INFORMASI UMUM
No. URAIAN INFORMASI
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 0.50 + 4.50 + 0.50 ) meter
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 8.73 Kilometer
7.45 Km = a C 7.45 Km = b
A B
5.0 Km = c
Base Camp --------->
D
21 ....................................
22 ....................................
No. Mata Perkiraan Harga % Thd.
Uraian Satuan
Pembayaran Kuantitas Satuan Total Biaya
(Rupiah) (%)
a b c d e f
99.99695
Jumlah
Harga-Harga
(Rupiah)
g = (d x e)
1,353,030,000
26,934
437,350
379,550
465,089
788,035
1,312,035
0
16,041,846
110,910
236,814
24,158
58,790
206,191
81,349
576,439
523,669
0
130,827
455,318
9,978
155,109
142,479
124,352
92,046
184,684
72,725
724
0
458,588
432,592
738,738
155,911
6,114
7,789
5,443
453,368
416,191
392,322
772,706
120,928
0
0
5,550
6,446
4,376
6,984
7,342
36,654
44,470
61,939
921,547
1,837,831
799,696
71,846
69,575
775,955
744,571
1,734,269
1,667,675
749,610
720,606
1,649,801
1,568,453
700,913
679,159
11,152
5,481
7,409
1,832,188
6,226,190
24,000
1,320,284
1,192,544
1,270,317
1,491,112
1,420,205
1,394,103
1,104,298
1,070,952
784,714
660,314
702,000
23,733,235
26,054,280
26,943,808
27,933,808
28,923,808
29,583,808
31,126,083
31,233,808
240,555
35,451,564
1,200,981
11,330
11,325
12,051
10,920
12,051
40,172
12,747
12,747
12,747
642
555
34,212
0
38,773
20,958
0
40,116
33,814
85,736
4,433,302
1,071,398
152,230
50,743
50,743
50,743
52,245
52,245
52,245
722,283
1,274,687
1,983,143
2,847,651
4,437,012
0
0
0
0
0
0
4,481,000
5,420,047
6,379,016
8,015,583
221,170
288,254
343,065
546,984
553,666
596,242
265,488
318,418
38,419
0
0
0
0
0
0
0
0
0
0
14,253
124,901
0
329,646
0
0
205,747
212,009
0
0
0
1,118,735
0
0
388,883
358,719
337,954
296,328
1,918,875
0
1,194,059
1,219,159
7,396
73,130
43,887
131,049
204,945
430,009
7,100
6,880
6,495
114,811
104,086
411,739
606,111
456,289
694,439
97,393
329,572
151,213
618,998
71,559
148,009
118,859
0
10,097
66,804
0
0
612,446
22,896,888
1,198,338
1,175,715
1,198,338
1,175,715
1,198,338
320,627
503,887
7,872
4,986
6,560
181,166
363,963
177,181
457,454
378,173
293,475
251,000
421,577
598,101
441,483
367,997
26,645
389,071
122,154
147,180
18,528
17,698
67,909,087
32,178,072
41,671,295
11,768,457
62,477,968
###
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Proyek / Bagpro :
No. Paket Kontrak :
Nama Paket :
Prop / Kab / Kodya :
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
1 Umum 1,353,030,000
2 Drainase 19,883,255
3 Pekerjaan Tanah 2,814,679
4 Pelebaran Perkerasan dan Bahu Jalan 1,805,174
5 Pekerasan Non Aspal 2,155,515
6 Perkerasan Aspal 26,754,834
7 Struktur 318,147,649
8 Pengembalian Kondisi dan Pekerjaan Minor 40,905,141
9 Pekerjaan Harian 4,672,264
10 Pekerjaan Pemeliharaan Rutin 216,004,879
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 1,986,173,389
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 198,617,339
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 2,184,790,728
Terbilang : ……………………………………………………………………………………....................................
……………………………………………………………………………………....................................
( ............................. ) ( ............................. )
-2
DAFTAR KUANTITAS DAN HARGA
DESEMEBER 2005
Proyek / Bagpro :
No. Paket Kontrak : ………………………………………………
Nama Paket : …………………………………………………………………..
Prop / Kab / Kodya : ………………………………………………
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.0 1,353,030,000
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 1.0 26,934.14
2.2 Pasangan Batu dengan Mortar M3 1.0 437,350.41
2.3 (1) Gorong² Pipa Beton Bertulang, Diameter Dalam 50 cm M1 1.0 379,549.65
2.3 (2) Gorong² Pipa Beton Bertulang, Diameter Dalam 50 cm sampai 70 cm M1 1.0 465,088.59
2.3 (3) Gorong² Pipa Beton Bertulang, Diameter Dalam 70 cm sampai 100 cm M1 1.0 788,034.79
2.3 (4) Gorong2 Pipa Beton Bertulang, Diameter Dalam 100 cm sampai 130 cm M1 1.0 1,312,035.14
2.3 (5) Gorong2 Beton Tanpa Tulang Diameter Dalam 140 cm sampai 150 cm M1 1.0
2.3 (6) Gorong2 Pipa Baja Bergelombang Ton 1.0 16,041,846.07
2.3 (7) Gorong2 Pipa Beton Tanpa Tulangan diameter dalam 20 cm sampai 30 cm M1 1.0 110,909.74
2.4 (1) Timbunan Porous atau Bahan Penyaring (Filter) M3 1.0 236,814.09
2.4 (2) Anyaman Filter Plastik M2 1.0 24,157.82
2.4 (3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1 1.0 60,534.46
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 5. PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A M3 1.0 453,368.40
5.1 (2) Lapis Pondasi Agregat Kelas B M3 1.0 416,190.68
5.2 (1) Lapis Pondasi Agregat Kelas C M3 1.0 392,321.88
5.4 (1) Semen untuk Lapis Pondasi Semen Tanah Ton 1.0 772,706.31
5.4 (2) Lapis Pondasi Tanah Semen M3 1.0 120,927.59
5.5 (1) Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) M3 1.0
5.6 (1) Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) M3 1.0
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1) Beton K500 M3 1.0 1,491,111.58
7.1 (2) Beton K400 M3 1.0 1,420,205.46
7.1 (3) Beton K350 M3 1.0 1,394,103.20
7.1 (4) Beton K300 M3 1.0 1,104,297.86
7.1 (5) Beton K250 M3 1.0 1,070,952.31
7.1 (6) Beton K175 M3 1.0 784,713.63
7.1 (7) Beton Siklop K175 M3 1.0 660,314.12
7.1 (8) Beton K125 M3 1.0 702,000.45
7.2 (1) Unit Pracetak Gelagar Tipe I bentang 16 m Buah 1.0 23,733,234.61
7.2 (2) Unit Pracetak Gelagar Tipe I bentang 20 m Buah 1.0 26,054,279.71
7.2 (3) Unit Pracetak Gelagar Tipe I bentang 22 m Buah 1.0 26,943,808.49
7.2 (4) Unit Pracetak Gelagar Tipe I bentang 25 m Buah 1.0 27,933,808.49
7.2 (5) Unit Pracetak Gelagar Tipe I bentang 28 m Buah 1.0 28,923,808.49
7.2 (6) Unit Pracetak Gelagar Tipe I bentang 30 m Buah 1.0 29,583,808.49
7.2 (7) Unit Pracetak Gelagar Tipe I bentang 31 m Buah 1.0 31,126,083.29
7.2 (8) Unit Pracetak Gelagar Tipe I bentang 35 m Buah 1.0 31,233,808.49
7.2 (9) Baja Prategang Kg 1.0 240,555.10
7.2 (10) Pelat Berongga (Hollow Slab) pracetak bentang 21 m Buah 1.0 35,451,563.78
7.2 (11) Beton Diafragma K350 termasuk pekerjaan penegangan setelah pengecoran (post tension) M3 1.0 1,200,980.98
7.3 (1) Baja Tulangan U24 Polos Kg 1.0 11,330.10
7.3 (2) Baja Tulangan U32 Polos Kg 1.0 11,324.60
7.3 (3) Baja Tulangan U32 Ulir Kg 1.0 12,050.60
7.3 (4) Baja Tulangan U39 Ulir Kg 1.0 10,920.35
7.3 (5) Baja Tulangan U48 Ulir Kg 1.0 12,050.60
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 1.0 40,171.68
7.4 (1) Baja Struktur Titik leleh 2500 kg/cm2 penyediaan dan pemasangan Kg 1.0 12,746.92
7.4 (2) Baja Struktur Titik leleh 2800 kg/cm2 penyediaan dan pemasangan Kg 1.0 12,746.92
7.4 (3) Baja Struktur Titik leleh 3500 kg/cm2 penyediaan dan pemasangan Kg 1.0 12,746.92
7.5 (1) Pemasangan Jembatan Rangka Baja Kg 1.0 642.34
7.5 (2) Pengangkutan Bahan Jembatan Kg 1.0 555.16
7.6 (1) Pondasi Cerucuk, Penyediaan dan Pemancangan M1 1.0 34,211.81
7.6 (2) Dinding Turap Kayu Tanpa Pengawetan M2 1.0
7.6 (3) Dinding Turap Kayu Dengan Pengawetan M2 1.0 38,772.95
7.6 (4) Dinding Turap Baja M2 1.0 20,957.98
7.6 (5) Dinding Turap Beton M2 1.0
7.6 (6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan M3 1.0 40,115.74
7.6 (7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan M3 1.0 33,814.44
7.6 (8) Penyediaan Tiang Pancang Baja Kg 1.0 85,736.42
7.6 (9) Penyediaan Tiang Pancang Beton Bertulang Pracetak M3 1.0 4,433,302.19
7.6 (10) Penyediaan Tiang Pancang Beton Pratekan Pracetak M3 1.0 1,071,397.58
7.6 (11) Pemancangan Tiang Pancang Kayu M1 1.0 152,229.71
7.6 (12) Pemancangan Tiang Pancang Pipa Baja : Diameter 400 mm M1 1.0 50,743.24
7.6 (13) Pemancangan Tiang Pancang Pipa Baja : Diameter 500 mm M1 1.0 50,743.24
7.6 (14) Pemancangan Tiang Pancang Pipa Baja : Diameter 600 mm M1 1.0 50,743.24
7.6 (15) Pemancangan Tiang Pancang Beton Pracetak :30 cm x 30 cm atau diameter 300 mm M1 1.0 52,244.91
7.6 (16) Pemancangan Tiang Pancang Beton Pracetak :40 cm x 40 cm atau diameter 400 mm M1 1.0 52,244.91
7.6 (17) Pemancangan Tiang Pancang Beton Pracetak :50 cm x 50 cm atau diameter 500 mm M1 1.0 52,244.91
7.6 (18) Tiang Bor Beton, dia. 600 mm M1 1.0 722,283.19
7.6 (19) Tiang Bor Beton, dia. 800 mm M1 1.0 1,274,686.81
7.6 (20) Tiang Bor Beton, dia. 1000 mm M1 1.0 1,983,142.80
7.6 (21) Tiang Bor Beton, dia. 1200 mm M1 1.0 2,847,651.15
7.6 (22) Tiang Bor Beton, dia. 1500 mm M1 1.0 4,437,011.86
7.6 (23) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(11) s/d M1 1.0
7.6.(17) bila Tiang Pancang Beton dikerjakan ditempat yang Berair
7.6 (24) Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(18) s/d M1 1.0
7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair
7.6 (25) Pengujian Pembebanan pada Tiang dengan diameter sampai 600 mm Buah 1.0
7.6 (26) Pengujian Pembebanan pada Tiang dengan diameter diatas 600 mm Buah 1.0
7.7 (1) Penyediaan Dinding Sumuran Silinder, Diameter 250 cm M1 1.0 4,481,000.36
7.7 (2) Penyediaan Dinding Sumuran Silinder, Diameter 300 cm M1 1.0 5,420,046.69
7.7 (3) Penyediaan Dinding Sumuran Silinder, Diameter 350 cm M1 1.0 6,379,016.40
7.7 (4) Penyediaan Dinding Sumuran Silinder, Diameter 400 cm M1 1.0 8,015,583.29
7.7 (5) Penurunan Dinding Sumuran Silinder, Diameter 250 cm M1 1.0 221,169.66
7.7 (6) Penurunan Dinding Sumuran Silinder, Diameter 300 cm M1 1.0 288,254.15
7.7 (7) Penurunan Dinding Sumuran Silinder, Diameter 350 cm M1 1.0 343,065.30
7.7 (8) Penurunan Dinding Sumuran Silinder, Diameter 400 cm M1 1.0 546,983.87
7.9 Pasangan Batu M3 1.0 553,666.41
7.10 (1) Pasangan Batu Kosong yang diisi Adukan M3 1.0 596,242.08
7.10 (2) Pasangan Batu Kosong M3 1.0 265,487.92
7.10 (3) Bronjong M3 1.0 318,417.85
7.11 (1) Expansion Joint Tipe Asphaltic Plug M1 1.0 38,419.32
7.11 (2) Expansion Joint Tipe Rubber 1 (celah 21-41 mm) M1 1.0
7.11 (3) Expansion Joint Tipe Rubber 2 (celah 32-62 mm) M1 1.0
7.11 (4) Expansion Joint Tipe Rubber 3 (celah 42-82 mm) M1 1.0
7.11 (5) Joint Filler untuk Sambungan Konstruksi M1 1.0
