411200 mE 411300 mE 411400 mE 411500 mE 411600 mE

PUSHBACK TAHUN KE - 3
PT ANDESITE QUALITY CORPORATION
DUSUN KALISONGGO, DESA PENDOWOREJO,
KECAMATAN GIRIMULYO, KABUPATEN KULONPROGO,
153 PEMERINTAH DAERAH ISTIMEWA YOGYAKARTA
MDPL N

W E
'
A
S

N0
m0
8
4
4
'B 0 meter
SKALA 1 : 1500

25 meter 50 meter 100 meter


1
9

LEGENDA :
146.5
MDPL = SETTLING POND = GARIS KONTUR
135
MDPL = WASTEDUMP = BATAS IUP
= SODETAN = POROS JALAN
= DAM = INPITDUMP
136
= BUKAAN PIT
MDPL
= INFRASTRUKTUR :

N0 1 = PENGOLAHAN / 1118.22 m2
m0
2 = STOCKYARD / 494.03 m2

B 14 1317
7
4
4 3 = STOCKPILE / 454.5 m2
1
9 4 = GUDANG C.E.M / 282.11 m2

16 12 11
10 5
6
=
=
FUEL TANK / 150.81 m2
GUDANG BENGKEL DAN OPERASIONAL / 168.89 m2
7 = BENGKEL / 226.49 m2
8 9 8 = PARKIR ALAT BERAT / 362.9 m2

PIT1 9 = PARKIR LV, MOTOR, TAMU, KARYAWAN / 192.43 m2


10 = KANTOR DAN PEMASARAN / 311.05 m2
7 6 5 4 11 = KANTIN, PANTRY, ENTERTAINMENT CENTER / 261.23 m2
12 = GUDANG UMUM / 193.51 m2
13 = MUSHOLLA / 50.6 m2
14 = MESS / 243.07 m2

155
2 3 15 = POS SATPAM / 67.05 m2
16 = KLINIK / 42.467 m2
N0
MDPL 17 = SUMUR BOR & TANDON AIR / 42.467 m2
m0
6
4
4
1
1
9

A 15

Section A - A' Section B - B' DOSEN AHLI : HIDAYATULLAH SIDIQ, ST., MT.
Z=200 Z=200 Z=200 Z=200

Z=150 Z=150 Z=150 Z=150

TEKNIK PERTAMBANGAN
SEKOLAH TINGGI TEKNOLOGI NASIONAL
Z=100 Z=100
YOGYAKARTA
Z=100 Z=100
2018