LAPORAN PEKERJAAN REVIEW DESIGN BIDANG MEKANIKAL

14 DESEMBER 2021
NO ID PENJABARAN LOKASI ISSUE BILL OF QUANTITY GAMBAR TENDER GAMBAR FORCON HASIL REVIEW
1 II.3.A POSISI COOLER TANK/BACK UP CHILLER ROOF TOP HDC-MEP-03-DW 030 HDC-MEP-03-DW 030 (REV. 03)
CEK SUDAH SESUAI DENGAN KAPASITAS DI
2 II.3.B DIAGRAM SKEMATIK TATA UDARA ? ? HDC-MEP-AC (LT. 1 SD 3)
KAPASITAS/SKEMATIK GAMBAR FORCON
VERIFIKASI PERLUNYA
KEPERLUAN POMPA POMPA VERTIKAL GARDEN AKAN DISUPLAI
3 II.3.C DIAGRAM SKEMATIK SISTEM AIR BERSIH ROOFTOP VERIFIKASI PERLUNYA POMPA BOOSTER TERDAPAT 2 POMPA BOOSTER
UNTUK VERTIKAL OLEH VENDOR VERTIKAL GARDEN.
GARDEN
UNTUK KEPERLUAN PENYIRAMAN
TANAMAN DI LANTAI DASAR
VERIFIKASI PERLUNYA 2
II.3.D DIAGRAM SKEMATIK SISTEM AIR HUJAN OFFICE ROOF TOP ? ? TERDAPAT 2 POMPA BOOSTER MENGGUNAKAN GARVITASI, CUKUP 1
POMPA BOOSTER
POMPA BOOSTER UNTUK KEPERLUAN AIR
BERSIH
ROOF TOP GEDUNG
JUMLAH PIPA SERTA MEMAKAI DIAMETER 150mm DAN 100mm
UTAMA, DATA
5 II.3.E DIAGRAM SKEMATIK SISTEM AIR HUJAN DIAMETER HITUNG ? ? HDC-MEP-PL-AH- LANTAI 3/ATAP (JUMLAH TITIK SUDAH LEBIH DARI CUKUP
CENTER, POWER
ULANG DI GAMBAR FORCON.
ROOM
6 II.3.F INSTALASI AIR BERSIH ATAP ROOF TOP TIDAK ADA ? ?
2 TITIK PIPA
PEMBUANGAN AIR RELOKASI PIPA YANG AKAN MENABRAK
7 II.3.G INSTALASI AIR HUJAN OFFICE ROOF TOP HDC-MEP-PL-AH- LANTAI 3/ATAP
HUJAN MENEMBUS CANOPY
CANOPY
HASIL DISKUSI BERSAMA TEAM LAIN
VERIFIKASI PERLUNYA
8 II.3.H DETAIL STP ? ? MENGGUNAKAN GRAVITASI KARENA
SEWAGE PUMP
ADANYA BEDA ELEVASI 5 METER
9 II.3.I DETAIL SUMP PIT TETAP TAKE OUT
10 II.3.J DETAIL PLUMBING NO ISSUE
11 II.3.K DETAIL PERLENGKAPAN NO ISSUE
LT. 1 DARI 66 MENJADI 55, LT. 2 DR 85
12 II.3.L INSTALASI PEMADAM KEBAKARAN OFFICE LT-2 LANTAI 2 VERIFIKASI JUMLAH
? ? HDC-MEP-PK-LT 1,2, 3. MENJADI 48 TITIK, LT. 3 DARI 85 MENJADI
SPRINKLER CUKUP
13 II.3.M INSTALASI PEMADAM KEBAKARAN OFFICE LT-3 LANTAI 3 51 TITIK.

TIDAK ADA PRESSURE RELIEF VALVE, HARUS


14 II.3.N RUANG POMPA PEMADAM KEBAKARAN BASEMENT RUMAH POMPA-HDC-FORCON 1A (REV.01). DI GAMBAR
ADANYATERDAPAT 2 UNIT.
POMPA SUBMERSIBLE AGAR TIDAK
TERGENANG, CUKUP 1 UNIT.
15 II.3.O DAFTAR GAMBAR LIFT PERUBAHAN GAMBAR
16 II.3.P POTONGAN LIFT SERVICE/FIRE GEDUNG UTILITY
17 II.3.Q POTONGAN LIFT SERVICE/FIRE GEDUNG OFFICE

ISSUE BARU
KAPASITAS PENDINGINAN LANTAI BASEMENT
VRF DARI OFFICE ZONE 1
1 KAPASITAS 6 PK X 2
VENTILASI RUMAH POMPA
PAKAI INDUSTRIAL FAN, GRILL DARI BANGUNAN DEPAN
PENAMBAHAN PRESSURE RELIEF VALVE
2
GAMBAR IN PROGRESS
3 PROTEKSI DRY SYSTEM GENSET HOUSE
PENAMBAHAN PIPA SUBMERSIBLE DI RUMAH POMPA
4
SEBANYAK 1 UNIT 0.75 KW