7.11 (6) Expansion Joint Tipe Baja Bersudut M1 1.0
7.12 (1) Perletakan Logam Buah 1.0
7.12 (2) Perletakan Elastomerik Jenis 1 (300 x 350 x 36) Buah 1.0
7.12 (3) Perletakan Elastomerik Jenis 2 (350 x 400 x 39) Buah 1.0
7.12 (4) Perletakan Elastomerik Jenis 3 (400 x 450 x 45) Buah 1.0
7.12 (5) Perletakan Strip M1 1.0
7.13 Sandaran (Railing) M1 1.0 14,253.41
7.14 Papan Nama Jembatan Buah 1.0 124,901.04
7.15.(1) Penmbongkaran Pasangan Batu M3 1.0
7.15.(2) Pembongkaran Beton M3 1.0 329,646.48
7.15.(3) Pembongkaran Beton Pratekan M3 1.0
7.15.(4) Pembongkaran Bangunan Gedung M2 1.0
7.15.(5) Pembongkaran Rangka Baja M2 1.0 205,746.88
7.15.(6) Pembongkaran Balok Baja (Steel Stringers) M1 1.0 212,009.34
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 1.0
7.15.(8) Pembongkaran Jembatan Kayu M2 1.0
7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 / Km 1.0
7.16 (1) Perkerasan Jalan Beton M3 1.0 1,118,735.17
7.17 (1) Wet Lean Concrete M2 1.0
7.17 (2) Sand Bedding (t = 4 cm) M2 1.0
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 260,300,000
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150 50,000 7,500,000
2 Kantor M2 60 75,000 4,500,000
3 Barak M2 60 45,000 2,700,000
4 Bengkel M2 100 25,000 2,500,000
5 Gudang, dan lain-lain M2 100 25,000 2,500,000
6 ...................... .... 0 0 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 108 55,000 5,940,000
3 Bituminous Testing
Marshall Asphalt Test Set 1 20,000,000 20,000,000
Extraction Test, Centrifuge/Refflux Method Set 1 9,000,000 9,000,000
Specific Gravity for Coarse Aggregate Set 1 9,000,000 9,000,000
Specific Gravity for Fine Aggregate Set 1 9,000,000 9,000,000
Mix Air Viod Content (Accurate Method) Set 1 15,000,000 15,000,000
Core Drill Set 1 15,000,000 15,000,000
Metal Thermometer Set 1 1,000,000 1,000,000
Accessories and Tolls Set 1 5,000,000 5,000,000
Penetration Test Bln 6 1,000,000 6,000,000
Softening Point Set 1 6,000,000 6,000,000
Refusal Density Compactor Set 1 15,000,000 15,000,000
4 Concrete Testing
Slump Cone Set 1 500,000 500,000
Cylinder/Cube Mould for Compressive Strength Set 1 10,000,000 10,000,000
Beam Mould for Flexural Strength (RIGID) Set 1 10,000,000 10,000,000
Crushing Machine Set 1 50,000,000 50,000,000
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1 5,000,000 5,000,000
2 ...................... .... 0 0 0
3 ...................... .... 0 0 0
4 ...................... .... 0 0 0
5 ...................... .... 0 0 0
6 ...................... .... 0 0 0
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
B. PERALATAN
HARGA
NO. URAIAN SATUAN VOLUME TOTAL
SATUAN
I. Laboratory Building
1. Laboratory Building m2 108.00 55,000.00 5,940,000.00
SUB TOTAL 5,940,000.00
V. Peralatan pendukung
1 Mobil Pick Up Unit 2.00 100,000,000.00 200,000,000.00
2 Komputer + Printer Set 1.00 10,000,000.00 10,000,000.00
3 Furniture Set 1.00 15,000,000.00 15,000,000.00
SUB TOTAL 225,000,000.00
VI. Operasional
Teknisi Laboratorium Bln 12.00 8,000,000.00 96,000,000.00
Tenaga Kerja Terampil Bln 60.00 3,000,000.00 180,000,000.00
SUB TOTAL 276,000,000.00
Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
KETERANGAN
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Sewa
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Perhitungan Kebutuhan Alat untuk Mobilisasi
No Nama Alat Kode Jadwal Pekerjaan Kuantitas Sat Target Peralatan Ya
No Item Pekerjaan Alat bulan Hari Kerja Jam Kerja Pekerjaan Produksi koefisien alat
per hari total Tiap Jam per item
1 2 3 4 5 6=4x5 7 8=7:6 9
1 Asphalt Mixing Plant E01
6.3 (1) 3 75 7 525 1 M2 0.002 0.0007
6.3 (2) 9 225 7 1575 1 M2 0.001 0.0009
6.3 (3) 9 225 7 1575 1 M2 0.001 0.0013
6.3(3a) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(4) 9 225 7 1575 1 M3 0.001 0.0448
6.3(4a) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(5a) 9 225 7 1575 1 M2 0.001 0.0019
6.3(5b) 9 225 7 1575 1 M2 0.001 0.0019
6.3(5c) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(5d) 2 50 7 350 1 Ton 0.003 0.0201
6.3(6a) 9 225 7 1575 1 M3 0.001 0.0466
6.3(6b) 9 225 7 1575 1 M3 0.001 0.0466
6.3(6c) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(6d) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(7a) 9 225 7 1575 1 M3 0.001 0.0466
6.3(7b) 9 225 7 1575 1 M3 0.001 0.0466
6.3(7c) 9 225 7 1575 1 Ton 0.001 0.0201
6.3(7d) 9 225 7 1575 1 Ton 0.001 0.0201
8.1 (5) 9 225 7 1575 1 M3 0.001 0.0554
4 Bulldozer E04
9.7 7 175 7 1225 jam 0.000
6 Concrete Vibrator
7.1(5) 4 100 7 700 m3 0.000
7.1(6) 4 100 7 700 m3 0.000
7.1(8) 4 100 7 700 m3 0.000
7 Compressor E05
6.1(1) 9 225 7 1575 liter 0.000
9.17 7 175 7 1225 jam 0.000
8 Crane E07
9.12 7 175 7 1225 jam 0.000
10 Excavator E10
2.1 7 175 7 1225 m3 0.000
3.1(1) 6 150 7 1050 m3 0.000
9.11 7 175 7 1225 jam 0.000
0.000001 0.00033 1 1
0.000001
0.000001
0.000013
0.000028
0.000013
0.000001
0.000001
0.000013
0.000057
0.000030
0.000030
0.000013
0.000013
0.000030
0.000030
0.000013
0.000013
0.000035
0.000001 0.00023 1 1
0.000001
0.000001
0.000012
0.000104
0.000003
0.000001
0.000001
0.000009
0.000009
0.000016
Peralatan Yang Diperlukan
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000016
0.000007
0.000007
0.000013
0.000013
0.000006
0.000006
0.000000
0.000000
0.000000
0.000000 0.00002 1 1
0.000000
0.000023
0.000000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000 0.000 1 1
0.000
0.000 0.000 1 1
0.000 0.000 18 18
Peralatan Yang Diperlukan
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
Peralatan Yang Diperlukan
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
ITEM PEMBAYARAN NO. : 2.1 Analisa EI-21
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor Konversi (<40 %) Fv 0.9
Waktu siklus = T1 x Fv Ts1 0.29 menit
- Menggali, memuat dan berputar T1 0.3 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.1 PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan SalurTOTAL HARGA (Rp.) : 26,934.14
SATUAN PEMBAYARAN : M3 0 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0075 Jam
Rp. 26,934.14 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3 1.40 - 1.80
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90 lihat panduan
Waktu siklus Ts1 menit
- Menggali / memuat (standar) T1 0.320 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 58,789.85
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0149 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0075 Jam
Rp. 58,789.85 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) : 206,190.85
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.01
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor (E05) Jam 0.1250 111,049.38 13,881.17
2. Jack Hammer (E26) Jam 0.1250 16,089.36 2,011.17
3. Wheel Loader (E15) Jam 0.1250 266,795.62 33,349.45
4. Excavator (E10) Jam 0.1250 383,252.01 47,906.50
5 Dump Truck (E08) Jam 0.5153 164,696.38 84,871.08
Alat bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.80 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 8.00 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 8.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 56.00 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1250 Jam
Rp. 206,190.85 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1 (3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian Struktur dengan Kedalaman 0 - 2 TOTAL HARGA (Rp.) : 81,348.72
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0075 383,252.01 2,859.87
2. Bulldozer (E04) Jam 0.014502 423,504.25 6,141.85
3. Alat bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
7 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 (EI-322) 0.50 M3
M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman < 40 %) Fv 0.90 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1 0.32 menit
Waktu siklus = T1 x Fv Ts1 0.29 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0075 Jam
Rp. 81,348.72 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1 (4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian Struktur dengan Kedalaman 2 - 4 TOTAL HARGA (Rp.) : 576,438.68
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.03
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0166 383,252.01 6,355.26
2. Bulldozer (E04) Jam 0.029005 423,504.25 12,283.70
3. Alat bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 1.00 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman 40 - 75%) Fv 1.00 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 60.30 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 422.13 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1658 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0166 Jam
Rp. 576,438.68 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian Struktur Kedalaman 4 m - 6 m TOTAL HARGA (Rp.) : 523,669.30
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0249 383,252.01 9,532.89
2. Bulldozer (E04) Jam 0.029005 423,504.25 12,283.70
3. Alat bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 30.00 %/M3
7 Faktor pembayaran Fp 2.00 1.5 - 2
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 0.60 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3 cek item 3.1(6)
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman > 75%) Fv 1.50 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 40.20 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 281.42 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2985 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0249 Jam
Rp. 523,669.30 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Berat volume bahan D 1.60 Ton/M3
5 Faktor pengembangan bahan Fk 1.20
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 3.50 Ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts
- Waktu tempuh isi = (Lt : v1) x 60 T1 9.00 menit
- Waktu tempuh kosong = (Lt : v2) x 60 T2 6.00 menit
Ts 15.00 menit
3. TENAGA
Tidak diperlukan tenaga kerja.
