 509,058.00 509,058.00
2. Dokumentasi dan Administrasi 1.00 LS 950,000.00 950,000.00 0.00 LS 950,000.00 - 0.00 LS 950,000.00 - 1.00 LS 950,000.00 950,000.00
3. Mobilisasi 1.00 LS 3,250,000.00 3,250,000.00 0.00 LS 3,250,000.00 - 0.00 LS 3,250,000.00 - 1.00 LS 3,250,000.00 3,250,000.00
- Mobilisasi Peralatan
- Pengaturan dan Rambu Lalulintas
- Manajemen Mutu (Laboratorium dan Layanan)

II. PEKERJAAN TROTOAR


1 Pembongkaran Trotoar Lama 554.07 M2 14,465.00 8,014,622.55 447.78 M2 14,465.00 6,477,137.70 0.00 M2 14,465.00 - 1,001.85 M2 14,465.00 14,491,760.25
2 Pembongkaran Kansteen Trotoar 12.28 M3 275,220.00 3,379,151.16 0.00 M3 275,220.00 - 0.00 M3 275,220.00 - 12.28 M3 275,220.00 3,379,151.16
3 Pembongkaran Lantai Rabat Trotoar 13.35 M3 275,220.00 3,674,902.57 0.00 M3 275,220.00 - 0.00 M3 275,220.00 - 13.35 M3 275,220.00 3,674,902.57
4 Pembongkaran Kerb 613.90 M1 10,312.00 6,330,536.80 47.20 M1 10,312.00 486,726.40 0.00 M1 10,312.00 - 661.10 M1 10,312.00 6,817,263.20
5 Mengurug dengan pasir urug 26.80 M3 173,085.00 4,639,283.80 0.00 M3 173,085.00 - 0.00 M3 173,085.00 - 26.80 M3 173,085.00 4,639,283.80
6 Pemadatan pasir urug 26.80 M3 29,645.00 794,589.76 0.00 M3 29,645.00 - 0.00 M3 29,645.00 - 26.80 M3 29,645.00 794,589.76
8 Memasang Paving Merah tipe holland t : 6 cm 383.69 M2 168,077.00 64,489,043.94 0.00 M2 168,077.00 - 89.61 M2 168,077.00 15,061,800.16 294.08 M2 168,077.00 49,427,243.78
9 Memasang Paving Natural tipe holland t : 6 cm 320.03 M2 149,190.00 47,744,902.73 170.10 M2 149,190.00 25,376,846.03 0.00 M2 149,190.00 - 490.13 M2 149,190.00 73,121,748.75
10 Memasang Lantai Guiding Blok (30 x 30) cm 184.17 M2 156,575.00 28,836,417.75 13.32 M2 156,575.00 2,085,579.00 0.00 M2 156,575.00 - 197.49 M2 156,575.00 30,921,996.75
11 Cor Kansteen Trotoar Beton K-175 12.28 M3 845,000.00 10,374,910.00 0.00 M3 845,000.00 - 0.00 M3 845,000.00 - 12.28 M3 845,000.00 10,374,910.00
12 Pengadaan dan Pemasangan Kerb Baru (TEGAK) 432.80 M1 64,922.00 28,098,241.60 0.00 M1 64,922.00 - 73.90 M1 64,922.00 4,797,735.80 358.90 M1 64,922.00 23,300,505.80
13 Pengadaan dan Pemasangan Kerb Baru (INGANG) 181.10 M1 64,922.00 11,757,374.20 121.10 M1 64,922.00 7,862,054.20 0.00 M1 64,922.00 - 302.20 M1 64,922.00 19,619,428.40
14 Pengecatan Kerb (3 kali) 184.17 M2 62,362.00 11,485,209.54 14.16 M2 62,362.00 883,045.92 0.00 M2 62,362.00 - 198.33 M2 62,362.00 12,368,255.46

III. PEKERJAAN INLET DAN MANHOLE


1. Pembongkaran Manhole 56.00 BH 44,715.00 2,504,040.00 0.00 BH 44,715.00 - 17.00 BH 44,715.00 760,155.00 39.00 BH 44,715.00 1,743,885.00
2. Cor Beton Landasan Manhole (Beton K-175) 9.52 M3 845,000.00 8,044,400.00 0.00 M3 845,000.00 - 2.68 M3 845,000.00 2,263,079.00 6.84 M3 845,000.00 5,781,321.00
3. Pembesian Landasan Manhole 988.00 KG 10,740.00 10,611,120.00 0.00 KG 10,740.00 - 341.40 KG 10,740.00 3,666,597.28 646.60 KG 10,740.00 6,944,522.72
4. Begesting Landasan Manhole 76.16 M2 162,690.00 12,390,470.40 0.00 M2 162,690.00 - 23.80 M2 162,690.00 3,872,022.00 52.36 M2 162,690.00 8,518,448.40
5. Pengadaan dan Pemasangan Manhole / manhole Besi 56.00 BH 750,000.00 42,000,000.00 0.00 BH 750,000.00 - 17.00 BH 750,000.00 12,750,000.00 39.00 BH 750,000.00 29,250,000.00
(Pengganti Manhole Beton)
IV. PEKERJAAN LAIN - LAIN
1. Pembersihan Sisa Bahan di Lapangan / Lokasi Pekerjaan 1.00 LS 967,000.00 967,000.00 0.00 LS 967,000.00 - 0.00 LS 967,000.00 - 1.00 LS 967,000.00 967,000.00
2. Pemindahan Bekas Bongkaran Trotoar (Kondisi Baik) 1.00 LS 1,451,000.00 1,451,000.00 0.00 LS 1,451,000.00 - 0.00 LS 1,451,000.00 - 1.00 LS 1,451,000.00 1,451,000.00
Atas perintah Direksi
3. Pembuangan Bongkaran 1.00 LS 2,250,000.00 2,250,000.00 0.00 LS 2,250,000.00 - 0.00 LS 2,250,000.00 - 1.00 LS 2,250,000.00 2,250,000.00

JUMLAH TOTAL 314,546,274.79 43,171,389.25 43,171,389.24 314,546,274.79


PPN 10% 31,454,627.48 4,317,138.92 4,317,138.92 31,454,627.48

JML TOTAL 346,000,902.27 47,488,528.17 47,488,528.17 346,000,902.27

#REF! Yogyakarta, 26 Juli 2017


Mengetahui dan Menyetujui : Telah diperiksa dan disetujui oleh : Dietujui oleh : Dibuat oleh :
Pejabat Pembuat Komitmen Direksi Teknis jj PPHP Konsultan Pengawas Penyedia Barang Jasa
CV. Cahaya Bumi Maya CV. Bumi Nusantara
1 Edy Suwantara 1. Suko Darmanto,S. Sos.

2 Sugeng Widada 2. Sunarto


Umi Akhsanti, ST. MT. Febri Lavanjaya, S. Pd. Ali Baza, SP.
NIP. 19720926 199803 2 007 3 Fr. Shinta Paramita, ST 3. Panut Haryono Direktur Utama Direktur