URUTAN URAIAN VOLUME SATUAN H. SATUAN JUMLAH TRIWULAN 1 TRIWULAN 2 TRIWULAN 3 TRIWULAN 4
1.2 PENINGKATAN SUMBER DAYA PENDIDIK DAN TENAGA KEPENDIDIKAN 2.400.000 2.400.000 0 0 0
5.2.2.2.7.0.1 BELANJA BARANG DAN JASA 2.400.000 2.400.000 0 0 0
Penyusunan KTSP 2013 (24 ORANG x 100.000) 24 ORANG 100.000 2.400.000 2.400.000 0 0 0
1.6 PENGADAAN, PEMELIHARAAN, PERAWATAN, SARANA PRASARANA DAN LINGKUNGAN SEKOLAH 86.280.000 41.940.000 44.340.000 0 0
5.2.3.2.8.0.2 BELANJA MODAL ASET TETAP LAINNYA 58.980.000 38.940.000 20.040.000 0 0
Pengadaan Meja Kursi Siswa (32 SET x 400.000) 32 SET 400.000 12.800.000 12.800.000 0 0 0
Pengadaan Laptop (2 UNIT x 7.500.000) 2 UNIT 7.500.000 15.000.000 15.000.000 0 0 0
Pengadaan Laptop (2 UNIT x 7.500.000) 2 UNIT 7.500.000 15.000.000 0 15.000.000 0 0
Pengadaan Printer (1 UNIT x 2.300.000) 1 UNIT 2.300.000 2.300.000 2.300.000 0 0 0
Pengadaan Printer (1 UNIT x 2.300.000) 1 UNIT 2.300.000 2.300.000 0 2.300.000 0 0
Pengadaan Pengeras Suara (2 UNIT x 750.000) 2 BATANG 750.000 1.500.000 0 1.500.000 0 0
Pembelian Peralatan Ekstra Kurikuler (1 PAKET x 1.240.000) 1 PAKET 1.240.000 1.240.000 0 1.240.000 0 0
Pengadaan Tralis Jendela Kantor (1 KELAS x 8.840.000) 1 KELAS 8.840.000 8.840.000 8.840.000 0 0 0
5.2.2.2.7.0.1 BELANJA BARANG DAN JASA 27.300.000 3.000.000 24.300.000 0 0
Pengadaan Alat Tulis Kantor ( ATK ) (1 TRIWULAN x 3.000.000) 1 TRIWULAN 3.000.000 3.000.000 0 3.000.000 0 0
Pengadaan Alat Tulis Kantor ( ATK ) (1 TRIWULAN x 3.000.000) 1 TRIWULAN 3.000.000 3.000.000 3.000.000 0 0 0
Pembuatan Jalur Irigasi Sekolah (42 METER x 250.000) 42 METER 250.000 10.500.000 0 10.500.000 0 0
Pembelian Pasir Hitam (5 PAKET x 1.500.000) 5 PAKET 1.500.000 7.500.000 0 7.500.000 0 0
Pengadaan Semen (30 SAK x 50.000) 30 SAK 50.000 1.500.000 0 1.500.000 0 0
Pengadaan Besi (20 LONJOR x 40.000) 20 BATANG 40.000 800.000 0 800.000 0 0
Pembelian Playas (100 SAK x 10.000) 100 BATANG 10.000 1.000.000 0 1.000.000 0 0
TOTAL 88.680.000 44.340.000 44.340.000 0 0