Rp. 9,978.16 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1 (9) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Biaya Tambahan untuk jarak angkut bahaTOTAL HARGA (Rp.) : 9,978.16
SATUAN PEMBAYARAN : M3/Km % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90 Lihat panduan
Waktu sklus Ts1
- Muat T1 0.32 menit
Waktu Siklus = T1 x Fv Ts1 0.29 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.2 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Timbunan Biasa dari selain Sumber GaliaTOTAL HARGA (Rp.) : 155,108.97
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.01
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E15) Jam 0.0075 266,795.62 1,990.86
2. Dump Truck (E08) Jam 0.4267 164,696.38 70,269.55
3. Motor Grader (E13) Jam 0.1190 343,794.00 40,927.86
4 Vibro Roller (E19) Jam 0.0109 334,542.74 3,631.20
5. Alat Bantu Ls 1.0000 0.00 0.00
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 134.01 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 938.07 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0298 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0075 Jam
Rp. 155,108.97 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.2 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Timbunan Pilihan TOTAL HARGA (Rp.) : 142,478.56
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.01
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0136 266,795.62 3,630.39
2. Dump Truck (E08) Jam 0.4341 164,696.38 71,488.95
3. Motor Grader (E13) Jam 0.0020 343,794.00 682.13
3. Tandem (E17) Jam 0.0289 401,348.48 11,616.87
4. Water Tanker (E23) Jam 0.0070 161,074.00 1,132.05
5. Alat Bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.45 menit
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 2.30 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 16.13 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.7363 Jam
- Mandor = (Tk x M) : Qt (L03) 0.4341 Jam
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 50.00 M
Lebar Efektif kerja Blade b 2.60 M
Lebae overlap bo 0.30
Faktor Efisiensi Alat Fa 0.80 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 4.00 lintasan
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.75 menit
- Lain-lain T2 1.00 menit
Ts1 1.75 menit
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1 3,257.14 M2/Jam
Produksi Pekerjaan / hari = Tk x Q1 Qt 22,800.00 M2
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.0012 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0003 Jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.3 PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : 723.79
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0003 343,794.00 105.55
2. Vibro Roller (E19) jam 0.0016 334,542.74 544.68
3 Alat Bantu Ls 1.0000 0.00 0.00
Rp. 723.79 / M2
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) 1.25861 M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain T1 0.45 menit panduan
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 4.2 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A TOTAL HARGA (Rp.) : 458,587.66
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 4.2 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B, CBR Min 60% TOTAL HARGA (Rp.) : 432,592.18
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
10 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - Pemuatan lepas
Faktor Efisiensi alat Fa 0.83 - sedang
Waktu siklus Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop = 3 buah
- Garpu = 2 buah
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal SBST t 1.50 Cm
9 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld 1.30 Cm
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : V - loading Ts1 0.45 menit lihat tabel
V - Loading
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 4.2 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Agregat Penutup BURTU TOTAL HARGA (Rp.) : 6,113.93
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 8,179.71 M2
Produksi / hari = Tk x Q1 Qt 57,257.97 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0024 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0001 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 95.24 % 100 bagian
- Minyak Tanah / Pencair K 4.76 % 5 bagian
7 Berat jenis bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / Ltr
- Minyak Tanah / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter Campuran
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Faktor efisiensi kerja Fa 0.80 - kondisi sedang
Kapasitas pompa aspal pas 100 liter/menit
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q1 4,800.00 Ltr/Jam
Produksi / hari = Tk x Q1 Qt 33,600.00 Liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 4.2 (6) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Bahan aspal untuk Pekerjaan PelaburaTOTAL HARGA (Rp.) : 7,788.94
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 56 % 100 bagian
- Kerosene K 44 % 80 bagian
7 Berat jenis bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Minyak Flux / Pencair D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.10 liter Campuran
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan V 30.00 m/menit Asumsi
Kapasitas pompa aspal pas 100 liter/menit Panduan
Faktor effisiensi kerja Fa 0.80 Sedang
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4 4,800.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 4.2 (7) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Resap Pengikat TOTAL HARGA (Rp.) : 5,442.57
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh1 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - kondisi sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain T1 0.45 menit panduan
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. A TOTAL HARGA : 453,368.40
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 266,795.62 2,266.49
2. Dump Truck (E08) jam 0.5043 164,696.38 83,053.72
3. Motor Grader (E13) jam 0.0039 343,794.00 1,342.35
4. Tandem Roller (E17) jam 0.0357 401,348.48 14,327.48
5. Water Tanker (E23) jam 0.0141 161,074.00 2,264.09
6. Alat Bantu Ls 1.0000 0.00 0.00
7.
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0595 jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 - lepas
Faktor Efisiensi alat Fa 0.83 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
Ts1 0.45 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. B TOTAL HARGA : 416,190.68
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0085 266,795.62 2,266.49
2. Dump Truck (E08) jam 0.4861 164,696.38 80,051.78
3. Motor Grader (E13) jam 0.0039 343,794.00 1,342.35
4. Tandem Roller (E17) jam 0.0178 401,348.48 7,163.74
5. Water Tanker (E23) jam 0.0141 161,074.00 2,264.09
6. Alat Bantu Ls 1.0000 0.00 0.00
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0595 jam
- Mandor = (Tk x M) : Qt - 0.0085 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat isi agregat (lepas) Bil 1.51 ton/M3
Faktor kehilangan - Agregat C Fh 1.05
1. BAHAN
Material Agregat Kelas C hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x (Bip/Bil) x Fh (M28) 1.2586 M3 Agregat lepas
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 (lepas)
Faktor bucket Fb 0.85 - Pemuatan sedang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 0.45 menit panduan
Ts1 0.45 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.2 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas C TOTAL HARGA : 392,321.88
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 77.96 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 545.69 M3
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0898 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0128 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 64 % terhadap volume
- Kerosene K 36 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan V 30.00 m/menit Asumsi
Kapasitas pompa aspal pas 100 liter/menit Panduan
Faktor effisiensi kerja Fa 0.80 Sedang
3. TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR Q4 4,800.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Resap Pengikat TOTAL HARGA (Rp.) : 5,550.36
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.1 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Perekat TOTAL HARGA (Rp.) : 6,446.25
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80 As 80 % terhadap volume
- Kerosene K 20 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / liter
- Kerosene D2 0.80 Kg / liter
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan : ( 1 liter x Fh ) PC 1.03 liter
2. ALAT
2.a. ASPHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Kecepatan penyemprotan v 30.00 M/menit asumsi
Kapasitas pompa aspal pas 100 liter/menit Panduan
Faktor effesiensi kerja Fa 0.80 sedang
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q4 4,800.00 liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Berat Isi Agregat Chipping : padat Bip 1.47 -
lepas Bil 1.27
8 Faktor Kehilangan Fh 1.05
9 Tebal SBST t 1.50 Cm
10 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran Ld 1.30 Cm
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : V - loading Ts1 0.45 menit lihat tabel
V - Loading
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.2 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Agregat Penutup BURTU TOTAL HARGA (Rp.) : 4,375.54
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 8,126.85 M2
Produksi / hari = Tk x Q1 Qt 56,887.94 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0025 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0001 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pekerjaan ini tidak termasuk aspal
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat Isi Agregat Chipping : padat Bip 1.47 -
lepas Bil 1.27
8 Faktor Kehilangan Fh 1.05
9 Tebal DBST t 2.50 Cm
10 Lapisan DBST terdiri dari (spesifikasi) :
- Lapisan pertama ukuran normal = 13 mm
- Lapis kedua ukuran normal Ld 6.00 mm
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus V - Loading Ts1 0.45 menit
Ts1 0.45 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.2 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Agregat Penutup BURDA TOTAL HARGA (Rp.) : 6,983.69
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : Wheel Loader Q1 4,876.11 M2
Produksi / hari = Tk x Q1 Qt 34,132.76 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0041 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0002 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.03 -
6 Komposisi campuran :
- Aspal Pen 60 atau Pen 80 As 96.00 % terhadap volume
- Kerosene K 4.00 % terhadap volume
7 Berat isi bahan :
- Aspal Pen 60 atau Pen 80 D1 1.03 Kg / Ltr
- Kerosene D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.03 liter
2. ALAT
2.a. APHALT DISTRIBUTOR (E41)
Lebar penyemprotan b 3.00 M
Faktor efisiensi kerja Fa 0.80 -
Kapasitas pompa aspal pas 100 liter/menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.2 (3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Bahan Aspal untuk Pekerjaan Pelabura TOTAL HARGA (Rp.) : 7,342.13
SATUAN PEMBAYARAN : Liter % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menentukan : ASPHALT DISTIRBUTOR Q1 4,800.00 liter
