DI SHAFT 4 SUDAH DIBERIKAN ARAHAN UNTUK ORE PADA SHAFT 4 BIJIH BAUKSIT SECARA
GETTING DENGAN LOSE FACTOR 10cm DENGAN BATAS VISUAL WARNA MERAH KEKUNINGAN
ORE DAN KONG SUDAH SETENGAJH LUASAN AREA DENGAN UKURAN FRAGMEN 1/2mm-64mm
YANG TERAMBIL DIASUMSIKAN SELESAI NYA HABIS RELATIF BERUKURAN PASIR-KRIKIL
SHIFT MALAM, DI SHAFT 2 SUDAH SELESAI ORE DENGAN KETEBALAN RATA-RATA ORE 1,9
GETTING DAN LAGI DILAKUKAN BACKFILLING, UNTUK METER DAN DI COMPAIR DENGAN HASIL
11/12/2020 22:49 23:46 VIRGO 4&2 480150 9742550 2,883.21 1.9 PENGUKURAN KETEBALAN DAN LUASAN AREA MASIH TEST PIT CMI YANG MENGHASILKAN ORE KERY
MENGUUNAKAN PERKIRAAN DIKARENAKAN ALAT GRADE PREMIUM.
UKUR YANG BELUM TERSEDIA.
2
PADA HARI INI MENGOLAH DATA DAN VALIDTION
TESTPIT UTUP DIMESS SAJA, HARI INI TIDAK
11/13/2020 21:46 22:25 UNTUP KELAPANGAN DIKARENAKAN TIDAK ADA KENDARAAN KERY
MAUPUN TUMPANGAN.
3
PADA HARI INI KEGIATAN DILAKUKAN YAITU PADA PIT UNTUP ORE SECARA VISUAL
PENGUPASAN OB PADA RENCANA JALAN HAULING. DENGAN WARNA MERAH KEKUNINGAN
DENGAN UKURAN FRAGMEN 2mm-256mm
RELATIF BERUKURAN KRIKIL-COUBLE
11/14/2020 8:00 12:02 UNTUP 479650 9741200 DENGAN KETABALAN OB 2.1 METER DAN WISMA
KETEBALAN ORE 1 METER
KERY