Produksi / hari = Tk x Q1 Qt 33,600.00 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal Lapis Latasir padat t 0.015 M Tabel 6.3.1 (2)
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
Berat isi Agregat (padat) Bip 1.81 ton/m3
Berat Isi Agregat (lepas) Bil 1.51 ton/m3
9 Komposisi campuran SS Kelas A
- Pasir Kasar PK 29.00 %
- Pasir Halus PH 58.00 % Gradasi harus -
- Semen FF 3.00 % memenuhi -
- Asphalt As 10.00 % Spesifikasi
10 Berat Isi bahan :
- Latasir (SS) Kelas A D1 2.20 ton / M3
- Pasir Kasar D2 1.46 ton / M3
- Pasir Halus D3 1.46 ton / M3
11 Jarak Stock pile ke Cold Bin l 0.05 km
1. BAHAN
1.a. Pasir Kasar = (PK x (D1 x tM3) x Fh1) : D2 (M01d) 0.0069 M3
1.b. Pasir Halus = (PH x (D1 x tM3) x Fh1) : D3 (M01c) 0.0138 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.0395 Kg
1.d. Aspal = (As x (D1 x tM3) x Fh2) x 1000 (M10) 3.3990 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 panduan
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus T1 + T2 + T3 Ts1 1.10 menit
- Kecepatan maju rata rata Vf 15.00 km/jam panduan
- Kecepatan kembali rata rata Vr 20.00 km/jam panduan
- Muat ke Bin = (l x 60) / Vf T1 0.20 menit
- Kembali ke Stock pile = (l x 60) / Vr T2 0.15 menit
- Lain - lain (waktu pasti) T3 0.75 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.3 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Latasir Kelas A (SS-A), (t = … cm) TOTAL HARGA (Rp.) : 36,654.41
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0003 266,795.62 87.26
2. AMP E01 Jam 0.0007 4,886,762.12 3,238.22
3. Genset E12 Jam 0.0007 288,170.35 190.96
4. Dump Truck E08 Jam 0.0122 164,696.38 2,009.81
5. Asphalt Finisher E02 Jam 0.0013 869,616.54 1,108.71
6. Tandem Roller E17 Jam 0.0011 401,348.48 435.63
7 P. Tyre Roller E18 Jam 0.0010 353,700.54 342.63
8 Alat Bantu Ls 1.0000 0.00 0.00
3. TENAGA
Produksi menentukan : Mixing Plant Q2 1,509.09 M2
Produksi Latasir / hari = Tk x Q2 Qt 10,563.64 M2
Kebutuhan tenaga :
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0046 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0007 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal LASBUTAG t 3.00 Cm
9 Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar CA 30.00 % Total Campuran
- Pasir Ps 49.50 % Total Campuran
- Asbuton Asb 16.00 % Total Campuran
- Peremaja, terdiri atas : Md 4.50 % Total Campuran
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (jarang digunakan) As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Lasbutag D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
3. TENAGA
Produksi menentukan : ASPHALT FINISHER Q5 3,213.00 M2
Produksi / hari = Tk x Q5 Qt 22,491.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0062 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 1.50 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan) CA 0.00 % Total Campuran
- Pasir Ps 73.00 % Total Campuran
- Asbuton Asb 21.00 % Total Campuran
- Peremaja, terdiri atas : Md 6.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphal Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1 Menggunakan cara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Dalam pek. ini tdk. termasuk Asbuton & Peremaja
5 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor pemadatan material Fp 1.15 -
8 Tebal Latasbusir t 2.00 Cm
9 Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar CA 14.00 % Total Campuran
- Pasir Ps 63.00 % Total Campuran
- Asbuton Asb 18.00 % Total Campuran
- Peremaja, terdiri atas : Md 5.00 % Total Campuran
- Bunker Oil (BO) Bo 44.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 18.00 % Total Modifier
- Bahan Anti Stripping As 0.00 % Total Modifier
10 Penyiapan campuran dilaksanakan di Base Camp
11 Berat Isi bahan : - Agregat Kasar D1 1.80 T/m3
- Pasir D2 1.80 T/m3
- Asbuton D3 1.05 T/m3
- Modifier D4 0.99 T/m3
- Bunker Oil (BO) D5 0.97 T/m3
- Aspal Semen D6 1.03 T/m3
- Minyak Tanah D7 0.80 T/m3
- Latasbusir D8 2.20 T/m3
II. URUTAN KERJA
1. BAHAN
2 ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1 0.45 menit lihat tabel
V - loading
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : Asphalt Finisher Q5 3,137.40 M2
Produksi / hari = Tk x Q5 Qt 21,961.80 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0064 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0003 Jam
I. ASUMSI
1. BAHAN
2 ALAT
3. TENAGA
I. ASUMSI
1 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km
2 Jam kerja efektif per-hari Tk 7.00 Jam
3 Kandungan Bitumen dalam Bunker Oil (BO) Bbo 80.00 %
4 Kandungan Bitumen dalam Aspal Semen Bas 100.00 %
5 Kandungan Bitumen dalam Kerosene Bk 0.00 %
6 Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO) Bo 47.00 % Total Modifier
- Aspal Semen Asp 38.00 % Total Modifier
- Minyak Tanah Mt 15.00 % Total Modifier
- Bahan Anti Stripping (umumnya tidak digunakan) As 0.00 % Total Modifier
7 Berat Isi bahan : - Modifier D1 0.99 T/m3
- Bunker Oil (BO) D2 0.97 T/m3
- Aspal Semen D3 1.03 T/m3
- Minyak Tanah D4 0.80 T/m3
8 Penyiapan Peremaja dilaksanakan di Base Camp
1. BAHAN
1.a Bunker Oil (BO) = (1000:Bit) x Bp1 x 1.01 : D2 (M54) 647.3300 Liter
1.b Aspal Semen = (1000:Bit) x Bp2 x 1.01 (M10) 507.6720 Kg
1.c Minyak Tanah = (1000:Bit) x Bp3 x 1.01 : D3 (M11) 250.4960 Liter
2 ALAT
3. TENAGA
Produksi menentukan : Liquid Asphalt Mixer Q1 1.26 Ton
Produksi / hari = Tk x Q1 Qt 8.85 Ton
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.4 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lasbutag TOTAL HARGA (Rp.) : 11,151.51
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.4 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Latasbusir Kelas A TOTAL HARGA (Rp.) : 5,480.77
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.4 (3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Latasbusir Kelas B TOTAL HARGA (Rp.) : 7,408.55
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja (L01) Jam 0.0064 4,532.31 28.89
2. Mandor (L02) Jam 0.0003 7,156.29 2.28
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.4 (4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Bitumen Asbuton TOTAL HARGA (Rp.) : 1,832,187.50
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0.08
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA PERALATAN 0.00
Analisa EI-645
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 6.4 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Bitumen Bahan Peremaja TOTAL HARGA (Rp.) : 6,226,189.55
SATUAN PEMBAYARAN : Ton % THD. BIAYA PROYEK : 0.28
A. TENAGA
B. BAHAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 456.0 Kg/M3 Berdasarkan
: Pasir Ps 637.0 Kg/M3 JMF & sesuai
: Agregat Kasar Kr 992.0 Kg/M3 dgn Spesifikasi
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5145 M3 669
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3 1,042
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.4000 M3
1.e. Paku (M18) 3.2000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Beton K-350 TOTAL HARGA (Rp.) : 1,394,103.20
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.06
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.8072 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 1,394,103.20 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 350 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 456.0 Kg/M3 Berdasarkan
: Pasir Ps 631.0 Kg/M3 JMF & sesuai
: Agregat Kasar Kr 992.0 Kg/M3 dgn Spesifikasi
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 469.680 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5097 M3 663
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3 1,042
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Beton K-300 TOTAL HARGA (Rp.) : 1,104,297.86
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 1,104,297.86 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 340 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
9 Perbandingan Camp. : Semen Sm 410.0 Kg/M3 Berdasarkan
: Pasir Ps 670.0 Kg/M3 JMF & sesuai
: Agregat Kasar Kr 992.0 Kg/M3 dgn Spesifikasi
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 422.300 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5412 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.7440 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.2000 M3
1.e. Paku (M18) 1.6000 Kg
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 600.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 3.00 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Beton K-250 TOTAL HARGA (Rp.) : 1,070,952.31
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 69.72 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0000 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.1044 jam
- Pekerja = (Tk x P) : Qt (L01) 0.8032 jam
Rp. 1,070,952.31 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 300 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 327.540 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5024 M3 653.10
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3 1,267.35
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.1000 M3
1.e. Paku (M18) 0.8000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (6) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Beton K-175 TOTAL HARGA (Rp.) : 784,713.63
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.04
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3655 jam
Rp. 784,713.6 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (7) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Beton Siklop K175 TOTAL HARGA (Rp.) : 660,314.12
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.03
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 300 Kg/M3 K-175
1. BAHAN
1.a. Semen (PC) = Sm x 0.7 x 1.03 (M12) 229.278 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 0.7 x 1.05 (M01) 0.3517 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 0.7 x 1.05 (M03) 0.6337 M3
1.d. Batu Belah = {(Kr/1000 x D1) : D4} x 0.30 * 1.05 (M06) 0.6518 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6827 jam
- Pekerja = (Tk x P) : Qt (L01) 8.1928 jam
Rp. 660,314.1 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 250 Kg/M3
1. BAHAN
1.a. Semen (PC) = Sm x 1.03 (M12) 311.060 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.05 (M01a) 0.5113 M3
1.c. Kerikil Pecah = (Kr/1000 : D4) x 1.05 (M03) 0.9053 M3 Agregat Kasar
1.e. Kayu Perancah (M19) 0.0500 M3
1.f Paku (M18) 0.4000 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (8) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Beton K125 TOTAL HARGA (Rp.) : 702,000.45
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.03
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3655 jam
Rp. 702,000.4 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 200.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0350 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0350 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.1050 jam
Rp. 11,330.10 / Kg
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Baja Tulangan 24 Polos TOTAL HARGA (Rp.) : 11,330.10
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25 % Spec.
: - Volume Pasir Ps 75 % Spec.
7 Perbandingan Batu & Mortar :
- Batu Bt 65 %
- Mortar (campuran semen & pasir) Mr 35 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.30 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1700 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.1225 M3
x {D5 x (1000)} (M12) 176.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.5088 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts 17.00 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.9 PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pasangan Batu TOTAL HARGA (Rp.) : 553,666.41
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.03
A. TENAGA
B. BAHAN
C. PERALATAN
3. TENAGA
Produksi menetukan : Produksi Concrete Mxer Q1 1.465 M3/Jam
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Qt 10.25 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Batu Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 5.4618 jam
Rp. 553,666.41 / M3
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 2.50 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
3. TENAGA C.
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan : 1.
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 3.00 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
3. TENAGA C.
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan : 1.
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 3.50 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
3. TENAGA C.
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan : 1.
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 4.00 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.45 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
3. TENAGA C.
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan : 1.
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 2.50 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.40 M
7 Banyak Galian pada Caison / M' Vt 4.91 M3
8 Faktor pengembangan bahan Fk 1.20 -
NO.
II. URUTAN KERJA
1 Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck A.
2 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh Lb 2.00 Km 1.
2
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT B.
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 5.66 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 194.52 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 3.00 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 7.07 M3
8 Faktor pengembangan bahan Fk 1.20 -
NO.
II. URUTAN KERJA
1 Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck A.
2 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh Lb 2.00 Km 1.
2.
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT B.
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.93 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 194.52 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 3.50 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 9.62 M3
8 Faktor pengembangan bahan Fk 1.20 -
NO.
II. URUTAN KERJA
1 Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck A.
2 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh Lb 2.00 Km 1.
2.
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT B.
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.61 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 243.15 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
PROYEK
I. ASUMSI No. PAKET KONT
1 Pekerjaan dilakukan secara mekanik/manual NAMA PAKET
2 Lokasi pekerjaan : sekitar jembatan PROP / KAB / KO
3 Diameter bagian luar Caison d 4.00 M ITEM PEMBAYAR
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 Km JENIS PEKERJAA
5 Jam kerja efektif per-hari Tk 7.00 Jam SATUAN PEMBA
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 12.57 M3
8 Faktor pengembangan bahan Fk 1.20 -
NO.
II. URUTAN KERJA
1 Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck A.
2 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh Lb 2.00 Km 1.
2.
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT B.
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.75 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 2.08 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 183.09 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 14.00 orang
- Mandor M 1.00 orang
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3 D.
Faktor bucket Fb 0.85 - E.
Faktor efisiensi alat Fa 0.83 - F.
Waktu Siklus Ts1 G.
- Muat T1 0.55 menit Note: 1
- Lain lain T2 1.00 menit
Ts1 1.55 menit 2
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja = (Tk x P) : Qt (L01) 1.4056 jam
Rp. 1.00 / M2
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 4,481,000.36
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.21
TENAGA
BAHAN
PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 5,420,046.69
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.25
TENAGA
BAHAN
PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 6,379,016.40
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.29
TENAGA
BAHAN
PERALATAN
Analisa EI-774
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 8,015,583.29
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.37
TENAGA
BAHAN
PERALATAN
Analisa EI-775
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 221,169.66
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.01
TENAGA
BAHAN
PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (6) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 288,254.15
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.01
TENAGA
BAHAN
PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (7) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 343,065.30
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.02
TENAGA
BAHAN
JUMLAH HARGA BAHAN 0.00
PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.7 (8) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, TOTAL HARGA (Rp.) : 546,983.87
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.03
TENAGA
PERALATAN
PROYEK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.16.1 PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Jalan Beton TOTAL HARGA (Rp.) : 1,118,735.17
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.05
TENAGA
Pekerja (L01) jam 1.4056 4,532.31 6,370.72
Tukang (L02) jam 0.7028 5,963.57 4,191.27
Mandor (L03) jam 0.1506 7,156.29 1,077.75
BAHAN
Semen (M12) Kg 410.0000 550.93 225,879.25
Pasir (M01a) M3 0.6237 96,600.00 60,246.82
Agregat Kasar (M03) M3 0.7885 210,171.86 165,724.27
Baja Tulangan Polos (M39a) Kg 15.8750 8,500.00 134,937.50
Joint Sealent (M94) Kg 0.9900 34,100.00 33,759.00
Cat Anti Karat (M95) Kg 0.0200 35,750.00 715.00
Expansion Cap (M96) M2 0.1700 6,050.00 1,028.50
Polytene 125 mikron (M97) Kg 0.4375 19,250.00 8,421.88
Curing Compound (M98) Ltr 0.8700 38,500.00 33,495.00
Multiplex 12 mm (M73) Lbr 0.1600 181,500.00 29,040.00
Kayu Acuan (M99) M3 0.0960 1,250,000.00 120,000.00
Paku (M18) Kg 1.0240 5,500.00 5,632.00
Additive (M67a) Ltr 0.9139 38,500.00 35,185.92
JUMLAH HARGA BAHAN 854,065.13
PERALATAN
Wheel Loader E15 jam 0.0244 266,795.62 6,512.85
Batching Plant E43 jam 0.0502 478,489.26 24,020.55
Truck Mixer E49 jam 0.2437 464,251.69 113,145.49
Con. Vibrator E20 jam 0.0502 18,228.49 915.08
Water Tank Truck E23 jam 0.0211 161,074.00 3,396.14
Conc. Paver E42 jam 0.0074 448,693.06 3,337.00
Alat Bantu Ls 1.0000 0.00 0.00
0.025
ITEM PEMBAYARAN NO. : 8.1 (1) Analisa EI-811
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk Pek. Minor
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 42.00 % memenuhi Spec.
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat A = 1 M3 x (Bip/Bil) x Fh (M26) ### M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit panduan
TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 25.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2124 jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274 jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 117.71 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 823.99 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1274 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0085 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Faktor kehilangan material Agregat Fh 1.10 -
7 Komposisi campuran (taksiran) :
- Agregat Kasar Ak 85.00 %
- Agregat Halus Ah 15.00 %
8 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
9 Berat isi padat Bip 1.81
10 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Menunggu, dan lain lain T1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 98.09 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 686.66 M3
Kebutuhan tenaga :
- Pekerja P 16.00 orang
- Mandor M 1.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1631 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0102 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal Lapis Hotmix padat untuk patching t 0.04 M Rata-rata
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran ATB :
- Coarse Agregat CA 55.00 % Gradasi harus -
- Fine Agregat FA 37.50 % memenuhi -
- Fraksi Filler FF 1.00 % Spesifikasi
- Asphalt minimum 6 % As 6.50 %
9 Berat jenis bahan :
- ATB D1 2.30 ton / M3
- Coarse Agregat & Fine Agregat D2 1.80 ton / M3
- Fraksi Filler D3 2.00 ton / M3
- Asphalt D4 1.03 ton / M3
10 Jarak stock pile ke cold bin l 100.00 m
11 Faktor kembang Fk 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju (ke bin) Vf 15.00 km/jam
Kecepatan kembali (ke stock pile) Vr 20.00 km/jam
Waktu Siklus Ts1
- Muat = l x 60 + l x 60 T1 0.70 menit
- Lain lain 1000 x Vf 1000 x Vr T2 0.75 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : AMP Q6 18.04 M3 / Jam
Produksi ATB / hari = Tk x Q6 Qt 126.30 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 1.1084 Jam
- Mandor = (Tk x M) / Qt (L03) 0.1108 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3 (As1 : t)
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : Ts1
- Memuat T1 0.50 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.30 menit
- Tunggu, dll. T4 0.20 menit
Ts1 2.00 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 10.375 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 72.63 M3
Kebutuhan tenaga : - Mandor M 2.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1928 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1566 jam
Rp. 1,219,159.14 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 % 100 bagian
- Minyak Fluk / Pencair K 13.00 % 15 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Kapasitas pompa aspal pas 55.00 liter/menit
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 3,012.90 liter
Produksi / hari = Tk x Q1 Qt 21,090.30 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat jenis bahan (lepas) D 1.60 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 2.00 menit
Ts2 47.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 jam
- Mandor = (Tk x M) : Qt (L03) 0.1000 jam
Rp. 73,130.07 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang/baik
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor pengembangan bahan Fk 1.20 -
7 Tebal hamparan padat t 0.15 M
8 Hasil bongkaran per M2 luas area d 0.50 ton
1. BAHAN
1a Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit
2. ALAT
2.a DUMP TRUCK (E09)
Kapasitas bak V 10.00 ton
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/jam
Kecepatan rata-rata kosong v2 30.00 KM/jam
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit T1 26.18 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 17.45 menit
- Lain-lain (termasuk dumping setempat-setempat) T3 2.00 menit
Ts2 45.63 menit
Kap. Prod. / jam = V x Fa x 60 Q2 21.83 M2
Ts2 x d
Koefisien Alat / M3 = 1 : Q2 (E09) 0.0458 jam
TENAGA
Produksi pembersihan dan pembongkaran/hari Qt 500.00 M2 asumsi
Kebutuhan tenaga :
- Pekerja P 5.00 orang
- Mandor M 1.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0700 jam
- Mandor = (Tk x M) : Qt (L03) 0.0140 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 30-50 cm setara dengan volume Vp 3.00 M3
6 Berat Jenis Kayu BjK 0.90 ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 TON
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts 55.00
3. TENAGA
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter 50 - 75 cm setara dengan volume Vp 5.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 10.00 menit
Ts2 55.00
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 3.5000 jam
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
I. ASUMSI
1 Menggunakan tenaga pekerja/peralatan
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 1 Pohon diameter > 75 cm setara dengan volume Vp 10.00 M3
6 Berat jenis kayu Bjk 0.90 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. DUMP TRUCK (E09)
Kapasitas bak V 10.0 ton
Faktor efisiensi alat Fa 0.83
Kecepatan rata-rata bermuatan v1 20.00 Km/Jam
Kecepatan rata-rata kosong v2 30.00 Km/Jam
Waktu siklus Ts2 menit
- Muat T1 35.00 menit
- Waktu tempuh isi = (L : v1) x 60 T2 6.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 4.00 menit
- Lain-lain T4 15.00 menit
Ts 60.00 menit
3. TENAGA
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 4.6667 jam
- Mandor = (Tk x M) : Qt (L03) 0.4667 jam
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
1. BAHAN
1.a. Gebalan Rumput = 1 M2 x Fh (M32) 1.1000 M2
2. ALAT
2.a. ALAT BANTU
- Gerobak Dorong = 2 buah
- Tusuk Bambu = 5 buah / M2
- Pagar Tali = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1400 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2800 jam
Rp. 7,100.38 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
1. BAHAN
1.a. - Semak/perdu (M32) 1.10 M2
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.25 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 6,879.96 / M2
I. ASUMSI
1 Menggunakan tenaga pekerja
2 Lokasi pekerjaan : di sepanjang jalan
3 Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
4 ukuran lubang 0,5 x 0,5 x 0,5 m
1. BAHAN
1.a. - pohon (M32) 1.00 bh
1.b. - Tanah humus setebal 20 cm mxx 0.22 m3
1.c. - Pupuk mxx 0.50 kg
2. ALAT
2.a. ALAT BANTU
- Pacul/sekop = 4 buah
- Gerobak Dorong = 1 buah
- Pagar Bambu/kayu = sesuai kebutuhan
3. TENAGA
Produksi penanaman rumput dalam 1 hari Qt 100.00 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 0.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0700 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0000 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4200 jam
Rp. 6,494.96 / bh
1. BAHAN
- Beton K300 0.22 m3
- Baja tulangan (bila diperlukan) kg
2. ALAT
2.a. COMPRESSOR, JACK HAMMER & LOADER (E05/26/10/15)
Produksi per jam Q1 7.50 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 7.50 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 52.50 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.6000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1333 Jam
Rp. 66,803.50 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
MATA PEMBAYARAN NO. : 8.1 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk - TOTAL HARGA (Rp.) : 388,883.32
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
MATA PEMBAYARAN NO. : 8.1 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk - TOTAL HARGA (Rp.) : 358,718.70
SATUAN PEMBAYARAN : M3 Pek. Minor % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup AspTOTAL HARGA (Rp.) : 337,954.39
% THD. BIAYA PROYEK : 0.02
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. - TOTAL HARGA (Rp.) : 296,327.81
SATUAN PEMBAYARAN : M3 Minor % THD. BIAYA PROYEK : 0.01
A. TENAGA
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) : 1,918,874.99
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.09
A. TENAGA
1. Pekerja Biasa (L01) Jam 1.1084 4,532.31 5,023.77
2. Mandor (L03) Jam 0.1108 7,156.29 793.23
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301 266,795.62 8,042.32
2. AMP E01 Jam 0.0554 4,886,762.12 270,832.60
3. Genset E12 Jam 0.0554 288,170.35 15,970.89
4. Dump Truck E09 Jam 0.4358 337,926.64 147,252.55
5. Pedestrian Roller E24 Jam 0.1975 64,559.15 12,751.16
6. Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor TOTAL HARGA : 1,194,059.09
SATUAN PEMBAYARAN : M3 (Perata) % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (8) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Minor TOTAL HARGA : 1,219,159.14
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.06
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.1 (9) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Residu Bitumen Untuk Pek.Minor TOTAL HARGA : 7,396.38
SATUAN PEMBAYARAN : LITER % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.2 (1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Galian untuk Bahu Jalan & Pek. Minor Lain TOTAL HARGA (Rp.) : 73,130.07
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
MATA PEMBAYARAN NO. : 8.2 (2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pembersihan dan Pembongkaran Tanaman TOTAL HARGA (Rp.) : 43,887.00
SATUAN PEMBAYARAN : M2 (diameter < 30 cm) % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.2 (3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penebangan Pohon, diameter 30 - 50 CM TOTAL HARGA (Rp.) : 131,048.59
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.2 (4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penebangan Pohon, diameter 50 - 75 CM TOTAL HARGA (Rp.) : 204,944.60
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.01
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.2 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Penebangan Pohon, diameter > 75 CM TOTAL HARGA (Rp.) : 430,008.57
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.02
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.3.(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Stabilisasi Dengan Tanaman TOTAL HARGA (Rp.) : 7,100.38
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa LI-832
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa LI-833
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-851
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Compressor E05 Jam 0.1333 111,049.38 14,806.58
2. Jack Hammer E26 Jam 0.1333 16,089.36 2,145.25
3. Wheel Loader E15 Jam 0.1333 266,795.62 35,572.75
4. Alat bantu Ls 1.0000 0.00 0.00
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.015 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Thermoplastic = C x R x (BJ.Cat) (M17b) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg Spec.10.4.3(2)(e)
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Rp. 114,811.23 / M2
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Material Fh 1.05 -
7 Tebal lapisan cat secara manual t 0.0038 M Spec.10.4.3(2)(d)
8 Berat Jenis Bahan Cat BJ.Cat 1.00 Kg/Liter
9 Perbandingan pemakaian bahan : - Cat C 65 %
- Thinner T 35 %
II. URUTAN KERJA
1 Permukaan jalan dibersihkan dari debu/kotoran
2 Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
3 Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
1. BAHAN
1.a. Cat Marka Non Thermoplastic = C x R x (BJ.Cat) (M17a) 1.9500 Kg
1.b. Minyak Pencair (Thinner) = TxR (M33) 1.0500 Liter
1.c. Blass Bead (M34) 0.4500 Kg Spec.10.4.3(2)(e)
2. ALAT
2.a. COMPRESSOR (E05)
Kapasitas penyemprotan V 40.00 Ltr/Jam
Jumlah cat cair = (1 M x 1 M) x t x 1000 R 3.00 Ltr/M2
3. TENAGA
Produksi pekerjaan per hari = Q1 x Tk Qt 93.33 M2
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Cat Tb 3.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M2 :
- Mandor = ( M x Tk ) : Qt (L03) 0.0750 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.2250 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.6000 jam
Rp. 104,086.23 / M2
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 139.4 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7743 jam
1. BAHAN
1.a. Pelat Rambu Jadi (Engineering Grade) (M35a) 2.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 139.4 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.9292 jam
1. BAHAN
1.a. Pelat Rambu Jadi (High Intensity Grade) (M35b) 1.00 BH
1.b. Pipa Galvanis Dia.1,6" (M24) 1.00 Batang
1.c. Beton K-175 (M60) 0.016 M3
1.d. Cat, dan bahan lainnya - 1.0000 Ls
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 30.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 2.5 menit / buah T3 37.5 menit
- Lain-lain = geser, atur, tunggu, dll. T4 30.0 menit
Ts 139.4 menit
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7743 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
3. TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1 Qt 45.20 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 3.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1549 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4646 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7743 jam
4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 20.0 Buah
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus : Ts
- Memuat = atur, ikat, dll. T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 menit T2 41.9 menit
- Menurunkan = Rata-rata 1 menit / buah T3 20.0 menit
- Lain-lain = geser, atur, tunggu, dll. T4 10.0 menit
Ts 91.9 menit
3. TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1 Qt 75.88 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0922 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3690 jam
- Pekerja = (Tk x P) : Qt (L01) 0.7380 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 94.4 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1049 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2097 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5243 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas 1 kali Angkut Cp 15.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 22.5 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 94.4 menit
3. TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1 Qt 66.75 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1049 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2097 jam
- Pekerja = (Tk x P) : Qt (L01) 0.5243 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar rel pengaman diterima di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 Km ukuran
5 Jam kerja efektif per-hari Tk 7.00 jam sesuai
6 Faktor kehilangan bahan Fh 1.00 - drawing
7 Tulangan praktis Rc 50.00 Kg/Cu.m
II. URUTAN KERJA
1 Kesatuam pondasi, pelat dan tiang rambu disiapkan dan
dipasang ditempat yang telah ditentukan
2. ALAT
2,a DUMP TRUCK (E08) (E08)
Kapasitas 1 kali Angkut Cp 15.0 M'
Waktu Siklus : Ts
- Memuat T1 50.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan T3 60.0 menit
- Lain-lain T4 30.0 menit
Ts 181.9 menit
3. TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1 Qt 34.64 M'
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M' :
- Mandor = (Tk x M) : Qt (L03) 0.2021 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.4042 jam
- Pekerja = (Tk x P) : Qt (L01) 1.6167 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar paku jalan diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar mata kucing diterima di lokasi pekerjaan
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
3. TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1 Qt 20.00 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.3500 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7000 jam
- Pekerja = (Tk x P) : Qt (L01) 1.7500 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pracetak) dicetak di base camp dan
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 125.00 Kg/M3
2. ALAT
2.a. FLAT BED TRUCK
Kapasitas 1 kali Angkut Cp 20.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 33.38 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 30.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 93.4 menit
3. TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1 Qt 89.96 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 5.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0778 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1556 jam
- Pekerja = (Tk x P) : Qt (L01) 0.3891 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan frontage
3 Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
2. ALAT
2.a. TAMPER (E25)
Kecepatan V 0.60 Km / Jam
Efisiensi alat Fa 0.83 -
Lebar pemadatan Lb 0.40 M
Banyak lintasan n 4 lintasan
Tebal lapis hamparan rata-rata tp 0.05 M
0.0000
3. TENAGA 0.24825
Produksi paving block / hari = Tk x Q1 Qt 348.60 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 4.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.0201 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.0803 jam
- Pekerja = (Tk x P) : Qt (L01) 0.1205 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Tulangan praktis Rc 100.00 Kg/M3
2. ALAT
2.a. DUMP TRUK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 40.06 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1748 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3495 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3980 jam
0.0000
0.24825
ITEM PEMBAYARAN NO. : 8.7(3) Analisa EI-873
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
SATUAN PEMBAYARAN : Buah URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 83.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 40.06 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1748 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3495 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3980 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 10.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 15.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 86.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 48.34 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1448 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2896 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1584 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.10 -
Instalasi jaringan induk telah tersedia
2. ALAT
2.a. FLAT BED TRUCK (E08)
Kapasitas 1 kali Angkut Cp 8.0 Buah
Waktu Siklus : Ts
- Memuat = muat, atur, ikat, dll T1 20.0 menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 41.88 menit
- Menurunkan = Rata-rata 1.5 menit / buah T3 12.0 menit
- Lain-lain = geser, tunggu, dll T4 10.0 menit
Ts 83.9 menit
3. TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1 Qt 40.06 Buah
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / Bh :
- Mandor = (Tk x M) : Qt (L03) 0.1748 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3495 jam
- Pekerja = (Tk x P) : Qt (L01) 1.3980 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian corbon steel
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Carbon Steel Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Carbon Steel Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = (L : V) x 60 T2 13.09 menit
- Kembali V=60 Km/jam = (L : V) x 60 T3 8.73 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 101.81 menit
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 123.76 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0566 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1131 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2263 jam
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar pagar pemisah pedestrian galvanised
seluruhnya diterima di base camp
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan bahan Fh 1.05 -
7 Pipa Galvanis Dia 3" = (3x2)+(1.4x2) m / 3 M V1 2.93 M
8 Pipa Galvanis Dia 1,5" = (1.0 x 20) / 3 M V2 6.67 M
2. ALAT
2.a. Flat Bed Truck (E11)
Kapsitas Bak Cp 30.00 M
Waktu Siklus : Ts
- Memuat = atur, ikat dll rata-rata 5 menit/m T1 50.00 menit
- Angkut V=40 Km/jam = Lef x V x 60 T2 13.09 menit
- Kembali V=60 Km/jam = Lef x V x 60 T3 8.73 menit
- Menurunkan = Rata-rata 2.5 menit/m T4 25.00 menit
- Lain-lain = geser, atur, tunggu dll T5 5.00 menit
Ts 101.81 menit
Kap. Prod. / Jam Cp Q1 17.6796 M
Ts : 60
3. TENAGA
Produksi penanaman rumput / hari = Tk x Q1 Qt 123.76 M2
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Las Tb 2.00 orang
- Pekerja P 4.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0566 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1131 jam
- Pekerja = (Tk x P) : Qt (L01) 0.2263 jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Marka Jalan Termoplastik TOTAL HARGA (Rp.) : 114,811.23
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.01
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Marka Jalan Bukan Termoplastic TOTAL HARGA (Rp.) : 104,086.23
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(4) .(a) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Rambu Jalan Tunggal dengan Permukaa
TOTAL HARGA (Rp.) : 456,289.31
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(4) .(b) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Rambu Jalan Ganda dengan Permukaan
TOTAL HARGA (Rp.) : 694,439.31
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.03
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-845
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Patok Pengarah TOTAL HARGA (Rp.) : 97,393.33
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(6) .(a) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Patok Kilometer TOTAL HARGA (Rp.) : 329,572.40
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(6) .(b) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Patok Hektometer TOTAL HARGA (Rp.) : 151,213.16
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.01
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(7) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Rel Pengaman TOTAL HARGA (Rp.) : 618,998.48
SATUAN PEMBAYARAN : M' % THD. BIAYA PROYEK : 0.03
A. PEKERJA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(8) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Paku Jalan TOTAL HARGA (Rp.) : 71,558.78
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.00
B. BAHAN
C. PERALATAN
Analisa EI-849
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(9) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Mata Kucing TOTAL HARGA (Rp.) : 148,008.78
SATUAN PEMBAYARAN : BH % THD. BIAYA PROYEK : 0.01
B. BAHAN
C. PERALATAN
Analisa EI-8410
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4 (10) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Kerb Pracetak TOTAL HARGA (Rp.) : 118,858.59
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK : 0.01
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.4.(12) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Perkerasan Blok Beton pada Trotoar d TOTAL HARGA (Rp.) : 10,096.95
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK : 0.00
A. TENAGA
1. Pekerja Biasa (L01) jam 0.02 4,532.31 91.01
2. Tukang (L02) jam 0.08 5,963.57 479.00
3. Mandor (L03) jam 0.12 7,156.29 862.20
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.6(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Kerb Pracetak Pemisah Jalan (ConcreteTOTAL HARGA (Rp.) : 612,445.90
SATUAN PEMBAYARAN : M % THD. BIAYA PROYEK : 0.03
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.7(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) : 22,896,888.29
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 1.05
A. TENAGA
B. BAHAN
1 Tiang lampu type tunggal, Lighting Pol buah 1.00 15,665,000.00 15,665,000.00
2 Lampu sodium 250 watt buah 1.00 249,286.00 249,286.00
3 Kabel type m1 15.00 7,840.00 117,600.00
4 Beton K 250 M3 0.72 973,593.01 700,986.97
5 Reinforcing Steel deform = 56 x 1.05 Kg 58.80 14,562.50 856,275.00
6 MCB,1P, 16 A buah 1.00 36,400.00 36,400.00
7 Plat besi = 0.009x0.4x0.4x7850 M3 0.72 18,750.00 13,500.00
8 Copper Rod = 22/7 x(0.007)^2 x 1 x 78 Kg 1.21 4,480.00 5,420.80
9 Pipa PVC dia 3" M3 15.00 40,464.00 606,960.00
10 Bekisting buah 1.00 2,508,000.00 2,508,000.00
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.7(2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda TOTAL HARGA (Rp.) : 1,198,338.42
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.05
A. TENAGA
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.7(3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) : 1,175,714.50
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
1. Beton K-300 M3 1.00 1,003,907.14 1,003,907.14
2. Besi Tulangan (Ulir) U 32 (M39)b Kg 1.00 9,000.00 9,000.00
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.7(4) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda TOTAL HARGA (Rp.) : 1,198,338.42
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.7(5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Unit lampu penerangan jalan tunggal TOTAL HARGA (Rp.) : 1,175,714.50
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.7(6) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Unit lampu penerangan jalan ganda TOTAL HARGA (Rp.) : 1,198,338.42
SATUAN PEMBAYARAN : Buah % THD. BIAYA PROYEK : 0.05
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.8(1) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Carbon SteeTOTAL HARGA (Rp.) : 320,626.72
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.01
A. TENAGA
B. BAHAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 8.8(2) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Pagar Pemisah Pedestrian Galvanised TOTAL HARGA (Rp.) : 503,886.72
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : 0.02
A. TENAGA
B. BAHAN
C. PERALATAN
1. Flat Bed Truck E11 Jam 0.0566 330,875.08 18,715.12
2. Welding Set E32 Jam 3.7091 63,095.33 234,028.68
3 Alat Bantu Ls 1.0000 0.00 0.00
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
A. URAIAN PERALATAN
E. LAIN - LAIN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (1)
JENIS PEKERJAAN : Pemeliharaan Rutin Perkerasan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 2.83
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (2)
JENIS PEKERJAAN : Pemeliharaan Rutin Bahu Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 1.47
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (3)
JENIS PEKERJAAN : Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 1.91
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (4)
JENIS PEKERJAAN : Pemeliharaan Rutin Perlengkapan Jalan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 0.54
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK :
NAMA PAKET :
PROPINSI :
ITEM PEMBAYARAN NO. : 10.1 (5)
JENIS PEKERJAAN : Pemeliharaan Rutin Jembatan
SATUAN PEMBAYARAN : Lump Sum / Bulan % THD. BIAYA PROYEK : 2.86
A. TENAGA
B. BAHAN
C. PERALATAN
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
II. PEKERJA
III. BAHAN
IV. ALAT
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis agregat padat t 0.15 M
6 Jam kerja efektif per-hari Tk 7.00 jam
7 Berat isi padat Bip 1.81 ton/m3
8 Berat volume agregat (lepas) Bil 1.51 ton/m3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Mencampur T1 1.00 menit
- Memuat dan lain-lain T2 0.45 menit
Ts1 1.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 76.81 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 537.66 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1953 jam
- Mandor = (Tk x M) : Qt (L03) 0.0130 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.A Analisa EI-10A
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk Pek. Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal Lapis Hotmix padat t 0.04 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.05 -
- Aspal Fh2 1.03 -
8 Berat isi padat Bip 1.81 ton/m3
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
10 Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm 5-10&10-15 44.70 % Gradasi harus -
- Agregat Pecah Mesin 0 - 5 mm 0-5 48.00 % memenuhi -
- Semen FF 1.90 % Spesifikasi
- Asphalt As 5.40 %
11 Berat Isi bahan :
- AC-WC D1 2.32 ton / M3
- Agr Pch Mesin 5 - 10 & 10 - 15 mm D2 1.42 ton / M3
- Agr Pch Mesin 0 - 5 mm D3 1.57 ton / M3
11 Jarak Stock pile ke Cold Bin l 50.00 m
1. BAHAN
1.a. Agr 5-10 & 10-15 = ("5-10 & 10-15" x (D1 x tM3) x Fh1) : D2 (M92) 0.0307 M3
1.b. Agr 0-5 = ("0-5" x (D1 x tM3) x Fh1) : D3 (M91) 0.0298 M3
1.c. Semen = (FF x (D1 x tM3) x Fh1) x 1000 (M05) 1.8514 Kg
1.d. Aspal = (AS x (D1 x tM3) x Fh2) x 1000 (M10) 5.1615 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju Vf 15.00 km/jam
Kecepatan kembali Vr 20.00 km/jam
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75 Ts1 1.10 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.B Analisa EI-10B
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan : DUMP TRUCK Q4 0.94 M3 / Jam
Produksi ATB / hari = Tk x Q4 Qt 6.57 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 10.6506 Jam
- Mandor = (Tk x M) / Qt (L03) 2.1301 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2 Tabel 6.6.4.
- Agregat Pengunci Ap 25.00 Kg/M2 Tabel 6.6.4.
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2 Tabel 6.6.4.
As2 94.55 Kg/M3 (As1 : t)
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit Lihat panduan
Ts1 0.45 menit
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.C Analisa EI-10C
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Rutin
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1701 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM Spec. 6.5.2 (2)
- Kadar Aspal terhadap berat total campuran As 4.50 % Tabel 6.5.3 (1)
- Tebal nominal padat t 0.04 M Tabel 6.5.3 (1)
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1997 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 90.4500 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts1
- Memuat T1 5.00 menit
- Mengaduk T2 3.50 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts1 13.50 menit
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 1.844 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 12.91 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5422 jam
- Pekerja = (Tk x P) : Qt (L01) 6.5060 jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 10.D Analisa EI-10D
JENIS PEKERJAAN : Camp. Aspal Dingin Utk.Pek.Rutin
SATUAN PEMBAYARAN : 10.D URAIAN ANALISA HARGA SATUAN
Lanjutan
Rp. 1,479,813.05 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 % 100 bagian
- Minyak Fluk / Pencair K 13.00 % 15 bagian
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Pencair D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter campuran
2. ALAT
2.a. APHALT SPRAYER (E03)
Kapasitas alat V 850.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu Siklus (termasuk proses pemanasan) Ts 2.00 Jam
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 352.75 liter
Produksi / hari = Tk x Q1 Qt 2,469.25 liter
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
7,45 km 7,45 km
PETA LOKASI QUARRY
Medan Kisaran Kisaran - Sp. Kawat Sp. Kawat
km 000+000 Km 158+000 Km 172+900
5,00 km ke Tanjung
10,00 km Balai
ke Rantau Prapat
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 25,750.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 383,252.01
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 337,926.64
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 19,500.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 383,252.01
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 337,926.64
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3 9,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 383,252.01
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 337,926.64
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam 266,795.62
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam 4,532.31
9 Berat volume batu belah Bil 1.60 ton/m3
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M06 - Batu Belah
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 2,446.51 Rupiah
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3 8,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 383,252.01
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 337,926.64
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M07 - Gravel
Lokasi : Quarry
Tujuan : Base Camp
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 17,500.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 383,252.01
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 337,926.64
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 18,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 383,252.01
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 337,926.64
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : M44 - Pasir Urug
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 7.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 20,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 383,252.01
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam 337,926.64
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
Bersambung
2 Handling - - -
Bahan : Aspal
BIAYA
No. URAIAN KO HP KAP. HARGA SEWA
DE ALAT ALAT/JAM
(di luar PPN)
###
A. URAIAN PERALATAN E41
1. Jenis Peralatan ROCK DRILL BREAKER E36
2. Tenaga Pw 3.0 HP ###
3. Kapasitas Cp - - ###
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ###
c. Harga Alat B 900,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 - ###
(1 + i)^A - 1 Kondisi Alat
3. Biaya Pasti per Jam : Nilai B' dari
a. Biaya Pengembalian Modal = (B-C)xD E 107,596.11 Rupiah Depresiasi
W
###
b. Asuransi, dll = 0.002 x B F 1,200.00 Rupiah E42
W ###
###
Biaya Pasti per Jam = (E+F) G 108,796.11 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 2,946.76 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 810.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 52,500 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 105,000.00 Rupiah Kondisi Alat
perbaikan W Nilai B' dari
4. Operator = ( 1 Orang / Jam ) x U1 L 4,054.29 Rupiah Depresiasi
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 10,748.57 Rupiah
###
Biaya Operasi per Jam = (H+I+K+L+M) P 176,059.61 Rupiah E43
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 284,855.73 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam ###
4. Bahan Bakar Bensin Mb 5,833.80 Liter ###
5. Bahan Bakar Solar Ms 6,548.35 Liter ###
6. Minyak Pelumas Mp 18,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
Kondisi Alat
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan COLD RECYCLER E38
2. Tenaga Pw 900.0 HP ###
3. Kapasitas Cp 2,200 M ###
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 19,500,000,000 Rupiah ###
5. ###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 1,950,000,000 Rupiah Kondisi Alat
Nilai B' dari
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - Depresiasi
(1 + i)^A - 1
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 2,617,718.97 Rupiah E45
W ###
###
b. Asuransi, dll = 0.002 x B F 19,500.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 2,637,218.97 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 884,027.25 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 243,000.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 853,125 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
3. Perawatan dan = (12,5 % - 17,5 %) x B K 1,218,750.00 Rupiah
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 4,054.29 Rupiah E46
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 10,748.57 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 3,213,705.11 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 5,850,924.08 Rupiah ###
###
###
E. LAIN - LAIN ###
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam ###
4. Bahan Bakar Bensin Mb 5,833.80 Liter ###
5. Bahan Bakar Solar Ms 6,548.35 Liter ###
6. Minyak Pelumas Mp 18,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi Kondisi Alat
Biaya Pekerjaan Nilai B' dari
Depresiasi
###
B. BIAYA PASTI PER JAM KERJA E
1. Nilai Sisa Alat = 10 % x B C 39,500,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 53,025.59 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 395.00 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 53,420.59 Rupiah ###
###
C. BIAYA OPERASI PER JAM KERJA > 15th ?
Kondisi Alat
1. Bahan Bakar = (12%-15%) x Pw x Ms H 112,959.04 Rupiah Nilai B' dari
Depresiasi
###
E
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 133,714,286 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 158,995.12 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,337.14 Rupiah ###
W ###
###
Biaya Pasti per Jam = (E+F) G 160,332.26 Rupiah > 15th ?
Kondisi Alat
C. BIAYA OPERASI PER JAM KERJA Nilai B' dari
Depresiasi
1. Bahan Bakar = (12%-15%) x Pw x Ms H 103,136.51 Rupiah
###
E
2. Pelumas = (2.5%-3%) x Pw x Mp I 28,350.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 58,500 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 83,571.43 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 4,054.29 Rupiah ###
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 10,748.57 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 288,360.80 Rupiah ###
###
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 448,693.06 Rupiah ###
> 15th ?
Kondisi Alat
E. LAIN - LAIN Nilai B' dari
1. Tingkat Suku Bunga i 15.00 % / Tahun Depresiasi
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam ###
4. Bahan Bakar Bensin Mb 5,833.80 Liter E
5. Bahan Bakar Solar Ms 6,548.35 Liter ###
6. Minyak Pelumas Mp 18,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
###
A. URAIAN PERALATAN ###
1. Jenis Peralatan CONCRETE PAN MIXER E43
2. Tenaga Pw 134 HP Kondisi Alat
3. Kapasitas Cp 600.00 Liter Nilai B' dari
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun Depresiasi
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,000,000,000 Rupiah ###
E
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 100,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 119,551.24 Rupiah ###
W ###
###
b. Asuransi, dll = 0.002 x B F 1,333.33 Rupiah ###
W > 15th ?
Kondisi Alat
Biaya Pasti per Jam = (E+F) G 120,884.57 Rupiah Nilai B' dari
Depresiasi
C. BIAYA OPERASI PER JAM KERJA
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 131,621.84 Rupiah E
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 36,180.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 58,333 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 116,666.67 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 4,054.29 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,748.57 Rupiah ###
###
Biaya Operasi per Jam = (H+I+K+L+M) P 357,604.69 Rupiah ###
> 15th ?
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 478,489.26 Rupiah Kondisi Alat
Nilai B' dari
Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam E
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam ###
4. Bahan Bakar Bensin Mb 5,833.80 Liter ###
5. Bahan Bakar Solar Ms 6,548.35 Liter ###
6. Minyak Pelumas Mp 18,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
###
> 15th ?
A. URAIAN PERALATAN Kondisi Alat
1. Jenis Peralatan CONCRETE BREAKER E44
2. Tenaga Pw 290 HP Depresiasi
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam E
c. Harga Alat B 900,000,000 Rupiah ###
###
###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 120,817.80 Rupiah ###
W ###
> 15th ?
b. Asuransi, dll = 0.002 x B F 900.00 Rupiah Kondisi Alat
W Nilai B' dari
Depresiasi
Biaya Pasti per Jam = (E+F) G 121,717.80 Rupiah
###
C. BIAYA OPERASI PER JAM KERJA E
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H 284,853.23 Rupiah ###
###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 78,300.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 39,375 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 56,250.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 4,054.29 Rupiah ###
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,748.57 Rupiah ###
> 15th ?
Biaya Operasi per Jam = (H+I+K+L+M) P 473,581.08 Rupiah Kondisi Alat
Nilai B' dari
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 595,298.88 Rupiah Depresiasi
###
E. LAIN - LAIN E
1. Tingkat Suku Bunga i 15.00 % / Tahun ###
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam ###
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam ###
4. Bahan Bakar Bensin Mb 5,833.80 Liter ###
5. Bahan Bakar Solar Ms 6,548.35 Liter ###
6. Minyak Pelumas Mp 18,000.00 Liter ###
7. PPN diperhitungkan pada lembar Rekapitulasi ###
Biaya Pekerjaan ###
###
###
URAIAN ANALISA ALAT
###
###
No. URAIAN KODE KOEF. SATUAN KET.
Kondisi Alat
Nilai B' dari
A. URAIAN PERALATAN Depresiasi
1. Jenis Peralatan ASPAHLT TANKER E45
2. Tenaga Pw 190 HP ###
3. Kapasitas Cp 4,000.00 liter E
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun ###
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam ###
c. Harga Alat B 500,000,000 Rupiah ###
###
5. Kapasitas tangki air Ca 4,000.00 liter ###
###
###
B. BIAYA PASTI PER JAM KERJA ###
1. Nilai Sisa Alat = 10 % x B C 50,000,000 Rupiah ###
###
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 - ###
(1 + i)^A - 1 ###
3. Biaya Pasti per Jam : ###
a. Biaya Pengembalian Modal = (B-C)xD E 59,453.30 Rupiah > 15th ?
W Kondisi Alat
Nilai B' dari
b. Asuransi, dll = 0.002 x B F 500.00 Rupiah Depresiasi
W
###
Biaya Pasti per Jam = (E+F) G 59,953.30 Rupiah E
###
C. BIAYA OPERASI PER JAM KERJA ###
###
1. Bahan Bakar = (12%-15%) x Pw x Ms H1 186,627.98 Rupiah ###
Bahan Bakar Pemanas Aspal = 1/1000 x ca x Ms H2 26,193.40 Rupiah ###
###
2. Pelumas = (2.5%-3%) x Pw x Mp I 51,300.00 Rupiah ###
###
Biaya bengkel (6.25% dan 8.75%) x B J 21,875 Rupiah ###
W ###
###
3. Perawatan dan = (12,5 % - 17,5 %) x B K 31,250.00 Rupiah ###
perbaikan W ###
4. Operator = ( 1 Orang / Jam ) x U1 L 4,054.29 Rupiah > 15th ?
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 3,582.86 Rupiah Kondisi Alat
Nilai B' dari
Biaya Operasi per Jam = (H+I+K+L+M) P 324,883.52 Rupiah Depresiasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam
4. Bahan Bakar Bensin Mb 5,833.80 Liter
5. Bahan Bakar Solar Ms 6,548.35 Liter
6. Minyak Pelumas Mp 18,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER E48
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 20,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam
4. Bahan Bakar Bensin Mb 5,833.80 Liter
5. Bahan Bakar Solar Ms 6,548.35 Liter
6. Minyak Pelumas Mp 18,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan TRUK MIXER (AGITATOR) E49
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 750,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam
4. Bahan Bakar Bensin Mb 5,833.80 Liter
5. Bahan Bakar Solar Ms 6,548.35 Liter
6. Minyak Pelumas Mp 18,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E50
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,170,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam
4. Bahan Bakar Bensin Mb 5,833.80 Liter
5. Bahan Bakar Solar Ms 6,548.35 Liter
6. Minyak Pelumas Mp 18,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON E51
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam
4. Bahan Bakar Bensin Mb 5,833.80 Liter
5. Bahan Bakar Solar Ms 6,548.35 Liter
6. Minyak Pelumas Mp 18,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E52
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 4,054.29 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 3,582.86 Rp./Jam
4. Bahan Bakar Bensin Mb 5,833.80 Liter
5. Bahan Bakar Solar Ms 6,548.35 Liter
6. Minyak Pelumas Mp 18,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
KETERANGAN
Di Luar PPN
per 1 M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT KELAS A :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 266,795.62 10,073.28
2. Blending Equpment (E52) jam 0.0482 159,858.72 7,704.03
3 Alat Bantu Ls 1.0000 0.00 0.00
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT KELAS B :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0378 266,795.62 10,073.28
2. Blending Equpment (E52) jam 0.0482 159,858.72 7,704.03
3 Alat Bantu Ls 1.0000 0.00 0.00
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 32.50 %
- Pasir Ps 67.50 %
II METHODE PELAKSANAAN